CONTRACT NO : 39275-U-SEMSB-SO-2368 SOGT PROJECT NO : S02368 OFFSHORE TRANSPORTATION, INSTALLATION AND PRE-COMMISSIONING FOR SOGT PROJECT DAILY PROGRESS

REPORT Onshore & Shore Approach Pipeline Construction and Installation & Pre-Commissioning DOC No. DATE CLIENT CONTRACT REFERENCE LOCATION AIT PMT REPRESENTATIVE/RESIDENT ENGINEER AIT SITE REPRESENTATIVE / CSR AIT HSE OFFICER AMSB SITE MANAGER AMSB CONSTRUCTION MANAGER AMSB SITE PROJECT ENGINEER AMSB FIELD ENGINEER AMSB SAFETY OFFICER 01. SAFETY / MANHOUR REPORT PREVIOUS TOTAL MANHOURS WORKED (AMSB/HSAP) (Start from FILL UP PRE-MOB DATE) TOTAL MANHOURS WORKED (AMSB/PVSB) (Start from FILL UP PRE-MOB DATE) TOTAL MANHOURS WORKED (AIT) NUMBER OF LOST WORKDAYS ( FOR LTI's ) NUMBER OF RESTRICTED WORK CASES ( RWC's ) NUMBER OF MEDICAL, TREATMENT CASES ( MTC's ) NUMBER FIRST AID TREATMENT CASES ( FTC's ) NUMBER OF FIRE INCIDENTS ( ON JOB SITE ) NUMBER OF PROPERTY DAMAGE ( ON JOB SITE ) NUMBER OF EQUIPMENT FAILURE INCIDENTS ( ON JOB SITE ) NUMBER OF NEAR MISSES ( ON JOB SITE ) NUMBER OF INCIDENT MEDICAL EVACUATION ( MEDIVAC ) 02. WEATHER REPORT DESCRIPTION WEATHER / SKY 03. SAFETY REPORT UCUA OBSERVATION PREVIOUS UNSAFE CONDITION UNSAFE ACT SAFE OBSERVATION 04. PROGRESS NARRATIVE FROM 0800 0830 0845 0845 1000 1100 1200 1300 1300 1645 TO 28" & 36" ONSHORE PIPELINE INSTALLATION 0830 0845 1000 1200 1200 1200 1300 1500 1645 1700 TOOL BOX MEETING PRE JOB BRIEFING PREPARATION TO CONSTRUCT FOOTING FOR 36 & 28 TEMPORARY PIPE SUPPORT CONSTRUCT DETOUR ROAD PRIOR TO INSTALL 36 & 28 CONCRETE SLAB CAST CEMENT FOR 36 & 28 TEMPORARY PIPE SUPPORT MOBILIZE 2-3 STONE PRIOR TO CONSTRUCT DETOUR ROAD BREAK FOR LUNCH CONSTRUCT FOAM WORK CONTINUE CONSTRUCT DETOUR ROAD PRIOR TO INSTALL 36 & 28 CONCRETE SLAB HOUSEKEEPING PRE-COMMISSIONING WORKS 0000 0000 0030 0100 0120 0140 0215 0245 0345 0415 0430 0515 0615 0635 0710 0810 0835 0910 0910 0925 0950 1015 1120 1135 1145 1205 1215 1220 1240 1250 1315 1320 1355 1405 1600 1605 1610 0030 0030 0100 0120 0140 0215 0245 0345 0415 0430 0515 0615 0635 0710 0730 0835 0910 0925 0925 0950 1015 1120 1135 1145 1205 1215 1220 1240 1250 1315 1320 1355 1405 1600 1605 1610 1615 CONTINUE FILLING SEAWATER INSIDE BREAK TANK TOTAL VOLUME OF CHEMICAL TREATED SEAWATER: 1031.2M3 PRE-FLOOD PERCENTAGE 25% START PUMPING TO FILL TREATED SEAWATER INSIDE 28" PIPELINE (FLOWRATE:0.9M3/MIN) STOP PUMPING AND CONTINUE