ANNEXURE III ERECTION OF 400kV, 220kV, 132 kV & 33kV SUBSTATIONS Sl. No.

-1

Description of Item Unit -2 -3 1 Hoisting of insulators & hardware, paving conductor and Bus Section stringing of 400kV main bus for three phases with quadruple moose conductor to a tension of 1000kgs for single moose conductor, bus section length is 54mtrs. 2 Hoisting of insulators & hardware, paving conductor and Bus Section stringing of 400kV Jack bus for three phases with twin moose conductor to a tension of 1000kgs for single moose conductor, bus section length is 60mtrs. 3 Hoisting of Insulators and hardware, stretching the conductor and stringing of 220 kV bus comprising of three phases with Quadruple Moose conductor to a tension of 900kgs for single moose conductor. (The maximum length or up to a length of bus section of 40m) 4 Hoisting of Insulators and hardware, stretching the conductor and stringing of 220 kV bus comprising of three phases with single Zebra/Moose conductor to a tension of 900kgs.( The maximum length or up to a length of bus section of 40m) 5 Hoisting of Insulators and hardware, stretching the conductor and stringing of 220 kV bus comprising of three phases with Twin Zebra/Moose conductor to a tension of 1800kgs, including fixing of spacer clamps( The maximum length or up to a length of bus section of 40m). 6 Hoisting of Insulators and hardware, stretching the conductor and stringing of 132 kV bus comprising of three phases with Single Zebra/Moose conductor to a tension of 900kgs.( The maximum length or up to a length of bus section of 45m). Each

Each

Each

Each

7 Hoisting of Insulators and hardware, stretching the conductor and stringing of 132 kV bus comprising of three phases with Twin Zebra/Moose conductor to a tension of 1800kgs including fixing of spacer clamps.( The maximum length or up to a length of bus section of 45m). 8 Hoisting of Insulators and hardware, stretching the conductor and stringing of 33 kV bus comprising of three phases with Single Zebra/Moose conductor to a tension of 450kgs.( The maximum length or up to a length of bus section of 20m). Sl. No. -1 9 Description of Item -2 Hoisting of Insulators and hardware, stretching the conductor and stringing of 33 kV bus comprising of three phases with Twin Zebra/Moose conductor to a tension of 900kgs including fixing of spacer clamps. (The maximum length or up to a length of bus section of 20m). Hoisting of Insulators and hardware, stretching the conductor and stringing of 132 kV bus comprising of two phases with Single Zebra/Moose conductor to a tension of 900kgs.( The maximum length or up to a length of bus section of 45m). Erection of 7/3.66 G.S. Earth wire from top of Peak tower and LMs to ground and connecting to untreated earth pits including cutting, clamping and fixing of all hardware like Pad type compression clamp, cleat type clamp and T clamp etc (for 400kV). Fixing of spacers for Twin Moose conductor Fixing of spacers for Quadruple Moose conductor Fixing of Hardware, stretching the ground wire and stringing of earth wire to a tension of 450kgs from pinacle to pinacle. Fixing of Hardware, stretching the ground wire and stringing of earth wire to a tension of 450kgs from pinacle to ground. Connecting equipment to equipment through 4" IPS Al tube including cutting, bending, welding, testing, clamping etc., for each meter including both side connections.

Each

Each

Unit -3 Each

10

Each

11

RM

12 13 14

Each Each Each

15

RM

16

Meter

17 Connection of equipment to bus and or another equipment with single zebra / Moose conductor including measuring, cutting, clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary. 18 Connection of equipment to bus and or another equipment with Twin zebra / Moose conductor including measuring, cutting, clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary. 19(i) Laying of earth mat including excavation & backfilling, welding, connecting to all equipment, structures, Junction boxes, and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting to cast iron pipes as per approved drawings with the following sizes:(for 400kV) M.S. Rod 40 mm dia. 19(ii) Fabrication and connecting to risers from earth mat to structures, equipment, marshalling boxes, electrical panels, PLCC panels, fencing posts etc.,.(for 400kV) (a) M.S./ G.S. Flat 75 x 12 mm (b) M.S./ G.S. Flat 50 x 8 mm (Above ground) (c) Un-Treated Earth pits including installation of 40 mm dia rod electrode, disconnecting links, and all required materials and RCC collar/ chambers with bricks, cement mortar 1:4 and completion of related civil works as specified for LMs, LAs, Carrier couplings and CVTs. (Cost of RCC Collar included) 20 Laying of earth mat including excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats /GI Flats.(for 220kV & 132kV) including fabrication. (a) 100x16mm MS Flat / GI Flat. (b) 50x 8mm MS Flat / GI Flat.

Each

Each

RM

RM RM Each

RM RM

(c) For laying of earth flat in hard rock in substation / bays extension, an additonal amount of Rs.40/-per RM to the basic labour rate of SSR will be allowed as there is no provision in the rate of laying of earth flat for remvoal of hard rocks. 21 Excavation of earth pit, putting cast iron pipe with flange on one end (as per ISS7181/86) of nominal dia 125mm and 2.75 meters long in side the pit including supply and fixing RCC collars 0.75 meter dia (OD), 50mm thick and 0.60meters long in side the pit, backfill the pit in the 25mm size granules of BHcoke for full depth of the pit with alternate layers of BH coke and salt of 300mm thick around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of BH coke, salt, clamps, C.I.Pipes and RCC collars, labour charges for all operational and incidental items of work etc., complete. 22(I) Laying including termination and providing suitable ferrules & lugs etc of armoured Control cables of size 2 core, 2.5 Sq.mm to 27 core, 2.5 Sq. mm including cost of Cable Glands, lugs, ferrules (for 400kV) (a) (b) (c) 22(II) 2 to 12 core 14 to 19 core 27 core Laying including termination and providing suitable ferrules & lugs, Jointing kits etc of armoured Power cables of the following size including cost of cable glands, lugs, ferrules etc complete.(for 400kV) upto 50 sq.mm above 50 sq.mm to 300 sq.mm above 300 sq.mm to 700 sq.mm Buried Cable Trench - Excavation for cable trench providing 100mm thick sand layer before and after laying the cable & Providing 4" thick brick cover over sand, refilling, consolidation and levelling of surplus earth including the cost and conveyance of all materials, route markers, labour charges etc. complete for finished item of work (for 400kV). Size : 300 x 600 mm Size : 1500 x 800 mm

Each

RM RM RM

(a) (b) I 23

RM RM RM

(a) (b)

RM RM

24 Erection of Galvanised Cable trays with 2mm thick perforated CRCA Sheet. Size : 200 and 600 mm (for 400kV) 25 Laying and termination of HF cables for PLCC system (for 400kV) 26 Laying of Telephone cable of Different sizes in cable trench/ PVC Conduit pipe in wall (for 400kV) 27 Laying of underground OFAC (Optical Fibre Approach cable of 12 fibre capacity) through 40 mm dia PLPE HDPE pipe (Laying of pipe included) (for 400kV) 28 Laying of control cables of all sizes (from 2 core. 2.5 / 4.0sqmm to 12 core, 2.5/4.0sqmm, both copper and alluminium in cable trenches including cost of suitable metallic cable glands with rubber lining. Note: This includes running of cables in control room where cables are run on cable racks in cable duct (for 220kV & 132kV). 29 Laying of power cables (for 220kV & 132kV). :a upto 50 sqmm b above 50 sqmm 30 Cable terminations to the switchgear, Marshalling boxes / Panel terminal blocks/control & relay panels, LTAC panel including providng suitable ferrules and lugs as per specification (including cost of ferrules and lugs) (for 220kV & 132kV). (i) 2.5 sqmm Copper with copper lugs each core at both ends. (ii) 4.0 sqmm Aluminium with Aluminium lugs each core at both ends. (iii) Up to 50 sqmm Power Cable with lugs each core at both ends. (iv) Above 50 sqmm Power Cable with lugs each core at both ends. 31 Instalation of lighting fixtures on switch yard structures including cabling and connections, labour charges etc., including 40mm dia G.I bent pipe of 0.75m length with suitable clamps for fixing to structures in complete shape (excluding cost of lighting fixtures)

RM

RM RM RM

RM

RM RM

Nos. Nos. Nos. Nos. Each

32 Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from Dept. stores to the site). Note :- In 400kV Substations only, 25% extra charges for Testing and Commissioning of switchgear equipment where ever applicable). a(i) 420 KV SF6 Circuit breaker with support structure & marshalling boxes a(ii) 220 kV Circuit breakers with support structure & marshalling boxes a(iii) 132 kV Circuit breakers with support structure & marshalling boxes a(iv) 33 kV Circuit breakers b(i) 420 KV Single phase current transformers with secondary terminal box b(ii) 220 kV Current Transformers. b(iii) 132 kV Current Transformers. b(iv) 33 kV Current Transformers. c(i) 220 kV Potential Transformers. c(ii) 132 kV Potential transformers. c(iii) 33 kV Potential transformers. d(i) 390 KV Lightning Arrestors 32d(ii) 220 kV Lightning Arrestors. d(iii) 132 kV Lightning Arrestors. d(iv) 33 kV Lightning Arrestors. e(i) 420kV Single phase Capacitive Voltage transformers with secondary terminal box ( with / without carrier coupling device) e(ii) 220 kV Capacitve Voltage Transformers. e(iii) 132 kV Capacitve Voltage Transformers. f(i) 400 KV Isolators, 3 pole Horizontal centre break With Single earth switch f(ii) 400 KV Isolators, 3 pole Horizontal centre break With Double earth switches f(iii) 220 KV Isolators, 3 pole Horizontal Double break With Double earth switches f(iv) 220 kV Isolators with earth swtich f(v) 132 kV Isolators with earth swtich f(vi) 220 kV Isolators without earth swtich f(vii) 132 kV Isolators without earth swtich

Set Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

Each Each Set Set Set Each Each Each Each

f(viii) g(i) g(ii) g(iii) h(i) h(ii)

33 kV Isolators 400 KV Line Traps with pedestal stand 220 kV Wave traps 132 kV Wave traps 400 KV Bus post insulators 220 kV Bus Post Type Insulators / Solid Core Insulators

Each Each Each Each Each Each Each Each Each

h(iii) 132 kV Bus Post Type Insulators / Solid Core Insulators h(iv) 33 kV Bus Post Type Insulators / Solid Core Insulators 33 33 kV /400 V Station Transformer and HG fuse set including all necessary connections on HV & LV side including cost of lugs (But excluding cost of transformer and HG fuse set) 34 Erection of Control / Relay panels, LTAC panels, annunciation panels etc., in the control room duly mounting them on channels and grouting them with foundation bolts excluding cost of channels & foundation bolts (for 220kV & 132kV) 35 Erection of 220 V, 200 Ah/ 80 Ah battery in complete shape fit for charging (for 220kV & 132kV). 36 Erection of 220 V, 200 Ah / 80Ah battery charger (for 220kV & 132kV). 37 Erection of PLCC battery set (Lead acid Battery) in complete shape fit for charging. 38 Erection of PLCC battery set (Maintenance free) in complete shape fit for charging (for 220kV & 132kV). 39 Erection of PLCC battery charger) in complete shape fit for charging (for 220kV & 132kV). 40 Erection of Line Matching Unit 41 Erection of Capacitor Bank including series reactor of 7.5 MVA Capacity 42 Erection of PLCC Equipment, site handling, providing base channel, supports in complete shape (for 400kv sub stations) (a) PLCC Panel (b) EPAX-Decolam Table (c) Battery charger cum DC DB (incl. Testing&Alumi) (d) 48 V, 400 AH Battery (incl. Testing&Comm.) 43 Erection of Marshalling kiosk 44 Erection of Marshalling boxes

Each

Set Set Set Set Set Each Each

Each Each Each Each Each Each

45 Erection of Lighting pillar-box in switchyard on foundation laid (Excluding pillar box). (for 220kV & 132kV) 46 Fabrication of Main and Auxiliary structures, stub setting templates, foundation bolts, U bolts etc,.using raw steel such as M.S.Angles, Plates, Channels, R.S.Joists, M.S.rounds, excluding cost of Mild Steel and transport charges to substation site. 47 Galvanization of Main and Auxiliary structures, stub setting templates, foundation bolts, U bolts etc, using raw steel such as M.S.Angles, Plates, Channels, R.S.Joists, M.S.rounds, excluding cost of zinc and transport charges to substation site. (Cost of zinc should be followed as per IEEMA rates.). The average quantity of Zinc required for all angles of tower parts is 60 Kgs. 48 Setting of stubs with stub setting template for substation structure: Erection of stub template, fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stub setting template, dismantling of template after completion of initial curing of CC (a) For 220kV Towers (b) For 132kV Towers (c) For 33kV Towers & CPLs 49 Erection of the main and auxiliary structures etc., using bolts and nuts. 50 Fixing of 90lb rail poles over the transformer plinths. 51 Fixing of 105lb rail poles over the transformer plinths. 52 Erection of 33kV HG Fuse set 53 Painting of towers with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of towers and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. (a) First coat of 1st Grade Aluminium Paint duly scratching and cleaning of towers including labour charges, cost of paint, brushes etc. (b) Labour charges for painting including scratching and cleaning of towers of 1st coat of Aluminium with out cost of paint & brushes.

Each

MT

MT

Set Set Set MT RM RM Each

MT

MT

Second coat of 1st Grade Aluminium Paint duly MT scratching and cleaning of towers including labour charges, cost of paint, brushes, etc,. (d) Labour charges for painting including scratching and MT nd cleaning of towers of 2 coat of Aluminium with out cost of paint & brushes. 54 Painting of towers single coat of red oxide paint of 1st Grade, including scratching and cleaning of towers. (a) One coat of 1st Grade Red Oxide Paint including labour MT charges for scratching and cleaning of towers including cost of paint, brushes etc,. (b) Labour charges for painting of towers including MT scratching and cleaning of towers without cost of paint & brushes. 55 Preparation of contour plan of Substation switch yard One Acre sites by taking levels at 10m X 10m grid interval (where ever the ground level variation are in substation or hilly areas 5 m x 5m grid may be adopted). Plotting the contours at each 1 Mtr. Intervals duly showing the boundaries of the site, existing structures/features, roads, natural drain and ponds. There alternative formation levels along with cutting and filling quantities of earth in a most economical way are to be prepared and submitted. The rates are inclusive of cost and conveyance of materials, labour charges, hire charges of equipment and tools & plants.

