Beruflich Dokumente
Kultur Dokumente
LS
Flooring
SM
1995.02
1200
2394025
Dadoing
SM
441.66
1200
529986
Skirting
RM
501.78
1200
602136
False Ceiling
SM
1995.02
700
1396514
Ceiling Plastering
SM
800.00
140
112000
Plastering
a.Internal
SM
2751.57
140
385220
b.External
SM
802.95
180
144531
10
Painting
11
a.Internal
SM
4746.59
120
569591
12
b.External
SM
802.95
200
160590
13
Doors
SM
119.28
5000
596400
14
Windows glazed
SM
130.00
4000
520000
15
LS
16
Railing
RM
17
Electrical
LS
4000000
18
LS
10000
19
Water Proofing
LS
200000
20
Elevator
LS
800000
21
Unforeseen Expenses
LS
500000
Grand Total
2063464
600000
194.88
5000
974400
16558857
26-02-10
Basements
(A) + (B)
38,200.0 SM. or
411,032.0 Sft.
RCC
Cum
#REF!
Shuttering
SM
#REF!
Steel
MT
#REF!
(C) + (D)
45,792.0 SM. or
492,721.9 Sft.
#REF!
#REF!
#REF!
9,616.3 104,863.7
Main. Bldg.
(E)
25,218.0 SM. or
271,345.7 Sft.
#REF!
#REF!
#REF!
5,295.8
57,749.2
Blocks
20,574.0 SM. or
221,376.2 Sft.
#REF!
#REF!
#REF!
4,320.5
47,114.5
129,784.0 SM. or
1,396,475.8 Sft.
#REF!
#REF!
#REF!
27,254.6 297,205.4
S.No
A
B
#REF!
D
E
F
G
H
I
J
K
L
M
N
O
#REF!
#REF!
#REF!
Description
Qty
Footings - Concrete
19.80
Footings - Shuttering
88.00
#REF!
#REF!
Pedestals-Concrete
1.28
Pedestals-Shuttering
6.40
Pedestals-Reinforcement
#REF!
Columns-Concrete
12.00
Columns-Shuttering
100.00
Columns-Reinforcement
#REF!
Plinth beams- Concrete
8.00
Plinth beams- Shuttering
64.00
Plinth beams- Reinforcement #REF!
RF Beams Concrete
40.64
GF Beams Shuttering
426.72
GF beams- Reinforcement
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
23,471
Unit
CM
SM
#REF!
CM
SM
#REF!
CM
SM
#REF!
CM
SM
MT
CM
SM
MT
#REF!
#REF!
#REF!
SM
Concrete
Shuttering
Steel
Floor wise
#REF!
#REF!
#REF!
CM
SM
MT
Concrete
#REF!
Shuttering
#REF!
Reinforcement #REF!
3,576.0
Excavation
29.07
20.65
Description
10
2.40
10
2.20
S.No
A
1
PCC
F-1
S.No
A
1
Description
Footings - Concrete
F-1
S.No
B
1
Description
Footings - Shuttering
F-1
22
2.20
1.800
D
1
Pedestals-Concrete
P-1/F-1
n
10
L
0.80
B
0.800
E
1
Pedestals-Shuttering
P-1/F-1
n
10
L
0.80
B
0.800
Description
Pedestals-Reinforcement
n
----
L
----
B
----
Columns-Concrete
C-1
n
10
B
0.600
S.No
F
G
1
0.40
B
2.000
B
1.800
H
1
S.No
I
J
1
2
K
1
2
S.No
L
Columns-Shuttering
C-1
n
10
Description
Columns-Reinforcement
n
----
L
----
B
----
Description
Plinth beams- Reinforcement
2
8
n
2
8
0.40
14.60
6.35
L
14.60
6.35
0.250
0.250
n
----
L
----
B
----
6.35
B
0.250
6.35
6.35
B
0.250
0.250
RF Beams Concrete
Vertical
n
8
N
1
GF Beams Shuttering
Vertical
n
8
8
n
----
L
----
Description
GF beams- Reinforcement
0.250
0.250
M
1
S.No
O
B
0.600
B
----
Form work
311.74
SM
Brick Work
Plastering
16
AC sheet
Truss
Exavation
10
2
2
3.00
15.00
14.00
Purlins
10
28.00 16.800
16
21
2
2
2
2
2
2
2
0.40 0.400
100.00 95.000
15.00 8.900
15.30 8.900
2.38 4.500
1.95 8.900
1.30 4.500
14.80 4.500
6.90 8.900
Total Steel wt
10.10
2.600
0.350
Ton
6.00
3601.85
0.100
D
0.500
D
0.500
Unit
4.80
4.80
Unit
19.80
19.80
Q
D
0.200
CM
CM
Unit
88.00
88.00
D
0.200
CM
CM
SM
SM
1.28
1.28
Unit
CM
CM
6.40
6.40
Unit
SM
SM
D
----
Q
#REF!
