SPECIFICATION FOR METRICA GRAPHS AND REPORTS

RADIO PLANNING

Page 1 of 15

Introduction.

This document specifies Metrica reports and graphs required by the Radio Planning team, classified in four main categories: traffic, accessibility, retainability and features. A few specific functionalities are needed; they are presented at the end of the document. General information: The reports relate to a group of cells and a specific date. The graphs relate to one, two or three cells, and to a determined date/time range. The graphs are of type Line if not stated otherwise. A so-called graph in this document can be shown as several graphs in Metrica, some of which can have two value axes. This is specified in the columns Graph # and Axis #. Decimal numbers must be shown with 2 decimals. Notice all mentioned dropping and failure rates are to be understood as the ones related to the Radio Network only. Remark: The period during which data have to remain available in Metrica will be discussed later.

Traffic.

Some new indicators will be used several times in the following reports and graphs and are presented below: TCH_capacity = ErlangB(Act_def_TCHs, 0.02) where Act_def_TCHs = Int[(TAVAACC / TAVASCAN + 0.5) / 8] * 8 + TNUCHCNT Mod 8 SDCCH_capacity = ErlangB(CNUCHCNT, 0.01) if CNUCHCNT <= 4 ErlangB(CNUCHCNT, 0.005) if CNUCHCNT > 4 TCH_key_traffic_dim is used for dimensioning purposes and is defined as the average of the highest 3 hourly traffic values related to a specific week. There is a new value each week. Important note: the highest 3 traffic values are directly selected from the 168 hourly values available, i.e. they can relate to the same day! TCH_key_traffic_mon is used for monitoring purposes and is as the average of the highest 3 hourly traffic values related to the previous 7 days. There will be a new value each day. Important note: the highest 3 traffic values are directly selected from the 168 hourly values available, i.e. they can relate to the same day!

2.1 TCH traffic weekly graph. This graph relates to selected cells and date range. One value per week is shown. From the date range selected, dates up to present (for which data is available) will be shown as in the first table below. The graph #1 will also show data for the future, based on the traffic and capacity forecast for the considered cell(s), as shown in the second table below. For dates <= current:
Name TCH Avg of Top 3 BH traffic (E) TCH capacity 2% (E) Formula TCH_key_traffic_dim TCH_capacity Description Average of the top 3 BH traffic over considered week in Erlang TCH capacity for 2% blocking in Erlang (calculated using BH of the last day of the considered week only) Total TCH congestion time over considered week in min. Data type Single Single Graph # 1 1 Axis # 1 1

TCH weekly congestion time (min)

TFTCONGS / 60

Single

Page 2 of 15

TCH BH alloc attempts (#) TCH BH blocking (%)

TFCALLS 100 * (CNRELCONG + TFNRELCONG) / TFCALLS

Number of TCH allocation attempts during BH of the considered week Unsuccessful TCH allocation attempts due to congestion of TCH allocation attempts during BH of the considered week in %

Long Single

3 3

1 2

For dates > current:


Name TCH Avg of Top 3 BH traffic (E) TCH capacity 2% (E) Formula TCH_key_traffic_dim_ fcst TCH_capacity Description Prediction of average of the top 3 BH traffic over considered week in Erlang Minimum required TCH capacity for 2% blocking in Erlang according to the traffic prediction (no calculation needed, the value will be imported into Metrica see also section 8) Data type Single Single Graph # 1 1 Axis # 1 1

2.2 TCH traffic daily graph. This graph relates to selected cells and date range. One value per day is shown.
Name TCH BH traffic (E) TCH capacity 2% (E) TCH BH congestion time (min) TCH daily congestion time (min) TCH BH alloc attempts (#) TCH BH blocking (%) Formula TFTRALACC / TFNSCAN TCH_capacity TFTCONGS / 60 TFTCONGS / 60 TFCALLS 100 * (CNRELCONG + TFNRELCONG) / TFCALLS Description TCH traffic during BH in Erlang TCH capacity for 2% blocking in Erlang (calculated using BH only) TCH congestion time during BH in min. TCH congestion time over the whole day in min. Number of TCH allocation attempts during BH Unsuccessful TCH allocation attempts due to congestion of TCH allocation attempts during BH in % Data type Single Single Single Single Long Single Graph # 1 1 2 2 3 3 Axis # 1 1 1 1 1 2

2.3 TCH traffic hourly graph. This graph relates to selected cells and date. One value per hour is shown.
Name TCH traffic (E) TCH capacity 2% (E) TCH congestion time (min) TCH alloc attempts (#) TCH blocking (%) Formula TFTRALACC / TFNSCAN TCH_capacity TFTCONGS / 60 TFCALLS 100 * (CNRELCONG + TFNRELCONG) / TFCALLS Description TCH traffic in Erlang TCH capacity for 2% blocking in Erlang TCH congestion time in min. Number of TCH allocation attempts Unsuccessful TCH allocation attempts due to congestion of TCH allocation attempts in % Data type Single Single Single Long Single Graph # 1 1 2 3 3 Axis # 1 1 1 1 2

2.4 SDCCH traffic daily graph. This graph relates to selected cells and date range. One value per day is shown.
Name SDCCH BH traffic (E) SDCCH capacity (E) Formula CTRALACC / CNSCAN SDCCH_capacity Description SDCCH traffic during BH in Erlang SDCCH capacity for 1% blocking (CNUCHCNT <= 4) or 0.5% blocking (CNUCHCNT > 4) in Erlang (calculated using BH only) SDCCH congestion time during Data type Single Single Graph # 1 1 Axis # 1 1