BSTATIONS SS Rate for 200910 (Rs.) -4 22257

11289

12930

3233

6468

3233

6468

2425

SS Rate for 200910 (Rs.) -4 4044

2155

33

64 96 484

33

143

193

299

86

75 32 1204

50 39.4

7819

29 33 39

50 64 81

140 372

33

9 4 16

7.4

7.4 10.2

20.2 21.5 39.3 73.2 647

13522 11318 8085 2506 3854 2750 1779 647 2750 1779 647 3718 1779 840 357 3854

2587 1779 7829 9395 5239 4366 3233 4044 2910

1051 2498 1213 840 3718 1779 840 357 4044

1131

6953 2506 3721 2291 1146 235 2900

3000 732 4413 4413 484 235

647

5738

3361

2268 1628 407 1617 322 376 390

2618

734

1532

416

1640

910

2000

ANNEXURE-IX EQUIPMENT / MATERIAL RATES


Sl. No. (1) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Description of Item (2) SUBSTATION MATERIALS 100kVA 33/0.4kV Stn. Transformer with HG Fuse set 250kVA 33/0.4kV Stn. Transformer with HG Fuse set 220kV SF6 Circuit Breakers 132kV SF6 Circuit Breakers 33kV Vacuum Circuit Breakers 220kV PTR CTs 300Amps. 220kV Feeder CTs 800 Amps 132kV PTR CTs 300A (Differential Core) 132kV Feeder CTs 600 A 33kV CTs 1200 A 33kV CTs 400 A 220kV Potential Transformers 132kV Potential Transformers 33kV Potential Transformers 220kV CVTs 132kV CVTs Unit (3) Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each SS Rate for 2009-10 (Rs.) (4) 250998.00 430186.00 1364414.00 735630.00 277989.00 380855.00 375855.00 121582.00 89637.00 34671.00 21558.00 371857.00 143784.00 28431.00 324342.00 220131.00 50769.00 36033.00 4300.00

17a 220kV Lightning Arrestors 17b 132kV Lightning Arrestors 17c 33kV Lightning Arrestors

17c 33kV Lightning Arrestors 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 220kV, 800A Isolators with E/s 220kV, 800A Isolators without E/s 220kV,1600A Isolators with E/s 220kV, 1600A Isolators without E/s 132kV 800A Isolators with E/s 132 kV 800A Isolators W/O E/s 33 kV Isolators - 800 Amps 220kV Solid Core Insulator 132kV Solid Core Insulator 33kV Solid Core Insulator 220V, 200AH Battery Set 220V 200Ah Battery set (M.F.) 220V 200Ah Charger with DCDB 220V 80Ah Battery set(MF) 220V 80Ah / 100 Ah Charger with DCDB 220kV Transformer C&R Panel 220kV Feeder C&R Panel 220kV Bus bar Protection Panels 220kV Bus-Coupler C & R Panels 132kV feeder C&R panel 132kV Transformer panel. LTAC panel 33kV Twin feeder panel 11kV , 2500 Amps VCB Kiosk 11kV , 1250 Amps VCB Kiosk

Each Each Each Each Each Each Each Each Each Each Each Set Set Set Set Set Each Each Each Each Each Each Each Each Each Each

4300.00 158851.00 136158.00 195000.00 185000.00 102118.00 79425.00 34039.00 16736.00 9191.00 2042.00 351741.00 499245.00 209910.00 249623.00 204237.00 1097534.00 1057516.00 2496226.00 366000.00 743564.00 964451.00 249623.00 243949.00 775000.00 480000.00

42 43 44 45 46 47

11kV , 1250 Amps VCB Kiosk 2C x 2.5 Sq.mm 4C x 2.5 Sq.mm 6C x 2.5 Sq.mm 10C x 2.5 Sq.mm 12C x 2.5 Sq.mm

Each KM KM KM KM KM

480000.00 26214.00 47022.00 67830.00 109140.00 130050.00

51 52 53 54 55 56 57 58 59 60 61 62

CLAMPS AND CONNECTORS FOR SS 5-Bolted type tension H/W for Twin Moose or Zebra Conductor with 400mm spacing for 220KV and 132KV Spacer clamps suitable for Moose or Zebra ACSR conductor with 400mm spacing for 220KV and 132KV Spacer T-clamps suitable for Moose or Zebra ACSR conductor with 400mm spacing for 220KV and 132KV Suspension clamps suitable for Twin Moose / Zebra conductor for 220KV and 132KV 5-Bolted type single tension H/W for single Moose or Zebra Conductor for 220KV and 132KV 3-Bolted type single tension H/W suitable for single Moose or Zebra ACSR Conductor for 33KV 3-Bolted type single tension H/W suitable for Twin Moose or Zebra ACSR Conductor with 150mm spacing for 33KV Spacer clamps suitable for Moose or Zebra ACSR conductor with 150mm spacing Spacer T-clamps suitable for Moose or Zebra ACSR conductor with 150mm spacing T-clamps suitable for Moose or Zebra all three ways 3-bolted Earth wire Tension clamp CT Stud clamps suitable for Moose or Zebra ACSR conductor on one side and CT Stud on other side with stud size for single Zebra CT Stud clamps suitable for Moose or Zebra ACSR conductor on one side and CT Stud on other side with stud size for Twin Zebra PT clamp for Single Zebra / Moose PT clamp for twin Zebra / Moose LA clamps for single Zebra / Moose LA clamps for twin Zebra / Moose Pad clamps suitable for twin Zebra/Moose/Panther Pad clamps suitable for single Zebra/Moose/Panther T-clamps suitable for any conductor Post type insulator support clamps for twin conductor for 220KV and 132KV

Set Set Set Set Set Set Set Set Set Each Set Each

63

Each

64 65 66 67 68 69 70 71

Each Each Each Each Each Each Each Each

72 73 74 75 76 77 78 79 80 81

Post type insulator support clamps for single conductor for 220KV and 132KV Post type insulator support clamps for twin conductor for 33KV Post type insulator support clamps for single conductor for 33KV Suspension clamp suitable for single conductor Spacer T-clamp with double dropper suitable for Moose/Zebra 5-bolted type tension hardware for quadruple Moose Suspension hardware for quadruple Moose Spacers for quadruple Moose 16mm U-Bolts Hot Dip Galvanized Bolts & Nuts including Spring washers, Pack washers and flat washers etc.,

Each Each Each Each Each Set Set Each Each MT

3203.00 439.00 901.00 3016.00 2012.00 1957.00 3040.00 314.00 806.00 399.00 681.00 484.00

917.00

550.00 911.00 447.00 911.00 911.00 444.00 399.00 893.00

643.00 705.00 574.00 1307.00 1017.00 8199.00 8025.00 1063.00 146.00 86629.00

DATA

Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM.


SCHEDULE - IV : ERECTION WORKS IN SWITCH YARD & CONTROL ROOM (ELECTRICAL)
Up to 5KM

5 25 15

33.53

DATE OF ESTIMATE :- Every KM beyond 5 up to 30Km Every SSR ADOPTED :- 2008-2009 Km beyond 30KM 2010-2011
LI & LA AREA ALLOWANCE INDUSTRIAL AREA ALLOWANCE LABOUR CESS DISTANCE FROM HYDERABAD 14.00% AA 25.00% LI & LA 20.00% 1.00% 45 Km All amountsare in Rupees Rail poles = Rs. 54667.00 = Rs. per MT 222.13 = Rs. 25.00% 14.00% = Rs. = Rs. = Rs. 86629.00 25.00% 14.00% 222.13 0.00 0.00 59394.13 86629.00 = Rs. 0.00 = Rs. 0.00 = Rs. 86629.00 0% Transport steel 13%

125.75 62.85
222.13

Add

80 Km

Supply G I structure parts including cost & conveyance, fabrication and galvanisation etc., complete for finished item of work Cost of G I structure parts per MT (cost of galv.ss structure-cost of galvanisation as per Memo No CPT310/SE/P II/DE-3/D No 49/10 Dt 18.02.2010 Add E.D @ 8.24% Transportation charges for steel up to site as per Common SSR 2010-11(Distance from Hyderabad per MT (in Rupees) Transportation charges per RM Add Area Allowances at the rate applicable LI & LA Ind Area Allowance Basic Rate

RM 54667.00 4505.00

59394.00

Supply of G I bolts & Nuts including cost of conveyance, duties & taxes and insurance Add Area Allowances at the rate applicable LI & LA Basic Rate

86629.00

Setting of stubs with stub setting template for sub-station structure: Erection of stub template, fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stub setting template, dismantling of template after completion of initial curing of CC Erection of stu setting template cost as per SSR2009-10 220kv Add Area Allowances at the rate applicable LI & LA Basic Rate Erection of stu setting template cost as per SSR2009-10 Add Area Allowances at the rate applicable LI & LA Basic Rate Erection of stu setting template cost as per SSR2009-10 Add Area Allowances at the rate applicable LI & LA Basic Rate

= Rs. 25.00% 14.00%

2268.00

= Rs. = Rs. = Rs. = Rs. = Rs. = Rs. = Rs. = Rs. = Rs. = Rs. = Rs. = Rs.

2268.00 567.00 317.52 3152.52 1628.00 407.00 227.92 2262.92 407.00 101.75 56.98 565.73 MT 566.00 2263.00 407.00 3153.00 1628.00

132kv

= Rs. 25.00% 14.00%

1628.00

33kv

= Rs. 25.00% 14.00%

407.00

Erection of all types of structures fabricated from RS joists, M.S.Angles, channels, plates,rods etc.(Super structures and Bolts & Nuts)

Structure erection

SED 3

Erection of structures cost as per SSR2009-10 Add Area Allowances at the rate applicable LI & LA Basic Rate

= Rs. 25.00% 14.00%

1617.00

= Rs. = Rs. = Rs. = Rs.

1617.00 1617.00 404.25 226.38 2247.63

2248.00

10

Fixing hardware, stretching the groundwire and stringing of over head earth bus from pinacle to pinacle excluding cost of ground wire, but including cost of tension clamps etc., Stringing Labour cost as per SSR 2009-10 Add Area Allowances at the rate applicable LI & LA Add Cost of 3 Bolted single tension clamps (2 Nos.) (2 Nos. per phase) Basic Rate

SED 5 Each 25.00% 14.00% 681.00 per set = Rs. = Rs. = Rs. = Rs. = Rs. SED 6

Each 484.00 484.00 121.00 67.76 1362.00 2034.76 Each 2035.00

11

Connecting equipment to bus and/or another equipment with SINGLE MOOSE / ZEBRA conductor including measuring,cutting clamping and also hoisting of suspension insulator assembly to support the conductor wherever necessary including cost of tee connector Without clamps Jumpering Labour cost as per SSR 2009-10 Add Area Allowances at the rate applicable LI & LA Laour charges for 1 jumper No.of Jumpers Labour charges for 10...jumpers Basic rate (Cost per jumper) Dismantling of jumpers of single zebra conductor

25.00% 14.00% 45 Nos

= Rs. = Rs. = Rs.

193.00 48.25 27.02 268.27 12072.15 268.27 201.20 201.00 Each

= Rs. = Rs. 268.27 x 75%

268.00

12

Connecting equipment to bus and/or another equipment with SINGLE MOOSE / ZEBRA conductor including measuring,cutting clamping and also hoisting of suspension insulator assembly to support the conductor wherever necessary including cost of tee connector With clamps Jumpering Labour cost as per SSR 2009-10 Add Area Allowances at the rate applicable LI & LA Laour charges for 1 jumper No.of Jumpers Labour charges for 29...jumpers Cost of Suspension hardware for Single Zebra Cost of T clamps Add Cost of clamps Cost of 29.. Jumpers Basic rate 25.00% 14.00%

Twin Jumper

SED 6b

= Rs. = Rs. = Rs.

193.00 193.00 48.25 27.02 268.27 12876.96 9048.00 5985.00 15033.00 27909.96 581.46 GI 44.91 4.49 49.40 622.45 50.00

48 Nos = Rs. 3 3016.00 15 399.00

= Rs. 100x16mm = Rs.

581.00 MS 30.00 3.00 33.00 415.80 50.00

13 a&b

laying of earth mat gi/ms 100X16 mm Cost of GI steel Per kg Add 10% extra towards wastage, cleats, overlap etc as per SSR 2009-10 Total cost of earth material per Kgs Cost of GI steel required for earth flat per RM (12.6Kg/RM) Laying cost of Earth mat as per SSR 2010-11 per RM

kg/RM = Rs.

12.6

= Rs.

Add Area Allowances at the rate applicable LI & LA Laour charges Basic rate Basic rate including supply of material 14 a&b Laying of earth mat including excavation of trenches,welding and fixing lugs,connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts,drilling and connecting earthrods with - 50 x 8mm MS Flat Basic Rate -(Total cost of MS steel including all taxes and duties including transportation to site.) per MT Cost of MS steel Per kg Add 10% extra towards wastage, cleats, overlap etc as per SSR 2009-10 Total cost of earth material per Kgs Cost of steel required for earth flat per RM (3.1Kg/RM) Laying cost of Earth mat as per SSR 2009-10 per RM Add Area Allowances at the rate applicable LI & LA Labour charges Basic rate Basic rate including supply of material 15 Excavation of earth pit, putting cast iron pipe with flange on one end ( as per relevant ISS ), of nominal dia 125 mm and 2.75 metres long inside the pit including supply and fixing of RCC Collars 1mtr dia and 0.6 mtrs long inside the pit, and backfill t Erection cost as per SSR 2009-10 Add Area Allowances at the rate applicable LI & LA Labour charges Add Transportation cost of C.I.Pipes (One C.I Pipe weight-95 Kgs) (Steel transportation cost per MT*95/1000 for 100KM) (471*95/1000)

25.00% 14.00%

= Rs. = Rs.

12.50 7.00 69.50 692.00 GI 70.00 485.00 MS

50x8mm flat

SED 7 c

As per SED 1b = Rs.

kg/RM = Rs. 25.00% 14.00%

3.1

= Rs. = Rs.

44.91 4.49 49.40 139.22 39.40 9.85 5.52 54.77 54.77 194.00 Each

30.00 3.00 33.00 93.00

55.00 148.00

Earth Pit

SED 8

= Rs. 25.00% 14.00%

7819.00 7819.00 1954.75 1094.66 10868.41 0.00 10868.41 RM

= Rs.

= Rs. = Rs. Control Cable SED 9 laynig = Rs. 25.00% 14.00% = Rs. = Rs. = Rs. Cu.. Cable Termination SED 10 a

10868.00

16

Laying of control cables of all sizes (from 2 core, 2.5 sqmm to12 core,2.5 sqmm both copper and aluminium) in cable trenches including cost of suitable metallic glands with rubber lining & dressing. This includes running of cables in control room where ca Laying cost as per SSR 2009-10 Add Area Allowances at the rate applicable LI & LA Basic rate

7.40 7.40 1.85 1.04 10.29 Each

17a

Cable termination to the switch-gear, marshalling boxes/panel terminal blocks/control & relay panels, LTAC panel, including providing suitable ferrules and lugs as per specification (including cost of ferrules and lugs).Note: Rate to be quoted for termina cost as per SSR 2008-09 Add Area Allowances at the rate applicable LI & LA Basic rate 25.00% 14.00%

= Rs. = Rs. = Rs. = Rs. Al.. Cable Termination SED 10 b

20.20 20.20 5.05 2.83 28.08 Each

28.00

17b

Cable termination to the switch-gear, marshalling boxes/panel terminal blocks/control & relay panels, LTAC panel, including providing suitable ferrules and lugs as per specification (including cost of ferrules and lugs).Note: Rate to be quoted is for term cost as per SSR 2009-10

= Rs.

20.20

20.20 Add Area Allowances at the rate applicable LI & LA Basic rate 18 Installation of lighting fixtures of 250 Watts HPSV of Crompton Greveas / Phillips make, on switchyard structures including cost of lighting fixtures and cabling and connections Cost of Lighting Fixture with lamp complete including all taxes & duties cost as per SSR 2009-10 Add Area Allowances at the rate applicable LI & LA Basic rate 20 Erection of marshalling box on the structures of equipment including cost of marshalling boxes 25.00% 14.00% = Rs. = Rs. = Rs. Lighting Fixtures =Rs. 25.00% 14.00% SED 11 b =Rs. 5.05 2.83 28.08 Each 6500.00 647.00 647.00 = Rs. = Rs. Erection Marshelling Box SED- 14 161.75 90.58 7237.58 Each

28.00

7238.00

Cost of marshalling box Erection cost as per SSR 2009-10 235.00 Add Area Allowances at the rate applicable LI & LA labour Basic rate 25 Writing of names in the control room for identification of rooms, on panels, equipment, marshalling boxes, kiosks, with CT ratio etc., & on maingates neatly with superior quality paint brushes & labour etc., complete on the main gate with superior quality synthetic enamel paint with two coats including cost of paint, brushes and labour charges etc complete. 25.00% 14.00% = Rs. = Rs.