Unit
#REF!
D
5.000
Q
12.00
12.00
Unit
CM
CM
D
5.000
Q
100.00
100.00
Unit
SM
SM
D
----
Q
#REF!
Unit
#REF!
0.400
0.400
Unit
2.92
5.08
8.00
CM
CM
CM
Unit
0.400
0.400
23.36
40.64
64.00
SM
SM
SM
D
----
Q
#REF!
Unit
MT
Unit
CM
CM
D
0.400
D
0.400
0.400
D
----
5.08
5.08
Q
40.64
12.70
53.34
Unit
SM
Q
#REF!
Unit
MT
SM
Kg
6.35
0.23
6.35
5.00
508.00
SM
15.00
27.00
405.00
SM
1.000
5.00
78.00
6.30
CM
4704.00
Kgs
58.42
CUM
0.600
100
10.000
10.000
7.85
7.85
200.96
15.66
267
272.34
21.42
34.71
11.7
133.2
122.82
1079.811
Kgs
95
21
78.5 15.6608
Reinforcement
Footings
S.No
Name of Building
Span
No of
Footings
Bottom Rft
Long Span
Short Span
10
10
2.2
1.8
Top Rft
Long Span
Short Span
10
10
2.2
1.8
Type
No of
Pedastals
Width
Depth
Main bars
Stirrups
10
10
0.80
0.60
No. of
Beams
Length
Width
2
2
17.884
0.94
0.25
Description
Pedastals
S.No
Name of Building
Plinth Beams
S.No
1
Name of Building
Type
Horizontal
Main bars
Stirrups
Vertical
Main bars
Stirrups
Name of Building
Type
Vertical
Main bars
Stirrups
8
8
9.634
0.94
0.25
No. of
Beams
Length
Width
8
8
9.634
0.94
0.25
Type
No of
columns
Main bars
Stirrups
10
10
Roof Beams
S.No
Columns
S.No
Item
Column
C1
Width
0.4
Depth of
Footing
Unit wt of
Bar
Quantity
0.5
0.5
2.42
2.03
18
18
12
12
0.89
0.89
387.73
325.33
0.5
0.5
2.43
2.03
18
18
12
12
0.89
0.89
389.33
325.33
1427.73
Cover
Span
Bar Length
0.04
0.7
0.7
0.80
Spacing
No' of Bars
0.2
4
4
Dia of Bar
Unit wt
of Bar
Quantity
12
8
0.89
0.40
24.89
11.06
35.95
Depth
Spacing
No. of bars
Dia. of
bars
0.15
6
119
16
8
0.4
Unit wt of
Bar
Quantity
1.58
0.40
339.13
88.55
0.4
0.15
6
64
16
8
1.58
0.40
730.76
190.81
1349.25
Depth
Spacing
No. of bars
Dia. of
bars
Unit wt of
Bar
Quantity
0.15
6
64
16
8
1.58
0.40
730.76
190.81
0.4
921.57
Depth
Cover
Span
Bar Length
0.6
0.04
6.3
6.3
1.76
Spacing
No' of Bars
0.2
8
32
Dia of Bar
16
8
Unit wt of Bar
Quantity
1.58
796.44
219.02
1015.47
0.40