SDCCH BH

CTCONGS / 60

Single

Page 3 of 15

congestion time (min) SDCCH daily congestion time (min) SDCCH BH seizure attempts (#) SDCCH BH blocking (%)

CTCONGS / 60 CCALLS 100 * CCONGS / CCALLS

BH in min. SDCCH congestion time over the whole day in min. Number of SDCCH seizure attempts during BH Unsuccessful SDCCH seizure attempts due to congestion during BH in %

Single Long Single

2 3 3

1 1 2

2.5 SDCCH traffic hourly graph. This graph relates to selected cells and date. One value per hour is shown.
Name SDCCH traffic (E) SDCCH capacity (E) Formula CTRALACC / CNSCAN SDCCH_capacity Description SDCCH traffic in Erlang SDCCH capacity for 1% blocking (CNUCHCNT <= 4) or 0.5% blocking (CNUCHCNT > 4) in Erlang SDCCH congestion time in min. Number of SDCCH seizure attempts Unsuccessful SDCCH seizure attempts due to congestion in % Data type Single Single Graph # 1 1 Axis # 1 1

SDCCH congestion (min) SDCCH seizure attempts (#) SDCCH blocking (%)

CTCONGS / 60 CCALLS 100 * CCONGS / CCALLS

Single Long Single

2 3 3

1 1 2

2.6 SDCCH congestion daily report. This report relates to a group of cells and a selected date. It only shows cells that have experienced SDCCH congestion during the considered day, sorted on SDCCH congestion in descending order.
Field name Cell ID SDCCH BH time Formula Description Cell ID Time in the day corresponding to the beginning of the hour during which SDCCH traffic has been heaviest SDCCH traffic during BH in Erlang Number of SDCCH subchannels defined on the cell (during BH) SDCCH capacity for 1% blocking (CNUCHCNT <= 4) or 0.5% blocking (CNUCHCNT > 4) in Erlang (calculated using BH only) SDCCH traffic load during BH in % SDCCH congestion time during BH in min. SDCCH congestion time over the whole day in min. Number of SDCCH seizure attempts during BH Unsuccessful SDCCH seizure attempts due to congestion during BH in % SDCCH mean holding time during BH in sec. Data type Time (hour) Single Byte Single

SDCCH BH traffic (E) SDCCHs defined (#) SDCCH capacity (E)

CTRALACC / CNSCAN CNUCHCNT SDCCH_capacity

SDCCH BH load (%) SDCCH BH congestion time (min) SDCCH daily congestion time (min) SDCCH BH seizure attempts (#) SDCCH BH blocking (%) SDCCH BH MHT (s)

100 * SDCCH traffic (E) / SDCCH_capacity CTCONGS / 60 CTCONGS / 60 CCALLS 100 * CCONGS / CCALLS (CTRALACC * PERLEN * 60) / (CNSCAN * CMSESTAB)

Single Single Single Long Single Single

2.7 TCH congestion/load daily report. This report relates to a group of cells and a selected date. It only shows cells that meet criteria (>= user-defined thresholds) on TCH BH load and TCH BH congestion in minutes. It is sorted first on TCH BH congestion and then on TCH BH load, both in descending order.
Name Cell ID TCH BH time Formula Description Cell ID Time in the day corresponding to Data type Time

Page 4 of 15

TCH BH traffic (E) TCH key traffic (E) TCHs defined (#) TCHs available (#) TCH capacity 2% (E) TCH key load (%) TCH BH congestion (min) TCH daily congestion (min) TCH BH alloc attempts (#) TCH BH blocking (%) TCH BH MHT (s)

TFTRALACC / TFNSCAN TCH_key_traffic_mon Act_def_TCHs TAVAACC / TAVASCAN TCH_capacity 100 * TCH key traffic (E) / TCH_capacity TFTCONGS / 60 TFTCONGS / 60 TFCALLS 100 * (CNRELCONG + TFNRELCONG) / TFCALLS (TFTRALACC * PERLEN * 60) / (TFNSCAN * TFMSESTB)

the beginning of the hour during which TCH traffic has been heaviest TCH traffic during BH in Erlang Key traffic indicator for monitoring in Erlang Most probable number of TCHs defined (calculated using BH only) Number of TCHs available during BH TCH capacity for 2% blocking in Erlang (calculated using BH only) TCH traffic load during BH in % TCH congestion time during BH in min. TCH congestion time over the whole day in min. Number of TCH allocation attempts during BH Unsuccessful TCH allocation attempts due to congestion of TCH allocation attempts during BH in % TCH mean holding time during BH in sec.