5200.00 235.00 58.75 32.90 326.65 5526.65 2000.00

5527.00

27

Supply of Insulation of Rubber mats of size 2m x 1m x 6mm confirming to IS 5424/96 and laying in front of panels in the Control Room Cost of Insulation Rubber mats (Including all Taxes & duties) Basic rate

Rubber mats SED 18

Each

= Rs. = Rs. Glow sign board SED 22 h

1200.00 1200.00 12000

30

Supply and fixing of Glow sign board, using 1" (25.4mm) square pipe for outer frame box, using best quality flex with computerised cut letters and symbol ( APTRANSCO logo, name and capacity) using good quality tubes, aluminium chokes of Phillips / Crompt Providing of "Caution Boards" of size 12"x8" painted as Danger including cost of paint, brushes and labour charges etc., complete as directed by the engineer in charge. Cost of Danger Board(Including all Taxes & duties) Basic rate

31 a

Danger Board

SED 22 d

Each

= Rs. = Rs. L/C Board SED 22 b

200.00 200.00 Each

31 b Providing of "Caution Boards" of size 12"x8" painted as Line Clear including cost of paint, brushes and labour charges etc., complete as directed by the engineer in charge. Cost of L/C Board(Including all Taxes & duties) Basic rate 32 a Providing of "Caution Boards" of size 12"x8" painted as Load Relief including cost of paint, brushes and labour charges etc., complete as directed by the engineer in charge. Cost of L/R Board(Including all Taxes & duties) Basic rate

= Rs. = Rs. L/R Board SED 22 a

200.00 200.00 Each

= Rs. = Rs.

200.00 200.00

32 b Providing of "Caution Boards" of size 12"x8" painted as Break down including cost of paint, brushes and labour charges etc., complete as directed by the engineer in charge. Cost of B/D Board(Including all Taxes & duties) Basic rate 33 Supply and fixing of Portable Emergency twin tube fittings of 20Watts capacity make Bajaj/Panasonic Basic rate Supply and fixing of 15 lbs CO2 portable fire extinguishers of standard make with ISI certification like Fire flex / Sharathy industries complete with first filling Horn and Hose. Cost of 15lbs Co2 portable fire extinguishers (Including all Taxes & duties) Basic rate 35 Supply and fixing of 50 lbs CO2 portable fire extinguishers (with Trolly) of standard make with ISI certification like Fire flex / Sharathy industries complete with first filling Horn and Hose. Cost of 50lbs Co2 portable fire extinguishers(Including all Taxes & duties) Basic rate Cost of Supply & Fixing of GI Flexible earth Bonds Basic rate

B/D Board

SED 22 c = Rs. = Rs.

Each 200.00 200.00 2500.00

34

15 lbs CO2

SED 19 a

Each

= Rs. = Rs. 50 lbs CO2 SED 19 b

5100.00 5100.00 Each

= Rs. = Rs. = Rs. = Rs.

13900.00 13900.00 150.00 150.00

Asst. Executive Engineer, T.L.C.SD-Mahabubnagar.

COST DATA FOR STEEL Apr-09 64824 55781 33000 44789 May-09 65097 55818 33000 45367 Jun-09 63017 54124 32500 44838 Jul-09 62656 53839 31500 44005 Aug-09 62276 52811 30000 43054

1 2 3 4

G I Tower parts G I structure parts MS Flat G I Flat

MT MT MT MT

Sep-09 63681 54489 31000 44681

Oct-09 63126 53515 30000 43758

Nov-09 63844 53753 29000 43047

Dec-09 64818 54667 30000 44910

STANDARD ELECTRICAL DISCRIPTIONS OF ITEMS IN SUBSTATION ESTIMATES. ABSTRCT ESTIMATE


NAME OF WORK :- ERECTION OF 132KV BAY EXTENSION IN132/33KV KOTHUR SS FOR SHAMSHABAD FEEDER

SCHEDULE - IV : ERECTION WORKS IN SWITCH YARD & CONTROL ROOM (ELECTRICAL)


S.L.N QTY o. (1) 1 Unit of Service Labour Std. Electl. Measu VAT @ Tax Description Item Short Discription Disc. No. Basic Rate Cess 4%) re@10.3 @1% (SED No.) ment % on (5) (6) (2) (3) (5) (4) (7) (8) (9) Setting of stubs with stub setting template for sub-station Stub setting structure: Erection of stub template, fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stub setting template, dismantling of template after completion of initial curing of CC 19 a. 220kv stuctures 3152.52 31.53 Each 126.10 107.15 8 b. 132kv structures 2262.92 22.63 Each 90.52 76.92 62 c. 33kv structures and CPLs 565.73 5.66 Each 22.63 19.23 63.00 Erection of all types of structures fabricated from RS joists, Structure erection SED 3 3152.52 31.53 MT 126.10 107.15 M.S.Angles, channels, plates,rods etc.(Super structures and Bolts & Nuts) 28 Fixing hardware, stretching the groundwire and stringing of over Earth Bus SED 5 2034.76 20.35 Each 81.39 69.16 head earth bus from pinacle to pinacle excluding cost of ground wire, but including cost of tension clamps etc., 45 Connecting equipment to bus and/or another equipment with Twin Jumper SINGLE MOOSE / ZEBRA conductor including measuring,cutting clamping and also hoisting of suspension insulator assembly to support the conductor wherever necessary including cost of tee connectors etc.,without clamps SED 6 268.27 2.68 Each 10.73 9.12 RATE (10) Amount (11)

3417.30 2452.99 613.25 3417.30

64928.70 19623.92 38021.50 215289.90

2205.66

61758.48

290.80

13086.00

6 7

Connecting equipment to bus and/or another equipment with Single Jumper SINGLE MOOSE / ZEBRA conductor including measuring,cutting clamping and also hoisting of suspension insulator assembly to support the conductor wherever necessary including cost of tee connectors,suspension clamps and spacer clamps etc.with Clamps Dismantling of jumpers of single Zebra from the dismantled 21 equipment 200 Laying of earth mat including excavation of trenches,welding and 100 x 16mm MS Flat fixing lugs,connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts,drilling and connecting earthrods with - 100 x 16mm MS Flat

48

SED 6 c

581.46

5.81 Each

23.26

19.76

630.29

30253.92

201.00 SED 7 a 69.50

2.01 0.70

Each RM

8.04 2.78

6.83 2.36

217.88 75.34

4575.48 15068.00

7A

30

Laying of earth mat including excavation of trenches, welding 100 x 16mm GI Flat and fixing lugs,connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts,drilling and connecting earthrods with 100 x 16mm GI Flat Laying of earth mat including excavation of trenches,welding and 50 x 8mm MS Flat fixing lugs,connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts,drilling and connecting earthrods with - 50 x 8mm MS Flat Laying of earth mat including excavation of trenches,welding and 50 x 8mm GI Flat fixing lugs,connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts,drilling and connecting earthrods with 50 x 8mm GI Flat Excavation of earth pit, putting cast iron pipe with flange on one Earth Pit end ( as per relevant ISS ), of nominal dia 125 mm and 2.75 metres long inside the pit including supply and fixing of RCC Collars 1mtr dia and 0.6 mtrs long inside the pit, and backfill the pit in 25mm size granules of BH coke for full depth of the pit with alternate layers of BH Coke and salt of 300mm thick (or back fill with bentonite compound) around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of BH Coke (or bentonite compound), salt, C.I.Pipe and RCC collars, labour charges for all operational and incidental items of work etc., as directed by the engineer in charge. All earth pits should be connected to the earth mat. Laying of control cables of all sizes (from 2 core, 2.5 sqmm to12 Control Cable laynig core,2.5 sqmm both copper and aluminium) in cable trenches including cost of suitable metallic glands with rubber lining & dressing. This includes running of cables in control room where cables are run on cable racks in cable duct.

SED 7 b

69.50

0.70

RM

2.78

2.36

75.34

2260.20

7B

325

SED 7 c

54.77

0.55

RM

2.19

1.86

59.37

19295.25

7C

200

SED 7 d

54.77

0.55

RM

2.19

1.86

59.37

11874.00

15

SED 8

10868.41

108.68 Each

434.74

369.42

11781.25

176718.75

150

SED 9

10.29

0.10

RM

0.41

0.35

11.15

1672.50

10

100

Cable termination to the switch-gear, marshalling boxes/panel Cu.. Cable Termination SED 10 a terminal blocks/control & relay panels, LTAC panel, including providing suitable ferrules and lugs as per specification (including cost of ferrules and lugs).Note: Rate to be quoted for termination of one core of cable at both ends. - 2.5 sq.mm. copper Installation of lighting fixtures of 250 Watts HPSV of Crompton Lighting Fixtures Greveas / Phillips make, on switchyard structures including cost of lighting fixtures and cabling and connections Erection of the following equipment at site including insurance etc., and made fit for commissioning SED 11 b

28.08

0.28 Each

1.12

0.95

30.43

3043.00

11

7237.58

72.38 Each

289.50

246.01

7845.47

39227.35

12

12A 12B 12C 12D 12E 12F 12G 12H 13

1 3 3 3 3 1 1 0 2

132 kV Circuit Breakers. 132 kV Current Transformers. 132kV Potential Transformers. 132kV Lightning Arrestors. 132 kV Capacitive Voltage Transformers. 132 kV Isolators with earth switch. 132 kV Isolators without earth switch. 132kV Wave Traps. Erection of control/relay panels, LTAC panels, annunciation panels, PLCC&EPAX pannels etc., in the control room duly mounting them on channels provided on the cable duct and grouting them with foundation bolts. Erection of marshalling box on the structures of equipment including cost of marshalling boxes Dismantling of following euipment and devoluting to TLC stores Erragadda including cost of handling, transport, insurance and all other incidental chargs complete 132 kV Circuit Breakers. 132 kV Current Transformers. 132kV Potential Transformers. 132kV Lightning Arrestors. 132 kV Capacitive Voltage Transformers. 132 kV Isolators with earth switch. 132 kV Isolators without earth switch. 132kV Wave Traps. Contrl & relay panels mounted in control room Writing of names in the control room for identification of rooms, on panels, equipment, marshalling boxes, kiosks, with CT ratio etc., & on maingates neatly with superior quality paint brushes & labour etc., complete on the main gate with superior quality synthetic enamel paint with two coats including cost of paint, brushes and labour charges etc complete.

Erection 132Kv CB Erection 132kv CT Erection 132kv PT Erection 132kv LA Erection 132kv CVT Erection 132kv Isol. with ES Erection 132kv Isol. w/o ES Erection 132kv Wavetrap Erection - Panels

SED 12 SED 12 SED 12 SED 12 11 SED 12 14 SED 12 16 SED 12 18 SED 12 21 SED 12 36

20989.00 4304.00 4856.00 2028.00 4606.00 8540.00 6703.00

209.89 43.04 48.56 20.28

Each Each Each Each

839.56 172.16 194.24 81.12 184.24 341.60 268.12

713.42 146.29 165.06 68.93 156.56 290.27 227.83

22751.87 4665.49 5263.86 2198.33 4992.86 9257.27 7265.98 #DIV/0! 7220.46

22751.87 13996.47 15791.58 6594.99 14978.58 9257.27 7265.98 #DIV/0! 14440.92

46.06 Each 85.40 Each 67.03 Each

#DIV/0! #DIV/0! Each 6661.00 66.61 Each

#DIV/0! #DIV/0! 266.44 226.41

14 15

Erection Marshelling Box

SED- 14

5526.65

55.27 Each

221.07

187.85

5990.84

17972.52

15A 15B 15C 15D 15E 15F 15G 15H 15I 16

1 3 3 3 0 1 1 0 2 LS

Writing name

17755.00 3592.00 4144.00 1692.00 5841.00 7246.00 5895.00 250.00 14275.00 2000.00

177.55 35.92 41.44 16.92 58.41 72.46 58.95 2.50 142.75 20.00

Each Each Each Each Each Each Each Each Each Each

710.20 143.68 165.76 67.68 233.64 289.84 235.80 10.00 571.00 80.00

603.49 122.09 140.85 57.51 198.54 246.29 200.37 8.50 485.21 67.98

19246.24 3893.69 4492.05 1834.11 6331.59 7854.59 6390.12 271.00 15473.96 2167.98

19246.24 11681.07 13476.15 5502.33 0.00 7854.59 6390.12 0.00 30947.92 2167.98

17

18

Supply of Insulation of Rubber mats of size 2m x 1m x 6mm Rubber mats confirming to IS 5424/96 and laying in front of panels in the Control Room Supply and fixing of Glow sign board 10' x 4' including cost of Glow sign board transportation to site labour charges etc., in complete finished item of work.

SED 18

1200.00

12.00 Each

48.00

40.79

1300.79

6503.95

12000.00

120.00

LS

480.00

407.88

13007.88

13007.88

19

Supply and fixing of Caution boards painted as' Danger ' made up Caution board of MS sheet size 300x200x2mm painted with superior quality synthetic enamel paint of 2 coats including cost of paint, brushes and labour charges etc ., in complete finished item of work. Supply and fixing of Caution boards painted as' On Line Clear ' Caution board made up of MS sheet size 300x200x2mm painted with superior quality synthetic enamel paint of 2 coats including cost of paint, brushes and labour charges etc ., in complete finished item of work. Supply and fixing of Caution boards painted as' Load Relief ' Glow sign board made up of MS sheet size 300x200x2mm painted with superior quality synthetic enamel paint of 2 coats including cost of paint, brushes and labour charges etc ., in complete finished item of work. Supply and fixing of Caution boards painted as' Break Down ' Caution board made up of MS sheet size 300x200x2mm painted with superior quality synthetic enamel paint of 2 coats including cost of paint, brushes and labour charges etc ., in complete finished item of work. Supply and fixing of 15 lbs CO2 portable fire extinguishers of Fire extinguisher standard make with ISI certification like Fire flex / Sharathy industries complete with first filling Horn and Hose. Supply and fixing of 50 lbs CO2 portable fire extinguishers (with Fire extinguisher Trolly) of standard make with ISI certification like Fire flex / Sharathy industries complete with first filling Horn and Hose. Supply & Fixing of GI Flexible earth Bonds \\vboxsrv\conversion_tmp\scratch_4\[128465837.xls.ms_office.xls]qty data

200.00

2.00

LS

8.00

6.80

216.80

650.40

19A

200.00

2.00

LS

8.00

6.80

216.80

650.40

19B

200.00

2.00

LS

8.00

6.80

216.80

650.40

19C

200.00

2.00

LS

8.00

6.80

216.80

650.40

20

SED 19 a

5100.00

51.00 Each

204.00

173.35

5528.35

11056.70

20A

SED 19 b

13900.00

139.00 Each

556.00

472.46

15067.46

15067.46

21

40

150.00

1.50 Each

6.00

5.10

162.60 TOTAL

6504.00 #DIV/0!

Asst. Executive Engineer, T.L.C.SD-Mahabubnagar.

Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM. Transportin, Loading & Unloading & Insurance Charges Total Transpo Loading Loading Dismantling rate No.Of rt Erection Charges & & as per SSR Loads Charges Unloadi Unloadi @ ng ng SSR SSR Total Total 1999.2 RATE Rate 12936.00 ####### 9702.00 9702.00 1.50 2998.76 1311.00 1311.00 2847.00 8541.00 2135.25 6405.75 1.00 1999.17 328.00 2847.00 8541.00 2135.25 6405.75 1.00 1999.17 328.00 2847.00 8541.00 2135.25 6405.75 1.00 1999.17 328.00 1344.00 4032.00 1008.00 3024.00 0.50 999.59 164.00 Insuranc Total e@ 0.5% on Erection cost cost & erection Total Erection cost per unit

Sno

Description

Cost

Qty

1 132 KV Circuit Breaker 3 132 KV Current Transformer (protection) 5 132 KV CT (metering) 6 132 KV Potential Transformer (metering) 8 132 KV Lightning Arrestors 10 132 KV Isolator With Out E/S with SCI 11 132 KV Isolator With E/S With SCI 13 70 KN Disc Insulators 14 ACSR Moose/Zebra Conductor 15 HTGS Earth Wire 16 Copper control cables 18 132 KV Wave Trap 20 Control & Relay Panels

735630.00 89637.00 150000.00 200000.00 36033.00 170500.00 193200.00

1.00 3.00 3.00 3.00 3.00 1.00 1.00

3742.83 20988.59 20989.00

984.00 1387.26 12911.43 4304.00 984.00 2292.71 13816.88 4606.00 984.00 3042.71 14566.88 4856.00 492.00 489.00 489.00 211.20 171.69 31.62 2.95 560.66 878.37 982.17 360.00 950.40 71.00 75.01 6084.24 8539.54 6703.34 955.04 1553.91 244.56 1127.94 2028.00 8540.00 6703.00 5.00 1799.00 431.00 8.00

5173.00 5173.00 3879.75 3879.75 1.00 1999.17 489.00 3233.00 3233.00 2424.75 2424.75 1.00 1999.17 489.00 0.19 0.22 0.07 0.02 383.84 1.10 431.82 198.72 141.94 55.66 29.99 19.65

375.00 192.00 220000.00 0.86 25000.00 0.57 100000.00 150.00 125000.00 500000.00 0.00 2.00

6.80

1020.00

1344.00 0.00 1008.00 0.00 0.13 249.90 87.00 1809.00 1760.00 1356.75 2713.50 3.00 5997.51 273.00

0.00 0.00 249.90 #DIV/0! 546.00 5018.09 13321.60 6661.00

LEAD STATEMENT Lead Distance


Upto 5km Every 5km beyond 5 up to 30km Every 5km beyond 30km 45 5 25 15 KM 33.53 125.75 62.85 222.13 = or say 1999.2 2000

Transport Charges for 9 MT

222.13

Asst. Executive Engineer,

T.L.C.SD-Mahabubnagar.

Dismantlin g Cost

17755.00 3592.00 5841.00 4144.00 1692.00 7246.00 5895.00

250.00 14275.00

APTRANSCO From Assistant Executive Engineer TLC, SD - Mahabubnagar -1 Lr No AEE/TLC/SD - MBNR 1/F 220/33KV SNGTM SS/D No SUB To Assistant Executive Engineer Civil, TLC, SD - Mahabubnagar /10 Dt 29-12-10

Erection of 220/33kv Singawattam SS - Civil quantities submitted - Estimate requested - Reg

The civil items work required for erection of 220/33kv Singottam SS are furnished as below. It is requested to arrange to submit the estimate for civil quantities for the above SS.

S.NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 A B C 21 22 23 24 25 26 27

Description 220 KV TA 220KV TB 220KV TC 220KV isolator 220KV BP Boom 220KV BQ Boom 132KV TNS 132KV TND 132KV TA 132KV Isolator 132KV BNC 132KV BNS 132KV BN 132KV BA CPL 33 KV TB 33 KV TC 33 KV TD 33KV BD Boom CB 220kv 132kv 33kv Stn Transformer 220kv Bay Kiosk 33kv Bay Kiosk Control romm for 220/33kv SS Cable duct in switch yard PTR plinths for 20MVA transformers Roads

Qty Reqd 0 10 0 5 6 0 8 0 0 0 0 4 0 0 23 4 13 16 43 4 0 6 1 1 1 1 275RM 2 250RM

Assistant Executive Engineer TLC, SD - Mahabubnagar

NAME OF WORK :- ERECTION OF 132KV BAY EXTENSION IN132/33KV KOTHUR SS FOR SHAMSHABAD FEEDER

S.L. No.

Item Short Discription (2) Erection 132Kv CB Erection 132kv CT Erection 132kv PT Erection 132kv LA Erection 132kv Isol. with Earth Switch Erection 132kv Isol. w/o Earth Switch Erection of C&R Panels,LTAC panels,PLCC panels EPAX panels etc

(1) 16 a 16 c 16 e 16 g 16 j 16 k 17

Labour Area LILA Labour Ind Area charges Allow. Cess Allowance as per 25.00% 14.00% 1% 20% ssr(SED No.) (3) (5) (6) (7) (8) (9) SED 12 - 2 8085.00 2021.00 1132.00 81.00 1617.00 SED 12 - 3 1779.00 445.00 249.00 18.00 356.00 SED 12 - 8 1779.00 445.00 249.00 18.00 356.00 SED 12 - 11 840.00 210.00 118.00 8.00 168.00 SED 12 - 16 3233.00 808.00 453.00 32.00 647.00 SED 12 - 18 2910.00 728.00 407.00 29.00 582.00 Std. Electl. Disc. No. SED 12 - 36 1131.00 283.00 158.00 11.00 226.00

Asst. Executive Engineer, T.L.C.SD-Mahabubnagar.

HAMSHABAD FEEDER

Erection charges including area (10) 12936.00 2847.00 2847.00 1344.00 5173.00 4656.00 1809.00

xecutive Engineer, D-Mahabubnagar.

Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM.


Weight of Structures & Bolts in Kgs S.NO 1 2 3 4 5 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Description 220 KV TA 220KV TB 220KV TC 220KV isolator 220KV BP Boom 220KV BQ Boom 132KV TNS 132KV TND 132KV Isolator 132KV BNC 132KV BNS 132KV BN 132KV BA CPL 33 KV TB 33 KV TC 33 KV TD 33KV BD Boom PTR Neutral & 33kv CT Support Structure(if required) Bolts & Nuts Weight of Qty reqd Stubs/Foundation Bolts Per 0 10 0 5 15 6 0 8 0 0 8 0 4 0 0 23 4 13 16 56 43 6 LS Total 4 0 6 19 8 62 203.57 120.86 177.01 60.8 0 0 92.84 133.44 37.56 0 0 0 0 17.92 66.4 71.04 17.28 0 Structure Weight Weight of Bolts & Nuts Total 0 511.3 0 218.6 310.44 0 440.32 0 0 0 148.52 0 0 282.9 188 395.2 205.92 1143.8 0 80 3925 Erection Weight 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 80 80

Total Per Total Per 0 1812.02 0 85.36 1208.6 1121.89 11218.9 51.13 0 1963.37 0 95.73 304 1310.976 6554.88 43.72 0 0 742.72 0 0 0 0 0 0 412.16 265.6 923.52 276.48 0 0 0 4133.08 953.25 1142.93 869.41 1015.7 606.85 571.22 619.56 800.6 617.71 193.22 690.88 480.96 200.7 199.09 150 5719.5 0 6955.28 0 0 0 2478.24 0 0 4444.06 2763.52 6252.48 3211.2 8560.87 900 0 59058.93 51.74 51.74 55.04 55.04 29.84 36.2 37.13 53.63 45.43 12.3 47 30.4 12.87 26.6

220kv towers 132kv Towers 33kv Towers & CPLs

Struc CB 15 8 56

2.Procurement of Raw Steel Weight of Stubs/Foundation bolts Weight of Structuress TOTAL 3.Weight Of Bolts & Nuts Weight of Bolts&Nuts Add 2% Wastage 4.Sructure Erection Erection Weight of Structures

4133.08 59058.93 63.19201

or say

63

MT

3925 78.5 4003.5 Structure parts Bolts & nuts Total 59058.93 4003.5 63062.43

Or say

MT

Or say

63

MT

Stringing of 220, 132, 33 KV Bus Description of he work 5.220 KV Twin Bus (Main) Qty 0 No of Cond/phase 2 Bus width 34 Rqmt of cond 0 No of ins /string Rqmt of Insulators

5.220 KV Single Bus (Main) 5.220 KV Single Bus (Aux) 10.132 KV Single Main.Bus 6.132 KV Twin Bus (Main) 9.132 KV Twin Aux. Bus 10.132 KV Single Aux.Bus

1 0 1 0 0 0 0 0 0 2 0 2 2 2 8

1 1 1 2 2 1

34 34 36 36 12 12

102 0 102 0 0 0 0

14

84

10 10 2 2 1 1 1 20 12 20 12 36 0 240 0 120 72 216 648 750 750

0 0 0

pilot insulator for 132kv bus 6.33 KV Twin Bus 11.33 KV Twin Aux. Bus 7.33 KV Single Aux. Bus 7.33 KV Single Aux. Bus 7.33 KV Single Aux. Bus Total requirement with wastage

Or say

192 192 192

EARTH WIRE Qty 220kv 220kv 132kv Total 2 12 14 28 Length/jump Rqmt of er E/W 0.036 0.018 0.02 0.072 0.216 0.28 0.568 No of main struc 10 8 EW per strruc 18 12 or say REQUIREMENT OF JUMPERS AND CONDUCTOR Number of Feeder bays Number of bus coupler bays Number of Transformer bays Number of PTs For Feeder Bays 220KV Jumper Length With W/O clamp clamp 6 3 0 6 6 5 6 3 3 3 3 4 6 0 0 0 0 0 0 0 0 0 3 6 0 3 0 0 0 3 3 3 3 3 0 18 0 33KV Jumper conductor Length With W/O clamp clamp 18 1 3 0 18 0 0 0 9 9 9 9 12 18 102 0 0 0 0 2 2 2 0 0 0 3 0 0 0 0 0 0 3 3 220KV 2 0 2 1 132KV 0 0 0 0 33kv 4 0 2 1

0.18 0.1 0.848 1

KM

conductor 3 0 0 0 6 6 6

Line - Las line - Isoaltor Line - WT WT - Isolator line - Isoaltor Isolator - CT(P) CT(P) - CT (M) CT (M) - PT (M) PT (M) - CB CB - iso Iso - Bus Total / Bay Grand Total for all bays

3 3

0 3 9 36

3 0 9 36

9 9 39 156

TOTAL REQUIREMENT OF JUMPERS & CONDUCTOR 132KV

33KV

Jumper With W/O clamp clamp For Bus For Feeder Bays For Trans Bays For PTs For Bus - Bus Jumper Total with single cond Grand Total of Cond 0 0 0 6 6 0 0 0 0 0

conductor 0 0 0 0 36 36 36 132kv 6 0 0 0 36

With clamp 36 0 6 0 42

Jumper W/O clamp 36 0 9 0 45

conductor 648 156 0 15 0 171 819

Total no of single Zebra/Moose jumpers with clamps Total no of single Zebra/Moose jumpers without clamps Total no of twin Zebra/Moose jumpers with clamps Total no of twin Zebra/Moose jumpers without clamps Total requirement of conductor Total requirement of conductor including wastage @1% Dismantling of Jumpers of Single Zebra REQUIREMENT OF EARTH FLAT EARTH MAT 100X16MS 86 18 50x8 MS Hor 50x8 GI Vert Equipment 65 71 136 Qty

33KV 42 45 0 0 819 863.55

48 45 0 0 855 864

21

25 18

25 Rqmt per equipment Total requirement GI MS GI MS 100x16 50x8 100x16 50x8 100x16 50x8 100x16 50x8 2.75 3 2.5 5 8.25 9 7.5 15 0 0 0 5 0 0 0 0 0 6 0 5 0 0 0 0 0 8.5 0 5 0 0 0 0 0 21 0 5 0 42 0 10 0 5 0 5 0 10 0 10 0 5 0 5 0 5 0 5 0 8.5 0 5 0 25.5 0 15 0 6 0 5 0 6 0 5 0 8.5 0 5 0 25.5 0 15 0 6 0 5 0 6 0 5 0 8.5 0 5 0 25.5 0 15 0 6 0 5 0 6 0 5 0 6 0 5 0 6 0 5 0 6 0 5 0 6 0 5 0 0 0 1 0 0 0 50 0 2.5 0 5 0 5 0 10 3.5 0 0 2.5 52.5 0 100 37.5 60.75 177.5 107.5 207.5

Las CVT CVT - MB Wave Trap Isolators Iso - MOM Box Iso - ES box CTs (METERING) CT - MB PTs PT - MB CTs (PROTECTION) CT - MB CB - 132kv CB - 132kv box Cable trench 132kv main structure Earth pits (Total)

3 0 0 0 2 2 1 3 1 3 1 3 1 1 1 50 2 15

Total requirement of Earth Flat For Earth mat For equipment & structure earthing TOTAL Total requirement of earth flat including 2% extra towards over laps 10.Laying Of Earth Mat With The Following Sizes of MS/GI Flats a)100X16 MM MS Flat b)100X16 MM GI Flat

0 60.75 60.75 62

0 177.5 177.5 181

86 107.5 193.5 197

136 207.5 343.5 350

197 62

200 30

RMT RMT

c)50X8 MM MS Flat d)50X8 MM GI Flat e.Excavation Of Earth Pits Number of Feeder bays Number of bus coupler bays Number of Transformer bays Qty Transformer Bay 132 KV Bay 33 KV Bay 132 KV Bus PT 33 KV Bus PT & stn Tf Control Room Equilising earth pits Total No.Of Earth Pits LAYING OF CONTROL CABLES length No of bays 2core 132kv feeder loops Sub total Lighting Grand Total 150 15 30 0 0 3 2 0 5 150 150 0 0 4 0 0 2 0 10 220KV 132KV 2 0 0 0 2 0 33kv 4 0 2 Transformer 0 LAS 0 0 4

350 181

325 200

RMT RMT

CB & CTS 0 0 2

Extra Pits 0 0 0 0 0 0 1

4 15

No of cables required 4core 6core 10core 8 4 0 8 5 0

12core 2

11.Laying Of Control Cables Total KM of 12CX2.5 Sqmm Copper Control Cable Total KM of 10CX2.5 Sqmm Copper Control Cable Total KM of 6CX2.5 Sqmm Copper Control Cable Total KM of 4CX2.5 Sqmm Copper Control Cable Total KM of 2CX2.5 Sqmm Copper Control Cable Total KM of copper control cable required or say 13.Cable Terminations to the Switch Gear 2.5 Sqmm Copper with copper lugs each core at both ends 120 Sqmm Aluminium with Aluminium lugs each core at both end Erection of change over switch 63A 3phase 14.Installation of Ligtning Fixtures Installation Of Lightning Fixtures 15.Erection Of the Following Equipment 132 KV Circuit Breaker 132 KV Current Transformer(protection) 132 KV Potential Transformer (metering) 132 KV Lightning Arrestors 132 KV Current Transformer(metering) 132 KV isolator With E/S 132 Kv Isolator With Out E/S 132 KV Wave Trap 132 KV Solid Core Insulators

0 0 0 0 150 150 0.15 100 0 0

RMT RMT RMT RMT RMT RMT Km Each Each Each

NO.S

1 3 3 3 3 1 1 0 18

Nos Nos Nos Nos Nos Nos Nos Nos Nos

Line matching unit Dismantling of following equipment 132 KV Circuit Breaker 132 KV Current Transformer(Feeder) 132 KV Potential Transformer 132 KV Lightning Arrestors 132 KV Capacitance Voltage Transformer 132 KV isolator With E/S 132 Kv Isolator With Out E/S 132 KV Wave Trap 132 KV Solid Core Insulators Line matching unit 132 KV Control & Relay Panel for feeder Marshalling Boxes 16.Erection Of the Control & Relay Panels 220 KV Control & Relay Panel 132 KV Control & Relay Panel for feeder Total No.Of Control & Relay Panels Erection Of the Following 25.Marshalling Kiosk 19.Marshalling Boxes 26.Supply & Fixing of 15 lbs capacity CO2 portable fire extinguishers (with out trolleys) 27.Supply & Fixing of 50 lbs capacity CO2 portable fire extinguishers (with trolleys)

Nos

1 3 0 3 2 1 1 1 18 1 2 3

Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Sets Nos

0 2 2

Sets Sets Sets

0 3 2

Each Each Each

Each

30.Supply & Fixing of insulation rubber mats and laying in the

Each

34.Supply & Fixing of Flexible GI earth Bonds

40

Each

36. Writing of Names in the control Room & Switch Yard 39.Supply and fixing of glow sign board 10' X 4' 40.Supply of caution Boards A) DANGER with logo B) LINE CLEAR C) BREAK DOWN D) LOAD RELIEF

25 1

Each Each

3 3 3 3

Each Each Each Each

Asst. Executive Engineer, T.L.C.SD-Mahabubnagar.

