area 01 unit steam boiler installed with furnace and pipe connections
01
unit
kiln 60
dryer building with 4 m x 4 m floor area 01 unit steam boiler installed with furnace and pipe connections Fan system, Fan system, heating system recorders installed functionally efficient kiln dryer Kiln dryer tested heating system recorders installed functionally efficient kiln dryer Kiln dryer tested
50
Installation of kiln fan system, Kiln fan system, heating system connections, temperature and humidity controls heating system and recorders Functional testing of the kiln dryer Perfromance testing starts
25
Functionally efficient lumber dry kiln Use of the established drying schedule for coconut timber
385 SUBMITTED BY: LUISITO J. PEAMORA Division Chief lll-TUD NOTED: RAMON L. RIVERA Officer In Charge