Sie sind auf Seite 1von 651

General

Section 100

Ministry of Road Transport & Highways

SPECIFICATIONS FOR ROAD AND BRIDGE WORKS


(Fourth Revision) First Published Reprinted First Revision Reprinted Reprinted Reprinted Second Revision Reprinted Reprinted Reprinted Reprinted Reprinted Third Revision Reprinted Reprinted Reprinted Reprinted Reprinted Reprinted Fourth Revision Reprinted Reprinted Reprinted April, 1973 November, 1975 May, 1978 September, 1981 October, 1983 April, 1986 February, 1988 August, 1988 April, 1990 June, 1992 February, 1993 July', 1993 April, 1995 January, 1997 (Incorporates Corrigendurn No.1 & 2 and Col. 12 & 15 of p.662) January, 1998 January, 1999 May, 1999 February, 2000 Septemer, 2000 (Section 700 "Geosynthetics" changed to "Geosynthetics and Reinforced Earth" August, 2001 January, 2002 March, 2002 September, 2002

(The Rights of Publication and Translation are reserved)

General

Section 100

PREFACE TO THE FOURTH REVISION This edition of Specifications for Road & Bridge Works marks the fourth revision. In the past few years significant developments have taken place in the road sector. A large scale highway modemisation programme has been undertaken which opens up immense opportunities to introduce innovative materials and new techniques in highway construction and maintenance. The major emphasis is on pavement durability and cost effective solutions with environmental preservation and road user safety in focus. In keeping with these needs Addendum to Third Revision of Specifications was issued in November, 2000, which included revised specifications for bituminous work covered under Sections 500, 900 & 3000 on the basis of indigenous research results, feed back and international practices. The fourth revision incorporates the Addendum and other amendments and changes that have been effected till date. The most important additions to the range of specifications are bituminous cold mixes, modified binders, crack prevention courses, and sand asphalt base course. It is hoped that the new specifications introduced for the first time will find wide application in practice, and feed back on their performance will be made available by field engineers and users of this document for further improvement in its future editions. The fourth revision of Specificationsfor Road & Bridge Works has been possible with concerted efforts of the officers of the Roads Wing, the consultants and several other individuals who contributed to this document. I wish to express my gratitude to them all. (S.C. SHARMA) New Delhi August, 2001 Director General (Road Development) & Additional Secretary to the Govt. of India

General

Section 100

CONTENTS

101 INTRODUCTION................................................................................................................56 102 DEFINITIONS.....................................................................................................................56 103 MATERIALS AND TEST STANDARDS..........................................................................58 104 SIEVE DESIGNATIONS....................................................................................................58 105 SCOPE OF WORK..............................................................................................................59 105.1 THE WORK TO BE CARRIED OUT UNDER THE CONTRACT SHALL CONSIST OF THE VARIOUS ITEMS AS GENERALLY DESCRIBED IN THE TENDER DOCUMENTS AS WELL AS IN THE BILL OF QUANTITIES FURNISHED IN THE TENDER DOCUMENTS.................................................................................................................59 105.2 THE WORKS TO BE PERFORMED SHALL ALSO INCLUDE ALL GENERAL WORKS PREPARATORY TO THE CONSTRUCTION OF ROADS, BRIDGES, CANAL CROSSINGS, DRAINAGE AND OTHER RELATED WORKS. THE WORKS SHALL INCLUDE WORK OF ANY KIND NECESSARY FOR THE DUE AND SATISFACTORY CONSTRUCTION, COMPLETION AND MAINTENANCE OF THE WORKS TO THE INTENT AND MEANING OF THE DRAWINGS AND THESE SPECIFICATIONS AND FURTHER DRAWINGS AND ORDERS THAT MAY BE ISSUED BY THE ENGINEER FROM TIME TO TIME. THE SCOPE OF WORK SHALL INCLUDE COMPLIANCE BY THE CONTRACTOR WITH ALL GENERAL CONDITIONS OF CONTRACT, WHETHER SPECIFICALLY MENTIONED OR NOT IN THE,VARIOUS CLAUSES OF THESE SPECIFICATIONS, ALL MATERIALS, APPARATUS, PLANT, EQUIPMENT, TOOLS, FUEL, WATER, STRUTTING, TIMBERING, TRANSPORT, OFFICES, STORES, WORKSHOP, STAFF LABOUR AND THE PROVISION OF PROPER AND SUFFICIENT PROTECTIVE WORKS, DIVERSIONS, TEMPORARY FENCING AND LIGHTING. IT SHALL ALSO INCLUDE: SAFETY OF WORKERS, FIRST-AID EQUIPMENT, SUITABLE ACCOMMODATION FOR THE STAFF AND WORKMEN WITH ADEQUATE SANITARY ARRANGEMENTS, THE EFFECTING AND MAINTENANCE OF ALL INSURANCES, THE PAYMENT OF ALL WAGES, SALARIES, FEES, ROYALTIES, DUTIES OR OTHER CHARGES ARISING OUT OF THE ERECTION OF WORKS AND THE REGULAR CLEARANCE OF RUBBISH, REINSTATEMENT AND CLEARING-UP OF THE SITE AS MAY BE REQUIRED ON COMPLETION OF WORKS, SAFETY OF THE PUBLIC AND PROTECTION OF THE WORKS AND ADJOINING LAND........59 105.3 THE CONTRACTOR SHALL ENSURE THAT ALL ACTIONS ARE TAKEN TO BUILD IN QUALITY ASSURANCE IN THE PLANNING AND EXECUTION OF WORKS. THE QUALITY ASSURANCE SHALL COVER ALL STAGES OF WORK SUCH AS SETTING OUT, SELECTION OF MATERIALS, SELECTION OF CONSTRUCTION METHODS, SELECTION OF EQUIPMENT AND PLANT, DEPLOYMENT OF PERSONNEL AND SUPERVISORY STAFF, QUALITY CONTROL TESTING, ETC. THE WORK OF BUILDING IN QUALITY ASSURANCE SHALL BE DEEMED TO BE COVERED IN THE SCOPE OF THE WORK. . .....................................................................................................................................................60 105.4 THE CONTRACTOR SHALL FURNISH, AT LEAST 15 DAYS IN ADVANCE, HIS PROGRAMME OF COMMENCEMENT OF ITEM OF WORK, THE METHOD OF WORKING HE INTENDS TO ADOPT FOR VARIOUS ITEMS OF WORK SUCH AS SITE CLEARANCE, CONSTRUCTION FOR EMBANKMENT, SUB-BASE, BASE, SUFFACING, CULVERTS, BRIDGES, RETAINING WALLS, WELL-SINKING, ~AST-IN-SITU PILING, CONSTRUCTION OF CAST-INSITU PRESTRESSED CONCRETE SIMPLY SUPPORTED GIRDERS, CANTILEVER CONSTRUCTION OF PRESTRESSED CONCRETE SUPERSTRUCTURE, AND SUCH OTHER ITEMS FOR WHICH THE ENGINEER DEMANDS THE SUBMISSION OF THE METHOD OF WORKING. HE SHALL PROVIDE INFORMATION REGARDING THE DETAILS OF THE METHOD OF WORKING

General

Section 100

AND EQUIPMENT HE PROPOSES TO EMPLOY AND SATISFY THE THE SAME.

ENGINEER ABOUT THE ADEQUACY AND SAFETY OF

THE SOLE RESPONSIBILITY FOR THE SAFETY AND ADEQUACY OF THE METHODS ADOPTED BY THE CONTRACTOR WILL, HOWEVER, REST ON THE CONTRACTOR, IRRESPECTIVE OF ANY APPROVAL GIVEN BY THE ENGINEER.......................................................................................................................................60 106 CONSTRUCTION EQUIPMENT......................................................................................60 107 CONTRACT DRAWINGS.................................................................................................61 107.1 THE CONTRACT DRAWINGS PROVIDED FOR TENDERING PURPOSES SHALL BE AS CONTAINED IN THE TENDER DOCUMENTS AND SHALL BE USED AS A REFERENCE ONLY. THE CONTRACTOR SHOULD VISUALISE THE
NATURE AND TYPE OF WORK CONTEMPLATED AND TO ENSURE THAT THE RATES AND PRICES QUOTED BY HIM IN

BILL OF QUANTITIE'S HAVE DUE CONSIDERATION OF THE QUALITATIVE AND QUANFITATIVE VARIATIONS, AS - COMPLEXITIES OF WORK INVOLVED DURING ACTUAL EXECUTION/CONSTRUCTION................................................................................................................61 107.2 THE TENDERED RATES/PRICES FOR THE WORK SHALL BE DEEMED TO INCLUDE THE COST OF PREPARATION, SUPPLY AND DELIVERY OF ALL NECESSARY DRAWINGS, PRINTS TRACINGS AND NEGATIVES WHICH THECONTRACTOR IS REQUIRED TO PROVIDE IN ACCORDANCE WITH THE CONTRACT..........................................61 107.3 TWO COPIES OF DRAWINGS, ON THE BASIS OF WHICH ACTUAL EXECUTION OF THE WORK IS TO PROCEED, SHALL BE FURNISHED FREE OF COST TO THE CONTRACTOR BY THE ENGINEER PROGRESSIVELY ACCORDING TO THE WORK PROGRAMME SUBMITTED BY THE CONTRACTOR AND ACCEPTED BY THE ENGINEER. DRAWINGS FOR ANY PARTICULAR ACTIVITY SHALL BE ISSUED' TO THE CONTRACTOR AT LEAST 30 DAYS IN ADVANCE OF THE SCHEDULED DATE OF THE START OF THE ACTIVITY.................................................................................61 107.4 EXAMINATION AND /OR APPROVAL BY THE ENGINEER OF ANY DRAWINGS OR OTHER DOCUMENTS SUBMITTED BY THE CONTRACTOR SHALL NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITIES OR LIABILITIES UNDER THE CONTRACT.....................................................................................................61
THE MAY BE FOUND AT THE SITE AND

108 SITE INFORMATION........................................................................................................61 108.1 THE INFORMATION ABOUT THE SITE OF WORK AND SITE CONDITIONS IN THE TENDER DOCUMENTS IS GIVEN *IN GOOD FAITH FOR GUIDANCE ONLY BUT THE CONTRACTOR SHALL SATISFY HIMSELF REGARDING ALL ASPECTS OF SITE CONDITIONS.............................................................................................................61 108.2 THE LOCATION OF TILE WORKS AND THE GENERAL SITE PARTICULARS ARE AS GENERALLY SHOWN ON THE SITE PLAN/INDEX PLAN ENCLOSED WITH THE TENDER DOCUMENTS.........................................................61 108.3 WHEREAS THE RIGHT-OF-WAY TO THE BRIDGE SITES/ROAD WORKS SHALL BE PROVIDED TO THE CONTRACTOR BY THE ENGINEER, THE CONTRACTOR SHALL HAVE TO MAKE HIS OWN ARRANGEMENT FOR THE LAND REQUIRED BY HIM FOR SITE OFFICES, LABOUR CAMPS, STORES, ETC..................................................62 108.4 THE QUARRY CHARTS ENCLOSED WITH THE TENDER DOCUMENTS INDICATE THE LOCATION OF QUARRIES AND OTHER SOURCES FROM WHICH NATURALLY OCCURRING MATERIALS ARE AVAILABLE, FOR GUIDANCE OF THE CONTRACTOR. THE LEADS INDICATED IN THE SAID CHARTS ARE ONLY APPROXIMATE. IT IS ASSUMED THAT THE CONTRACTOR HAS INSPECTED THE QUARRIES, BORROW-AREAS ETC., BEFORE QUOTING HIS RATES'FOR THE WORK TO ASSESS THE AVAILABILITY OF CONSTRUCTION MATERIALS IN REQUIRED QUANTITY AND QUALITY...............62 109 SETTING OUT....................................................................................................................62 109.1 THE CONTRACTOR SHALL ESTABLISH WORKING BENCH MARKS TIED WITH " REFERENCE BENCH X- E AREA SOON AFTER TAKING POSSESSION OF THE SITE. THE REFERENCE BENCH MARK FOR THE AREA SHALL BE

General

Section 100

CONTRACT DOCUMENTS AND THE VALUES OF THE SAME SHALL BE OBTAINED BY THE CONTRACTOR FROM THE ENGINEER. THE WORKING BENCH MARKS SHALL BE AT THE RATE OF FOUR PER KM AND ALSO AT OR NEAR ALL DRAINAGE STRUCTURES, OVER-BRIDGES AND UNDERPASSES. THE WORKING BENCH MARKS/LEVELS SHOULD BE GOT APPROVED FROM THE ENGINEER. CHECKS MUST BE MADE ON THESE BENCH MARKS ONCE EVERY MONTH AND ADJUSTMENTS, IF ANY, GOT AGREED WITH THE \ENGINEER AND RECORDED. AN UP-TO-DATE RECORD OF ALL BENCH MARKS INCLUDING APPROVED ADJUSTMENTS, IF ANY, SHALL BE MAINTAINED BY THE CONTRACTOR AND ALSO A COPY SUPPLIED TO THE ENGINEER FOR HIS RECORD..............62 109.2 THE LINES AND LEVELS OF FORMATION, SIDE DOPES, DRAINAGE WORKS, CARRIAGEWAYS AND SHOULDERS SHALL BE CAREFULLY SET OUT AND FREQUENTLY CHECKED, CARE BEING TAKEN TO ENSURE THAT CORRECT GRADIENTS AND CROSSSECTIONS ARE OBTAINED EVERYWHERE.................................................................62 109.3 IN ORDER TO FACILITATE THE SETTING OUT OF THE WORKS, THE CENTRE LINE OF THE CARRIAGEWAY OR HIGHWAY MUST BE ACCURATELY ESTABLISHED BY THE CONTRACTOR AND APPROVED BY THE ENGINEER. IT MUST THEN BE ACCURATELY REFERENCED IN A MANNER SATISFACTORY TO THE ENGINEER, EVERY 50 M INTERVALS IN PLAIN AND ROLLING TERRAINS AND 20 M INTERVALS IN HILLY TERRAIN AND IN ALL CURVE POINTS AS DIRECTED BY THE ENGINEER, WA MARKER PEGS AND CHAINAGE BOARDS SET IN OR NEAR THE FENCE LINE, AND A SCHEDULE OF REFERENCE DIMENSIONS SHALL BE PREPARED AND SUPPLIED BY THE CONTRACTOR TO THE ENGINEER. THESE MARKERS SHALL BE MAINTAINED UNTIL THE WORKS REACH FINISHED FORMATION LEVEL AND ARE ACCEPTED BY THE ENGINEER.......................................................................................................62 109.4 ON CONSTRUCTION REACHING THE FORMATION LEVEL STAGE, THE CENTRE LINE SHALL AGAIN BE SET OUT BY THE CONTRACTOR AND WHEN APPROVED BY THE ENGINEER, SHALL BE ACCURATELY REFERENCED IN A MANNER SATISFACTORY TO THE ENGINEER BY MARKER PEGS SET AT THE OUTER LIMITS OF THE FORMATION.. .63 109.5 NO REFERENCE PEG OR MARKER SHALL BE MOVED OR WITHDRAWN WITHOUT THE APPROVAL OF THE ENGINEER AND NO EARTHWORK OR STRUCTURAL WORK SHALL BE COMMENCED UNTIL THE CENTRE LINE HAS BEEN REFERENCED............................................................................................................................63 109.6 THE CONTRACTOR WILL THE SOLE RESPONSIBLE PARTY FOR SAFE-GUARDING ALL SURVEY MONUMENTS, BENCH MARKS, BEACONS, ETC. THE ENGINEER WILL PROVIDE THE CONTRACTOR WITH THE DATA NECESSARY FOR SETTING OUT OF THE CENTRE LINE. ALL DIMENSIONS AND LEVELS SHOWN ON THE DRAWINGS OR MENTIONED IN DOCUMENTS FORMING PART OF OR ISSUED UNDER THE CONTRACT SHALL BE VERIFIED BY THE CONTRACTOR ON THE SITE AND HE SHALL IMMEDIATELY INFORM THE ENGINEER OF ANY APPARENT ERRORS OR DISCREPANCIES IN SUCH DIMENSIONS OR LEVELS. THE CONTRACTOR SHALL, IN CONNECTION WITH THE STAKING OUT OF THE CENTRE LINE, SURVEY THE TERRAIN ALONG THE ROAD AND SHALL SUBMIT TO THE ENGINEER FOR HIS APPROVAL, A PROFILE ALONG THE ROAD CENTRE LINE AND CROSS-SECTIONS AT INTERVALS AS REQUIRED BY THE ENGINEER................................................................................................................................63 109.7 AFTER OBTAINING APPROVAL OF THE ENGINEER, WORK ON EARTHWORK CAN COMMENCE AND THE PROFILE AND CROSS-SECTIONS SHALL FORM THE BASIS FOR MEASUREMENTS AND PAYMENT. THE CONTRACTOR
AS INDICATED IN THE SHALL BE RESPONSIBLE FOR ENSURING THAT ALL THE BASIC TRAVERSE POINTS ARE IN PLACE AT THE COMMENCEMENT OF THE CONTRACT AND IF ANY ARE MISSING, OR APPEAR TO HAVE BEEN DISTURBED, THE

CONTRACTOR SHALL MAKE ARRANGEMENTS TO RE-ESTABLISH THESE POINTS. A "SURVEY FILE" CONTAINING THE NECESSARY DATA WILL BE MADE AVAILABLE FOR THIS PURPOSE. IF IN THE OPINION OF THE ENGINEER, DESIGN MODIFICATIONS OF THE CENTRE LINE OR-GRADE ARE ADVISABLE, THE ENGINEER WILL ISSUE DETAILED INSTRUCTIONS TO THE CONTRACTOR AND THE CONTRACTOR SHALL PERFORM THE MODIFICATIONS IN THE FIELD, AS REQUIRED, AND MODIFY THE GROUND LEVELS ON THE CROSS-SECTIONS ACCORDINGLY AS MANY TIMES AS

General
REQUIRED.

Section 100

THERE WILL BE NO SEPARATE PAYMENT FOR ANY SURVEY WORK PERFORMED BY THE CONTRACTOR.

THE COST OF THESE SERVICES SHALL BE CONSIDERED AS BEING INCLUDED IN THE COST OF THE ITEMS OF WORK IN THE BILL OF QUANTITIES..............................................................................................................63 109.8 THE WORK OF SETTING OUT SHALL BE DEEMED TO BE A PART OF GENERAL WORKS PREPARATORY TO THE EXECUTION OF WORK AND NO SEPARATE PAYMENT SHALL BE MADE FOR THE SAME.....................................63 109.9 PRECISION AUTOMATIC LEVELS, HAVING A STANDARD DEVIATION OF 2 MM PER KM, AND FITTED WITH MICROMETER ATTACHMENT SHALL BE USED FOR ALL DOUBLE RUN LEVELLING WORK. SETTING OUT OF THE ROAD ALIGNMENT AND MEASUREMENT OF ANGLES SHALL BE DONE BY USING THEODOLITE WITH TRAVERSING TARGET, HAVING AN ACCURACY OF ONE SECOND. MEASUREMENT OF DISTANCES SHALL BE DONE PREFERABLY USING PRECISION INSTRUMENTS LIKE DISTOMAT.............................................................................................63 110 PUBLIC UTILITIES...........................................................................................................64 110.1 DRAWINGS SCHEDULING THE AFFECTED SERVICES LIKE WATER PIPES, SEWERS, OIL PIPELINES, CABLES,, GAS DUCTS ETC. OWNED BY VARIOUS AUTHORITIES INCLUDING PUBLIC UNDERTAKINGS AND LOCAL AUTHORITIES INCLUDED IN THE CONTRACT DOCUMENTS SHALL BE VERIFIED BY THE CONTRACTOR FOR THE ACCURACY OF THE INFORMATION PRIOR TO THE COMMENCEMENT OF ANY WORK.........................................64 110.2 NOTWITHSTANDING THE FACT THAT THE INFORMATION ON AFFECTED SERVICES MAY NOT BE EXHAUSTIVE, THE FINAL POSITION OF THESE SERVICES WITHIN THE WORK~ SHALL BE SUPPOSED TO HAVE BEEN
INDICATED BASED ON THE INFORMATION FURNISHED BY DIFFERENT BODIES AND TO THE EXTENT THE BODIES ARE FAMILIAR WITH THE FINAL PROPOSALS.

THE INTERMEDIATE STAGES OF THE WORKS ARE, HOWEVER, UNKNOWN AT THE DESIGN STAGE, THESE BEING DICTATED BY THE CONTRACTOR'S METHODS OF WORKING. ACCORDINGLY, THE CONTRACTOR'S'PROGRAMME MUST TAKE INTO ACCOUNT THE PERIOD OF NOTICE AND DURATION OF DIVERSIONARY WORKS OF EACH BODY AS GIVEN ON THE DRAWINGS AND THE CONTRACTOR MUST ALSO ALLOW FOR ANY EFFECT OF THESE SERVICES AND ALTERATIONS UPON THE WORKS AND FOR ARRANGING REGULAR MEETINGS WITH THE VARIOUS BODIES AT THE COMMENCEMENT OF THE CONTRACT AND THROUGHOUT THE PERIOD OF THE WORKS IN ORDER TO MAINTAIN THE REQUIRED CO-ORDINATION. DURING .THE PERIOD OF THE WORKS, THE CONTRACTOR SHALL HAVE NO OBJECTION IF THE PUBLIC UTILITY BODIES VARY THEIR DECISIONS IN THE EXECUTION OF THEIR PROPOSALS IN TERMS OF PROGRAMME AND CONSTRUCTION, PROVIDED THAT, IN THE OPINION OF THE ENGINEER, THE CONTRACTOR HAS RECEIVED REASONABLE NOTICE THEREOF BEFORE THE RELEVANT ALTERATIONS ARE PUT IN HAND...........................................................................................64 110.3 NO CLEARANCE OR ALTERATIONS TO THE UTILITY SHALL BE CARRIED OUT UNLESS SPECIALLY ORDERED BY THE ENGINEER............................................................................................................................64 110.4 ANY SERVICES AFFECTED BY THE WORKS MUST BE TEMPORARILY SUPPORTED BY THE CONTRACTOR WHO MUST ALSO. TAKE ALL MEASURES REASONABLY REQUIRED BY THE VARIOUS BODIES TO PROTECT THEIR SERVICES AND PROPERTY DURING THE PROGRESS, OF THE WORKS............................................................64 110.5 THE CONTRACTOR MAY BE REQUIRED TO CARRY OUT CERTAIN WORKS FOR AND - ON BEHALF OF THE VARIOUS BODIES AND HE SHALL ALSO PROVIDE, WITH THE PRIOR APPROVAL OF THE ENGINEER, SUCH ASSISTANCE TO THE VARIOUS BODIES.AS MAY BE AUTHORISED BY THE ENGINEER.......................................64 110.6 THE WORK OF TEMPORARILY SUPPORTING AND PROTECTING THE PUBLIC UTILITY SERVICES DURING EXECUTION OF THE WORKS SHALL BE DEEMED TO BE PART OF THE CONTRACT AND NO EXTRA PAYMENT SHALL BE MADE FOR THE SAME....................................................................................................................64 110.7 THE CONTRACTOR MAY BE REQUIRED TO CARRY OUT THE REMOVAL OR SHIFTING OF CERTAIN SERVICES/UTILITIES ON SPECIFIC ORDERS FROM THE ENGINEER FOR WHICH PAYMENT SHALL BE MADE TO HIM.

General

Section 100

SUCH WORKS SHALL BE TAKEN UP BY THE CONTRACTOR ONLY AFTER OBTAINING CLEARANCE FROM THE ENGINEER AND ENSURING ADEQUATE SAFETY MEASURES........................................................................64 111 PRECAUTIONS FOR SAFIEGUARDIING THE ENVIRONMENT.............................65 111.1 GENERAL.............................................................................................................................65 111.2 BORROWPITS FOR EMBANKMENT CONSTRUCTION........................................................................65 111.3 QUARRY OPERATIONS............................................................................................................65 111.4 CONTROL OF SOIL EROSION, SEDIMENTATION AND WATER POLLUTION.........................................65 111.5 POLLUTION -FROM HOT-MIX PLANTS AND BATCHING PLANTS....................................................65 111.6 SUBSTANCES HAZARDOUS TO HEALTH......................................................................................65 111.7 USE OF NUCLEAR GAUGES.....................................................................................................65 111.8 THE CONTRACTOR MUST TAKE ALL REASONABLE STEPS TO MINIMISE DUST NUISANCE DURING THE, CONSTRUCTION OF THE WORKS...........................................................................................................65 111.9 ALL EXISTING HIGHWAYS AND ROADS USED BY VEHICLE OF THE CONTRACTOR OR ANY OF HIS SUB-CONTRACTORS OR SUPPLIERS OF MATERIALS OR PLANT, AND SIMILARLY ANY NEW ROADS WHICH ARE PART OF BE WORKS AND WHICH ARE BEING USED BY-TRAFFIC,-SHALL BE KEPT CLEAN AND CLEAR OF ALL DUST/MUD OR OTHER EXTRANEOUS MATERIALS DROPPED BY THE SAID VEHICLES OR THEIR TYRES. SIMILARLY, ALL DUST/MUD OR OTHER EXTRANEOUS MATERIALS FROM THE WORKS SPREADING ON THESE HIGHWAYS SHALL BE IMMEDIATELY CLEARED BY THE CONTRACTOR......................................................................................66 111.10 CLEARANCE SHALL BE EFFECTED IMMEDIATELY BY MANUAL SWEEPING AND REMOVAL OF DEBRIS, OR, IF SO DIRECTED BY THE ENGINEER, BY MECHANI.CAL SWEEPING AND CLEARING EQUIPMENT, AND ALL DUST, MUD AND OTHER DEBRIS SHALL BE REMOVED ENTIRELY FROM THE ROAD SURFACE. ADDITIONALLY, IF SO DIRECTED BY THE ENGINEER, THE ROAD SURFACE SHALL BE HOSED OR WATERED USING SUITABLE EQUIPMENT. .....................................................................................................................................................66 111.11 ANY STRUCTURAL DAMAGE CAUSED TO THE EXISTING ROADS BY THE CONTRACTOR'S CONSTRUCTION EQUIPMENT SHALL BE MADE GOOD WITHOUT ANY EXTRA COST.................................................................66 111.12 COMPLIANCE WITH THE FOREGOING WILL NOT RELIEVE THE CONTRACTOR OF ANY RESPONSIBILITY FOR COMPLYING WITH THE REQUIREMENTS OF ANY HIGHWAY AUTHORITY IN RESPECT OF THE ROADS USED BY HIM.. .....................................................................................................................................................66 112 ARRANGEMENT FOR TRAFFIC DURING CONSTRUCTION..................................66 112.1 GENERAL.............................................................................................................................66 112.2 PASSAGE OF TRAFFIC ALONG A PART OF THE EXISTING CARRIAGEWAY UNDER IMPROVEMENT...........66 112.3 PASSAGE OF TRAFFIC ALONG A TEMPORARY DIVERSION..............................................................67 112.4 TRAFFIC SAFETY AND CONTROL..............................................................................................67 112.5 MAINTENANCE OF DIVERSIONS AND TRAFFIC CONTROL DEVICES.................................................68 112.6 MEASUREMENTS FOR PAYMENT AND RATE................................................................................68 113 GENERAL RULES FOR THE MEASUREMENT OF WORKS FOR PAYMENT......68 113.1 GENERAL.............................................................................................................................68 113.2 MEASUREMENT OF LEAD FOR MATERIALS.................................................................................68 113.3 MEASUREMENT OF PAVEMENT THICKNESS FOR PAYMENT ON VOLUME BASIS................................69 113.4 CHECKING -OF PAVEMENT THICKNESS FOR PAYMENT ON AREA BASIS..........................................69

General

Section 100

113.5 MEASUREMENT OF BITUMINOUS COURSES FOR PAYMENT ON WEIGHT BASIS.................................69 114 SCOPE OF RATES FOR DIFFERENT ITEMS OF WORK..........................................70 114.1 FOR ITEM RATE CONTRACTS, THE CONTRACT UNIT RATES FOR DIFFERENT ITEMS OF WORK SHALL BE PAYMENT IN FULL FOR COMPLETING THE WORK TO THE REQUIREMENTS OF THE SPECIFICATIONS INCLUDING FULL COMPENSATION FOR ALL THE OPERATIONS DETAILED IN THE RELEVANT SECTIONS OF THESE SPECIFICATIONS UNDER "RATES". IN THE ABSENCE OF ANY DIRECTIONS TO THE CONTRARY, THE RATES ARE TO BE CONSIDERED AS THE FULL INCLUSIVE RATE FOR FINISHED WORK COVERING ALL LABOUR, MATERIALS, WASTAGE, TEMPORARY WORK, PLANT, EQUIPMENT, OVER-HEAD CHARGES AND PROFIT AS WELL AS THE GENERAL LIABILITIES, OBLIGATIONS, INSURANCE AND RISKS ARISING OUT OF GENERAL CONDITIONS OF CONUWL.......................70 114.2 THE ITEM RATES QUOTED BY THE CONTRACTOR SHALL, UNLESS OTHERWISE SPECIFIED, ALSO INCLUDE COMPLIANCE WITH/SUPPLY OF THE FOLLOWING :...................................................................................70 114.3 PORTIONS OF ROAD WORKS BEYOND THE LIMITS AND/OR ANY OTHER WORK MAY BE GOT CONSTRUCTED BY THE EMPLOYER DIRECTLY THROUGH OTHER AGENCIES. ACCORDINGLY, OTHER AGENCIES EMPLOYED BY THE EMPLOYER MAY BE WORKING IN THE VICINITY OF THE WORKS BEING EXECUTED BY THE CONTRACTOR. THE CONTRACTOR SHALL LIAISE WITH SUCH AGENCIES AND ADJUST HIS CONSTRUCTION PROGRAMME FOR THE
COMPLETION OF WORK ACCORDINGLY AND NO CLAIM OR COMPENSATION DUE TO ANY REASON WHATSOEVER WILL BE ENTERTAINED ON THIS ACCOUNT.

THE EMPLOYER WILL BE INDEMNIFIED BY THE CONTRACTOR FOR

ANY CLAIMS FROM OTHER AGENCIES ON THIS ACCOUNT..........................................................................71

115 METHODOLOGY AND SEQUENCE OF WORK..........................................................71 116 CRUSHED STONE AGGREGATES.................................................................................71 117 APPROVAL OF MATERIALS..........................................................................................71 118 SUPPLY OF QUARRY SAMPLES....................................................................................72 119 USE OF SURFACES BY CONSTRUCTION TRAFFIC.................................................72 119.1 ORDINARILY, NO CONSTRUCTION TRAFFIC SHALL BE ALLOWED ON PAVEMENT UNDER CONSTRUCTION UNLESS AULHORISED BY THE ENGINEER. EVEN IN THAT CASE THE LOAD AND INTENSITY OF CONSTRUCTION
TRAFFIC SHOULD BE SO REGULATED THAT NO DAMAGE IS CAUSED TO THE SUBGRADE OR PAVEMENT LAYERS ALREADY CONSTRUCTED.

WHERE NECESSARY, SERVICE ROADS SHALL BE CONSTRUCTED FOR THIS PURPOSE AND

THE SAME SHALL BE CONSIDERED AS INCIDENTAL TO THE WORK...............................................................72

119.2 THE WHEELS OR TRACKS OF PLANT MOVING OVER THE VARIOUS PAVEMENT COURSES SHALL BE KEPT FREE OF DELETERIOUS MATERIALS.......................................................................................................72 119.3 BITUMINOUS BASE COURSE SHALL BE KEPT CLEAN AND UNCONTAMINATED AS LONG AS THE SAME REMAINS UNCOVERED BY A WEARING COURSE OR SURFACE TREATMENT. THE ONLY TRAFFIC PERMITTED ACCESS
TO THE BASE COURSE SHALL BE THAT ENGAGED IN LAYING AND COMPACTING THEWEARING COURSE OR THAT ENGAGED ON SUCH SURFACE TREATMENT WHERE THE BASE-COURSE IS TO BE BLINDED AND /OR SURFACE DRESSED.

SHOULD THE BASE COURSE OR TACK COAT ON THE BASE COURSE BECOME CONTAMINATED, THE CONTRACTOR SHALL MAKE GOOD BY CLEARING IT TO THE SATISFACTION OF THE ENGINEER, AND IF THIS IS IMPRACTICABLE, BY REMOVING THE LAYER AND REPLACING IT TO SPECIFICATION WITHOUT ANY EXTRA COST. 72 120 SITE OFFICE FOR ENGINEER AND OTHER SUPERVISORY STAFF....................72

General

Section 100

120.1 SCOPE..................................................................................................................................72 120.2 DESCRIPTION........................................................................................................................72 120.3 OWNERSHIP..........................................................................................................................74 120.4 MAINTENANCE......................................................................................................................74 120.5 MEASUREMENTS FOR PAYMENT...............................................................................................74 120.6 RATE...................................................................................................................................75 121 FIELD LABORATORY......................................................................................................75 121.1 SCOPE..................................................................................................................................75 121.2 DESCRIPTION........................................................................................................................75 121.3 LABORATORY EQUIPMENT.......................................................................................................76 121.4 OWNERSHIP..........................................................................................................................78 121.5 MAINTENANCE......................................................................................................................78 121.6 MEASUREMENTS FOR PAYMENT...............................................................................................78 121.7 RATE...................................................................................................................................78 122 SITE RESIDENTIAL ACCOMMODATION FOR ENGINEER AND OTHER SUPERVISORY STAFF............................................................................................................78 122.1 SCOPE..................................................................................................................................78 122.2 OWNERSHIP..........................................................................................................................79 122.3 MAINTENANCE......................................................................................................................79 123 SITE RESIDENTIAL ACCOMMODATION FOR ENGINEER AND OTHER SUPERVISORY STAFF............................................................................................................79 123.1 SCOPE..................................................................................................................................79 123.2 OWNERSHIP..........................................................................................................................80 123.3 MAINTENANCE......................................................................................................................80 123.4 MEASUREMENT FOR PAYMENT.................................................................................................80 123.5 RATE...................................................................................................................................81 124 PROVIDING AND MAINTAINING WIRELESS COMMUNICATION SYSTEM......81 124.1 SCOPE..................................................................................................................................81 124.2 SUPPLY................................................................................................................................81 124.3 APPROVAL............................................................................................................................81 124.4 MAINTENANCE......................................................................................................................81 124.5 MEASUREMENTS FOR PAYMENT...............................................................................................82 124.6 RATES.................................................................................................................................82 125 PROVIDING AND MAINTAINING VEHICLES FOR THE ENGINEER....................82 125.1 SCOPE..................................................................................................................................82 125.2 DESCRIPTION........................................................................................................................82 125.3 MAINTENANCE......................................................................................................................83 125.4 WITHDRAWAL OF VEHICLES....................................................................................................83

General

Section 100

125.5 MEASUREMENTS FOR PAYMENT...............................................................................................83 125.6 RATES.................................................................................................................................83 126 SUPPLY OF COLOUR RECORD PHOTOGRAPHS AND ALBUMS..........................84 126.1 SCOPE..................................................................................................................................84 126.2 DESCRIPTION........................................................................................................................84 126.3 MEASUREMENTS FOR PAYMENT...............................................................................................84 126.4 RATE...................................................................................................................................84 127 SUPPLY OF VIDEO CASSETTES....................................................................................84 127.1 DESCRIPTION........................................................................................................................84 127.2 MEASUREMENTS FOR PAYMENT...............................................................................................85 127.3 RATES.................................................................................................................................85 201 CLEARING AND GRUBBING..........................................................................................87 127.4 SCOPE..................................................................................................................................87 127.5 PRESERVATION OF PROPERTY/AMENITIES..................................................................................87 127.6 METHODS, TOOLS AND EQUIPMENTS........................................................................................87 127.7 DISPOSAL OF MATERIALS.......................................................................................................88 127.8 MEASUREMENTS FOR PAYMENT...............................................................................................88 127.9 RATES.................................................................................................................................88 128 DISMANTLING CULVERTS, BRIDGES AND OTHER STRUCTURES/PAVEMENTS..................................................................................................89 128.1 SCOPE..................................................................................................................................89 128.2 DISMANTLING CULVERTS AND BRIDGES....................................................................................89 128.3 DISMANTLING PAVEMENTS AND OTHER STRUCTURES..................................................................90 128.4 BACK-FILLING.......................................................................................................................90 128.5 DISPOSAL OF MATERIALS.......................................................................................................90 128.6 MEASUREMENTS FOR PAYMENT...............................................................................................91 128.7 RATES.................................................................................................................................91 301 EXCAVATION FOR ROADWAY AND DRAINS...........................................................93 128.8 SCOPE..................................................................................................................................93 128.9 CLASSIFICATION OF EXCAVATED MATERIAL..............................................................................93 128.10 CONSTRUCTION OPERATIONS.................................................................................................94 128.11 PLYING OF CONSTRUCTION TRAFFIC.......................................................................................97 128.12 PRESERVATION OF PROPERTY................................................................................................97 128.13 PREPARATION OF CUT FORMATION.........................................................................................97 128.14 FINISHING OPERATIONS........................................................................................................98 128.15 MEASUREMENTS FOR PAYMENT.............................................................................................98 128.16 RATES...............................................................................................................................99 129 BLASTING OPERATIONS..............................................................................................100

General

Section 100

129.1 GENERAL...........................................................................................................................100 129.2 MATERIALS, TOOLS AND EQUIPMENT.....................................................................................100 129.3 PERSONNEL.........................................................................................................................101 129.4 BLASTING OPERATIONS........................................................................................................101 129.5 MISFIRE.............................................................................................................................102 129.6 ACCOUNT...........................................................................................................................102 130 PRESPLITTING ROCK EXCAVATION SLOPES.......................................................102 130.1 GEN ERAL..........................................................................................................................102 130.2 CONSTRUCTION OPERATIONS.................................................................................................102 130.3 TOLERANCES.......................................................................................................................104 130.4 MEASUREMENTS FOR PAYMENT.............................................................................................104 130.5 RATES...............................................................................................................................104 131 EXCAVATION FOR STRUCTURES..............................................................................104 131.1 SCOPE................................................................................................................................104 131.2 CLASSIFICATION OF EXCAVATION...........................................................................................105 131.3 CONSTRUCTION OPERATIONS.................................................................................................105 131.4 MEASUREMENTS FOR PAYMENT.............................................................................................107 131.5 RATES...............................................................................................................................107 132 EMBANKMENT CONSTRUCTION...............................................................................108 132.1 GENERAL...........................................................................................................................108 132.2 MATERIALS 'AND GENERAL REQUIREMENTS............................................................................108 132.3 CO NSTRUCTION OPERATIONS................................................................................................112 132.4 CONSTRUCTION OF EMBANKMENT AND SUBGRADE UNDER SPECIAL CONDITIONS ..........................116 132.5 PLYING OF TRAFFIC.............................................................................................................119 132.6 SURFACE FINISH AND QUALITY CONTROL OF WORK................................................................119 132.7 SUBGRADE STRENGTH..........................................................................................................119 132.8 MEASUREMENTS FOR PAYMENT.............................................................................................119 132.9 RATES...............................................................................................................................120 133 SOIL EROSION AND SEDIMENTATION CONTROL...............................................121 133.1 DESCRIPTION......................................................................................................................121 133.2 MATERIALS........................................................................................................................121 133.3 CONSTRUCTION OPERATIONS.................................................................................................121 133.4 MEASUREMENTS FOR PAYMENT.............................................................................................123 133.5 RATES...............................................................................................................................123 134 TURFING WITH SODS....................................................................................................123 134.1 SCOPE................................................................................................................................123 134.2 MATERIALS........................................................................................................................123 134.3 CONSTRUCTION OPERATIONS.................................................................................................123

General

Section 100

134.4 MEASUREMENTS FOR PAYMENT.............................................................................................124 134.5 RATE.................................................................................................................................124 135 SEEDING AND MULCHING..........................................................................................125 135.1 SCOPE................................................................................................................................125 135.2 MATERIALS........................................................................................................................125 135.3 SEEDING OPERATIONS..........................................................................................................125 135.4 MULCHING, APPLYING BITUMINOUS EMULSION AND JUTE NETTING/ GEONETTING.......................126 135.5 MAINTENANCE....................................................................................................................126 135.6 MEASUREMENTS FOR PAYMENT..............................................................................................126 135.7 RATE.................................................................................................................................126 136 SURFACE/SUB-SURFACE DRAINS..............................................................................127 136.1 SCOPE................................................................................................................................127 136.2 SURFACE DRAINS................................................................................................................127 136.3 SUB-SURFACE DRAINS..........................................................................................................127 136.4 MEASUREMENTS FOR PAYMENT.............................................................................................130 136.5 RATES...............................................................................................................................130 137 PREPARATION AND SURFACE TREATMENT OF FORMATION.........................130 138 WORKS TO BE KEPT FREE OF WATER....................................................................131 138.1 THE CONTRACTOR SHALL ARRANGE FOR THE RAPID DISPERSAL OF WATER COLLECTED/ACCUMULATED ON
THE EARTHWORK OR COMPLETED FORMATION DURING CONSTRUCTION OR ON THE EXISTING ROADWAY OR WHICH ENTERS THE EARTHWORK OR ANY OTHER ITEM OF WORK FROM ANY SOURCE, AND WHERE PRACTICABLE, THE WATER SHALL BE DISCHARIED INTO THE PERMANENT OUTFALL OF THE DRAINAGE SYSTEM.

THE ARRANGEMENTS SHALL BE MADE IN.RESPECT OF ALL EARTHWORK INCLUDING EXCAVATION FOR * PIPE TRENCHES, FOUNDATIONS OR CUTTINGS.................................................................................................................................131 138.2 THE CONTRACTOR SHALL PROVIDE, WHERE. NECESSARY, TEMPORARY WATER COURSES, DITCHES, DRAINS, PUMPING OR OTHER MEANS FOR MAINTAINING THE EARTHWORK FREE FROM WATER. SUCH PROVISIONS
SHALL INCLUDE CARRYING OUT THE WORK OF FORMING THE CUT SECTIONS AND EMBANKMENTS IN SUCH MANNER THAT THEIR SURFACES HAVE AT ALL TIMES A SUFFICIENT MINIMUM CROSSFALL AND, WHERE PRACTICABLE, A'SUFFICIENT LONGITUDINAL GRADIENT TO ENABLE THEM TO SHED WATER AND PREVENT PONDING.