ELECTRICAL PORTION Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM. ABSTRACT Material Portion Labour Portion Total Add 3% Contingencies Add 10.75% General & Adm Charges Grand Total Or Say 15976145.97 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

MATERIAL PORTION Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM.


SNO 3 4 5 6 7 8 9 12 15 17 19 20 21 23 24 25 31 32 33 34 36 Description Material GI Structure parts Supply of GI bolts & nuts Supply of 100x16mm MS earth flat Supply of 100x16mm GI earth flat Supply of 50x8mm MS earth flat Supply of 50x16mm MS earth flat 132 KV Circuit Breaker 132 KV Current Transformer(protection) 132 KV Potential Transformer (metering) 132 KV Lightning Arrestors 132 KV Current Transformer(metering) 132 KV isolator With E/S 132 Kv Isolator With Out E/S 132 KV Wave Trap 33 KV/400 V Station Transformer(100 KVA) 132 KV Solid Core Insulators 70 KN Disc Insulators ACSR Moose Conductor ACSR Moose/Zebra Conductor HTGS Earth Wire Copper Control Cable QTY 63 4 200 30 325 200 1 3 3 3 3 1 1 0 1 18 192 0 0.9 0.568 0.15 Rate 59394.13 86629.00 415.80 622.45 93.00 139.22 735630.00 89637.00 143784.00 36033.00 220131.00 102118.00 79425.00 125000.00 250998.00 9191.00 375.00 260000.00 220000.00 25000.00 100000.00 Per Each MT RMT RMT RMT RMT Each Each Each Each Each Each Each Each Each Each Each KM KM KM KM Amount 3741830.19 346516.00 83160.00 18673.58 30225.00 27844.20 735630.00 268911.00 431352.00 108099.00 660393.00 102118.00 79425.00 0.00 250998.00 165438.00 72000.00 234000.00 124960.00 14200.00 15000.00 15976145.97

Asst. Executive Engineer, T.L.C.SD-Mahabubnagar.

Sno

Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM. DETAILED ESTIMATE Description Of Work Qty 63

Rate 59394.00

Per

Amount 3741822.00

Electrical Portion 2 Procurement of raw steel such as MS angles, plates, channels, RS joist, MS rounds etc and fabrication and galvanisation of main and auxilary structure, stubs, stub setting template and foundation bolts, U bolts with suitable galvanised nuts for foundation 3 Providing and fixing of GI bolts & nuts including cost of material for fabricated structures. Setting of stubs with stub setting template for sub-station structure: Erection of stub template, fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stub setting template, dismantling of template after completion of initial curing of CC a. 220kv stuctures b. 132kv structures c. 33kv structures and CPLs 4 Erection of structures fabricated from RS Joists, channels, M.S Angles. 5 Hoisting of insulators and hard ware stretching the conductor and stringing of 132 KV main Bus comprising of Three phases with Single Zebra/Moose conductor to a tensin of 900Kgs including fixing of spacer clamps( The approximate length of bus section will be 40mts.) 6 Hoisting of insulators and hard ware stretching the conductor and stringing of 33 KV Main Bus comprising of Three phases with Twin /Moose conductor to a tensin of 900Kgs including fixing of spacer clamps( The approximate length of bus section will be 20mts.) 7 Hoisting of insulators and hard ware stretching the conductor and stringing of 132 KV Aux.Bus comprising of Three phases with Single Zebra/Moose conductor to a tensin of 900Kgs including fixing of spacer clamps( The approximate length of bus section will be 40mts.) 8 Fixing hard ware, stretching the groundwire and stringing of over head earth bus from pinacle to pinacle including supply of tension clamps 9 Connecting equpiment to bus and/or another equipment with Single Moose/Zebra including measuring,cutting, clamping & also hoisting of suspension insulator assembly to support the conductor whereever necessary. a) with out clamps b) with clamps 11 Laying of earth mat including excavation of trenches, welding & fixing of lugs, connecting to equipment & connecting lightninig shield to earthmat & earthing of fence posts, driling and connecting earthrods including connecting cast iron pipes as per Drg.Drg.No.SET(SS)1/99 with the following sizes of M.S.Flats & G.I Flats Incl. cost of Flats & Earthrods a) 100 X1 6 MM MS Flat b) 100 X 16 MM GI Flat c) 50 X 8 MM MS Flat d) 50 X8 GI Flat 12 Excavation of earth pits, putting cast iron pipe with flange on one end ( as per ISS 7181/74), of nominal dia 125mm & 2.75 Mts long inside the pit and back filing the pit with BH coke Incl. COST OF C.I PIPES & BH COKE 13 Laying of control cables of all sizes (from 2core, 2.5 sqmm to 12 core, from 2.5sqmm to 120Sq mm of both copper and aluminium) in cable trenchesincluding cost of suitable metallic glands and rubber lining & dressing. Note : This incl. running the cable in control room where cables are run on cable racks in the cab duct a. 2.5Sq mm b. 70Sq mm 15 Cable termination to the switch gear, marshalling boxes/panel terminal blocks/C&R panels, LTAC panel incl. providing suitable ferrules and lugs as per specification (incl. cost of ferrules and lugs Note : Rate to be quoted is for termination of one core of cable at both ends) a) 2.5 sqmm copper with copper lugs each at both ends b) 4 C X 120 sqmm Aluminium with Aluminium lugs each core at both ends 16 Installation of lighting fixtures on switch yard structures incl. cost of lightning fixtures & cabling connections 17 Erection of the following equipment incl. loading & unloading, transport to site from APTRANSCO's stores and the incidental handling charges 132 KV Circuit Breaker 33 KV Circuit Breaker

86629.00

346516.00

15 8 56 63 0

3153.00 2263.00 566.00 2248.00 MT 16566.00

47295.00 18104.00 31696.00 141624.00 0.00

26687.00

53374.00

14737.00

29474.00

28

2035.00

56980.00

45 48

268.00 581.00

E E

12060.00 27888.00

197 62 350 181 15

568.00 692.00 148.00 194.00 10868.00

RMT RMT RMT RMT 0

111896.00 42904.00 51800.00 35114.00 163020.00

150 0

10.29 RMT 28.00

1542.90 0.00

100 0 5

28.00 102.00 7238.00

E E E

2800.00 0.00 36190.00

1 0

10268.00 3183.00

E E

10268.00 0.00

18

19

20

21 22 23 24 25

132 KV Current Transformer 33 KV Current Transformer 132 KV Potential Transformer 33 KV Potential Transformer 132 KV Lightning Arrestors 33 KV Lightning Arrestors 132 KV Capacitance Voltage Transformer 132 KV isolator With E/S 132 Kv Isolator Without E/S 33 KV Isolator 132 KV Wave Trap 33kv Solid core insulator Erection of control/relay panels LTAC panels annunication panels, PLCC&EPAX panels etc., in the control room duly mounting them on channels & grouting them with foundations bolts to be supplied by the contractor incl.GI channels. Erection of line matching unit Erection of the battery set incl. loading & unloading, transport to site from APTRANSCO's stores and the icidental handling charges 220 V 80 Ah Battery 48 V PLCC Battery Set Erection of the battery charger incl. loading & unloading, transport to site from APTRANSCO's stores and the incidental handling charges a) 220 V Battery Charger with DC Distribution b) 48 V Battery Charger Erection of Marshalling boxes on the structures of equipment including cost of Marshalling boxes Erection of Station Transformer including cost of Stn Ptf, HG fuse set etc in complete shape Supply & fixing of CT operated electronic energy meter for 250KVA 33kv/400V-100/5A class of accuracy, fixed in out door pilfer proof box Supply & Erection of LT Distribution box containing three sets for distribution with MCCB Units Erection of Lightning pillar box in the switchyard on foundation to be laid as per drawings no at contractors cost including cost of all materials required that includes cost of pillar box & cement

3 0 3 0 3 0 3 1 1 0 0 6 2

2259.00 822.00 2259.00 822.00 1067.00 453.00 2259.00 4106.00 3696.00 1335.00 1335.00 453.00 1436.00

E E E E E E E E E E E E E

6777.00 0.00 6777.00 0.00 3201.00 0.00 6777.00 4106.00 3696.00 0.00 0.00 2718.00 2872.00

298.00

0.00

0 0

8830.00 4726.00

E E

0.00 0.00

0 0 3

3183.00 1455.00 5527.00

E E E E E E E

0.00 0.00 16581.00 0.00 0.00 0.00 0.00

0 288930.00 0 10607.44 0 0 11877.00 10899.00

26 Supply & Fixing of 15 lbs capacity CO2 portable fire extinguishers (with out trolleys) complete with first filling Horn & Hose 27 Supply & Fixing of 50 lbs capacity CO2 portable fire extinguishers 9with trolley) complete with first filling Horn & Hose 28 Fabrication of name board for SS with 16 SWG MS Tin and support framing with suitable angle and side angles 10 feet length for erection of the name board with suitable colours indicating the particulars of SS including erection complete 29 Supply of MDF(Medium density Fibre) boards with 12mm thick 3' X 4' size with teakwood beading and painting with two coats of white paint and drawings of SS single line diagram with various colours. 30 Supply & Fixing of insulation rubber mats and laying in the control room 31 Supply & Fixing of GI Flexible earth Bonds 32 Supply & Fixing of Copper Flexible earth Bonds suitable for PTR Neutrals Supply and fixing of threaded LV bushing clamps 33 Writing of names in the control room for identification of rooms on panels, equipment, marshalling boxes, kiosks, with CT Ratio etc., & on main gates neatly with superior quantity paint brushes & labour etc., complete 34 Supply and fixing of keyboard made up of teak wood of size 750X500X250 mm with wood framed glass shutters, lock & key arrangement for providing of all keys including cost of transportation to site labour charges etc. in complee finished item of work as directed by engineer at site 35 Supply and fixing of glow sign board 10' X 4' including cost of transportation to site labour charges etc. in complee finished item of work 36 Supply & fixing of caution boards made up of M S sheet size 300X200X2 mm painted with superior quality synthetic enamel paint of 2 coats including cost of paint , brushes and labour charges etc in complete as follows A) DANGER with LOGO B) LINE CLEAR

2 1 0

5100.00 13900.00 17200.00

E E E

10200.00 13900.00 0.00

12000.00

0.00

5 40 0 0 25

1200.00 E 150.00 E 500.00 E 3000.00 E 50.00 LS

6000.00 6000.00 0.00 0.00 1250.00

5000.00

0.00

12000.00

12000.00

3 3

200.00 200.00

E E

600.00 600.00

C) BREAK DOWN D) LOAD RELIEF

3 3 0

200.00 200.00 450.00

600.00 600.00 0.00 0.00 0.00 0.00

Supply and fixing of "Ajanta" quartz wall clock with music bell.
Supply of furniture (GODREJ make) in the control room Supply of tool box containing spanners cutting pilers etc.,

0 100000.00 0 0 57000.00 30000.00

Supply of latest Pentium personal computer with all accessories, laser printer, UPS, computer table, printer table and computer chair Supply including transportation and installation of 1.5 T Air conditioners (Split Type ) (LG/Carrier/Voltas/Samsung)complete with cable work etc and with stablizer

5140115.27 Add 2.8% W.C.T 143923.23 Add 12.36% OF 33% total as S.T 209655.02 Total 5493693.52 Or Say 5493694.00

Assistant Executive Engineer, T.L.C.SD - Mahabubnagar.

ANNEXURE VII (I). Loading / Unloading of materials from departmental / Private vehicles in to the stores yard and stacking and vice-versa
Sl. No. -1 I 2 (I) (ii) (iii) Description of Item -2 Cement All othe materials Steel Tower parts RS Joists and rail poles and MS Sheets pf various sizes. 3 Cable / Conductor drums (for loading / un loading ) a Panther ACSR b Zebra ACSR c Moose ACSR d Moose ACSR (Huge Drums of 1.75KM and above) e Earth wire f Control cables up to 6 Core g Control cables above 6 Core h 3 1/2 Core LTAC cable drum 4 Other materials received in cases. (i) Case weighing not more than 100kgs. (ii) Case weighing from101kgs to 500kgs. Unit -3 MT MT MT MT

Each Drum Each Drum Each Drum Each Drum Each Drum Each Drum Each Drum Each Drum Each case Each case

(iii) Case containg fragile items and weighing more than 501kgs and up to 1MT (iv) for LTAC panel (v) 70/120/160 KN disc insulator (Normal) (vi) 70/120/160 KN disc insulator (Anti- fog) (vii) Loading / Un loading and stacking charges for 70KN /120KN SRC insulators. (a) 132kV (b) 220kV (viii) Loading / Un loading and stacking charges for 120KN /160KN SRC insulators for 400kV . 5 Cases containing Control & Relay Panels (a) 33kV (b) 132kV and 220kV 6 Cases containing CTs, PTs, CVTs (i) 11kV to 33kV Rating (ii) Above 33kV and up to 132kV (iii) 220kV Rating 7 Cases containing LAs (i) 33kV (ii) 132kV (iii) 220kV 8 Loading / Un-Loading of 1 33kV Breaker 2 132kV CB 3 220kV SF6 CB 4 Station Transformer (100KVA) 5 Station Transformer (250KVA) 6 132kV Wave Trap 7 220kV Wave Trap

Each case Each Each Each

Each string Each string Each string Each Each Each case Each case Each case Each case Each case Each case Each set Each set Each set Each set Each set Each Each

8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 a b 31 32 33 34 35 36 37 38 39

220V 80AH Battery (Conventional) Set 220V 80AH Battery (VRLA) Set 220V 200AH Battery Set 220V 400AH Battery Set 48V PLCC battery 150 AH Set 48V PLCC battery 250 AH Set 48V Battery Charger 10A Set 48V Battery Charger 35/50A Set 48V Battery Charger 100A Set 220V Battert Charger with DC distribution Board Set DCDB for battery Charger. Each 132kV Hardware single Set 132 KV Hardware double Set 220 kV Hardware single Set 220 KV Hardware double Set 220 KV Isolators, without insulators including Set machanism box 220kV Solid core insulators Each 132 KV Isolators (without soild core insulators) Each 132kV Solid core insulators Each 33 KV Isolators (without soild core insulators) Each 33kV Solid core insulators Each Vibration dampers, mid span compression joints, repair 100 Nos sleeves, clamps & connectors etc Capacitor Banks 5 MVAR Set Neutral C.T. Each Scrap items like MS Scrap, GI Scrap, Ferrous Scrap Per MT etc,. Scrap items like Conductor scrap, Earth wire Scrap, Per MT etc,. Single channel PLCC Panel Each Twin Channel PLCC Panel Each Phase to Phase couplings units (LMU) Set Bolts & Nuts weighing 50 Kgs bags including springs Each washers, flat washers. bag 3 1/2 Core LTAC Cable bits (loose) by measuring and Mts load / unload Cable bits (loose) up to 6 Core by measuring and load / Mts un load Cable bits (loose) above 6 Core by measuring and load Mts / un load

40 41 42 43 44 45 46 47 48

Copper Scrap Battery Scrap Capacitor units Scrap 33kV Breaker Limb 132kV Breaker Limb 220kV Breaker Limb Tyres scrap of all sizes Empty oi drums Full oil drums

Per MT Per MT Each Each Each Each Each Barrel Barrel

(III). Crane Hire charges:(for departmental works at the premises)


Sl. No. -1 Description of Item -2 a) For 2 to 8 Tonne Capacity crane i.For Ist hour ii.For every hour or part thereof after Ist hour b) For 8 to 20 Tonne Capacity crane i.For Ist hour ii.For every hour or part thereof after Ist hour c) For above 20 Tonne Capacity crane i.For Ist hour ii.For every hour or part thereof after Ist hour Unit -3 Hour Hour Hour Hour Hour Hour

(IV). Sparing of Departmental vehicle to the contractor:


Sl. No. -1 1 Description of Item Unit

-2 -3 Sparing of Departmental vehicle(Lorry) to the contractor Per day is under emergency only. When departmental lorry is engaged to the Contractor on a particular day an amount of Rs2102/- per day or part there of should be recovered for a total KM run up to 100KM on that day plus for every additional KM at Rs.17.50 per KM Which ever is higher. The run to be worked out taking initial reading at starting point and closing reading after Plus returing the same starting point duly completing the addition al KM transport work.

