HOW ELECTRICITY IS DELIVERED TO YOUR HOME

GENERATION NPC/IPPs DELIVERY POINT SUBSTATION TRANSMISSION 230kV

SUBSTATION
SUB-TRANSMISSION DISTRIBUTION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

www.meralco.com.ph

MERALCO HAS 219 POWER TRANSFORMERS INSTALLED AT ITS 123 SUBSTATION. SUBSTATION MERALCO SUBSTATION OFFICE IS ISO 9001:2000 CERTIFIED SINCE 2002.

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

Area North Central South

Substations

Land Area (m2)

Power Transformers

Power Circuit Breakers

Disconnect Switches

SUBSTATION
28 44 51 131,618 181,566 143,910 47 78 74 393 753 416 381 578 433

North Central South

Total

123

457,094

199

1,562

1392

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

GENERAL DEFINITION:

TRANSFORMER IS AN ELECTRICAL DEVICE THAT TRANSFERS ENERGY FROM ONE CIRCUIT TO ANOTHER BY MAGNETIC COUPLING WITH NO SUBSTATION MOVING PARTS TRANSFORMERS ARE USED TO CONVERT BETWEEN HIGH AND LOW VOLTAGES, TO CHANGE IMPEDANCE, AND TO PROVIDE ELECTRICAL ISOLATION BETWEEN CIRCUITS

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

VOLTAGE RATING (kV) MVA RATING 300MVA 150MVA 133MVA 100MVA 83MVA 50MVA 33MVA 25MVA 20MVA 15MVA 12.5MVA 10MVA 8.33MVA 7MVA 6.6MVA 5MVA 4MVA 2MVA 1.5MVA
SUBSTATION PRESENTATION TO IIEE DELEGATES 0.333MVA JUNE 28,2007

230/ 115

230 /69

230/ 34.5

115/ 34.5

115/ 13.8

69/ 13.8

34.5/ 6.24

34.5/ 13.8

34.5/ 4.8

TOTAL

6 2 2 6 7 78 1 1 4 2 3

6 4 6 7 78 2 7 2 22 1 3 4 6 3 3 5 2 3 3 5 3 6 5 31 2 3 37 6 3 3 12 3 3 5 3 6 219

SUBSTATION 5 16 1
1

0.833MVA TOTAL

100

15

53

17

19

230kV LEVEL BRAND AEG ALSTOM FUJI ELECTRIC HYUNDAI PAUWELS TAKAOKA AEG COUNT 1 3 1 1 1 4 1 ABB AEG ALSTOM

115kV LEVEL BRAND COUNT 41 2 4 ABB EFACEC HYUNDAI

69kV LEVEL BRAND COUNT 3 4 2 ABB

34.5kV LEVEL BRAND COUNT 2

AICHI ELECTRIC
ALSTOM ELIN ELECTRIC

1
1 1 4 3 22 1

EFACEC
ELIN ELECTRIC GE HYOSUNG HYUNDAI MITSUBISHI OSAKA PAUWELS SGB TAKAOKA TOSHIBA TRAFO-UNION WESTINGHOUSE

12
1 7 1 11 3 2 7 1 5 1 1 6

PAUWELS
PENNSYLVANIA TAKAOKA

FUJI DENKI 3 SUBSTATION FUJI ELECTRIC 1

TOTAL

15

GE HITACHI

TOTAL

11

HYUNDAI
NEW KOREA PHILEC SHIHLIN WESTINGHOUSE

13
1 10 3 26

TOTAL

88

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

TOTAL

105

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

POWER TRANSFORMER MAINTENANCE INSPECTION CHECKLIST


RESULT OF INSPECTION IS REFLECTED IN THE SUBSTATION CHECKLIST FORM

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

POWER TRANSFORMER MAINTENANCE

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

POWER TRANSFORMER MAINTENANCE

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

POWER CIRCUIT BREAKERS


DEFINITION: AN ELECTRICAL DEVICE CAPABLE OF: CARRYING NORMAL LOAD CURRENT TO WHICH IT IS DESIGNED

SUBSTATION MAKING AND BREAKING NORMAL LOAD CURRENT (CAPABLE OF MULTIPLE INTERRUPTION OF NORMAL LOAD CURRENT)
INTERRUPTING RATED FAULT CURRENT TO WHICH IT IS DESIGNED (CAPABLE OF MULTIPLE INTERRUPTION OF RATED FAULT CURRENT)