,....................................................................................................................................131

139 WATER COURSES AT CULVERTS..............................................................................131 139.1 EXCAVATION CARRIED OUT IN THE DIVERSION, ENLARGEMENT, DEEPENING OR STRAIGHTENING WATER COURSES AT CULVERTS, WHERE NECESSARY, SHALL INCLUDE THE OPERATIONS SUCH AS CLEARING, GRUBBING, REMOVAL 'OF VEGETATION, TRIMMING OF SLOPES, GRADING OF BEDS, DISPOSAL OF EXCAVATED MATERIALS, PUMPING, TIMBERING ETC. NECESSARY FOR DEALING WITH THE FLOW OF WATER.......................................131 139.2 THE BEDS AND SLOPING SIDES OF WATER COURSES SHALL, WHERE SHOWN ON THE DRAWINGS, BE
PROTECTED AGAINST THE ACTION OF WATER BY RUBBLE PAVING TO FORM A FLAT OR CURVED SURFACE AS INDICATED.-

THE PROTECTION SHALL CONSIST OF LARGE SMOOTH FACED STONES OR OF BLOCKS OF PRECAST CONCRETE. STONES FOR RUBBLE PAVING SHALL BE ROUGHLY DRESSED SQUARE. NO STONE SHALL BE LESS THAN

General

Section 100

255 MM IN DEPTH NOR LESS THAN 0.02 CU. M. IN VOLUME AND NO ROUNDED BOULDERS SHALL BE USED. AFTER COMPLETION OF CONSTRUCTION OF CULVERTS, TEMPORARY DIVERSION OF WATERCOURSE, IF ANY, SHALL
BE CLOSED AND WATER COURSE RESTORED FOR FLOW THROUGB THE CULVERT AS PER THE DIRECTION OF THE

ENGINEER.....................................................................................................................................131 139.3 MEASUREMENTS FOR PAYMENT.............................................................................................132 139.4 RATES...............................................................................................................................132 140 CONSTRUCTION OF ROCKFILL EMBANKMENT..................................................132 140.1 SCOPE................................................................................................................................132 140.2 MATERIAL..........................................................................................................................132 140.3 SPREADING AND COMPACTION...............................................................................................132 140.4 MEASUREMENTS FOR PAYMENT.............................................................................................133 140.5 RATE.................................................................................................................................133 401 GRANULAR SUB-BASE..................................................................................................135 140.6 SCOPE................................................................................................................................135 140.7 MATERIALS........................................................................................................................135 140.8 STRENGTH OF SUB-BASE........................................................................................................136 140.9 CONSTRUCTION OPERATIONS.................................................................................................136 140.10 SURFACE FINISH AND QUALITY CONTROL OF WORK..............................................................137 140.11 ARRANGEMENTS FOR TRAFFIC.............................................................................................137 140.12 MEASUREMENTS FOR PAYMENT...........................................................................................137 140.13 RATE...............................................................................................................................138 141 LIME TREATED SOIL FOR IMPROVED SUB-GRADE/SUB-BASE........................138 141.1 SCOPE................................................................................................................................138 141.2 MATERIALS........................................................................................................................138 141.3 CONSTRUCTION OPERATIONS.................................................................................................139 141.4 SURFACE FINISH AND QUALITY CONTROL OF WORK................................................................141 141.5 STRENGTH..........................................................................................................................141 141.6 ARRANGEMENTS OF TRAFFIC.................................................................................................141 141.7 MEASUREMENTS FOR PAYME NT............................................................................................141 141.8 RATES...............................................................................................................................141 142 CEMENT TREATED SOIL SUB-BASE/BASE..............................................................142 142.1 SCOPE................................................................................................................................142 142.2 MATERIALS........................................................................................................................142 142.3 CONSTRUCTION OPERATIONS.................................................................................................143 142.4 SURFACE FINISH AND QUALITY CONTROL OF WORKS...............................................................143 142.5 STRENGTH..........................................................................................................................144 142.6 ARRANGEMENTS FOR TRAFFIC...............................................................................................144 142.7 MEASUREMENTS FOR PAYMENT.............................................................................................144 142.8 RATES...............................................................................................................................144

General

Section 100

143 WATER BOUND MACADAM SUB-BASFYBASE.......................................................144 143.1 SCOPE................................................................................................................................144 143.2 MATERIALS........................................................................................................................144 143.3 CONSTRUCTION OPERATIONS.................................................................................................148 143.4 SURFACE FINISH AND QUALITY CONTROL OF WORK................................................................151 143.5 ARRANGEMENT FOR TRAFFIC.................................................................................................151 143.6 MEASUREMENTS FOR PAYMENT..............................................................................................151 143.7 RATE.................................................................................................................................151 144 CRUSHED CEMENT CONCRETE SUB-BASE/BASE.................................................151 144.1 SCOPE................................................................................................................................152 144.2 MATERIALS........................................................................................................................152 144.3 CONSTRUCTION OPERATIONS.................................................................................................152 144.4 SURFACE FINISH AND QUALITY CONTROL OF WORKS...............................................................153 144.5 ARRANGEMENTS FOR TRAFFIC...............................................................................................153 144.6 MEASUREMENTS FOR PAYMENT.............................................................................................153 144.7 RATES...............................................................................................................................153 145 WET MIX MACADAM SUB-BASE/BASE.....................................................................153 145.1 SCOPE................................................................................................................................154 145.2 MATERIALS........................................................................................................................154 145.3 CONSTRUCTION OPERATIONS.................................................................................................155 145.4 OPENING TO TRAFFIC...........................................................................................................157 145.5 SURFACE FINISH AND QUALITY CONTROL OF WORK................................................................157 145.6 RECTIFICATION OF SURFACE IRREGULARITY.............................................................................157 145.7 ARRANGEMENT FOR TRAFFIC.................................................................................................157 145.8 MEASUREMENTS FOR PAYMENT.............................................................................................157 145.9 RATES...............................................................................................................................157 146 SHOULDERS, ISLANDS AND MEDIAN.......................................................................157 146.1 SCOPE................................................................................................................................157 146.2 MATERIALS........................................................................................................................158 146.3 SIZE OF SH OULDERS/MEDIAN/IS LANDS.................................................................................158 146.4 407.4. CONSTRUCTION OPERATIONS......................................................................................158 146.5 SURFACE FINISH AND QUALITY IFFONTROL OF WORKS.............................................................159 146.6 MEASUREMENTS FOR PAYMENT.............................................................................................159 146.7 RATE.................................................................................................................................159 147 CEMENT CONCRETE KERB AND KERB WITH CHANNEL..................................159 147.1 SCOPE................................................................................................................................160 147.2 MATERIALS........................................................................................................................160 147.3 TYPE OF CONSTRUCTION.......................................................................................................160 147.4 EQUIPMENT.........................................................................................................................160

General

Section 100

147.5 CONSTRUCTION OPERATIONS.................................................................................................160 148 FOOTPATHS AND SEPARATORS................................................................................161 148.1 SCOPE................................................................................................................................161 148.2 MATERIALS........................................................................................................................161 148.3 CONSTRUCTION OPERATIONS.................................................................................................161 148.4 MEASUREMENTS FOR PAYMENT.............................................................................................162 148.5 RATES...............................................................................................................................162 149 CRUSHER-RUN MACADAM BASE..............................................................................162 149.1 SCOPE................................................................................................................................162 149.2 MATERIALS........................................................................................................................162 149.3 CONSTRUCTION OPERATIONS ................................................................................................163 149.4 SURFACE FLNISH AND QUALITY CONTROL OF WORK................................................................164 149.5 ARRANGEMENTS FOR TRAFFIC...............................................................................................164 149.6 MEASUREMENTS FOR PAYMENT.............................................................................................164 149.7 RATE.................................................................................................................................164 501 GENERAL REQUIKEMENTS FOR BITUMINOUS PAVEMENT LAYERS............166 149.8 GENERAL...........................................................................................................................166 149.9 MATERIALS........................................................................................................................166 149.10 MIXING............................................................................................................................167 149.11 TRANSPORTING..................................................................................................................167 149.12 LAYING............................................................................................................................167 149.13 COMPACTION....................................................................................................................169 149.14 JOINTS.............................................................................................................................170 149.15 PREPARATION OF SURFACE..................................................................................................170 150 PRIME COAT OVER GRANULAR BASE....................................................................179 150.1 SCOPE................................................................................................................................179 150.2 MATERIALS........................................................................................................................179 150.3 WEATHER AND SEASONAL LIMITATIONS.................................................................................179 150.4 CONSTRUCTION...................................................................................................................179 150.5 QUALITY CONTROL OF WORK...............................................................................................180 150.6 ARRANGEMENTS FOR TRAFFIC...............................................................................................180 150.7 MEASUREMENT FOR PAYMENT...............................................................................................180 150.8 RATE.................................................................................................................................180 151 TACK COAT.....................................................................................................................181 151.1 SCOPE................................................................................................................................181 151.2 MATERIALS........................................................................................................................181 151.3 WEATHER AND SEASONAL LIMITATIONS.................................................................................181 151.4 CONSTRUCTION...................................................................................................................181

General

Section 100

151.5 QUALITY CONTROL OF WORK...............................................................................................182 151.6 ARRANGEMENTS FOR IRAFFIC................................................................................................182 151.7 MEASUREMENT FOR PAYMENT...............................................................................................182 151.8 RATE.................................................................................................................................182 152 BITUMINOUS MACADAM.............................................................................................182 152.1 SCOPE................................................................................................................................183 152.2 MATERIALS........................................................................................................................183 152.3 CONSTRUCTION OPERATIONS.................................................................................................184 152.4 SURFACE FINISH AND QUALITY CONTROL OF WORK................................................................185 152.5 PROTECTION OF THE LAYER..................................................................................................185 152.6 ARRANGEMENTS FOR TRAFFIC...............................................................................................185 152.7 MEASUREMENT FOR PAYMENT...............................................................................................186 152.8 RATE.................................................................................................................................186 153 BITUMINOUS PENETRATION MACADAM...............................................................186 153.1 SCOPE................................................................................................................................186 153.2 MATERIALS........................................................................................................................186 153.3 CONSTRUCTION OPERATIONS.................................................................................................186 153.4 SURFACE FINISH AND QUALITY CONTROL...............................................................................188 153.5 SURFACING.........................................................................................................................188 153.6 ARRANGEMENTS FOR TRAFFIC...............................................................................................189 153.7 MEASUREMENT, FOR PAYMENT..............................................................................................189 153.8 RATE.................................................................................................................................189 154 BUILT-UP SPRAY GROUT.............................................................................................189 154.1 SCOPE................................................................................................................................189 154.2 MATERIALS........................................................................................................................189 154.3 CONSTRUCTION OPERATIONS.................................................................................................190 154.4 SURFACE FINISH AND QUALITY CONTROL...............................................................................191 154.5 FINAL SURFACING ..............................................................................................................191 154.6 ARRANGEMENTS FOR TRAFFIC...............................................................................................191 154.7 MEASUREMENT FOR PAYMENT...............................................................................................191 154.8 RATE.................................................................................................................................191 155 DENSE GRADED BITUMINOUS MACADAM.............................................................191 155.1 SCOPE................................................................................................................................191 155.2 MATERIALS........................................................................................................................191 155.3 MIXTURE DESIGN................................................................................................................194 155.4 CONSTRUCTION OPERATIONS.................................................................................................197 155.5 OPENING TO TRAFFIC...........................................................................................................198 155.6 SURFACE FINISH AND QUALITY CONTROL OF WORK................................................................198 155.7 ARRANGEMENTS FOR TRAFFIC...............................................................................................198

General

Section 100

155.8 MEASUREMENT FOR PAYMENT...............................................................................................198 155.9 RATE.................................................................................................................................198 156 SEMI-DENSE BITUMINOUS CONCRETE...................................................................198 156.1 SCOPE................................................................................................................................198 156.2 MATERIALS........................................................................................................................198 156.3 MIXTURE DESIGN................................................................................................................199 156.4 CONSTRUCTION OPERATIONS.................................................................................................201 156.5 OPENING TO TRAFFIC...........................................................................................................202 156.6 SURFACE FINISH AND QUALITY CONTROL...............................................................................202 156.7 ARRANGEMENTS FOR TRAFFIC...............................................................................................202 156.8 MEASUREMENT FOR PAYMENT...............................................................................................202 156.9 RATE.................................................................................................................................202 157 BITUMINOUS CONCRETE............................................................................................202 157.1 SCOPE................................................................................................................................202 157.2 MATERIALS........................................................................................................................202 157.3 MIXTURE DESIGN................................................................................................................203 157.4 CONSTRUCTION OPERATIONS.................................................................................................204 157.5 OPENING TO TRAFFIC...........................................................................................................206 157.6 SURFACE FINISH AND QUALITY CONTROL...............................................................................206 157.7 ARRANGEMENTS FOR TRAFFIC...............................................................................................206 157.8 MEASUREMENT FOR PAYMENT...............................................................................................206 157.9 RATE.................................................................................................................................206 158 SURFACE DRESSING.....................................................................................................206 158.1 SCOPE................................................................................................................................206 158.2 MATERIALS........................................................................................................................206 158.3 CONSTRUCTION OPERATIONS..................................................................................................207 158.4 OPENING TO TRAFFIC...........................................................................................................209 158.5 SURFACE FINISH AND QUALITY CONTROL OF WORK................................................................210 158.6 ARRANGEMENTS FOR TRAFFIC...............................................................................................210 158.7 MEASUREMENT FOR PAYMENT...............................................................................................210 158.8 RATE.................................................................................................................................210 159 OPEN-GRADED PREMIX SURFACING.......................................................................210 159.1 OPEN-GRADED PREMIX SURFACING USING PENETRATION BITUMEN OR CUTBACK..........................210 159.2 OPEN GRADED PREMIX SURFACING USING CATIONIC BITUMEN EMULSION........................................213 160 CWSE-GRADED PREMIX SURFACING/MIXED SEAL SURFACING....................216 160.1 SCOPE................................................................................................................................216 160.2 MATERIALS........................................................................................................................216 160.3 CONSTRUCTION OPERATIONS.................................................................................................217

General

Section 100

160.4 OPENING TO TRAFFIC...........................................................................................................217 160.5 SURFACE FINISH AND QUALITY CONTROL OF WORK................................................................217 160.6 ARRANGEMENTS FOR TRAFFIC...............................................................................................217 160.7 MEASUREMENTS FOR PAYMENT.............................................................................................217 160.8 RATE.................................................................................................................................217 161 SEAL COAT......................................................................................................................217 161.1 SCOPE................................................................................................................................217 161.2 MATERIALS........................................................................................................................218 161.3 CONSTRUCTION OPERATIONS.................................................................................................218 161.4 OPENING TO TRAFFIC...........................................................................................................219 161.5 SURFACE FINISH AND QUALITY CONTROL OF WORK................................................................219 161.6 ARRANGEMENTS FOR TRAFFIC...............................................................................................219 161.7 MEASUREMENT FOR PAYMENT...............................................................................................219 161.8 RATE.................................................................................................................................220 162 SUPPLY OF STONE AGGREGATES FOR PAVEMENT COURSES.......................220 162.1 SCOPE................................................................................................................................220 162.2 SIZES OF STONE AGGREGATES...............................................................................................220 162.3 STACKING...........................................................................................................................221 162.4 QUALITY CONTROL OF MATERIALS........................................................................................221 162.5 MEASUREMENT FOR PAYMENT...............................................................................................221 162.6 RATES...............................................................................................................................222 163 MASTIC ASPHALT..........................................................................................................222 163.1 SCOPE................................................................................................................................222 163.2 MATERIALS........................................................................................................................222 163.3 MIX DESIGN.......................................................................................................................224 163.4 CONSTRUCTION OPERATIONS.................................................................................................224 163.5 OPENING TO TRAFFIC...........................................................................................................226 163.6 SURFACE FINISH AND QUALITY CONTROL OF WORK................................................................226 163.7 ARRANGEMENTS FOR TRAFFIC...............................................................................................226 163.8 MEASUREMENT FOR PAYMENT...............................................................................................226 163.9 RATE.................................................................................................................................226 164 SLURRY SEAL..................................................................................................................226 164.1 SCOPE................................................................................................................................226 164.2 MATERIALS........................................................................................................................227 164.3 MIXTURE DESIGN................................................................................................................227 164.4 CONSTRUCTION OPERATIONS.................................................................................................228 164.5 OPENING TO TRAFFIC...........................................................................................................230 164.6 SURFACE FINISH AND QUALITY CONTROL OF WORK................................................................230 164.7 ARRANGEMENTS FOR TRAFFIC...............................................................................................230

General

Section 100

164.8 MEASUREMENT FOR PAYMENT...............................................................................................230 164.9 RATE.................................................................................................................................230 165 RECYCLING OF BITUMINOUS PAVEMENT............................................................231 165.1 SCOPE................................................................................................................................231 165.2 RECLAIMED BITUMINOUS MATERIALS FOR CE~TRAL PLANT' RECYCLING....................................231 165.3 MIXTURE DESIGN................................................................................................................233 165.4 RECLAIMING OLD PAVEMENT MATERIALS..............................................................................233 165.5 MIXING AND LAYING...........................................................................................................234 165.6 IN SITU RECYCLING - THE REMIX AND REPAVE PROCESSES......................................................234 165.7 OPENING TO TRAFFIC...........................................................................................................236 165.8 SURFACE FINISH AND QUALITY CONTROL...............................................................................236 165.9 ARRANGEMENTS FOR TRAFFIC...............................................................................................236 165.10 MEASUREMENT FOR PAYMENT.............................................................................................236 165.11 RATE..............................................................................................................................236 166 FOG SPRAY......................................................................................................................237 166.1 SCOPE................................................................................................................................237 166.2 MATERIAL..........................................................................................................................237 166.3 WEATHER AND SEASONAL LIMITATIONS SPRAYING SHALL NOT TAKE PLACE WHEN THE TEMPERATURE IS BELOW 10'C, NOR IN WINDY OR DUSTY CONDITIONS, NOR WHEN IT IS RAINING OR THE SURFACE TO BE SPRAYED IS WET (A DAMP SURFACE IS ACCEPTABLE BUT REFER TO CLAUSE 518.4.2.)...........................................237 166.4 CONSTRUCTION OPERATIONS.................................................................................................237 166.5 BLINDING...........................................................................................................................237 166.6 QUALITY CONTROL OF WORK...............................................................................................238 166.7 ARRANGEMENTS FOR TRAFFIC...............................................................................................238 166.8 MEASUREMENT FOR PAYMENT...............................................................................................238 166.9 RATE.................................................................................................................................238 167 BITUMINOUS COLD MIX (INCLUDING GRAVEL EMULSION))..........................238 167.1 THE DESIGN MIX................................................................................................................238 167.2 DESIGNED COLD MIX..........................................................................................................238 167.3 RECIPE COLD MIX..............................................................................................................244 168 SAND ASPHALT BASE COURSE'.................................................................................247 168.1 SCOPE................................................................................................................................247 168.2 MATERIALS........................................................................................................................247 168.3 MIX DESIGN.......................................................................................................................248 168.4 CONSTRUCTION OPERATIONS.................................................................................................249 168.5 OPENING TO TRAFFIC...........................................................................................................250 168.6 SURFACE FINISH AND QUALITY CONTROL OF WORK................................................................250 168.7 ARRANGEMENTS FOR TRAFFIC...............................................................................................251 168.8 MEASUREMENT FOR PAYMENT...............................................................................................251

General

Section 100

168.9 RATE.................................................................................................................................251 169 MODIFIED BINDER........................................................................................................251 169.1 SCOPE................................................................................................................................251 169.2 MATERIALS........................................................................................................................251 169.3 MODIFLER PROPORTIONS......................................................................................................252 169.4 MIXING..............................................................................................................................252 169.5 QUALITY CONTROL OF MATERIALS........................................................................................252 169.6 MEASUREMENT FOR PAYMENT...............................................................................................254 169.7 RATE.................................................................................................................................255 170 CRACK PREVENTION COURSES'...............................................................................255 170.1 SCOPE................................................................................................................................255 170.2 MATERIALS........................................................................................................................256 170.3 CONSTRUCTION OPERATIONS.................................................................................................256 601 DRY LEAN CEMENT CONCRETE SUB-BASE...........................................................259 170.4 SCOPE................................................................................................................................259 170.5 MATERIALS........................................................................................................................259 170.6 PROPORTIONING OF MATERIALS FOR THE MIX.........................................................................260 170.7 SUBGRADE..........................................................................................................................261 170.8 CONSTRUCTION...................................................................................................................261 170.9 TRIAL MIXES......................................................................................................................264 170.10 TRIAL LENGTH ...............................................................................................................265 170.11 TOLERANCES FOR SURFACE REGULARITY, LEVEL, THICKNESS, DENSITY AND STRENGTH.............266 170.12 TRAFFIC...........................................................................................................................266 170.13 MEASUREMENTS' FOR PAYMENT..........................................................................................266 170.14 RATE...............................................................................................................................266 171 CEMENT CONCRETE PAVEMENT.............................................................................266 171.1 SCOPE................................................................................................................................266 171.2 MATERIALS........................................................................................................................266 171.3 PROPORTIONING OF CONCRETE..............................................................................................269 171.4 SUB-BASE...........................................................................................................................271 171.5 SEPARATION MEMBRANE......................................................................................................271 171.6 JOINTS...............................................................................................................................271 171.7 WEATHER AND SEASONAL LIMITATIONS.................................................................................275 171.8 SIDE FORMS, RAILS AND GUIDEWIRES....................................................................................275 171.9 CONSTRUCTION...................................................................................................................277 171.10 TRIAL LENGTH..................................................................................................................283 171.11 PREPARATION AND SEALING OF JOINT GROOVES....................................................................285 171.12 MEASUREMENT OF TEXTURE DEPTH - SAND PATCH METHOD.................................................287 171.13 OPENING TO TRAFFIC.........................................................................................................288

General

Section 100

171.14 TOLERANCES FOR SURFACE REGULARITY, LEVEL, THICKNESS AND STRENGTH...........................288 171.15 MEASUREMENTS FOR PAYMENT...........................................................................................288 171.16 RATE...............................................................................................................................289 172 ROLLED CEMENT CONCRETE BASE........................................................................289 172.1 SCOPE................................................................................................................................289 172.2 MATERIALS........................................................................................................................290 172.3 PROPORTIONING OF MATERIALS FOR THE MIX.........................................................................291 172.4 SUBGRADE..........................................................................................................................292 172.5 CONSTRUCTION...................................................................................................................293 172.6 TRIAL MIX.........................................................................................................................293 172.7 TRIAL LENGTH....................................................................................................................293 172.8 TRAFFIC.............................................................................................................................293 172.9 TOLERANCES FOR SURFACE REGULARITY, LEVEL, THICKNESS AND STRENGTH.............................293 172.10 MEASUREMENTS FOR PAYMENT...........................................................................................293 172.11 RATE...............................................................................................................................293 701 GEOSYNTHETICS IN ROAD AND BRIDGE WORKS..............................................296 172.12 SCOPE..............................................................................................................................296 172.13 MATERIAL TESTING AND ACCEPTANCE.................................................................................296 172.14 APPLICATION AREAS..........................................................................................................297 173 GEOTEXTILES IN SUB-SURFACE DRAINS...............................................................298 173.1 SCOPE................................................................................................................................298 173.2 MATERIALS........................................................................................................................298 173.3 INSTALLATION.....................................................................................................................299 173.4 NARROW FILTER DRAINS CONSISTING OF A POROUS OR PERFORATED PIPE LAID IN A NARROW TRENCH
SURROUNDED BY A LAYER OF GEOTEXTILE FILTER SHALL HAVE THE SAME PROPERTIES OF GEOTEXTILE AS

CLAUSE 702.2. THE SPICING OF LENGTHS OF GEOTEXTILE AND MINIMUM OVERLAP SHALL BE AS PER THE DESIGN DRAWING OR AS APPROVED BY THE ENGINEER. SUCH DRAINS SHALL BE INSTALLED AS PER THE DESIGN DRAWING TO CLAUSES 702.3 AND 309.3.5...........................................................................299 173.5 MEASUREMENTS. FOR PAYMENT............................................................................................299 173.6 RATES...............................................................................................................................299
SPECIFIED IN

174 GEOSYNTHETICS FOR HIGHWAY PAVEMENTS...................................................300 174.1 SCOPE................................................................................................................................300 174.2 PAVING FABRICS.................................................................................................................300 174.3 MATERIAL REQUIREMENTS...................................................................................................300 174.4 CONSTRUCTION AND INSTALLATION REQUIREMENTS..................................................................301 175 PROTECTION WORKS WITH GEOSYNTHETICS...................................................303 175.1 SCOPE................................................................................................................................303 175.2 GABIONS/MATTRESSES WITH GEOGRIDS AND GEONETS.............................................................303

General

Section 100

175.3 CONSTRUCTION...................................................................................................................303 801 TRAFFIC SIGNS..............................................................................................................307 175.4 GENERAL...........................................................................................................................307 175.5 MATERIALS........................................................................................................................307 175.6 TRAFFIC SIGNS HAVING RETRO-REFLECTIVE SHEETING.............................................................308 175.7 INSTALLATION.....................................................................................................................311 175.8 MEASUREMENTS FOR PAYMENT.............................................................................................311 175.9 RATE.................................................................................................................................311 176 OVERHEAD SIGNS..........................................................................................................312 176.1 GENERAL ..........................................................................................................................312 176.2 HEIGHT..............................................................................................................................312 176.3 LATERAL CLEARANCE..........................................................................................................312 176.4 NUMBER OF SIGNS AT AN OVERHEAD INSTALLATION................................................................313 176.5 MATERIALS FOR OVERHEAD SIGN AND SUPPORT STRUCTURES...................................................313 176.6 SIZE, LOCATIONS, ETC. OF SIGNS...........................................................................................313 176.7 INSTALLATION.....................................................................................................................313 176.8 MEASUREMENTS FOR PAYMENT.............................................................................................314 176.9 RATE.................................................................................................................................314 177 ROAD MARKINGS..........................................................................................................315 177.1 GENERAL...........................................................................................................................315 177.2 MATERIALS........................................................................................................................315 177.3 ORDINARY ROAD MARKING PAINT........................................................................................315 177.4 HOT APPLIED THERMOPLASTIC ROAD MARKING......................................................................315 177.5 REFLECTORISED PAINT.........................................................................................................318 177.6 APPLICATION......................................................................................................................318 177.7 MEASUREMENTS FOR PAYMENT.............................................................................................319 177.8 RATE.................................................................................................................................319 178 HECTOMETREIKILOMETRE STONES......................................................................319 178.1 GENERAL...........................................................................................................................319 178.2 THE DIMENSIONS OF THE STONES AND THE SIZE, COLOUR, ARRANGEMENT OF LETTERS AND SCRIPT SHALL BE AS PER IRC : 26 "TYPE DESIGNS FOR 200 ME" STONES" AND IRC: 8 "TYPE DESIGNS FOR HIGHWAY KILOMETRE STONES".....................................................................................................................319 178.3 THE HECTOMETRE/KILOMETRE STONES MAY BE MADE OF LOCAL STONES, CONCRETE OR ANY OTHER MATERIAL AVAILABLE LOCALLY AND APPROVED BY THE ENGINEER. THE STONES SHALL BE BEDDED INTO THE GROUND WITH ADEQUATE FOUNDATIONS AS INDICATED IN THE DRAWINGS OR IN THE RELEVANT I.R.C. SPECIFICATIONS OR AS DIRECTED BY THE ENGINEER. THE ORIENTATION AND LOCATION OF THE STONES SHALL BE AS INDICATED IN THE DRAWINGS OR IN THE RELEVANT I.R.C. SPECIFICATIONS OR AS DIRECTED BY THE ENGINEER.....................................................................................................................................320 178.4 MEASUREMENTS FOR PAYMENT.............................................................................................320

General

Section 100

178.5 RATE.................................................................................................................................320 179 ROAD DELINEATORS....................................................................................................320 179.1 GENERAL...........................................................................................................................320 179.2 THE DESIGN, MATERIALS TO BE USED AND THE LOCATION OF THE ROAD DELINEATORS SHALL CONFORM TO RECOMMENDED PRACTICE FOR ROAD DELINEATORS, IRC: 79, AND TO RELEVANT DRAWINGS OR AS OTHERWISE DIRECTED BY THE ENGINEER............................................................................................320 179.3 MEASUREMENTS FOR PAYMENT.............................................................................................320 179.4 RATE.................................................................................................................................320 180 BOUNDARY STONES......................................................................................................320 180.1 GENERAL...........................................................................................................................320 180.2 MEASUREMENTS FOR PAYMENT.............................................................................................320 180.3 RATE.................................................................................................................................321 181 FENCING...........................................................................................................................321 181.1 GENERAL...........................................................................................................................321 181.2 THE M.S. POSTS SHALL CONFORM TO IS:226 AND SHALL BE OF ANGLE IRON OF SIZE INDICATED IN THE DRAWINGS. THE ANGLE IRON SHALL BE EMBEDDED IN CONCRETE ' TO A SUFFICIENT DEPTH BELOW GROUND AS INDICATED IN THE DRAWINGS. THE STEEL SHALL BE FABRICATED AND PAINTED TO CONFORM TO SECTION' 1900 OF THESE SPECIFICATIONS...............................................................................................................321 181.3 THE BARBED WIRE SHALL BE OF GALVANISED IRON AND SHALL CONFORM TO IS:278.....................321 181.4 ENTRY GATE(S) SHALL BE MADE OF M.S. RODS OR OTHER METAL AS PER THE DESIGN SHOWN IN THE DRAWING(S)..................................................................................................................................321 181.5 MEASUREMENTS FOR PAYMENT.............................................................................................321 181.6 RATE.................................................................................................................................321 182 TUBULAR STEEL RAILING..........................................................................................321 182.1 GENERAL...........................................................................................................................321 182.2 THE RAILINGS SHALL BE OF TUBULAR STEEL IN CONFORMANCE TO IS:1239. THE FABRICATION AND PAINTING EXCEPT FOR THE FINAL COAT SHALL BE COMPLETED BEFORE DESPATCH TO THE SITE. PRIOR TO THE PAINTING, ALL SURFACES SHALL BE GRIT BLASTED TO THE SATISFACTION OF THE ENGINEER AND PICKLED. THE PRIMING COAT OF PAINT SHALL BE APPLIED AS SOON AS THE STEEL HAS DRIED.........................................321 182.3 THE POSTS SHALL BE VERTICAL AND OF THE TYPE AS SHOWN IN THE DRAWING WITH A TOLERANCE NOT EXCEEDING 6 MIN IN A LENGTH OF 3 M. THE RAILING SHALL BE ERECTED TRUE TO LINE AND GRADE...........321 182.4 MEASUREMENTS FOR PAYMENT.............................................................................................321 182.5 RATE.................................................................................................................................322 183 CONCRETE CRASH BARRIER.....................................................................................322 183.1 GENERAL...........................................................................................................................322 183.2 MATERIALS........................................................................................................................322 183.3 CONSTRUCTION OPERATIONS.................................................................................................322

General

Section 100

183.4 TOLERANCE THE OVERALL HORIZONTAL ALIGNMENT OF RAILS SHALL NOT DEPART FROM THE ROAD ALIGNMENT BY MORE THAN 30 MM, NOR DEVIATE IN ANY TWO SUCCESSIVE LENGTHS FROM STRAIGHT BY MORE THAN 6 MM AND THE FACES SHALL NOT VARY MORE THAN 12 MM FROM THE EDGE OF A 3 M STRAIGHT EDGE. BARRIERS SHALL BE AT THE SPECIFIED HEIGHT AS SHOWN IN THE PLANS ABOVE THE EDGE OF THE NEAREST ADJACENT CARRIAGEWAY OR SHOULDER, WITHIN A TOLERANCE OF 30 MM..............................323 183.5 MEASUREMENTS FOR PAYMENT.............................................................................................323 183.6 RATE.................................................................................................................................323 184 METAL BEAM CRASH BARRIIER...............................................................................323 184.1 GENERAL...........................................................................................................................323 184.2 MATERIALS........................................................................................................................323 184.3 CONSTRUCTION OPERATIONS.................................................................................................324 184.4 INSTALLATION OF POSTS.......................................................................................................324 184.5 ERECTION...........................................................................................................................324 184.6 TOLERANCE........................................................................................................................325 184.7 MEASUREMENTS FOR PAYMENT.............................................................................................325 184.8 RATE.................................................................................................................................325 185 ROAD TRAFFIC SIGNALS.............................................................................................325 185.1 GENERAL...........................................................................................................................325 185.2 THE TRAFFIC SIGNALS SW1 HAVE A COMPLETE ELECTRONIC MECHANISM FOR. CONTROLLING THE OPERATION OF TRAFFIC WITH AN AUXILIARY MANUAL CONTROLLER. THE TIME PLAN OF SIGNALS SHALL BE AS PER DRAWING AND SHALL BE MODIFIED AS DIRECTED BY THE ENGINEER.................................................325 185.3 MATERIALS........................................................................................................................325 185.4 TESTS................................................................................................................................326 185.5 MAINTENANCE OF TRAFFIC SIGNALS......................................................................................326 185.6 MEASUREMENTS FOR PAYMENT.............................................................................................326 185.7 RATE.................................................................................................................................326 901 GENERAL..........................................................................................................................328 185.8 ALL MATERIALS TO BE USED, ALL METHODS ADOPTED AND ALL WORKS PERFORMED SHALL BE STRICTLY IN ACCORDANCE WITH THE REQUITTMENTS OF DWSE SPECIFICATIONS. THE CONTRACTOR SHALL SET UP A FIELD LABORATORY AT LOCATIONS APPROVED BY,THE ENGINEER AND EQUIP THE SAME WITH ADEQUATE EQUIPMENT AND PERSONNEL IN ORDER TO CARRY OUT ALL REQUIRED TESTS AND QUALITY CONTROL WORK AS PER SPECIFICATIONS AND/OR AS DIRECTED BY THE ENGINEER. THE INTERNAL LAYOUT OF THE LABORATORY SHALL BE,AS PER CLAUSE 121 AND/OR AS DIRECTED BY THE ENGINEER. THE LIST OF EQUIPMENT AND THE FACILITIES TO BE PROVIDED SHALL BE GOT~ APPROVED FROM THE ENGINEER IN ADVANCE........................................328 185.9 THE CONTRACTOR'S LABORATORY SHOULD BE MANNED BY A QUALIFIED MATERIALS ENGINEER/CIVIL ENGINEE; ASSISTED BY EXPERIENCED TECHNICIANS, AND THE SET-UP SHOULD BE GOT APPROVED BY THE ENGINEER.....................................................................................................................................328 185.10 THE CONTRACTOR SHALL CARRY OUT QUALITY CONTROL TESTS ON THE MATERIALS AND WORK TO THE FREQUENCY STIPULATED IN SU'BSEQUENTPARAGMPHS. IN THE ABSENCE OF CLEAR INDICATIONS ABOUT METHOD AND OR FREQUENCY OF TESTS FOR ANY ITEM, THE INSTRUCTIONS OF THE ENGINEER SHALL BE FOLLOWED....328

General

Section 100

185.11 FOR SATISFYING HIMSELF ABOUT THE QUALITY OF THE MATERIALS AND WORK, QUALITY CONTROL TESTS WILL ALSO BE CONDUCTED BY THE ENGINEER (BY HIMSELF, BY HIS QUALITY CONTROL UNITS OR BY ANY OTHER AGENCIES DEEMED FIT BY HIM), GENERALLY TO THE FREQUENCY SET FORTH HEREINUNDER. ADDITIONAL TESTS MAY ALSO BE CONDUCTED WHERE, IN THE OPINION OF THE ENGINEER, NEED FOR SUCH TESTSEXISTS..................................................................................................................................328 185.12 THE CONTRACTOR SHALL PROVIDE NECESSARY CO-OPERATION AND ASSISTANCE IN OBTAINING THE SAMPLES FOR TESTS AND CARRYING OUT THEFIELD TESTS AS REQUIRED BY THE ENGINEER FROM TIME TO TIME. THIS MAY INCLUDE PROVISION OF LABOUR, ATTENDANTS, ASSISTANCE IN PACKING AND DESPATCHING AND ANY OTHER ASSISTANCE CONSIDERED NECESSARY IN CONNECTION WITH THE TESTS..........................................328 185.13 FOR THE WORK OF EMBANKMENT, SUBGRADE AND PAVEMENT, CONSTRUCDON OF SUBSEQUENT LAYEROF
SAME OR OTHER MATERIAL OVER THE FINISHED LAYERSHALL BE DONE AFTER OBTAINING PERMISSION FROM THE

ENGINEER. SIMILAR PERMISSION FROM THE ENGINEER SHALL BE OBTAINED IN RESPECT OF ALL OTHER ITEMS OF WORKS PRIOR TO PROCEEDING WITH THE NEXT STAGE OF CONSTRUCTION.................................................328 185.14 THE CONTRACTOR SHALL CARRY OUT "FICATIONS IN THE PROCEDURE OF WORK, IF FOUND NECESSARY, AS DIRECTED BY THE ENGINEER DURING INSPECTION. WORKS FALLING SHORT OF QUALITY SHALL BE RECTIFIED/REDONE BY THE CONTRACTOR AT HIS OWN COST, AND DEFECTIVE WORK SHALL ALSO BE REMOVED FROM THE SITE OF WORKS BY THE CONTRACTOR AT HIS OWN COFT........................................................328 185.15 THE COST OF LABORATORY BUILDING INCLUDING SERVICES, ESSENTIAL SUPPLIES LIKE WATER, ELECTRICITY, SANITARY SERVICES AND THEIR MAINTENANCE AND COST OF ALL EQUIPMENT, TOOLS, MATERIALS,
LABOUR ANDINCIDENTALS TOPERFORM TESTS AND OTHER OPERATIONS OF QUALITY CONTROL ACCORDING TO THE

SPECIFICATION REQUIREMENTS SHALL BE DEEMED TO BE INCIDENTAL TO THE WORK AND NO EXTRA PAYMENT SHALL BE MADE FOR THE SAME. IF, HOWEVER, THERE IS A SEPARATE ITEM IN THE BILL OF QUANTITIES FOR SETTING UP OF A LABORATORY AND INSTALLING TESTING EQUIPMENT, SUCH WORK SHALL BE PAID FOR SEPARATELY..................................................................................................................................329 185.16 FOR TESTING OF SAMPLES OF SOILS/SOIL MIXES, GRANULAR MATERIALS, AND MIXES, BITUMINOUS MATERIALS AND MIXES, AGGREGATES, CORES ETC., SAMPLES IN THE REQUIRED QUANTITY AND FORM SHALL BE SUPPLIED TO THE ENGINEER BY THE CONTRACTOR AT HIS OWN COST.....................................................329 185.17 FOR CEMENT, BITUMEN, MILD STEEL, AND SIMILAR OTHER MATERIALS WHERE ESSENTIAL TESTS ARE TO BE CARRIED OUT AT THE MANUFACTURER'S PLANTS OR AT LABORATORIES OTHER THAN THE SITE LABORATORY, THE COST OF SAMPLES, SAMPLING, TESTING AND FURNISHING OF TEST CERTIFICATES SHALL BE HOME BY THE CONTRACTOR. HE SHALL ALSO FURNISH THE TEST CERTIFICATES TO THE ENGINEER.................................329 185.18 FOR TESTING OF CEMENT CONCRETE AT SITE DURING CONSTRUCTION, ARRANGEMENTS FOR SUPPLY OF SAMPLES, SAMPLING, TESTING AND SUPPLY OF TEST RESULTS SHALL BE MADE BY THE CONTRACTOR AS PER THE FREQUENCY AND NUMBER OF TESTS SPECIFIED IN THE HANDBOOK OF QUALITY CONTROL FOR CONSTRUCTION OF ROADS ANDRUNWAYS (IRC: SP: 11) ANDRELEVANT IS CODES OR RELEVANTCLAUSES OF THESE SPECIFICATIONS, THE COST OF WHICH SHALL BE BORNE BY THE CONTRACTOR.........................................329 185.19 THE METHOD OF SAMPLING AND TESTING OF MATERIALS SHALL BE AS REQUIRED BY THE "HANDBOOK OF QUALITY CONTROL FOR CONSTRUCTION OF ROADS AND RUNWAYS" (IRC : SP: 11), AND THESE MOST SPECIFICATIONS. WHERE THEY ARE CONTI-ADICTING, THE PROVISION IN THESE SPECIFICATIONS SHALL BE FOLLOWED. WHERE THEY ARE SILENT, SOUND ENGINEERING PRACTICES SHALL BE ADOPTED. THE SAMPLING AND TESTING PROCEDURE TO BE USED SHALL BE 8 APPROVED BY THE ENGINEER AND HIS DECISION SHALL BE FINAL AND BINDING ON THE CONTRACTOR..................................................................................................329

General

Section 100

185.20 THE MATERIALS FOR EMBANKMENT CONSTRUCTION SHALL BE GOT APPROVED FROM THE ENGINEER. THE RESPONSIBILITY FOR ARRANGING AND OBTAINING THE LAND FOR BORROWING OR EXPLOITATION IN ANY OTHER WAY SHALL REST WITH THE CONTRACTOR WHO SHALL ENSURE SMOOTH AND UNINTERRUPTED SUPPLY OF MATERIALS IN THE REQUIRED QUANTITY DURING THE CONSTRUCTION PERIOD...........................................329 185.21 DEFECTIVE MATERIALS......................................................................................................329 185.22 IMPORTED MATERIALS.......................................................................................................330 186 CONTROL OF ALIGNMENT, LEVEL AND SURFACE REGULARITY.................330 186.1 GENERAL...........................................................................................................................330 186.2 HORIZONTAL ALIGNMENT.....................................................................................................330 186.3 SURFACE LEVELS................................................................................................................330 186.4 SURFACE REGULARITY OF PAVEMENT COURSES.......................................................................331 186.5 RECTIFICATION....................................................................................................................332 187 QUALITY CONTROL TESTS DURING CONSTRUCTION.......................................333 187.1 GENERAL...........................................................................................................................333 187.2 TESTS ON EARTHWORK FOR EMBANKMENT, SUBGRADE CONSTRUCTION AND CUT FORMATION.......334 187.3 TESTS ON SUB-BASES AND BASES (EXCLUDING BITUMEN BOUND BASES)......................................334 187.4 TESTS ON BITUMINOUS CONSTRUCTION..................................................................................336 187.5 QUALITY CONTROL TESTS FOR CONCRETE ROAD CONSTRUCTION..............................................345 1001 GENERAL........................................................................................................................355 188 SOURCES OF MATERIAL.............................................................................................355 189 BRICKS..............................................................................................................................355 190 STONES..............................................................................................................................355 191 CAST ERON......................................................................................................................355 192 CEMENT............................................................................................................................355 193 COARSE AGGREGATES................................................................................................356 194 SANDMINE AGGREGATES...........................................................................................357 195 STEEL................................................................................................................................358 195.1 CAST STEEL.......................................................................................................................358 195.2 STEEL FOR PRESTRESSING THE PRESTRESSING STEEL SHALL CONFORM TO EITHER OF THE FOLLOWING (A) PLAIN HARD DRAWN STEEL WIRE CONFORMING TO IS:1785 (PM 1) AND IS:1785 (PART (B) COLD DRAWN INDENTED WIRE CONFORMING TO IS:6003 (C) HIGH TENSILE STEEL BAR CONFORMING TO IS:2090 (D) UNCOATED STRESS REFIEVED STRANDS CONFORMING TO IS-6".............................................................358 195.3 REINFORCEMENT / UNTENSIONED STEEL.................................................................................358 195.4 GREY IRON CASTINGS..........................................................................................................359 195.5 STEEL FORGIBGS...............................................................................................................359 195.6 STRUCTURAL STEEL.............................................................................................................359 195.7 STAINLESS STEEL................................................................................................................360

General

Section 100

196 WATER..............................................................................................................................360 197 TIMBER.............................................................................................................................361 198 CONCRETE ADMIXTURES...........................................................................................361 198.1 GENERAL...........................................................................................................................361 198.2 PHYSICAL AND CHEMICAL REQUIREMENTS..............................................................................361 199 REINFORCED CONCRETE PIPES...............................................................................362 200 STORAGE OF MATERIALS...........................................................................................362 200.1 GENERAL...........................................................................................................................362 200.2 BRICK................................................................................................................................362 200.3 AGGREGATES......................................................................................................................362 200.4 CEMENT.............................................................................................................................362 200.5 REINFORCEMENT /UN.TENSIONED STEEL.................................................................................363 200.6 PRESTRESSING MATERIALS....................................................................................................363 200.7 WATER..............................................................................................................................364 201 TESTS AND STANDARD OF ACCEPTANCE..............................................................364 201.1 TESTING AND APPROVAL OF MATERIAL..................................................................................364 201.2 SAMPLING OF MATERIALS.....................................................................................................364 201.3 REJECTION OF MATERIALS NOT CONFORMING TO THE SPECIFICATIONS.........................................365 201.4 TESTING AND APPROVAL OF PLANT AND EQUIPMENT................................................................365 1101 DESCRIPTION................................................................................................................367 201.5 THIS WORK SHALL CONSIST OF CONSTRUCTION OF ALL TYPES OF PILES FOR STRUCTURES IN ACCORDANCE
WITH THE DETAILS SHOWN ON THE DRAWINGS AND CONFORMING TO THE REQUIREMENTS OF THESE SPECIFICATIONS.