FILLING SEAWATER INSIDE BREAK TANK START PUMPING TO FILL TREATED SEAWATER INSIDE 28" PIPELINE STOP PUMPING AND CONTINUE FILLING SEAWATER INSIDE BREAK TANK START PUMPING TO FILL TREATED SEAWATER INSIDE 28" PIPELINE (FLOWRATE:1.1M3/MIN) CONTINUE FILLING SEAWATER INSIDE BREAK TANK START PUMPING TO FILL TREATED SEAWATER INSIDE 28" PIPELINE CONTINUE FILLING SEAWATER INSIDE BREAK TANK START PUMPING TO FILL TREATED SEAWATER INSIDE 28" PIPELINE (FLOWRATE: 1.2M3/MIN) FLOODING PUMP IDLING AWAITING BREAK TANK TO BE FILLED-UP START PUMPING TO FILL TREATED SEAWATER INSIDE 28" PIPELINE (FLOWRATE:1.1M3/MIN) FLOODING PUMP IDLING AWAITING BREAK TANK TO BE FILLED-UP START PUMPING TO FILL TREATED SEAWATER INSIDE 28" PIPELINE TOOL BOX MEETING PRE JOB BRIEFING HOUSEKEEPING AND LIFTING 8" RUBBER HOSE USING CRANE PREPARATION FOR ALL EQUIPMENT RELATED AND PROCEED WITH PUMP SELF-PRIMING RECEIVED 3 DRUMS OF DIESEL AT SITE LOCATION START PUMPING TO FILL TREATED SEA WATER INSIDE 28" PIPELINE STOP PUMPING TREATED SEAWATER INSIDE 28" PIPELINE DUE TO LOW TIDE CONDITION (1.1M SEA LEVEL) AND CONTINUED FILL UP SEA WATER INSIDE BREAK TANK CONTINUE PUMPING TREATED SEAWATER INSIDE 28" PIPELINE STOP PUMPING AND CONTINUE FILLING SEAWATER INSIDE BREAK TANK CONTINUE PUMPING AT 600RPM (1.8M3/MIN) STOP PUMPING FOR PRESSURE STABILIZE INSIDE PIPELINE CONTINUE PUMPING AT 900RPM (1.27M3/MIN) STOP PUMPING AND CONTINUE FILLING SEAWATER INSIDE BREAK TANK CONTINUE PUMPING AT 900RPM (1.42M3/MIN) STOP PUMPING DUE TO LOW TIDE CONDITION (1.2M SEA LEVEL) CONTINUE PUMPING AT 700RPM (1.23M3/MIN) STOP PUMPING AND CONTINUE FILLING SEAWATER INSIDE BREAK TANK CONTINUE PUMPING (0.48M3/MIN) STOP PUMPING DUE TO LOW TIDE CONDITION (1.2M SEA LEVEL) CONTINUE PUMPING (0.86M3/MIN) STOP PUMPING CONTINUE PUMPING (1.2M3/MIN) 115min 30min 65min ACTIVITIES DESCRIPTION DT (MINUTES) 88 62 36 TODAY 2 0 0 TOTAL ACCUMULATIVE 90 62 36 188 0900 FINE 1200 FINE 1500 FINE 41,354 6,600 3,857 0 0 0 0 0 0 0 0 0 0 TODAY 240 276 24 0 0 0 0 0 0 0 0 0 0 CUMULATIVE 41,594 6,876 3,881 52,351 0 0 0 0 0 0 0 0 0 0 : : : : : : : : : : : : : : ASO/SEM/1104/DPR/ONS-125 7-Aug-12 (TUESDAY) ALLIANCE INTERGRATED TEAM(AIT) CHO/2009/DFIN/743 SABAH OIL & GAS TERMINAL(SOGT),KIMANIS TENGKU SHAHRU HASLAN PARK SUNG HWAN HARAHAP ALLAN JOHN LIEW LIEW KIEW NAM MUHAMMAD WARID BIN ABDULLAH ARIFIN ABD RAUF / AHMAD ZARIDZ BIN AHMAD NIZAM MOHD ISAMUDDIN HARON RYAN O NEIL