(hour) Single Single Single Single Single Single Single Single Long Single Single

2.8 Low TCH traffic daily report. This report relates to a group of cells and a selected date. It aims at identifying cells that carry little traffic compared to the installed capacity and at giving input to the TRU re-deployment process. It includes cells having no congestion and a load (TCH 14-day BH load (%)) smaller than a user-defined threshold, sorted on load in ascending order.
Name Cell ID TCH capacity 2% (E) TCH BH traffic (E) TCH BH load (%) TCH 14-day BH traffic (E) TCH 14-day BH load (%) Formula TCH_capacity TFTRALACC / TFNSCAN 100 * TCH BH traffic (E) / TCH_capacity Max(TFTRALACC / TFNSCAN) related to 1 hour over last 14 days 100 * TCH 14-day BH traffic (E) / TCH_capacity Description Cell ID TCH capacity for 2% blocking in Erlang (calculated using BH only) TCH traffic during BH in Erlang TCH traffic load during BH in % TCH traffic during Busiest Hour of last 14 days in Erlang TCH traffic load during Busiest Hour of last 14 days in % Data type Single Single Single Single Single

2.9 Idle Channel Statistics weekly graph. This graph relates to selected cells and date range. One value per week is shown. The five indicators always sum up to 100%. The graph shows bars of the same height (100%), one per week, containing parts of different colours and sized according to the value. The mapping of Interference band to colours is shown on a legend below the graph.
Name Interference band 1 Formula (ITFUSIB1/ (ITFUSIB1+ ITFUSIB2+ ITFUSIB3+ ITFUSIB4+ ITFUSIB5))*100 (ITFUSIB2/ (ITFUSIB1+ ITFUSIB2+ ITFUSIB3+ ITFUSIB4+ ITFUSIB5))*100 Description Idle TCH in interference band 1 of total idle TCH in underlaid subcell % Data type Single Graph # 1 Axis # 1

Interference band 2

Idle TCH in interference band 2 of total idle TCH in underlaid subcell %

Single

Page 5 of 15

Interference band 3

Interference band 4

Interference band 5

(ITFUSIB3/ (ITFUSIB1+ ITFUSIB2+ ITFUSIB3+ ITFUSIB4+ ITFUSIB5))*100 (ITFUSIB4/ (ITFUSIB1+ ITFUSIB2+ ITFUSIB3+ ITFUSIB4+ ITFUSIB5))*100 (ITFUSIB5/ (ITFUSIB1+ ITFUSIB2+ ITFUSIB3+ ITFUSIB4+ ITFUSIB5))*100

Idle TCH in interference band 3 of total idle TCH in underlaid subcell %

Single

Idle TCH in interference band 4 of total idle TCH in underlaid subcell %

Single

Idle TCH in interference band 5 of total idle TCH in underlaid subcell %

Single

2.10 Idle Channel Statistics daily graph. This graph relates to selected cells and date range. One value per day is shown. The graph is presented in the same format as Idle Channel Statistics weekly graph.
Name Interference band 1 Formula (ITFUSIB1/ (ITFUSIB1+ ITFUSIB2+ ITFUSIB3+ ITFUSIB4+ ITFUSIB5))*100 (ITFUSIB2/ (ITFUSIB1+ ITFUSIB2+ ITFUSIB3+ ITFUSIB4+ ITFUSIB5))*100 (ITFUSIB3/ (ITFUSIB1+ ITFUSIB2+ ITFUSIB3+ ITFUSIB4+ ITFUSIB5))*100 (ITFUSIB4/ (ITFUSIB1+ ITFUSIB2+ ITFUSIB3+ ITFUSIB4+ ITFUSIB5))*100 (ITFUSIB5/ (ITFUSIB1+ ITFUSIB2+ ITFUSIB3+ ITFUSIB4+ ITFUSIB5))*100 Description Idle TCH in interference band 1 of total idle TCH in underlaid subcell % Data type Single Graph # 1 Axis # 1

Interference band 2

Idle TCH in interference band 2 of total idle TCH in underlaid subcell %

Single

Interference band 3

Idle TCH in interference band 3 of total idle TCH in underlaid subcell %

Single

Interference band 4

Idle TCH in interference band 4 of total idle TCH in underlaid subcell %

Single

Interference band 5

Idle TCH in interference band 5 of total idle TCH in underlaid subcell %

Single

2.11 Idle Channel Statistics hourly graph. This graph relates to selected cells and date. One value per hour is shown. The graph is presented in the same format as Idle Channel Statistics weekly graph.
Name Interference band 1 Formula (ITFUSIB1/ (ITFUSIB1+ ITFUSIB2+ ITFUSIB3+ ITFUSIB4+ ITFUSIB5))*100 (ITFUSIB2/ (ITFUSIB1+ ITFUSIB2+ Description Idle TCH in interference band 1 of total idle TCH in underlaid subcell % Data type Single Graph # 1 Axis # 1

Interference band 2

Idle TCH in interference band 2 of total idle TCH in underlaid subcell %

Single

Page 6 of 15

Interference band 3

Interference band 4

Interference band 5

ITFUSIB3+ ITFUSIB4+ ITFUSIB5))*100 (ITFUSIB3/ (ITFUSIB1+ ITFUSIB2+ ITFUSIB3+ ITFUSIB4+ ITFUSIB5))*100 (ITFUSIB4/ (ITFUSIB1+ ITFUSIB2+ ITFUSIB3+ ITFUSIB4+ ITFUSIB5))*100 (ITFUSIB5/ (ITFUSIB1+ ITFUSIB2+ ITFUSIB3+ ITFUSIB4+ ITFUSIB5))*100

Idle TCH in interference band 3 of total idle TCH in underlaid subcell %

Single

Idle TCH in interference band 4 of total idle TCH in underlaid subcell %

Single

Idle TCH in interference band 5 of total idle TCH in underlaid subcell %

Single

Accessibility.