............................................................................................................................367

201.6 THE CONSTRUCTION OF PILE FOUNDATIONS REQUIRES A CAREFUL CHOICE OF THE PILING SYSTEM DEPENDING UPON SUB-SOIL CONDITIONS AND LOADING CHARACTERISTICS AND TYPE OF STRUCTURE. THE PERMISSIBLE LIMITS OF TOTAL AND DIFFERENTIAL SETTLEMENTS, UNSUPPORTED LENGTH OF PILE UNDER SCOUR, IMPACT/ ENTANGLEMENT OF FLOATING BODIES AND ANY OTHER SPECIAL REQUIREMENTS OF PROJECT ARE ALSO EQUALLY IMPORTANT CRITERIA FOR SELECTION OF THE PILING SYSTEM. THE METHOD OF INSTALLING THE PILES, INCLUDING DETAILS OF THE EQUIPMENT SHALL BE SUBMITTED BY THE CONTRACTOR AND GOT APPROVED FROM THE ENGINEER..............................................................................................................................367 201.7 THE WORK SHALL BE DONE AS PER IS:2911 EXCEPT AS MODIFIED HEREIN....................................367 202 SUB-SURFACE INVESTIGATION................................................................................367 202.1 THE COMPLETE -P*-=FHCE INVESTIGATION OF STRATA IN WHICH PILE FOUNDATIONS ARE PROPOSED SHALL BE CARRIED OUT IN ADVANCE AND BY IN-SITU PILE TESTS. FOR DETAILS OF GEOTECHNICAL SUB-SURFACE EXPLORATIONS REFERENCE MAY BE MADE TO SECTION 2400. AT LEAST ONE BORE-HOLE FOR EVERY FOUNDATION OF THE BRIDGE SHALL BE EXECUTED. BORINGS SHOULD BE CARRIED OPTO SUFFICIENT DEPTHS SO AS TO ASCERTAIN THE NATURE OF STRATA AROUND THE PILE SHAFT AND BELOW THE PILE TIP. HOWEVER, DEPTH OF BORING SHALL NOT BE LESS THAN :..............................................................................................367

General

Section 100

202.2 THE SUB-SURFACE INVESTIGATION SHALL DEFINE ADEQUATELY STRATIFICATION OF SUB-STRATA INCLUDING THE NATURE AND TYPE OF STRATA, ITS VARIATION AND EXTENT AND SPECIFIC PROPERTIES OF THE SAME. THE INVESTIGATION SHALL BE ADEQUATE FOR THE PURPOSE OF SELECTION OF APPROPRIATE PILING SYSTEM AND FOR ESTIMATING DESIGN CAPACITIES FOR DIFFERENT DIAMETERS AND LENGTH OF PILES...........367 202.3 PRESSURE METER TESTS MAY BE USED IN THE CASE OF ROCK, GRAVEL OR SOIL FOR DIRECT EVALUATION OF STRENGTH AND COMPRESSIBILITY CHARACTERISTICS. THOUGH THESE TESTS ARE OF SPECIALISED NATURE THEY ARE MOST APPROPRIATE FOR DIFFICULT/UNCERTAIN SUB-STRM ESPECIALLY FOR IMPORTANT PROJECTS. ...................................................................................................................................................367 202.4 FOR PILES SOCKETED INTO ROCKS, IT IS NECESSARY TO DETERMINE THE UNIAXIAL COMPRESSIVE STRENGTH OF THE ROCK AND ITS QUALITY..........................................................................................367 203 TYPE OF PILES................................................................................................................368 204 MATERIALS.....................................................................................................................368 204.1 THE BASIC MATERIALS SHALL CONFORM TO THE SPECIFICATIONS FOR M*ZRIALS GIVEN IN SECTION 1000. THE SPECIFICATIONS FOR STEEL REINFORCEMENT , STRUCTURAL CONCRETE, PRESTRESSED CONCRETE AND STRUCTURAL STEEL TO BE USED IN PILE FOUNDATIONS SHALL BE AS GIVEN IN THE RELEVANT SECTIONS........368 204.2 CONCRETE IN PILES.............................................................................................................368 205 TEST PJFLLES.................................................................................................................368 205.1 TEST PILES WHICH ARE SHOWN ON THE DRAWINGS OR SPECIFIED IN THE CONTRACT OR INSTALLED BY THE CONTRACTOR ON HIS OWN TO DETERMINE THE TENGTHS OF PILES TO BE FURNISHED SHALL CONFORM TO THE REQUIREMENTS FOR PILING AS INICATED IN THESE SPECIFICATIONS, IF THEY ARE TO BE INCORPORATED IN THE COMPLETED STRUCTURE..................................................................................................................368 206 PRECAST\CONCRETE PILES.......................................................................................369 206.1 GENERAL...........................................................................................................................369 206.2 STACKING, STORING AND HANDLING......................................................................................369 206.3 LENGTHENING OF PILES........................................................................................................370 206.4 REMOVAL OF SURPLUS LENGTH.............................................................................................370 206.5 RISEN PILES.......................................................................................................................370 206.6 MANUFACTURE...................................................................................................................370 206.7 PRESTRESSED CONCRETE PILES.............................................................................................371 207 CAST-IN-SITU CONCRETE PILES...............................................................................371 208 STEEL PILES....................................................................................................................373 209 TIMBER PILES.................................................................................................................374 210 DRIVING EQUEPMENT.................................................................................................374 211 DRIVING ...........................................................................................................................375 211.1 GENERAL PROCEDURE..........................................................................................................375 211.2 PREBORING AND JETTING......................................................................................................377 212 RAKER (INCLINED) PILES...........................................................................................377

General

Section 100

213 PILE TESTS.......................................................................................................................378 213.1 GENERAL,..........................................................................................................................378 214 PELE CAP..........................................................................................................................378 215 IMPORTANT CONSIDERATIONS, INSPECTION PRECAUTIONS FOR DIFFERENT TYPES OF PILES.............................................................................................379 215.1 DRIVEN CAST-IN-SITU PILES................................................................................................379 215.2 BORED CAST-IN-SITU PILES.................................................................................................379 216 TOLERANCES..................................................................................................................380 216.1 PERMISSIBLE TOLERANCES FOR PILE.......................................................................................381 216.2 PERMISSIBLE TOLERANCES FOR PILE,CAPS..............................................................................381 217 TESTS AND STANDARDS OF ACCEPTANCE............................................................381 218 MEASUREMENTS FOR PAYMENT.............................................................................381 219 RATE..................................................................................................................................382 1201 DESCRIUPTION.............................................................................................................384 220 GENERAL..........................................................................................................................384 220.1 WELLS MAY HAVE A CIRCULAR, RECTANGULAR, OR D-SHAPE IN PLAN AND MAY CONSIST OF ONE, TWO OR MORE COMP%,VTMENTS IN PLAN. THE OUTER WALL OF THE WELL IS KNOWN AS WELL STEIN;.-IG, WHICH MAY BE CELLULAR.........................................................................................................................384 220.2 AT LEAST ONE BORE-HOLE MUST BE 6AILABLE/CARRIED OUT IN ACCORDANCE WITH THESE SPECIFICATIONS AT EACH WELL FOUNDATION LOCATION, PRIOR TO COMMENCEMENT OF WORK. THE DEPTH OF BORE-HOLES SHOULD EXTEND UPTO A DEPTH EQUAL TO ONE AND A HALF TIMES THE OUTER OIAMETER/LEAST DIMENSION OF THE WELL BELOW THE ANTICIPATED FOUNDING- LEVEL. THE RESULTSOF SOIL EXPLORATION SHOULD BE PRESENTED IN ACCORDANCE WITH CLAUSE 7.4 OF IRC:78. IN CASE THE WELL FOUNDATION IS TO REST ON A ROCKY STRATA, IT MAY BE NECESSARY TO UNDERTAKE ADDITIONAL BORINGS /PROBINGS PRIOR TO COMMENCEMENT OF WORK TO ASCERTAIN THE ACTUAL PROFILE AND THE QUALITY OF THE ROCKY STRATA, AT THE LEVEL AT WHICH. THE VELL HAS TO BE SEATID, ETC......................................................................384 220.3 BLASTING MAY HAVE TO BE RESORTED TO IN ORDER TO FACILITATE SINKING THROUGH DIFFICULT STRATA, SUCH AS BOULDERS AND ROCKS ETC. IN*, CASE BLASTING IT ANTICIPATED, PROTECTIVE/STRENGTHENING MEASURES SPECIFIED. IN CLAUSE 710.6 (IV) OF IRC:78, SHALL BE TAKEN. THE GRADE OF.CONCRETE IN BOTTOM 3 METRES OF STEINING SHALL NOT BE LEANER THAN M 20 OR AS SHOWN ON THE DRAWINGS..............................................................................................................................384 220.4 IN CASE THE BORE HOLE DATA SHOWS THE PRESENCE OF. STEEPLY DIPPING ROCK, CHISELLING MAY HAVE TO BE RESORTED TO SO AS TO OBTAIN PROPER SEATING OF THE FOUNDATION. FOR THIS PURPOSE, THE WELL MAY REQUIRE TO BE, DEWATERED COMPLETELY UNDER HIGH AIR PRESSURE INSIDE THE WELL. THIS PROCESS IS. KNOWN AS PNEUMATIC SINKING. PNEUMATIC SINKING MAY ALSO HA ' VE TO BE RESORTED TO IN CASES WHERE OBSTACLES SUCH AS TREE TRUNKS, LARGE SIZED BOULDERS OR HARD STRATA ETC. CANNOT BE REMOVED BY OPEN DREDGING. THE NECESSITY OF ADOPTIPG PNEUMATIC SINKING SHALL BE DECIDED BY THE ENGINED......................................................................................................................................385

General

Section 100

221 SETTING OUT AND PREPARATIONS FOR SINKING.............................................385 221.1 NECESSARY REFERENCE POINTS SHALL BE FIXED, AWAY FROM THE ZONE OF BLOW-UPS OR POSSIBLE SETTLEMENTS RESULTING FROM WELL SINKING OPERATIONS. SUCH REFERENCE POINTS SHALL BE CONNECTED TO THE PERMANENT THEODOLITE STATIONS WITH THE BASE LINE ON THE. BANKS. THE CENTRE OF THE INDIVIDUAL WELLS SHALL BE MARKED WITH REFERENCE TO THESE STATIONS. THE DISTANCE, WHEREVER PRACTICABLE, SHALL BE CHECKED-,WITH THE HELP,OF ACCURATE TAPES AND PRECISION DISTOMAT.................................385 221.2 FOR WELLS'WHICH ARE'TO BE PITCHED IN WATER, AN EARTHEN OR' SAND ISLAND SHALL BE CONSTRUCTED. SAND ISLANDS ARE PRACTICABLE FOR WATER DEPTHS OF ABOUT 5 METRES UNDER STABLE BED SOIL CONDITIONS. FOR GREATER' DEPTHS OR IN FAST FLOWING RIVERS OR FOR LOCATIONS WHERE SOIL IS TOO WEAK TO SUSTAIN SAND ISLAND, FLOATING CAISSONS MAY HAVE TO BE ADOPTED.....................................385 221.3 EQUIPMENT.........................................................................................................................386 222 CUTTING EDGE...............................................................................................................386 222.1 THE MILD STEEL CUTTING EDGE SHALL BE MADE FROM STRUCTURAL STEEL SECTIONS. THE CUTTING EDGE SHALL WEIGH NOT LESS THAN 40 KG PER METRE LENGTH AND BE PROPERLY ANCHORED INTO THE WELL CURB, AS SHOWN IN THE DRAWING. ..................................................................................................386 222.2 THE PARTS OF CUTTING EDGE SHALL BE ERECTED ON LEVEL FIRM GROUND. TEMPORARY SUPPORTS SHALL BE PROVIDED TO FACILITATE ERECTION AND MAINTAINING THE ASSEMBLY IN TRUE SHAPE. THE FABRICATION MAY BE -CARRIED OUT IN THE SHOP OR AT SITE. STEEL SECTIONS SHALL NOT BE HEATED AND FORCED INTO SHAPE. HOWEVER, "V" CUTS MAY BE MADE IN THE HORIZONTAL PORTION, UNIFORMLY THROUGHOUT THE LENGTH, TO FACILITATE COLD BENDING. AFTER BENDING, SUCH "V" CUTS SHOULD BE CLOSED BY WELDING. JOINTS IN THE LENGTHS OF STRUCTURAL SECTIONS, UNLESS OTHERWISE SPECIFIED SHALL BE FILLET WELDED USING SINGLE COVER PLATE TO ENSURE THE.REQUISITE STRENGTH OF THE ORIGINAL SECTION. ...................................................................................................................................................386 222.3 THE CUTTING EDGE SHALL BE LAID ABOUT 300 MM ABOVE .PREVALENT WATER LEVEL...................386 223 WELL CURB.....................................................................................................................387 223.1 THE WELL CURB MAY BE PRECAST OR CAST- IN-SITU. STEEL FORMWORK FOR WELL CURB SHALL BE FABRICATED STRICTLY IN CONFORMITY WITH THE DRAWING. THE OUTER FACE OF THE CURB SHALL BE VERTICAL. STEEL REINFORCEMENTS SHALL BE ASSEMBLED AS SHOWN ON THE DRAWINGS. THE BOTTOM ENDS OF
VERTICAL BOND RODS OF STEINING SHALL BE FIXED SECURELY TO THE CUTTING EDGE WITH CHECK NUTS OR BY WELDS..........................................................................................................................................387

223.2 ALL CONCRETING IN THE WELL CURB SHALL BE DONE IN ONE CONTINUOUS OPERATION....................387 224 WELL STEINING.............................................................................................................387 224.1 THE DIMENSIONS, SHAPE, CONCRETE STRENGTH AND REINFORCEMENTS OF THE WELL SHALL STRICTLY CONFORM TO THOSE SHOWN ON THE DRAWINGS. THE FORMWORK SHALL PREFERABLY BE OF M.S. SHEETS SHAPED AND STIFFENED SUITABLY. IN CASE TIMBER FORMS ARE USED, THEY SHALL BE LINED WITH PLYWOOD OR M.S. SHEETS................................................................................................................................387 224.2 STEINING BUILT IN THE FIRST LIFT ABOVE THE WELL CURB SHALL NOT BE MORE THAN 2 METRES AND IN
SUBSEQUENT LIFTS IT SHALL NOT EXCEED THE DIAMETER OF THE WELL OR THE DEPTH OF WELL SUNK BELOW THE ADJOINING BED LEVEL AT ANY TIME.

AFTER SINKING THE CURB AT' LEAST PARTIALLY FOR STABILITY.

FOR STABILITY, THE FIRST LIFT OF STEINING SHALL BE CAST ONLY CONCRETING OF STEINING MAY BE CARRIED

General

Section 100

2 TO 2.5 METRES. ATTEMPTS SHOULD BE MADE TO MINIMISE THE NUMBER OF CONSTRUCTION JOINTS. THE CONCRETING LAYERS SHALL BE LIMITED TO ABOUT 450 -MM RESTRICTING THE FREE FALL OF CONCRETE TO NOT MORE THAN 1.5 M. LAITANCE FORMED AT THE TOP SURFACE
OUT IN SUBSEQU ENT LIFTS OF ABOUT OF A LIFT SHALL BE REMOVED TO EXPOSE COARSE AGGREGATES BEFORE SETTING OF CONCRETE AT THE PROPOSED CONSTRUCTION JOINT.

AS FAR AS POSSIBLE, CONSTRUCTION JOINTS SHALL NOT BE KEPT AT THE LOCATION OF LAPS IN THE VERTICAL STEINING BARS............................................................................387 224.3 THE STEINING OF THE WELL SHALL BE BUILT IN ONE STRAIGHT LINE FROM BOTTOM TO TOP SUCH THAT IF THE WELL IS TILTED, THE NEXT LIFT OF STEINING WILL BE ALIGNED IN THE DIRECTION OF THE TILT. THE WORK WILL BE CHECKED CAREFULLY WITH THE AID OF STRAIGHT EDGES OF LENGTHS APPROVED BY THE ENGINEER. PLUMB BOB OR SPIRIT LEVEL SHALL NOT BE USED FOR ALIGNMENT. AFTER SINKING OF A STAGE IS COMPLETE, DAMAGED PORTIONS IF ANY, OF STEINING AT TOP OF THE PREVIOUS STAGE SHALL BE PROPERLY REPAIRED BEFORE CONSTRUCTING THE NEXT STAGE...........................................................................................387 224.4 THE HEIGHT OF STEINING SHALL BE CALIBRATED BY MAKING AT LEAST 4 GAUGES (PREFERABLY IN TRAFFIC DIRECTION AND IN A DIRECTION NORMAL TO TRAFFIC DIRECTION) DISTRIBUTED EQUALLY ON THE OUTER PERIPHERY OF THE WELL EACH IN THE FORM OF A 100 MM WIDE STRIP PAINTED ON THE WELL, WITH EVERY METRE MARK SHOWN IN ' BLACK PAINT. THE,.GAUGES SHALL START WITH ZERO AT THE BOTTOM OF THE CUTTING EDGE. MARKING OF THE GAUGES SHALL BE DONE CAREFULLY WITH A STEEL TAPE.......................387 224.5 AFTER REACHING THE FOUNDING LEVEL, THE WELL STEINING SHALL BE INSPECTED TO CHECK FOR ANY DAMAGE OR CRACKS. THE ENGINEER WILL DIRECT AND THE CONTRACTOR SHALL EXECUTE THE REMEDIAL MEASURES BEFORE ACCEPTANCE OF THE WELL STEINING. IN CAM THE WELL CANNOT BE ACCEPTED EVEN WITH ANY REMEDIAL MEASURES, THEN THE WELL SHALL STAND REJECTED.......................................................388 225 WELL SINKING...............................................................................................................388 225.1 GENERAL...........................................................................................................................388 225.2 USE OF KENTLEDGE AS SINKING LOAD...................................................................................388 225.3 USE OF WATER JETTING.......................................................................................................388 225.4 USE OF EXPLOSIVES.............................................................................................................388 225.5 USE OF DIVERS...................................................................................................................389 225.6 USE OF PNEUMATIC SINKING................................................................................................389 225.7 PRECAUTIONS DURING SINKING.............................................................................................393 225.8 TILTS AND SHIFTS...............................................................................................................393 225.9 SEATING OF WELLS.............................................................................................................394 226 BOTTOM PLUG...............................................................................................................395 227 SAND FILLING.................................................................................................................395 228 TOP PLUG.........................................................................................................................396 229 WELL CAP.......................................................................................................................396 230 TOLERANCES..................................................................................................................396 231 TESTS AND STANDARDS OF ACCEPTANCE............................................................396 232 MEASUREMENTS FOR PAYMENT.............................................................................396

General

Section 100

233 RATE..................................................................................................................................397 1301 BRICK MASONRY .......................................................................................................400 234 MATERIALS.....................................................................................................................400 235 PERSONNEL.....................................................................................................................400 236 CEMENT MORTAR.........................................................................................................400 237 SOAKING, OF BRICKS...................................................................................................400 238 JOINTS...............................................................................................................................401 239 LAYING.............................................................................................................................401 240 JOINTING OLD AND NEW WORK..............................................................................401 241 CURING.............................................................................................................................402 242 SCAFFOLDING................................................................................................................402 243 EQUIPMENT.....................................................................................................................402 244 FINISHING OF SURFACES............................................................................................402 244.1 GENERAL...........................................................................................................................402 244.2 JOINTING............................................................................................................................403 244.3 POINTING...........................................................................................................................403 244.4 PLASTERING........................................................................................................................403 244.5 CURING OF FINISHES............................................................................................................404 244.6 SCAFFOLDING FOR FINISHES..................................................................................................404 245 ARCHITECTURAL COPING FOR WING/RETURN/PARAPET WALL..................404 246 ACCEPTANCE OF WORK.............................................................................................404 247 MEASUREMENT:S FOR PAYMENT............................................................................404 248 RATE..................................................................................................................................404 1401 DESCRIPTION................................................................................................................407 249 MATERIALS.....................................................................................................................407 250 PERSONNEL.....................................................................................................................407 251 TYPE OF MASONRY.......................................................................................................407 252 CONSTRUCTION OPERATIONS..................................................................................407 252.1 GENERAL REQUIREMENTS.....................................................................................................407 252.2 LAYING..............................................................................................................................407 252.3 RANDOM MASONRY (UNCOURSED AND COURSED)...................................................................409 252.4 SQUARE RUBBLE - COURSED RUBBLE (FIRST SORT)................................................................410 252.5 ASHLAR MASONRY (PLAIN ASHLAR).....................................................................................411

General

Section 100

252.6 POINTING...........................................................................................................................411 252.7 SCAFFOLDING......................................................................................................................412 252.8 WEEP HOLES......................................................................................................................412 252.9 JOINTING WITH EXISTING STRUCTURES....................................................................................412 253 ARCHITECTURAL COPING FOR WING/RETURN/ PARAPET WALLS..............412 254 TESTS AND STANDARD OF ACCEPTANCE..............................................................412 255 MEASUREMENTS FOR PAYMENT.............................................................................412 256 RATE..................................................................................................................................412 1501 DESCRIPTION................................................................................................................415 257 MATERIALS.....................................................................................................................415 258 DESIGN OF FORMWORK..............................................................................................415 258.1 THE CONTRACTOR SHALL FURNISH THE DESIGN AND DRAWING OF COMPLETE FORMWORK (I.E. THE FORMS AS WELL AS THEIR SUPPORTS) FOR APPROVAL OF THE ENGINEER BEFORE ANY ERECTION IS TAKEN UP. IF PROPRIETARY SYSTEM OF FORMWORK IS USED, THE CONTRACTOR SHALL FURNISH DETAILED INFORMATION AS PER APPENDIX 150011 TO THE ENGINEER FOR APPROVAL...................................................................415 258.2 THE DESIGN OF THE FORMWORK SHALL CONFORM TO PROVISIONS OF IRC:87. IT SHALL ENSURE THAT THE FORMS CAN BE CONVENIENTLY/ REMOVED WITHOUT DISTURBING THE CONCRETE. THE DESIGN SHALL FACILITATE PROPER AND SAFE ACCESS TO ALL PARTS OF FORMWORK FOR INSPECTION................................415 258.3 IN THE CASE OF PRESTRESSED CONCRETE SUPERSTRUCTURE, CAREFUL CONSIDERATION SHALL BE GIVEN TO REDISTRIBUTION OF LOADS ON PROPS DUE TO PRESTRESSING.............................................................415 259 WORKMANSHEP.............................................................................................................415 259.1 THE FORMWORK SHALL BE ROBUST AND STRONG AND THE JOINTS SHALL BE LEAK-PROOF................415 259.2 THE NUMBER OF JOINTS IN THE FORMWORK SHALL BE KEPT TO A MINIMUM BY - USING LARGE SIZE PANELS. THE DESIGN SHALL PROVIDE FOR PROPER "SOLDIERS" TO FACILITATE ALIGNMENT. ALL JOINTS SHALL BE LEAK PROOF AND MUST BE PROPERLY SEALED. USE OF PVC JOINT SEALING TAPES, FOAM RUBBER OR PVC T-SECTION IS ESSENTIAL TO PREVENT LEAKAGE OF GROUT. -........................................................415 259.3 AS FAR AS PRACTICABLE, CLAMPS SHALL BE USED TO HOLD THE FORMS TOGETHER. WHERE USE OF
NAILS IS UNAVOIDABLE MINIMUM NUMBER OF NAILS SHALL BE USED AND THESE SHALL BE LEFT PROJECTING SO THAT THEY CAN BE WITHDRAWN EASILY.

USE OF DOUBLE HEADED NAILS SHALL BE PREFERRED..................416 259.4 USE OF TIES SHALL BE RESTRICTED, AS FAR AS PRACTICABLE. WHEREVER TIES ARE USED THEY SHALL BE USED WITH HDPE SHEATHING SO THAT THE TIES CAN EASILY BE REMOVED. NO PARTS PRONE TO CORROSION SHALL BE LEFT PROJECTING OR NEAR THE SURFACE. THE SHEATHING SHALL BE GROUTED WITH CEMENT MORTAR OF THE SAME STRENGTH AS THAT OF THE STRUCTURE...................................................416 259.5 UNLESS OTHERWISE SPECIFIED, OR DIRECTED, CHANIFERS OR FILLETS OF SIZES 25 MM X 25 MM SHALL BE PROVIDED AT ALL ANGLES OF THE FORMWORK TO AVOID SHARP COMERS. THE CHARRIFERS, BEVELLED EDGES AND MOULDINGS SHALL BE MADE IN THE FORMWORK ITSELF. OPENING FOR FIXTURES AND OTHER FITTINGS SHALL BE PROVIDED IN THE SHUTTERING AS DIRECTED BY THE ENGINEER................................................416

General

Section 100

259.6 SHUTTERING FOR WALLS, SLOPING MEMBERS AND THIN SECTIONS OF CONSIDERABLE HEIGHT SHALL BE
PROVIDED WITH TEMPORARY OPENINGS TO PERMIT INSPECTION AND CLEANING OUT BEFORE PLACING OF CONCREM......................................................................................................................................416

259.7 THE F6RMWORK SHALL BE CONSTRUCTED WITH PRECAMBER TO THE SOFFIT TO ALLOW FOR DEFLECTION OF THE FORMWORK. PRE-CAMBER TO ALLOW FOR DEFLECTION OF FORMWORK SHALL BE IN ADDITION TO THAT INDICATED FOR THE PERMANENT STRUCTURE IN THE DRAWINGS.............................................................416 259.8 WHERE CENTERING TRUSSES OR LAUNCHING TRUSSES ARE ADOPTED FOR CASTING OF SUPERSTRUCTURE, THE JOINTS OF THE CENTERING TRUSSES, WHETHER WELDED, RIVETED OR BOLTED SHOULD BE THOROUGHLY CHECKED PERIODICALLY. ALSO, VARIOUS MEMBERS OF THE CENTERING TRUSSSS SHOULD BE PERIODICALLY
EXAMINED FOR PROPER ALIGNMENT AND UNINTENDED DEFORMATION BEFORE PROCEEDING WITH THE CONCRETING.

THEY SHALL ALSO BE PERIODICALLY CHECKED FOR ANY DETERIORATION IN QUALITY DUE TO STEEL CORROSION..........................................................................................................................416 259.9 THE FORMWORK SHALL BE SO MADE AS TO PRODUCE A FINISHED CONCRETE TRUE TO SHAPE, LINE AND LEVELS AND DIMENSIONS AS SHOWN ON THE DRAWINGS, SUBJECT TO THE TOLERANCES. SPECIFIED INRESPECTIVE SECTIONS OF THESE SPECIFICATIONS, OR AS DIRECTED BY THE ENGINEER................................416 259.10 WHERE METAL FORMS ARE USED, ALL BOLTS AND RIVETS SHALL BE COUNTERSUNK AND WELL GROUND TO PROVIDE A SMOOTH, PLANE SURFACE. WHEM, TIMBER IS USED IT SHALL BE WELL SEASONED, FREE FROM LOOSE KNOTS, PROJECTING NAILS, SPLITS OR OTHER DEFECTS THAT MAY MAR THE SURFACE OF CONCRETE....416 259.11 FORMS SHALL BE, MADE SUFFICIENTLY RIGID BY THE USE OF TIES AND BRACINGS TO PREVENT ANY DISPLACEMENT OR SAGGING BETWEEN SUPPORTS. THEY SHALL BE STRONG ENOUGH TO WITHSTAND ALL PRESSURE, RAMMING AND VIBRATION DURING AND AFTER PLACING THE CONCRETE. SCREW JACKS OR HARD
WOOD WEDGES WHERE REQUIRED SHALL BE PROVIDED TO MAKE UP ANY SETTLEMENT IN THE FORMWORK EITHER BEFORE OR DURING THE PLACING OF CONCRETE...................................................................................416

259.12 THE FORMWORK SHALL TAKE DUE ACCOUNT OF THE CALCULATED AMOUNT OF POSITIVE OR NEGATIVE CAMBER SO AS TO ENSURE THE CORRECT FINAL SHAPE OF THE STRUCTURES, HAVING REGARD TO THE DEFORMATION OF FALSE WORK, SCAFFOLDING OR PROPPING AND THE INSTANTANEOUS OR DEFERRED DEFORMATION DUE TO VARIOUS CAUSES AFFECTING PRESTRESSED STRUCTURES.........................................417 259.13 SUITABLE CAMBER SHALL BE PROVIDED TO HORIZONTAL MEMBERS OF STRUCTURE, SPECIALLY IN LONG SPANS TO COUNTERACT THE EFFECTS OF DEFLECTION. THE FORMWORK SHALL BE SO FIXED AS TO PROVIDE FOR SUCH CAMBER...............................................................................................................................417 259.14 THE FORMWORK SHALL BE COATED WITH AN. APPROVED RELEASE AGENT THAT WILL EFFECTIVELY PREVENT STICKING AND WILL NOT STAIN THE CONCRETE SURFACE. LUBRICATING (MACHINE OILS) SHALL BE PROHIBITED FOR USE AS COATING......................................................................................................417 260 FORMED SURFACE AND FE41SH...............................................................................417 261 PRECAUTIONS................................................................................................................417 262 PREPARATION OF FORMWORK BEFORE CONCRETING...................................417 263 REMOVAL OF FORMWORK........................................................................................418 264 RE-USE OF FORMWORK..............................................................................................419 265 SPECIALISM FORMWORK...........................................................................................419 266 TESTS AND STANDARDS OF ACCEPTANCE............................................................419

General

Section 100

267 MEASUREMENTS FOR PAYMENT.............................................................................420 268 RATE..................................................................................................................................420 1601 DESCRIPTION................................................................................................................422 269 GENERAL..........................................................................................................................422 270 PROTECTION OF REINFORCEMENT........................................................................422 271 BENDING OF REINFORCEMENT................................................................................422 272 PLACING OF REINFORCEMENT................................................................................423 273 BAR SPLICES...................................................................................................................423 273.1 LAPPING.............................................................................................................................423 273.2 WELDING...........................................................................................................................424 273.3 MECHANICAL COUPLING OF BARS.........................................................................................425 274 TESTING AND ACCEPTANCE......................................................................................425 275 MEASUREMENTS FOR PAYMENT.............................................................................425 276 RATE..................................................................................................................................425 1701 DESCRIPTION................................................................................................................428 277 MATERIALS.....................................................................................................................428 278 GRADES OF CONCRETE...............................................................................................428 278.1 THE GRADES- OF CONCRETE SHALL BE DESIGNATED BY THE CHARACTERISTIC STRENGTH AS GIVEN IN TABLE 1700-1, WHERE THE CHARACTERISTIC STRENGTH IS DEFINED'AS THE STRENGTH OF CONCRETE BELOW WHICH NOT MORE THAN 5 PER CENT OF THE TEST RESULTS ARE EXPECTED TO FALL..................................428 278.2 THE LOWEST GRADES OF CONCRETE IN BRIDGES AND CORRESPONDING MINIMUM CEMENT CONTENTS AND WATER-CEMENT RATIOS SHALL BE MAINTAINED AS INDICATED IN TABLES 17M2 AND 17M3....................428 278.3 CONCRETE USED IN ANY COMPONENT OR STRUCTURE SHALL BE SPECIFIED BY DESIGNATION ALONG WITH PRESCRIBED METHOD OF DESIGN OF MIX, I.E. "DESIGN MIX" I OR "NOMINAL MIX". FOR ALL ITEMS OF CONCRETE, ONLY 'BESIGN MIX" SHALL BE USED, EXCEPT WHERE "NOMINAL MIX" CONCRETE IS PERMITTED AS PER DRAWING OR BY THE ENGINEEIR."NOMINAL MIX" MAY BE- PERMITTED ONLY FOR MINOR BRIDGES AND CULVERTS OR OTHER INCIDENTAL CONSTRUCTION WHERE STRENGTH REQUIREMENTS ARE UPTO M 20 ONLY. "NOMINAL MIX" MAY ALSO BE PERMITTED FOR NON-STRUCTURAL CONCRETE OR FOR SCREED BELOW OPEN FOUNDATIONS................................................................................................................................430 278.4 IF THE CONTRACTOR SO ELECTS, THE ENGINEER MAY PERMIT THE USE OF HIGHER GRADE CONCRETE THAN THAT SPECIFIED ON THE DRAWING, IN WHICH EVENT THE HIGHER GRADE CONCRETE SHALL MEET THE SPECIFICATIONS APPLICABLE THERETO WITHOUT ADDITIONAL COMPENSATION...........................................430 279 PROPORTIONING OF CONCRETE.............................................................................430 279.1 REQUIREMENTS OF CONSISTENCY...........................................................................................430 279.2 REQUIREMENTS FOR DESIGNED MIXES....................................................................................431 279.3 REQUIREMENTS OF NOMINAL MIX CONCRETE.........................................................................432

General

Section 100

279.4 ADDITIONAL REQUIREMENTS.................................................................................................433 279.5 SUITABILITY OF PROPOSED MIX PROPORTIONS.........................................................................433 280 ADMIXTURES..................................................................................................................433 281 SIZE OF COARSE AGGREGATE..................................................................................434 282 EQUIPMENT.....................................................................................................................434 283 MIXING CONCRETE......................................................................................................435 284 TRANSPORTING, PLACING AND COMPACTION OF CONCRETE.....................436 285 CONSTRUCTION JOINTS..............................................................................................437 286 CONCRETING UNDER WATER...................................................................................437 287 ADVERSE WEATHER CONDMONS............................................................................438 287.1 COLD WEATHER CONCRETING..............................................................................................438 287.2 HOT WEATHER CONDITIONS.................................................................................................438 288 PROTECTION AND CURING........................................................................................439 288.1 WATER CURING..................................................................................................................439 288.2 STEAM CURING...................................................................................................................439 288.3 CURING COMPOUNDS...........................................................................................................440 289 FINISHING........................................................................................................................440 290 TOLERANCES..................................................................................................................441 291 TESTS AND STANDARDS OF ACCEPTANCE............................................................441 291.1 CONCRETE SHALL CONFORM TO THE SURFACE FINISH AND TOLERANCE AS PRESCRIBED IN THESE SPECIFICATIONS FOR RESPECTIVE COMPONENL.....................................................................................441 291.2 RANDOM SAMPLING AND LOT BY LOT OF ACCEPTANCE INSPECTION SHALL BE MADE FOR THE 28 DAYS CUBE STRENGTH OF CONCRETE..........................................................................................................441 291.3 DENSITY OF FRESH CONCRETE..............................................................................................442 291.4 DENSITY OF HARDENED CONCRETE........................................................................................442 291.5 PERMEABILITY TEST............................................................................................................442 291.6 IF THE CONCRETE IS NOT ABLE TO MEET ANY OF THE STANDARDS OF ACCEPTANCE AS PRESCRIBED, THE EFFECT OF SUCH DEFICIENCY ON THE STRUCTURE SHALL BE INVESTIGATED BY THE CONTRACTOR AS DIRECTED BY THE ENGINEER. THE ENGINEER MAY ACCEPT THE CONCRETE AS SUB-STANDARD WORK. ANY ADDITIONAL WORK REQUIRED BY THE ENGINEER FOR SUCH ACCEPTANCE SHALL BE CARRIED OUT BY THE CONTRACTOR AT HIS COST. IN CASE THE CONCRETE IS NOT FOUND TO BE ACCEPTABLE AFTER INVESTIGATION, THE CONTRACTOR SHALL REMOVE THE REJECTED CONCRETE FORTHWITH...........................................................................442 292 MEASUREMENTS FOR PAYMENT.............................................................................443 293 RATE..................................................................................................................................443 1801 DESCRIPTION................................................................................................................445

General

Section 100

294 MATERIALS.....................................................................................................................445 294.1 ALL MATERIALS SHALL CONFORM TO SECTION 1000................................................................445 294.2 SHEATHING.........................................................................................................................445 294.3 ANCHORAGES......................................................................................................................446 295 TESTING OF PRESTRESSING STEEL AND ANCHORAGES..................................446 296 WORKMANSHIP..............................................................................................................447 296.1 CLEANING..........................................................................................................................447 296.2 STRAIGHTENING...................................................................................................................447 296.3 POSITIONING.......................................................................................................................447 296.4 CUTTING............................................................................................................................448 296.5 PROTECTION OF PRESTRESSING STEEL.....................................................................................448 296.6 SHEATHING.........................................................................................................................448 296.7 GROUT VENTS....................................................................................................................449 296.8 ANCHORAGES......................................................................................................................449 296.9 STRUCTURAL CONCRETE.......................................................................................................449 297 SUPERVISION..................................................................................................................449 298 ISM. TENSIONING EQUIPMENT.................................................................................450 299 POST-TENSIONING........................................................................................................450 300 GROUTING OF PRESTRESSED TENDONS................................................................451 301 PRE-TENSIONING...........................................................................................................451 301.1 GENERAL...........................................................................................................................451 301.2 STRESSING BED FOR PRE-TENSIONING.....................................................................................451 301.3 TENSIONING PROCEDURE......................................................................................................452 301.4 TRANSFER OF PRESTRESS......................................................................................................453 301.5 PROTECTION OF ENDS..........................................................................................................453 302 SAFETY PRECAUTIONS DURING TENSIONING.....................................................454 303 TRANSPORTATION AND STORAGE OF UNITS.......................................................454 304 TOLERANCES..................................................................................................................454 305 TESTS AND STANDARDS OF ACCEPTANCE............................................................455 306 MEASUREMENTS. FOR PAYMENT............................................................................455 307 RATE..................................................................................................................................455 1901 DESCRIPTION................................................................................................................458 308 GENERAL..........................................................................................................................458 309 MATERIALS.....................................................................................................................458 309.1 ALL MATERIALS SHALL CONFORM TO SECTION 1000. SPECIAL REQUIREMENTS ARE GIVEN BELOW :..458

General

Section 100

309.2 MATERIALS FOR CASTINGS AND FORGINGS, FASTENERS AND WELDING CONSURNABLES SHALL BE AS UNDER..........................................................................................................................................459 309.3 IN AGGRESSIVE ENVIRONMENT, CORROSION RESISTANT STEEL CAN BE USED. THESE ARE LOW-ALLOYED STEELS CONTAINING A TOTAL OF 1 PER CENT - 2 PER CENT ALLOYS, IN PARTICULAR, COPPER, CHROMIUM, NICKEL AND PHOSPHOROUS..............................................................................................................459 309.4 PAINTS...............................................................................................................................460 310 FABRICATION.................................................................................................................460 310.1 GENERAL...........................................................................................................................460 310.2 PREPARATION OF EDGES AND ENDS........................................................................................461 310.3 PREPARATION OR HOLES.......................................................................................................462 310.4 RIVET AND RIVETING...........................................................................................................464 310.5 BOLTS, NUTS AND WASHERS................................................................................................465 310.6 PINS AND PIN HOLES...........................................................................................................466 310.7 SHOP ERECTION AND MATCH MARKING.................................................................................467 310.8 WELDING...........................................................................................................................467 310.9 TOLERANCES.......................................................................................................................469 311 ERECTION........................................................................................................................471 311.1 GENERAL...........................................................................................................................471 311.2 ORGANISATION AND EQUIPMENT............................................................................................471 311.3 HANDLING AND STORING OF MATERIALS................................................................................473 311.4 FORMWORK........................................................................................................................473 311.5 STRAIGHTENING BENT MATERIAL..........................................................................................473 311.6 ASSEMBLING STEEL.............................................................................................................474 311.7 FIELD INSPECTION................................................................................................................474 312 PAINTING.........................................................................................................................478 312.1 GENERAL...........................................................................................................................478 312.2 SURFACE PREPARATION........................................................................................................480 312.3 COATINGS..........................................................................................................................480 312.4 PAINTING IN THE SHOP.........................................................................................................482 312.5 PAINTING AT SITE................................................................................................................482 312.6 METHODS OF APPLICATION...................................................................................................482 312.7 GUIDELINE OF SPECIFICATIONS FOR PROTECTIVE COATING SYSTEM IN DIFFERENT ENVIRONMENTS..483 313 TESTS AND STANDARDS OF ACCEPTANCE............................................................484 314 MEASUREMENTS FOR PAYMENT.............................................................................484 315 RATE..................................................................................................................................485 2001 DESCRIPTION................................................................................................................487 316 GENERAL..........................................................................................................................487 317 STEEL BEARINGS...........................................................................................................487

General

Section 100

317.1 MATERIALS -......................................................................................................................487 317.2 CONSTRUCTION OPERATIONS.................................................................................................487 317.3 WORKMANSHIP...................................................................................................................488 317.4 TOLERANCES.......................................................................................................................488 317.5 INSTALLATION OF STEEL BEARINGS........................................................................................489 318 SPECIAL BEARINGS.......................................................................................................490 318.1 SPHERICAL BEARING............................................................................................................490 318.2 PIN BEARING......................................................................................................................491 318.3 IN GENERAL THE SLIDING SPHERICAL AND PIN BEARING SHALL CONFORM TO BS:5400, PARTS 9.1 AND 9.2 AND ALL RELEVANT CLAUSES OF THIS SPECIFICATION. BEARINGS SHALL BE GUARANTEED FOR DESIGN LOADS AND MOVEMENTS. THE TERM BEARING, SHALL INCLUDE THE ENTIRE ASSEMBLY COVERING ALL THE ACCESSORIES REQUIRED FOR OPERATION, ERECTION AND DISMANTLING FOR REPLACEMENT. ALL BEARINGS SHALL BE OF REPLACEABLE ' TYPE. THESE BEARINGS SHOULD BE BASED ON THEIR DESIGN TO THE SPECIFICATIONS MENTIONED/INTERNATIONAL SPECIFICATIONS. THE MANUFACTURER SHOULD GET THEIR DESIGN APPROVED FROM APPROPRIATE AUTHORITY AND THE MANUFACTURER SHOULD BE ASSOCIATED WITH INSTALLATION OF BEARINGS. ...................................................................................................................................................491 318.4 MATERIALS........................................................................................................................492 318.5 SEATING OF PIN BEARING.....................................................................................................492 318.6 ACCEPTANCE TEST ON SPHERICAL BEARINGS..........................................................................492 318.7 2004.7. ACCEPTANCE TEST ON PIN BEARINGS.......................................................................492 319 ELASTOMERIC BEARINGS..........................................................................................492 319.1 RAW MATERIAL..................................................................................................................493 319.2 FABRICATION......................................................................................................................494 319.3 ACCEPTANCE SPECIFICATIONS................................................................................................496 319.4 CERIFICATION AND MARKING................................................................................................501 319.5 STORAGE AND DANDLING......................................................................................................501 319.6 INSTALLATION.....................................................................................................................501 319.7 SEATING OF ELASTOMERIC BEARINGS ON A NON-HORIZONTAL PLANE INSTALLATION OF ELASTOMERI6 BEARINGS ON A NON-HORIZONTAL PLANE SHALL BE AS FOLLOWS.........................................................502 320 POT BEARINGS...............................................................................................................503 320.1 GENERAL...........................................................................................................................503 320.2 FABRICATION......................................................................................................................504 320.3 MATERIALS........................................................................................................................504 320.4 WORKMANSHIP...................................................................................................................505 320.5 TEST.................................................................................................................................506 320.6 INSTALLATION OF POT-CUM-PTFE BEARINGS.......................................................................506 321 INSPECTION AND TESTING.........................................................................................507 322 TESTS AND STANDARDS OF ACCEPTANCE............................................................508 323 MEASUREMENTS FOR PAYMENT.............................................................................508

General

Section 100

324 RATE..................................................................................................................................508 2101 DESCRIPTION................................................................................................................510 325 MATERIALS.....................................................................................................................510 326 GENERAL..........................................................................................................................510 327 WORKMANSHIP..............................................................................................................510 327.1 PREPARATION OF FOUNDATIONS.............................................................................................510 327.2 SETTING OUT.....................................................................................................................510 327.3 CONSTRUCTION...................................................................................................................511 328 TESTS AND STANDARDS OF ACCEPTANCE............................................................512 329 TOLERANCES..................................................................................................................512 330 MEASUREMENT FOR PAYMENT...............................................................................512 331 RATE..................................................................................................................................512 2201 DESCRIPTION................................................................................................................514 332 MATERIALS.....................................................................................................................514 333 GENERAL..........................................................................................................................514 334 PEERS AND ABUTMENTS.............................................................................................514 335 PIER CAP AND ABUTMENT CAP................................................................................515 336 DIRT/ BALLAST WALL, RETURN WALL AND WING WALL...............................515 337 TESTS AND STANDARDS OF ACCEPTANCE............................................................516 338 TOLERANCES IN CONCRETE ELEMENTS...............................................................516 339 MEASUREMENTS FOR PAYMENT.............................................................................516 340 RATE..................................................................................................................................516 2301 DESCRIPTION................................................................................................................518 341 MATERIALS.....................................................................................................................518 342 GENERAL..........................................................................................................................518 342.1 A METHOD STATEMENT FOR CONSTRUCTION, INDICATING THE FOLLOWING, SHALL BE SUBMITTED BY THE CONTRACTOR FOR APPROVAL OF THE ENGINEER, WELL IN ADVANCE OF THE COMMENCEMENT OF THE CONSTRUCTION OF SUPERSTRUCLURE.................................................................................................518 342.2 DIMENSIONS, LINES AND LEVELS SHALL BE SET OUT AND CHECKED WITH RESPECT TO PERMANENT REFERENCE LINES AND PERMANENT BENCH MARK. SO THAT THE FINAL PRODUCT IS IN ACCORDANCE WITH THE DRAWINGS OR AS DIRECTED BY THE ENGINEER....................................................................................518 342.3 THE WORK SHALL CONFORM TO THE FOLLOWING SECTIONS BESIDES STIPULATIONS IN THIS SECTION WITH REGARD TO SPECIFIC TYPE OF CONSTRUCTION:.....................................................................................518

General

Section 100

343 REINFORCED CONCRETE CONSTRUCTION..........................................................518 343.1 SOLID SLABS......................................................................................................................518 343.2 RCC T-BEAM AND SLAB....................................................................................................519 344 PRESTRESSED CONCRETE CONSTRUCTION.........................................................519 344.1 PSC GIRDER AND COMPOSITE RCC SLAB.............................................................................519 344.2 BOX GIRDER......................................................................................................................519 344.3 CANTILEVER CONSTRUCTION.................................................................................................520 345 TOLERANCES..................................................................................................................520 345.1 PRECAST CONCRETE SUPERSTRUCTURE VARIATION IN CROSS-SECTIONAL DIMENSIONS....................520 345.2 CAST-IN-SITU SUPERSTRUCTURE............................................................................................520 346 TESTS AND STANDARDS OF ACCEPTANCE............................................................520 347 MEASUREMENTS FOR PAYMENT.............................................................................521 348 RATE..................................................................................................................................521 2401 GENERAL........................................................................................................................523 348.1 THE OBJECTIVE OF SUB-SURFACE EXPLORATION IS TO DETERMINE THE SUITABILITY OR OTHERWISE OF
THE SOIL OR ROCK SURROUNDING THE FOUNDATION AND SOIL PARAMETERS AND ROCK CHARACTERISTICS FOR THE DESIGN OF FOUNDATION BY IN-SITU TESTING OR TESTING OF SAMPLES/CORES TAKEN OUT OF EXPLORATION.

