Well Service Programme

Well Name: Licence / DTI No. Operation Planned Date (s) Perforation Depths: Well Status: Work Objectives: HNX3

24 hr AO 1001 chemical circulation 10 Sep 12 Pumping Beam Pump Pump 200 ltrs AO 1001 into annulus, circ 24 hrs, bring well back on production.

Sera 170

Risk Assessments : Weald Basin Fluid Pumping Procedure / Work Instructions : Fluid Treatments AO 1001

SE-02-025 COSHH

1. 2. 3. 4. 5.

6. 7. 8. 9. 10. 10) 11. 11) 12. 12) 13. 13) 14. 14) 15. 15) 16. 16) 17. 17) 18. 19. 19) 20) 21) 22) 23) 24) 25) 26) 27) Task undertaken by: 28) Comments : 29) 30) 31)
Originator:

Summary Procedure Hold pre-job TBT / Safety Meeting, with all personnel present Obtain work permit / provide authorized Work Instruction. Prepare all equipment at location Install blagdon pump to site air supply. Position AO 1001 barrel as required, use Blagdon pump to transfer contents to pressure washer. Switch off beam pump Connect jump hose to link flow-line and annulus. Rig up pressure washer to jump hose vent. Pump 200 ltrs AO 1001 down annulus. Disconnect pressure washer. Isolate flow-line at manifold ensuring PSHH switch still live. Restart beam pump allowing flow to return to annulus Monitor for 30 mins to ensure no unexpected pressure build-up. Leave well on circulation for 24 hrs. Tidy away equipment etc. Switch off beam pump Reopen flow-line at manifold, isolate, vent down and remove jump hose. Restart beam pump, monitor for 30 mins to ensure no unexpected pressure build-up. Clean-up work area, cancel permit Record activites in site log and SafeWells

R.WHITING

.2012

Approved:

Well Service Programme

Originator:

R.WHITING

.2012

Approved: