Sie sind auf Seite 1von 27

DATOS

Del tanque
Dimetro del tanque =
Espesor de Pared del tanque =
Altura del tanque =
De los rociadores
Distancia rociador - pared de tanque
Distancia radial desde el CL rociador
Presin necesaria en el ltimo rociador
Marca de rociador
Modelo
Orificio
Angulo de montaje
Angulo de Spray
K (preliminar)
K (final)
De los Rates, Factores y Coeficientes
rate
Coeficiente de perdida por friccin (C )

=
=
=
=
=
=
=
=
=
=

11000.00 mm
4.76 mm
9500.00 mm
600.00 mm
1.00 m
3.50 bar
Wormald
Type D3
16.00
90.00
125.00
13.686
17.300

=
=

8.15 litros/min*m2
100.00 (Tubera seca - Hazen and Williams)

Dimetro Nominal
Schedule
Dimetro interno
Elevacin relativa (Inicio)
Elevacin relativa (Fin)

=
=
=
=
=

2.00
80.000
49.256
8.90
8.90

"

Dimetro Nominal
Schedule
Dimetro interno
Elevacin relativa (Inicio)
Elevacin relativa (Fin)
Longitud de Tubera

=
=
=
=
=
=
=
=
=
=
=
=
=

3.00
40.000
77.928
0.70
8.90
180.00
6.00
10.00
2.00
2.00
0.00
1.00
44.501

"

Del Toroide

mm
m
m

De la Montante

Cant. E45
Cant. E90
Cant. T
Cant. GV
Cant. BV
Cant. RV

Longitud Equivalente de Accesorios

mm
m
m
m

CALCULO
Toroide
Dimetro de desarrollo del toroide =
Nmero de tramos =

12611.000 mm
9.000

Rociadores
Nmero de boquillas
Nmero de boquillas (corregido)
Area de influencia de un rociador
Caudal por boquilla (inicial basado en rea)
Caudal por boquilla (inicial basado en presin)
Separacion entre rociadores

=
=
=
=
=
=

17.286
9.00
3.14
25.604
32.365
2.201

m2
litros/min
litros/min
m

Dn (i

DATOS
Del tanque
* Dimetro del tanque= 11000 mm
* Espesor de Pared del tanque= 4.7625 mm
* Altura del tanque= 9500 mm
De los rociadores
* Distancia rociador - pared de tanque = 600 mm
* Distancia radial desde el CL rociador= 1 m
* Presin necesaria en el ltimo rociador= 3.5 bar
* Marca de rociador= Wormald
* Modelo= Type D
* Orificio= N 16
* Angulo de montaje= 90
* Angulo de Spray= 125
* K (final)= 17.3
De los Rates, Factores y Coeficientes
* rate= 8.15 litros/min*m2
* Coeficiente de perdida por friccin (C )= 100 (Tubera seca - Hazen and Williams)
Del Toroide
* Dimetro Nominal= 2"
* Schedule= 80
* Dimetro interno= 49.256 mm
* Elevacin relativa (Inicio)= 8.9 m
* Elevacin relativa (Fin)= 8.9 m
De la Montante
* Dimetro Nominal= 3"
* Schedule= 40
* Dimetro interno= 77.928 mm
* Elevacin relativa (Inicio)= 0.7 m
* Elevacin relativa (Fin)= 8.9 m
* Long. Tub.= 180 m
* E45= 6
* E90= 10
* T= 2
* GV= 2
* BV= 0
* RV= 1
Long. Acc.= 44.500 m

Toroide
* Dimetro de desarrollo del toroide= 12611 mm
* Nmero de tramos= 9
Rociadores
* Nmero de boquillas= 8.6431
* Nmero de boquillas (corregido)= 9
* Caudal por boquilla (inicial basado en rea)= 25.603 litros/min
* Caudal por boquilla (inicial basado en presin)= 32.365 litros/min
* Separacion entre rociadores= 2.2010 m

E45= 6
E90= 10
T= 2
GV= 2
BV= 0
RV= 1

Modelo
Type D3
Type D3
Type D3
Type D3
Type D3
Type D3
Type D3

Orificio K
lpm/bar^0.5
17.3
16
25.9
18
33.1
21
43.2
24
59
28
80.6
32
103.7
34

Angulo de Montaje
0
30
45
60
90
120
135
150
180
Angulo de Spray
65
80
95
110
125
140
160
180

Dimetro Nominal Schedule


0.75
1.0
80
1.5
80
2.0
80
3.0
40
4.0
40
6.0
40
8.0
40

Dn (in)

Dim. Int.
24.306
38.100
49.256
77.928
102.260
154.046
202.722

t (in)

De (in)

Di (in) E45
E90
0.000 1.000 1.000

T
GV
4.000 0.000

0.133

1.315

1.049 1.000 2.000

5.000 0.000

2.000 4.000

2.000 8.000

0.750
1.000
1.500
2.000

0.154

2.375

2.067 2.000 3.000 10.000 1.000

3.000

0.216

3.500

3.068 3.000 5.000 15.000 1.000

4.000

0.237

4.500

4.026 4.000 6.000 20.000 2.000

6.000

0.280

6.625

6.065 7.000 9.000 30.000 3.000

8.000

0.322

8.625

7.981 9.000 13.000 35.000 4.000

BV

RV

0.000
0.000
0.000
6.000
10.000
12.000
10.000

4.000
5.000
9.000
11.000
16.000
22.000
32.000

12.000 45.000

SECCION 1 :

TOROIDE

SECCION 1: TOROIDE (Boquillas 1 a la 9)


Tramo 1-2

Tramo 1-2
Nodo inicio
Nodo fin
Elev. Nodo1
Elev. Nodo2
q1
Q12
d12

=
=
=
=
=
=
=

Long
Acc.
Total
P1
f12
Pt2
Pe12
Pf12
v12

=
=
=
=
=
=
=
=
=

Tramo 2-3
Nodo inicio
Nodo fin
Elev. Nodo2
Elev. Nodo3
q2
Q23
d23

=
=
=
=
=
=
=

Long
Acc.
Total
P2
f23
Pt3
Pe23
Pf23
v23

=
=
=
=
=
=
=
=
=

Tramo 3-4
Nodo inicio
Nodo fin
Elev. Nodo3
Elev. Nodo4
q3
Q34
d34

=
=
=
=
=
=
=

Long
Acc.
Total
P3
f34
Pt4
Pe34
Pf34
v34

=
=
=
=
=
=
=
=
=

1
2
8.900
8.900
32.365
32.365
49.26
2.00
2.201
--2.201
3.5000
0.0004
3.5009
0.0000
0.0009
0.2831

m
m
Litros/min
Litros/min
mm
m
m
m
bar
bar/m
bar
bar
bar
m/s

8.9
8.9
q1= 32.365
Q12= 32.365
d12= 49.25
2.00
Long= 2.201
Acc.= --Total= 2.201
P1= 3.5
f12= 0.0004
Pt2= 3.5009
Pe12= --Pf12= 0.0009
v12= 0.2830 m/s
Tramo 2-3

2
3
8.900
8.900
32.370
64.735
49.26
2.00
2.201
--2.201
3.5009
0.0015
3.5044
0.0000
0.0034
0.5662

m
m
Litros/min
Litros/min
mm
m
m
m
bar
bar/m
bar
bar
bar
m/s

8.9
8.9
q2= 32.369
Q23= 64.735
d23= 49.25
2.00
Long= 2.201
Acc.= --Total= 2.201
P2= 3.5009
f23= 0.0015
Pt3= 3.5043
Pe23= --Pf23= 0.0034
v23= 0.5662 m/s
Tramo 3-4

3
4
8.900
8.900
32.385
97.121
49.26
2.00
2.201
--2.201
3.5044
0.0033
3.5116
0.0000
0.0072
0.8495

m
m
Litros/min
Litros/min
mm
m
m
m
bar
bar/m
bar
bar
bar
m/s

8.9
8.9
q3= 32.385
Q34= 97.120
d34= 49.25
2.00
Long= 2.201
Acc.= --Total= 2.201
P3= 3.5043
f34= 0.0032
Pt4= 3.5115
Pe34= --Pf34= 0.0072
v34= 0.8494 m/s

Tramo 4-5

Tramo 4-5
Nodo inicio
Nodo fin
Elev. Nodo4
Elev. Nodo5
q4
Q45
d45

=
=
=
=
=
=
=

Long
Acc.
Total
P4
f45
Pt5
Pe45
Pf45
v45

=
=
=
=
=
=
=
=
=

Tramo 5-6
Nodo inicio
Nodo fin
Elev. Nodo5
Elev. Nodo6
q5
Q56
d56

=
=
=
=
=
=
=

Long
Acc.
Total
P5
f56
Pt6
Pe56
Pf56
v56

=
=
=
=
=
=
=
=
=

Tramo 6-7
Nodo inicio
Nodo fin
Elev. Nodo6
Elev. Nodo7
q6
Q67
d67

=
=
=
=
=
=
=

Long
Acc.
Total
P6
f67
Pt7
Pe67
Pf67
v67

=
=
=
=
=
=
=
=
=

6
7
8.900
8.900
32.561
194.576
49.26
2.00
2.201
--2.201
3.5425
0.0119
3.5686
0.0000
0.0261
1.7019

