depth as nominated in construction drawings or specifications. Generally soft peat, slurry and muddy material. May be of organic composition. This material has no structural value. :
Material
These are major earthworks operations. Cut refers to the removal of excess material to Clearing and Grubbing reach formation level. : Removal and excavation operation of natural material trees, roots etc. for Excavation : disposal from that area. Concreting Formwork Lean concrete : Weepholes : 75mm PVC Pipes use to drain. : : Excavation of soils The use of designed concrete grade. Mould being use to form proper shape Grade 15 concrete
Carry out survey earthworks to identify proper position/level of R.C wall. : Excavation
Excavation to the level required. Protect slope from falling. : Lean Concrete
Stage 3 3.1
Stage 4 4.1
Placement of reinforcement in the formwork and tied up properly. Install weepholes at specified locations : Concreting works
Pour concrete to footing. Vibrating concrete in footing : Backfilling and compact earth
Backfill and spread the soil using selected backfill Compact the soil in layers of 0.3m thick : Placement of formwork for wall
Stage 8 4.8
-2-
Stage 9 4.9
Placement of reinforcement
Placement of reinforcement in the formwork and tied up properly. 4.10 Install weepholes at specified locations Stage 10 : Concreting works
4.11 Pour concrete to wall. 4.12 Vibrating concrete in wall Stage 11 : Strike the formworks 4.13 Strike the formwork. Stage 12 : Backfiling and compact earth
4.14 Backfill and spread the soil using selected backfill 4.15 Compact the soil in layers of 0.3m thick Stage 13 : Site clearance