3.1 Random access daily report. This report relates to a group of cells and a selected date.
Name Cell ID RA highest failure time RA attempts (#) RA failure rate (%) Formula Hour related to Max[100* RAACCFA / (CNROCNT + RAACCFA)] over the day (CNROCNT + RAACCFA) related to the hour where [RAACCFA / (CNROCNT + RAACCFA)] is highest Max[100* RAACCFA / (CNROCNT + RAACCFA)] over the day Description Cell ID Random Access Highest Failure Rate Hour Number of Random access attempts during the Random Access Highest Failure Rate Hour Random access highest failure rate of the day Data type Time Long Single

3.2 Call attempt daily report. This report relates to a group of cells and a selected date. It can be sorted on [SDCCH seiz att failure rate (%)] or on [TCH assign failure rate (%)] in ascending order. The user can define a minimum threshold for both of those fields.
Name Cell ID SDCCH seizure attempts (#) SDCCH seiz att failure rate (%) TCH first assign attempts (#) TCH assign failure rate (%) Formula CCALLS 100 * [1 (CMSESTAB / (CCALLS CCONGS))] TASSATT 100 * [1 (TFCASSALL / TASSATT)] Description Cell ID Number of SDCCH seizure attempts over the whole day SDCCH seizure success rate when no SDCCH congestion over the whole day (%) Number of TCH first assignment attempts over the whole day TCH first assignment attempt success rate over the whole day (%) Data type Long Single Long Single

3.3 Call attempt daily graph. This graph relates to a selected cell and date range. One value per day is shown.
Name Cell ID SDCCH seizure attempts (#) SDCCH seiz att failure rate (%) TCH first assign attempts (#) Formula CCALLS 100 * (CCALLS CCONGS CMSESTAB) / (CCALLS CCONGS) TASSATT Description Cell ID Number of SDCCH seizure attempts over the whole day SDCCH seizure failure rate when no SDCCH congestion over the whole day (%) Number of TCH first assignment attempts over Data type Long Single Graph # 1 1 Axis # 1 2

Long

Page 7 of 15

TCH assign failure rate (%)

(TASSATT TFCASSALL) / TASSATT

the whole day TCH first assignment attempt failure rate over the whole day (%)

Single

3.4 Call attempt hourly report. This report relates to a group of cells and a selected date. One value per hour is shown.
Name Cell ID SDCCH seizure attempts (#) SDCCH seiz att failure rate (%) TCH first assign attempts (#) TCH assign failure rate (%) Formula CCALLS 100 * (CCALLS CCONGS CMSESTAB) / (CCALLS CCONGS) TASSATT (TASSATT TFCASSALL) / TASSATT Description Cell ID Number of SDCCH seizure attempts over the whole day SDCCH seizure failure rate when no SDCCH congestion over the whole day (%) Number of TCH first assignment attempts over the whole day TCH first assignment attempt failure rate over the whole day (%) Data type Long Single Long Single

Retainability.

4.1 SDCCH drop daily report. This report relates to a group of cells and a selected date. Depending on the user choice it can be sorted on SDCCH drop rate (%) in descending order or on SDCCH time between drops (min) in ascending order. A threshold can be entered by the user (criterion: SDCCH drop rate (%) >= threshold).
Name Cell ID SDCCH connections (#) SDCCH drop rate (%) SDCCH drops SS (%) Formula CMSESTAB 100 * CNDROP / CMSESTAB 100 * CDISSS / CNDROP Description Cell ID Number of SDCCH connections over the whole day Dropped SDCCH connections of total number of SDCCH connections over the whole day (%) Dropped SDCCH connections due to Low Signal Strength of total number of dropped SDCCH connections over the whole day (%) Dropped SDCCH connections due to Bad Quality of total number of dropped SDCCH connections over the whole day (%) Dropped SDCCH connections due to Excessive Timing Advance of total number of dropped SDCCH connections over the whole day (%) Dropped SDCCH connections due to other reasons than LSS, BQ or ETA of total number of dropped SDCCH connections over the whole day (%) Erlang seconds per dropped SDCCH connection over the whole day TCH traffic during BH in Erlang Data type String Long Single Single

SDCCH drops BQ (%)

100 * CDISQA / CNDROP

Single

SDCCH drops TA (%)

100 * CDISTA / CNDROP

Single

SDCCH drops other (%)

100 * [CNDROP (CDISSS + CDISQA + CDISTA)] / CNDROP 60 * CTRALACC * PERLEN / (CNDROP * CNSCAN) TFTRALACC / TFNSCAN

Single

SDCCH time between drops (s) TCH BH traffic (E)

Single Single

4.2 SDCCH drop daily graph. This graph shows information at cell level. It splits the SDCCH drops amongst different causes (bar graph with bars of same height containing parts of different colours).
Name SDCCH connections (#) SDCCH drop rate (%) SDCCH drops SS (%) SDCCH drops Formula CMSESTAB 100 * CNDROP / CMSESTAB 100 * CDISSS / CNDROP 100 * CDISQA / Description Number of SDCCH connections over the whole day Dropped SDCCH connections of total number of SDCCH connections over the whole day (%) Dropped SDCCH connections due to Low Signal Strength of total number of dropped SDCCH connections over the whole day (%) Dropped SDCCH connections due to Data type Long Single Single Graph # 1 1 2 Axis # 1 2 1

Single

Page 8 of 15

BQ (%) SDCCH drops TA (%) SDCCH drops other (%)