Accumulative Total Manhours :

Page 1 of 4

CONTRACT NO : 39275-U-SEMSB-SO-2368 SOGT PROJECT NO : S02368 OFFSHORE TRANSPORTATION, INSTALLATION AND PRE-COMMISSIONING FOR SOGT PROJECT DAILY PROGRESS REPORT Onshore & Shore Approach Pipeline Construction and Installation & Pre-Commissioning DOC No. DATE 1615 1645 1700 1730 1735 1935 2000 2030 2200 2225 2245 2310 2345 1645 1700 1730 1735 1935 2000 2030 2200 2225 2245 2310 2345 0000 : : ASO/SEM/1104/DPR/ONS-125 7-Aug-12 (TUESDAY) 30min 30min

STOP PUMPING, SUCTION PUMP FAILURE DUE TO LOW TIDE CONDITION (1.1M SEA LEVEL) CONTINUE PUMPING (1.9M3/MIN) STOP PUMPING, SUCTION PUMP FAILURE DUE TO LOW TIDE CONDITION (1.1M SEA LEVEL) STILL UNABLE TO CONTINUE PUMPING. THE TOTAL VOLUME PUMPED IS 1478.3M3 HOUSEKEEPING AND CHECKED CURRENT CONDITION OF EQUIPMENT HANDOVER OVER JOB AND PRE JOB BRIEFING TO NIGHT CREWS CREW CHANGE FOR NIGHT SHIFT PUMP STILL STANDBY DUE TO LOW TIDE CONDITION (0.9M TO 1.0M) CONTINUED FILLING SEAWATER INSIDE BREAK TANK (SUBMERSIBLE PUMPS AND GEN-SET ARE ARRIVED) START PUMPING TO FILL TREATED SEAWATER INSIDE 28" PIPELINE (FLOWRATE: 1.2M3/MIN) STOP PUMPING DUE TO CHEMICAL TREATED SEAWATERCOMING OUT FROM 2" LAUNCHER OUTLET AWAITING FOR PIPELINE INTERNAL PRESSURE TO BE STABILIZED . INSTALLATION OF PRESSURE GAUGE AT 1/2" OUTLET ON TOP OF LAUNCHER CONTINUE WITH FILLING SEA WATER INSIDE BREAK TANK. TOTAL VOLUME: 1567.2M3, 28" PRE-FLOOD PERCENTAGE 38% TOTAL (MIN)

270min

05.

MEANWHILE ACTIVITY FROM TO MEANWHILE DT (MINUTES)

TOTAL (MIN) 06. PROJECT MILES STONE PROGRESS ACHIEVEMENT ITEMS ACTIVITIES WT % PREVIOUS TODAY TO DATE PLANNED

COMPLETION DATE

ONSHORE CONSTRUCTION WORK


01 02 03 04 05 Mobilisation of Equipment, Machineries and Material Site Office Set-Up Construction of Rock Berm Reinstatement Work Demob of Equipment, Machineries and Material PL 36" 06 07 08 09 10 11 12 13 14 Piling of Cofferdam Welding Sturts and Whalers Piling Holdback Anchor Wall (Linear Winch and Barge) Install Linear Winch and Barge Holdback Padeye Excavation of Trench Linear Winch Set-up Onshore Pipeline Installation Extraction of Sheet Pile Backfill Open Trench PL 28" 15 16 17 18 19 20 21 22 23 Piling of Cofferdam Welding Sturts and Whalers Piling Holdback Anchor Wall (Linear Winch and Barge) Install Linear Winch and Barge Holdback Padeye Excavation of Trench Linear Winch Set-up Onshore Pipeline Installation Extraction of Sheet Pile Backfill Open Trench TOTAL 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 15.00% 1.68% 1.68% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 1-May-12 9-May-12 3-May-12 26-May-12 7-Jun-12 1-Jun-12 24-Jul-12 28-Jul-12 1-Aug-12 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 15.00% 1.68% 1.68% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 29-Apr-12 1-May-12 3-May-12 4-May-12 14-May-12 12-May-12 24-Jul-12 2-Aug-12 3-Aug-12 20.00% 10.00% 2.30% 1.70% 1.68% 100.00% 100.00% 100.00% 70.00% 32.62% 0.00% 0.00% 0.00% 5.00% 0.00% 100.00% 100.00% 100.00% 75.00% 32.62% 100.00% 100.00% 100.00% 100.00% 100.00% 28-Apr-12 13-Apr-12 28-Apr-12

100.00%

98.42%

0.09%

98.51%

NOTE 1: ONSHORE TEAM ACTIVIES IN ASSISTING 1MAS 300 BEACH PULL AND PL PRE-COMMISSIONING (OPTIONAL) ARE NOT CAPTURED IN THE MILESTONE AND PERCENTAGE PROGRESS ACHIEVEMENT

No. 1 2 3 4 5 6 7 8 9

ACTIVITIES Mobilization of all PVSB personnal, material & equipment Setup Equipment/HDPE Pre-comm 28" pipeline Pre-flooding for 28" Cleaning,Gauging for 28" Hydrotesting Pre-comm 36" pipeline Pre-flooding for 36" Cleaning,Gauging for 36" Hydrotesting Demobilization TOTAL

WT %

PREVIOUS

TODAY

TO DATE

PLANNED

COMPLETION DATE 3-Aug-12

10.00% 20.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 100.00%

99.96% 100.00% 15.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 31.50%

0.00% 0.00% 23.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2.30%

99.96% 100.00% 38.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 33.80%

100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 2.50% 0.00% 80.25%

07.