THE SUB-SURFACE EXPLORATION SHALL BE PLANNED IN SUCH A WAY THAT DIFFERENT TYPES OF SOIL UPTO THE
DESIRED DEPTH AND THEIR PROFILE FOR THE FULL PROPOSED LENGTH OF THE BRIDGE CAN BE RECORDED AND OTHER INFORMATION SUCH AS MECHANICAL AND PHYSICAL PROPERTIES LIKE GRAIN-SIZE DISTRIBUTION, SENSITIVITY, ANY EXISTENCE OF DELETERIOUS MATERIAL IN SOIL OR GROUND WATER, ETC., ARE DETERMINED ALONGWITH SOIL PARAMETERS AND ROCK CHARACTERISTICS.

THE SUB-SURFACE EXPLORATION SHALL ALSO

THROW LIGHT ON POROSITY OF ROCK AND SUBSIDENCE DUE TO MINING, GROUND WATER LEVEL, ARTESIAN CONDITION, IF ANY, LIKELY SINKING AND DRIVING EFFORT, LIKELY CONSTRUCTIONAL DIFFICULTIES, ETC......523

348.2 FIELD INVESTIGATION...........................................................................................................523 348.3 SOIL INVESTIGATION FOR FOUNDATIONS SHALL CONTAIN A PROGRAMME FOR BORING AND RETRIEVAL OF SAMPLES. THE FIELD WORK SHALL CONSIST OF EXCAVATION, DRILLING OF BORE-HOLES FOR THE PURPOSES OF COLLECTION OF UNDISTURBED AND DISTURBED SAMPLES, STANDARD PENETRATION TESTS, IN-SITU VANE TESTS, STATIC AND DYNAMIC CONE PENETRATION TESTS, OTHER FIELD TESTS, AS SPECIFIED BY THE ENGINEER AND PREPARATION OF BORE-LOGS. COLLECTION AND PRESERVATION FOR TESTING OF DISTURBED AND UNDISTURBED SAMPLES FROM BOREHOLES, BORROW PITS, ETC., AS SPECIFIED BY THE ENGINEER SHALL FORM A PART OF THE ABOVE. ALL IN-SITU TESTS SHALL BE SUPPLEMENTED BY LABORATORY INVESTIGATIONS. RELEVANT INDIAN STANDARDS SUCH AS IS: 1498, IS: 1888, IS:1892, IS:2131, IS:2132, IS:2720, IS:4434 AND IS:4968 AND APPENDIX I OF IRC:78, ETC., SHALL BE FOLLOWED FOR GUIDANCE...............................................524 348.4 THE SOUNDINGS BY DYNAMIC METHOD SHALL BE CARRIED OUT IN BORE-HOLES USING EF STANDARD SAMPLER AS SPECIFIED IN IS:2131...................................................................................................524 349 PRELIMINARY INVESTIGATION...............................................................................524 349.1 FOUNDATIONS.....................................................................................................................524

General

Section 100

350 DETAILED EXPLORATION..........................................................................................525 350.1 THE EXPLORATION SHALL COVER THE ENTIRE LENGTH OF THE BRIDGE AND ALSO EXTEND AT EITHER END
FOR A DISTANCE OF ABOUT TWICE THE DEPTH BELOW BED OF THE LAST MAIN FOUNDATION TO ASSESS THE EFFECT OF THE APPROACH EMBANKMENT ON THE END FOUNDATIONS.

GENERALLY THE SUB-SURFACE INVESHOWEVER,

TIGATIONS (PRELIMINARY AND DETAILED) FOR BRIDGES SHALL EXTEND TO A DEPTH BELOW THE ANTICIPATED FOUNDATION LEVEL EQUAL TO ABOUT ONE AND A HALF TIMES THE WIDTH OF THE FOUNDATION. WHERE SUCH INVESTIGATIONS END IN ANY UNSUITABLE OR QUESTIONABLE FOUNDATION MATERIAL, THE EXPLORATION SHALL BE EXTENDED TO A SUFFICIENT DEPTH INTO FIRM AND STABLE SOILS OR TO ROCK........525

350.2 THE TYPE AND EXTENT OF EXPLORATION SHALL BE DIVIDED INTO THE FOLLOWING GROUPS AS PER REQUIREMENT OF FOUNDATION DESIGN AND LIKELY METHOD OF DATA COLLECTION :.................................525 350.3 LOCATION BORING..............................................................................................................525 350.4 CONSTRUCTION STAGE EXPLORATION.....................................................................................526 350.5 LOGGING OF BORE;.HOLES BY RADIO-ACTIVE METHODS SHALL BE DONE FOR DETAILED INVESTIGATIONS AS' SPECIFIED IN THE CONTRACT OR IN SPECIAL PROVISIONS...................................................................526 350.6 FOR BRIDGE WORKS, THE INVESTIGATIONS SHALL BE COMPREHENSIVE ENOUGH TO. ENABLE THE DESIGNER TO ESTIMATE OR DETERMINE THE FOLLOWING.......................................................................526 351 EXPLORATION FOR BRIDGE FOUNDATIONS RESTING ON ROCK..................526 351.1 INVESTIGATION AND INTERPRETATION OF DATA FOR ROCK IS A SPECIALISED WORK. TO ARRIVE AT THE CHARACTERISTIC STRENGTH OF ROCK MASS, RELIANCE SHALL BE PLACED MORE'ON IN-SITU TESTS IN COMPARISON TO LABORATORY TESTS. AN ENGINEERING GEOLOGIST SHALL ALSO BE ASSOCIATED IN THE EXPLORATION PROGRAMINE..............................................................................................................526 351.2 IDENTIFICATION AND CLASSIFICATION OF ROCK TYPES FOR ENGINEERING PURPOSES MAY IN GENERAL BE LIMITED TO BROAD, BASIC GEOLOGICAL CLASSES IN ACCORDANCE WITH ACCEPTED PRACTICE. STRENGTH OF
PARENT ROCK ALONE IS OF LIMITED VALUE BECAUSE OVERALL CHARACTERISTICS DEPEND CONSIDERABLY ON CHARACTER, SPACING AND DISTRIBUTION OF DISCONTINUITIES OF THE ROCK MASS, SUCH AS THE JOINTS, BEDDING PLANES, FAULTS AND WEATHERED SEARNSI.

AN IMPORTANT FACTOR AFFECTING THE BEHAVIOUR IS THE WEATHERED ZONE AT TOP..........................................................................................................526 351.3 BASIC INFORMATION REQUIRED FROM EXPLORATIONS...............................................................526 351.4 EXPLORATION PROGRAMME...................................................................................................527 351.5 THE EXTENT OF EXPLORATION SHALL BE ADEQUATE ENOUGH TO GIVE A COMPLETE PICTURE OF THE ROCK PROFILE BOTH -IN DEPTH AND ACROSS THE CHANNEL WIDTH TO ASSESS THE CONSTRUCTIONAL DIFFICULTIES IN REACHING THE FOUNDATION LEVELS..................................................................................................527 351.6 THE DEPTH OF BORING IN ROCK DEPENDS PRIMARILY ON LOCAL GEOLOGY, CRODIBILITY OF THE ROCK, EXTENT OF STRUCTURAL LOADS TO BE TRANSFERRED TO FOUNDATION ETC. NORTNALLY, IT SHALL PAN THROUGH THE UPPER WEATHERED OR OTHERWISE WEAK ZONE, WELL INTO THE SOUND ROCK. MINIMUM DEPTH OF BORING IN SOUND ROCK SHALL BE 3 METRES..................................................................................527 351.7 DETAILED INVESTIGATION FOR ROCK.....................................................................................527 351.8 SPECIAL CASES...................................................................................................................527 351.9 CAUTION............................................................................................................................528 351.10 PRESENTATION OF DATA.....................................................................................................528 352 BORING.............................................................................................................................528

General

Section 100

353 RECORDS OF BORINGS AND TRIAL PITS................................................................529 353.1 THE FIELD RECORDS* FOR THE PRELIMINARY AND DETAILED EXPLORATION SHALL CONTAIN THE DATE WHEN THE BORING WAS MADE, THE LOCATION OF THE BORING WITH REFERENCE TO A PERMANENT SYSTEM OF CO-ORDINATES AND THE ELEVATION OF THE GROUND SURFACE WITH RESPECT TO A PERMANENT BENCH MARK. THEY SHALL INCLUDE ELEVATION AT WHICH THE WATER TABLE AND THE UPPER BOUNDARY OF EACH OF THE SUCCESSIVE SOIL STRATA WERE ENCOUNTERED, THE INVESTIGATOR'S CLASSIFICATION OF THE LAYER ON THE BASIS OF' GENERAL INFORTNATION OBTAINED FROM FIELD EXAMINATION (REFER TO APPENDIX 2.1 OF IRC:75) AND THE VALUE OF THE RESISTANCE OBTAINED BY MEANS OF STANDARD PENETRATION TEST. THE TYPE OF TOOLS USED FOR BORINGS SHALL BE RECORDED. IF THE TOOLS WERE CHANGED, THE DEPTH AT WHICH THE CHANGE WAS MADE AND THE REASON THEREOF SHALL ALSO BE NOTED. INCOMPLETE AND ABANDONED BORINGS SHALL BE DESCRIBED WITH NO LESS CARE THAN SUCCESSFULLY COMPLETED DRILL HOLES. THE NOTES SHALL
CONTAIN EVERYTHING OF SIGNIFICANCE OBSERVED ON THE JOB SUCH AS THE ELEVATION AT WHICH WASH WATER WAS LOST FROM THE HOLE....................................................................................................529

353.2 FOR ALL BORINGS AND TRIAL PITS, NECESSARY INFORMATION AS DETAILED BELOW SHALL'BE GIVEN. A SITE PLAN SHOWING THE DISPOSITION OF THE BORE HOLES SHALL ALSO BE ATTACHED...............................529 353.3 UPON REMOVAL OF SAMPLING TUBE, THE LENGTH OF THE SAMPLE IN THE TUBE AND THE LENGTH
BETWEEN THE TOP OF THE TUBE AND THE TOP OF THE SAMPLE IN THE TUBE SHALL BE MEASURED AND RECORDED....................................................................................................................................530

354 METHODS OF SAMPLING............................................................................................530 355 PROCEDURE FOR TAKING SAMPLES......................................................................530 355.1 FOR PROPER IDENTIFICATION OF SUB-SURFACE MATERIAL, SAMPLE SHOULD BE RECOVERED CONTAINING ALL THE CONSTITUENTS OF THE MATERIALS IN THEIR PROPER PROPORTION. IN CLAYEY DEPOSITS SUCH SAMPLES COULD BE COLLECTED BY SPLIT SPOON SAMPLERS. IN THE CASE OF SANDY DEPOSITS, SAINPLING SPOONS SHALL BE FITTED WITH SUITABLE DEVICES FOR RETAINING SAMPLES. ALL DATA REQUIRED FOR SOIL IDENTIFICATION (APPENDIX 2.1 OF IRC:75) SHOULD BE COLLECTED FROM THE SAMPLES SO EXTRACTED WHEN UNDISTURBED SAMPLES, WHICH ARE MORE DESIRABLE FOR COLLECTION OF SOME OF THE DATA, ARE NOT AVAILABLE. PENETRATION TEST SHOULD BE CARRIED OUT WITH THE STANDARD SPLITSPOON SAMPLER OR PENETROMETERS IF THE SOIL IS COARSE GRAINED. WHEN IT IS KNOWN IN ADVANCE THAT THE SOIL PROFILE IS FAIRLY REGULAR, PRELIMINARY AND DETAILED INVESTIGATION MAY BE COMBINED. TUBE SAMPLERS CAN BE USED IN PLACE OF SPLIT SPOON SAMPLERS FOR COLLECTING SAMPLES IN CLAYEY STRATA....................................................530 355.2 DISTURBED SOIL SAMPLES....................................................................................................530 355.3 UNDISTURBED SOIL SAMPLES................................................................................................531 355.4 ROCK SAMPLES...................................................................................................................532 356 PROTECTION, HANDLING AND LABELLING OF SAMPLES...............................532 356.1 CARE SHALL BE TAKEN IN HANDLING AND LABELLING OF SAMPLES SO THAT THEY ARE RECEIVED IN A FIT
STATE FOR EXAMINATION AND TESTING AND CAN BE CORRECTLY IDENTIFIED AS COMING FROM A SPECIFIED TRIAL PIT OR BORING...............................................................................................................................532

356.2 THE DISTURBED MATERIAL IN THE~ UPPER END OF THE TUBE SHALL BE COMPLETELY REMOVED BEFORE APPLYING WAX FOR SEALING. THE LENGTH AND TYPE OF SAMPLE SO REMOVED SHOULD BE RECORDED.........532

General

Section 100

356.3 THE SOIL AT THE LOWER END OF THE TUBE SHALL BE REAMED TO A DISTANCE OF ABOUT 20 MM. AFTER CLEANING, BOTH ENDS SHALL BE SEALED WITH WAX APPLIED IN A WAY THAT WILL PREVENT WAX FROM ENTERING THE SAMPLE. WAX USED FOR SEALING SHOULD NOT BE HEATED TO MORE THAN A ' FEW DEGREES ABOVE ITS MELTING TEMPERATURE. THE EMPTY SPACE IN THE SAMPLERS, IF ANY, SHOULD BE FILLED WITH MOIST SOIL, SAW DUST, ETC., AND THE ENDS COVERED WITH TIGHT FITTING CAPS.....................................532 356.4 LABELS GIVING THE FOLLOWING INFORMATION SHOULD BE AFFIXED TO THE TUBES :.......................532 357 TESTS FOR EXPLORATION OF SHALLOW FOUNDATIONS OF BRIDGES......533 357.1 TEST PITS OR TRENCHES ARE THE MOST DEPENDABLE AND VALUABLE METHODS OF EXPLORATION SINCE
THEY PERMIT DIRECT VISUAL EXAMINATION AND MORE RELIABLY THE TYPE OF SOIL AND THEIR STRATIFICATION.

THIS WILL ALSO ALLOW IN-SITU TESTS LIKE PLATE BEARING TESTS, SHEAR TESTS AND UNI-AXIAL JACKING TESTS, ETC....................................................................................................................................533 357.2 TESTS SHALL BE CONDUCTED ON UNDISTURBED SAMPLES, WHICH MAY BE OBTAINED FROM OPEN PITS. THE USE OF PLATE LOAD TEST (AS PER IS:1888) IS CONSIDERED DESIRABLE TO ASCERTAIN THE SAFE BEARING PRESSURE AND SETTLEMENT CHARACTERISTICS. A FEW EXPLORATORY BORE HOLES OR SOUNDINGS .SHALL BE MADE TO SAFEGUARD AGAINST PRESENCE OF WEAK STRATA UNDERLYING THE FOUNDATION. THIS SHALL EXTEND TO A DEPTH OF ABOUT 11/2 TIMES THE PROPOSED WIDTH OF FOUNDATION.........................533 358 TESTS FOR EXPLORATION FOR DEEP FOUNDATIONS OF BRIDGES.............533 358.1 THE TESTS TO BE CONDUCTED AT VARIOUS LOCATIONS FOR PROPERTIES OF SOIL, ETC., ARE DIFFERENT FOR COHESIVE AND COHENSIONLESS SOILS. THESE ARE ENUMERATED BELOW AND SHALL BE CARRIED OUT, WHEREVER PRACTICABLE, ACCORDING TO SOIL TYPE............................................................................533 358.2 THE SUB-SURFACE EXPLORATION FOR BRIDGE WORKS CAN BE DIVIDED INTO 3 ZONES :....................533 358.3 THE SUB-SOIL WATER SHALL BE TESTED FOR CHEMICAL PROPERTIES TO ASCERTAIN THE HAZARD OF DETERIORATION TO FOUNDATIONS. WHERE DEWATERING IS EXPECTED TO BE REQUIRED, PERMEABILITY CHARACTERISTICS SHALL BE DETERMINED...........................................................................................533 358.4 FOR THE DIFFERENT ZONES CATEGORISED IN PARA 2411.2 THE DATA REQUIRED, SUCH AS SOIL CLASSIFICATION, PARTICLE SIZE DISTRIBUTION, SHEARING STRENGTH CHARACTERISTICS, METHOD OF SAMPLING DISTURBED AND UN(DWHISTURBED SAMPLES, TESTING, INCLUDING PARTICLE SIZE DISTRIBUTION, SHEAR STRENGTH, UNCONFINED COMPRESSION TEST, SHALL BE COMPLIED WITH..................................................534 359 TESTING OF MATERIAL FOR GUIDE BUND AND HIGH EMBANKMENT AND ITS FOUNDATIONS................................................................................................................534 359.1 THE SOIL PROPERTIES FOR THE EMBANKMENT FOUNDATION SHALL BE AS SPECIFIED IN PARTICULAR SPECIFICATIONS AND SHALL BE GOT VERIFIED PRIOR TO CONSTRUCTION OPERATION. IN CASE THE ACTUAL SOIL PROPERTIES DO NOT MATCH THE PARTICULAR SPECIFICATION, THEN EMBANKMENT DESIGN SHALL BE REVISED. ...................................................................................................................................................534 359.2 FIELD INVESTIGATION FOR THE EMBANKMENT MATERIAL SHOULD BE CARRIED OUT TO COLLECT GENERAL INFORMATION AS INDICATED IN IRC:75. FOR DETAILS REFER TO CLAUSE 305.......................................534 359.3 IN ADDITION TO THE RELEVANT IDENTIFICATION TESTS, MENTIONED IN IRC:75, IT SHALL BE NECESSARY
TO CONDUCT SOME OF THE FOLLOWING TESTS ON THE UNDISTURBED SAMPLES COLLECTED FROM THE SUB-STRATA.

THE CHOICE OF TEST IS PRIMARILY DETE~NINED BY THE TYPE OF SOIL, TYPE OF STABILITY ANALYSIS (VIDE TABLE 2400-2), AVAILABILITY OF APPARATUS AND COST OF INVESTIGATION...................534

General

Section 100

359.4 LABORATORY INVESTIGATIONS OF EMBANKMENT MATERIAL......................................................535 360 MEAKREMENTS FOR PAYMENT...............................................................................536 361 RATE..................................................................................................................................536 2501 DESCRIPTION................................................................................................................538 362 GUIDE BUND....................................................................................................................538 362.1 THIS WORK SHALL CONSIST OF CONSTRUCTION OF EMBANKMENT OF GUIDE BUND AND PROVISION OF PITCHING/RIVETMENT ON SLOPES, APRON, TOE PROTECTION, CURTAIN WALLS ETC. AS INDICATED ON THE DRAWING IN ACCORDANCE WITH THESE SPECIFICATIONS OR AS APPROVED BY THE ENGINEER......................538 362.2 THE ALIGNMENT AND LAYOUT OF GUIDE BUND SHALL BE AS INDICATED ON THE DRAWING OR AS APPROVED BY THE ENGINEER. THE CONSTRUCTION OF EMBANKMENT FOR GUIDE BUND SHALL CONFORM TO PROVISIONS OF SECTION 300 OF THESE SPECIFICATIONS. PITCHING, FILTER UNDERNEATH PITCHING AND TURFING, APRON, TOE PROTECTION, CURWN WALLS, ETC., SHALL BE AS PER THESE SPECIFICATIONS............538 362.3 GUIDE BUNDS SHALL GENERALLY BE MADE OF LOCALLY AVAILABLE MATERIALS FROM. THE RIVER BED PREFERABLY COLIESIONLESS MATERIALS. TRIAL PITS SHALL BE TAKEN IN BORROW HOLES TO EXAMINE
SUITABILITY OF SOIL FOR CONSTRUCTION AND ALSO TO DECIDE THE TYPES OF EARTH MOVING MACHINERY TO BE ARRANGED.

THE BORROW PITS SHOULD BE SUFFICIENTLY AWAY FROM THE LOCATION OF THE LAUNCHING APRON. NO BORROW PITS SHOULD BE DUG ON THE RIVER SIDE OF THE GUIDE BUNDS.................................538 362.4 CONSTRUCTION OF APRON AND PITCHING OF THE GUIDE BUNDS SHALL GENERALLY CONFORM TO CLAUSE 2503 AND 2504 OF THESE SPECIFICATIONS. SUFFICIENT LENGTH OF PIT ALONG THE GUIDE BUND SHALL BE READY WITHIN ONE ' TO TWO MONTHS OF COMMENCEMENT OF WORK SO THAT THE PLACING OF STONES IN THE APRON AND IN THE SLOPE PITCHING CAN BE COMMENCED. AS A GUIDELINE, EARTHWORK SHOULD BE COMPLETED WITHIN 80 PER CENT OF WORKING SE ASON AND ABOUT 70 PER CENT WORKING SEASON SHALL BE AVAILABLE ' FOR LAYING APRON AND PITCHING. NO PORTION OF THE GUIDE BUND SHOULD BE LEFT BELOW BFL BEFORE THE ONSET OF MONSOON. BOTTOM OF APRON PIT SHALL BE AS LOW AS PERMITTED BY SUB-SOIL WATER/LOWEST WATER LEVEL. SUFFICIENT LABOUR AND APPROPRIATE EARTH MOVING MACHINERY AND TRAINED STAFF SHALL BE DEPLOYED IN CONSTRUCTION........................................................................538 362.5 THE CONTRACTOR SHALL FURNISH HIS PLANNING FOR APPROVAL OF THE ENGINEER REGARDING
TRANSPORT OF STONES FROM THE QUARRIES TO THE SITE OF WORK TAKING INTO ACCOUNT THE QUANTITIES OF STONE REQUIRED TO BE TRANSPORTED EVERY DAY, TRAIN/TRUCK, ETC., DEPLOYED, AVAILABLE FERRY OR BOATS AND LABOUR AVAILABLE FOR LOADING AND UNLOADING AND FOR LAYING WITHIN THE TIME FRAME FOR CONSTRUCTION OF GUIDE BUND. DECIDED BY THE

ADEQUATE RESERVE OF STONES SHOULD BE MAINTAINED FOR MAJOR WORKS AS

ENGINEER. RESERVE STONES SHALL BE STACKED FAR AWAY FROM THE MAIN CHANNEL OF THE RIVER...........................................................................................................................................539 362.6 WHERE THE ALIGNMENT OF GUIDE BUND OR THE APPROACH EMBANKMENT CROSSES A BRANCH CHANNEL OF THE RIVER, THE BRANCH CHANNEL MAY BE EITHER DIVERTED TO THE MAIN CHANNEL OF THE RIVER WITH THE HELP OF SPURS, ETC. OR CLOSED BY A PROPERLY DESIGNED CLOSING DYKE OR CLOSURE BUND BEFORE TAKING UP CONSTRUCTION OF GUIDE BUND....................................................................................................539 363 APRON...............................................................................................................................539 363.1 GENERAL...........................................................................................................................539 363.2 LAYING'BOULDER APRON.....................................................................................................539

General

Section 100

363.3 LAYING WIRE CRATES AND MATTRESSES IN THE APRON..........................................................540 364 PUCHING / REVETMENT ON SLOPES.......................................................................540 364.1 DESCRIPTION......................................................................................................................540 364.2 PITCHING/FILTER MEDIA.......................................................................................................541 364.3 CONSTRUCTION OPERATIONS.................................................................................................542 364.4 TOE PROTECTION................................................................................................................542 365 RUBBLE STONEXEMENT CONCRETE BLOCK FLOORING OVER CEMENT CONCRETE BEDDING..........................................................................................................543 365.1 THIS WORK SHALL CONSIST OF CONSTRUCTING RUBBLE STONE / E.C. BLOCK FLOORING LAID OVER A CEMENT CONCRETE (M 15) BEDDING. THE FLOOR PROTECTION WILL COMPRISE RIGID FLOORING STATED ABOVE WITH CURTAIN WALLS AND FLEXIBLE APRON.......................................................................................543 365.2 CONSTRUCTION OPERATIONS.................................................................................................543 366 DRY RUBBLE FLOORING.............................................................................................543 367 CURTAIN WALL AND FLEXIBLE APRON................................................................544 367.1 CURTAIN WALL..................................................................................................................544 367.2 FLEXIBLE APRON................................................................................................................544 368 TESTS AND STANDARDS OF ACCEPTANCE............................................................544 369 MEASUREMENTS FOR PAYMENT.............................................................................544 370 RATE..................................................................................................................................544 2601 DESCRIPTION................................................................................................................547 371 GENERAL..........................................................................................................................547 372 REQUIREMENTS.............................................................................................................547 372.1 THE REQUIREMENT CRITERION WILL BE SEPARATELY APPLICABLE FOR THE EXPANSION JOINT PROPER AND THE TRANSITION ZONE OF ATTACHMENT TO THE DECK..........................................................................547 372.2 THERE ARE TWO TYPES OF PERFORMANCE REQUIREMENTS FOR THE EXPANSION JOINT PROPER VIZ. FROM THE NECESSITY OF THE BRIDGE AND FROM THE ROAD USERS E.G. MAN, ANIMAL AND VEHICLE.....................547 372.3 PERFORMANCE REQUIREMENT WITH RESPECT TO BRIDGES.........................................................548 372.4 PERFORMANCE REQUIREMENT WITH RESPECT TO USER.............................................................548 372.5 PERFORMANCE REQUIREMENT FOR TRANSITION ZONE...............................................................548 373 STEEL PLATE SLIDING EXPANSION JOINTS.........................................................548 374 FILLER JOINTS...............................................................................................................549 375 ELASTOMERIC SLAB SEAL EXPANSION JOINT....................................................549 375.1 MATERIALS........................................................................................................................549 375.2 FABRICATION......................................................................................................................550 375.3 SUPPLY AND HANDLING.......................................................................................................550

General

Section 100

375.4 INSTALLATION.....................................................................................................................550 375.5 ACCEPTANCE TEST..............................................................................................................552 376 STRIP SEAL EXPANSION JOINT.................................................................................553 376.1 COMPONENTS......................................................................................................................553 376.2 MATERIAL..........................................................................................................................553 376.3 FABRICATION (PRE-INSTALLATION)........................................................................................554 376.4 HANDLING AND STORAGE.....................................................................................................554 376.5 INSTALLATION.....................................................................................................................555 377 TESTS AND STANDARDS OF ACCEPTANCE............................................................556 378 MEASUREMENTS FOR PAYMENT.............................................................................556 379 RATE..................................................................................................................................557 2701 DESCRIPTION................................................................................................................559 380 WEARING COAT.............................................................................................................559 380.1 BITUMINOUS WEARING COAT...............................................................................................559 380.2 CEMENT CONCRETE WEARING COAT.....................................................................................559 380.3 FOR PROVIDING CROSS CAMBER NO VARIATION IN THICKNESS OF WEARING COAT SHALL BE PERMITTED. ...................................................................................................................................................559 381 RAILINGS..........................................................................................................................559 381.1 GENERAL...........................................................................................................................559 381.2 METAL RAILINGS................................................................................................................560 381.3 CAST-IN-SITU CONCRETE RAILINGS.......................................................................................560 381.4 PRECAST CONCRETE RAILINGS..............................................................................................560 382 APPROACH SLAB............................................................................................................561 383 DRAINAGE SPOUTS.......................................................................................................561 383.1 THIS WORK SHALL CONSIST OF FURNISHING AND FIXING IN POSITION OF DRAINAGE SPOUTS AND DRAINAGE PIPES FOR BRIDGE DECKS..................................................................................................561 383.2 FABRICATION......................................................................................................................561 383.3 PLACEMENT........................................................................................................................561 383.4 FINISHING...........................................................................................................................561 384 WEEP HOLE.....................................................................................................................562 385 TESTS AND STANDARDS OF ACCEPTANCE............................................................562 386 MEASUREMENTS FOR PAYMENT.............................................................................562 387 RATE..................................................................................................................................562 2801 DESCRIPTION................................................................................................................565 388 GENERAL..........................................................................................................................565

General

Section 100

388.1 ENVIRONMENTAL ASPECT.....................................................................................................565 388.2 PHASING............................................................................................................................565 388.3 TRAFFIC MANAGEMENT........................................................................................................565 388.4 SAFETY PRECAUTIONS..........................................................................................................565 388.5 DISMANTLING AND REMOVAL OF MATERIAL...........................................................................565 389 SEALING OF CRACKS BY INJECTION OF EPOXY RESIN....................................565 389.1 GENERAL...........................................................................................................................565 389.2 THE CONTRACTOR SHALL FURNISH DETAILED METHODOLOGY OF CON'STRUCTION INCLUDING SOURCES OF SUPPLY OF MATERIAL, TOOLS, EQUIPMENT AND APPLIANCES TO BE USED ON WORK, DETAILS OF PERSONNEL AND SUPERVISION.................................................................................................................................565 389.3 PERSONNEL........................................................................................................................565 389.4 MATERIAL..........................................................................................................................565 389.5 EQUIPMENT FOR INJECTION...................................................................................................566 389.6 PREPARATION......................................................................................................................566 389.7 EPOXY INJECTION................................................................................................................567 389.8 PRECAUTIONS FOR APPLICATION............................................................................................567 389.9 TESTING.............................................................................................................................567 390 EPOXY MORTAR FOR REPLACEMENT OF SPALLED CONCRETE...................571 390.1 MATERIAL..........................................................................................................................571 390.2 PROPORTIONING AND MIXING................................................................................................571 390.3 SURFACE PREPARATION........................................................................................................571 390.4 CONTAMINANTS, SUCH AS OIL, GREASE, TAR, ASPHALT, PAINT, WAX, CURING COMPOUNDS OR SURFACE IMPREGNANTS LIKE LINSEED OIL OR SIFICONS, INCLUDING LAITANCE AND WEAK OR LOOSE CONCRETE SHALL BE REMOVED. WHEN BONDING TO ASPHALT, TH-, SURFACE SHOULD BE ROUGHENED SO THAT CLEAN AGGREGATE IS EXPOSED. EPOXY BONDING AGENTS SHALL NOT BE APPLIED WHEN IT RAINS, OR IN STANDING WATER. THE SURFACE MUST BE DRY...................................................................................................................571 390.5 APPLICATION......................................................................................................................572 390.6 COVERAGE.........................................................................................................................572 390.7 CLEANING AND MAINTENANCE OF EQUIPMENT.........................................................................572 390.8 TESTING.............................................................................................................................572 390.9 HANDLING PRECAUTIONS......................................................................................................572 390.10 PERSONNEL AND ENVIRONMENT. SAFETY..............................................................................572 391 EPOXY BONDING OF NEW CONCRETE TO OLD CONCRETE............................573 391.1 EPOXY RESIN USED FOR BONDING SHALL BE OBTAINED FROM A REPUTED MANUFACTURER. THE POT LIFE OF SUCH BONDING EPOXY SHALL NOT BE LESS THAN 60-90 MINUTES AT NORMAL TEMPERATURE. ..............573 391.2 THE ENTIRE SURFACE OF THE EXISTING CONCRETE MEMBER SHOULD BE THOROUGHLY CLEANED BY WIRE BRUSH AND THEN WITH COMPRESSED AIR TO REMOVE DUST AND LOOSE PARTICLES FROM THE SURFACE. ANY CRACK OR SPALLING OF CONCRETE SHALL BE, SEALED BY EPOXY INJECTION/EPOXY MORTAR/GROUTING AS DECIDED BY THE ENGINEER. A COATING OF SUITABLE EPOXY RESIN AT THE RATE OF 0.8 KG/SQ.M. (MINIMUM)

General
SHOULD THEN BE APPLIED ON THE SURFACE OF THE EXISTING CONCRETE MEMBERS.

Section 100

, FRESH CONCRETE SHALL THEN BE PLACED WITHIN THE POT LIFE OF THE RESIN SYSTEM................................................................573 391.3 TESTING.............................................................................................................................573 392 CEMENT GROUTING.....................................................................................................573 392.1 MATERIAL..........................................................................................................................573 392.2 PREPARATION......................................................................................................................574 392.3 PROPORTIONING, MIXING. AND EQUIPMENT FOR GROUTING.......................................................575 392.4 APPLICATION......................................................................................................................575 392.5 CLEANING OF EQUIPMENT.....................................................................................................575 392.6 TESTING.............................................................................................................................575 393 GUNITING/SHOTCRETE...............................................................................................576 393.1 THE GUNITE IS A MIXTURE OF CEMENT, SAND AND WATER. IT COMPRISES 100 PARTS BY WEIGHT OF CEMENT, 300 PARTS BY WEIGHT QUARTZ SAND, 35-50 PARTS BY WEIGHT WATER AND 2 PARTS BY WEIGHT APPROVED QUICK SETTING COMPOUND. IN GENER4 DRY MIX SHOTCRETE SHALL BE USED............................576 393.2 ORDINARY PORTLAND CEMENT CONFORMING TO IS:269 SHALL BE USED IN GUNITING....................576 393.3 SAND FOR GUNITING SHALL COMPLY WITH THE REQUIREMENTS STIPULATED IN IS:383. IN GENERAL, SAND SHOULD NEITHER BE TOO COARSE TO INCREASE THE REBOUND NOR TOO FINE TO INCREASE THE SLUMP. SAND SHOULD PREFERABLY HAVE A MOISTURE CONTENT BETWEEN 3 TO 6'PER CENT.................................576 393.4 FOR THICK SECTIONS IT MAY BE ADVANTAGEOUS TO INCORPORATE COARSE AGGREGATE IN THE MIX PROVIDED ADEQUATE GUNITING EQUIPMENT IS AVAILABLE. COARSE AGGREGATE, WHEN USED, SHALL CONFORM TO GRADING GIVEN IN TABLE I OF IS:9012. THE PERCENTAGE OF COARSE AGGREGATE MAY NORMALLY BE KEPT AS 20 TO 40 PER CENT OF THE TOTAL AGGREGATE AND THE MIX SHALL BE SUITABLY DESIGNED.........576 393.5 WATER/CEMENT RATIO FOR GUNITING SHALL FALL WITHIN THE RANGE 0.35 TO 0.50 BY MASS, WET ENOUGH TO REDUCE THE REBOUND. DRYING SHRINKAGE MAY BE BETWEEN 0.06 PER CENT TO 0.10 PER CENT. THE QUICK SETTING COMPOUND SHALL BE ADDED AT THE NOZZLE WITH WATER JUST BEFORE GUNITING.......576 393.6 WORKM ANSHIP..................................................................................................................576 393.7 TEST PANELS SIMULATING ACTUAL FIELD CONDITIONS SHALL BE FABRICATED FOR CONDUCTING PRECONSTRUCTION TESTING. THE PROCEDURE FOR TESTING THE CUBES OR CYLINDERS TAKEN FROM THE PANELS STIPULATED IN CLAUSE 6 OF IS:9012 SHALL BE FOLLOWED.................................................................577 393.8 IT SHOULD BE ENSURED FROM TESTS THAT A STRENGTH OF ABOUT 25 M?A AT 28 DAYS IS AVAILABLE FOR THE MORTAR/CONCRETE MIX......................................................................................................577 393.9 THE DEFECTIVE CONCRETE SHALL BE CUT OUT TO THE FULL DEPTH TILL SOUND CONCRETE SURFACE IS REACHED. UNDER NO CIRCUMSTANCES SHOULD THE THICKNESS OF CONCRETE TO BE REMOVED BE LESS THAN CLEAR COVER TO THE MAIN REINFORCEMENT. NO SQUARE SHOULDERS SHALL BE LEFT AT THE PERIMETER OF THE CUT-OFF PORTION AND ALL EDGES SHALL BE TAPERED. THEREAFTER, ALL LOOSE AND FOREIGN MATERIALS
SHOULD BE REMOVED AND THE SURFACE BE SANDBLASTED TO MAKE IT ROUGH TO RECEIVE SHOTCRETE AFTER

@ 1.0 KG PER 1.5 SQ.M. OF SURFACE AREA.................................................................................................................577 393.10 THE EXPOSED REINFORCEMENT SHALL BE THOROUGHLY CLEANED FREE OF RUST, SCALES ETC. BY WIRE BRUSHING. WHEREVER THE REINFORCEMENTS HAVE BEEN CORRODED, THE SAME SHALL BE REMOVED AND
APPLYING A COAT OF BONDING EPOXY AS PER RECOMMENDATION OF THE MANUFACTURER

General
REPLACED BY ADDITIONAL REINFORCEMENT.

