GT13E2 M/MXL Upgrades

Erol Morgan

July 2006

Agenda GT13E2 M/MXL M blading GT13E2 MXL GT13E2 M References New Blade 5 M Compressor Upgrade
2
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

GT13E2 Turbine Upgrades


GT Power output and efficiency
(ISO conditions)

GT13E2 Upgrades:
GT13E2 M

M Upgrade: increase in GT power output / efficiency

Enhanced GT power output and efficiency versus extended inspection intervals


Diff ere nt p osi tion ing

pos sib le

GT13E2 MXL GT13E2


Baseline, GT13E2 ISO conditions, NG

GT13E2 XL

24,000

32,000

36,000

XL & MXL Upgrades: extend C-inspection intervals


ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

Hot gas path C insp. interval (EOH) 3

Agenda GT13E2 M/MXL M blading GT13E2 MXL GT13E2 M References New Blade 5 M Compressor Upgrade
4
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

M Blading

Customized solutions
c an m fo r r Pe
GT13E2 M

M Blading

Li f eti

me

GT13E2 MXL Lower temperature Extended inspection intervals SC performance slightly increased
5

Unchanged firing temperature Clear performance increase Inspection intervals unchanged

Whatever suits best

ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

M Blading Concept

# blades: 63 (all rows) # vanes: 40/48/48/60/50 SHS-A,B,C new heat shields Shroud-less blade 1,2,3,4 Cooled vane 3 Blade 4 hollow design Shrouded blade 5 (w/o damping bolt) Blade 5 cast solid blade All blades & vanes in CC-IN738LC

TBC at Vane 1, 2 & Blade 1


Module 3 New stages 4,5 Module 2 New stages 2,3 Module 1 Modified stage 1 6
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

M Upgrades Commissioning & Operational Requirements


TIT changed M TIT increased MXL TIT decreased Re-Commissioning Procedure Heat Balance NOx mapping in the upper load range (70 % - 100%) incl. pulsation measurement add. equipment / measurements: Tk2, exhaust pressure, p air inlet implementation of new ODC delivering more detailed information regarding operating mode of GT (e.g. frequency response, peak mode) EOH formula modified approx. 4 - 5 days re-commissioning time required

12
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

Summary

Simplified design of M-blading components Thorough validation of new components under real operation conditions Design benefits from 10 years of operating experience with GT13E2
> 1,300,000 OH

Increased operation flexibility with M-technology M-blading technology is now standard for all new GT13E2 units since mid 2003

13
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

Agenda GT13E2 M/MXL M blading GT13E2 MXL GT13E2 M References New Blade 5 M Compressor Upgrade
14
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

GT13E2 MXL

Power output & efficiency (ISO conditions)

GT13E2 M
+ 6.1 MW / + 0.4 %

Extended Lifetime Improved Availability Reduced maintenance costs


GT13E2 MXL GT13E2 XL

+ 1.0 MW / + 0.2 %
+/- 0 MW / +/- 0 %

GT13E2

24000

32000

36000

Hot gas path insp. interval (EOH)

Extended inspection intervals (36 kEOH) Slightly increased SC performance (power output & efficiency)
15
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

GT13E2 MXL - Scope of Work

Modification of Turbine Vane Carrier on-site

Zone 2 inner and outer shell with TBC Enlarged Axial Thrust Bearing

Improved stage 1 version A with TBC and optimized cooling New Vanes, Blades & Heat-Shields at Stage 2-5

Operation Concept Hot gas path C-inspection each 36000 EOH Slightly increased SC performance

16
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

GT13E2 M / MXL Modifications of Turbine Vane Carrier

GT13E2

New: Cooled vane row 3 82 add. cooling holes in expansion bends

New: Vane row 2 direct cooling air feed from Plenum 24 add. cool. holes in TVC Old cooling holes plugged

GT13E2 M / MXL
17

ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

GT13E2 M / MXL Modifications of Turbine Vane Carrier


Stage 1:
SHSS A: no modification required for Power Plants equipped with 1st stage version A