PLANNED ACTIVITIES FOR THE NEXT 24 HOURS ACTIVITIES ONSHORE PIPELINE INSTALLATION 1 2 3 4 1 2 MOBILIZE 2-3 STONE PRIOR TO CONSTRUCT DETOUR ROAD CONSTRUCT DETOUR ROAD PRIOR TO INSTALL 36 & 28 CONCRETE SLAB EXCAVATE GROUND PRIOR TO INSTALL 36 & 28 CONCRETE SLAB INSTALL FOAM WORK INSIDE OPEN CUT TRENCH PRE-COMMISSIONING WORKS CONTINUR WITH PRE-FLOODING ACTIVITY RECTIFICATION WORK TO IMPROVE ON PUMPING FLOW RATE( TRY TO GET AN ADDITIONAL PUMP FOR AUXILIARY PUMPING)

08.

MATERIAL ON SITE MATERIAL ON SITE SHEET PILE (PCS) ARMOUR ROCK (TON) I-BEAM (PCS) CHEMICAL (3 IN 1 & DYE) 36" PIG 28" PIG DIESEL PREVIOUS 798 2142 52 76 4 5 13 TODAY 0 0 0 0 0 0 0 TO DATE 798 2142 52 76 4 5 13

Page 2 of 4

CONTRACT NO : 39275-U-SEMSB-SO-2368 SOGT PROJECT NO : S02368 OFFSHORE TRANSPORTATION, INSTALLATION AND PRE-COMMISSIONING FOR SOGT PROJECT DAILY PROGRESS REPORT Onshore & Shore Approach Pipeline Construction and Installation & Pre-Commissioning DOC No. DATE 09. EQUIPMENT ON SITE EQUIPMENT ON SITE SHORE APPROACH EX 200 EXCAVATOR 25 TON MOBILE CRANE 20 FT OFFICE CONTAINER 10 FT STORE CONTAINER PORTABLE TOILET WITH SEPTIC TANK 20FT RESTING SHED 100KVA GENSET WATER TANK EX 400 EXCAVATOR C/W VIBRO HAMMER 600 AMPS WELDING MACHINE TOWER LIGHT EX 200 LONG ARM EXCAVATOR 120 TON MOBILE CRANE LINEAR WINCH SPREAD 26.5T LINEAR WINCH 30T CABLE DRUM PRE-COMMISSIONING SUCTION PUMP FLOODING PUMP 6" HDPE PIPE (700 METER) BREAK TANK FILTER UNIT CHEMICAL PUMP 6" FLOWMETER MANIFOLD 12" C/W 6" OUTLET 175 CFM AIR COMPRESSOR DIESEL STORAGE 36" TEMPORARY LAUNCHER 28" TEMPORARY LAUNCHER SITE OFFICE @ 20' CANOPY TEST CABIN TOWER LIGHT TOILET & SANITARY 20 KVA GENSET HIGH PRESSURE PUMP TOTAL 10 PROJECT DOWNTIME BREAK DOWN PROJECT DOWNTIME BREAK DOWN (ONSHORE PIPELINE INSTALLATION) 1.1 EQUIPMENT BREAKDOWN 1.2 PTW 1.3 WEATHER DOWNTIME 1.4 WELD REPAIR 1.5 NDT 1.6 OTHERS SUB TOTAL : CRITICAL TODAY (HRS) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CRITICAL TODATE (HRS) 7.00 3.00 28.40 0.00 0.00 21.18 59.58 NON-CRITICAL TODAY (HRS) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NON-CRITICAL TODAY (HRS) 0.00 0.00 0.00 0.00 0.00 NON-CRITICAL TODATE (HRS) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NON-CRITICAL TODATE (HRS) 0.00 0.00 0.00 0.00 0.00 4 2 1 1 1 2 2 1 4 1 1 1 1 1 2 2 1 2 54 28/07/2012 17/07/2012 17/07/2012 17/07/2012 19/07/2012 27/07/2012 17/07/2012 17/07/2012 17/07/2012 27/07/2012 28/07/2012 27/07/2012 27/07/2012 27/07/2012 17/07/2012 17/07/2012 28/07/2012 1 1 3 1 1 1 2 1 1 4 3 1 1 1 1 1 07/04/2012 07/04/2012 08/04/2012 08/04/2012 08/04/2012 09/04/2012 09/04/2012 09/04/2012 11/04/2012 16/04/2012 27/04/2012 04/05/2012 09/05/2012 10/05/2012 11/05/2012 11/05/2012 13/07/2012 03/07/2012 03/07/2012 03/07/2012 07/08/2012 QUANTITY On Hire Off Hire : : ASO/SEM/1104/DPR/ONS-125 7-Aug-12 (TUESDAY)