Tramo 7-8
Nodo inicio =
Nodo fin =

7
8

4
5
8.900
8.900
32.419
129.539
49.26
2.00
2.201
--2.201
3.5116
0.0056
3.5239
0.0000
0.0123
1.1330

m
m
Litros/min
Litros/min
mm
m
m
m
bar
bar/m
bar
bar
bar
m/s

8.9
8.9
q4= 32.418
Q45= 129.53
d45= 49.25
2.00
Long= 2.201
Acc.= --Total= 2.201
P4= 3.5115
f45= 0.0055
Pt5= 3.5238
Pe45= --Pf45= 0.0123
v45= 1.1330 m/s
Tramo 5-6

5
6
8.900
8.900
32.476
162.015
49.26
2.00
2.201
--2.201
3.5239
0.0085
3.5425
0.0000
0.0186
1.4171

m
m
Litros/min
Litros/min
mm
m
m
m
bar
bar/m
bar
bar
bar
m/s

8.9
8.9
q5= 32.475
Q56= 162.01
d56= 49.25
2.00
Long= 2.201
Acc.= --Total= 2.201
P5= 3.5238
f56= 0.0084
Pt6= 3.5424
Pe56= --Pf56= 0.0186
v56= 1.4170 m/s
Tramo 6-7

m
m
Litros/min
Litros/min
mm
m
m
m
bar
bar/m
bar
bar
bar
m/s

8.9
8.9
q6= 32.561
Q67= 194.57
d67= 49.25
2.00
Long= 2.201
Acc.= --Total= 2.201
P6= 3.5424
f67= 0.0118
Pt7= 3.5686
Pe67= --Pf67= 0.0261
v67= 1.7018 m/s
Tramo 7-8

Elev. Nodo7
Elev. Nodo8
q7
Q78
d78

=
=
=
=
=

Long
Acc.
Total
P7
f78
Pt8
Pe78
Pf78
v78

=
=
=
=
=
=
=
=
=

Tramo 8-9
Nodo inicio
Nodo fin
Elev. Nodo8
Elev. Nodo9
q8
Q89
d89

=
=
=
=
=
=
=

Long
Acc.
Total
P8
f89
Pt9
Pe89
Pf89
v89

=
=
=
=
=
=
=
=
=

8.900
8.900
32.681
227.257
49.26
2.00
2.201
--2.201
3.5686
0.0158
3.6034
0.0000
0.0348
1.9877

m
m
Litros/min
Litros/min
mm
m
m
m
bar
bar/m
bar
bar
bar
m/s

8.9
8.9
q7= 32.681
Q78= 227.25
d78= 49.25
2.00
Long= 2.201
Acc.= --Total= 2.201
P7= 3.5686
f78= 0.0158
Pt8= 3.6034
Pe78= --Pf78= 0.0348
v78= 1.9877 m/s
Tramo 8-9

8
9
8.900
8.900
32.840
260.097
49.26
2.00
2.201
--2.201
3.6034
0.0203
3.6481
0.0000
0.0447
2.2750

m
m
Litros/min
Litros/min
mm
m
m
m
bar
bar/m
bar
bar
bar
m/s

8.9
8.9
q8= 32.840
Q89= 260.09
d89= 49.25
2.00
Long= 2.201
Acc.= --Total= 2.201
P8= 3.6034
f89= 0.0202
Pt9= 3.6480
Pe89= --Pf89= 0.0446
v89= 2.2749 m/s

SECCION 2 :

TOROIDE

SECCION 2: TOROIDE (Boquillas 1' a la 9')


Tramo 1'-2'

Tramo 1'-2'
Nodo inicio
Nodo fin
Elev. Nodo1'
Elev. Nodo2'
q1'
Q1'2'
d1'2'

=
=
=
=
=
=
=

Long
Acc.
Total
P1'
f1'2'
Pt2'
Pe1'2'
Pf1'2'
v1'2'

=
=
=
=
=
=
=
=
=

Tramo 2'-3'
Nodo inicio
Nodo fin
Elev. Nodo2'
Elev. Nodo3'
q2'
Q2'3'
d2'3'

=
=
=
=
=
=
=

Long
Acc.
Total
P2'
f2'3'
Pt3'
Pe2'3'
Pf2'3'
v2'3'

=
=
=
=
=
=
=
=
=

Tramo 3'-4'
Nodo inicio
Nodo fin
Elev. Nodo3'
Elev. Nodo4'
q3'
Q3'4'
d3'4'

=
=
=
=
=
=
=

Long
Acc.
Total
P3'
f3'4'
Pt4'
Pe3'4'
Pf3'4'
v3'4'