Stage 2:
Vane 2: (48 vanes instead of 60)

new fixation of vanes new cooling feed

SHSS B: new design of stator heat shield require intermediate rings

Stage 3:
Vane 3: (48 vanes instead of 60)

new fixation of vanes

All rework can be done on site

SHSS C: new design of stator heat shield require intermediate rings


18

ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

GT13E2 MXL - Summary

GT13E2 GT13E2 MXL Years

24000

24000 C 4 5

24000 36000

C C

24000 36000 10 11

C C 12

36000 1 2 3

Save 1 out of 3 C-inspections in a span of 9 years


GT13E2 MXL with 36000 EOH C-inspection intervals Slightly increased SC performance (ISO / Baseload)
+ 1.0 MW / + 0.2%

Boost your plant availability with 36000 EOH C-inspection intervals


19
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

Additional advantages of MXL

Peak load application up to 16C increased TIT allowed for continuous operation and counted with only factor 1.5 A-, B-inspection cycle 9,000 EOH (+ 3,000 EOH) Lower TIT compared to GT13E2 and GT13E2 XL
less thermal stress reduced reconditioning efforts direct positive impact on lifetime

20
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

Agenda GT13E2 M/MXL M blading GT13E2 MXL GT13E2 M References New Blade 5 M Compressor Upgrade
21
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

GT13E2 M

Power output & efficiency (ISO conditions)

Improved performance Increased Power Output Increased Efficiency

GT13E2 M
+ 6.1 MW / + 0.4 %

GT13E2
+ 1.0 MW / + 0.2 % +/- 0 MW / +/- 0 %

GT13E2 MXL GT13E2 XL

24000

32000

36000

Hot gas path insp. interval (EOH)

Unchanged inspection intervals compared to GT13E2


22
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

GT13E2 M - Scope of Work

Site specific checks (e.g. Generator & Transformer capacity, etc.) necessary Modification of Turbine Vane Carrier on-site Zone 2 inner and outer shell with TBC Enlarged Axial Thrust Bearing

Improved stage 1 version A with TBC and optimized cooling New Vanes, Blades & Heat-Shields at Stage 2-5

Operation Concept Hot gas path C- inspection each 24000 EOH Increased performance
23

ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

Performance compared to GT13E2


Performance [Power & Efficiency] Upgrade Standard C-inspection Standard C-inspection

+ 6.1 MW / + 0.4%

Maintenance Interval

Performance recovery during a standard C-inspection

24000 EOH

24000 EOH

24000 EOH

Plant Lifetime

Increase power output and efficiency


24
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

GT13E2 M - Summary

GT13E2 GT13E2 M Years

24000 24000 1 2

C C 3

24000 24000 4 5

C C 6

24000 24000 7 8

C C 9

24000 24000 10 11

C C 12

Increase performance while keeping insp. intervals unchanged


GT13E2 M with 24000 EOH C-inspection intervals Increased performance (ISO / Baseload)
+ 6.1 MW / + 0.4 %

Reduced costs per MWh due to increased power output and efficiency
25
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

Agenda GT13E2 M/MXL M blading GT13E2 MXL GT13E2 M References New Blade 5 M Compressor Upgrade
26
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

GT13E2 M/MXL - Fleet Growths


Status: January 2006
45 40 35 30
Units

GT13E2 upgrade packages Customized solutions for competitive markets. Higher power output Increased efficiency Increased availability Extended inspection intervals ALSTOMs implementation success: 36 MXL configuration sold 5 M configurations sold

25 20 15 10 5 0

13 units in operation 43 units sold

GT13E2 M/MXL higher performance at increased availability


27
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 2002 2003 2004 2005 2006 2007 2008 2009

today

Status: February 2006

GT13E2 Upgrade List (2)


Plant
Zawia Zawia Benghazi Keppel Keppel Braemar Braemar Braemar Aluar Aluar Diemen 33 Lageweide Wagerup Wagerup Sohar Sohar Sohar Sohar

Unit
GT12 GT16 GT14 GT11 GT12 GT11 GT12 GT13 GT11 GT12 GT1 GT7 GT11 GT12 GT11 GT12 GT13 GT14

In Op
2Q/00 3Q/05 2Q/02 1Q/07 1Q/07 3Q/06 3Q/06 3Q/06 4Q/07 4Q/07 2Q/95 4Q/94 4Q/07 4Q/07 3Q/08 3Q/08 3Q/08 3Q/08

Current Set-up
MXL MXL MXL MXL MXL MXL MXL MXL MXL MXL MXL MXL MXL MXL MXL MXL MXL MXL

Since
2006 Aug 2005 2006 Jan 2007 Jan 2007 July 2006 July 2006 July 2006 Nov 2007 Nov 2007 Oct 2008 Mar 2009 Oct 2007 Oct 2007 June 2008 June 2008 June 2008 June 2008