Section 100

BEFORE APPLICATION OF GUNITE, A COAT OF NEAT CEMENT SLURRY SHOULD BE APPLIED ON THE SURFACE OF THE REINFORCEMENT..............................................................577 393.11 SUFFICIENT CLEARANCE SHALL BE PROVIDED AROUND THE REINFORCEMENT TO PERMIT ENCASEMENT WITH SOUND GUNITE. CARE SHALL BE TAKEN TO AVOID SAND POCKETS BEHIND THE REINFORCEMENT..........577 393.12 A THICKNESS OF 25 TO 40 MM OF GUNITE CAN NORMALLY BE DEPOSITED IN ONE OPERATION. IF, FOR SOME REASON, THE TOTAL THICKNESS IS TO BE BUILT UP IN SUCCESSIVE OPERATIONS, THE PREVIOUS LAYER SHOULD BE ALLOWED TO SET BUT NOT BECOME HARD BEFORE THE APPLICATION OF THE SUBSEQUENT LAYER. IT WOULD ALWAYS BE NECESSARY TO APPLY GUNIFING ON A DAMP CONCRETE SURFACE................................577 393.13 WHERE REQUIRED, WELDED WIRE FABRICS 5CM X 5 CM X NO. 10 GAUGE SHALL BE PROVIDED IN THE FIRST LAYER OF GUNITING. THE FABRIC SHALL BE TIED PROPERLY. IN CASE THE DAMAGE TO THE CONCRETE MEMBER IS TOO DEEP, THE SPECIFICATIONS FOR GUNITING AS WELL AS REQUIREMENT OF PLACEMENT OF WIRE MESH HAS TO BE DECIDED AS PER' FIELD CONDITIONS...........................................................................577 393.14 THE STIPULATIONS GIVEN IN IS:9012 REGARDING APPLICATION OF GUNITE SHOULD BE FOLLOWED SO AS TO KEEP THE REBOUND TO THE MINIMUM. THE QUALITY OF GUNITING AND WORKMANSHIP SHALL BE SUCH THAT THE PERCENTAGE OF REBOUND MENTIONED IN IS:9012 CAN BE-ADHERED TO. IN NO CIRCUMSTANCES SHALL THE REBOUND MATERIAL BE RE-USED IN THE WORK....................................................................577 393.15 IT WOULD BE DESIRABLE THAT GREEN GUNITE IS MOISTENED FOR AT LEAST 7 DAYS. GUNITING WORK SHALL NOT BE DONE DURING WINDY OR RAINY CONDITIONS...................................................................577 394 REPLACEMENTIRECTIFICATION OF BEARINGS.................................................578 394.1 THE REPLACEMENT/RECTIFICATION OF BEARINGS SHALL BE CARRIED OUT IN ACCORDANCE.WITH APPROVED REPAIR PLAN OR AS APPROVED BY THE ENGINEER.................................................................578 394.2 LIFTING OF SUPERSTRUCTURE SPANS MAY BE CARRIED OUT BY JACKING UP FROM BELOW OR BY LIFTING THE SPAN FROM TOP. WHERE JACKS ARE EMPLOYED, THEIR LOCATION/NUMBER AND SIZE SHALL BE SELECTED IN SUCH A MANNER SO THAT THERE ARE NO UNDUE STRESSES CREATED IN THE STRUCTURE. JACKS MAY BE PLACED ON PIERS/PIER CAPS OR SPECIALLY ERECTED TRESTLES IN ACCORDANCE WITH THE APPROVED METHODOLOGY FOR LIFTING OF SUPERSTRUCTURE. ALL JACKS SHALL BE OPERATED FROM ONE CONTROL PANEL BY A SINGLE CONTROL LEVER. THE SYSTEM WILL HAVE PROVISION FOR MANUAL OVER RIDE TO CONTROL THE LOADS OF ANY PARTICULAR JACK. THE JACKS SHOULD BE SO SYNCHRONISED THAT DIFFERENTIAL LIFT BETWEEN INDIVIDUAL JACKS SHALL NOT EXCEED I MM.......................................................................................................578 394.3 NECESSARY REPAIR/REPLACEMENT OF BEARINGS SHALL BE CARRIED OUT AS INDICATED IN THE REPAIR PLAN OR AS DIRECTED BY THE ENGINEER. CARE SHALL BE TAKEN TO PLAN THE EXECUTION OF REPAIR IN THE SHORTEST POSSIBLE PERIOD..............................................................................................................578 394.4 PRECAUTIONS DURING LIFTING OF GIRDERS FOR RECTIFICATION OF BEARINGS.............................578 395 DISMANTLING OF CONCRETE WEARING COAT..................................................578 395.1 COMMENCEMENT OF DISMANTLING........................................................................................578 395.2 DISMANTLING OF CONCRETE WEARING COAT SHALL BE CARRIED OUT USING JACK HAMMERS OR SUITABLE MANUAL METHODS AS,APPROVED BY THE ENGINEER. CARE SHOULD BE TAKEN TO AVOID ANY DAMAGE TO THE EXISTING STRUCTURE INCLUDING REINFORCEMENT OR PRESTRESSING ANCHORAGES FOR CABLES, IF ANY, LOCATED IN THE DECK SLAB............................................................................................................578 395.3 PRECAUTIONS DURING DISMANTLING WORK ..........................................................................578

General

Section 100

396 EXTERNAL PRESTRESSING........................................................................................579 396.1 VARIOUS COMPONENTS CONSTITUTING THE SYSTEM OF EXTERNAL PRESTRESSING ARE AS FOLLOWS :..579 396.2 MATERIAL..........................................................................................................................579 396.3 WORKMANSHIP...................................................................................................................579 396.4 IT SHALL BE ENSURED THAT NO PART OF THE EXISTING STRUCTURE IS DAMAGED/DISTRESSED DUE TO THE EXTERNAL PRESTRESSING.................................................................................................................580 397 TESTS AND STANDARDS OF ACCEPTANCE............................................................580 398 MEASUREMENTS FOR PAYMENT.............................................................................580 399 RATE..................................................................................................................................580 2901 SCOPE..............................................................................................................................583 400 MATERIALS.....................................................................................................................583 401 EXCAVATION FOR PIPE...............................................................................................583 402 BEDDING FOR PIPE.......................................................................................................584 403 LAYING OF PIPE.............................................................................................................584 404 JOINTING..........................................................................................................................584 405 BACKFILLING.................................................................................................................585 406 EADWALLS AND OTHER ANCILLARY WORKS.....................................................585 407 OPENING TO TRAFFIC..................................................................................................585 408 MEASUREMENTS FOR PAYMENT.............................................................................586 409 RATE..................................................................................................................................586 3001 GENERAL........................................................................................................................588 410 RESTORATION OF RAIN CUTS...................................................................................588 410.1 SCOPE................................................................................................................................588 410.2 MATERIALS........................................................................................................................588 410.3 CONSTRUCTION OPERATION..................................................................................................588 410.4 MEASUREMENTS FOR PAYMENT.............................................................................................588 410.5 RATE.................................................................................................................................588 411 MAINTENANCE OF EARTHEN SHOULDER.............................................................589 411.1 SCOPE................................................................................................................................589 411.2 MATERIAL..........................................................................................................................589 411.3 CONSTRUCTION PROCEDURE..................................................................................................589 411.4 MEASUREMENTS FOR PAYMENT.............................................................................................589 411.5 RATE................................................................................................................................589

General

Section 100

412 BITUMINOUS WORK IN CONNECTION WITH MAINTENANCE AND REPAIRS ....................................................................................................................................................590 412.1 GENERAL...........................................................................................................................590 412.2 FILLING POT-HOLES AND PATCH REPAIRS...............................................................................590 412.3 CRACK SEALING..................................................................................................................592 412.4 DUSTING............................................................................................................................593 412.5 SLURRY SEAL.....................................................................................................................594 412.6 SURFACE DRESSING FOR MAINTENANCE WORK.......................................................................594 412.7 SPECIALIST REPAIRS............................................................................................................594 413 MAINTENANCE OF CEMENT CONCRETE ROAD..................................................594 413.1 REPAIR OF JOINT GROOVES WITH EPOXY MORTAR OR EPOXY CONCRETE ...................................594 413.2 REPAIR INVOLVING REMOVAL OF OLD JOINT SEALANT AND SEALING WITH FRESH SEALANT IN CEMENT CONCRETE PAVEMENTS ....................................................................................................595 3101 SCOPE..............................................................................................................................598 414 REINFORCING ELEMENT............................................................................................598 414.1 THE REINFORCING ELEMENT SHALL BE OF GEOTEXTILE, ALUMINIUM ALLOY STRIP, COPPER STRIP, CARBON STEEL STRIP, MATS OF METAL OR SYNTHETIC GRIDS, OR ANY OTHER PROPRIETARY MATERIAL WHICH MAY BE APPROVED BY THE ENGINEER AND INDICATED ON THE DRAWINGS...............................................598 414.2 GEOTEXTILE.......................................................................................................................598 414.3 ALUMINIUM ALLOY STRIP SHALL COMPLY WITH BS:1470 QUALITY 5454 IN THE H 24 CONDITION. 598 414.4 COPPER STRIP SHALL COMPLY WITH BS:2870 QUALITY C 101 OR C 102 IN THE 1/2 H CONDITION AND SHALL HAVE 0.2 PER CENT PROOF STRESS OF NOT LESS THAN 180 N/MM'........................................598 414.5 CARBON STEEL STRIP WHICH SHALL BE GALVANIZED SHALL COMPLY WITH BS:1449 (PART 1), EITHER QUALITY KHR 34/20 P OR QUALITY 50/35 P, EACH HAVING A SILICON CONTENT OF NOT LESS THAN 0.25 PER CENT AND NOT MORE THAN 0.40 PER CENT. THE FABRICATED ELEMENT SHALL BE GALVANIZED IN ACCORDANCE WITH BS:729, AND THE AVERAGE ZINC COATING WEIGHT FOR ANY INDIVIDUAL TEST AREA SHALL RIOT BE LESS THAN 1000 GM/SQ.M...................................................................................................598 414.6 STAINLESS STEEL STRIP SHALL COMPLY WITH BS: 1449 (PART 2) QUALITY 316 S 31 OR 3/6 S 33 EXCEPT THAT THE MATERIAL SHALL BE COLD ROLLED TO PROVIDE A 0.2 PER CENT PROOF STRESS OF NOT LESS THAN 400 N/SQ. MM AND THE TENSILE STRENGTH SHALL NOT BE LESS THAN 540 N/SQ. M......................598 414.7 ALL METALLIC COMPONENTS BURIED IN SOIL SHALL BE OF ELECTROLYTICALLY COMPATIBLE MATERIALS. ...................................................................................................................................................598 414.8 GEOGRIDS..........................................................................................................................598 415 EARTH FILL.....................................................................................................................598 416 FACIA MATERIAL..........................................................................................................599 416.1 THE FACING SHALL COMPRISE OF ONE OF FOLLOWING: (I) REINFORCED CONCRETE (CAST IN SITU OR PRECAST) SLABS (II) PLAIN CEMENT CONCRETE FORM FILL HOLLOW BLOCK (PRECAST) (III) MASONRY CONSTRUCTION, RUBBLE FACIA (IV) OTHER PROPRIETARY AND PATENTED PROVEN SYSTEM.......................599

General

Section 100

416.2 FACIA UNITJOINT FILLER SHOULD BE DURABLE RESISTANT TO THE EFFECT OF AIR POLLUTION AND WATER/SALINE WATER....................................................................................................................599 416.3 BEDDING MATERIAL SHALL CONSIST OF EITHER CEMENT MORTAR OR A DURABLE GASKET SEATING SUCH AS RESIN BONDED CORK STRIP..........................................................................................................599 416.4 CONNECTION BETWEEN THE FACIA AND THE REINFORCING ELEMENT SHALL BE BY USING POLYETHYLENE STRIPS/RODS, FIBRE GLASS DOWELS OR ANY OTHER MATERIAL SHOWN IN THE DRAWING. ANY OTHER MATERIAL USED SHALL BE TESTED TO PROVIDE 100 PER CENT JOINT STRENGTH AS OF PARENT ELEMENT IN CONTINUITY. ...................................................................................................................................................599 417 CONSTRUCTION DETAILS...........................................................................................599 417.1 THE PLAN AREA OF THE REINFORCED EARTH STRUCTURE SHALL BE EXCAVATED TO PROVIDE A
NOMINALLY LEVEL BASE WHICH MAY BE STEPPED AT THE BACK AS REQUIRED TO RECEIVE THE HORIZONTAL REINFORCING ELEMENT GRID............................................................................................................599

417.2 ORIENTATION......................................................................................................................599 417.3 FACING BATTER..................................................................................................................600 417.4 DRAINAGE..........................................................................................................................600 417.5 LAYING AND COMPACTING....................................................................................................600 418 MEASUREMENTS FOR PAYMENT.............................................................................600 419 RATES................................................................................................................................600 APPENDICES APPENDIX 1. 687 STANDARDS APPENDIX 2. SPECIFICATIONS APPENDIX 3. PULVERISATION APPENDIX 4. 699 OF BITUMEN AP PENDIX 5. ANTI-STRIPPING AGENTS USED FOR 701 BITUMINOUSMATERIALS AND MIXES GUIDELINES ON SELECTION OF THE GRADE METHOD OF SIEVING FOR WET SOILS TO DETERMINE THE DEGREE OF 698 LIST OF INDIAN AND FOREIGN STANDARDS REFERRED TO IN TTIE 690 LIST OF I.R.C. PUBLICATIONS REFERRED

TO IN THE SPECIFICATIONS, CODES &

General

Section 100

APPENDIX 706

1000-1 DRAFT DOCUMENT ON ISC 9077-1979 CODE OF PRACTICE FOR CORROSION PROTECTICN OF STEEL REINFORCEMENT IN RB AND RCC CONSTRUCTION (REVISED)

APPENDIX 1200/1-2 1200/11 APPENDIX 715 SYSTEMS APPENDIX 717 1700/11 APPENDIX 1800/11 1800/111 CONCRETE 1800/1V

1200/1-1

HISTORY OF SINKING OF WELL 712 713

711

PLAN OF WELL NOS. 150011

TILT AND SHIFT IN WELL NOS.

INFORMATION TO BE SUPPLIED TO THE

MANUFACTURERS OF PROPRIETARY 1700/1 SPECIFICATION FOR CONSTRUCTION JOINTS PERMEABILITY TEST 719 720 729

1800/1 TESTS ON SHEATHING DUCTS PRESTRESSING REPORT 727

SPECIFICATIONS FOR GROUTING OF POST-

TENSIONED CABLES IN PRESTRESSED GROUTING RECORD 735

General

Section 100

General 100 General

General

Section 100

101

INTRODUCTION

These Specifications shall apply to all such road and bridge works as required to be executed under the Contract or otherwise directed by the Engineer-in-Charge (hereinafter referred to as the Engineer). In every case, the work shall be carried out to the satisfaction of the Engineer and conform to the location, lines, dimensions, grades and crossxvions shown on the drawings or as indicated by the Engineer. The qtmhty of materials, processing of materials as may be needed at the site, salient features of the construction work and quality of finished work shall comply with the 'requirements set forth in succeeding sections. Where the drawings and Specifications describe a portion of the, work in only general terms, and not in complete detail, it shall be understood that only the best general practice is to prevail, materials and workmanship of the best quality are to be employed and instructions of the Engineer are to be fully complied with. A list of Indian Roads Congress Specifications and Recommended Codes of Practice which have been made use of in the preparadoil of these Specifications is given at Appendix-L The latest edition of all Specifications/Standards till 30 (thirty) days before the final date of submission of the tender, shall be adopted. 102 DEFINITIONS

The words like Contract, Contractor, Engineer (synonymous with Engineer-in-charge), Drawings, Employer, Government, Works and Work Site used in, these Specifications shall be considered to have the meaning as.understood from the definitions of these terms given in the General Conditions of Contract. The following abbreviations shall have the meaning as set forth below:
AASHTO ASTM BS CBR IRC IS American Association of State Highway and Transportation Officials American Society for Testing and Materials British Standard published by the British Stapdards Institution California Bearing Ratio Indian Roads Congress Indian Standard published by the Bureau of Indian Standards

The various elements in the cross-section of a road referred to in these Specifications are shown in the cross-sections in Figs. 100-f and 100-2.

General

Section 100

ui Do 5 3C 03 Cz as x fj w -2 be Iz 0 z w 4 w E4 w tz C. 9

5 uj CL LU ul LU 4 Cw fa Z) U UrE .2 N I.z ul 00 or Ca

General

Section 100

12 w w 0 ui LU w Treated shoulders shown in the cross-section shall be of two types:(i) "Hard" shoulders which have select gravelfinoorwn, any other compacted granular layer or bricks. (ii) "Paved" shoulders which have a biturninous surfacing over granular layers.

ul

w w

103

MATERIALS AND TEST STANDARDS

The relevant standards for materials, as well as the testing procedures, have been indicated at. appropriate places in the Specifications. A list of these standards with their full title and the year of publication applicable is included at Appendix-2. 104 SIEVE DESIGNATIONS

The sieve designations referred to in the Specifications correspond to those specified by Bureau of Indian Standards in IS: 460. Table 100-1 gives the list of the commonly used IS sieves.
TABLE 100-1. DESIGNATION OF TEST SIEVES IS Designation conforming to IS: 460 (in mm) *125 106 *710 600 *90 75 *63 53 *500 425 355 425 355 300 *45 37.5 *250 212 (in micron) 850

General
*31.5 26.5 *22.4 19.0 *16.0 13.2 *11.2 9.50 *8.00 6.70 *5.60 4.75 *4.00 3.35 *2.80 2.36 *2.00 1.70 *1.40 1.18 *1.00 Notes 1. '*' are the principal sizes stated in ISO-565 and are preferred. *45 *125 106 *90 75 *63 53 *180 150

Section 100

Z Sieve sizes given in BS:410 & ASIM -H 11 are same as in IS.460 3. Only sieves with square openings shall be used.

105

SCOPE OF WORK

105.1 The work to be carried out under the Contract shall consist of the various items as generally described in the Tender Documents as well as in the Bill of Quantities furnished in the Tender Documents. 105.2 The works to be performed shall also include all general works preparatory to the construction of roads, bridges, canal crossings, drainage and other related works. The works shall include work of any kind necessary for the due and satisfactory construction, completion and maintenance of the works to the intent and meaning of the drawings and these Specifications and further drawings and orders that may be issued by the Engineer from time to time. The scope of work shall include compliance by the Contractor with all General Conditions of Contract, whether specifically mentioned or not in the,various clauses of these Specifications, all

General

Section 100

materials, apparatus, plant, equipment, tools, fuel, water, strutting, timbering, transport, offices, stores, workshop, staff Labour and the provision of proper and sufficient protective works, diversions, temporary fencing and lighting. It shall also include: safety of workers, first-aid equipment, suitable accommodation for the staff and workmen with adequate sanitary arrangements, the effecting and maintenance of all insurances, the payment of all wages, salaries, fees, royalties, duties or other charges arising out of the erection of works and the regular clearance of rubbish, reinstatement and clearing-up of the site as may be required on completion of works, safety of the public and protection of the works and adjoining land. 105.3 The Contractor shall ensure that all actions are taken to build in quality assurance in the planning and execution of works. The quality assurance shall cover all stages of work such as setting out, selection of materials, selection of construction methods, selection of equipment and plant, deployment of personnel and supervisory staff, quality control testing, etc. The work of building in quality assurance shall be deemed to be covered in the scope of the work. . 105.4 The Contractor shall furnish, at least 15 days in advance, his programme of commencement of item of work, the method of working he intends to adopt for various items of work such as site clearance, construction for embankment, sub-base, base, suffacing, culverts, bridges, retaining walls, well-sinking, ~ast-in-situ piling, construction of cast-insitu prestressed concrete simply supported girders, cantilever construction of prestressed concrete superstructure, and such other items for which the Engineer demands the submission of the method of working. He shall provide information regarding the details of the method of working and equipment he proposes to employ and satisfy the Engineer about the adequacy and safety of the same. The sole responsibility for the safety and adequacy of the methods adopted by the Contractor will, however, rest on the Contractor, irrespective of any approval given by the Engineer.

106

CONSTRUCTION EQUIPMENT

In addition to the general conditions indicated in the Contract Documents, the following conditions regarding use of equipment in works shall be satisfied:
(a) The Contractor shall be required to give a trial run of the equipment for establishing their capability to achieve the laid down Specifications and tolerances to the satisfaction of the Engineer before commencement of the work; (b) All equipment provided shall be of proven efficiency and shall be operated and maintained at all times in a manner acceptable to the Engineer,

General

Section 100

(c) All the plant/equipment to be deployed on the works shall be got approved from the Engineer for ensuring their fitness and efficiency before commencement of work; (d) Any material or equipment not meeting the approval of the Engineer shall be removed from the site forthwith; (e) No equipment will be removed from site without permission of the Engineer; and (f) The Contractor shall also make available the equipment for site quality control work as directed by the Engineer.

107

CONTRACT DRAWINGS

107.1 The Contract Drawings provided for tendering purposes shall be as contained in the Tender Documents And shall be used as a reference only. The Contractor should visualise the nature and type of work contemplated and to ensure that the rates and prices quoted by him in the Bill of Quantitie's have due consideration of the qualitative and quanfitative variations, as may be found at the site and - complexities of work involved during actual execution/construction. 107.2 The tendered rates/prices for the work shall be deemed to include the cost of preparation, supply and delivery of all necessary drawings, prints tracings and negatives which the- Contractor is required to provide in accordance with the Contract. 107.3 Two copies of drawings, on the basis of which actual execution of the work is to proceed, shall be furnished free of cost to the Contractor by the Engineer progressively according to the work programme submitted by the Contractor and accepted by the Engineer. Drawings for any particular activity shall be issued' to the Contractor at least 30 days in advance of the scheduled date of the start of the activity. 107.4 Examination and /or approval by the Engineer of any drawings or other documents submitted by the Contractor shall not relieve the Contractor of his responsibilities or liabilities under the Contract.

108

SITE INFORMATION

108.1 The information about the site of work and site conditions in the Tender Documents is given *in good faith for guidance only but the Contractor shall satisfy himself regarding all aspects of site conditions. 108.2 The location of tile works and the general site particulars are as generally shown on the Site plan/Index plan enclosed with the Tender Documents.

General

Section 100

108.3 Whereas the right-of-way to the bridge sites/road works shall be provided to the Contractor by the Engineer, the Contractor shall have to make his own arrangement for the land required by him for site offices, labour camps, stores, etc. 108.4 The quarry charts enclosed with the Tender Documents indicate the location of quarries and other sources from which naturally occurring materials are available, for guidance of the Contractor. The leads indicated in the said charts are only approximate. It is assumed that the Contractor has inspected the quarries, borrow-areas etc., before quoting his rates'for the work to assess the availability of construction materials in required quantity and quality.

109

SETTING OUT

109.1 The Contractor shall establish working Bench Marks tied with " Reference Bench X- e area soon after taking possession of the site. The Reference Bench Mark for the area shall be as indicated in the Contract Documents and the values of the same shall be obtained by the Contractor from the Engineer. The working Bench Marks shall be at the rate of four per km and also at or near all drainage structures, over-bridges and underpasses. The working Bench Marks/levels should be got approved from the Engineer. Checks must be made on these Bench Marks once every month and adjustments, if any, got agreed with the \Engineer and recorded. An up-to-date record of all Bench Marks including approved adjustments, if any, shall be maintained by the Contractor and also a copy supplied to the Engineer for his record. 109.2 The lines and levels of formation, side dopes, drainage works, carriageways and shoulders shall be carefully set out and frequently checked, care being taken to ensure that correct gradients and crosssections are obtained everywhere. 109.3 In order to facilitate the setting out of the works, the centre line of the carriageway or highway must be accurately established by the Contractor and approved by the Engineer. It must then be accurately referenced in a manner satisfactory to the Engineer, every 50 m intervals in plain and rolling terrains and 20 m intervals in hilly terrain and in all curve points as directed by the Engineer, wA marker pegs and chainage boards set in or near the fence line, and a schedule of reference dimensions shall be prepared and supplied by the Contractor to the

General

Section 100

Engineer. These markers shall be maintained until the works reach finished formation level and are accepted by the Engineer. 109.4 On construction reaching the formation level stage, the centre line shall again be set out by the Contractor and when approved by the Engineer, shall be accurately referenced in a manner satisfactory to the Engineer by marker pegs set at the outer limits of the formation. 109.5 No reference peg or marker shall be moved or withdrawn without the approval of the Engineer and no earthwork or structural work shall be commenced until the centre line has been referenced. 109.6 The Contractor will the sole responsible party for safe-guarding all survey monuments, bench marks, beacons, etc. The Engineer will provide the Contractor with the data necessary for setting out of the centre line. All dimensions and levels shown on the drawings or mentioned in documents forming part of or issued under the Contract shall be verified by the Contractor on the site and he shall immediately inform the Engineer of any apparent errors or discrepancies in such dimensions or levels. The Contractor shall, in connection with the staking out of the centre line, survey the terrain along the road and shall submit to the Engineer for his approval, a profile along the road centre line and cross-sections at intervals as required by the Engineer. 109.7 After obtaining approval of the Engineer, work on earthwork can commence and the profile and cross-sections shall form the basis for measurements and payment. The Contractor shall be responsible for ensuring that all the basic traverse points are in place at the commencement of the contract and if any are missing, or appear to have been disturbed, the Contractor shall make arrangements to re-establish these points. A "Survey File" containing the necessary data will be made available for this purpose. If in the opinion of the Engineer, design modifications of the centre line or-grade are advisable, the Engineer will issue detailed instructions to the Contractor and the Contractor shall perform the modifications in the field, as required, and modify the ground levels on the cross-sections accordingly as many times as required. There will be no separate payment for any survey work performed by the Contractor. The cost of these services shall be considered as being included in the cost of the items of work in the Bill of Quantities. 109.8 The work of setting out shall be deemed to be a part of general works preparatory to the execution of work and no separate payment shall be made for the same. 109.9 Precision automatic levels, having a standard deviation of 2 mm per km, and fitted with micrometer attachment shall be used for all double run levelling work.

General

Section 100

Setting out of the road alignment and measurement of angles shall be done by using theodolite with traversing target, having an accuracy of one second. Measurement of distances shall be done preferably using precision instruments like Distomat.

110

PUBLIC UTILITIES

110.1 Drawings scheduling the affected services like water pipes, sewers, oil pipelines, cables,, gas ducts etc. owned by various authorities including Public Undertakings and Local Authorities included in the Contract Documents shall be verified by the Contractor for the accuracy of the information prior to the commencement of any work. 110.2 Notwithstanding the fact that the information on affected services may not be exhaustive, the final position of these services within the work~ shall be supposed to have been indicated based on the information furnished by different bodies and to the extent the bodies are familiar with the final proposals. The intermediate stages of the works are, however, unknown at the design stage, these being dictated by the Contractor's methods of working. Accordingly, the Contractor's'programme must take into account the period of notice and duration of diversionary works of each body as given on the Drawings and the Contractor must also allow for any effect of these services and alterations upon the Works and for arranging regular meetings with the various bodies at the commencement of the Contract and throughout the period of the Works in order to maintain the required co-ordination. During .the period of the Works, the Contractor shall have no objection if the public utility bodies vary their decisions in the execution of their proposals in terms of programme and construction, provided that, in the opinion of the Engineer, the Contractor has received reasonable notice thereof before the relevant alterations are put in hand. 110.3 No clearance or alterations to the utility shall be carried out unless specially ordered by the Engineer. 110.4 Any services affected by the Works must be temporarily supported by the Contractor who must also. take all measures reasonably required by the various bodies to protect their services and property during the progress, of the Works. 110.5 The Contractor may be required to carry out certain works for and - on behalf of the various bodies and he shall also provide, with the prior approval of the Engineer, such assistance to the various bodies.as may be authorised by the Engineer. 110.6 The work of temporarily supporting and protecting the public utility services during execution of the Works shall be deemed to be part of the Contract and no extra payment shall be made for the same. 110.7 The Contractor may be required to carry out the removal or shifting of certain

General

Section 100

services/utilities on specific orders from the Engineer for which payment shall be made to him. Such works shall be taken up by the Contractor only after obtaining clearance from the Engineer and ensuring adequate safety measures. 111 111.1 General The Contractor shall take all precautions for safeguarding the environment durmig the course of the construction of the works. He shall abide by all laws, rules and regulations in force governing pollution and environmental protection that are applicable in the area where the works are situated. 111.2 Borrowpits for Embankment Construction Borrowpits shall not be dug in the right-of-way of the road. The stipulations in,Clause 305.2.2. shall govern. 111.3 Quarry Operations. The Contractor shall obtain materials from quarries only after the consent of the Forest Department or other concerned authorities is obtained. The quarry operations shall be undertaken within the purview of the rules and regulations in force. 111.4 Control of Soil Erosion, Sedimentation and Water Pollution The Contractor shall carry out the works in such a manner that soil erosion is,fully controlled, and sedimentation and pollution of natural water courses, ponds, tanks and reservoirs is avoided. The stipulations in Clause 306 shall govern. 111.5 Pollution -from Hot-Mix Plants and Batching Plants Biturninous hot-mix plants and concrete batching plants shall be located sufficiently away from habitation, agricultural operations or industrial establishments. The Contractor shall take every precaution to reduce the levels of noise, vibration', dust and emissions from his plant and shall be fully responsible for any claims for damages caused to the owners of property, fields and residences in the vicinity. 111.6 Substances Hazardous to Health The Contractor shall not use or generate any materials in the works which are hazardous to the health of persons, animals or vegetation. Where it is necessary to use some substances which can cause injury to the health of workers, the Contractor shall provide protective clothing or appliances- to his workers. 111.7 Use of Nuclear Gauges Nuclear gauges shall be used only where permitted by the Engineer. The Contractor shall provide the Engineer with a copy of the regulations governing the safe use of nuclear gauges he intends to employ and shall abide by such regulations. 111.8 The Contractor must take all reasonable steps to minimise dust nuisance during the, construction of the works. PRECAUTIONS FOR SAFIEGUARDIING THE ENVIRONMENT

General

Section 100

111.9 All existing highways and roads used by vehicle of the Contractor or any of his sub-contractors or suppliers of materials or plant, and similarly any new roads which are part of be works and which are being used by-traffic,-shall be kept clean and clear of all dust/mud or other extraneous materialS dropped by the said vehicles or their tyres. Similarly, all dust/mud or other extraneous materials from the works spreading on these highways shall be immediately cleared by the Contractor. 111.10 Clearance shall be effected immediately by manual sweeping and removal of debris, or, if so directed by the Engineer, by mechani.cal sweeping and clearing equipment, and all dust, mud and other debris shall be removed entirely from the road surface. Additionally, if so directed by the Engineer, the road surface shall be hosed or watered using suitable equipment. 111.11 Any structural damage caused to the existing roads by the Contractor's construction equipment shall be made good without any extra cost. 111.12 Compliance with the foregoing will not relieve the Contractor of any responsibility for complying with the requirements of any Highway Authority in respect of the roads used by him.. 112 112.1 General The Contractor shall at all times carry out work on the highway in a manner creating least interference to the flow of traffic while consistent with the satisfactory execution of the same. For all works involving improvements to the existing highway, the Contractor shall, in accordance with the direction of the Engineer, provide and maintain, during execution.of the work a passage for,traffic either along a part of the existing carriageway under improvement, or along a temporary diversion constructed close to the highway. The Contractor shall take prior approval of the Engineer regarding traffic arrangements during construction. 112.2 Passage of Traffic along a part of the Existing Carriageway under Improvement For widening/strengthening existing carriageway where part width of the existing carriageway is proposed to be used for passage of traffic, ramed shoulders shall be provided on the side on which work is not & progress. The treatment to the shoulder shall consist of providing odtast 150 mm thick granular base course covered with bituminous surface dressing in a width of-atleast 1.5 in and the surface shall maintained throughout the period during which traffic uses the same satisfaction of the Engineer. The continuous length in which work shall be carried out, would be limited normally to 500 m place. However, where work is allowed by the Engineer in longer stretches passing places atleast 20 in long with additional paved width,of 23 m shall be provided at every 0.5 km interval. ARRANGEMENT FOR TRAFFIC DURING CONSTRUCTION

General

Section 100

In case of widening existing two-lane to' four-lane, the additional two lanes would be constructed first and the, traffic diverted to it and ouly thereafter the required treatment to the existing carriageway would be carried out. However, in case where on the request of the~.Contractor, work on existing two-lane carriageway is allowed by the Engineer with traffic using part of the existing carriageway, stipulations as in pm. above shall apply. After obtaining permission of the Engineer, the treatedshoulder be dismanded, the debris disposed of and the area cleared as per the direction of the Engineer. 112.3 Passage of Traffic along a Temporary Diversion In stretches where it is not possible to pass the traffic on part width of the carriageway, a temporary diversion shall be constructed with 7 in carriageway and 2.5 in earthen shoulders on each ~ide (total WM of roadway 12 in) with the following provision for road crust .in the 7 in width:
(i) 200 turn (compacted) granular subbase; (ii) 225 mm (compacted) granular base course; and (iii) Premix carpet with Seal Coat/Mix Seal Surfacing.

The alignment and longitudinal section of diversion including -juncdons and temporary cross drainage provision shall be as approved by the Engineer. 112.4 Traffic Safety and Control The Contractor shall take all necessary measures for the safety %.of traffic during construction and provide, erect and maintain such barricades, including sips, markings, flags, lights and flagmen as may be required by the Engineer for the information and protection of traffic approaching or passing through the section of the highway under improvement. Before taking up any construction, an agreed phased programme for the diversion of traffic on the highway shall be drawn up in consultation with the Engineer. The barricades erected on either side of the carriageway/portion of the carniageway closed' to traffic, shall be of strong design to resist violation, and.painted with. alternate black and white stripes. Red lanterns or warning lights of similar type shall be mounted on tfie barricades at ~ight and kept lit throughout from sunset to sunrise. At the points where traffic is to deviate from its normal path (whether on temporary diversion or part width of the carriagew~y) the channel for traffic shall be clearly marked with the aid of pavement markings, painted drums or a similar device to the directions of the Engineer. At night, the passage shall be delineated with lanterns or other suitable light source. One-way. traffic operation shall be established whenever the traffic is to be passed over part of the carriageway inadequate for two-lane traffic. This shall be done with the help of temporary traffic signals or flagmen kept positioned on opposite sides during all hours. For regulation of traffic, the flagmen shall be equipped with red and green flags and lanterns/lights. On both sides, suitable regulatpry/waming signs as approved by the Engineer shall be installed for the guidance of road users. On each approach,. at least, two signs shall be put up, one close to the point where transition of carriageway begins and the other 120

General

Section 100

m away. The signs shall be of approved design and of reflectory type, if so directed by the Engineer. 112.5 Maintenance of Diversions and Traffic Control Devices Signs, lights, barriers and other traffic control devices, as well as the riding surface of diversions shall be maintained in a satisfactory condition till such time they are required as directed by the Engineer. The temporary travelled way shall be kept free of dust by frequent applications of water, if necessary. 112.6 Measurements for Payment and Rate All arrangements for traffic during construction including provision of temporary cross drainage structures, if required, and treated shoulder as described in Clause 112.2 including their maintenance, dismantling and clearing debris, where necessary, shall be considered as incidertal to the works and shall be the Contractor's responsibility. The construction of temporary diversion including temporary cross drainage structures as described in Clause 112.3, shall be measured in linear metre and the unit contract rate shall be inclusive of full compensation for construction (including supply of material, labour, tools etc.), maintenance, final dismantling, and disposal. 113 GENERAL RULES FOR THE MEASUREMENT OF WORKS FOR PAYMENT

113.1 General All measurements shall be made in the metric system. Differen t items of work shall be measured'in accordance with the procedures set forth in the relevant sections read in conjunction with the General Conditions of Contract. The same shall not, however, apply in the case of lumpsum contracts. All measurements and computations, unless otherwise indicated, shall be carried nearest to the following limits:
(i) (ii) length and breadth height, depth or thickness of earthwork, subgrade, sub-bases, bases, surfacing and structural members (iii) (iv) areas cubic contents 5 mm 0.01 sq. m. 0.01 cu. m. 10 mm

In recording dimensions of work, the sequence of length, width and height or depth or thickness shall be followed. 113.2 Measurement of Lead for Materials Where lead is specified in the Contract for construction materials, the same shall be measured as described hereunder: Lead shall be measured over the shortest practicable route and not the one actually taken and the decision of the Engineer in this regard shall be taken as final. Distances upto and including 100 m shall be measured in units of 50 m, exceeding 100 m but not

General

Section 100

exceeding I km in units of 100 m and exceeding I kni in units of 500 m, the half and greater than half of the unit shall be reckoned as one and less than half of the unit ignored. In this regard, the source of the material shall be divided into suitable blocks and for each block, the distance from the centre of the block to the centre of placing pertaining to that block shall be taken as the lead distance. 113.3 Measurement of Pavement Thickness for Payment on Volume Basis The finished thickness of sub-base, base and bituminous courses to be paid on volume basis shall be computed in the following manner: Levels shall be taken before and after. construction, at grid of point; 10 m centre to centre longitudinally in straight reaches but 5 m at curves, Normally, on two-lane roads, the levels shall be taken at four positiorm transversely, at 0.75 and 2.75 m from either edge of the carnageway; and on single lane roads, these shall be taken at two sitions transversely, being at 1.25 m from either edge. of the carriageway. For multi-lane roads, levels shall be taken at two positions traunsversely for each lane at locations specified by the Engineer. Suitable references for the transverse grid lines should be le in the form of embedded bricks on either ends or by other means so that it is possible to locate the grid points for level measuremen after each successive course is laid. For pavement courses laid only over widening portions, atleast line of levels shall be taken on each strip of widening, or more dependin on the width of widening as decided by the Engineer. Notwithstanding the above, the measurements may be taken at clos intervals also, if so desired by the Engineer, the need for which may arise particularly in the case of estimation of the volume of t for profile corrective course (levelling course). The average thickn of the pavement course in any area shall be the arithmetic mean of th difference of levels before and after construction at all the grid poin falling in that area, provided that the thickness of finished work s be limited to those shown on the drawings or approved by the Engin in writing. As supplement to level measurements, the Engineer shall ave option to take cores/make holes to check the depth of constr ction. T holes made and the portions cut for taking cores shall be ade g by the Contractor by laying fresh mix/material including compacting required at no extra cost immediately after the measurements are record 113.4 Checking -of Pavement Thickness for Payment on Area Basis Where payment for any bituminous course in Section 500 is allowed to be made on area basis, the Engineer may have its thickness checked with the help of a suitable penetration gauge at regular intervals or other means as he may decide. 113.5 Measurement of Bituminous Courses for Payment on Weight Basis Plant-mixed bituminous materials for pavement courses where designated to be paid on weight basis shall be weighed on accurate scales approved by the Engineer. Approved scales shall mean scales that are of size, capacity, kind and type suitable for the

General

Section 100

weighing to be done, and these shall be properly and adequately installed and maintained. Prior to the use of the scales and as frequently thereafter as the Engineer may deem necessary to ensure accuracy, the scales shall be checked and approved by the Engineer, or the Engineer may direct the Contractor to have the scales checked by other competent agency at the cost of the Contractor. Location of the scales shall be as.designated by the Engineer. Trucks used for hauling the material to be weighed shall be weighed empty daily at such times as the Engineer directs, and each truck shall bear a plainly legible identification mark. For materials specified to be measured by weight, the Engineer will have the option to make measurements of the finished work by volume in accordance with Clause 113.3 and such volumes shall be converted into weight for payment purposes. The factor for conversion from volume meas prement to weight measurement shall be computed from the representative density of the compacted material at site determined at locations approved by the Engineer. 114 SCOPE OF RATES FOR DIFFERENT ITEMS OF WORK

114.1 For item rate contracts, the contract unit rates for different items of work shall be payment in full for completing the work to the requirements of the Specifications including full compensation for all the operations detailed in the relevant sections of these Specifications under "Rates". In the absence of any directions to the contrary, the rates are to be considered as the full inclusive rate for finished work covering all labour, materials, wastage, temporary work, plant, equipment, over-head charges and profit as well as the general liabilities, obligations, insurance and risks arising out of General Conditions of ConUWL 114.2 The item rates quoted by the Contractor shall, unless otherwise specified, also include compliance with/supply of the following :
(i) General works such as setting out, clearance of site before setting out and clearance of works after completion; (h) A detailed programme for the construction and completion of the work(using CPMj PERT techniques) giving, in addition to construction activities, detailed network activities for the submission and approval of materials, procurement of critical materials and equipment, fabrication of special products/equipment and their installation and testing, and for all activities of the Employer that are likely to affect the progress of work, etc., including updating of all such activities on the basis of the decisions taken at the periodic site review meetings or as directed by the Engineer (iii) Samples of various materials proposed to be used on the Work for conducting tests thereon as required as per the provisions of the Contract; (iv) Design of mixes as per the relevant Clauses of the Specifications giving proportions of ingredients, sources of aggregates and binder along with accompanying trial mixes as per the relevant Clauses of these Specifications to be submitted to the Engineer for his approval before use on the Works; (v) Detailed design calculations and drawings for all Temporary Works (such as formwork; staging, centering; specialised constructional handling and launching equipment and the like); (vi) Detailed drawings for templates, support and end anchorage, details for prestressing cable profiles, bar bending and cutting schedules for reinforcement, material lists for fabrication of structural steel, etc;

General

Section 100

(vii) Mill test reports for all mild and high tensile steel and cast steel as per the relevant provisions of the Specifications; (viii) Testing of various finished items and materials including bitumen, cement concrete, bearings as required under these Specifications and furnishing tes; reports/certificates; (ix) Inspection Reports in respect of formwork, staging, reinforcement and other items of work as per the relevant Specifications; (x) Any other data which may be required as per these ' Specifications or the Conditions of Contract or any other annexures/schedules forming part of the Contract; (xi) Any other item of work which is not specifically provided in the Bill of Quantities but which is necessary for complying with the provisions of the Contract; (xii) All temporary works, formwork and false work; (xiii) Establishing and running a laboratory with facilities for testing for various items of works as specified in Section 900 and other relevant Clauses, where there is no separate item in the Bill of Quantities for establishing and running a laboratory; (xiv) (xvi) Cost of in-built provisions for Quality Assurmnce~ (xv) Cost of safeguarding the environment; and Cost of providing "as-built drawings" in original and two sets of prints.

114.3 Portions of road works beyond the limits and/or any other work may be got constructed by the Employer directly through other agencies. Accordingly, other agencies employed by the Employer may be working in the vicinity of the Works being executed by the Contractor. The Contractor shall liaise with such agencies and adjust his construction programme for the completion of work accordingly and no claim or compensation due to any reason whatsoever will be entertained on this account. The Employer will be indemnified by the Contractor for any claims from other agencies on this account. 115 METHODOLOGY AND SEQUENCE OF WORK

Prior to start of the construction activities at site, the Contractor shall, within 30 days after the date of the Letter of Acceptance, submit to the Engineer for approval, the detailed construction methodology including mechanical equipment proposed to be used, sequence of various activities and schedule from start to end of the project. Programme relating to pavement and shoulder construction shall be an integrated activity to be done simultaneously in a coordinated manner. The methodology and the sequence shall be so planned as to provide proper safety, drainage and free flow of traffic. 116 CRUSHED STONE AGGREGATES

Where the terms crushed gravel/shingle, crushed stone, broken stone or stone aggregate appear in any part of the Tender Documents or Drawings issued for work, they refer to crushed gravel/crushed shingle/crushed stone aggregate obtained from integrated crushing plant having appropriate primary crusher, secondary crusher and vibratory screen. 117 APPROVAL OF MATERIALS

General

Section 100

Approval of all sources of material for work shall be obtained in writing from the Engineer before their use on the project. 118 SUPPLY OF QUARRY SAMPLES

Raw and processed samples of the mineral aggregates from the approved quarry shall be submitted by the Contractor at no extra cost. 119 USE OF SURFACES BY CONSTRUCTION TRAFFIC

119.1 Ordinarily, no construction traffic shall be allowed on pavement under construction unless auLhorised by the Engineer. Even in that case the load and intensity of construction traffic should be so regulated that no damage is caused to the subgrade or pavement layers already constructed. Where necessary, service roads shall be constructed for this purpose and the same shall be considered as incidental to the work. 119.2 The wheels or tracks of plant moving over the various pavement courses shall be kept free of deleterious materials. 119.3 Bituminous base course shall be kept clean and uncontaminated as long as the same remains uncovered by a wearing course or surface treatment. The only traffic permitted access to the base course shall be that engaged in laying and compacting thewearing course or that engaged on such surface treatment where the base-course is to be blinded and /or surface dressed. Should the base course or tack coat on the base course become contaminated, the Contractor shall make good by clearing it to the satisfaction of the Engineer, and if this is impracticable, by removing the layer and replacing it to Specification without any extra cost.