=
=
=
=
=
=
=
=
=

1'
2'
8.900
8.900
32.365
32.365
49.26
2.00
2.201
--2.201
3.5000
0.0004
3.5009
0.0000
0.0009
0.2831

m
m
Litros/min
Litros/min
mm
m
m
m
bar
bar/m
bar
bar
bar
m/s

8.9
8.9
q1'= 32.365
Q1'2'= 32.365
d1'2'= 49.25
2.00
Long= 2.201
Acc.= --Total= 2.201
P1'= 3.5
f1'2'= 0.0004
Pt2'= 3.5009
Pe1'2'= --Pf1'2'= 0.0009
v1'2'= 0.2830 m/s
Tramo 2'-3'

2'
3'
8.900
8.900
32.370
64.735
49.26
2.00
2.201
--2.201
3.5009
0.0015
3.5044
0.0000
0.0034
0.5662

m
m
Litros/min
Litros/min
mm
m
m
m
bar
bar/m
bar
bar
bar
m/s

8.9
8.9
q2'= 32.369
Q2'3'= 64.735
d2'3'= 49.25
2.00
Long= 2.201
Acc.= --Total= 2.201
P2'= 3.5009
f2'3'= 0.0015
Pt3'= 3.5043
Pe2'3'= --Pf2'3'= 0.0034
v2'3'= 0.5662 m/s
Tramo 3'-4'

3'
4'
8.900
8.900
32.385
97.121
49.26
2.00
2.201
--2.201
3.5044
0.0033
3.5116
0.0000
0.0072
0.8495

m
m
Litros/min
Litros/min
mm
m
m
m
bar
bar/m
bar
bar
bar
m/s

8.9
8.9
q3'= 32.385
Q3'4'= 97.120
d3'4'= 49.25
2.00
Long= 2.201
Acc.= --Total= 2.201
P3'= 3.5043
f3'4'= 0.0032
Pt4'= 3.5115
Pe3'4'= --Pf3'4'= 0.0072
v3'4'= 0.8494 m/s

Tramo 4'-5'

Tramo 4'-5'
Nodo inicio
Nodo fin
Elev. Nodo4'
Elev. Nodo5'
q4'
Q4'5'
d4'5'

=
=
=
=
=
=
=

Long
Acc.
Total
P4'
f4'5'
Pt5'
Pe4'5'
Pf4'5'
v4'5'

=
=
=
=
=
=
=
=
=

Tramo 5'-6'
Nodo inicio
Nodo fin
Elev. Nodo5'
Elev. Nodo6'
q5'
Q5'6'
d5'6'

=
=
=
=
=
=
=

Long
Acc.
Total
P5'
f5'6'
Pt6'
Pe5'6'
Pf5'6'
v5'6'

=
=
=
=
=
=
=
=
=

Tramo 6'-7'
Nodo inicio
Nodo fin
Elev. Nodo6'
Elev. Nodo7'
q6'
Q6'7'
d6'7'

=
=
=
=
=
=
=

Long
Acc.
Total
P6'
f6'7'
Pt7'
Pe6'7'
Pf6'7'
v6'7'

=
=
=
=
=
=
=
=
=

6'
7'
8.900
8.900
32.561
194.576
49.26
2.00
2.201
--2.201
3.5425
0.0119
3.5686
0.0000
0.0261
1.7019

Tramo 7'-8'
Nodo inicio =
Nodo fin =

7'
8'

4'
5'
8.900
8.900
32.419
129.539
49.26
2.00
2.201
--2.201
3.5116
0.0056
3.5239
0.0000
0.0123
1.1330

m
m
Litros/min
Litros/min
mm
m
m
m
bar
bar/m
bar
bar
bar
m/s

8.9
8.9
q4'= 32.418
Q4'5'= 129.53
d4'5'= 49.25
2.00
Long= 2.201
Acc.= --Total= 2.201
P4'= 3.5115
f4'5'= 0.0055
Pt5'= 3.5238
Pe4'5'= --Pf4'5'= 0.0123
v4'5'= 1.1330 m/s
Tramo 5'-6'

5'
6'
8.900
8.900
32.476
162.015
49.26
2.00
2.201
--2.201
3.5239
0.0085
3.5425
0.0000
0.0186
1.4171

m
m
Litros/min
Litros/min
mm
m
m
m
bar
bar/m
bar
bar
bar
m/s

8.9
8.9
q5'= 32.475
Q5'6'= 162.01
d5'6'= 49.25
2.00
Long= 2.201
Acc.= --Total= 2.201
P5'= 3.5238
f5'6'= 0.0084
Pt6'= 3.5424
Pe5'6'= --Pf5'6'= 0.0186
v5'6'= 1.4170 m/s
Tramo 6'-7'

m
m
Litros/min
Litros/min
mm
m
m
m
bar
bar/m
bar
bar
bar
m/s

8.9
8.9
q6'= 32.561
Q6'7'= 194.57
d6'7'= 49.25
2.00
Long= 2.201
Acc.= --Total= 2.201
P6'= 3.5424
f6'7'= 0.0118
Pt7'= 3.5686
Pe6'7'= --Pf6'7'= 0.0261
v6'7'= 1.7018 m/s
Tramo 7'-8'