CNDROP 100 * CDISTA / CNDROP 100 * [CNDROP (CDISSS + CDISQA + CDISTA)] / CNDROP TFTRALACC / TFNSCAN

Bad Quality of total number of dropped SDCCH connections over the whole day (%) Dropped SDCCH connections due to Excessive Timing Advance of total number of dropped SDCCH connections over the whole day (%) Dropped SDCCH connections due to other reasons than LSS, BQ or ETA of total number of dropped SDCCH connections over the whole day (%) TCH traffic during BH in Erlang

Single

Single

TCH BH traffic (E)

Single

4.3 TCH drop daily report. This report relates to a group of cells and a selected date. It is sorted on TCH dropping rate in descending order. A threshold can be entered by the user (criterion: TCH drop rate (%) >= threshold).
Name Cell ID TCH connections (#) TCH drop rate (%) TCH drops SS DL (%) TCH drops SS UL (%) TCH drops SS BL (%) TCH drops BQ DL (%) TCH drops BQ UL (%) TCH drops BQ BL (%) TCH drops TA (%) Formula TFMSESTB 100 * TFNDROP / TFMSESTB 100 * TFDISSDL / TFNDROP Description Cell ID Number of TCH connections over the whole day Dropped TCH connections of total number of TCH connections over the whole day (%) Dropped TCH connections due to Low Signal Strength on Downlink of total number of dropped TCH connections over the whole day (%) Dropped TCH connections due to Low Signal Strength on Uplink of total number of dropped TCH connections over the whole day (%) Dropped TCH connections due to Low Signal Strength on both links of total number of dropped TCH connections over the whole day (%) Dropped TCH connections due to Bad Quality on Downlink of total number of dropped TCH connections over the whole day (%) Dropped TCH connections due to Bad Quality on Uplink of total number of dropped TCH connections over the whole day (%) Dropped TCH connections due to Bad Quality on both links of total number of dropped TCH connections over the whole day (%) Dropped TCH connections due to Excessive Timing Advance of total number of dropped TCH connections over the whole day (%) Dropped TCH connections due to other reasons than LSS, BQ or ETA of total number of dropped TCH connections over the whole day (%) Erlang seconds per dropped TCH connection over the whole day TCH mean holding time during BH in seconds. TCH traffic during BH in Erlang Data type String Long Single Single

100 * TFDISSUL / TFNDROP

Single

100 * TFDISSBL / TFNDROP

Single

100 * TFDISQADL / TFNDROP 100 * TFDISQAUL / TFNDROP 100 * TFDISQABL / TFNDROP 100 * TFDISTA / TFNDROP

Single

Single

Single

Single

TCH drops other (%)

TCH time between drops (s) TCH BH MHT (s) TCH BH traffic (E)

100 * [TFNDROP (TFDISSDL + TFDISSUL + TFDISSBL + TFDISQADL + TFDISQAUL + TFDISQABL + TFDISTA)] / TFNDROP 60 * TFTRALACC * PERLEN / (TFNDROP * TFNSCAN) (TFTRALACC * PERLEN * 60) / (TFNSCAN * TFMSESTB) TFTRALACC / TFNSCAN

Single

Single Single Single

4.4 TCH drop daily graph. This graph shows information at cell level. It splits the TCH drops amongst different causes (bar graph with bars of same height containing parts of different colours).
Name TCH connections (#) Formula TFMSESTB Description Number of TCH connections over the whole day Data type Long Graph # 1 Axis # 1

Page 9 of 15

TCH drop rate (%)

100 * TFNDROP / TFMSESTB 100 * TFDISSDL / TFNDROP

TCH drops SS DL (%)

TCH drops SS UL (%)

100 * TFDISSUL / TFNDROP

TCH drops SS BL (%)

100 * TFDISSBL / TFNDROP

TCH drops BQ DL (%)

100 * TFDISQADL / TFNDROP

TCH drops BQ UL (%)

100 * TFDISQAUL / TFNDROP

TCH drops BQ BL (%)

100 * TFDISQABL / TFNDROP

TCH drops TA (%)

100 * TFDISTA / TFNDROP

TCH drops other (%)

TCH BH traffic (E) TCH BH MHT (s)

100 * [TFNDROP (TFDISSDL + TFDISSUL + TFDISSBL + TFDISQADL + TFDISQAUL + TFDISQABL + TFDISTA)] / TFNDROP TFTRALACC / TFNSCAN (TFTRALACC * PERLEN * 60) / (TFNSCAN * TFMSESTB)

Dropped TCH connections of total number of TCH connections over the whole day (%) Dropped TCH connections due to Low Signal Strength on Downlink of total number of dropped TCH connections over the whole day (%) Dropped TCH connections due to Low Signal Strength on Uplink of total number of dropped TCH connections over the whole day (%) Dropped TCH connections due to Low Signal Strength on both links of total number of dropped TCH connections over the whole day (%) Dropped TCH connections due to Bad Quality on Downlink of total number of dropped TCH connections over the whole day (%) Dropped TCH connections due to Bad Quality on Uplink of total number of dropped TCH connections over the whole day (%) Dropped TCH connections due to Bad Quality on both links of total number of dropped TCH connections over the whole day (%) Dropped TCH connections due to Excessive Timing Advance of total number of dropped TCH connections over the whole day (%) Dropped TCH connections due to other reasons than LSS, BQ or ETA of total number of dropped TCH connections over the whole day (%)

Single

Single

Single

Single

Single

Single

Single

Single

Single

TCH traffic during BH in Erlang TCH mean holding time during BH in seconds.

