ANNEXURE-I

PROJECT -DPPAHS FOR BED ASH & FLY ASH CONVEYING FOR 2x480TPH CFBC BOILERS OF 2x150MW POWER PLANT AT TUTICORIN (TN) AQUATHERM DOC TRANSMITTAL NO:- AEC/8629/IBTPL/VDT-156 Dated 16/04/2011

REF:- DWG NO..MPPL-U1083/ 337 Rev_0 S.NO.


DESCRIPTION COMMENTS SHEET NO. MECGALE REPLY

POWER CONTROL CENTRE

LOCATION TO BE INDICATED AS ESP/AHS MCC ROOM BUS DUCT RATING TO BE CHANGED TO 2500A INCOMER#1 ACB SHALL BE 4 POLE TYPE

2 OF 6 2 OF 6 2 OF 6

DRAWING REVISED ACCORDINGLY DRAWING REVISED ACCORDINGLY PLEASE NOTE THAT FOR SOLIDLY EARTHED 415V SYSTEM WHERE IN NEUTRAL IS ALWAYS AT EARTH POTENTIAL, THERE IS NO NEED TO PROVIDE 4 POLE ACB HENCE NOT PROVIDED. ALSO THE REQUIREMENT IS BEYOND THE SCOPE OF CONTRACT. NOTED. DRAWING REVISED ACCORDINGLY NOTED. DRAWING REVISED ACCORDINGLY. ALSO PLEASE NOTE THAT CT, AMMETER & MAIN BUS BAR RATINGS HAVE ALSO BEEN REVISED TO 2500A. NOTED. DRAWING REVISED ACCORDINGLY PLEASE NOTE THAT WE HAVE INSTEAD OF CURRENT TRANSDUCER, PROVIDED A MULTI FUNCTION METER(MFM) WHICH HAS RS485 PORT FOR DCS CONNECTIVITY.MFM SHALL ALLOW TO TRANSMIT NOT ONLY CURRENT SIGNAL BUT VOLTAGE/ KW/ KVA/ KWH SIGNALS ALSO. AS SUCH CURRENT TRANSDUCER IS REDUNDANT & HENCE NOT PROVIDED. DRAWING REVISED ACCORDINGLY REPLY SAME AS INCOMER#1 REPLY SAME AS INCOMER#1 NOTED. DRAWING REVISED ACCORDINGLY NOTED. DRAWING REVISED ACCORDINGLY NOTED. DRAWING REVISED ACCORDINGLY

AEC COMMENTS 1 ACB SHALL HAVE UNDER VOLTAGE RELEASE. 2 THE INCOMER & BUS COUPLER RATING SHALL BE CHANGED TO 2500A INSTEAD OF 2000A. 3 ONE NO 63A WELDING SOCKET FEEDER SHALL BE PROVIDED 4 CURRENT TRANSDUCER (4-20mA) SHALL BE PROVIDED AT INCOMING FOR DCS INTERFACE

2 OF 6 2 OF 6

2 OF 6 2 OF 6

BUS DUCT RATING TO BE CHANGED TO 2500A INCOMER#2 ACB SHALL BE 4 POLE TYPE BUS COUPLER ACB SHALL BE 4 POLE TYPE MAIN BUS BAR RATING SHALL BE 2500A MCCB RATING SHALL BE 63A INSTEAD OF 25A FLY ASH SILO#1 &2 FLUIDISING POWER CUM CONTROL PANEL. POWER CUM CONTROL PANEL FLY ASH SILO#1/ POWER CUM CONTROL PANEL FLY ASH SILO#2. SPARE FEEDERS SHALL BE PROVIDED FOR EACH RATING.

3 OF 6 3 OF 6 3 OF 6 3 OF 6 3 OF 6 4 OF 6

SPARE FEEDERS SHALL BE PROVIDED FOR EACH RATING.

5 OF 6

PLEASE NOTE THAT THESE PANELS BEING EXCLUSIVE TO PARTICULAR SUB-SYSTEMS ARE OF STANDARD DESIGN. ALSO PLEASE NOTE THAT PLACES OF INSTALLATION OF THESE PANELS HAVE RESTRICTIONS ON AVAILABILITY OF SPACE FOR MOUNTING. IT IS THEREFORE NOT POSSIBLE TO PROVIDE SPARE FEEDERS IN THESE PANELS PLEASE NOTE THAT THIS PANEL BEING EXCLUSIVE TO PARTICULAR SUB-SYSTEM IS OF STANDARD DESIGN. ALSO PLEASE NOTE THAT PLACE OF INSTALLATION OF THIS PANEL HAS RESTRICTIONS ON AVAILABILITY OF SPACE FOR MOUNTING. IT IS THEREFORE NOT POSSIBLE TO PROVIDE SPARE FEEDERS IN THIS PANEL.

POWER CUM CONTROL PANEL BED ASH SILO. 4

SPARE FEEDERS SHALL BE PROVIDED FOR EACH RATING.

6 OF 6