Elev. Nodo7'
Elev. Nodo8'
q7'
Q7'8'
d7'8'

=
=
=
=
=

Long
Acc.
Total
P7'
f7'8'
Pt8'
Pe7'8'
Pf7'8'
v7'8'

=
=
=
=
=
=
=
=
=

Tramo 8'-9'
Nodo inicio
Nodo fin
Elev. Nodo8'
Elev. Nodo9'
q8'
Q8'9'
d8'9'

=
=
=
=
=
=
=

Long
Acc.
Total
P8'
f8'9'
Pt9'
Pe8'9'
Pf8'9'
v8'9'

=
=
=
=
=
=
=
=
=

8.900
8.900
32.681
227.257
49.26
2.00
2.201
--2.201
3.5686
0.0158
3.6034
0.0000
0.0348
1.9877

m
m
Litros/min
Litros/min
mm
m
m
m
bar
bar/m
bar
bar
bar
m/s

8.9
8.9
q7'= 32.681
Q7'8'= 227.25
d7'8'= 49.25
2.00
Long= 2.201
Acc.= --Total= 2.201
P7'= 3.5686
f7'8'= 0.0158
Pt8'= 3.6034
Pe7'8'= --Pf7'8'= 0.0348
v7'8'= 1.9877 m/s
Tramo 8'-9'

8'
9'
8.900
8.900
32.840
0.000
49.26
2.00
2.201
--2.201
3.6034
0.0000
3.6034
0.0000
0.0000
0.0000

m
m
Litros/min
Litros/min
mm
m
m
m
bar
bar/m
bar
bar
bar
m/s

8.9
8.9
q8'= 32.840
Q8'9'= 0
d8'9'= 49.25
2.00
Long= 2.201
Acc.= --Total= 2.201
P8'= 3.6034
f8'9'= 0
Pt9'= 3.6034
Pe8'9'= ----v8'9'= 0 m/s

SECCION 3 :
Tramo 9-10
Nodo inicio
Nodo fin
Elev. Nodo9
Elev. Nodo10
q9
Q910
d910

=
=
=
=
=
=
=

Long
Acc.
Total
P9
f910
Pt10
Pe910
Pf910
v910

=
=
=
=
=
=
=
=
=

Tramo 9'-10
Nodo inicio
Nodo fin
Elev. Nodo9'
Elev. Nodo10
q9'
Q9'10
d9'10

=
=
=
=
=
=
=

Long
Acc.
Total
P9'
f9'10
Pt10
Pe9'10
Pf9'10
v9'10

=
=
=
=
=
=
=
=
=

Tramo 10-11
Nodo inicio
Nodo fin
Elev. Nodo10
Elev. Nodo11
q10
Q1011
d1011

=
=
=
=
=
=
=

Long
Acc.
Total
P10
f1011
Pt11
Pe1011
Pf1011
v1011

=
=
=
=
=
=
=
=
=

MONTANTE
9
10
8.900
8.900
0.000
260.097
49.26
2.00
1.101
--1.101
3.6481
0.0203
3.6704
0.0000
0.0223
2.2750
9'
10
8.900
8.900
0.000
0.000
49.26
2.00
1.101
--1.101
3.6034
0.0000
3.6034
0.0000
0.0000
0.0000
10
11
0.700
8.900
0.000
260.097
77.93
3.00
180.000
44.501
224.501
3.6704
0.0022
4.5713
0.8041
0.0967
0.9089

m
m
Litros/min
Litros/min
mm
m
m
m
bar
bar/m
bar
bar
bar
m/s

m
m
Litros/min
Litros/min
mm
m
m
m
bar
bar/m
bar
bar
bar
m/s

m
m
Litros/min
Litros/min
mm
m
m
m
bar
bar/m
bar
bar
bar
m/s

Q11 =
P11 =
Q11 =
P11 =

68.710
67.153
15%
79.017
77.225

gpm
psi
gpm
psi

SECCION 3: MONTANTE (Tramo 9-10 , Tramo 9'-10 y Tramo 10-11 )


Tramo 9-10

8.9
8.9
q9= 0
Q910= 260.09
d910= 49.25
2.00
Long= 1.100
Acc.= --Total= 1.100
P9= 3.6480
f910= 0.0202
Pt10= 3.6704
Pe910= --Pf910= 0.0223
v910= 2.2749 m/s
Tramo 9'-10