WITHSTANDING MOMENTARY FAULT CURRENT


SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

POWER CIRCUIT BREAKERS


MAIN FUNCTIONS/PURPOSES
1. INTERRUPT FAULT CURRENT AS QUICKLY AS POSSIBLE 2. ISOLATE AFFECTED CIRCUITS TO MINIMIZE DAMAGE TO OTHER EQUIPMENT 3. ENSURES CONTINUITY OF SERVICE

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

POWER CIRCUIT BREAKERS


TYPES OF CIRCUIT BREAKER
CLASSIFICATION ACCORDING TO ARC QUENCHING MEDIUM AIR CIRCUIT BREAKER (ACB) OIL CIRCUIT BREAKER (OCB) VACUUM CIRCUIT BREAKER (VCB) GAS CIRCUIT BREAKER (GCB)

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

AIR CIRCUIT BREAKER (ACB)


METHODS OF ARC DISTINGUISHING BLOWING OF AIR TO THE ARC TOWARDS THE ARC CHUTES

SUBSTATION

SAMPLE OF A TYPCIAL WITHDRAWABLE TYPE AIR CIRCUIT BREAKER

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

OIL CIRCUIT BREAKER (OCB)


METHODS OF ARC DISTINGUISHING

COOLING THE ARC BY PUMPING OIL INSIDE THE INTERRUPTER ABSORBS HEAT BROUGHT ABOUT BY THE ARC GOOD INSULATING MEDIUM WHICH PREVENTS RESTRIKING OF INTERRUPTED CURRENT

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

OIL CIRCUIT BREAKER (OCB)


POWER CIRCUIT BREAKERS

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

BOTOCAN SUBSTATION

SF6 GAS CIRCUIT BREAKER (GCB)


POWER CIRCUIT BREAKERS
METHODS OF ARC DISTINGUISHING PUFFING SF6 GAS TO THE INTERRUPTER AND ABSORBING HEAT BROUGHT ABOUT BY THE ARC. HIGH DIELECTRIC STRENGTH OF SULFUR HEXAFLOURIDE (SF6) PREVENTS RESTRIKING OF INTERRUPTED CURRENT.

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SEQUENCE OF SF6 GAS ARC QUENCHING

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SF6 GAS CIRCUIT BREAKER (GCB)


POWER CIRCUIT BREAKERS

TERMINAL PADS

INTERRUPTER BUSHING

PRESSURE RELIEF DEVICE

SUBSTATION

CONTROL & MECHANISM GROUNDED TANK

CURRENT TRANSFORMER

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

VACUUM CIRCUIT BREAKER (VCB)


POWER CIRCUIT BREAKERS

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

VACUUM CIRCUIT BREAKER (VCB)


METHODS OF ARC DISTINGUISHING AIR WHICH CONTRIBUTES TO ARC PRODUCTION IS ABSENT, THUS NO ARC IS PRODUCED DURING CURRENT INTERRUPTION.

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

VACUUM CIRCUIT BREAKER (VCB)


POWER CIRCUIT BREAKERS

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

DISCONNECT SWITCH

SUBSTATION

115kV DISCONNECT SWITCH


SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

69kV DISCONNECT SWITCH

115kV DISCONNECT SWITCH

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

115kV MOTORIZED REMOTECONTROLLED DISCONNECT SWITCHER

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

34.5kV DISCONNECT SWITCH (CONVENTIONAL SUBSTATION)

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SWITCHGEARS

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

GAS INSULATED SWITCHGEAR

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SF6-FILLED GAS

STATIONARY CONTACT

SUBSTATION
MOVING CONTACT

NORMAL OPEN POSITION

GAS INSULATED SWITCHGEAR BREAKER MODULE

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

GAS INSULATED SWITCHGEAR CROSS SECTIONAL VIEW

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

FACTORY-ASSEMBLED BLOCK WITH HORIZINTALLY MOUNTED CAPACITOR UNITS

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SAMPLE 200 KVAR, 19996 V, CAPACITOR UNIT

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

LEGAZPI SUBSTATION - MCBD

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

LEGAZPI SUBSTATION - MCBD

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

LEGAZPI SUBSTATION MAKATI CENTRAL BUSINESS DISTRICT(MCBD)

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

115kV ENCAPSULATED 3-PHASE SWITCHGEAR

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

MICROSCADA SYSTEM

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

CBP1A SUBSTATION

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

CUBAO SUBSTATION

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

MAINTENANCE OF OIL FILLED POWER TRANSFORMER AND CAPACITORS


SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

SUBSTATION

SUBSTATION PRESENTATION TO IIEE DELEGATES JUNE 28,2007

Meralcos 34.5 kV radial system is a wye-grounded system