S NO.
PIPE SIZE
LENGTH
RECOVERY LOCATION
SILL CROSSING
EX. BALKASSAR
KHAUR STORE
TOTAL LENGTH =
(MUHAMMAD KHALIQ)
SR. ENGINEER (PIPELINE)
123829 RFT
=37.752 KM
KM #.
REASON (LEAKAGE/THEFT)
13/11/04
3/4/2005
3/4/2005
4/4/2005
27/4/2005
3/8/2005
4/9/2005
21-22
31-32
20-21
31-32
32-33
29-30
0-1
LEAKAGE
LEAKAGE
LEAKAGE
LEAKAGE
LEAKAGE
LEAKAGE
LEAKAGE
19/2/2006
11/4/2006
18/4/2006
15/5/2006
16/6/2006
11/9/2006
30/9/2006
3/11/2006
23/11/2006
1/12/2006
3/12/2006
3/12/2006
3-4
20-21
20-21
20-21
20-21
11--12
20-21
02--03
20-21
2--3
2--3
20--21
LEAKAGE
LEAKAGE
LEAKAGE
LEAKAGE
LEAKAGE
LEAKAGE
LEAKAGE
LEAKAGE
LEAKAGE
LEAKAGE
LEAKAGE
LEAKAGE
29
17
0.5
Nill
14
7
17
2
3
3
2
23/01/2007
28/3/2007
14/4/2007
17/4/2007
24/4/2007
18/8/2007
17/9/2007
10--11
10--11
29--30
2--3
10--11
10--11
2--3
LEAKAGE
LEAKAGE
LEAKAGE
LEAKAGE
LEAKAGE
LEAKAGE
LEAKAGE
40
78
0.5
10
8
Nill
48
22/2/2008
28/4/2008
3/5/2008
26/7/2008
11/8/2008
6--7
15--16
29--30
21--22
20--21
LEAKAGE
LEAKAGE
LEAKAGE
LEAKAGE
LEAKAGE
55
1.5
2
1.5
0.5
10/5/2009
30/5/2009
20/7/2009
21/8/2009
22/9/2009
24/9/2009
21--22
17--18
12--13
29--30
25--26
25--26
LEAKAGE
LEAKAGE
THEFT CASE
LEAKAGE
LEAKAGE
LEAKAGE
0.5
Nill
26
1
1.5
Nill
3/1/2010
13/5/2010
27/5/2010
17/6/2010
3/7/2010
8/8/2010
21/8/2010
24/8/2010
12/9/2010
15/9/2010
25/9/2010
29--30
12--13
11--12
8--9
17--18
21--22
16--17
12--13
16--17
21--22
16--17
16--17
LEAKAGE
THEFT CASE
THEFT CASE
THEFT CASE
LEAKAGE
LEAKAGE
THEFT CASE (NEAR DHOK NUMERDAR)
THEFT CASE
THEFT CASE (NEAR DHOK NUMERDAR)
LEAKAGE
LEAKAGE (NEAR DHOK NUMERDAR)
THEFT CASE (NEAR DHOK NUMERDAR)
2
11.5
173
Nill
95
1.5
24
4
25
7
87
6
29/9/2010
LOSS (BBL)
NOTE:
At the weak area 16-17KM where maximum leakage have been observed, replacement job is in progress.
Work Agreement for the this job already made.
(MUHAMMAD KHALIQ)
SR. ENGINEER (PIPELINE)
11400 RFT.
Replaced on 07/12/2006 from Dhulian Well # 19 - near Dhulian Main Barrier (4" Dia Pipe Ex-Fimkassar used) at KM # 19 to
21
1700 RFT.
Replaced on 16/12/2006 near Sora Kass Meyal (4" Dia Pipe Ex-Fimkassar used) at KM # 3 to 4
2985 RFT.
Replaced on 16/12/2006 from MOPS Meyal - near Meyal Well # 4 (4" Dia Pipe Ex-Fimkassar used) at KM # 0 to 1
845 RFT.
Replaced on 13/09/2007 near Sil Noshara Kass (6" Dia Pipe Ex-Ranyal used) at KM # 10 to 11
300 RFT.
Replaced on 03/07/2010 near Meyal Well # 1 (5" Drill Pipe recoved used) at KM 2 to 3
SUGGESTIONS:
1
Weak Sections in which Leakage occurred during 2004, 2005, 2006 & 2007 has been replaced.
During the last one year there are five cases of Leakage (215 Bbls) and seven theft cases (219 Bbls) loss. On the basis of leakage during
2008, 2009 & 2010 the weak sections at KM # 16 - 17 (1 KM) needs to be repalced now. Job has been started.
(MUHAMMAD KHALIQ)
SR. ENGINEER (PIPELINE)