8.9
8.9
q9'= 0
Q9'10= 0
d9'10= 49.25
2.00
Long= 1.100
Acc.= --Total= 1.100
P9'= 3.6034
f9'10= 0
Pt10= 3.6034
Pe9'10= ----v9'10= 0 m/s
Tramo 10-11

0.7
8.9
q10= 0
Q1011= 260.09
d1011= 77.92
3.00
Long= 180
Acc.= 44.500
Total= 224.5
P10= 3.6704
f1011= 0.0021
Pt11= 4.5713
Pe1011= 0.8041
Pf1011= 0.0967
v1011= 0.9088 m/s

Q11= 68.710
P11= 67.152
Q11= 79.016 gpm
P11= 77.225 psi

GMI S.A.
Ingenieros Consultores

AMPLIACION DE CAPACIDAD DE ALMACENAMIENTO DE GRIFO YANACANCHA


PROYECTO: 08655
CONTRATO: 4700000707

N 104-08655-130-MEC-M-009
*104-08655-130-MEC-M-009*

MEMORIA DE CALCULO DE TOROIDE DE AGUA DE


ENFRIAMIENTO DE TANQUES 650-TKF-005/006
MECNICA
Rev. B

Jefe de Disciplina

Ing. Carlos Llanos

Jefe de Proyecto

Ing. Angel Cuya

Cliente

RECOSAC

Revisin
A
B

Hecho Por
C.Llanos
C.Llanos

COMENTARIOS DEL CLIENTE:

Descripcin
Emitido para coordinacin interna
Emitido para Aprobacin del cliente

Fecha
07/12/10
07/02/11

Revisado
C.Llanos
C.Llanos

Aprobado
A.Cuya
A.Cuya

PROYECTO: 08655

AMPLIACION DE CAPACIDAD DE ALMACENAMIENTO DE GRIFO


YANACANCHA

Fecha:

07/02/11

Documento N: 104-08655MEMORIA DE CALCULO DE TOROIDE DE AGUA DE ENFRIAMIENTO


130-MEC-M-009

DE TANQUES 650-TKF-005/006

Revisin:

MECNICA
DATOS

Del tanque
* Dimetro del tanque= 11000 mm
* Espesor de Pared del tanque= 4.7625 mm
* Altura del tanque= 9500 mm
De los rociadores
* Distancia rociador - pared de tanque = 600 mm
* Distancia radial desde el CL rociador= 1 m
* Presin necesaria en el ltimo rociador= 3.5 bar
* Marca de rociador= Wormald
* Modelo= Type D
* Orificio= N 16
* Angulo de montaje= 90
* Angulo de Spray= 125
* K (final)= 17.3
De los Rates, Factores y Coeficientes
* rate= 8.15 litros/min*m2
* Coeficiente de perdida por friccin (C )= 100 (Tubera seca - Hazen and Williams)
Del Toroide
* Dimetro Nominal= 2"
* Schedule= 80
* Dimetro interno= 49.256 mm
* Elevacin relativa (Inicio)= 8.9 m
* Elevacin relativa (Fin)= 8.9 m
De la Montante
* Dimetro Nominal= 3"
* Schedule= 40
* Dimetro interno= 77.928 mm
* Elevacin relativa (Inicio)= 0.7 m
* Elevacin relativa (Fin)= 8.9 m
* Long. Tub.= 180 m
* E45= 6
* E90= 10
* T= 2
* GV= 2
* BV= 0
* RV= 1

Pgina:

2 de 7

PROYECTO: 08655

AMPLIACION DE CAPACIDAD DE ALMACENAMIENTO DE GRIFO


YANACANCHA

Fecha:

07/02/11

Documento N: 104-08655MEMORIA DE CALCULO DE TOROIDE DE AGUA DE ENFRIAMIENTO


130-MEC-M-009

DE TANQUES 650-TKF-005/006

Revisin:

MECNICA
CALCULOS PRELIMINARES

Toroide
* Dimetro de desarrollo del toroide= 12611 mm
* Nmero de tramos= 9
Rociadores
* Nmero de boquillas= 8.6431
* Nmero de boquillas (corregido)= 9
* Caudal por boquilla (inicial basado en rea)= 25.603 litros/min
* Caudal por boquilla (inicial basado en presin)= 32.365 litros/min
* Separacion entre rociadores= 2.2010 m

Pgina:

3 de 7

PROYECTO: 08655

AMPLIACION DE CAPACIDAD DE ALMACENAMIENTO DE GRIFO


YANACANCHA

Fecha:

07/02/11

Documento N: 104-08655MEMORIA DE CALCULO DE TOROIDE DE AGUA DE ENFRIAMIENTO


130-MEC-M-009

DE TANQUES 650-TKF-005/006

Revisin:

Pgina:

4 de 7

MECNICA

SECCION 1: TOROIDE (Boquillas 1 a la 9)


RESUMEN DE CALCULOS - SECCION 1

Boq.
/ Loc.

