Beruflich Dokumente
Kultur Dokumente
Relatrio Final
Maio/2012
(verso revisada em Julho/2012)
______________________________________________________________________
COGENAssociaodaIndstriadeCogeraodeEnergia
RuaFerreiradeArajo,202CJ112CEP05428000SoPauloSPTel(11)38154887Fax(11)38154631
www.cogen.com.br
Apoio Tcnico
______________________________________________________________________
COGENAssociaodaIndstriadeCogeraodeEnergia
RuaFerreiradeArajo,202CJ112CEP05428000SoPauloSPTel(11)38154887Fax(11)38154631
www.cogen.com.br
2.25
2.00
1.50
1.25
1.00
0.00
280
410
660
910
1160
1410
1660
2745
3995
Fig. 1.11 Inversor de 5.000 W. Na parte inferior um dispositivo para desconectar a entrada CC.
Fixo
1-eixo
2-eixos
200
180
175
163
170
163
160
140
129
125
156
153
123
120
151
147
134
128
118
106
131
122
102
132
125
144
140
116
105
150
147
134
133
121
163
154
125
165
153
124
110
150
144
117
100
80
60
40
20
0
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Mdia
PREOS GERAO DC
Capacidade de um container de 40 ps (Watts)
FOB (eur/Wp)
MDULOS
INVERSORES
130.000
0,98
0,19
127.400,00
24.700,00
5.200,00
2.000,00
132.600,00
26.700,00
15.912,00
3.738,00
4.565,70
2.700,22
636,43
12.437,37
2.931,44
7.918,18
31.049,59
19.789,75
3,725.95
2.374,77
1.200,00
1.200,00
35.975,54
23.364,52
FOB (eur)
FRETE + SEGURO INTERNACIONAL (eur)
CIF (eur) = FOB + FRETE + SEGURO
(A) =II (12% DO VALOR CIF P/MDULOS E 14% P/ INVERSORES)
(B) = IPI (0% P/ MDULO E 15% INVERSORES) INCID. CIF + (A)
(C) = PIS (1,65% "POR DENTRO", APLICVEL A CIF + (A) + (B)
(D) = COFINS (7,6% "POR DENTRO", APLICVEL A CIF + (A) + (B)
(E) = ICMS, 12% INCIDENTE SOBRE CIF + (B)
(F) Total Impostos (eur) (A+B+C+D+E)
MDULOS
INVERSORES
168.575,54
50.064,52
2,30
387.723,74
3,87
115.148,39
12%
13%
14%
15%
16%
17%
18%
1.20
1.10
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
5
8
9
CAPEX (R$/Wp)
10
11
12
AC
AL
AM
AP
BA
CE
DF
ES
GO
MA
MG
MS
MT
PA
PB
PE
PI
PR
RJ
RN
RO
RR
RS
SC
SE
SP
TO
TIR 7.5%
TIR 10%
450
407
400
368
339
350
307
300
250
246
272
200
150
100
50
0
4000 R$/KW-inst
5000 R$/KW-inst
6000 R$/KW-inst
TIR 7.5%
TIR 10%
450
396
400
362
330
350
302
300
250
242
265
200
150
100
50
0
4000 R$/KW-inst
5000 R$/KW-inst
6000 R$/KW-inst
Lease