120

SITE OFFICE FOR ENGINEER AND OTHER SUPERVISORY STAFF

120.1 Scope The work covers the construction and provision of furnished site office accommodation for the supervisory staff of Engineer and maintaining the same. 120.2 Description The Contractor shall arrange to provide fully furnished office accommodation constructed as shown in drawings. Work includes providing electric supply, all electrical items like lights, fans and complete wiring, providing water supply including all pipes, fittings, tanks, tube well, pumps, valves etc. complete, septic tank, sewer lines, drains, fencing, internal surfaced roads etc. complete as shown on the drawings. The Contractor shall provide the office accommodation within 4 months from the date of the commencement of work or 3 months from the date of providing the land and the working drawings for the construction of office accommodation, whichever is later. List of

General

Section 100

furniture to be provided and maintained for Engineer's site office shall be as in Table 100-2.
Table 100-2. LIST OF FURNITURE TO BE PROVIDED AND MAINTAINED FOR ENGINEER'S SITE OFFICE S.No. 01 02. 03. Item Executive table (for the Engineer) Executive chair (for the Engineer) Table (for Site Engineer, Accountant and Head Clerk) 04. Ordinary chair Type I(For the Engineer, Accountant, Head Clerk and visitors) 05. 06. Table (for all other staff) Ordinary chair-Type 11 (for all other staff and visitors) 07. 08. Stool Steel Almirah 1980mm x 915mm x 485mm or equivalent 09. Steel Almirah 1270mm x 765 nim x 440 mm 10. Racks - 5 Tier 1800 mm x 900 mm x 375 mm 11. Typewriter Made of slotted angles and M.S. Sheets of Godrej make Electronic-Bilingual (English & Hindi) Network make or equivalent. 12. Steel Cash Chest of size 1.5' x 1.5' (450 nun x 450 mm) (approx.) 13. Air'Coolers The coolers shall have 24" (60cm) size fan with suitable pump and shall be of either GEC, Khaitan or Cool Make-Godrej Storewel or equivalent Make-Godrej Model Minor plain or equivalent Make-Godrej Model No. ST-2 or equivalent. Make-Godrej Model No.1 Storewel plain Make-Godrej Model No T-101 or equivalent Make-Godrej Model No. CHR-6 or equivalent Make-Godrej Model No. CHR-6 or equivalent. Specifications Make - Godrej Model No. T-108 or equivalent Make-Godrej Model No. PCH-701 or equivalent Make-Godrej Model No. T-104 or equivalent. Nos. Reqd.*

General
Home make or equivalent 14. Room Heaters 2000 W capacity - Bajaj make or equivalent 15. 16. Ceiling Fans 1400 mm size Computer with printer Ceiling fans shall be of approved make and colour PC 486 with hard disc capacity 230 MB, Maths coprocessor, Two disc drives of 5.25" (132 mm) and 3.5" (88 mm), 14" (350 mm) size colour VGA monitor letter quality dotmatrix printer of 132 columns and 101 Key board 17. Photocopier Make RICOH Model Fr 4065 or equivalent * Numbers to be decided by the Engineer as per requirements of the Project. The heaters shall be of

Section 100

120.3 Ownership The site office with all services, furniture and fittings shall be the property of the Employer. The land for the site office shall be provided by the Engineer and the location shall be as indicated in the Drawings. 120.4 Maintenance The Contractor shall arrange to maintain the site office until the issue of Taking over Certificate for the complete work. Maintenance includes the day to day upkeep of the building and the surroundings, attending to repairs to various parts of the building, furniture, fittings, office equipment and the connected services as and when necessary, including the periodic white/colour washing of building and painting of wood work, steel work, replacing the broken window/door/ventilator glasses, furniture and other hardware and maintaining necessary watch and ward during day and night. The Contractor shall arrange to provide uninterrupted supply of electricity and water for the office building. In case of failure of main power/water supply; alternate source shall be available for providing uninterrupted supply. All sources, tappings and connected equipment and fittings, piping, tanks, wiring and all accessories of the main alternate power/water supply, for the site office accommodation shall be the property of the Employer. 120.5 Measurements for Payment The measurement for construction and provision of site office shall be in square metres of the plinth area of the office accommodation and the payment shall be made after the completion and handing over of the buildings with connected services fully furnished including office equipment for occupation.

General

Section 100

If the Contractor fails to hand over the furnished office accommodation within the period stipulated under Clause 120.2, an amount of Rs. 15,000 per month or part thereof shall be debited to the Contractor's account for the period of delay. The measurement for maintenance of Engineer's site office accommodation shall be on maintenance months and shall be made on completion of satisfactory maintenance every month. If at any stage, the Contractor fails to carry out the required maintenance satisfactorily, an amount of Rs. 5000 per month or part thereof shall be debited to the Contractor's account. In addition, the month/months during which the Contractor fails to carry out the required maintenance satisfactorily shall not be measured for payment. If the Contract works are not completed within the stipulated period or within the granted extended time of completion, maintenance of site office accommodation in accordance with Clause 120.4 shall be carried out by the Contractor at his own cost and as such no payment shall be made for the same. In case of any failure by the Contractor. to do so, an amount of Rs. 15,000 per month or part thereof shall be debited to the Contractor's account. 120.6 Rate The Contract unit rate for constructing and providing the site office accommodation shall include the expenses of all the operations involved in construction of the building including all services, fittings, fixtures, furniture, fencing, internal surfaced roads, as mentioned under Clause 120.2. The Contract unit rate for maintenance shall include expenses towards all items of works detailed in Clause 120.4 including power and water charges for supply from the mains and for providing uninterrupted supply of power and water from alternate sources in case of failure of main supply. 121 121.1 Scope The work covers the provision and maintenance of an adequately equipped field laboratory as required for site control on the quality of materials and the works. 121.2 Description The Contractor shall arrange to provide fully furnished and adequately equipped field laboratory constructed as shown in drawings. The field laboratory shall preferably be located adjacent to the site office of the Engineer and provided with amenities like water supply, electric supply etc. as for the site office of the Engineer in Clause i20.2. The floor space requirement for the field laboratory shall be as indicated in the drawing . It shall include office space for the Materials Engineers, one from the'Contractor's side and another from the Engineer's side and a store for the storage of samples. The remaining space shall be provided for the installation of equipment, laboratory tables and cupboards, working space for carrying out various laboratory tests, besides a wash FIELD LABORATORY

General

Section 100

basin, toilet facility and a curing tank for the curing of samples, around 4m x 2m x Im in size and a fume chamber. The furnishing in each of two offices of the Materials Engineers shall be as provided for the Site Engineer in Table 100-2. Wooden/concrete working table with a working platform area of about Im x 10m shall be provided against the walls, also providing wooden cupboards above and below the working tables to store accessories such as sample moulds etc. Atleast 4 racks of slotted angles and, M.S. sheets as at SI.No. 10 of Table 100-2 and atleast 6 stools for laboratory test operators as at SI.No 7 of Table 100-2 shall also be provided. 121.3 Laboratory Equipment The following items of laboratory equipment shall be provided in the field laboratory. 121.3.1
(i)

General

Oven - Electrically operated, thermostatically controlled, range upto 200'C sensitivity l*C I No. I No. I No. 2 Nos. I No.

(ii) (iii) (iv) (v)

Platform balance 300 kg capacity Balance 20 kg capacity-self indicating type Electronic Balance 5 k9 capacity accuracy 0.5 gm Water bath-electrically operated and thermostatically controlled with adjustable shelves, sensitivity VC

(vi)

Thermometers: Mercury-in-glass thermometer range 00 to 2500C Mercury-in-steel thermometer with 30 cm stem, range upto 300-C

4 Nos.

(vii) (viii)

Kerosene or gas stove or electric hot plate Glasswares, spatulas, wire gauzes, As required steel scales, measuring tape, casseroles, karahis, enamelled trays of assorted sizes, pestle-mottar, porcelain dishes, gunny bags, plastic bags, chemicals, digging tools like pickaxes, shovels etc.

I No.

(ix)

Set of IS sieves with lid and pan: 450 mm diameter: 63 mm, 53 mm. 37.5 mm, 26.5 mm, 13.2 mm, 9.5 mm, 6.7 mm and 4.75 mm size 200 mm diameter: 2.36 nun, 2.0 nun, 1.18 mm, 600 micron, 425 micron, 300 micron, 150 micron, and 75 micron 2 sets I set

(x) (xi)

Water testing kit First aid box

I set I set

General

Section 100

121.3.2
(i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (x) (xi) (xii)

For soils and aggregates


I No. I set I set I set I set I set I set I set 1 set I set I set I set

Riffle Box Atterberg Limits (liquid and plastic limits) determination apparatus Compaction Test Equipment both 2.5 kg and 4.5 kg rammen (Light and Heavy compactive efforts) I* Bulk Density Test apparatus (sand pouting cylinder, tray, can etc.) complete Speedy Moisture Meter complete with chemicals Post-hole Auger with extensions Core cutter apparatus 10 cm dia, 10115 cm height, complete with dolly, Tammer etc. Aggregate Impact Value Test apparatus/Los Angeles Abrasion Test apparatus Flakiness and Elongation Test Gauges Standard measures of 30, 15 and 3 litres capacity alongwith standard tamping rod California Bearing Ratio test apparatus Unconfined compression test apparatus

121.3.3
(i) (ii) (iii)

For bitumen and bituminous mixes


I set I No. I set I set

Penetrometer with standard needles Riffle box-small, size Centrifuge type bitumen extractor, hand operated, complete with petrol/commercial benzene

(iv) (v) (vi) (vii) (viii)

Marshall stability test apparatus, complete with all accessories Field density bottle alongwith cuning tray, chisel, hammer and standard sand 3 m straight edge Camber board Core cutting machine with 10 cm dia diamond cutting edge

2 Nos. I No. I No. I set

(ix)

Vacuum pump and 3 specific gravity bottles

I set

121.3.4
(i) (ii) (iii)

For cement and cement concrete


Vicat apparatus for testing setting times Slump testing apparatus Compression and Flexural strength testing I set 4 sets

General
machine of 200 torme capacity with additional dial for flexural testing (iv) (y) (vi) Needle Vibrator Air Meter Vibrating hammer for vibrating dry mix as for Dry Lean Cement concmte sub-base I No. I No. 2 Nos. I No.

Section 100

Note - The items and their numbers listed above in this Clause shall be decided by the Engineer as per requirements of the project and modified accordingly.

121.4 Ownership If provided as aseparate payable item in the Bill of Quantities, the field laboratory building and equipment shall be the property of the Employers and the land for laboratory will be provided by the Employer. 121.5 Maintenance If provided for as a separate payable item in the Bill ofQuantities, the ' Contractor shall arrange to maintain the field laboratory in a satisfactory manner until the issue of Taking Over Certificate for the complete work. Maintenance iticludes all activities described in Clause 120.4. 121.6 Measurements for Payment If provided as a separate payable item in the Bill of Quantities, the measurement for payment for the construction of the field laboratory shall be on square metres of plinth area. The supply of testing equipment, the erection, maintenance and running the samp shall be on a lump sum basis. 121.7 Rate If provided in the Bill of Quantities as a separate payable item, the contract unit rate for constructing and providing the field laboratory shall include expenses of all operations involved in construction of the building including all services, fittings, fixtures, furniture and fencing as mentioned in Clause 121.2. The Contract unit rate for maintenance shall include expenses towards all items of works and equipment in Clauses 121.2 and 121.3 including power and water charges for supply from the mains and for providing uninterrupted supply of power and water from alternate sources in case of failure of main supply. The Contract lumpsum rate for the supply, erection, maintenance 'and running of testing equipment shall include cost of supply, installation and running including all consurnables like chemicals and reagents. 122 SITE RESIDENTIAL ACCOMMODATION FOR ENGINEER AND OTHER SUPERVISORY STAFF

122.1 Scope

General

Section 100

The work covers the provision and maintenance of unfurnished site residential accommodation for the Engineer and other supervisory staff. The Contractor shall arrange to provide residential accommodation constructed as shown in the drawings. Work includes providing electric supply, all electrical items like wiring, switches,'all fittings, lights, fans, etc. complete; providing water supply and sanitation including all pipes, fittings, tanks, tube well, pumps, valves etc. complete; septic tank, sewer lines, drains, fencing, internal roads etc., complete as shown in the drawings. 122.2 Ownership The site residential accommodation with all services andfittings etc., shall be the property of the Employer. The land for the residential accommodation shall be provided by the Engineer and the location shall be as indicated by the Engineer. The Contractor shall provide the residential accommodation within 4 months from the date of commencement of the work or 3 months from the date of providing land and the working drawings for the construction of residential accommodation, whichever is later. 122.3 Maintenance The Contractor shall arrange to maintain the supervisory staff residential accommodation until the issue of Taking Over Certificate for the complete work. Maintenance includes attending to repairs to various parts of the building, fittings etc. and the connected services as and when necessary, including the annual white/colour washing of the building and periodic painting of wood and steel work; replacing the broken window/door, ventilator glasses and other hardware; and maintenance of internal roads. The Contractor shall arrange to provide uninterrupted supply of electricity and water for the buildings. In case of failure of main water or power supply, suitable alternate arrangement shall be made for The Contract lumpsum rate for the supply, erection, maintenance 'and running of testing equipment shall include cost of supply, installation and running including all consurnables like chemicals and reagents. 123 SITE RESIDENTIAL ACCOMMODATION FOR ENGINEER AND OTHER SUPERVISORY STAFF

123.1 Scope The work covers the provision and maintenance of unfurnished site residential accommodation for the Engineer and other supervisory staff. The Contractor shall arrange to provide residential accommodation constructed as shown in the drawings. Work includes providing electric supply, all electrical items like wiring, switches,'all fittings, lights, fans, etc. complete; providing water supply and sanitation including all

General

Section 100

pipes, fittings, tanks, tube well, pumps, valves etc. complete; septic tank, sewer lines, drains, fencing, internal roads etc., complete as shown in the drawings. 123.2 Ownership The site residential accommodation with all services andfittings etc., shall be the property of the Employer. The land for the residential accommodation shall be provided by the Engineer and the location shall be as indicated by the Engineer. The Contractor shall provide the residential accommodation within 4 months from the date of commencement of the work or 3 months from the date of providing land and the working drawings for the construction of residential accommodation, whichever is later. 123.3 Maintenance The Contractor shall arrange to maintain the supervisory staff residential accommodation until the issue of Taking Over Certificate for the complete work. Maintenance includes attending to repairs to various parts of the building, fittings etc. and the connected services as and when necessary, including the annual white/colour washing of the building and periodic painting of wood and steel work; replacing the broken window/door, ventilator glasses and other hardware; and maintenance of internal roads. The Contractor shall arrange to provide uninterrupted supply of electricity and water for the buildings. In case of failure of main water or power supply, suitable alternate arrangement shall be made for providing uninterrupted supply. All sources/tappings and connected equipment and fittings, piping, tanks, wiring and all other accessories of the main and alternate power/water supply for the residential accommodation shall be the property of the Employer. 123.4 Measurement for Payment The measurement for construction of the residential accommodation shall be on square metres of plinth area of the accommodation. The payment shall be made after the residential accommodation, complete with all services, fencing etc., is constructed and handed over for occupation. If the Contractor fails to complete and hand over the complete residential accommodation within the period stipulated under Clause 122.2, an amount of Rs. 50,000 per month or part thereof shall be debited to the Contractor's account for the period of delay. The measurement for maintenance of supervisory staff residential accommodation shall be in maintenance months and shall be made on completion of satisfactory maintenance every month. If at any stage the Contractor fails to carry out the required maintenance satisfactorily, an amount of Rs. 25,000 per month or part thereof shall be debited to the Contractor's account. In addition, the month/months during which the Contractor fails to carry out the required maintenance satisfactorily shall not be measured for payment. If the Contract works are not completed within the stipulated period or within the granted extended time of completion, maintenance of residential accommodation in accordance with Clause 122.3 shall be carried out by the Contractor at his own cost and as such no

General

Section 100

payment shall be made for the same. In case of any failure by the Contractor to do so, an amount of Rs. 60,000 per month or part thereof shall be debited to the Contractor's account. 123.5 Rate The Contract unit rate for constructing and providing residential accommodation for the Engineer and other supervisory staff shall include cost of all the operations involved in construction of buildings and connected services and fittings, fencing etc. complete. The Contract unit ratefor maintenance shall include theexpenses for all items of work detailed in Clause 122.3 including provision of uninterrupted supply of power and water. 124 PROVIDING AND MAINTAINING WIRELESS COMMUNICATION SYSTEM

124.1 Scope The work covers the provision and maintenance of wireless communication systems with necessary mobile/base trans-receivers and other accessories. 124.2 Supply The Contractor shall arrange to supply, install and commission the complete wireless system of approved quality suitable for a range of upto 65 kin. The system shall consist of the following:
(a) Mobile Trans-receiver suitable for mounting on 4 wheelers with Microphone assembly, Mobile Antenna with Cable and External Speaker assembly (3 W audio output) with all necessary fittings and accessories - 10 sets. (b) Base Trans-receivers with Microphone assembly, suitable Antenna, external speaker twit (3 W audio output) with all necessary fittings and accessories 3 sets. (c) Hand held radio sets - 10 Nos.

The Contractor shall provide the complete -wireless system within 12 months from the date of commencement of work or 8 months from the date on which frequency is allotted to him by the Govt. Department, whichever is later. He shall submit a guarantee for replacement of any defective trans-receiver/trans-receivers during the currency of the contract. 124.3 Approval The Contractor shall arrange to obtain all necessary statutory approvals from various Government bodies for operating the system. He shall also fulfil the requirements laid down by various Government Departments and obtain the frequency to operate the wireless system. 124.4 Maintenance The Contractor shall arrange to maintain the entire wireless system including the mobile and base trans-receivers and all accessories until the issue of the Taking Over Certificate for the complete work. He shall replace any Trans-receiver or accessory which goes out of order, at his own cost and provide all necessary spares and attend to all repairs necessary for keeping the complete system in satisfactory working condition.

General

Section 100

On issue of the Taking Over Certificate after obtaining clearance from the Engineer, the Contractor shall dismantle the complete wireless system and hand over to the Engineer. 124.5 Measurements for Payment The measurement for supply and installation of wireless system. shall be on lumpsum basis for the complete system as described in the preceding paras. If the Contractor fails to commission and hand over the complete wireless system in the stipulated time, an amount of Rs. 10,000 per month or part thereof shall be debited to the Contractor's account. The measurement for maintenance of the wireless system shall be on maintenance months and shall be made on completion of satisfactory maintenance every month. If the Contractor fails to carry out the required maintenance as directed by the Engineer at any stage of work, an amount of Rs. 5000 per month or part thereof shall be debited to the Contractor. In addition, the month/months during which the Contractor fails to carry out the required maintenance shall not be measured for payment. If the Contract Works are not completed within the stipulated period or within granted extended time of completion, the maintenance of wireless system in accordance with Clause 123.4 shall be carried out by the Contractor at his own cost and as such, no payment shall be made for the -sam*e. In case of any failure by the Contractor to do so, an amount of Rs. 8000 per month or part thereof shall be debited to the Contractor's account. 124.6 Rates The Contract unit rate for the supply and installation of wirriess system shall cover all the expenses towards the supply of all necessary items and expenses towards obtaining statutory approvals and operating frequency, erection, commissioning and handing over, guarantee for replacement of the trans-receiver/trans-receivers (which are found defecfive) during the currency of the Contract and' all other incid entals. The Contract unit rate for the maintenance of wireless system shall be payment in full for carrying out periodic servicing and checking of the system, replacement of components, attending 'to all necessary repair, payment of taxes, if any, and other incidentals to keep the complete system in satisfactory working condition. 125 PROVIDING AND MAINTAINING VEHICLES FOR THE ENGINEER

125.1 Scope The work covers providing and maintaining of hard top passenger cars and /or hard top jeeps for use by the Engineer as described under the Bill of Quantities. 125.2 Description The passenger cars shall be petrol or diesel driven and may be Ambassador or equivalent having cylinder capacity of minimum 1400 cc. The hard top jeeps shall be 4 W Drive either petrol or diesel driven and may be Maruti Gypsy Model MG - 410, Mahindra & Mahindra Jeep Model MM-540/MM-440 or equivalent. The number of'vehicles to be provided by the Contractor shall be decided by the Engineer at various times, out of the total provision in the Bill of Quantities and indicated in writing.

General

Section 100

The Contractor shall provide within one month from the date of order by the Engineer, vehicles as indicated above. The vehicles shall be provided and maintained until issue of the Taking Over Certificate for the complete Work. Initially, new vehicles shall be provided. In case of vehicles of Indian make ' a vehicle shall be replaced with a new vehicle after a maximum run of 75,000 kin or two years whichever is earlier. In case of vehicles of foreign make approved by the Engineer, the vehicle shall be replaced with a new vehicle after a maximum run of 1,60,000 km or three years whichever is earlier. All necessary taies for operating the vehicles shall be fully paid and all necessary papers shall be provided as required by prevailing Motor Vehicles Act with comprehensive insurance cover for the vehicles. The vehicles shall be provided day and night as required by the Engineer. The Contractor shall also make available drivers having valid licence at such times and for such duration as instructed by the Engineer. 125.3 Maintenance The vehicles shall be maintained in a smooth running condition. All expenses required for keeping the vehicles in smooth running condition such as fuel, lubrication oil and other consurnables, necessary service and maintenance, drivers, repairs and replacement etc. are to be met by the Contractor. In the event of any vehicle being off the road for maintenance or on account-of breakdown, the Contractor shall provide substitute vehicle(s) immediately. If the Contractor at any time fails to provide vehicle(s) or substitute vehicle(s) as specified above, an amount of Rs. 500 per day or part thereof for each vehicle (that the Contractor failed to provide) shall be debited to the Contractor's account. Also the number of days for which the vehicle(s) were not provided shall not be included for payment. If the Contract Works are not completed within the stipulated period or within the granted extended time of completion, provision and maintenance of vehicles in accordance with Clause 124.1 through 124A shall be carried out by the Contractor at his own cost and no payment shall be made for the same. In case of any failure by the Contractor to do so, an amount of Rs. 700 per day or part thereof per vehicle shall be debited to the Contractor's account. 125.4 Withdrawal of Vehicles The Contractor shall withdraw particular vehicle/vehicles for the non-use by the Engineer if so directed by the Engineer. In such cases the instructions for non-use of vehicle shall be given in writing 15 days in advance and the withdrawal of vehicles shall not be for a period of less than 15 days continuously at a time. 125.5 Measurements for Payment The payment for providing and maintaining vehicles shall be on vehicle day basis for actual number of days the vehicles were provided in satisfactory working order. No payment shall be made for the period of withdrawal as per Clause 124.4 irrespective of the fact whether vehicle was available or not. 125.6 Rates

General

Section 100

The Contract unit rate for providing and maintaining vehicles for Engineer shall include all expenses towards providing and keeping the vehicles in smooth running condition including taxes etc., mentioned in the preceding paras. 126 126.1 Scope The work covers the supply of photographs, negatives and albums to serve as a permanent record of various stages/facets of the work needed for an authentic documentation as approved by the Engineer. 126.2 Description The Contractor shall arrange to take, colour photographs at various stages/facets of the work including interesting and novel features of the work as desired by the Engineer. The photographs shall be of acceptable quality and they shall be taken by a professionally competent photographer with camera having the facility to record the date of photographs taken in the prints and negative. The Contractor shall supply two colour prints of each of the photographs taken to the standard postcard size mounted in albums of acceptable quality. Also the negative in 35 mm size shall be supplied for each photograph. Each photograph in the album shall be suitably captioned. 126.3 Measurements for Payment Supply of two copies of colour record photographs mounted in the albums and the negative thereof shall be measured in number of record photographs supplied. Supply of additional prints of colour record photographs shall be measured in number of additional prints supplied. 126.4 Rate The rate for the supply of record photographs shall include the cost of taking the photographs, developing and obtaining colour prints, cost of album, mounting of photographs and captioning the same etc. The rate for additional colour prints shall similarly include all costs incurred. The photographs and materials including negatives shall form a part of the records of the Department and the prints of the same cannot be supplied to anybody else or published without the written permission of the Department. 127 127.1 Description The work consists of taking video films of important activities of the work as directed by the Engineer during the currency of the project and editing them to a vidpo film of playing time not less than 60 minutes and upto 180 minutes as directed by the Engineer. It shall contain narration of the activities in English by a competent narrator. The edition of the video film and the script for narration shall be as approved by the Engineer. The video SUPPLY OF VIDEO CASSETTES SUPPLY OF COLOUR RECORD PHOTOGRAPHS AND ALBUMS

General

Section 100

cassettes shall be of acceptable quality and the film shall be capable of producing colour pictures. 127.2 Measurements for Payment The measurement shall, be by number of sets of edited master cassettes each with four copies thereof. 127.3 Rates The contract unit rate shall include all expenses for making video films with the help of a professionally competent photographer, editing, narration and supplying the final edited master cassette alongwith four copies thereof.

Site Clearance

Section 200

Site Clearance 200 Site Clearance

Site Clearance

Section 200

201 127.4 Scope

CLEARING AND GRUBBING

This Work shall consist of cutting, removing and disposing of all -4aterials such as Lrees, bushes, shrubs, stumps, roots, grass, weeds, top ",Organic soil not exceeding 150 mm in thickness, rubbish etc., which inn in the *c opinion of the Engineer are unsuitable for incorporation ,works, froni the area of road land containing road embankment, drains, c-drainage structures and such other areas as may be specified on the drawings or by the Engineer. It shall include necessary cxcavation, backfilling of pits resulting from uprooting of trees and stumps to required compaction, handling, salvaging, and disposal of cleared materials. Clearing and grubbing shall be performed in advance of earthwork operations and in accordance with the requirements of these Specifications. 127.5 Preservation of Property/Amenities Roadside trees, shrubs, any other plants, pole lines, fences, signs, monuments, buildings, pipelines, sewers and all highway facilities within or adjacent to the highway which are not to be disturbed shall be protected from injury or damage. The Contractor shall provide and install at his own expense, suitable safeguards approved by the Engineer for this purpose. During clearing and grubbing, the Contractor shall take all adequate precautions against soil erosion, water pollution, etc., and where required, undertake additional works to that effect vide Clause 306. Before start of operations, the Contractor shall submit to the Engineer for approval, his work plan including the procedure to be followed for disposal of waste materials, etc., and the schedules for carrying out temporary and permanent erosion control works as stipulated,in Clause 306.3. 127.6 Methods, Tools and Equipments Only such methods, tool, and equipment as are approved by the Engineer and which will not affect the property to be nreserved shall be adopted for the Work. If the area has thick vegetation/roots/trees, a crawler or pneumatic tyred dozer of adequate capacity may be used for clearance purposes. The dozer shall have ripper attachments for removal of tree stumps. All trees, stumps, etc., falling within excavation and fill lines shall be cut to such depth below ground level that in no case these fall within 500 mm of the subgrade. Also, all vegetation such as roots, under-growth, grass and other deleterious matter unsuitable for incorporation in the embankment/subgrade shall be removed between fill lines to the satisfaction of the Engineer. On areas beyond these limits, trees and stumps required to be removed as directed by the Engineer shall be cut down to I in below ground level so that these do not present an unsightly appearance. All branches of trees extending above the roadway shall be inmined as d=ted by the Engineer All excavations below the general ground level arising out of the removal of trees, stumps, etc., shal I be filled with suitable material and compacted thoroughly so as to make the surface at these points conforrm to the surrounding area.

Site Clearance

Section 200

Ant-hills both above and below the ground, as are liable to collapse and obstruct free subsoil water flow shall be removed and their workings, which may extend to several metres, shall be suitably treated. 127.7 Disposal of Materials All materials arisin% from clearin% vad ypxlob~u% vpev&1IDns shall be the property of Government and shall be disposed of by the Contractor as hereinafter provided or directed by the Engineer. Trunks, branches and stumps of trees shall be cleaned of limbs and roots and stacked. Also boulders, stones and other materials usable in road construction shall be neatly stacked as directed by the Engineer. Stacking of stumps, boulders, stones etc., shall be done at specified spots with all lifts and upto a lead of 1000 in. All products of clearing and grubbing which, in the opinion of the Engineer, cannot be used or auctioned shall be cleared away from the roadside in a manner as directed by the Engineer. Care shall be taken to see that unsuitable waste materials are disposed of in such a manner that there is no likelihood of these getting mixed up with the materials meant for embankment, subgrade and road construction. 127.8 Measurements for Payment Clearing and grubbing for road embankment, drains and crossdrainage structures shall be-measured on area basis in terms of hectares. Clearing and grubbing of borrow areas shall be deemed to be a part of works preparatory to embankment construction and shall be deemed to have been included in the rates quoted for the embankment construction item and no separate payment shall be made for the same. Cutting of trees upto 300 mm in girth' including removal of stumps and roots, and trimming of branches of trees extending above the roadway shall be considered incidental to the clearing and grubbing operations. Removal of stumps left over after trees have been cut by any other agency shall also be considered incidental to the clearing and grubbing operations. Cutting, including removal of stumps and roots of trees of girth above 300 mm and backfilling to required compaction shall be measured in terms of number according to the sizes given below:i) ii) iii) Above 300 mm to 600 mm Above 600 mm to 900 mm Above 900 mm to 1800 mm

iv) Above 1800 mm

For this purpose, the girth shall be measured at a height of 1 metre above ground or at the top of the stump if the height of the stump is less than one metre from the ground. 127.9 Rates 127.9.1 The Contract unit rates for -1he various items of clearing and grubbing shall be payment in full-for carrying out the required operations including full compensation for all labour, materials, tools, equipment and incidentals necessary to complete the work. These will also include removal of stumps of trees less than 300 mm in girth as well as stumps left over after cutting of

Site Clearance

Section 200

trees carried out by another agency, excavation and back-filling to required density, where necessary, and handling, salvaging, piling and disposing of the cleared materials with all lifts and upto a lead of 1000 m. 127.9.2 The Contract unit rate for cutting (including removal of stumps and roots) of trees of girth above 300 mm shall include excavation and backfilling to required compaction, handling, salvaging, piling and disposing of the cleared materials with all lifts and upto a lead of 1000 m. 127.9.3 Where a Contract does not include separate items of clearing and grubbing, the same shall be considered incidental to the earthwork items and the Contract unit prices for the same shall be considered as including clearing and grubbing operations. 128 128.1 Scope This work shall consist of removing, as hereinafter set forth, existing culverts, bridges, pavements, kerbs and other structures like guard-rails, fences, utility services, manholes, catch basins, inlets, etc., which are in place but interfere with the new construction or are not suitable to remain in place, and of salvaging and disposing of the resulting materials and back filling the resulting trenches and pits. Existing culverts, bridges, pavements and other structures which are within the highway and which are designated for removal, shali be removed upto the limits and extent specified in the drawings or as indicated by the, Engineer, Dismantling and removal operations shall be carried out with such equipment and in such a manner as to leave undisturbed, adjacent pavement, structures and any other work to be left in place. All operations necessary for the removal of any existing structure which might endanger new construction shall be completed prior to t'ie start of new work. 128.2 Dismantling Culverts and Bridges The structures shall be dismantled carefully and the resulting materials so removed as not to cause any damage to the serviceable materials to be salvaged, the part of the structure to be retained and any other properties or structures nearby. Unless otherwise specified, the superstructure portion of culverts/ bridges. shall be entirely removed and other parts removed below the ground level or as necessary depending*upon the interference they cause to the new construction. Removal of overlying or adjacent material, if required in connection with the dismantling of the structures, shall be incidental to this item. Where existing culverts/bridges are to be extended or otherwise incorporated in the new work, only such part or parts of the existing structure shall be removed as are necessary and directed by the Engineer to provide a proper connection to the new work. The connecting edges shall be cut, chipped and trimmed to the required lines.and grades DISMANTLING CULVERTS, BRIDGES AND OTHER STRUCTURES/PAVEMENTS

Site Clearance

Section 200

without weakening or damaging any part of the structure to be retained. Due care should be taken to ensure that reinforcing bars which are to be left in place so as to project into the new work as dowels or ties are not injured during removal of concrete. Pipe culverts shall be carefully removed in such a manner as to avoid damage to the pipes. Steel structures shall, unless otherwise provided, be carefully dismantled in such a manner as to avoid damage to members thereof, If specified in the drawings or directed by the Engineer that the structure is to be removed in a condition suitable for re-erection, all members shall be match-marked by the Contractor with white lead paint before dismantling; end pins, nuts, loose plates, etc., shall be similarly marked to indicate their proper location; all pins, pin holes and machined surfaces shall be painted with a mixture of white lead and tallow and all loose parts shall be securely wired to adjacent members or packed in boxes. Timber structures shall be removed in such a manner as to avoid damage to such timber or lumber as is designated by the Engineer to be salvaged. 128.3 Dismantling Pavements and Other Structures In removing pavements, kerbs, gutters, and other structures like guard-rails, fences, manholes, catch basins, inlets, etc., where portions of the existing construction are to be left in the finished work, the same shall be removed to an existing joint or cut and chipped to a true line with a face perpendicular to the surface of the existing structure. Sufficient removal shall be made to provide for proper grades and connections with the new work as directed by the Engineer. All concrete pavements, base courses in carriageway and shoulders etc., designated for removal shall be broken to pieces whose volume shall; not exceed 0.02 cu. m. and stockpiled at designated locations if the material is to be used later or otherwise arranged for disposal as directed (see Clause 202.5). 128.4 Back-filling Holes and depressions caused by dismantling operations shall be backfilled with excavated or other approved materials and compacted to required density as directed by the Engineer. 128.5 Disposal of Materials All materials obtained by dismantling shall be the property of Government. Unless otherwise specified, materials having any salvage value shall be placed in neat stacks of Re materials within the rightof-way, as directed by the Engineer with all lifts and upto a lead of 1000 m. Pipe culverts that are removed shall be cleaned and neatly piled on the right-of-way at points designated by the Engineer with all lifts and lead upto 1000 in. Structural steel removed from old structures shall, unless otherwise specified or directed, be stored in a neat and presentable manner on blocks in locations suitable for loading.

Site Clearance

Section 200

Structures or portions thereof which are specified in the Contract for re-erection shall be stored in separate piles. Timber or lumber from old structures which is designated by the Engineer as materials to be salvaged shall have all nails and bolts removed therefrom and shall be stored in neat piles in locations suitable for loading. All materials obtained from dismantling operations which, in the opinion of the Engineer, cannot be used or auctioned shall be disposed of as directed by the Engineer with all lifts and upto a lead of 1000 128.6 Measurements for Payment The work of dismantling structures shall be paid for in units indicated below by taking measurements before and after, as applicable:
(i) (ii) (iii) (iv) (y) (vi) Dismantling brick/stone masonry/ concrete (plain and reinforced) Dismantling flexible and cement concrete pavement Dismantling steel structures Dismantling timber structures Dismantling pipes, guard rails, kerbs, gutters and fencing linear Utility services m. Nos. CU. In. tonne CU. m. CU. m.

128.7 Rates The Contract unit rates for the various items of dismantling shall be paid in full for carrying out the required operations including full compensation for all labour, materials, tools, equipment, safeguards and incidentals necessary to complete the work. These will also include excav ation and backfilling where necessary to the required compaction and for handling, salvaging, piling and disposing of the dismantled materials within all lifts and upto a lead of 1000 m.

Earthwork, Erosion Control and Drainage Earthwork, Erosion Control and Drainage 300

Section 300

Earthwork, Erosion Control and Drainage

Earthwork, Erosion Control and Drainage

Section 300

301 128.8 Scope

EXCAVATION FOR ROADWAY AND DRAINS

This work shall consist of excavation, removal and satisfactory disposal of all materials necessary for the construction of roadway, side &ains and waterways in accordance with requirements of these Specificalions and the lines, grades and cross-sections shown in the drawings or as indicated by the Engineer. It shall include the hauling and stacking of or hauling to sites of embankment and subgrade construction, suitable cut materials as required, as also the disposal of unsuitable cut materials in specifie d manner, trimming and finishing of the road to specified dimensions or as directed by the Engineer. 128.9 Classification of Excavated Material 128.9.1 Classification : All materials involved in excavation shall be classified by the Engineer in the following manner:
(a) Soil turf, sand, silt, loan, clay, mud. peat, black cotton soil, soft shale or loose and similar material which yields to the. ordinary application of pick, spade ordinary digging implement. Removal of gravel or any other nodular material direction noteixceeding 75 mm occurring in such stratz shall be deemed. to be This shall comprise topsoil, moorurn, a mixture of dose and/or shovel, rake or other havink dintertsion in any one covered under this category. (b)

Ordinary Rock (not requiring bl asting)IIiis shall include:

(i) rock types such as laterites, shales and conglomerates, varieties of limestone and sandstone etc., which may be quarried or split with crow bars, also including any rock which 'in dry state may be hard, requiring- blasting but which, when wet, becomes soft and manageable by mum other than blasting; (ii) macadam surfaces such as water bound and bitumenAar bound; soling of roads, paths etc. and hard core; compact' moorurn or stabilised soil requiring grafting tool or pick or both and shovel, closely applied; gravel and cobble stone having maximum dimension in any one direction between 75 and 300 mm; (iii) lime concrete, stone masonry in limemortar -and brick work in lime4cement mortar below ground level, reinforced'cement concrete which may be broken up with crow bars or picks and stone-masonry in cement mortar below ground level; and (iv) boulders which do not require blasting, having maximum dimension in any direction of mom than 300 mm, found lying loose on the surface or embedded in river bed, soil, talus, slope wash and terrace material of dissimilar origin. (c) Hard Rock (requiring blasting) This shall comprise: (i) any rock or cement concrete for the excavation of which the use of mechanical plant and/or blasting is required; (ii) reinforced cement concrete (reinforcement cut through but not separated from the concrete) below ground level; and (iii) (d) boulders requiring blasting. Hard Rock (blasting prohibited)

Hard rock requiring blasting as described under (c) but where blasting is prohibited for any reason and excavation has to be carried out by chiselling, wedging or any other agreed method. (e) Marshy Soil

Earthwork, Erosion Control and Drainage

Section 300

This shall include soils like soft clays and peats excavated below the original ground level of marshes and swamps and soils excavated from other areas requiring continuous pumping or bailing out of water.

128.9.2 Authority for classification : The classification of excavation shall be decided by the Engineer and his decision shall be final and binding on the Contractor. Merely the use of explosives in excavation will not be considered as a reason for higher classification unless blasting is clearly necessary in the opinion of the Engineer. 128.10 Construction Operations 128.10.1 Setting out : After the site has been cleared as per Clause 201, the limits of excavation shall be set out true to lines, curves, slopes, grades and sections as shown on the drawings or as directed by the Engineer. The Contractor shall provide all labour, survey instruments and materials such as strings, pegs, nails, bamboos, stones, lime, mortar, concrete, etc., required in connection with the setting out of works and the establishment of bench marks. The Contractor shall be responsible for the maintenance of bench marks and other marks and stakes as long as in the opinion of the Engineer, they are required for the work. 128.10.2 Stripping and storing topsoil : When so directed by the Engineer, the topsoil existing over the sites of excavation shall be stripped to specified depths constituting Horizon "A" and stockpiled at designated locations for re-use in covering embankment slopes, cut slopes, berms and other disturbed areas where re-vegetation is desired. Prior to stripping the topsoil, all trees, shrubs etc. shall be removed along with their roots, with approval of the Engineer. 128.10.3 Excavation - General : All excavations shall be carried out in conformity with the directions laid here-in-under and in a manner approved by the Engineer. The work shall be so done that the suitable materials available from excavation are satisfactorily utilized as decided upon beforehand. While planning or executing excavations, the Contractor shall take a adequate precautions against soil erosion, water pollution etc. as per Clause 306, and take appropriate drainage measures to keep the site free of water in accordance with Clause 311. The excavations shall conform to the lines, grades, side slopes and levels shown on the drawings or as directed by the Engineer. The Contractor shall not excavate outside the limits of excavation. Subject to the permitted tolerances, any excess depth/ width excavated beyond the specified levels/dimensions on the drawings shall be made good at the cost of the Contractor with suitable material of characteristics similar to that removed and compacted to the requirements of Clause 305. All debris and loose material on the slopes of cuttings shall be removed. No backfilling shall be allowed to obtain required slopes excepting that when boulders or soft materials are encountered in cut slopes, these shall be excavated to approved depth on

Earthwork, Erosion Control and Drainage

Section 300

instructions of the Engineer and the resulting cavities filled with suitable material and thoroughly compacted in an approved manner. After excavation, the sides of excavated area shall be trimmed and the area contoured to minimise erosion and ponding, allowing for natural drainage to take place. If trees were removed, new trees shall be planted, as directed by the Engineer. The cost of planting new trees shall be deemed to be incidental to the work. 128.10.4 Methods, tools and equipment : Only such methods, tools and equipment as approved by the Engineer shall be adopted/used in ,the work. If so desired by the Engineer, the Contractor shall demonstrate the efficacy of the type of equipment to be used before the commencement of work. 128.10.5 Rock excavation : Rock, when encountered in road excavation, shall be removed upto the formation level or as otherwise indicated on the drawings. Where, however, unstable shales or other unsuitable materials are encountered at the formation level, these shall be excavated to the extent of 500 mm below the formation level or as otherwise specified. In all cases, the excavation operations shall be so carried out that at no point on cut formation the rock protrudes above the specified levels. Rocks and large boulders which are likely to cause differential settlement and also local drainage problems should be removed to the extent of 500 mm below the formation level in full fortnation width including drains and cut through the side drains. Where excavation is done to levels lower than those specified, the excess excavation shall be made good as per Clauses 301.3.3 and 301.6 to the satisfaction of the Engineer. Slopes in rock cutting shall~be finished to.uniform lines corresponding to slope lines shown on the drawings or as directed by the Engineer. Notwithstanding the foregoing, all loose pieces of rock on excavated slope surface which move when pierced by a crowbar shall be removed. Where blasting is to be resorted to, the same shall be carried, out to Clause 302 and all precautions indicated therein observed. Where presplitting is prescribed to be done for the establishment of a specified slope in rock excavation, the same shall be carried out to Clause 303. 128.10.6 Marsh excavation : The excavation of soils from marshes/ swamps shall be carried out as per the programme approved by the Engineer. Excavation of marshes shall begin at one end and proceed in one. direction across the entire marsh immediately ahead of backfilling. The method and sequence of excavating and backfilling shall be such as to ensure, to the extent practicable, the complete removal or displacement of all muck from within the lateral limits called for on the drawings or as staked by the Engineer, and to the bottom of the marsh, firm support or levels indicated. 128.10.7 Excavation of road shoulders/verge/median for widening of pavement or providing treated shoulders : In works involving widening of existing

Earthwork, Erosion Control and Drainage

Section 300

pavements or providing treated shoulders, unless otherwise specified, the shoulder/verge/median -shall be removed to their full width and to levels shown on drawings or as indicated by the Engineer. While doing so, care shall be taken to see that no portion of the existing pavement designated for retention is loosened or disturbed. If the existing t pavement gets disturbed or loosened, it shall be dismantled and cut to a regular shape with sides vertical and the dislurbedAoosened portion'removed completely and relaid as directed by the Engineer, at the cost of the Contractor. 128.10.8 Excavation for surface/sub-surface drains : Where the Contract provides for construction of surface/sub-surface drains to Clause 309, excavation for these shall be carried out in proper sequence with other works as approved by the Engineer. 128.10.9 Slides : If slips, slides, over-breaks or subsidence occur in cuttings during the process of construction, they shall be removed 9 the cost of the Contractor as ordered by the Engineer. Adequate precautions shall be taken to ensure that during construction, the slopes are not rendered unstable or give rise to-recurrent slides after construction. If finished slopes slide into the roadway subsequently, such slides shall be removed and paid for at the Contract rate for the class of excavation involved, provided the slides are not due to any negligence on the part of the Contractor. The classification of the debris material from the slips, slides etc. shall conforin to its condition at the time of removal and payment made accordingly regardless of its condition earlier. 128.10.10 Dewatering : If water is met with in the excavations due to springs, seepage, rain or other causes, it shall be removed by suitable diversions, pumping or bailing out and the excavation kept dry whenever so required or directed by the Engineer. Care shall be taken to discharge the drained water into suitable outlets as not to cause damage to the works, crops or any other property. , Due to any negligence on the part of the Contractor, if any such damage is caused, it shall be the sole responsibility of the Contractor to repair/restore to the original condition at his own cost or compensate for the damage. 128.10.11 Disposal of excavated materials : All the excavated materials shall be the property of the Employer. The material obtained ftorn the excavation of roadway, shoulders, verges, drains, crossdrainage works etc., shall be used for filling up of (i) roadway embankment, (ii) the existiq pits in the right-of-way and (iii) for landscaping of the road as directed by the Engineer, including levelling and spreading with all lifts and lead upto 1000 in and no extra payment shall be made for the same. All hard materials, such as hard moorum, rubble, etc., not intended for use as above shall be stacked neatly on specified land as directed by the Engineer with all lifts and lead upto 1000 in.