PROJECT DOWNTIME BREAK DOWN (PRE-COMMISSIONING WORKS) 1.1 EQUIPMENT BREAKDOWN 1.2 PTW 1.3 WEATHER DOWNTIME 1.4 OTHERS SUB TOTAL :

CRITICAL TODAY (HRS) 0.00 0.00 0.00 4.50 4.50

CRITICAL TODATE (HRS) 0.00 0.00 6.50 9.50 16.00

Page 3 of 4

CONTRACT NO : 39275-U-SEMSB-SO-2368 SOGT PROJECT NO : S02368 OFFSHORE TRANSPORTATION, INSTALLATION AND PRE-COMMISSIONING FOR SOGT PROJECT DAILY PROGRESS REPORT Onshore & Shore Approach Pipeline Construction and Installation & Pre-Commissioning DOC No. DATE 11 PROJECT PERSONNEL PERSONNEL SHORE APPROACH SITE MANAGER SITE PROJECT ENGINEER FIELD ENGINEER SAFETY OFFICER CONSTRUCTION MANAGER FIELD ENGINEER SAFETY OFFICER QA/QC 3RD PARTY INSPECTOR RIGGER FOREMAN RIGGER WELDER FOREMAN FITTER PIPE WELDER STRUCTURAL WELDER EXCAVATOR OPERATOR VIBROHAMMER OPERATOR CRANE OPERATOR LINEAR WINCH OPERATOR NDT TECHNICIAN STOREKEEPER BACKHOE OPERATOR HELPER SURVEYOR MECHANIC ELECTRICIAN SITE CLERK SECURITY GUARD OTHERS COMPANY AMSB AMSB AMSB AMSB HSAP HSAP HSAP HSAP AMSB/BV HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP SUB TOTAL PERSONNEL PRE-COMMISSIONING PROJECT MANAGER PROJECT CO-ORDINATOR TECHNICAL ADVISOR ENGINEER SAFETY OFFICER SUPERVISOR MECHANIC SKILL OPERATOR OPERATOR HDPE PERSONNEL COMPANY PVSB PVSB PVSB PVSB PVSB PVSB PVSB PVSB PVSB PVSB SUB TOTAL CLIENT CSR AIT RESIDENT ENGINEER AIT SURVEYOR AIT INSPECTOR AIT PROJECT ENGINEER AIT CIVIL & STRUCTURE ENGINEER AIT HSO AIT CONSTRUCTION ENGINEER GRAND TOTAL REMARKS/ COMMENTS BY AIT: COMPANY AIT AIT AIT AIT AIT AIT AIT AIT SUB TOTAL MALAYSIAN 1 1 1 1 1 1 1 1 0 4 4 0 1 0 2 2 0 1 0 0 0 0 1 2 2 0 0 3 0 30 MALAYSIAN 0 1 1 2 1 3 2 4 9 0 23 MALAYSIAN 0 1 0 0 0 0 1 0 2 55 ASIAN 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ASIAN 0 0 0 0 0 0 0 0 0 0 0 KOREAN 1 0 0 0 0 0 0 0 1 1 OTHERS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 OTHERS 0 0 0 0 0 0 0 0 0 0 0 OTHER 0 0 0 0 0 0 0 0 0 0 TOTAL 1 1 1 1 1 1 1 1 0 4 4 0 1 0 2 2 0 1 0 0 0 0 1 2 2 0 0 3 0 30 TOTAL 0 1 1 2 1 3 2 4 9 0 23 TOTAL 1 1 0 0 0 0 1 0 3 56 : : ASO/SEM/1104/DPR/ONS-125 7-Aug-12 (TUESDAY)

PREPARED BY (AMSB):-

CHECKED BY (AMSB):-

CHECKED BY (AMSB):-

APPROVED BY (AIT):-

NAME :

AHMAD ZARIDZ BIN AHMAD NIZAM

NAME : MUHAMMAD WARID POSITION : PROJECT ENGINEER

NAME : JOHN LIEW POSITION : SITE MANAGER

NAME : PARK SUNG HWAN POSITION : AIT CSR

POSITION : FIELD ENGINEER

Page 4 of 4