Caudal (litros) Dia. (in)

Tramo q1= 32.365


1-2 Q12= 32.365

2.00

Tramo q2= 32.369


2-3 Q23= 64.735

2.00

Tramo q3= 32.385


3-4 Q34= 97.120

2.00

Tramo q4= 32.418


4-5 Q45= 129.53

2.00

Tramo q5= 32.475


5-6 Q56= 162.01

2.00

Tramo q6= 32.561


6-7 Q67= 194.57

2.00

Tramo q7= 32.681


7-8 Q78= 227.25

2.00

Tramo q8= 32.840


8-9 Q89= 260.09

2.00

Tuberia y
accesorios
-------------------------------------------------

Long. Equiv.
(tuberia y
accesorios) (m)
Long= 2.201
Acc.= --Total= 2.201
Long= 2.201
Acc.= --Total= 2.201
Long= 2.201
Acc.= --Total= 2.201
Long= 2.201
Acc.= --Total= 2.201
Long= 2.201
Acc.= --Total= 2.201
Long= 2.201
Acc.= --Acc.= --Long= 2.201
Acc.= --Total= 2.201
Long= 2.201
Acc.= --Total= 2.201

Perdida x
friccin
(bar/m)

Resumen de Elev.
Presiones (bar) (m)

Pt2= 3.5009
f12= 0.0004 Pe12= --Pf12= 0.0009
Pt3= 3.5043
f23= 0.0015 Pe23= --Pf23= 0.0034
Pt4= 3.5115
f34= 0.0032 Pe34= --Pf34= 0.0072
Pt5= 3.5238
f45= 0.0055 Pe45= --Pf45= 0.0123
Pt6= 3.5424
f56= 0.0084 Pe56= --Pf56= 0.0186
Pt7= 3.5686
f67= 0.0118 Pe67= --Pf67= 0.0261
Pt8= 3.6034
f78= 0.0158 Pe78= --Pf78= 0.0348
Pt9= 3.6480
f89= 0.0202 Pe89= --Pf89= 0.0446

Notas
v12= 0.2830 m/s

8.9
v23= 0.5662 m/s
8.9
v34= 0.8494 m/s
8.9
v45= 1.1330 m/s
8.9
v56= 1.4170 m/s
8.9
v67= 1.7018 m/s
8.9
v78= 1.9877 m/s
8.9
v89= 2.2749 m/s
8.9

PROYECTO: 08655

AMPLIACION DE CAPACIDAD DE ALMACENAMIENTO DE GRIFO


YANACANCHA

Fecha:

07/02/11

Documento N: 104-08655MEMORIA DE CALCULO DE TOROIDE DE AGUA DE ENFRIAMIENTO


130-MEC-M-009

DE TANQUES 650-TKF-005/006

Revisin:

Pgina:

5 de 7

MECNICA

SECCION 3: MONTANTE (Tramo 9-10 , Tramo 9'-10 y Tramo 10-11 )


RESUMEN DE CALCULOS - SECCION 3

Boq.
/ Loc.

Caudal (litros) Dia. (in)

Tramo q9= 0
9-10 Q910= 260.09

2.00

Tramo q9'= 0
9'-10 Q9'10= 0

2.00

Tramo q10= 0
10-11 Q1011= 260.09

Long=
180

Tuberia y
accesorios
------------E45= 6 , E90= 10
T= 2 , GV= 2
BV= 0 , RV= 1

Long. Equiv.
(tuberia y
accesorios) (m)
Long= 1.100
Acc.= --Total= 1.100
Long= 1.100
Acc.= --Total= 1.100
Long= 180
Acc.= 44.500
Total= 224.5

Perdida x
friccin
(bar/m)

Resumen de Elev.
Presiones (bar) (m)

Pt10= 3.6704
f910= 0.0202 Pe910= --Pf910= 0.0223
Pt10= 3.6034
f9'10= 0
Pe9'10= ----Pe1011= 0.8041
f1011= 0.0021 Pf1011= 0.0967
v1011= 0.9088 m/s

Notas
v910= 2.2749 m/s

8.9
v9'10= 0 m/s
8.9
v1011= 0.9088 m/s
0.7

PROYECTO: 08655

AMPLIACION DE CAPACIDAD DE ALMACENAMIENTO DE GRIFO


YANACANCHA

Fecha:

