Sie sind auf Seite 1von 4

Item

1 2 3

3-YEAR WORKMANSHIP WARRANTY PROFESSIONAL SERVICES

Description

DESIGN CONSULTATION ,FURNITURE LAYOUT PLAN & MASTERIAL PROPOSAL 3D PERSPECTIVE DRAWING ,PROJECT CONSULTATION & MANAGEMENT ON SITE SUPERVISION BY QUALIFY PERSONNEL & LETTER OF WARRANTY LIVING/DINING HALLS AND HOUSEHOLD SHELTER

1 2 3 4 5 6 7

SUPPLY/LAY HOMOGENEOUS TILES WITH SKIRTING FOR LIVING/DINING HALLS ($3 psf) SUPPLY/LAY HOMOGENEOUS TILES WITH SKIRTING FOR HOUSEHOLD SHELTER ($3 psf) SUPPLY/LAY SLATE TILES WITH SKIRTING AT FOYER ($3 psf) SUPPLY/INSTALL VENEER/LAMINATED FEATURE WALL C/W TIC-TAC DOOR TO SEAL UP HOUSEHOLD SHELTER(5FTS WIDTH) SUPPLY/INSTALL FULL HEIGHT LAMINATED SHOERACK AT FOYER C/W DESIGNER HANDLES, ABS TRIMS (6FTS WIDTH) added $100 for veneer finish SUPPLY/CONSTRUCT L-BOX FOR LIVING AND FALSE CEILING FOR FOYER SUPPLY/BOX UP 2 NOS. U-BOX TO CONCEAL AIR-CON PIPES AT PASSAGEWAY($90 EACH) BEDROOMS

1 2 3 4 5

SUPPLY/LAY PARQUAT FLOORING WITH TIMBER SKIRTING FOR MASTER BEDROOM SUPPLY/LAY HOMOGENEOUS TILES WITH SKIRTING FOR BEDROOM 2 AND 3 SUPPLY/INSTALL L-SHAPE WALK-IN WARDROBE C/W DRAWERS WITH TRIM W/O DOOR AT M/ROOM(13FTS) added $100 for veneer finish SUPPLY/INSTALL L-SHAPE GYPSUM PARTITION FOR WALK-IN AREA AT MASTER BEDROOM SUPPLY/INSTALL 1 MIRROR INSTALL ON WALL FOR WALK-IN AT MASTER BEDROOM(2 X 5)FTS KITCHEN

1 2 3 4 5 6 7 8

DEMOLITION OF OPENING BETWEEN DINING HALL AND KITCHEN AND MAKE GOOD ON AFFECTED AREA SUPPLY/CONSTRUCT FALSE BEAM ABOVE KITCHEN ENTRANCE AND NEW OPENING SUPPLY/INSTALL 1 NO.FRAMELESS TEMPERED GLASS SWING DOOR AT KITCHEN ENTRANCE SUPPLY/INSTALL L-SHAPE TEMPERED FIXED PANEL FOR KITCHEN NEW OPENING CONSTRUCTION OF FRIDGE, WASHING MACHINE AND CABINET BASES FOR KITCHEN AND VANITY RELOCATION OF INLET/OUTLET PIPING FOR KITCHEN SINK, MASTER TOILET SINK AND WASHING MACHINE SUPPLY/INSTALL SOLID LAMINATED KITCHEN CABINET (TOP/BOTTOM=34FTS)(INCLUDE STAIN)LESS STEEL DISHRACK, 2 GLASS PANELS C/W LAMINATED FRAME, ABS TRIMS, DESIGNER HANDLES AND CULTURY TRAY SUPPLY/INSTALL SOLID SURFACE TOP FOR KITCHEN CABINET (23FTS) TOILETS

1 2 3 4 5

CONSTRUCTION OF SHOWER KERBS FOR BOTH TOILETS SUPPLY/INSTALL FRAMELESS SHOWER SCREEN AT MASTER TOILET (10MM THICKNESS) SUPPLY/INSTALL 2 NOS.FRAMELESS TEMPERED SWING/FROSTED DOOR AT BOTH TOILETS' ENTRANCE SUPPLY/INSTALL 1 NO. WALL TO WALL SOLID SURFACE VANITY FOR MASTER TOILET(EXCLUDE BASIN) SUPPLY/INSTALL SOLID LAMINATED SUSPENDED CABINET BELOW VANITY C/W FULL MIRROR AT MASTER TOILET added $100 for veneer and ABS TRIMS WHOLE HOUSE AND GENERAL

1 2 3 4 5 6

REPLACEMENT OF WHOLE HOUSE PVC PIPES TO COPPER SUPPLY/INSTALL ALUMINIUM GRILLES FOR WHOLE HOUSE (EXCLUDE LIVING HALL BOTTOM) PAINTING OF WHOLE HOUSE WALLS/CEILINGS WITH ICI PENTALITE AND NIPPON 5000 (6 COLOURS) PAINTING OF DOOR FRAMES,PIPINGS AND GATE HAULAGE OF SAND SERVICE TO BE CARRIED OUT SUPPLY/LAY CURROGATED BOARD TO PROTECT NEW FLOORING

WHOLE HOUSE ACID WASHING

ACCEPTED BY

PG 1 OF 1

Amount
FOC FOC FOC

$ $ $ $ $ $ $

1,980 290 350 780 1,270 750 180

$ $ $ $ $

980 1,580 2,215 390 220

$ $ $ $ $ $ $ $

330 150 420 590 390 220 3,332 1,840

$ $ $ $ $

180 450 980 380 790

$ $ $ $ $

490 780 980 180 680 FOC

FOC $ 24,147

Das könnte Ihnen auch gefallen