Single Single

3 3

1 2

4.5 Inter-cell handover daily report. This report shows information at cell neighbouring relationship level and is run for a group of serving cells. For each of those all defined neighbours (for more details on neighbouring relationships file import, see 2.9 Cell zero handover report) are considered as target cells. The report can be sorted in descending order on HO failure rate, HO decisions to attempts or Succ HO back to old 10 sec (%). The user can enter thresholds for HO failure rate (%), for HO decisions to attempts and for Succ HO back to old 10 sec (%).
Name Serving cell ID Target cell ID HO decisions to attempts (%) HO attempts (#) Formula Description Serving cell ID Target cell ID HO decisions leading to HO attempts (%) Data type String String Single

100 * HOVERCNT / (HOTOKCL + HOTOLCL + HODWNQA + HOUPLQA + HOEXCTA + HOASWCL) HOVERCNT

Number of HO attempts over the whole day

Long

Page 10 of 15

HO failure rate (%) MS lost at HO (%) Succ HO back to old 10 sec (%)

100 * (HOVERCNT HOVERSUC) / HOVERCNT 100 * (HOVERCNT HORTTOCH HOVERSUC) / HOVERCNT 100 * HOFUPFT / HOVERSUC

Unsuccessful HOs of total number of HO attempts over the whole day (%) Mobiles lost at HO of total number of HO attempts over the whole day (%) Successful HOs back to old cell within 10 seconds of total number of successful HOs over the whole day (%)

Single Single Single

4.6 Handover daily graph serving cell. This graph shows information at serving cell level. All indicators shown are aggregated over all target cells (as in Metrica table CELL_HCS).
Name Serving cell ID HO attempts (#) HO failure rate (%) MS lost at HO (%) Succ HO back to old 10 sec (%) HO better K-cell (%) HO better L-cell (%) HO BQ DL (%) Formula HOVERCNT 100 * (HOVERCNT HOVERSUC) / HOVERCNT 100 * (HOVERCNT HORTTOCH HOVERSUC) / HOVERCNT 100 * HOFUPFT / HOVERSUC 100 * HOTOKCL / (HOTOKCL + HOTOLCL + HODWNQA + HOUPLQA + HOEXCTA + HOASWCL) 100 * HOTOLCL / (HOTOKCL + HOTOLCL + HODWNQA + HOUPLQA + HOEXCTA + HOASWCL) 100 * HODWNQA / (HOTOKCL + HOTOLCL + HODWNQA + HOUPLQA + HOEXCTA + HOASWCL) 100 * HOUPLQA / (HOTOKCL + HOTOLCL + HODWNQA + HOUPLQA + HOEXCTA + HOASWCL) 100 * HOEXCTA / (HOTOKCL + HOTOLCL + HODWNQA + HOUPLQA + HOEXCTA + HOASWCL) 100 * HOASWCL / (HOTOKCL + HOTOLCL + HODWNQA + HOUPLQA + HOEXCTA + HOASWCL) 100 * HOVERCNT / (HOTOKCL + HOTOLCL + HODWNQA + HOUPLQA + HOEXCTA + HOASWCL) Description Serving cell ID Number of HO attempts over the whole day Unsuccessful HOs of total number of HO attempts over the whole day (%) Mobiles lost at HO of total number of HO attempts over the whole day (%) Successful HOs back to old cell within 10 seconds of total number of successful HOs over the whole day (%) HO decisions to better K-cell of total number of HO decisions over the whole day (%) HO decisions to better L-cell of total number of HO decisions over the whole day (%) HO decisions due to bad quality on DL of total number of HO decisions over the whole day (%) HO decisions due to bad quality on UL of total number of HO decisions over the whole day (%) HO decisions due to excessive timing advance of total number of HO decisions over the whole day (%) HO decisions to worse cell of total number of HO decisions over the whole day (%) HO decisions leading to HO attempts (%) Data type String Long Single Single Single Graph # 1 1 1 2 Axis # 1 2 2 1

Single

Single

Single

HO BQ UL (%)

Single

HO TA (%)

Single

HO AW (%)

Single

HO decisions to attempts (%)

Single

4.7 Handover daily graph cell neighbouring relationship. This graph shows the same information as the previous one at cell neighbouring relationship level.
Name Serving cell ID Target cell ID HO attempts (#) HO failure rate (%) MS lost at HO (%) Formula Description Serving cell ID Target cell ID Number of HO attempts over the whole day Unsuccessful HOs of total number of HO attempts over the whole day (%) Mobiles lost at HO of total number of HO attempts over the whole day (%) Data type String String Long Single Single Graph # Axis #

HOVERCNT 100 * (HOVERCNT HOVERSUC) / HOVERCNT 100 * (HOVERCNT HORTTOCH HOVERSUC) / HOVERCNT

1 1 1

1 2 2

Page 11 of 15

Succ HO back to old 10 sec (%) HO better K-cell (%) HO better L-cell (%) HO BQ DL (%)

100 * HOFUPFT / HOVERSUC 100 * HOTOKCL / (HOTOKCL + HOTOLCL + HODWNQA + HOUPLQA + HOEXCTA + HOASWCL) 100 * HOTOLCL / (HOTOKCL + HOTOLCL + HODWNQA + HOUPLQA + HOEXCTA + HOASWCL) 100 * HODWNQA / (HOTOKCL + HOTOLCL + HODWNQA + HOUPLQA + HOEXCTA + HOASWCL) 100 * HOUPLQA / (HOTOKCL + HOTOLCL + HODWNQA + HOUPLQA + HOEXCTA + HOASWCL) 100 * HOEXCTA / (HOTOKCL + HOTOLCL + HODWNQA + HOUPLQA + HOEXCTA + HOASWCL) 100 * HOASWCL / (HOTOKCL + HOTOLCL + HODWNQA + HOUPLQA + HOEXCTA + HOASWCL)