Note:When the departmental lorry is used for transport of fragile and costly equipment, they have to be insured by the contractor in first place before transport and the same will be claimed in the respective work bill.

1.

If the crane is given on hire to other than APTRANSCO works, the rate is a minimum of Rs18984/-(Rs.791/-per hr X 24Hrs) + (Fuel cost & lubricants) per day or part there of and the time is to be reckoned from the time of leaving department premises till reaching back. ANNEXURE -VIII TRANSPORT OF PROTECTION AND CONTROL EQUIPMENT & LINE MATERIALS The following are the minimum materials / equipment, for each load One Load=9.0MT 1 CTs, PTs, & CVTs: a). 220kV b).132kV c).33kV

NOTE:

For transport of 220kV CTs, PTs &CVTs extra provison of Rs.197/- may be added for each load towards labour for clearing the obstructions like electrically and telephone

2 SF6 Circuit Breakers: a). 220kV b).132kV c).33kV 3 Isolators with or without Earth switch including post type insulators: a). 220kV b).132kV c).33kV 4 Lighting Arrestors: a). 220kV b).132kV c).33kV 5 Control & Relay panels: 6 ACSR Conductor and Earth wire drums: a)ACSR moose

b)ACSR Zebra c)ACSR Panther d)Earth wire e)CABLE DRUMS 7 Solid Core Insulators (a) 70 KN (b) 120KN 8 Silicon Rubber Insulators (a) 70 KN (b) 120KN 9 Wave Traps a). 220kV b).132kV

Private vehicles in to the stores

SS Rate for 2009-10 (Rs.) Loading Un loading -4 -5 66 77 131 131 131 131 131 131

164 230 230 262 98 98 131 87

164 230 230 262 98 98 131 87

87 164

87 164

328 219 1.1 2.2

262 219 1.1 2.2

2 2 3

2 2 3

219 273 66 328 492

219 273 66 328 492

15 164 219

15 164 219

656 1311 1639 273 328 87 328

656 1311 1639 273 328 87 328

546 383 600 874 219 328 219 273 383 328 109 7.7 7.7 10.9 10.9 328 44 246 27 109 3 109

546 383 600 874 191 273 219 273 383 328 109 7.7 7.7 10.9 10.9 328 44 246 27 109 3 109

874 60 164 219 164 219 109 5 0.55 0.5 0.75

874 60 164 219 164 219 109 5 0.45 0.5 0.75

131 137 5 164 273 393 13.1 4.6 27.3

131 137 3 164 273 393 6.6 4.6 27.3

t the premises)
SS Rate for 200910 (Rs.) -4 1742 791 2716 905 4188 1472

SS Rate for 200910 (Rs.) -4 2102

17.5

NT & LINE MATERIALS

or each load

2 Nos. 3 Nos. 12 Nos.

of Rs.197/- may be structions like electrically and telephone lines as the equipment are very tall.

1/2 sets 2/3 sets 1 No. 1 set in 2 Loads. 1 No. 8 Nos. 6 Nos. 6 Nos. 24 Nos. 6 Nos. 3Nos.

t type insulators:

4Nos. 6Nos. 8Nos. 10Nos. - 1000 Nos. - 800 Nos. - 275 Nos. - 228 Nos. 6 Nos. 16 Nos.

TENTATIVE DEVIATION STATEMENT Name of the work : Erection of 220/132KV SUB-STATION AT JURALA Name of the Coctractor : M/S.STANDARD CONSULTANTS LIMITED, Hyderabad Contract Award No. LR. No. CPT 210/SE-PM-I/220KV JURALA SS/RC -3920/2008 Dt. 4-12-2008. L.S. Agrmt No. /2008 - 09 of SE/TLC/HYDERABAD. Remarks/R easons for excess or less Qty. 19

Sl.No.

DESCRIPTION Qty

Upto 25% Rate 8 2796.00 2248.00 Amount 9 12582.00 49006.40

Above 25% with tender %age Qty 10 -3 -46 Rate 11 2172.24 1320.77

4.99% Amount 12 -5430.61 Qty 15 2

Excess Amount 16 5592.00 -54401.60 Qty 17

Less Amount 18

1 1 2 3 #REF!

2 Erection of structures fabricated from RS Joists, channels, M.S Angles. Hoisting of insulators and hard ware stretching the conductor and stringing of 220 KV Bus comprising of Three phases with Single Zebra/Moose conductor to a tensin of 900Kgs including fixing of spacer clamps( The approximate length of bus section will be 40mts.)

7 4.5 21.8

-60755.61 -24

0.75

16572.37

12429.28

-3

9989.80

-27471.95

-2

-33144.74

Hoisting of insulators and hard ware stretching the conductor and stringing of 132 KV Bus comprising of Three phases with Twin Zebra/Moose conductor to a tensin of 900Kgs including fixing of spacer clamps( The approximate length of bus section will be 40mts.)

-2.00

33433.29

-66866.58

19936.03

0.00

-2

-66866.58

Hoisting of insulators and hard ware stretching the conductor and stringing of 132 KV Aux.Bus comprising of Three phases with Single Zebra/Moose conductor to a tensin of 450Kgs including fixing of spacer clamps( The approximate length of bus section will be 40mts.) Fixing hard ware, stretching the groundwire and stringing of over head earth bus from pinacle to pinacle including supply of tension clamps Connecting equpiment to bus and/or another equipment with Single Moose/Zebra including measuring,cutting, clamping & also hoisting of suspension insulator assembly to support the conductor whereever necessary.

-1

26687.00

-26687.00

-1

17288.97

-17288.97

-2

-53374.00

7.5

2035.00

15262.50

-10

1676.69

-15928.56

-2

-4070.00

0.00

0.00

0.00

0.00

0.00

(a) a) with out clamps (b) b) with clamps 8 Connecting equpiment to bus and/or another equipment with Twin Zebra/Moose including measuring,cutting, clamping & also hoisting of suspension insulator assembly to support the conductor whereever necessary. b) with clamps

22 27.25

268.00 581.00

5896.00 15832.25

-65 -88

173.23 342.27

-11260.18 -43 -30205.10 -61

-11524.00 -35441.00

-42.00

0.00

0.00

342.27

0.00 -42

0.00

Laying of earth mat including excavation of trenches, welding & fixing of lugs, connecting to equipment & connecting lightninig shield to earthmat & earthing of fence posts, driling and connecting earthrods including connecting cast iron pipes as per Drg.Drg.No.SET(SS)1/99 with the following sizes of M.S.Flats & G.I Flats Incl. cost of Flats & Earthrods a) 100 X1 6 MM MS Flat b) 100 X 16 MM GI Flat c) 50 X 8 MM MS Flat d) 50 X8 GI Flat

-653.00 -238.00 1000 -2219.00

568.00 692.00 148.00 194.00

-370904.00 -164696.00

0 0

31.50 31.50 25.20 25.20

0.00 -653 0.00 -238 -117168.84 -3650 0.00

-370904.00 -164696.00 -540200.00 -2219 -430486.00

148000.00 -4650 -430486.00 0

10 e) Excavation of earth pits, putting cast iron pipe with flange on one end ( as per ISS 7181/74), of nominal dia 125mm & 2.75 Mts long inside the pit and back filing the pit with BH coke Incl. COST OF C.I PIPES & BH COKE 11 Laying of control cables of all sizes (from 2core, 2.5 sqmm to 12 core, 2.5sqmm both copper and allminium) in cable trenches. Note : This incl. running the cable in control room where cables are run on cable racks in the cab duct 12 Laying of Power cables of all sizes (4 C X 120 sqmm Aluminium cable) Note : This incl. running the cable in control room where cables are run on cable racks in the cab duct

-46.00

10868.00

-499928.00

6387.59

0.00

-46

-499928.00

6500

10.29

66859.00 -32350

7.95

-257109.49 ####

-265893.10

a) upto 50 sqmm b) above 50 sqmm 13 Cable termination to the switch gear, marshalling boxes/panel terminal blocks/C&R panels, LTAC panel incl. providing suitable ferrules and lugs as per specification (incl. cost of ferrules and lugs Note : Rate to be quoted is for termination of one core of cable at both ends) a) 2.5 sqmm copper with copper lugs each at both ends b) 4 C X 120 sqmm Aluminium with Aluminium lugs each core at both ends 14 Installation of lighting fixtures on switch yard structures incl. cost of lightning fixtures & cabling connections

0 -250.00

0.00 10.85

0.00 -2712.50

0 0

0.00 11.23

0.00

0.00 -2712.50

0.00 -250

-3400.00 -50.00

28.00 102.00

-95200.00 -5100.00

0 0

28.00 0.00

0.00 -3400 0.00

-95200.00 -50 -5100.00

-20.00

7238.00

-144760.00

7352.45

0.00 -20

-144760.00

15 Erection of the following equipment incl. loading & unloading, transport to site from APTRANSCO's stores and the incidental handling charges 220 KV Circuit Breaker a) 132 KV Circuit Breaker 220 KV Current Transformer c) 132 KV Current Transformer 220 KV Potential Transformer e) 132 KV Potential Transformer 220 KV Lightninig Arrestors g) 132 KV Lightning Arrestors h) 33 KV Lightning Arrestors 220 KV Capacitance Voltage Transformer i) 132 KV Capacitance Voltage Transformer 220 Kv isolator With E/S 220 Kv isolator With Out E/S j) 132 KV isolator With E/S k) 132 Kv Isolator Without E/S l) 33 KV Isolator 220 KV Wave Trap m) 132 KV Wave Trap 16 Erection of control/relay panels LTAC panels annunication panels, PLCC&EPAX panels etc., in the control room duly mounting them on channels & grouting them with foundations bolts to be supplied by the contractor incl.GI channels. 17 Erection of the battery set incl. loading & unloading, transport to site from APTRANSCO's stores and the icidental handling charges 220 V 200 Ah Battery b) 48 V PLCC Battery Set 18 Erection of the battery charger incl. loading & unloading, transport to site from APTRANSCO's stores and the incidental handling charges a) 220 V Battery Charger with DC Distribution b) 48 V Battery Charger 10A 19 Erection of Marshalling boxes on the structures of equipment including cost of Marshalling boxes 20 Erection of Marshalling kiosks in the switchyard on foundation to be laid as per drawings no at contractors cost including cost of all materials 21 Erection of Station Transformer -1 -1 -15 3183.00 1455.00 5527.00 -3183.00 -1455.00 -82905.00 0 0 0 3183.00 1455.00 5527.00 0.00 0.00 -1 -1 -3183.00 -1455.00 -82905.00 -1 -1 6954.19 4726.00 -6954.19 -4726.00 0 0 6954.19 4726.00 0.00 0.00 -1 -1 -6954.19 -4726.00 -6 -3 5 3 1 0 -18 -9 -3 -12 -1 -4 2 1 -4 -1 -12 -4 10268.00 22096.72 4564.07 2259.00 4161.44 2259.00 2267.46 1067.00 453.00 4411.52 2259.00 5088.35 4574.49 4106.00 3696.00 1335.00 968.57 1335.00 -61608.00 -66290.16 20538.32 6777.00 3121.08 0.00 -40814.28 -9603.00 -1359.00 -52938.24 -2259.00 -20353.40 8005.36 2053.00 -14784.00 -1335.00 -11622.84 -5340.00 0 0 1 -12 -4 0 0 0 0 0 0 0 -9 2 0 0 0 0 10268.00 22096.72 4564.07 2259.00 4161.44 2259.00 2267.46 1067.00 453.00 4411.52 2259.00 5088.35 4574.49 4106.00 3696.00 1335.00 968.57 1335.00 0.00 0.00 4564.07 -27108.00 -15605.40 0.00 0.00 0.00 0.00 0.00 -40026.79 8212.00 0.00 0.00 0.00 -1 -4 -1335.00 -11622.84 -5340.00 0.00 -12 -6 -3 6 -9 -3 0 -9 -3 -1 -4 -7 3 -61608.00 -66290.16 25102.39 -20331.00 -12484.32 0.00 -40814.28 -9603.00 -1164.36 -52938.24 -2259.00 -20353.40 -32021.43 10265.00 -4 -14784.00

0.00 -18

0.00 -12

-23

1436.00

-33028.00

1436.00

0.00 -23

-33028.00

0.00 -15

-6

20242.97

-121457.82

20242.97

0.00

-6

-121457.82

-1

288930.00

-288930.00

288930.00

0.00

-1

-288930.00

22 Supply & fixing of CT operated electronic energy meter for 250KVA 33kv/400V-100/5A class of accuracy, fixed in out door pilfer proof box 23 Supply & Erection of LT Distribution box containing three sets for distribution with MCCB Units 24 Erection commissioning of Greaves make Diesel Engine with standard accessories coupled to kirloskar/Crompton make alternator of 3 phase, 445V, 0.8 p.f, 50 Hz, 1500 rpm, standard control panel, fuel tank, batterry leads etc., 15 KVA Diesel generator set complete as per details givenin specification. Including cost of materials such as M.S Chanels, cement, sand etc., payment will be made against proforma invoice of Diesel generator 25 Erection of Lightning pillar box in the switchyard on foundation to be laid as per drawings no at contractors cost including cost of all materials required that includes cost of oillar box & cement 26 Supply & Fixing of 15 lbs capacity CO2 portable fire extinguishers (with out trolleys) complete with first filling Horn & Hose 27 Supply & Fixing of 50 lbs capacity CO2 portable fire extinguishers 9with trolley) complete with first filling Horn & Hose 28 Fabrication of name board for SS with 16 SWG MS Tin and support framing with suitable angle and side angles 10 feet length for erection of the name board with suitable colours indicating the particulars of SS including erection complete 29 Supply of MDF(Medium density Fibre) boards with 12mm thick 3' X 4' size with teakwood beading and painting with two coats of white paint and drawings of SS single line diagram with various colours. 30 Supply & Fixing of insulation rubber mats and laying in the control room 31 Supply & Fixing of Copper Flexible earth Bonds suitable for PTR Neutrals 32 Supply & Fixing of GI Flexible earth Bonds 33 Supply and fixing of threaded LV bushing clamps 34 Writing of names in the control room for identification of rooms on panels, equipment, marshalling boxes, kiosks, with CT Ratio etc., & on main gates neatly with superior quantity paint brushes & labour etc., complete