Last Set-up
-

Original Set-up
V96 MXL VA MXL MXL MXL MXL MXL MXL MXL V96 V96 MXL MXL MXL MXL MXL MXL
29

ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

Status: February 2006

GT13E2 Upgrade List (3)


Plant
Afam Afam Afam Dubal Dubal Kwinana Deeside Dunkerque Dunkerque

Unit
GT11 GT12 GT13 GT1 GT2 GT1 GT1 GT1 GT2

In Op
2008 2008 2008 1Q/07 3Q/07 4Q/08 2Q/94

Current Set-up
MXL MXL MXL MXL MXL MXL MXL MXL MXL

Since

Last Set-up

Original Set-up
MXL MXL MXL MXL MXL MXL V96 VA VA

2008 2008 2008 March 2007 Sept 2007 Nov 2008 Oct 2006 -

30
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

GT13E2 M - Reference Kuala Langat First unit (GT#14) in Kuala Langat completed 1st C-cycle
Operation data Commercial base load operation, primarily on natural gas 22,103 OH, 45 starts, 26,795 EOH by March 31, 2005 Operation experience 100% reliability of M-blading Good conditions allowed stretched C-cycle!

31
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

GT13E2 M/MXL - Fleet Key Data


Status: May 2006

43 units sold of which 13 units in commercial operation


5 M and 38 MXL (5 M and 8 MXL in operation)
Total Fleet Data First unit in operation since June 2002 > 130000 Equivalent Operating Hours > 120000 Operating Hours > 580 Starts Fleet Leader completed C-cycle More than 22,103 OH on gas More than 26,795 EOH

32
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

Agenda GT13E2 M/MXL M blading GT13E2 MXL GT13E2 M References New Blade 5 M Compressor Upgrade
33
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

New Blade 5 M for GT13E2 M & MXL


New

Extensive testing showed potential for improvement Further Improvement of the existing Blade 5 Version M Achieves an even further improved turbine exit profile shape and exhaust diffusor characteristic Improves both power and efficiency of the GT13E2 M & MXL

Original New
Tip

Mid

Original

New

Hub

Original 34
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

New Blade 5 M for GT13E2 M & MXL


New Blade 5 M NOT mixable with old Blade 5 M No influence on duration of C-inspection No other new hardware required Only new Blade 5 M

Hardware available within standard delivery time Unchanged Operation Concept Unchanged EOH formula Already implemented and validated in 2 units
Status May 2006

GT#14: S = 38; OH = 7482; EOH = 9813 GT#15: S = 17; OH = 7628; EOH = 8190
35
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

Benefits of New Blade 5 M Simple Cycle


Power + 1.1 MW compared to GT13E2 M/MXL Efficiency + 0.2% (additive) compared to GT13E2 M/MXL At ISO, Base Load, Gas Operation

Combined Cycle
Expected Power ~+ 0.5 MW compared to GT13E2 M/MXL Expected Efficiency ~+ 0.1% (additive) compared to GT13E2 M/MXL To be determined case per case

36
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

Benefits of New Blade 5 M GT13E2 M/MXL performance compared to GT13E2


Performance [Power & Efficiency] Upgrade M SC + 7.2 MW/ Standard + 0.6% C-inspection MXL (SC +2.1 MW/ +0.4%) Maintenance Interval Standard C-inspection

Performance recovery during a standard C-inspection

24000 EOH

24000 EOH

M 24000 EOH (MXL 36000 EOH)

Plant Lifetime

37
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

Benefits of GT13E2 M/MXL & New Blade 5 M


Power output & efficiency (ISO/Base Load/ New & Clean)
+ 7.2 MW / + 0.6 % + 6.1 MW / + 0.4 %

GT13E2 M + New Blade 5M (2005) GT13E2 M (2003) GT13E2 MXL + New Blade 5M (2005) GT13E2 MXL (2003)

+ 2.1 MW / +0.4 % + 1.0 MW / +0.2 % 165.1 MW / 35.7 %

GT13E2 (1993)
24000

36000

Hot gas path insp. interval (EOH)

