Independent Analysis Information Flow Integrated Design Reviews Development of Joint Action Plans Decision Engagement
Run a Safe Operation Long Term Relief Wells Short Term Containment
Leverage Industry and Government Expertise Multiple Parallel Options No Stone Unturned to Minimize Pollution
Toisa Pisces
Subsea Manifold
New Manifold New Manifold 49 x 25 x 11 49 x 25 x 11 45 Tons 45 Tons
Loch Rannoch
Cum. Q4000
Daily
249 40 30 20 58 10
1 1 1 5 1 1 6 1 5 1 6 1 5
204
150 100 50 0
6/4
6/6
6/8
6/10
6/12
6/14
6/16
6/18
6/20
6/22
6/24
6/26
6/28
Start up of Q4000 Does not include 22,000 barrels recovered from RIT tool in May
Increase System Capacity & Redundancy Opportunity to Shut-in Well Aid Well Kill & Cementing
LMRP Cap
Collecting from Enterprise Sits over the LMRP Flange Must be replaced to move to Long Term Containment
Execution Process
Helix Producer full rate and stable Q4000 full rate and stable Remove LMRP Cap containment Install sealing cap assembly Well integrity test If shut- in unsuccessful
Sealing Cap
Sealing Connection Necessary for Long Term Containment Replaces LMRP Cap Shut-in Option
Relief Wells
Electromagnetic Field