Earthwork, Erosion Control and Drainage

Section 300

Unsuitable and surplus material not intended for use within the lead specified above shall also, if necessary, be transported with all lifts and lead beyond initial 1000 nij disposed of or used as directed by the Engineer. 128.10.12 Backfilling - Backfilling of masonry /concrete/hume pipe drain excavation shall be done with approved material after concrete/ masonry/hume pipe is fully set and carried out in such a way as not to cause undue thrust on any part of the structure and/or not to cause differential settlement. All space between the drain walls and the side of the excavation shall be refilled to the original surface making due allowance for settlement, in layers generally not exceeding 150 mm compacted thickness to the required density, using suitable compaction equipment such as mechanical tamper, rammer or plate compactor as directed -by the Engineer. 128.11 Plying of Construction Traffic Construction traffic shall not use the cut formation and finished subgFade without the prior permission of the Engineer. Any damage arising out of such use shall be made good by the Contractor at his own expense. 128.12 Preservation of Property The Contractor shall undertake all reasonable precautions for the protection and preservation of any or all existing roadside trees, drains, sewers or. other sub-surface drains, pipes, conduits and any other structures under or above ground, which may be affected by construction operations and which, in the opinion of the Engineer, shall be continued in use without any change. Safety measures taken by the Contractor in this respect, shall be got approved from the Engineer. However, if any of these objects is damaged by reason of the Contractor's negligence, it shall be replaced or restored to the original condition at his expense. If the Contractor fails to do so, within the required time as directed by the Engineer or if, in the opinion of the Engineer, the actions initiated by'the Contractor to replace/restore the damaged objects are not satisfactory, the Engineer shall arrange the replacemenU restoration directly through any other agency at the risk and cost of the Contractor after issuing a prior notice to the effect. 128.13 Preparation of Cut Formation The cut formation, which serves as a subgrade, shall be prepared to receive th6sub-base/base course as directed by the Engineer. Where the material in the subgrade (that is within 500 min from the lowest level of the pavement) has a density less than specified in Table 300-2, the same shall be loosened to a depth of 500 mm and compacted in layers in accordance with the requirements of Clause 305. Any unsuitable material encountered in the subgrade level shall be removed as directed by the Engineer and replaced with suitable material compacted in accordance with Clause 305.

Earthwork, Erosion Control and Drainage

Section 300

In rocky formations, the surface irregularities shall be corrected and the )evcls brought up to the specified elevation with granular base material as directed by the Engineer, laid and compacted in accordance with the respective Specifications for these materials. The unsuitable material shall be disposed of in accordance with Clause 301.3.11. After satisfying the density requirements, the cut formation shall be prepared to receive the subbase/base course in accordance with Clauses 310 and 311 to receive the sub-base/base course. 128.14 Finishing Operations Finishing operations shall include the work of properly shaping and dressing all excavated surfaces. When completed, no point on the slopes shall vary from the designated slopes by more than 150 mm measured at right angles to the slope, except where excavation is in rock (hard or soft) where no point shall vary more than 300 mm from the designated slope, In no case shall any portion of the slope encroach on the roadway. The finished cut formation shall satisfy the surface tolerances described in Clause 902. Where directed, the topsoil removed earlier and conserved (Clauses 301.3.2 and 305.3.3) shall be spread over cut slopes, where feasible, berms and other disturbed areas. Slopes may be roughened and moistened slightly, prior to the application of topsoil, in order to provide satisfactory bond. The depth of topsoil shall be sufficient to sustain plant growth, the usual thickness being from 75 mm: to 100 mm. 128.15 Measurements for Payment Excavation for roadway shall be measured by taking crosssections at suitable intervals in the original position before the work starts and after its completion and computing the volumes in cu. in. by the method of average end areas for each class of material encountered. Where it is not feasible to compute volumes by this method because of erratic location of isolated deposits, the volumes shall be computed by other accepted methods. At the option of the Engineer, the Contractor shall leave depth indicators during excavations of such shape and size and in such positions as directed so as to indicate the original ground level as accurately as possible. The Contractor shall see that these remains intact till the final measurements are taken. For rock excavation, the overburden shall be removed first so that npcessary cross-sections could be taken for measurement. Where cross sectional measurements could not be taken due to irregular configuration or where the rock is admixed with other classes of materials, the volumes shall be computed on the basis of stacks of excavated rubble after making 35 per cent deduction therefrom. When volumes are calculated in this manner for excavated material- other than rock, deduction- made will be to the extent of 16 per cent of stacked volumes. Works involved in the preparation of cut formation shall be measured in units indicated below

Earthwork, Erosion Control and Drainage


(i) Loosening and recompacting the looliened material at subgrade (ii) Loosening and removal of unsuitable material and replacing with a suitable material and compacting to. required density (iii) preparing rocky subgrade (iv)' Stripping including storing and reapplication of topsoil (v) Disposal of surplus material beyond initial 1000 in lead ... CU. in. ... ... sq. in. CU. in. CU. in. ... CU. in.

Section 300

128.16 Rates 128.16.1 The Contract unit rates for the items of roadway and drain excavation shall be payment in full for carrying out the operations required for the indiyidual items including full compensation for
(i) setting out; (ii) transporting the excavated materials and depositing the same on sites of embankments, spoil banks or-stacking as directed within all lifts and lead upto 1000 in or as otherwise specified; (iii) (iv) (v) trinuning bottoms and slopes of excavation; dewatering; keeping the work free of water as per Clause 311; and

(vi) all labour, materials, tools, equipment, safety measures, testing and incidentals necessary to complete the work to Specifications.

Provided, however, where presplitting is prescribed to achieve a specified slope in rock excavation, the same shall be paid for vide Clause 303.5. 128.16.2 The Contract unit rate for loosening and recompacting the loosened materials at subgrade shall include full compensation for loosening to the specified depth, including breaking clods, spreading in layers, watering whore necessary and compacting to the requirements. 128.16.3 Clauses 301.9.1 and 305.8 shall apply as regards Contract unit rate for item of removal of unsuitable material and replacement with suitable material respectively. 128.16.4 The Contract unit rate for item of preparing rocky subgrade as per Clause 301.6 shall be full compensation for providing, laying and compacting granular base material for correcting surface irregularities including all materials, tabour and incidentals necessary to complete the work and all leads and lifts. 128.16.5 The Contract unit rate for the items of stripping and storing topsoil and of reapplication of topsoil shall include full compensation for all the necessary operations including all lifts, but leads upto 1000M. 128.16.6 The Contract unit rate for disposal of surplus earth from roadway and

Earthwork, Erosion Control and Drainage

Section 300

drain excavation shall be full compensation for all tabour, equipment, tools and incidentals necessary on account of the additional haul or transportation involved beyond the initial lead of 1000 m. 129 129.1 General Blasting shall be carried out in a. manner that completes the excavation to the lines indicated indrawings, with the least disturbance to adjacent material. It shall be done ~nly with the written permission of the Engineer. All the statutory laws, regulations, rules, etc., pertaining to the acquisition, transport, storage, handling and use of explosives shall be strictly followed, The Contractor may adopt any method or methods of blasting consistent with the safety and job requirements. Prior to starting any phase of the operation the Contractor shall provide information describing pertinent blasting procedures, dimensions and notes. The magazine for the storage of explosives shall be built to the designs and specifications of the Explosives Department concerned and located at the approved site. No unauthorized person shall be admitted, into the magazine which when not in use shall be kept securely locked. No matches or inflammable material shall be allowed in the magazine. The magazine shall have an effective lightning conductor. The following shall be hung in the lobby of the magazine:
(a) A copy of the relevant rules regarding safe storage both in English and in the language with which the workers concerned are familiar. (b) (c) (d) A statement of up-to-date stock in the magazine. A certificate showing the last date of testing of the lightning conductor. A notice that smoking is strictly prohibited.

BLASTING OPERATIONS

All explosives shall be stored in a secure manner in compliance with all laws and ordinances, and all such storage places shall be clearly marked. Where no local laws or ordinances apply, storage shall be provided to the satisfaction of the Engineer and in general not closer than 300 in from the road or from any building or camping area or place of human occupancy. In addition to these, the Contractor "shall also observe the following instructions and any further additional instructions which may be given by the Engineer and shall be responsible for damage to property and any accident which may occur to workmen or the public on account of any operations connected with the storage, -handling or use of explosives and blasting. The Engineer shall frequently check the Contractor's compliance with these precautions. 129.2 Materials, Tools and Equipment All the materials, tools and equipment used for blasting operations shall be of approved type. The Engineer may specify the type of explosives to be allowed in special cases. The fuse to be used in wet locations shall be sufficiently water-resistant as to be u ' naffected when immersed in water for 30 minutes. The rate of burning of the fuse shall be uniform and definitely known to permit such a length being cut as will permit sufficient

Earthwork, Erosion Control and Drainage

Section 300

time to the firer to reach safety before explosion takes place. Det ' onators shall be capable, of giving effective blasting of the explosives. The blasting powder, explosives, detonators, fuses, etc., shall be fresh and not damaged due to dampness, moisture or any other cause. They shall be inspected before use and damaged articles shall be discarded totally and removed from the site immediately. 129.3 Personnel The blasting operation shall remain in the charge of competent and experienced supervisor and workmen who are thoroughly acquainted with the details of handling explosives and blasting operations. 129.4 Blasting Operations The blasting shall be carried out during fixed hours of the day preferably during the mid-day luncheon hour or at the close of the work as ordered in writing by the Engineer. The hours shall be made known to the people in the vicinity. All the charges shall be prepared by the man in charge only. The Contractor shall notify each public utility company having structures in proximity to the site of the work of his intention to use explosives. Such notice shall be given sufficiently in advance to enable the companies to take such steps as they may deem necessary to protect their property from injury. In advance of any blasting work within 50 m of any railway track or structures, the Contractor shall notify the concerned Railway Authority of the location, date, time and approximate duration bf such blasting operations. Red danger flags shall be displayed prominently in all directions during the blasting operations. The flags shall be planted 200 m from the blasting site in all directions. People, except those who actually light the fuse, shall be prohibited from entering this area, and all persons including workmen shall be excluded from the flagged area. at least 10 minutes before the firing, a warning siren being sounded for the purpose. The charge holes shall be drilled to required depths and at suitable places. Blasting should be as light as possible consistent with thorough breakage of the material necessary for economic loading and hauling. Any method of blasting which leads to overshooting shall be discontinued. When blasting is done with powder, the fuse cut to the required length shall be inserted into the hole and the powd~r dropped in. The powder shall be gently tamped with copper rods with rounded ends. The explosive powder shall then be covered with tamping material which shall be tamped, lightly but firmly. When blasting is done with dynamite and other high explosives, dynamite cartridges shall be prepared by inserting the square cut end of a fuse into the detonator and finishing it with nippers at the open end, the detonator gently pushed into the primer leaving 1/3rd of the copper tube exposed outside. The paper of the cartridge shall then be closed up and securely bound with wire or twine. The primer shall be housed into the explosive. Boreholes shall be of such size that the cartridge can easily go down. The holes shall be cleared of all debris and explosive inserted. The space of about 200 mm

Earthwork, Erosion Control and Drainage

Section 300

above the charge shall then be gently filled with dry clay, pressed home and the rest of the tamping formed of any convenient material gently packed with a wooden rammer. At a time, not more than 10 such charges will be prepared and fired. The man in charge shall blow a siren in a recognised manner for cautioning the people. All the people shall then be required to move to safe distances. The charges shall be lighted by the man-in-charge only. The man-in-charge shall count the number of explosions. He shall satisfy himself that all the charges have been exploded before allowing the workmen to go back to the work site. After blasting o perations, the Contractor shall compact the loose residual material below subgrade and replace the material removed below subgrade with suitable material 129.5 Misfire In case of misfire, the following procedure shall be observed:
(i) Sufficient time shall be allowed to account for the delayed blast. The man-in. charge shall inspect all the charges and determine the missed charge. '.. (ii) If it is the blasting powder charge, it shall be completely flooded with water. A new hole shall be drilled at about 450 mrn from the old hole and fired. This should blast the old charge. Should it not blast the old charge, the procedure shall be repeated till the old charge is blasted. (iii) In case of charges of gelignite, dynamite, etc., the man-in-charge shall gently remove the tamping and the primer with the detonator. A fresh detonator and primer shall then be used to blast the charge. Alternatively, the hole may be cleared of 300 mm of tampittg and the direction then ascertained by placing a stick in the hole. Another hole may then be drilled 150 mm away and parallel to it. 'nis hole shall then be charged and fired when the misfired hole should explode at the same time. 'Me man-in-charge shall at once repornt to the Contractor's office and the Engineer all cases of misfire, the cause of the same and what steps were taken in connection therewith.

If a misfire has been found to be due to defective detonator or dynamite, the whole quantity in the box from which defective article was taken must be sent to the authority directed by the Engineer for inspection to ascertain whether all the remaining materials in the box are also defective. 129.6 Account A careful and day to day account of the explosive shall be maintained by the Contractor in an approved register and manner which shall be open to inspection by the Engineer at all times. 130 130.1 Gen eral Presplitting is defined as the establishment of a specified excavation slope in rock by the controlled use. of explosives and blasting accessories in properly aligned. and spaced drill holes. The presplitting technique shall be used for forming rock excavation slopes at locations shown on the plans or as otherwise decided by the Engineer. 130.2 Construction Operations PRESPLITTING ROCK EXCAVATION SLOPES

Earthwork, Erosion Control and Drainage

Section 300

Prior to starting drilling operations for presplitting, the Contractor shall furnish the Engineer a plan outlining the position of all drill holes, depth of drilling, type of explosives to be used, loading pattern and sequence of firing. The drilling and blasting plan is for record purposes only and will not absolve the Contractor of his responsibility for using proper drilling and, blasting procedures. Controlled blasting shall begin with a short test section of a length approved by the Engineer. The test section shall be presplit, production drilled and blasted and sufficient material excavated whereby the Engineer can determine if the Contractor's methods have produced an acceptable slope. All overburden soil and weathered rock along the top of the excavation for a distance -of about 5 to 15 in beyond the drilling limits, or to the end of the excavation, as decided by Engineer shall be removed before drilling the presplitting holes. Particular care and attention shall be directed to the beginning and end of excavations to ensure complete removal of all overburden soil and weathered rock and to expose fresh rock to an elevation equal to the bottom of the adjacent lift of the presplitting holes being drilled. Slope holes for presplitting shall be drilled along the line of,the planned slope within the specified tolerances. The drill holes shall be not less than 60 mm nor more than 75 min in diameter. Drilling 9perations shall be controlled by the use of proper equipment and technique to ensure that no hole shall deviate from the plane of the planned slope 'by more than 300 mm nor shall any hole deviate from 'being parallel to an adjacent hole by more than two-third of the planned horizontal spacing between holes. The length of presplit holes for any individual lift shall not exceed 9 M. The spacing of presplit holes shall not exceed 900 mm on centres and shall be adjusted to result in a uniform shear face between holes. Auxiliary drill holes along the presplit line, not loaded or stemmed, may be ordered by the Engineer. Except for spacing, auxiliary drill holes shall conform to the provisions for presplit holes. The line of production holes shall be placed inside the presplit lines in such a manner as to avoid damage to the presplit face. If necessary, to reduce shatter and overbreak of the presplit surface, the first line of the production holes shall be drilled parallel to the slope line at the top of the cut and at each bench level. thereafter. Any blasting technique, which results in damage to the presplit surface, shall be immediately discontinued. No portion of any production hole shall be drilled within 2.5 m of a presplit plane except as approved by the Engineer. The bottom of the production holes shall not be lower than the bottom of the prcsplit holes. A maximum offset of 600 mm will be permitted for a construction working bench at the bottom of each lift for use in drilling.the next lower presplitting pattern. The drilling operations shall be adjusted to compensate for drift of previous levels and for the offset at the start of new levels to maintain the specified slope plane.

Earthwork, Erosion Control and Drainage

Section 300

The maximum diameter of explosives used in presplit holes shall not be greater than one-half the diameter of the presplit hole. Only standard cartridge explosives prepared and packaged by explosive manufacturing firms shall be used in presplit holes. These shall be fired as recommended by the manufacturer. Ammonium nitrate composition blasting agents will not be permitted in presplitting operations. Stemming may be required to achieve a satisfactory presplit face. Stemming material shall be dry free-running material all of which passes 11.2 mm sieve and 90 per cent of which is retained on 2.80 mrn sieve. Stemmed presplit holes shall be completely filled to the collar. All charges in each presplitting pattern shall be detonated simultaneously. 130.3 Tolerances The presplit face shall not deviate more than 300 mm from the plane passing through adjacent drill holes, except where the character of the rock is such that, as determined by the Engineer, irregularities are unavoidable. When completed, the average plane of the slopes shall conform to the slopes indicated on the plans and no point on the completed slopes shall vary from the designated slopes by more than 300 mm. These tolerances shall be measured perpendicular to the plane of the slope. In no case shall any portion of the slope encroach on the side drains. As long as equally satisfactory presplit slopes are obtained, then either the slope face maybe presplit before drilling for production blasting or presplitting the slope face and production blasting may be done at the same time, provided that the presplitting drill holes are fired with zero delay and the production holes are delayed starting at the row of holes farthest fiorn the slope and progressing in steps to the row of holes nearest the presplit line, which row shall be delayed at least 50 milliseconds. In either case the presplitting holes shall extend either to the end of the excavation or for a distance of not less than 15 in beyond the limits of the production holes to be detonated. 130.4 Measurements for Payment The area of presplitting to be paid for will be measured as square metres of acceptable presplit slope surface. 130.5 Rates The Contract unit rate for presplitting work shall be payment in full for carrying out the required operations for obtaining acceptable presplit slope surfaces. The quantity of rock excavated through the production/presplit holes shall be paid for as per Clause 301.9.1. 131 131.1 Scope Excavation for structures shall consist of the removal of material for the construction of foundations for bridges, culverts, retaining walls, headwalls, cutoff walls, pipe culverts EXCAVATION FOR STRUCTURES

Earthwork, Erosion Control and Drainage

Section 300

and other similar structures, in accordance with the requirements of these Specifications and the lines and dimensions sh ' own on the drawings or as indicated by the Engineer. The work shall include construction of the necessary cofferdams and cribs and their subsequent removal; all necessary sheeting, shoring, bracing, draining and pumping; the removal of all logs, stumps, grubs and other deleterious matter and obstructions, necessary for placing the foundations; trimming bottoms of excavations; backfilling and clearing up the site and the disposal of all surplus material. 131.2 Classification of Excavation All mateiials involved in excavation shall be classified in accordance with Clause 301.2. 131.3 Construction Operations 131.3.1 Setting out : After the site has been cleared according to Clause 201, the limits -of excavation shall be set out true to fines, curves and slopes to Clause 301.3.1. 131.3.2 Excavation : Excavation shall be taken to the width of the lowest step of the footing and the sides shall be left plumb where the nature of soil allows it. Where the nature of soil or the depth of the trench and season of the year do not permit vertical sides, the Contractor at his own expense shall put up necessary shoring, strutting and planking or cut slopes to a safer angle or both with due -regard to the safety of personnel and works and to the satisfaction of the Engineer. The depth to. which the excavation is to be carried out shall be as shown on the drawings, unless the type of material encountered is such as to require changes, in which case the depth shall be as ordered by the Engineer.. Propping shall be 'undertaken when any foundation or stressed zone from an adjoining structure is within a line of I vertical to 2 horizontal from the bottom of the excavation. Where blasting is to be resorted to, the same shall be carried out in accordance with Clause 302 and all precautions indicated therein observed. Where blasting is likely to endanger adjoining foundations or other structures, necessary precautions such as controlled blasting, providing rubber mat cover to prevent flying of debris etc. shall be taken to prevent any damage. 131.3.3 Dewatering and protection : Normally, open foundations shall be laid dry. Where water is met with in excavation due to strearn flow, seepage, springs, rain or other reasons, the Contractor shall take adequate measures such as bailing, pumping, constructing diversion channels, drainage channels, bunds, depression of water level by wellpoint system, cofferdams and other necessary works to keep the foundation trenches dry when so required and to protect the green concrete/masonry against damage by erosion or sudden rising of water level. The methods to be adopted in this regard and other details thereof shall be left to the choice of the Contractor but subject to approval of the Engineer. Approval of the Engineer shall, however, not relieve the Contractor of the responsibility for the adequacy of dowatering and

Earthwork, Erosion Control and Drainage

Section 300

protection arrangements and for the quality and safety of the works. Where cofferdams are required, these shall be carried to adequate depths and heights, be safely designed and constructed and be made as watertight as is necessary for facilitating, construction to becarried out inside them. The interior dimensions of the cofferdams shall be such as to give sufficient clearance for the construction and inspection and to permit installation of pumping equipments, etc., inside the enclosed area. If it is determined beforehand that the foundations cannot be laid dry or the situation is found that the percolation is too heavy for keeping tk foundation dry, the foundation concrete shall be laid under water by tremie pipe only, In case of flowing water or' artesian springs, the flow shall be stopped or reduced as far as possible at the time of placing the concrete. Pumping from the interior of any foundation enclosure shall be done in such a manner as to preclude the possibility -of the movement of water -through any fresh concrete. No pumping shall be permitted during the placing of concrete or for any period of at least 24 hours thereafter, Wess it is done from a suitable sump separated from the concrete work by a watertight wall or other similar means. At the discretion of the Contractor, cement grouting or other approved methods may be used to prevent or reduce seepage and to protect the excavation area. The Contractor shall take all precautions in diverting channels and in discharging the drained water as not to cause damage to the works, 6ps or any other property. 131.3.4 Preparation of foundation : The bottom of the foundation shall be levelled both longitudinally and transversely or stepped as directed by the Engineer. Before footing is laid, the gurface shall be slightly watered and rammed. In the event of excavation having been made deeper than that shown on the drawings or as otherwise ordered by the Engineer, the extra depth shall be made up with concrete or masonry of the foundation at :he cost of the Contractor as per Clause 2104.1. Ordinary filling shall not be used for the purpose to bring the foundation to level. When rock or other hard strata is encountered, it shall be freed of all soft and loose material, cleaned and cut to a firm surface ei level and stepped as directed by the Engineer. All seams shall be clem out and filled with cement mortar or grout to the satisfaction of Engineer. In the case of excavation in rock, annular space around foo shall be filled with lean concrete (L34-nominal mix) upto the top le of rock. If the depth of fill required is more than 1.5m above the top the footing, filling upto 1.5m above top of footing shall be done lean concrete (1:3:6 nominal mix) followed by boulders grouted cement. When foundation piles pre used, the excavation of each pit shaD be substantially completed before beginning pile-driving operation therein. After pile driving operations in

Earthwork, Erosion Control and Drainage

Section 300

a given pit are completed, loose and displaced materials therein shall be removed to the elevation of the bottom of the footings. 131.3.5 Slips and slip-outs : If there are any slips or slip-outs in the excavation, these shall be removed by the Contractor at his own cost. 131.3.6 Public safety : Near towns, villages and all frequented places, trenches and foundation pits shall be securely fenced, provided with proper caution signs and marked with red lights at night to avoid accidents. The Contractor shall take adequate protective measures to see that the excavation operations do not affect or damage adjoining. structures. For safety precautions, guidance may be taken from IS : 3764. 131.3.7 Backfilling : Backfilling shall be done with approved material after concrete or masonry is fully set and carried out in such a way as not to cause undue thrust on any pan of the structure. AD space between foundation masonry or concrete and the sides of excavation shall be refilled to the original surface in. layers not exceeding 150 mm compacted thickness. The compaction shall be done with the help of suitable equipment such as mechanical tamper, rammer, plate vibrator etc., after necessary watering, so as to achieve a density not less than the field density before excavation. 131.3.8 Disposal of surplus excavated materials : Clause 301.3.11 shall apply. 131.4 Measurements for Payment Excavation for structures shall be measured in cu. in. for each class of material encountered, limited to the dimensions shown on the drawings or as directed by the Engineer. Excavation over increased width, cutting of slopes, shoring, shuttering and planking shall be deemed as convenience for the- Contractor in executing the work and shall not be measured and paid for separately. Preparation of rock foundation shall be measured in square metres. Foundation sealing, deWatering, including pumping shall be deemed to be incidental to the work unless separate provision is made for in the Contract. In the latter case, payment shall be on lumpsum basis as provided in the Bill of Quantities. 131.5 Rates 131.5.1 The Contract unit rate for the items of excavation for structures shall be payment in full for carrying out the required operations including full compen~ation for (i) setting out; (ii) construction of necessary cofferdams, cribs, sheeting, shoring and bracing and their subsequent removal; (iii) removal of all logs, stumps, grubs and other deleterious matter and obstructions, for placing the foundations including trirr~ming of bottoms of excavations; (iv) foundation sealing, dewatering including pumping when no separate provision for it is made in the Contract;

Earthwork, Erosion Control and Drainage

Section 300

(v) backfilling, clearing up the site and disposal of all surplus material within all lifts and leads upto 1000 m or as otherwise specified; and (vi) all labour, materials, tools. equipment, safety measures, diversion of traffic and incidentals necessary to complete the work to Specification. 131.5.2 The Contract unit rate for preparation of rock foundation shall be full compensation for cutting, trimming and cleaning the foundation surface and filling/sealing of all seams with cement grout or mortar including all materials, labour and incidentals required for completing the work. 131.5.3 The Contract unit rate for transporting material from the "cavation for structures shall be full compensation for all labour, equipment, tools and incidentals necessary on account of the additional haul or transportation involved beyond the initial lead of 1000 in. 132 132.1 General 132.1.1 Description: These Specifications shall apply to the construction of embankments including subgz-ades, earthen shoulders and miscellaneous backfills with approved material obtained from roadway and drain excavation, borrow pits or other sources. All embankments, subgr,ades, earthen shoulders and miscellaneous backfills shall be constructed in accordance with the requirements of these Specifications and in conformity with the lines, grades, and cross-sections shown on the drawings or as directed by the Engineer. 132.2 Materials 'and General Requirements 132.2.1 Physical requirements: 132.2.1.1 The materials used in embankments, subgrades, earthen shoulders and miscellaneous backfills shall be soil, moorum, gravel, a mixture of these or any other material approved by the Engineer. Such materials shall be free of logs, stumps, roots, rubbish or any other ingredient likely to deteriorate or affect the stabig liquid limit exceeding 70 and plasticity index exceeding 45; and (f) Materials with salts resulting in leaching in- the embankment. 132.2.1.2 Expansive clay exhibiting marked swell and shrinkage properties C'free swelling index" exceeding 50 per cent when tested as per IS: 2720 - Part 40) shall not be used as a fill material. Where an expansive clay with acceptable "free swelling index" value is used as a fill material, subgrade and top 500 mm portion of the embankment just below subgrade shall be non-expansive in nature. 132.2.1.3 Any fill material with a soluble sulphate content exceeding 1.9 grams of sulphate (expressed as SO 3) per litre when tested in' accordance with BS : 1377 Test 10, but using a 2:1 water-soil ratio shall EMBANKMENT CONSTRUCTION

Earthwork, Erosion Control and Drainage

Section 300

-not be deposited within 500 mm or other distance described in the Contract, of concrete, cement bound materials or other cementitious materials forming part of the Permanent Works. Materials with a total sulphate content (expressed as SO 3 ) exceeding 0.5 per cent by mass, when tested in accordance with BS : 1377 Test shall not be deposited within 500 mm, or other distances described in the Contract, of metallic items forming part of the Permanent Works. 132.2.1.4 The size of the coarse material in the mixture of earth shall ordinarily not exceed 75 mm when being placed in the embankment ind 50 min when placed in the subgrade. However, the Engineer may it his discretion permit the use of material coarser than this also if he is satisfied that the same will -not present any difficulty as regards the placement of fill material and its compaction to the requirements of these Specifications. The maximum particleL.-size shall not be more than two-thirds of the compacted layer thickness. 132.2.1.5 Ordinarily, only the materials satisfying the density requirements given in Table 300-1 shall be employed for the construction of the embankment and the subgrade.

Earthwork, Erosion Control and Drainage


TABLE 300-1. DENSITY REQUIREMENTS OF EMBANKMENT AND SUBGRADE MATERIALS S.No. Type of Work

Section 300

Maximum laboratory dry unit weight when tested as per IS: 2720 (Part 8)

1.

Embankments up to 3 metres height, not subjected to extensive flooding.

Not less than 15.2 kN/cu.m.

Embankments exceeding 3 metreg height or embankments of any height subject to long periods of inundation

Not less than 16.0 kN/cu. m.

Subgrade and earthen shoulders/verges/back-fill

Not less than 17.5 kN/cu. m.

Notes:

(1)

This Table is not applicable for lightweight fill material e.g. cinder, fly ash etc.

(2) The Engineer may relax these requirements at his discretion taking into account the availability of materials for construction and other relevant factors. (3) The material to be used in subgmde should also satisfy design CBR at the dry unit weight applicable as per Table 300-2-

132.2.2

General requirements :

132.2.2.1 The materials for embankment shall be obtained from approved sources with preference given to materials becoming available from nearby roadway excavation or any other excavation under the same Contract. The work shall be so planned and executed that the best available materials are saved for the subgrade and the embankment portion just below the subgrade. 132.2.2.2 Borrow materials : Where the materials are to be obtained from designated borrow areas, the location, size and shape of these areas shall be as indicated by the Engineer and the same shall not be opened without his written permission. Where specific borrow areas are not designated by the Employer/the Engineer, arrangement for locating the source of supply of material for embankment and subgrade as well as compliance to environmental requirements in respect of excavation and borrow areas as stipulated, from time to time by tthe Nfinistry of Environment and ForesM Government of India and the local bodies, as applicable, shall be the sole responsibility of the Contractor. Borrowpits along the road shall be discouraged. If permitted by the Engineer, these shall not be dug continuously. Ridges of not ' less than 8 in width should be left at intervals not exceeding 300 in. Small drains shall be cut through the ridges to facilitate drainage. The depth of the pits shall be so regulated that their bottom does not cut an imaginary line

Earthwork, Erosion Control and Drainage

Section 300

having a slope of I vertical to 4 horizontal projected from the edge of the final section of the bank, the maximum depth in any case being limited-to 1.5 in. Also, no pit shall be dug, within the offset width from the toe of the embankment required as per the consideration of stability with a minimum width of 10 in. Haulage of material to embankments or other areas of fill shall proceed only when sufficient spreading and compaction plant is operating -at the place of deposition. No excavated acceptable material other than surplus to requirements of the Contract shall be removed from the site. Should the Contractor be permitted to remove acceptable material from the site to guit his operational procedure, then he shall make good any consequent deficit of material arising therefrom. Where the excavation reveals a combination of acceptable and unacceptable materials, the Contractor shall, unless otherwise agreed by the Engineer, carry out the excavation in such a manner that the acceptable materials are excavated separately for use in the permanent works without contamination by the unacceptable materials. The' acceptable materials shall be stock-piled separately. The Contractor shall ensure that he does not adversely affect the stability of excavation or fills by dfe methods of stockpiling materials, use of plants or siting of temporary buildings or structures. The Contractor shall obtain representative samples frorn each of the identified borrow areas and have these tested at the site laboratory following a testing programme approved by the Engineer. It shall be ensured that the subgrade material when compacted to the density requirements as in Table 300-2 shall yield the design CBR value of the subgrade.
TABLE 300-2. COMPACTION REQUIREMENTS FOR EMBANKMENT AND SUBGRADE Type of work/ material Relative compaction as percentage of max. laboratory dry density as per IS: 2720 (Part 8) 1. 1 3. Subgrade and earthen shoulders Embankment Expansive Clays a) Subgrade and 500 nim portion just below the subgrade b) Remaining portion of embankment Not less than 90 Not allowed Not less than 97 Not less than 95

The Contractor shall at least 7 working days before commencement of compaction submit the following to the Engineer for approval:
(i) The values of maximum dry density and optimum moisture content obtained in accordance with IS: 2720 (Pan 7) or (Pan 8), as the case may be, appropriate for each of the fill materials he intends to use.

Earthwork, Erosion Control and Drainage

Section 300

(ii) A graph of density plotted against moistum content from which each of the values in (i) above of maximum dry density and optimum moisture content were determined. (iii) Tfi6 Dry density-moisture content -CBR relationships for light, intermediate and heavy compactive efforts aight corresponding to IS: 2720 (Part 7), heavy corresponding to IS: 2720 (Part 8) and intermediate in-between the two) for each of the fill materials he intends to use in the subgmde.

Once the above information has been approved by the Engineer, it shall form the basis for compaction. 132.3 Co nstruction Operations 132.3.1 Setting out : After the site has been cleared to Clause 201, the work shall be set out to Clause 301.3.1. The limits of ernbankment/subgrade shall b e marked by fixing batter pegs on both ides at regular intervals as guides before commencing the earthwork. The embankment/subgrade shall be built sufficiently wider than the design dimension so that surplus material may be trimmed, ensuring that the remaining material is to the desired density and in position specified and conforms to the specified side slopes. 132.3.2 Dewatering : If the foundation of the embankment is in an area with stagnant water, and in the opinion of the Engineer it is feasible to remove it, the same shall be removed, by bailing out or pumping, as directed by the Engineer and the area of the embankment foundation shall be kept dry. Car ' e(shall be taken to discharge the drained water so as 'not to cause damage to the works, crops or any other property. Due to any negligence on the part of the Contractor, if any such damage is caused, it shall be the sole responsibility of the Contractor to repair/restore it to original condition or compensate the damage at his own cost. If the embankment is to be constructed under water, Clause 305.4.6 shall apply. 132.3.3 Stripping and storing topsoil : In localities where most of the available embankment materials are not conducive to plant growth, or when so directed by the Engineer, the topsoil from all areas of cutting and from all areas to be covered by embankment foundation shall be stripped to specified depths not exceeding 150 mm and stored in stockpiles of height.noi exceeding 2 in for covering embankment slopes, cut slopes and other disturbed areas where re-vegetation is desired. Topsoil shall not be unnecessarily trafficked either before stripping or when in a stockpile. Stockpiles shall not be surcharged or otherwise loaded and multiple handling shall be kept to a minimum. 132.3.4 Compacting ground supporting embankment/subgrade: Where necessary, the original ground shall be levelled to facilitate placement of first layer of embankment, scarified, mixed with water and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2. In case where the difference between the subgrade level (top of the subgrade on which pavement rests) and ground level is less than 0.5 in and the ground does not have 97

Earthwork, Erosion Control and Drainage

Section 300

per cent relative compaction with respect to the dry density as given in Table 300-2, the ground shall be loosened upto, a. level 0.5 m below the subgrade level, watered and compacted in layers in accordance with Clauses 305.3.5 and 305.3.6 to not less than 97 per cent of dry density as given in Table 300-2. Where so directed by the Engineer, any unsuitable material occurring in the embankment foundation shall be removed and replaced by approved materials laid in layers to the required degree of compaction. Embankment or subgrade work shall not proceed until the foundations for embankment/subgrade have been inspected by the Engineer for satisfactory condition and approved. Any foundation treatment specified for embankments especially high embankments, resting on suspect foundations as revealed by borehole _logs shall be carried out in a manner and to the depth as desired by the Engineer. Where the ground on which an embankment is to be built has any of the material types (a) to (f) in Clause 305.2.1, at least 500 mm of such material must be removed and replaced by acceptable fill material before embankment construction commences. 132.3.5 Spreading material in layers and bringing to appropriate moisture content 132.3.5.1 The embankment and subgrade material shall be spread in layers of uniform thickness not exceeding .200 mm compacted thickness over the entire width of embankment by mechanical means, finished by a motor grader and compacted as per Clause 305.3.6. The motor grader blade shall have hydraulic control suitable for initial adjustment and maintain the same so as to achieve the specific slope and grade. Successive layers shall not be placed until the layer under construction has been thoroughly compacted to the specified requirements as in Table 300-2 and got approved by the Engineer. Each compacted layer shall be finished parallel to the final cross-section of the embankment. 132.3.5.2 Moisture content of the material shall be checked at the site of placement prior to commencement of compaction; if found to be out of agreed limits, the same shall be made good. Where water is required to be added in such constructions, water shall be sprinkled from a water tanker fitted with sprinkler capable of applying water uniformly with a controllable rate of flow to variable widths of surface but without any flooding. The water shall be added uniformly and thoroughly mixed in soil by blading, discing or harrowing until a uniform moisture content is obtained throughout the depth of the layer. If the material delivered to the roadbed is too wet, it shall be dried, by aeration and exposure to the sun, till the moisture content is acceptable for compaction. Should circumstances arise, where owing to wet weather, -the moisture content cannot be

Earthwork, Erosion Control and Drainage

Section 300

reduced to the required amount by the above 'procedure, compaction work shall be suspended. Moisture content of each layer of soil shall be checked in accordance with IS: 2720 (Part 2), and unless otherwise mentioned, shall be so adjusted, making due allowance for evaporation losses, that at the time of compaction it is in the range of I per cent above to 2 per cent below the optimum moisture content determined in accordance with IS:2720 (Part 7) or IS:2720 (Part 8) as the case may 4e. Expansive clays shall, however, be compacted at moisture content corresponding to the specifieddry density, but on the wet side of the optimum moisture content obtained from the laboratory compaction curve. After adding the required arnount of water, the soil shall be processed by Meog of graders, harrows, rotary mixers or as otherwise approved by the Engineer until the layer is uniformly wet. Clods or hard lumps of earth shall be broken to have a maximum size of 75 mm when being placed in the embankment and a maximum size of 56 mm when being placed in ft 6ubgrado, 132.3.5.3 Embankment and other areas of fD1 shall, unless otherwise required in the Contract or permitted by the Engineer, be constructed .evenly over their full width and their fullest possible extent and the Contractor shall control and direct construction plant and other vehicular traffic uniformly over them. Damage by construction plant and other vehicular traffic shall be made good by the Contractor with material having the same characteristics and strength as the material had before it was damaged. Embankments and other areas of unsupported fills shall not be constructed with steeper side slopes, or to greater widths than those shown in the Contract, except to permit adequate compaction at the edges before trimming back, or to obtain the final profile following any settlement of the fill and the underlying material. Whenever fill is to be deposited against the face of a natural slope, or sloping earthworks face including embankments, cuttings, other fills and excavations steeper than I vertical on 4 horizontal, such faces shall be benched as per, Clause 305.4.1 immediately before placing the subsequent fill. All permanent - faces of side slopes of embankments and other areas of fill formed shall, subsequent to any trimming operations, be reworked and sealed to the satisfaction of the Engineer by tracking a tracked vehicle, considered suitable by the Engineer, on tW slope or any other method approved by the Engineer. 132.3.6 Compaction : Only t he compaction equipment approved by the Engineer shall be employed to compact the different material types encountered during construction. Smooth wheeled, vibratory, pneumatic tyred, sheepsfoot or pad foot rollers, etc. of suitable size and capacity as approved by the Engineer shall be used for the different types and grades of materials required to be compacted either individually or in suitable combinations.

Earthwork, Erosion Control and Drainage

Section 300

The compaction shall be done with the help of vibratory roller of 80 to 100 kN static weight with plain or pad foot drum or heavy pneumatic tyred roller of adequate capacity capable of achieving required compaction. The Contractor shall demonstrate the efficacy of the equipment he intends to use by carrying out compaction trials. The procedure to be adopted for these site trials shall first be submitted to the Engineer for approval. Earthmoving plant shall not be accepted as compaction equipment nor shall the use of a lighter category of plant to provide any preliminary compaction to assist the use of heavier plant be taken into account. Each layer of the material shall be thoroughly compacted to the densities specified in Table 300-2. Subsequent layers shall be placed only after the finished layer has been tested according to Clause 903.2.2 and accepted by the Engineer. The Engineer may permit measurement of field dry density bya nuclear moisture/density gauge used in accordance wiffi agreed procedure and the gauge is calibrated to provide results identical to that obtained from tests in accordance with IS: 2720 (Part 28). A record of the same shall be maintained by the Contractor. When density measurements reveal any soft areas in the embankment/subgrade/earthen shoulders, further compaction shall be carried out as directed by the Engineer. If inspite of that the specified compaction is not achieved, the material in the soft areas shall be removed and replaced by approved material, compacted to the density requirements and satisfaction of the Engineer. 132.3.7 Drainage : The surface of the embankment/subgrade at all times during construction shall be maintained at such ' a cross fall (not flatter than that required for effective drainage of an earthen surface) as will shed water and prevent ponding. 132.3.8 Repairing of damages caused by rain/spillage of water: The soil iri the affected portion shall be removed in such areas as directed by the Engineer before next layer is laid and refilled in layers'and compacted using appropriate mechanical means such as small vibratory roller, plate compactor or power rammer to achieve the required density in accordance with Clause 305.3.6. If the cut is not sufficiently wide for use of required mechanical means for compaction, the same shall be widened suitably to permit their use for proper compaction. Tests shall be carried out as directed by the Engineer to ascertain the density requirements of the repaired area. The work of repairing the damages including widening of the cut, if any, shall be carried out by the Contractor at his own cost, including the arranging of machinery/equipment for the purpose. 132.3.9 Finishing operations : Finishing operations shall include the work of shaping and dressing the shoulders/verge/roadbed and side slopes to conform to the alignment, levels, cross-sections and dimensions shown on the drawings or as directed by the Engineer subject to the surface tolerance described in Clause 902. Both the upper and lower ends of the side slopes

Earthwork, Erosion Control and Drainage

Section 300

shall be rounded off to improve appearance and to merge the embankment with the adjacent terrain. The topsoil, removed and conserved earlier (Clause 301.3.2 and 305.3.3) shall be spread over the fill slopes as per directions of the Engineer to facilit& the growth of vegetation. Slopes shall be roughened and moistened slightly prior to the application of the topsoil in order to provide satisfactory bond. The depth of the topsoil shall be sufficient to sustain' plant growth, the usual thickness being from 75 rnm to 150 MITI. Where directed, the slopes shall be turfed with sods in accordance with Clause 307. If seeding and mulching of slopes is prescribed, this shall be done to the requirement of Clause 308. When earthwork operations have been substantially completed, the road area shall be cleared of all debris, and ugly scars in the construction area responsible for objectionable appearance eliminated. 132.4 Construction of Embankment and Subgrade under Special Conditions 132.4.1 Earthwork for widening existing road embankment When an existing embankment and/or subgrade is to be widened and its slopes are steeper than I vertical on 4 horizontal, continuous horizontal benches, each at least 300 min wide, shall be cut into the old slope for ensuring adequate bond with the fresh embankment/subgrade material to be added. The material obtained from cutting of benches could be utilized in the widening of the embankment/subgrade. However, when the existing slope against which the fresh material is to be placed is flatter than I vertical on 4 horizontal,the slope surface may only be ploughed or scarified instead of resorting to benching. Where the width of the widened portions is insufficient to permit the 'use of conventional rollers, compaction shall be carried out with the help of small vibratory rollers/plate compactors/power rammers or any other appropriate equipment approved by the Engineer. End dumping of material from trucks for widening operations shall be avoided except in difficult circumstances when the extra width is too narrow to permit the movement of any other types of hauling equipment. 132.4.2 Earthwork for embankment and subgrade to be placed against sloping ground : Where an embankment/subgrade is to be placed against sloping ground, the latter shall be appropriately benched or ploughed/scarified as required in Clause 305.4.1 before placing the embankment/subgrade material. Extra earthwork involved in benching or due to ploughing/scarifying etc. shall be considered incidental to the work. For wet conditions, benches with slightly inward fall and subsoil drains at the lowest point shall be provided as per the drawings, before-the fill is placed against sloping ground. Where the Contract requires construction of transverse subsurface drain at the cut-fill interface, work on the same shall be carried out to Clause 309 in proper sequence with the embankment and subgrade work as approved by the Engineer.