HO BQ UL (%)

HO TA (%)

HO AW (%)

Successful HOs back to old cell within 10 seconds of total number of successful HOs over the whole day (%) HO decisions to better K-cell of total number of HO decisions over the whole day (%) HO decisions to better L-cell of total number of HO decisions over the whole day (%) HO decisions due to bad quality on DL of total number of HO decisions over the whole day (%) HO decisions due to bad quality on UL of total number of HO decisions over the whole day (%) HO decisions due to excessive timing advance of total number of HO decisions over the whole day (%) HO decisions to worse cell of total number of HO decisions over the whole day (%)

Single

Single

Single

Single

Single

Single

Single

4.8 Cell neighbouring relationship daily report. This report relates to a specific serving cell and date.
Name Target cell ID Total HO attempts (#) HO attempts (%) Formula HOVERCNT(target cell) 100 * HOVERCNT(target cell) / HOVERCNT(total) Description Target cell ID Total number of HO attempts from Serving cell to considered Target cell over the whole day Percentage of HO attempts from Serving cell to Target cell of all HO attempts from Serving Cell over the whole day Data type String Long Single

4.9 Cell zero handover report. This report identifies useless cell neighbouring relationships. All relationships for which no handover from A to B occurred during the past two weeks are shown, even if handovers did take place from B to A. The cell relationships shown in this report must be checked before they are considered as useless and action is taken. The report is sorted on alphabetical order and will be run on a weekly basis. It can also be processed for an area (based on the first two digits of the cell ID, i.e. AN, BW, BX etc.). The defined neighbouring relationships will be extracted on a weekly basis from a text file, each row containing two fields: Serving Cell and Target Cell. This process will be launched manually.
Serving cell ID Target cell ID HO attempts B to A (#) Serving cell ID Target cell ID Number of HO attempts from B to A over the last 2 weeks String String Long

HOVERCNT

Overall.

5.1 Summary report. This report relates to a group of cells and a selected date. It shows several key indicators in order to help identify cells where action has to be taken. Thresholds can be set on any field except TCH BH traffic (E). Also, the report can be sorted on any of those fields in this descending order, as well as on alphabetical order. It can be processed for an area (based on the first two digits of the cell ID, i.e. AN, BW, BX etc.).
Name Formula Description Data type

Page 12 of 15

Cell ID SDCCH drop rate (%) TCH drop rate (%) HO failure rate (%) TCH daily congestion (min) TCH BH traffic (E)

100 * CNDROP / CMSESTAB 100 * TFNDROP / TFMSESTB 100 * (HOVERCNT HOVERSUC) / HOVERCNT TFTCONGS / 60 TFTRALACC / TFNSCAN

Cell ID Dropped SDCCH connections of total number of SDCCH connections over the whole day (%) Dropped TCH connections of total number of TCH connections over the whole day (%) Unsuccessful HOs of total number of HO attempts over the whole day (%) aggregated over all target cells. TCH congestion time over the whole day in min. TCH traffic during BH in Erlang

String Single Single Single Single Single

Features.

6.1 SMS weekly report. This report relates to a group of cells and a selected week. All fields showing percentages can be used for trigger and sort.
Name Cell ID SMS (#) SMS on SDCCH (%) SMS on TCH (%) SMS on SDCCH from SDCCH estab (%) SMS on TCH from TCH estab (%) Formula CSMSDWN + TSMSDWN 100 * CSMSDWN / (CSMSDWN + TSMSDWN) 100 * TSMSDWN / (CSMSDWN + TSMSDWN) 100 * CSMSDWN / CMSESTAB 100 * TSMSDWN / TFMSESTAB Description Cell ID Total number of SMS messages over considered week SMS messages on SDCCH from total number of SMS messages over considered week (%) SMS messages on TCH from total number of SMS messages over considered week (%) SMS messages on SDCCH from total number of establishments on SDCCH over considered week (%) SMS messages on TCH from total number of establishments on TCH over considered week (%) Data type String Long Single Single Single Single

6.2 Assignment to Another Cell weekly report. This report relates to a group of serving cells and a selected week. For each serving cell, it shows one line per target cell. The serving-target relationships dont need to be extracted from the neighbouring relationships file; the report only shows pairs of cells between which HO assignments to Better or HO assignments to Worse have happened. It shows number of incoming / outgoing assignments to better / worse cell as well as the respective failure rates. Each of the success rate fields can be used for trigger and descending sort.
Name Serving cell ID Target cell ID I/C HO assign to Better (#) I/C HO assign to Better fail rate (%) I/C HO assign to Worse (#) I/C HO assign to Worse fail rate (%) O/G HO assign to Better (#) O/G HO assign to Better fail rate (%) O/G HO assign to Worse (#) O/G HO assign to Formula Description Serving cell ID Target cell ID Number of HO assignments to better cell from Serving cell to Target cell over considered week Success rate for assignment to better cell from Serving cell to Target cell over considered week Number of HO assignments to better cell from Serving cell to Target cell over considered week Success rate for assignment to worse cell from Serving cell to Target cell over considered week Number of HO assignments to better cell from Target cell to Serving cell over considered week Success rate for assignment to better cell from Target cell to Serving cell over considered week Number of HO assignments to better cell from Target cell to Serving cell over considered week Success rate for assignment to worse Data type String String Long Single Long Single Long Single Long Single