Continuous improvement keeps your plant competitive


38
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

Benefits of GT13E2 M

GT13E2 GT13E2 M Years

24000 24000 1 2

C C 3

24000 24000 4 5

C C 6

24000 24000 7 8

C C 9

24000 24000 10 11

C C 12

Increase performance while keeping inspection intervals unchanged


GT13E2 M with 24000 EOH C-inspection intervals and New Blade 5 M Increased SC performance (ISO / Baseload)
+ 7.2 MW / + 0.6 %

Reduced Costs of Electricity due to increased power output and efficiency


39
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

Benefits of GT13E2 MXL

GT13E2 GT13E2 MXL Years

24000

24000 C 4 5

24000 36000

C C

24000 36000 10 11

C C 12

36000 1 2 3

Save 1 out of 3 C-inspections in a span of 9 years


GT13E2 MXL with 36000 EOH C-inspection intervals and New Blade 5 M Slightly increased SC performance (ISO / Baseload)
+ 2.1 MW / + 0.4%

Boost your plant availability with 36000 EOH C-inspection intervals


40
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

Agenda GT13E2 M/MXL M blading GT13E2 MXL GT13E2 M References New Blade 5 M Compressor Upgrade
41
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

Product Information

GT13E2 MXL Compressor Upgrade


VELE VELA VIGV

Flow

Restaggered Rows
42
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

GT13E2 Compressor
Compressor Upgrade
Increased mass flow by stagger angle adjustment on leading compressor rows Development with the proven tools and methods already used for earlier compressor upgrades Stagger angle adjustment
Compressor row Stages 1 to 5 Open Stagger angle change Between 0.6 and 1.5
Stagger Angle Engine Axis

Output increase through approx. 4% mass flow increase


43
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

Product Information
Degree of re-stagger angle reduced at every row in flow direction Material & coating unchanged i.e. ST12TNIE + Coating (VIGV, Blades 1-5 & Vanes 1-4) Upgrade released for GT13E2 MXL (combination with Maximum Continuous Load (MCL) operation to be checked due to possible capacity limitations such as Geno, Transformer, etc.) Other upgrade applications (e.g. GT13E2, GT13E2 XL and GT13E2 M) are being investigated

44
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

Product Information
Compressor Upgrade results in:
~3-4 % increased Air Mass flow Increased power output of ~5 MW SC (CC details must be calculated case by case) + 0.2% Efficiency (additive) No extension of C-insp duration All casings & assembly material unchanged, only blades and vanes replaced with re-staggered ones

Compressor Upgrade settings are specific for each unit


Site specific re-commissioning settings are required Adaptation of operation concept (e.g. VIGV)

Already implemented and validated in one unit


GT#13 more than S = 18, OH = 5746, EOH = 6695
45
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

Benefits of Compressor Upgrade Performance compared to GT13E2 MXL


SC Performance [Power & Efficiency] Upgrade Standard C-inspection SC +5 MW /+0.2% Maintenance Interval Performance recovery during a standard C-inspection Standard C-inspection

36000 EOH

36000 EOH

36000 EOH

Plant Lifetime

Increase power output


46
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

Benefits of GT13E2 MXL Upgrade


Power output & efficiency (SC / ISO / Base Load / New & Clean / Gas) + 7,1 MW / +0.6 %
+ 6.1 MW / + 0.4 %

+ 6 MW / +0.4 %

New Blade 5 M + Compressor Upgrade (2005) GT13E2 M (2003)

+ 1.0 MW / +0.2 % 165.1 MW / 35.7 %

GT13E2 (1993)
24000

GT13E2 XL

GT13E2 MXL (2003)

32000

36000

Hot gas path insp. interval (EOH)

Reduced Cost of Electricity due to increased power output


47
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

Benefits of GT13E2 MXL Upgrade with Compressor Upgrade


GT13E2 GT13E2 MXL Years 1 24000 C 24000 C 4 5 6 C 24000 36000 7 8 C C 9 10 24000 36000 11 12 C C

36000 2 3

Save 1 out of 3 C-inspections in a span of 9 years GT13E2 MXL with 36000 EOH C-inspection intervals and Compressor Upgrade Increased SC performance (ISO / Baseload / Gas / New & Clean)
+ 6 7.1 MW / + 0.4 0.6% compared to GT13E2 (depending on B5 M version)

Boost your plant availability with 36000 EOH C-inspection intervals Extremely reduced Cost of Electricity due to increased power output
48
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

www.service.power.alstom.com
49
ALSTOM (Switzerland)Ltd 2001Preliminary/for discussion purposes only. We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.