-1

10607.44

-10607.44

10607.44

0.00

-1

-10607.44

-1

11877.00

-11877.00

11877.00

0.00

-1

-11877.00

-1

2052.70

-2052.70

2052.70

0.00

-1

-2052.70

-2

10899.00

-21798.00

10899.00

0.00

-2

-21798.00

-10

5100.00

-51000.00

5100.00

0.00 -10

-51000.00

-7

13900.00

-97300.00

13900.00

0.00

-7

-97300.00

-1

17200.00

-17200.00

17200.00

0.00

-1

-17200.00

-1

12000.00

-12000.00

12000.00

0.00

-1

-12000.00

-5 -8 -160 0.75

1200.00 500.00 50.00

-6000.00 -4000.00 -8000.00 0.00

0 0 0 -4

1200.00 500.00 50.00

0.00 0.00

-5 -8

-6000.00 -4000.00 -24000.00 -9000.00

0.00 -160 0.00 -3

24

5000.00

120000.00

5000.00

0.00

24

1200.00

35 Supply and fixing of keyboard made up of teak wood of size 750X500X250 mm with wood framed glass shutters, lock & key arrangement for providing of all keys including cost of transportation to site labour charges etc. in complee finished item of work as directed by engineer at site 36 Supply and fixing of glow sign board 10' X 4' including cost of transportation to site labour charges etc. in complee finished item of work 37 Supply & fixing of caution boards made up of M S sheet size 300X200X2 mm painted with superior quality synthetic enamel paint of 2 coats including cost of paint , brushes and labour charges etc in complete as follows A) DANGER with LOGO B) LINE CLEAR C) BREAK DOWN D) LOAD RELIEF

-1

12000.00

-12000.00

12000.00

0.00

-1

-5000.00

0.00

0.00

0.00

0.00

0.00

-2 -2 -2 -2

200.00 200.00 200.00 200.00

-400.00 -400.00 -400.00 -400.00

0 0 0 0

200.00 200.00 200.00 200.00

0.00 0.00 0.00 0.00

-2 -2 -2 -2

-400.00 -400.00 -400.00 -400.00

T O T A L Rs

-2407358.97

-612583.41

-2901893.32

-1003672.00

-4027191.96 -3019942.38 SUPPLEMENTAL WORKS TO BE CARRIED OUT 1 Hoisting of insulators and hard ware stretching the conductor and stringing of 220 KV Bus comprising of Three phases with Twin Zebra/Moose conductor to a tensin of 1800Kgs including fixing of spacer clamps( The approximate length of bus section will be 40mts.) -3905565.32

Connecting equpiment to bus and/or another equipment with Twin Zebra/Moose including measuring,cutting, clamping & also hoisting of suspension insulator assembly to support the conductor whereever necessary. a) with out clamps 280.32

Supply & erection of HG Fuse setsuitable for 33kv/400V station transformer

TOTAL ESTIMATE VALUE

TENTATIVE DEVIATION STATEMENT Name of the work : Erection of 220/132KV SUB-STATION AT JURALA Name of the Coctractor : M/S.STANDARD CONSULTANTS LIMITED, Hyderabad Contract Award No. LR. No. CPT 210/SE-PM-I/220KV JURALA SS/RC -3920/2008 Dt. 4-12-2008. L.S. Agrmt No. /2008 - 09 of SE/TLC/HYDERABAD. Upto 25% Qty 7 3.055 0.275 -650 -270 1000 -2200 -6 -3 -6 -12 -6 2 1 0 -18 -9 -12 -1 -4 2 0 -1 0 28 -52 2 0 0 0 -2 -1 154 0.381 -0.894 0.113 -1 Rate 8 #REF! 86629.00 415.80 622.45 93.00 139.22 1599015.00 735630.00 360000.00 356083.00 121582.00 89637.00 518672.00 143784.00 63727.00 36033.00 369520.00 220131.00 340868.00 318637.00 102118.00 79425.00 250998.00 17199.00 9191.00 2042.00 1209339.00 1209339.00 1209339.00 500000.00 249623.00 375.00 260000.00 220000.00 25000.00 591233.00 Amount 9 #REF! -270270.00 -168062.20 -306286.20 -9594090.00 -2206890.00 -2160000.00 -4272996.00 -729492.00 134455.50 389004.00 0.00 -1147086.00 -324297.00 -4434240.00 -220131.00 -1363472.00 557614.75 0.00 -99281.25 0.00 472972.50 -477932.00 4084.00 0.00 0.00 0.00 -1000000.00 -249623.00 Above 25% as per Cl.No.6 of order Qty 10 #REF! 0 0 0 0 0 0 0 0 4 -4 0 0 0 0 0 0 -9 -1 -3 0 57 0 -12 0 0 0 0 0 Rate 11 #REF! 86629.00 415.80 622.45 93.00 139.22 1599015.00 735630.00 360000.00 356083.00 121582.00 89637.00 518672.00 143784.00 63727.00 36033.00 369520.00 220131.00 340868.00 318637.00 102118.00 79425.00 250998.00 17199.00 9191.00 2042.00 1209339.00 1209339.00 1209339.00 500000.00 249623.00 375.00 260000.00 220000.00 25000.00 591233.00 Amount 12 #REF! 227401.13 Qty 15 #### 3 Excess Amount 16 #REF! 251224.10 -270270.00 -168062.20 -341775.00 -2200 -6 -3 -6 -6 6 -3 0 -9 -1 -4 -7 -1 0 85 -9594090.00 -2206890.00 -2160000.00 -4272996.00 -729492.00 493003.50 -1556016.00 0.00 -1147086.00 -324297.00 -4434240.00 -220131.00 -1363472.00 -2230459.00 -102118.00 -4 0.00 1453315.50 -52 -20420.00 0.00 0.00 0.00 -1000000.00 -249623.00 -159750.00 -161980.00 -1 0 -1 2950.00 -591233.00 -196680.00 0 0 0 -2 -1 -1 -477932.00 -317700.00 -306286.20 Qty 17 Less Amount 18 Remarks/R easons for excess or 19

Sl.No. 1 #REF!

DESCRIPTION 2 Supply of GI bolts & nuts Supply of 100x16mm MS earth flat Supply of 100x16mm GI earth flat Supply of 50x8mm MS earth flat Supply of 50x16mm MS earth flat 220 KV Circuit Breaker 132 KV Circuit Breaker 220 KV Current Transformer (PTR) 220 KV Current Transformer(Feeder) 132 KV Current Transformer(PTR) 132 KV Current Transformer(protection) 220 KV Potential Transformer 132 KV Potential Transformer (metering) 220 KV Lightninig Arrestors 132 KV Lightning Arrestors 220 KV Capacitance Voltage Transformer 132 KV Current Transformer(metering) 220 Kv isolator With E/S 220 Kv isolator With Out E/S 132 KV isolator With E/S 132 Kv Isolator With Out E/S 33 KV/400 V Station Transformer(100 KVA) 220 KV Solid Core Insulators 132 KV Solid Core Insulators 33 KV Solid Core Insulators 220KV C & R panel (feeder) 220KV C & R panel (PTR) 220kv bus bar protection panel 132kv C & R panel LTAC Panel 70 KN Disc Insulators ACSR Moose Conductor ACSR Moose/Zebra Conductor HTGS Earth Wire 220 V 200 Ah Battery

23822.98 2.63

0.00 -650 0.00 -270 -434775.00 -3675 0.00 0.00 0.00 0.00 0.00 358548.00 -1945020.00 0.00 0.00 0.00 0.00 -2788073.75 -102118.00 -218418.75 0.00 980343.00 0.00 -24504.00 -10 0.00 0.00 0.00 0.00 0.00 -260975.00 0.00 137.50 0.00

93000.00 -4675

0.00 -12

0.00 -18 0.00 -12

57750.00 -580 98995.00 -1.004 -196680.00 0.000 2812.50 0.006 -591233.00 0

-217500.00 -426

220 V Battery Charger with DC Distribution Copper Control Cable 12x2.5Sqmm Copper cable 10x2.5Sqmm Copper cable 6x2.5Sqmm Copper cable 4x2.5Sqmm Copper cable 2x2.5Sqmm Copper cable Supply of furniture Supply of T & P Cropton Greaves diesel generator Supply of certain amenities TOTAL SUPPLEMENTAL ITEM TO BE SUPPLIED 220 KV Current Transformer(Bus Coupler) 220 Kv isolator With Out E/S(1600A) 3 1/2 X 120 Sq.mm Power Cable 220kv PT distribution panel Bus coupler panel Supply of HG Fuse set Change over switch with box 800A 33 KV Isolator

-1 1.25 1 1.5 1.5 -3.85 -1 -1 -1 -1

510610.00 0.00 0.00 0.00 0.00 0.00 100000.00 60000.00 152308.00 58000.00

-510610.00 0.00 0.00 0.00 0.00 0.00 -100000.00 -60000.00 -152308.00 -58000.00

0 -6 -5 -8 -8 0 0 0 0 0

510610.00 0.00 0.00 0.00 0.00 0.00 100000.00 60000.00 152308.00 58000.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

-1 0 -4 -6 -6 -1 -1 -1 -1

-510610.00 0.00 -5 0.00 0.00 0.00 -4 -100000.00 -60000.00 -152308.00 -58000.00 0.00 0.00

0.00 0.00 350000.00 0.00

0.00 0.00 350000.00 0.00

34039.00

0.00

34039.00

COST DATA Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM. 1. Fixing of 90lb Rail Pole Cost steel as per Circular Lr. No.310/SE/P-II/DE3/D.No.49/09 Dt.18.02.10 Add for Transportation Charges Add loading & unloading Charges 120-00 X 4 Cost of Black Paint required for two coats 2396.00+672.00 Cost of Rail Pole/RMT 0.040832 * Rate for fixing of Rail Pole as per SSR 33770.13

30000.00

Or say 2. Procurement, fabrication & galvanisation of raw steel Cost steel as per Circular Lr. No.310/SE/P-II/DE3/D.No.49/09 Dt.18.02.10 Add loading and unloading charges as per SSR/MT Add Transport Charges per MT Total Cost of Steel/MT

30000 222.13 480.00 3068.00 33770.13 1378.9019 295.00 295.00 1673.90 1674.00

120-00 X 4

Or say 3.Suply of Hot dip Galavanized bolts & nuts Total Cost of Steel/MT Add 10% for making threading and moulding of bolts & nuts Or say 4.Erection of Structures As per SSR

54667.00 480.00 222.13 55369.13 55369.00

55369.00 5536.9 60905.90 60906.00

1480.00

6.Stringing of 132 KV Twin Bus As Per SSR Cost of Clamps 5bolted tension Clamps(6 Nos) Cost of Spacer Clamps(15 nos) Cost of Suspension Clamps Transportation, Loading & Unloading charges for disc insulators Transportationcharges for Zebra conductor Cost of Stringing of 132 KV Twin Bus for each 5.Stringing of 132 KV Single Bus As Per SSR Cost of Clamps 5bolted single tension Clamps(6 Nos) Cost of Suspension Clamps Transportation, Loading & Unloading charges for disc Transportationcharges for Moose/Zebra conductor Cost of Stringing of 132 KV Single Bus for each 6.Stringing of 33 KV Twin Bus As Per SSR Cost of Clamps 3bolted Double tension Clamps(6 Nos) Transportation, Loading & Unloading charges for disc insulators Transportationcharges for Moose/Zebra conductor Cost of Stringing of 33 KV Twin Bus for each 7.Stringing of 33 KV Single Aux. Bus As Per SSR

0 0 0 0 0 0

5032.00 1000 250 500 5 1799

0.00 0 0 0 0 0 0.00 0.00

0 6 0 0 0

2958 1800 1000 5.00 1799.00

0 10800 0 0.00 0.00 10800.00 0.00

2 12 48 0.24

3700.00 2850 5.00 1799.00

7400.00 34200 240.00 431.76 42271.76 21136.00

3700.00

Cost of Clamps 3bolted single tension Clamps(6 Nos) Transportation, Loading & Unloading charges for disc insulators Transportation charges for Moose/Zebra conductor Cost of Stringing of 33 KV Single Aux. Bus for each 8.Stringing of Earth Wire As Per SSR Cost of Clamps 3bolted tension Clamps(2 Nos) Transportationcharges for Earth Wire Cost of Stringing of Earth wire from pinacle to pinacle for each 9.Connecting of Equipment with Single Zebra/Moose With Out Clamps As Per SSR for single jumper Cost of jumpering for X no.s of jumpers 45 Transport, loading,unloading & insurance 0.045 charges for Moose/Zebra Total Cost of Jumpering with Single Jumpers Cost of Each jumper With Clamps As Per SSR for single jumper Cost of jumpering for X no.s of jumpers 48 Cost of Twin Moose Spacer I clamps for Single Moose 0 Cost of Twin Moose/Zebra T-Off clamps for 52 Single Moose/Zebra Cost of T clamps for single Moose/Zebra 60 Cost of 33 KV SCI insulator support clamps 12 Cost of Sus insulator Clamps 3 Transport, loading,unloading & insurance 0.048 charges for Zebra/Moose Cost of Each jumper Cost of Each jumper for shut down 15. With Twin Zebra/Moose With Clamps As Per SSR for Each Twin jumper Total cost of Jumpering with Twin Jumpers 0 Cost of Twin Zebra spacer I clamps for Twin zebra 0 Cost of Twin Zebra Spacers clamps for Twin Zebra 6 Cost of T-Off clamps for single Zebra 12 Cost of 33 KV SCI insulator support clamps 3 Transport, loading,unloading & insurance charges for Zebra 0 Total Cost of Jumpering with Twin Jumpers Cost of each jumper

0 0 0

2850 5.00 1799.00

0 0 0 0.00 #DIV/0!