HOASBCL 100 * (1 - (HOSUCBCL / HOASBCL)) HOASWCL 100 * (1 - (HOSUCWCL / HOASWCL)) HOASBCL 100 * (1 - (HOSUCBCL / HOASBCL)) HOASWCL 100 * (1 - (HOSUCWCL /

Page 13 of 15

Worse fail rate (%)

HOASWCL))

cell from Target cell to Serving cell over considered week

6.3 Hierarchical Cell Structure weekly report. This report relates to a group of serving cells and a selected week. It shows the incoming / outgoing handover attempts and handover success rates on fast moving mobiles (handovers at high rate). The success rate fields can be used for trigger and descending sort.
Name Serving cell ID Target cell ID I/C HO attempts at high HO rate (#) Succ I/C HO at high HO rate (#) Succ rate of I/C HO at high HO rate (%) O/G HO attempts at high HO rate (#) Succ O/G HO at high HO rate (#) Succ rate of O/G HO at high HO rate (%) Formula Description Serving cell ID Target cell ID No of HO attempts at high HO rate from Serving cell to Target cell over considered week No of successful handovers at high HO rate from Serving cell to Target cell over considered week Success rate for handovers at high HO rate from Serving cell to Target cell over considered week No of HO attempts at high HO rate from Target cell to Serving cell over considered week No of successful handovers at high HO rate from Target cell to Serving cell over considered week Success rate for handovers at high HO rate from Target cell to Serving cell over considered week Data type String String Long Long Single Long Long Single

HOATTHR HOSUCHR 100 * (HOSUCHR / HOATTHR) HOATTHR HOSUCHR 100 * (HOSUCHR / HOATTHR)

6.4 Cell Load Sharing weekly report. This report relates to a group of serving cells and a selected week. It shows the incoming / outgoing handover attempts and handover success rates due to cell load sharing. The success rate fields can be used for trigger and descending sort.
Name Serving cell ID Target cell ID I/C HO attempts due to CLS (#) Succ I/C HO due to CLS (#) Succ rate of I/C HO due to CLS (%) O/G HO attempts due to CLS (#) Succ O/G HO due to CLS (#) Succ rate of O/G HO due to CLS (%) Formula Description Serving cell ID Target cell ID No of HO attempts due to cell load sharing from Serving cell to Target cell over considered week No of successful handovers due to cell load sharing from Serving cell to Target cell over considered week Success rate for handovers due to cell load sharing from Serving cell to Target cell over considered week No of HO attempts due to cell load sharing from Target cell to Serving cell over considered week No of successful handovers due to cell load sharing from Target cell to Serving cell over considered week Success rate for handovers due to cell load sharing from Target cell to Serving cell over considered week Data type String String Long Long Single Long Long Single

HOATTLS HOSUCLS 100 * (HOSUCLS / HOATTLS) HOATTLS HOSUCLS 100 * (HOSUCLS / HOATTLS)

6.5 Immediate Assignment on TCH weekly report. This report relates to a group of cells and a selected week. It shows the number and percentage of TCH connections used for signalling. The field TCH connections used for signalling (%) can be used for trigger and sort.
Name Cell ID TCH connections used for signalling (#) TCH first assign attempts for Formula TCHSIG TASSATT Description Cell ID Number of TCH connections used for signalling over considered week Number of TCH first assignment attempts (for voice or data) over Data type String Long Long

Page 14 of 15

voice/data (#) TCH connections used for signalling (%)

100 * (TCHSIG / (TASSATT + TCHSIG))

considered week Percentage of TCH connections used for signalling over considered week

Single

6.6 Differential Channel Allocation daily report. This report relates to a group of cells and a selected date. Each field can be used for trigger and sort.
Name Cell ID HO attempts due to preemption (#) Failure rate (%) Disconnect due to preemption (#) Formula HOATTPH 100 * FAILPH / HOATTPH DISPH Description Cell ID HO attempts due to preemption over whole day Failure rate of HO attempts due to preemption over whole day (%) Disconnections due to preemption over whole day Data type String Long Single Long

List of Ericsson counters to be imported into Metrica database.

See annexed Excel file.

Data to be imported into Metrica.

1.1 Traffic prediction. On a monthly basis a text file containing traffic predictions will be imported into Metrica. This file will contain one line per cell and per week, from the current week to the end of forecasting period (can be up to 2 years). Each line will show: Cell ID, Date, Predicted traffic, Required capacity. 1.2 Cell neighbouring relationships. The cell neighbouring relationships will be imported into Metrica to allow identification of zerohandover cells. The frequency will be between weekly and monthly. The file will be a text file with each line containing Serving cell ID and Target cell ID.

Miscellaneous.

1.1 Web access. All the reports and graphs defined in this document will be available through the Metrica web access. 1.2 Cell group creation. It will be possible for dedicated Metrica users (license) within the Radio Planning team to create new cell groups. Those groups will then be available to web access users. 1.3 Area cell group. Groups of cells based on the first two digits of the cell ID will be available (by example, the cell AN0246 would belong to the area group AN, etc.). They will be based on dynamic queries on cell Ids (as opposed to static definition).

End of document.

Page 15 of 15