AREVA WORK PROGRESS (400KV & 33KV SWY) TO TILL,22-5-12, May-2012

400KV SR. NO. 1 2 DESCRIPTION TOWER FOUNDATION EQUIPMENT FOUNDATION GROUTING DESCRIPTION TOWER EQUIPMENT LM TOTAL 37 370 PCC 37 370 RCC 37 370

SR NO 1 2 3

TOTAL 37 370 6 TOTAL 850mtr 850mtr 850mtr COMPLETED 330mtr 190mtr 30

COMPLETED BALANCE 30 7 65 305 1 5 BALANCE 520mtr 660mtr 820mtr

ROAD
1 2 3 WBM PCC RCC

FIRE FIGHTING
SR NO 1 2 3 4 5 6 7 DESCRIPTION 150mm dia pipe 80mm dia pipe Gate valve(150mm) Gate valve(80mm) Hydrant valve single header 15mtr length Gm pipe with nozzle TOTAL 1438Mtr 203mtr 16no 6no 39no 73nos 39nos COMPLETED 400mtr 50mtr 5 1 0 0 0 BALANCE 1038mtr 153mtr 11nos 5nos 39 73 39

FENCING
1 2 BRICK WORK NET FIXING

TOTAL COMPLETED BALANCE 1398mtr 1168mtr 230mtr 1398mtr 1168mtr 230mtr

Cable Trench: 993MTR of cable trench was completed out of 1013mtr.bal 20mtr PIPE & LATIC STR ( ERECTION) DESCRIPTION TOTAL PIPE STRUCTURE 343 CT 42 WT 6 ISOLATOR 28 LA 18 CVT 18 BPI+PI 91 CB 9 TOWER BEAM 20 TOWER ERECTION 37 LM STRUCTURE 7 EARTHING 15000 mtr

SR. NO. 1 a b c d e f 2 3 4 5 6

ERECTED 331 42 6 28 15 18 82 9 20 37 7 11374

BALANCE 12 0 0 0 3 0 9 0 0 0 0 3626

SR. NO. 1 2 3 4 5 6 7 8

400 KV EQUIPMENT ERECTED DESCRIPTION TOTAL 42 CT 4 WT 28 ISOLATOR 18 LA 18 CVT 91 BPI+PI 9 CB AC KIOSK 3 400 Kv STRINGING

ERECTED 42 4 28 12 18 72 9 3

BALANCE 0 0 0 6 0 19 0 0

Stringing Stringing

(Quad Moose)

1276 mtr stringing was completed out of 1276 mtr

1409 mtr stringing was completed out of 1409 mtr (Twin Moose) AL PIPE BUS Main bus 1&2 erection completed 345 no's of equipments erected out of 370 no's Balance=25no's 30no's of Aux mat laying out of 112no's. Balance=82no's

SR. NO. 1 2 3

DESCRIPTION TOWER FOUNDATION EQUIPMENT FOUNDATION AC KIOSK GROUTING

33KV SWY TOTAL 28 350 3

PCC 28 350 3

RCC 28 350 3

SR. NO. 1 2 3

DESCRIPTION TOWER EQUIPMENTS LM

TOTAL 28 350 1 TOTAL 47mtr 47mtr 47mtr COMPLETED 37mtr 37mtr 37mtr

COMPLETED 28 350 0

BALANCE 0 0 1

ROAD
1 2 3 WBM PCC RCC

BALANCE 10mtr 10mtr 10mtr

FIRE FIGHTING
SR NO 1 2 3 4 5 6 7 DESCRIPTION 150mm dia pipe 80mm dia pipe Gate valve(150mm) Gate valve(80mm) Hydrant valve single header 15mtr length Gm pipe with nozzle TOTAL 285Mtr mtr 5no 6no 39no 73nos 39nos COMPLETED 180 BALANCE 105

Cable Trench: 1000MTR of cable trench was completed out of 1013mtr.bal 13mtr

387no equipment erected out of 387nos


56no's of Aux mat was completed out of 56 no's. CONTROL BUILDING SR. NO. 1 2 3 4 5 6 7 8 9 10 DESCRIPTION CABLE TRENCH WINDOW & DOOR FITTING TILES FIXING FALSE CEILING AC fixing PCC DCDB ACDB BATTERY BATTERY CHARGER ROOF TREATMENT STATUS completed Completed Completed Completed Completed Erected Erected Erected Erected Erected Not Completed

balance=0nos
Balance=0no's

11 12

PAINTING LIGHTING & WIRING

completed completed

33KV STRINGING Stringing (Twin Moose) 304 mtr stringing was completed out of 304 mtr.

AL PIPE BUS

Main Bus 1 &2 IPS tube erection completed

Cable tray laying,glanding & termination TESING FENCING BRICK WORK NET FIXING TOTAL 284MTR 284MTR

completed UNDER Progress COMPLETED BALANCE 173mtr 111mtr 0 284mtr

1 2

SRT 1 SRT2 TESTING

TRANSFERMER Erection ,testing ,filteration completed Erection ,testing, filteration completed 33kv equipments testing Under progress

y-2012

BOLTING 37 370

BALANCE 0 0

Balance: 0 Balance: 0

lance=25no's alance=82no's

BOLTING 28 350 3 0 0 0

alance=0nos

alance=0no's

Balance: 0

ted

ted

gress