28 56 0.568

377.00 600 431.00

10556 33600 244.808 44400.81 1586

45 0.045

177 1799.00

177 7965 80.96 8045.96 179.00

48 0 52 60

177 950 650 350 650 1000 1799.00

177 8496 0 33800 21000 7800 3000 2239.40 76335.40 1590 1590

12 3
0.048

233 900 250 350 1000 1799

233 0 0 1500 4200 3000 0 8700 0

10.Laying Of Earth Mat Cost of MS Earth Flat Cost steel as per Circular Lr. No.310/SE/P-II/DE-3/D.No.49/09 Dt.18.02.10 Add 5% wastage Add loading and unloading charges as per SSR/MT Add Transport Charges Total Cost of Steel/MT 120 2.00

or say Cost of GI Earth Flat Cost of raw steel as per IEEMA(March)/MT Add 5% wastage Add loading and unloading charges as per SSR/MT 120 2.00

32500.00 1625.00 34125.00 240.00 222.13 34587.13 34587.00

44838.00 2241.90 47079.90 240.00

Add Transport Charges/MT Total Cost of Steel/MT or say a) 100 X 16 mm GI Flat Rate as per SSR Cost of GI Earth Flat incl. galvanisation Charges/RMT Total Laying Charges or say b) 100 X 16 mm MS Flat Rate as per SSR Cost of MS Earth Flat/RMT Total Laying Charges or say c) 50 X 8 mm MS Flat Rate as per SSR Cost of MS Earth Flat/RMT Total Laying Charges or say d) 50 X 8 mm GI Flat Rate as per SSR Cost of GI Earth Flat/RMT Total Laying Charges or say e) Excavation of Earth pits Rate as per SSR 11.Laying Of Control Cables Rate as per SSR Laying charges including Loading, Unloading, Transport & Insurance Charges as per sheet enclosed 12.Laying Of Power Cables Rate as per SSR Laying charges including Loading, Unloading, Transport & Insurance Charges as per sheet enclosed 13. Cables Terminations Rate as per SSR for 2.5 Sqmm copper Rate as per SSR for 4.0 Sqmm copper 14. Installation of lightnining Fixtures Rate as per SSR Cost of Lightnining Fixtures 19. Erection of Marshalling Boxes Cost of Marshalling Box Erection rate as per SSR Total cost 21. Supply and erection of station transformer Cost of transformer including cost of HG fuse set & SCI erection cost including transport, insurance charges Total Cost 23.Supply & Erection of LT Distribution box containing three sets for distribution with MCCB units Erection rate as per SSR Total cost

222.13 47542.03 47542.00

35.3 599.03 708.66 709

35.3 435.80 567.9 568

28.2 107.22 135.4197 135

28.2 147.38 175.5802 176

7155

6.80 8.00

9.30 #DIV/0!

18.5 19.7

592 6500 7092


4500 215 4715

250000 #DIV/0! #DIV/0!

6000
215

6215

30.Supply & Erection of Generator Set Rate As per SSR(treated as lighting pillar bax) Cost of LTDB 24.Supply & Erection of Lighting Pillar Box Rate As per SSR Cost of Lighting Pillar box

592 6000 6592.00 592 10000 10592

25.Supply & Fixing of Portable Emergency twin tube fittings of 20 watts capacity 26.Supply & Fixing of 15 lbs capacity CO2 portable fire extinguishers (with out trolleys) 27.Supply & Fixing of 50 lbs capacity CO2 portable fire extinguishers (with trolleys) 28.Fabrication of name board for SS 29.Supply of MDF(Medium density Fibre) boards for drawings of SS single line diagram 30.Supply & Fixing of insulation rubber mats and laying in the control room 31.Supply of furniture (GODREJ make) in the control room 32.Supply of tool box containing spanners cutting pilers etc., 33. Supply of Multimeter (MECO Make), Digital Insulation Tester (SEW/Waco Make), 5 KV Meggar Hand operated 34.Supply & Fixing of Flexible GI earth Bonds as per local market rate 35.Supply & Fixing of Flexible Copper Earth Bonds suitable for PTR Neutrals 37.Supply and fixing of keyboard 38.Supply and fixing of wallclock with musical bell. 39.Supply and fixing of glow sign board 10' X 4' 40.Supply of caution Boards A) Danger Boards B) On Line Clear Boards C) Men on Work

3000 6000 12000 10000 12000 1200 100000 15000 30000

125

500 5000 500 10000

150 150 150

Asst. Executive Engineer, T.L.C.SD-Mahabubnagar.

Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM. SL NO With out Clamps Total No.Of Jumpers to Be Connected with Single Moose/Zebra Qty Of Moose/Zebra Conductor required With Clamps Single Moose/Zebra T Clamps suited to Single Moose 0 0 Total No.Of Jumpers to Be Connected with Single Moose/Zebra Qty Of Moose/Zebra Conductor required Twin Moose/Zebra Spacer T-off Clamps suited to Single Moose

Line Isolator to Wave Trap

Bus Isolator to Breaker

Line Isolator to Line

CT to Line Isolator

Bus Isolator to Bus

Wave Trap to Line

132 KV Bay 0 33 KV Bay ####

3 3

3 3

3 3

0 0 ##### #### ##### ####

3 3

Bus PT to Bus 3 6 220/132/33 KV Bays #### #### #### #### 0 ####

Breaker to CT

CVT to Line

LA to Line

Qty

0 0 ##### #### #### ##### #### ####

Total NO.OF Single Moose/Zebra Jumpers to be connected with out clamps Total No.Of Jumpers Connected With Single Moose/Zebra Total NO.OF Single Moose/Zebra Jumpers to be connected with clamps Total No.Of Jumpers Connected With Single Moose/Zebra with Clamps Total NO.OF Single Moose/Zebra T Clamps for Single Moose/Zebra Total NO.OF Twin Moose/Zebra Spacer T-Off Clamps for Single Moose/Zebra Total QTY Of ACSR Moose/Zebra Conductor

#### #### ####

Asst. Executive Engineer,

T.L.C.SD, NALGONDA.

SL NO

132/33 KV 10/16 MVA PTR


Qty HV Isolator to Breaker HV Breaker to CT'S HV CT'S to LA'S HV LA'S to HV Bushings LV Isolator to Breaker LV Breaker to CT'S Total No.Of Jumpers to Be Connected with Single Moose/Zebra

0 3 3

With out Clamps

Total QTY Of ACSR Moose/Zebra Conductor 3 3 3 3 0 72 0 216


Qty Of Moose/Zebra Conductor required in Mts for Single Moose Jumpers LV Aux. Bus to LV Support SCI

Total NO.OF Single Moose/Zebra T Clamps for Single Moose 3


LV Support SCI to LV CT'S

Total NO.OF Single Moose/Zebra Jumpers to be connected with clamps Total No.Of Jumpers Connected With Single Moose/Zebra with Clamps LV jumper Support Clamps 3 306 216 432 360
LV Aux. Bus to LA'S

Total NO.OF Twin Moose/Zebra Spacer T-off Clamps for Single Gun Metal Clamps suitable to LV Bushings 0 3 ### 72 36 0
Transformer Bay LV Aux. Bus to LV Support SCI

Total No. of Single Moose/Zebra Jumpers to be connected with out clamps Total No.Of Jumpers Connected With Single Moose/Zebra

Total No. of Single Moose Jumpers to be connected with out clamps

Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM.

216 1116 2196

3 3 3 3 3

LV Support SCI to LV Bushings Bypass Jumpers HV Isolator to HV Bus LV Isolator to LV Bus Total No.Of Jumpers to Be Connected with Single Moose/Zebra Qty Of Moose/Zebra Conductor required in Mts for Single Moose/Zebra Jumpers Single Moose/Zebra T Clamps suited to Single Moose/Zebra LV jumper Support Clamps Gun Metal Clamps suitable to LV Bushings

Asst. Executive Engineer, T.L.C.SD, NALGONDA.

0 0 0 0 216 1116 1152 0 0 0 0 36

Twin Moose/Zebra Spacer T-off Clamps suited to Single Moose

Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM.


Name of the work Qty disc insulators required conductor double tension required in Mts clamps required Zebra 220 KV Twin Bus with Moose conductor(approximate 40 mts bus section) 132 KV Twin Bus with Zebra conductor(approximate 45 mts bus section) 132 KV Single Bus with Moose conductor (approximate 45 mts bus section) 33 KV Twin Bus with Moose conductor (approximate 20 mts bus section) 132 KV LV Aux. Bus with Twin Zebra conductor (approximate 20 mts bus section) 132 KV LV Aux.Bus with Single Zebra conductor (approximate 20 mts bus section) 33 KV LV Aux. Bus with Twin Zebra conductor (approximate 20 mts bus section) 33 KV LV Aux. Bus with Single Moose conductor (approximate 20 mts bus section) 0 0 0 Moose Zebra 0 single suspension single tension / Support clamps clamps required required Moose Zebra 0 Moose spacer clamps Solid Core Insulators Zebra Moose

Moose Zebra 0

Zebra 0

Moose

0 0

0 0

0 0

0 0

48

246

12

14

48

102

12

96

348

12

12

14

Total No.Of Disc Insulators Required Total Qty of ACSR Moose Conductor Required in Mts Total No.Of Single Tension Clamps Required for Moose Total No.Of Doble Tension Clamps Required for Moose Total No.Of Single suspension Clamps Required for Moose Total No.Of SpacerClamps Required for Moose Total No.Of Solid Core Insulators Required

96 348 12 12 6 14 6

Asst. Executive Engineer, T.L.C.SD, NALGONDA.

APTRANSCO From Assistant Executive Engineer TLC, SD - Mahabubnagar Lr No AEE/TLC/SD - MBNR/F 132kv Bay extension in Kothur SS /D No Sir, SUB: Erection of ONE No 132kv bay extension in 132/33kv Kothur SS in Mahabubnagar - Tentative Revised Estimate Submitted - Reg REF: 1 2 To The Executive Engineer TLC, Mahabubnagar /10 Dt 26-04-2010

***** In the reference (1) cited above, the approval was accorded for bifurcation of 132kv bus to load demand and to utilise both the incoming circuits at 132kv level to 132/33kv Kothur SS. The tentative estimate for the said was submitted vide reference (2) cited above. Further, it is instructed to submit the estimate for ONE No 132kv bay extension in Kothur SS for Shamshabad feeder in stead of bus bifercation. Therefore, the tenetative estimate for an amount of Rs #DIV/0! is prepared based on the SSR rates of 2009-10 and the same is submitted herewith for necessary action

Encl: Report Accompany the estimate Detail estimate Data sheet Cost data Assistant Executive Engineer TLC, SD - Mahabubnagar

REPORT ACCOMPANY THE ESTIMATE Estimate amount The tentative estimate for an amount of Rs #DIV/0! Rs

is prepared towards erection of 132kv bay extension in .

132/33kv kothur SS. The tentative estimate envisages for procurement & erection of GI structure parts, earthing of equipment & structure and laying of earth amt including supply of earth flat, supply & erection and of 132kv control and metering, connecting of jumpers including cost of required clamps and connectors and panels etc. Further, the estimate is prepared for dismantling of old equipment available in 132kv bay extension of steel company, which is not in use as the date. The estimate is essential for erection of 132kv bay extension in 132/33kv SS at Kothur SS inorder to utilise both the incoming supplies at 132kv level from Shamshabad and Shadnagar sub stations. The rates adopted for the estimate is as per SSR of 2009-10 of CE/Construction/VS/Hyderabad and common SSR of 2009-10 of Govt of AP.

The expenditure of Rs #DIV/0!

is chargeable to the erection of 132kv bay extension in 132/33kv Kothur SS.

Assistant Executive Engineer TLC, SD - Mahabubnagar

APTRANSCO From Assistant Executive Engineer TLC, SD - Mahabubnagar Lr No AEE/TLC/SD - MBNR/F 132/33kv Singotam SS/D No 720 /09 Dt 03-03-2010 Sir, SUB: Erection of 132/33kv SS at Singotam in Mahabubnagar - Tentative Revised Estimate Submitted - Reg REF: 1. T O O ( CE - Construction) MS No 230 Dt 23-12-2008 2. Lr No AEE/TLC/SD-MBNR/F Singitam SS/D No 615 /09 Dt 12-10-2009 To The Executive Engineer TLC, Mahabubnagar

***** In the reference (1) cited above, the administrative approval for erection of 132/33kv Singotam SS and its connected line from 132/33kv NagarKurnool SS for an amount of Rs2050Lakhs was issued. The proposals for acquisition of land was submitted to The RDO/Nagarkurnool and the identified land is to be handed over to APTRANSCO. Pending the taking over of land, the tentative estimate for erection of 132/33kv SS at Singotam for an amount of Rs #DIV/0! was submitted vide ref (2) cited above and revised estimate for an amount of Rs as per SSR of 2009-2010 and submitted herewith for necessary action

Encl: Report Accompany the estimate Detail estimate Data sheet Cost data

Assistant Executive Engineer TLC, SD - Mahabubnagar

REPORT ACCOMPANY THE ESTIMATE Estimate amount Rs The tentative estimate for an amount of Rs #DIV/0! is prepared towards erection of 132/33kv Singotam SS. The tentative estimate envisages for procurement & erection of GI structure parts, earthing of equipment & structure and laying of earth amt including supply of earth flat, supply & erection and of 132kv control and metering equipment connecting of jumpers including cost of required clamps and connectors, panels for automisation etc. The estimate is essential for erection of 132/33kv SS at Singotam inorder to provided better voltage and also to reduce reduce the line losses and loading of PTRs in 220/132/33kv Wanaparthy SS.

The rates adopted for the estimate is as per SSR of 2008-09 of CE/Construction/VS/Hyderabad and common SSR for the 2008-09 of Govt of AP.

The expenditure of Rs #DIV/0!

is chargeable to erection of 132/33kv Singotam SS.

Assistant Executive Engineer TLC, SD - Mahabubnagar

The Executive Engineer TLC, Mahabubnagar

Dt 26-04-2010

agar - Tentative Revised Estimate Submitted - Reg

132kv bus to load demand and to utilise estimate for the said was submitted vide

NE No 132kv bay extension in Kothur SS

estimate for an amount of Rs

s submitted herewith for necessary action

Assistant Executive Engineer TLC, SD - Mahabubnagar

STIMATE #DIV/0!

ds erection of 132kv bay extension in .

tion of GI structure parts, earthing of

upply & erection and of 132kv control and

ctors and panels etc. Further, the estimate

of steel company, which is not in use

at Kothur SS inorder to utilise both the

on/VS/Hyderabad and common SSR of

ay extension in 132/33kv Kothur SS.

Assistant Executive Engineer TLC, SD - Mahabubnagar

The Executive Engineer TLC, Mahabubnagar

stimate Submitted - Reg

132/33kv Singotam SS and its connected ed. The proposals for acquisition of land ed over to APTRANSCO. Pending the ingotam for an amount of Rs #DIV/0!

#DIV/0! is prepared

Assistant Executive Engineer TLC, SD - Mahabubnagar

STIMATE #DIV/0!

ds erection of 132/33kv Singotam SS. arts, earthing of equipment & structure 132kv control and metering equipment els for automisation etc.

rovided better voltage and also to reduce

on/VS/Hyderabad and common SSR for

Assistant Executive Engineer TLC, SD - Mahabubnagar

Name Of The Work : ERECTION OF 220/33KV SS SINGOTAM.


Equipments Size Of the Bolt & Nuts 132 KV Wt./ 132 Solid 33 Piece 132 KV 132 KV 132 KV 132 KV 33 KV 33 KV KV Core KV in C.T'S CVT'S P.TS Isolator C.T'S P.T'S L.A'S Insulat L.A'S KG'S ors 0.189 0.141 0.133 0.125 0.117 0.07 0.009 0 0 0 0 0 0 96 12 12 0 0 0 0 96 12 0 0 12 0 0 32 12 0 0 12 0 0 24 0 0 0 24 0 0 84 0 0 0 72 72 0 504 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 33 KV Solid Earth Core Pits Insulators 0 0 0 0 0 0 0 60 0 120 0 0 0 588 Isolat Control CTM Total or & Relay B'S No.s MB'S Panels

Total Wt

16 X 80 MM 16 X 50 MM 16 X 45 MM 16 X 40 MM 16 X 35 MM 12 X 40 MM 16 X 3.5 X 5

0 0 0 12 0 0 60

0 0 0 20 0 4 84

0 0 0 48 0 0 68

96 12 120 200 72 4 1636 Or Say

18.144 1.692 15.96 25 8.424 0.28 14.724 84.224 80

Asst. Executive Engineer, T.L.C.SD-Mahabubnagar.