07/02/11

Documento N: 104-08655MEMORIA DE CALCULO DE TOROIDE DE AGUA DE ENFRIAMIENTO


130-MEC-M-009

DE TANQUES 650-TKF-005/006

Revisin:

Pgina:

6 de 7

MECNICA

Conclusiones:
1. Teniendo en cuenta un factor adicional de 15% por prdida de carga en la lnea se necesitarn en el punto de control
una presin y un caudal mnimos iguales a:
Q11= 79.016 gpm
P11= 77.225 psi
2. Los rociadores necesarios tendrn las siguientes caractersticas:
* Marca de rociador= Wormald
* Modelo= PSN49-316-1-125
* K= 17.3
* Cantidad= 9
* Separacion mxima entre rociadores= 2.01 m
* Separacion mxima entre rociador y boquilla de tanque= 0.60 m
* Angulo de instalacin= 90

PROYECTO: 08655

AMPLIACION DE CAPACIDAD DE ALMACENAMIENTO DE GRIFO


YANACANCHA

Fecha:

07/02/11

Documento N: 104-08655MEMORIA DE CALCULO DE TOROIDE DE AGUA DE ENFRIAMIENTO


130-MEC-M-009

DE TANQUES 650-TKF-005/006

Revisin:

Pgina:

MECNICA

GRAFICOS

DISTRIBUCION DE ROCIADORES

DESARROLLO DE MONTANTE Y ACOMETIDA (DIAGRAMA ESQUEMATICO)

7 de 7

PROYECTO: 08655

AMPLIACION DE CAPACIDAD DE ALMACENAMIENTO DE GRIFO


YANACANCHA

Fecha:

07/02/11

Documento N: 104-08655MEMORIA DE CALCULO DE TOROIDE DE AGUA DE ENFRIAMIENTO


130-MEC-M-009

DE TANQUES 650-TKF-005/006

Revisin:

Pgina:

4 de 7

MECNICA

SECCION 2: TOROIDE (Boquillas 1' a la 9')


RESUMEN DE CALCULOS - SECCION 2

Boq.
/ Loc.

Caudal (litros) Dia. (in)

Tramo q1'= 32.365


1'-2' Q1'2'= 32.365

2.00

Tramo q2'= 32.369


2'-3' Q2'3'= 64.735

2.00

Tramo q3'= 32.385


3'-4' Q3'4'= 97.120

2.00

Tramo q4'= 32.418


4'-5' Q4'5'= 129.53

2.00

Tramo q5'= 32.475


5'-6' Q5'6'= 162.01

2.00

Tramo q6'= 32.561


6'-7' Q6'7'= 194.57

2.00

Tramo q7'= 32.681


7'-8' Q7'8'= 227.25

2.00

Tramo q8'= 32.840


8'-9' Q8'9'= 0

2.00

Tuberia y
accesorios
-------------------------------------------------

Long. Equiv.
(tuberia y
accesorios) (m)
Long= 2.201
Acc.= --Total= 2.201
Long= 2.201
Acc.= --Total= 2.201
Long= 2.201
Acc.= --Total= 2.201
Long= 2.201
Acc.= --Total= 2.201
Long= 2.201
Acc.= --Total= 2.201
Long= 2.201
Acc.= --Acc.= --Long= 2.201
Acc.= --Total= 2.201
Long= 2.201
Acc.= --Total= 2.201

Perdida x
friccin
(bar/m)

Resumen de Elev.
Presiones (bar) (m)

Pt2'= 3.5009
f1'2'= 0.0004 Pe1'2'= --Pf1'2'= 0.0009
Pt3'= 3.5043
f2'3'= 0.0015 Pe2'3'= --Pf2'3'= 0.0034
Pt4'= 3.5115
f3'4'= 0.0032 Pe3'4'= --Pf3'4'= 0.0072
Pt5'= 3.5238
f4'5'= 0.0055 Pe4'5'= --Pf4'5'= 0.0123
Pt6'= 3.5424
f5'6'= 0.0084 Pe5'6'= --Pf5'6'= 0.0186
Pt7'= 3.5686
f6'7'= 0.0118 Pe6'7'= --Pf6'7'= 0.0261
Pt8'= 3.6034
f7'8'= 0.0158 Pe7'8'= --Pf7'8'= 0.0348
Pt9'= 3.6034
f8'9'= 0
Pe8'9'= -----

Notas
v1'2'= 0.2830 m/s

8.9
v2'3'= 0.5662 m/s
8.9
v3'4'= 0.8494 m/s
8.9
v4'5'= 1.1330 m/s
8.9
v5'6'= 1.4170 m/s
8.9
v6'7'= 1.7018 m/s
8.9
v7'8'= 1.9877 m/s
8.9
v8'9'= 0 m/s
8.9

Das könnte Ihnen auch gefallen