Earthwork, Erosion Control and Drainage

Section 300

132.4.3 Earthwork over existing road surface : Where the embankment is to be placed over an -existing road surface, the work shall be carried out as indicated below
(i) If the existing road surface is of granular or bituminous type and lies within I m of the new subgrade level, the same shall be scarified to a depth of 50 mrn or more if specified, so as to provide ample bond between the old and new material ensuring that at least 500 min portion below the top of new subgrade level is compacted to the desired density. (ii) If the existing road surface is of cement concrete type and lies within I in of the new subgrade level the same shall be removed completely. (iii) If the level difference between the existing road surface and the new formation level is more than Im, the existing surface shall be permitted to stay in place without any modification.

132.4.4 Embankment and subgrade around structurress :: Too avoid interference with the construction of abutments, wing walls or return walls of culvert/bridge structures, the Contractor shall, at points to be determined by the Engineer suspend work on embankment forming approaches to such structures, until such time as the -construction of the latter is sufficiently advanced to permit the completion of approaches without the risk of damage to the structure. Unless directed otherwise, the filling around culverts, bridges and other structures upto a. distance of twice the height of the road from the back of the abutment shall be carried out independent of the work on the main embankment. The fill material shall not be placed against any abutment or wing wall, unless permission has been given by the Engineer but in any case not until the concrete or masonry has been in position for 14 days. The embankment and subgrade shall be brought up simultaneously in equal layers on each side of the -structure to avoid displacement and unequal pressure. The sequence of work in this regard shall be got approved from the Engineer. The material used for backfill shall not be an organic soil or highly plastic clay having plasticity index and liquid limit more than 20 and 40 respectively when tested according to IS:2720 (Part 5). Filling behind abutments and wing walls for all structures shall conform to the general guidelines given in Appendix 6 of IRC:78 (Standard Specifications and Code of Practice for Road Bridges-Section VII) in respect of the type of material, the extent of backfill, its laying and compaction etc. The fill material shall be deposited in horizontal layers in loose thickness and compacted thoroughly to the requirements of Table 300-2. Where the provision of any filter medium is specified behind the abutment, the same shall be laid in layers simultaneously with the laying of fill material. The material used for filter shall conform to the requirements for filter medium spelt out in Clause 2502/309.3.2 (B) unless otherwise specified in the Contract. Where it may be impracticable to use conventional rollers, the compaction shall be carried out by appropriate mechanical means such as small vibratory roller, plate compactor or power rammer. Care shaI I be taken to see that the compaction equipment does not hit or come too close to any structural member so as to cause any damage to them or excessive pressure against the structure. 132.4.5 Construction of embankment over ground incapable of supporting

Earthwork, Erosion Control and Drainage

Section 300

construction equipment : Where embankment is to be constructed across ground which will not support the weight of repeated heavy loads of construction equipment, the first layer of the fill may be constructed by placing successive loads of material in a uniformly distributed layer of a minimum thickness required to support the construction equipment as permitted by the Engineer. The Contractor, if so desired by him, may also use suitable geosynthefic material to increase the bearing capacity of the foundation. This exception to normal procedure will not be permitted where, in the opinion of the Engineer, the embankments could be constructed in the approved manner over such ground by the use-of ligbter or modified equipment after proper ditching and drainage' have been provided. Where this exception is permitted, the selection of the material and the construction procedure to obtain an acceptable layer shall be the responsibility of the Contractor. The cost of providing suitable traffic conditions, for construction equipment over any area of the Contract will be the responsibility of the Contractor and no extra payment will be made to him. The remainder of the embankment shall be constructed as specified in Clause 305.3. 132.4.6 Embankment construction under water : Where filling or backfilling is to be placed under water, only acceptable granular material or rock shall be used unless otherwise approved by the Engineer. Acceptable granular material shall consist of graded, hard durable particles with maximum particle size not exceeding 75 mm. The material should be non-plastic having uniformity coefficient of not less than 10. The material placed in open water shall be deposited by end tipping without compaction. 132.4.7 Earthwork for high embankment : In the case of high embankments, the Contractor shall normally use the material from the specified borrow area. In case he desires to use different material for his own convenience, he shall have to carry out necessary soil investigations and redesign the high embankment M his own cost. The Contractor shall then furnish the soil test data and design of high embankment for approval, of the Engineer, who reserves the right to accept or reject it. If necessary, stage construction of fills and any controlled rates of filling shall be carried out in accordance with the Contract including installation of instruments and its monitoring. Where required, the Contractor shall surcharge embankments or other areas of fill with approved material for the periods specified in the Contract. If settlement of surcharged fill results in any surcharging material, which is unacceptable for use in the fill being surcharged, lying below formation level, the Contractor shall remove the unacceptable material and dispose it as per direction of the Engineer. He shall then bring the resultant level up to formation level with acceptable material. 132.4.8 Settlement period : Where settlement period is specified in the Contract,

Earthwork, Erosion Control and Drainage

Section 300

the embankment shall remain in place for the required settlement period before excavating for abutment, wingwall, retaining wall, footings, etc., or driving foundation piles. The duration of the required settlement period at each location shall be as provided for in the Contract or as directed by the Engineer. 132.5 Plying of Traffic Construction and other vehicular traffic shall not use the prepavred surface of the embankment and/or subgrade without the prior permission of the Engineer. Any damage arising out of such use shall, however, be made good by the Contractor at his own expense as directed by the Engineer. 132.6 Surface Finish and Quality Control of Work The surface finish of construction of subgrade shall conform to the requirements of Clause 902. Control on the quality of materials and works shall be exercised in accordance with Clau7se 903. 132.7 Subgrade Strength 132.7.1 It shall be ensured prior to actual execution that the borrow area material to be used in the subgrade satisfies the requirements of desigp CBR. 132.7.2 Subgrade shall be compacted and finished to the design strength consistent with other physical requirements. The actual laboratory CBR values of constructed subgrade shall be determined on undisturbed samples cut out from the compacted subgrade in CBR mould fitted with cutting shoe or on remoulded samples, compacted to the field density at the field moisture content. 132.8 Measurements for Payment Earth embankment/subgrade construction shall be measured separately by taking cross sections at intervals in the original position before the work starts and after its completion and computing the volumes of earthwork in cubic metres by the method of average end areas. The measurement of fill material from borrow areas shall be the difference between the net quantities of compacted fill and the net quantities of suitable material brought from roadway and drainage excavation. For this purpose, it shall be assumed that one cu.m. of suitable material brought to site from road and drainage excavation forms one cu.m. of dompacted fill and all bulking or shrinkage shall be ignored. Construction of embankment under water shall be measured in cu.m. Construction of high embankment with specified material and in specified manner shall be measured in cu. m. Stripping including storing and reapplication of topsoil shall be measured'in cu. m. Work involving loosening and recompacting of ground supporting einbankment/subgrade shall be measured in cu. m. Removal of unsuitable material at embankment/subgrade foundation ad replacement with suitable material shall be measured in cu.m.

Earthwork, Erosion Control and Drainage

Section 300

Scarifying existing granular/bituminous road surface shall be measad in square meti-es. Dismantling and removal of existing cement concrete pavement " be measured vide Clause 202.6. Filter medium and backfill material behind abutments, wing walls od other retaining structures shall be measured as finished work in pition in cu.m. 132.9 Rates 132.9.1 The Contract unit rates for the items of embankment 'and sobgrade construction shall be payment in full for carrying out the xquired operations including-full compensation for :
(i) Cost of arrangement of land as a source of supply of material of required quantity for construction unless provided otherwise in the Contract; (ii) Setting out; (iii) Compacting ground supporting embankment/subgrade except where removal and replacement of unsuitable material or loosening and recompacting is involved; (iv) Scarifying or cutting continuous horizontal benches 300 mmi wide on side slopes of existing embankment and subgrade as applicable; (v) Cost of watering or drying of material in borrow areas and/or embankment and subgrade during construction as. required; (vi) Spreading in layers, bringing to appropriate moisture content and cornpaclin to Specification requirements; (vii) Shaping and dressing topland slopes of the embankment and subgrado includiq rounding of comers; (viii) (ix) Restricted working at sites of structures; Working on narrow width of mrsbanbrient and subgrade;

(x), Excavation in alljoils from borrow pits/designated borrow areas including cleariq and grubbing and transporting the material to embankment and subgmde sit with all lifts and leads unless otherwise provided for in the Contract; (xi) All labour, materials, tools, equipment and incidentals necessary to complese b work to the Specifications; (xii) (xiii) Dewatering; and Keeping the embankment/completed formation free of water as per Clause 311,

132.9.2 In case die Contract unit rate specified is not inclusive of all leads, the unit rate for transporting' material beyond the initial leaA as specified in the Contract for construction of embankment and subgrA shall be inclusive of full compensation for all labour,equipment, tool and incidentals necessary on account of the additional haul or trans. portation involved beyond the specified initial lead. 132.9.3 Clause 301.9.5 shall apply as regards Contract unit rates for items of stripping and storing top soil and of reapplication of topsoil. 132.9.4 Clause 301.9.2 shall apply as regards Contract unit rate for the item of loosening and recompacting the embankment/subgra foundation.

Earthwork, Erosion Control and Drainage

Section 300

132.9.5 Clauses 301.9.1 and 305.9 shall apply as regards Con rates for items of removaf of unsuitable material and mplAcement suitable material respectively. 132.9.6 The Contract unit rate for karifying existing granu luminous road surface shall be payment in full for carrying t required operations including full compensation for all lab6ur, m - ri tools, equipment and incidentals necessary to complete the worL This will also comprise of handling, salvaging, stacking and disposn of the dismantled materials within all lifts and upto a lead of 1000 m or as otherwise specified. 132.9.7 Clause 202.7 shall apply as regards Contract unit rate dismantling and removal of existing cement concrete pavement. 132.9.8 The Contract unit rate for providing and laying Al material behind abutments shall be payment in full for carnrying the required operations including all materials, labour, tools, equipment and incidentals to complete the work to Specifications. 132.9.9 Clause 305A.6 shall apply as regards Contract unit rate for construction of embankment under water. 132.9.10 Clause 305A.7 shall apply as regards Contract unit rate for construction of high embankment. It shall include cost of instrumentation, its monitoring and settlement period, where specified in'the Contract or directed by the Engineer. 133 133.1 Description This work shall consist ofmeasures as shown on plans , or as directed by the Engineer to control soil erosion, sedimentation and water pollution, through use of berms, dikes, sediment basins, fibre mats, mulches, grasses, slope,drains, and other devices. 133.2 Materials All materials shall meet commercial grade s ' tandards and shall be approved by the Engineer before being used in the work. 133.3 Construction Operations Prior to the start of the relevant construction, the Contractor shall submit to the Engineer for approval his schedules for carrying out temporary and permanent erosion/sedimentation control works as are applicable for the items of clearing and grubbing, roadway and drainage excavation, embankipenysubgrade construction, bridges and other strucJm across water courses, pavement courses and shoulders. He shall also submit for approval his proposed method of erosion/sedim6ntation control on service, road and borrowpits and his plan, for disposal of waste materials. Work shall not be started until the erosion/sedimentation control schedules and methods of operations for the applicable construction have been approved by the Engineer. SOIL EROSION AND SEDIMENTATION CONTROL

Earthwork, Erosion Control and Drainage

Section 300

The surface area of erodible earth material, exposed by clearing and Snibbing, excavation, borrow and fill operations sfiall be limited to the extent practicable. The Contractor may be directed to provide immediate permanent or temporary erosion and sedimentation control measures to prevent soil erosion and sedimentation that will adversely affect construction operations, damage adjacent properties, or cause rontamination of nearby streams or other water cobrses, lakes, reservoirs et. Such work may involve the construction of temt)orary berms, ftes, sediment basins, slope drains and use of temporary mulches, fab mats, seeding, or other control devices or methods as necessary to con erosion and sedimentation. Cut and fill slopes shall be seeded and tu as required on the plans. The Contractor shall be required to incorporate all permanent crosi and sedimentation control features into the project at the carli practicable time as outlined in his accepted schedule to minimize need for temporary erosion and sedimentation control measures. Temporary erosion/sedimentation and pollution control measures wi be used to control the phenomenon of erosion, sedimentation and pollution that may develop during normal construction practices, but may neith be foreseen during design stage nor associated with permanent contmi features on the Project. Where erosion or sedimentation is likely to be a problem, clearin" and grubbing operations should be so scheduled and performed th grading operations and permanent erosion or sedimentation con features can follow immediately thereafter if the project conditions permi otherwise temporary erosion or sedimentation control measures may required between successive construction stages. Under no conditio shall a large surface area of erodi6le earth material be exposed at one time by clearing and grubbing or excavation without prior apprM of'the Engineer. The Engineer may limit the area of excavation, borrow and em; bankment operations in progress, commensurate with the Contractor" capability and progress in keeping the finish grading, mulching, seedin and other such permanent erosion, sedimentation and pollution con measures, in accordance with the accepted schedule. Should seasoni limitations make such coordination unrealistic,~ temporary erosion/sedi. mentation control measures shall be taken immediately to the extent feasible and justified. In the event temporary erosio ' n, sedimentation and pollution control measures become necessary, due to the Contractor's negligence, carelessness or failure to install permanent controls as a part of -the or as scheduled or ordered by the Engineer, these shall be caffirried out the Contractor's own expense. Temporary erosion, sedimentation ad pollution control work required, which is not attributed to the ContracJ tor's negligence, carelessness or failure to install permanent controls, will be performed as ordered by the Engineer. Temporary erosion, sedimentation and pollution control may include construction work outside the right-of-way where such work is necessary as a result of road construction such as borrow pit operati ons, service roads and equipment storage sites.

Earthwork, Erosion Control and Drainage

Section 300

The temporary erosion, sedimentation and pollution control features installed by the Contractor shall be acceptably maintained by him till these are needed, unless otherwise agreed by the Engineer. 133.4 Measurements for Payment The soil erosion, sedimentation and pollution control works will be measured in terms of units specified in the Bill of Quantities for the respective items. 133.5 Rates The Contract unit rate,for different items of soil erosion, sedimentation and pollution control works shall be payment in full for carrying out all required operations including full compensation for all labout, tools, equipment and incidentals to complete the works to the Specifications. 134 134.1 Scope This work shall consist of furnishing and laying of the live sod of perennial turf forming grass on embankment slopes, verges (earthen shoulde rs) or other locations shown on the drawings or as directed by the Engineer. Unless otherwise specified, the work shall be taken up as soon as possible following construction of the embankment, provided the season is favourable for establishment of the sod. 134.2 Materials The sod shall consist of dense, well-rooted growth of permanent and desirable grasses, indigenous to the locality where it is to be used, and shall be practically free from weeds or other undesirable matter. At the time the sod is cut, the. grass on the sod shall have a length of approximately 50 mm and the sod shall have been freed of debris. Thickness of the sod shall be as uniform as possible, with some 5080 mm or so of soil covering the grass roots depending on the nature of the sod, so that practically all the dense root system of the grasses is retained in the sod strip. The sods shall be cut in rectangular strips of uniform width, not less than about 250 mm x 300 mm in size but not so large that it is inconvenient to handle and transport these without damage. During wet weather, the sod shall be allowed to dry sufficiently to prevent rearing during handling and during dry weatha shall be watered before lifqng , to ensure its vitality and prevent the dropping of the soil in handling. 134.3 Construction Operations 134.3.1 Preparation of the earth bed : The area to be sodded shall have been previously constructed to the required slope and cross section. Soil on the area shall be loosened, freed of all stones larger than 50 mm size, sticks, stumps and any undesirable foreip matter, and brought to a reasonably fine granular texture to a dep~ of not less than 25 mm for receiving the sod. Where required, topsoil shall be spread over the slopes. Prior to placing the topsoil, the slopes shall be scarified to a depth which, after settlement, will provide the required TURFING WITH SODS

Earthwork, Erosion Control and Drainage

Section 300

nominal depth shown on the plans, Spreading shall not be done when the ground is excessively wet. Following soil preparation and top soiling, whe re required, fertilizer' and ground limestone when specified shall be spread uniformly at the rate indicated on the plans. After spreading, the materials are incorporated in the soil by discing or other means to the depths shown on the plans. 134.3.2 Placing the sods : The prepared sod bed shall be moistened to the loosened depth, if not already sufficiently moist, and the shall be placed thereon within approximately 24 hours after the same had been cut. Each sod strip shall be laid edge to edge and such tha the joints caused by abutting ends are staggered. Every strip, after k is snugly placed against the strips already in position, shall be lig tly tamped with suitable wooden or metal tampers so as to eliminate air pockets and to press it into the underlying soil. On side slopes steeper than 2 (horizontal) to I (vertical), the laying of sods shall be started from bottom upwards. At points where water may flow over a sodded area, the upper edges of the sod strips shall be turned into the soil below the adjacent area and a layer of earth placed over this followed by its thorough compaction. 134.3.3 Staking the sods : Where die side slope, is 2 (horizontal) to I (vertical) or steeper and the distance along the slope is"more than 2 m, the sods shall be staked with pegs or nails spaced approximately 500 to 1000 mm along the longitudinal axis of the sod strips. Stakes shall be driven approximately plumb through the sods to be almost flush with them. 134.3.4 Top dressing : After the sods have been laid in position, Ille surface shall be cleaned of loose sod; excess soil and other foreign material. Thereafter, a thin layer of topsoil shall be scattered over the surface of top dressing and the area thoroughly moistened by sprinkling with water: 134.3.5 Watering and maintenance : The sods shall be watered by the Contractor for a period of at least four weeks after laying. Watering shall be so done as to avoid erosion and prevent damage to sodded areas by wheels of water tanks. The Contractor shall erect necessary warning signs and barriers, repair or replace sodded areas failing to show uniform growth. of pass or damaged by his operations and shall otherwise maintain tk sod at his cost until final acceptance. 134.4 Measurements for Payment Turfing with sods shall be measured as finished work in square metres. 134.5 Rate The Contract unit rate for turfing with sods shall mean payment in full for carrying out all the required operations explained above including compensation for
(i) furnishing all the materials to be incorporated in the Works with all leads and lifts; and

Earthwork, Erosion Control and Drainage

Section 300

(ii) all labour, tools, equipments and incidentals to complete the work in accordance with these Specifications.

The Contract unit rate for application of topsoil shall be as per Clause 301.9.5. 135 135.1 Scope This shall consist of preparing slopes, placing topsoil, furnishing all seeds, commercial or organic fertilizers and mulching materials, providing jute netting and placing and incorporating the same on e6bankment slopes or other locations designated by the Engineer or shown in the Contract documents. 135.2 Materials
A. Seeds: The seeds shall be of approved quality and type suitable for the soil on which these are to be applied, and shall have acceptable purity and germination to requirements set down by the Engineer. Fertilizer shall consist of standard commercial materials and conform to the grIA specified. Organic manure shall be fully putrefied organic matter such as ccow dung. Mulching materials shall consisr of straw, hay, wood shavings or sawd4 and shall be delivered dry. They shall be reasonably free of weed seed and sud foreign materials as may detract from their effectiveness as a mulch or bs injurious to the plant growth. B. Topsoil: Topsoil shall not be obtained from an area known to have noxious w growing in it. If treated with herbicides or sterilents, it shall be got by appropriate agricultural authority to determine the residual in the soil. 0 shall not contain less than 2 per cent and more than 12 per cent organic mank" C. Bituminous Emulsion: A suitable grade of bituminous cutback or emulsion used as a tie down for mulch shall be as described in the Contract document or as desired by the Engineer. Emulsified bitumen shall not contain any solves or diluting agent toxic to plant life. D. Netting: Jute netting shall be undyed jute yam woven into a uniform open wea'Ve with approximate 2.5 cin square openings.

SEEDING AND MULCHING

Geonetting shall be made of uniformly extruded rectangular mesh having m sh opening of 2 cin x 2 cm. 'Me colour may be black or green. It shall weio not less than 3.8 kg per 100D sq. in. 135.3 Seeding Operations 135.3.1 Seed-bed preparation : The area to be seeded shall be brought to the required slope and cross-section by filling, reshapint eroded areas and refinishing slopes, medians etc. Topsoil shall be evenl~ spread over the specified areas to the depth shown on the plans, unless otherwise approved by the Engineer. The seed-bed preparation shall consist of eliminating all live plants by suitable means usi .. ng agricultural implements. All stones 150 mm in smallest- dimension and larger shall be removed. The soil shall be excavated on the contourr wo a depth of 100 min. All clods larger than 25 mm in diameter shall be crushed and packed. Where necessary, water shall then be applied. All topsoil shall be compacted unless otherwise specified or approved by the Engineer. Compaction shall be by slope compactor, cleated tractor or similar equipment approved by the Engineer. Equipment shall be so designed and constructed as to produce a

Earthwork, Erosion Control and Drainage

Section 300

uniform rough textured~ surface ready for seeding and mulching and which will bond the topsoil-, to the underlying material. The entire area shall be covered by a minimum of 4 passes or 2 round trips of the roller or approved, equipment. . 135.3.2 Fertilizer application : Fertilizer to the required quantities shall be spread and thoroughly incorporated into the soil surface as a pan of the seed-bed preparation. 135.3.3 Planting of seeds : All seeds shall be planted uniformly at the approved rate. Immediately after sowing, the area shall be raked, dragged or otherwise treated so as to cover the seeds to a depth of 6 The operation of seed sowing shall not be performed when the ground is muddy or when the soil or weather conditions would otherwise prevent proper soil preparation and subsequent operations. 135.3.4 Soil moisture and watering requirements: Soil-moisture shall exist throughout the zone from 25 mm to at least 125 mm below the surface at the time of planting. Watering of L seeded areas shall be carried out, as determined by the Engineer. 135.4 Mulching, Applying Bituminous Emulsion and Jute Netting/ Geonetting Within 24 hours of seeding, mulching material mixed with organic manure shall be placed so as to form a continuous, unbroken cover of approximate uniform thickness of 25 mm using an acceptable mechanical blower. Mulching material shall be held in place and made resistant to being * blown away by suitable means approved by the Engineer. When called for in the Contract documents, mulch material shall be anchored in place with bituminous emulsion applied at the rate of 2300 litres per hectare. Any mulch disturbed or displaced following application shall be removed, reseeded and remulched as specified. Jute netting/Geonetting shall be unrolled and placed parallel to the flow of water immediately following the bringing, to-finished grade, the area specified on the plans or the placing of seed and fertilizer. Where more than one strip is required to cover the given areas, they shall overlap a minimum of 100 mm. Jute netting/ Geonetting shall be held in place by approved wire staples, pins, spikes or wooden stakes driven vertically into the soil. 135.5 Maintenance The Contractor shall maintain all seeded and mulched areas until final acceptance. Maintenance shall includ~ protection of traffic by approved warning signs or barricades and repairing any areas damaged following the seeding and mulching operations. If mulched areas become damaged, the area shal~ be reshaped and then seeded and mulched again as originally s*,ified. 135.6 Measurements for payment Seeding and mulching shall be measured as finished work in square metres. 135.7 Rate

Earthwork, Erosion Control and Drainage

Section 300

The Contract unit rate for seeding and mulching shall be payment in full for carrying out all the requirbd operations including full compensation for all materials, labour, tools and incidentals. 136 136.1 Scope This work shall consist of constructing surface and/or sub-surface drains in accordance with the requirements of these Specifications and to the lines, grades, dimensions and other particulars shown on the drawings or as directed by the Engineer. Schedule of work shall be so arranged that the drains are completed in proper sequence with road works to ensure that no excavation of the completed road works is necessary subsequently or any damage is caused to these works due to lack of drainage. 136.2 Surface Drains Surface drains shall be excavated to the specified lines, grades, levels and dimensions to the requirements of Clause 301. The excavated material shall be removed from the area adjoining the drains and if found suitable, utilised in embankmenUsubgrade construction. All unsuitable material shall be disposed of as directed. The excavated bed and sides of the drains shall be dressed to bring these in close conformity with the specified dimensions, levels and slopes. Where so indicated, drains shall. be. lined or turfed with suitable materials in accordance with details shown on the drawings. All works on drain construceon shall be planned and executed in proper sequence with other works as approved by the Engineer, with a view to ensuring adequate drainage for the area and minimising erosion/ sedimentation. 136.3 Sub-surface Drains 136.3.1 Scope : Sub-surface drains shall be of close-jointed perforated pipes, open-jointed unperforated pipes, surrounded by granular material laid in a trench or aggregate drains to drain the pavement courses. Sub-surface drains designed using Geosynthetics: and approved by the Engineer can also be used. 136.3.2 Materials
A. Pipe : Perforated pipes for the drains may be of metal/asbe" cement/ cament concreteRVC. and unpetforated pipes of vitrifted clay/cement concmw asbestos cement no type, size and graft of the pipe to be used shall be as specified in the Contract. In no case, however, shall the internal diameter of the pipe be less than 100 mm. Holes for perforated pipes shall be on one half of the circumference only and conforrit to the spacing indicated on the drawings. Size of the holes "I not ordinarily be greater than half of D~ size of the material surrounding the pipe, subject to being minimum 3 min and. maximum 6 nun. D, stands for the size lot the sieve that allows 85 per cent of the material to pass through iL B Backfill material : Backfill material shall consist of sound, tough, hard, durable particles of free draining sand-gravel material or crushed stone and shall be free of organic material. clay balls or other deleterious matter. Unless -the Contract specifies any particular gradings for the backfill material or requires these'to be designed on inverted filter criteria for filtration and permeability to the approval of the Engineer. the ba&Xill material shall be provided on the following lines,

SURFACE/SUB-SURFACE DRAINS

Earthwork, Erosion Control and Drainage

Section 300

(i) Where the soil met with in the trench is of fine grained type (e.g., siltclay or a mixture thereof),the backfill material "I conform to Class I grading set out in-Table 3OD-3. (ii) Where the soil met with in the trench is of coarse silt to medium sand or sandy type, the backfill material shall correspond to Class 11 grading of Table 300-3. (iii) Where soil met with in the'trench is gravelly sand, the backfill material shall correspond to Class III grading of Table 3M3.

Thickness of backfill material around the pipe shall be as shown on the drawings subject to being at least 150 mm alround in all cases. Geosynthetics for use with subsurface drain shall conform -to the requirements as per Section 700.
Table 300-3. GRADING REQUIREMENTS FOR FILTER MATERIAL Per cent passing by weight Sieve Designation 53 mm 45 mm 26.5 min 22.4 mm 11.2 mm 5.6 mm 2.8 mm 1.4 mm 710 micron 355 micron 180 micron 90 micron 100 92-100 83-100 59-96 35-90 14-40 3-15 0-5 Class I Class II 100 95-100 48-100 28-54 20-35 6-18 2-9 0-4 0-3 Class III 100 97-100 58-100 20-60 4-32 0-10 0-5 -

136.3.3 Trench excavation: Trench for sub-surface drain shall be excavated to the specified lines, grades and dimensions shown in the drawings provided that width of trench at pipe level shall not be less than 450 mm. The excavation shall begin at the outlet end of the drain and proceed towards the upper end. Where unsuitable material is met with at the trench bed, the same shall be removed to such depth as directed by the Engineer and backfilled with approved material whi6 shall be thoroughly compacted to the specified degree. 136.3.4 Laying of pipe and backfilling : Laying of pipe in the trench shall be started at the outlet end and proceed towards the upper end, true to the lines and grades specified. Unless otherwise provided, longitudinal gradient of the pipe shall not be less than I in 100. Before placing the pipe, backfill material of the required grading(s) shall be laid for full width of the trench bed and compacted' to a minimum thickness of 150 min or as shown on the drawings. The pipe shall then be embedded firmly on the bed. Perforated pipes, unless otherwise specified, shall be placed with their perforations down to minimise clogging. The pipe sections shall be joined securely with appropriate coupling fittings or bands.

Earthwork, Erosion Control and Drainage

Section 300

Non-perforated pipes shall be laid with joints as close as possible with tfie open joints wrapped with suitable pervious material (like double layer of hessian, suitable Geosynthetics or some other material of not less than 150 mm width) to permit entry of water but prevent fines entering the pipes. In the case of non-perforated pipes with bell end, the bell shall face upgrade. Upgrade end sections of the pipe installation shall be tightly closed by means of concrete plugs or plugs fabricated from the same material as the pipe and securely held in place to prevent entry of soil materials. After the pipe installation has been completed and approved, backfill material of the required grading(s) (see Clause 309.3.2B) shall be placed over the pipe to the required level in horizontal layers not exceeding 150 min in thickness and thoroughly compacted. The minimum thickness of material above the top of the pipe shall be 300 mm. Unless otherwise provided, sub-surface drains not located below the road pavement shall be sealed at the top by means of 150 min thick layer of compacted clay so as to prevent percolation of surface water. 136.3.5 Use of geosynthetic in laying of pipe and backfilling : After excavating the trench for subsurface drain, the filter fabric shall be placed, the pipe installed and the trench backfilled with permeable material according to dimensions and details shown on the plans. Surfaces to receive filter fabric prior to placing shall be free of loose or extraneous material and sharp objects that may damage the filter fabric during installation. Adjacent rolls of the fabric shall be overlapped a minimum of 450 mm. The preceding roll sWl overlap the following roll in the direction the material is being spread. Damage to the fabric resulting from Contractor's vehicles, equipment or operations shall be replaced or repaired by the Contractor at his expense. 136.3.6 Drain outlet : The outlet for a sub-drain shall not be under water or plugged with debris but should be a free outlet discharging into a stream, culvert or open ditch. The bottom of the pipe shall be kept above high water in the ditch and the end protected with a grate or screen. For a length of 500 min from the outlet end, the trench for pipe shall not be provided with granular material but backfilled with excavated soil and thoroughly -compacted so as to stop water directly percolating- from the backfill material around the pipe. The pipe in this section shall not have any perforations. 136.3.7 Aggregate drains : Aggregate drains shall be placed within the verge/shoulders after completion of the pavement. Depth, thickness and spacing of the aggregate drains shall be as shown on the plan. Trenches for aggregate drains shall be excavated to a minimum width of 300 mm and to the depth shown on the plans or ordered by the Engineer. The bottom of the trench shall' be sloped to drain and shall be free from loose particles of soil. The trench shall be excavated so as to expose clearly the granular pavement courses to be drained.

Earthwork, Erosion Control and Drainage

Section 300

Aggregate for the drains shall & durable gravel, stone or slag and shall be free from vegetable matter and other deleterious substances. The grading requirements are given at Table 300-4. Type B grading may be used only where the drain is designed to intercept surface water flowing to the pipe and is likely to get slowly blocked. Typc A grading allows a much wider range.
TABLE 300-4. GRADING REQUIREMENTS FOR AGGREGATE DRAINS Sieve size Type A 63 mm 37.5 min 19 u6n 9.5 nun 3.35 mm 600 micron 150 micron 75 micron Type B 100 45-100 25-90 8-45 0-10 0-5 100 95-100 0-20 0-5 Per cent passing by weight

136.4 Measurements for Payment Measurement for surface and sub-surface drains shall be per running metre length of the drain. Disposal of ~urplus material beyond 1000 m shall be measured in cu. in. 136.5 Rates The Contract unit rates for surface and subsurface drains shall be payment in full for all items such as excavation, dressing the sides and bottom; providing lining, turfing, pitching, masonry, concrete and plastering; providing, laying and jointing pipes; providing, laying and compacting backfill and bed of granular material; providing, fixing and painting of cover etc. including full compensation fr all materials, labour, tools, equipment and other incidentals to complete the work as shown on drawings with all leads and1ifts except for removal of unsuitable material for which the~lead shall be 1000, in. Provision of inlets, gratings, sumps, outlet pipes, bedding, disbursers etc. wherever required shall be incidental to construction of drain. The Contract unit rate for disposal of surplus and unsuitable material beyond the initial 1000. m lead shall be in accordance with Clause,304.5.3. 137 PREPARATION AND SURFACE TREATMENT OF FORMATION

Preparation and surface treatment of the formation, that is top of the subgrade, shall be carried out only after completion of any specified subgrade drainage and unless otherwise agreed by the Engineer, immediately prior to laying the sub-base or the road base where no sub-base is required. The sequence of operations shall be as follows:
(a) All surfaces below carriageway, laybye-, footways and hard shoulders shall, afttrminstatonentof any soft areas to the required Specifications be well cleaned and freed of mud and slurry.

Earthwork, Erosion Control and Drainage

Section 300

(b) Ihe surface shall be compacted by 4 passes of a smooth wheeled roller of go to 100 kN weight aftr spraying requisite amount of water, if required. before the commencement of rolling. (c) Ile formation shall, wherever necessary. be regWated and trimmed to the requirements of Clause 305.3.9 with motor grader, (d) Ile trimrned formation shall be rolled by one pass of smooth wheeled roller of 80 to 100 kN weight After spraying requisite, Amount of water, if required, before the commencement of rolling.

Where the completed formation is not immediately covered with subbase or road bm matefial, its moisture content shall be maintained to prevent. cracking in the formation by suitable measures as approved by the Engineer. The entire work of surface treatment of formation Shall be deemed as incidental to the work of sub-base/base course to be provided on -the subgrade and. as such no extra payment. shall be made, for the same. 138 WORKS TO BE KEPT FREE OF WATER

138.1 The Contractor shall arrange for the rapid dispersal of water collected/accumulated on the earthwork or completed formation during construction or on the existing roadway or which enters the earthwork or any other item of work from any source, and where practicable, the water shall be discharied into the permanent outfall of the drainage system. The arrangements shall be made in.respect of all earthwork including excavation for * pipe trenches, foundations or cuttings. 138.2 The Contractor shall provide, where. necessary, temporary water courses, ditches, drains, pumping or other means for maintaining the earthwork free from water. Such provisions shall include carrying out the work of forming the cut sections and embankments in such manner that their surfaces have at all times a sufficient minimum crossfall and, where practicable, a'sufficient longitudinal gradient to enable them to shed water and prevent ponding. , The works involved in keeping, the earthwork or any other item of works free of water shall be deemed as incidental to the respective Jtem of work and as such no separate payment shall, be made for the s-me. 139 WATER COURSES AT CULVERTS

139.1 Excavation carried out in the diversion, enlargement, deepening or straightening water courses at culverts, where necessary, shall include the operations such as clearing, grubbing, removal 'of vegetation, trimming of slopes, grading of beds, disposal of excavated materials, pumping, timbering etc. necessary for dealing with the flow of water. 139.2 The beds and sloping sides of water courses shall, where shown on the Drawings, be protected against the action of water by rubble paving to form a flat or curved surface as indicated.- The protection shall consist of large smooth faced stones or of blocks of precast concrete. Stones for rubble paving shall be roughly

Earthwork, Erosion Control and Drainage

Section 300

dressed square. No stone shall be less than 255 mm in depth nor less than 0.02 cu. m. in volume and no rounded boulders shall be used. After completion of construction of culverts, temporary diversion of watercourse, if any, shall be closed and water course restored for flow througb the culvert as per the direction of the Engineer. 139.3 Measurements for Payment The work for water courses at culverts as stated above shall be measured in terms of units specified in the Bill of Quantities for respective items. The temporary diversion of channel to facilitate construction of culverts, its closure and restoration to original water course shall be considered incidental to the work of construction of culverts and no extra payment shall be made for the same. 139.4 Rates The Contract unit rates for different items for water courses at culverts shall be payment in full for carrying out all required operations including full compensation for all cost of materials, labour, tools, equipment and other incidentals to complete the work to the Specification, 140 140.1 Scope In normal circumstances, the embankment should not be constructed with rockfill material. However, where specifically permitted by the Engineer because of imperative economic or technical reasons, construction of rockfill embankments shall be in accordance with the lines, grades and cross-sections as shown in drawings or as directed by the Engineer. Rockfill shall not be used at least for a depth of 500 mm below the formation level. There should be a minimum of 500 mm thick earthen cushion over the rockfill. 140.2 Material The size of rock pieces used in rockfill embankments shall be such that they can be deposited in layers so as to suit the conditions evaluated in the field compaction trials or as directed by the Engineer. The rockfill shall consist of hard, durable and inert-material, preferably maximum size not exceeding 300 mm and per cent finer than 125 min not exceeding 10 per cent. Argillaceous rocks (clay, shales etc.), unburnt colliery stock and chalk shall not be used in rockfill. The rock fragments and blinding material required for filling the voids shall also satisfy the above requirements. 140.3 Spreading and Compaction The material shall be tipped, spread and levelled in layers extending to the full width of embankment by a suitable dozer. Fragments of rock shall then be spread on the top of layer to the required extent and layer compacted by minimum of 5 passes of vibratory CONSTRUCTION OF ROCKFILL EMBANKMENT

Earthwork, Erosion Control and Drainage

Section 300

roller having static weight 8-10 tonnes. The compacted thickness of each layer shall not exceed 500 min. After compaction of each layer, the surface voids shall be filled with broken fragments. Next layer, where required, shall be placed in the same manner, above the earlier compacted layer. The top layer of rockfill, on which normal earth fill will rest shall be thoroughly blinded with suitable granular material to sea] its surface. 140.4 Measurements for Payment Measurement shaIl be made by taking cross-sections at intervals in the original position before the work starts and after its completion and computing the volume in cu. in. by the method of average end areas. 140.5 Rate The Contract unit rate shall be paid in full for carrying out all the above operations including cost of rockfill, broken fragments and blinding material and shall provide full compensation for all items as per Clause 305.9.1 and 305.9.2.

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders Sub-Bases, Bases (Non-Bituminous) and Shoulders 400 Sub-Bases, Bases (Non Bituminous) and Shoulders

Section 400

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

401 140.6 Scope

GRANULAR SUB-BASE

This work shall consist of laying and compacting well-graded material on prepared subgrade in accordance with the requirements of these Specifications. The material shall be laid in one or more layers as sub-base or lower sub-base and upper sub-base (termed as sub-base hereinafter) as necessary according to lines, grades and cross-sections shown on the drawings or as directed by the Engineer. 140.7 Materials 140.7.1 The material to be used for the work shall be natural sand moorum, gravel, crushed stone, or combination thereof depending upon the grading required. Materials like crushed slag, crushed concrete, brick metal and kankar may be allowed only with the specific approval of Engineer. The material shall be free from organic or other deleterious constituents and conform to one of the three gradings given in Table 400-1. While the gradings in Table 400-1 are in respect of close-graded pintlar sub-base materials, one each for maximum particle size of 75 mm, 53 mm and 26.5 mm, the correspording gradings for the coarsepded materials for each of the three maximum particle sizes are Oven at Table 400-2. The grading to be adopted for a project shall be as specified in the Contract. 140.7.2 Physical requirements: The materia! shall have a 10 percentage fines value of 50 kN or more (for sample in soaked condition) when tested in compliance with BS:812 (Part I 11). The water absorption value of the coarse aggregate shall be determined as per IS : 2386 (Part 3); if this value is greater than 2 per cent, the soundness test shall be carried out on the material delivered to site as per IS : 383. Fbr Grading II and III materials, the CBR shall be determined at k density and moisture content likely to be developed in equilibrium conditions which shall be taken as being the density relating to a wiforin air voids content of 5 per cent.
TABLE 400-1. GRADING FOR CLOSE-GRADED GRANULAR SUB-BASE MATERIALS IS Sieve Designation 75.0 mm 53.0 mm 26.5 mm 9.50 mm 4.75 mm 2.36 mm0.425 mm 0.075 mm Per cent by weight passing the IS sieve_ Grading I 100 80-100 55-90 35-65 25-55 20-40 10-25 3-10 Grading 11 100 70-100 50-80 40-65 30-50 15-25 3-10 100. 65-95 50-80 40-65 20-35 3-10 Grading III

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders


CBR Value (Minimum) 30 25 20

Section 400

.TABLE 400-2. GRADING FOR COARSE GRADED GRANULAR SUB-BASE MATERIALS IS Sieve Designation 75.0 mm 53.0 mm 26.5 mm 9.50 mm 4.75 mm 2.36 mm 0.425 mm 0.075 mm CBR Value (Minimum) <10 30 <10 25 <10 20 10-30 15-35 25-45 55-75 Per cent hy weight passing the IS Sieve Grading I 100 Grading 11 100 50-80 100 Grading III -

Note : The material passing 425 micron (0.425 mm) sieve for all the three gradings when tested according to IS : 2720 (Part 5) shall have liquid limit and plasticity index not more than 25 and 6 per cent respectively.

140.8 Strength of sub-base It shall be ensured Prior to actual execution that the material to be used in the sub-base satisfies the requirements of CBR and othe r physical requirements when compacted and finished. When directed by the Engineer, this shall be verified by performing CBR tests in the laboratory as required on - specimens remoulded at field dry density and moisture content and any other tests for the quality" of materials, as may be necessary. 140.9 Construction Operations 140.9.1 Preparation of subgrade : Immediately prior to the laying of sub-base, the subgrade already finished to Clause 301 or 305 as applicable shall be prepared by removing all vegetation and other extraneous matter, lightly sprinkled with water if necessary and rolled with two passes of 80 -100 kN smooth wheeled roller. 140.9.2 Spreading and compacting : The sub-base material of grading specified in the Contract shall be spread on the prepared subgrade with the help of a motor grader of adequate capacity, its blade having hydraulic controls suitable for initial adjustment and for maintaining the required slope and grade during the operation or other means as approved by the Engineer. When the sub-base material consists of combination of materials mentioned in Clause 401.2.1, mixing shall be done mechanically by the mixin-place method. Manual mixing shall be permitted only where the width of laying is not adequate for mechanical operations, as in small-sized jobs. The equipment used for mix-in-place construction shall be a rotavator or similar approved equipment capable of mixing the

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

material to the desired degree, If so desired by the Engineer, trial runs with the equipment shall be carried out to establish its suitability for the work. Moisture content of the loose material shall be checked in accordance with IS:2720 (Part 2) and suitably adjusted by sprinkling additional water from a truck mounted or trailer mounted water tank and suitable for applying water uniformly and at controlled quantifies to variable widths of suriace or other means approved by the Engineer so that, at the time of compaction, it is from I per cent above to 2 per cent below the optimum moisture content corresponding to IS:2720 (Part 8). While adding water, due allowance shall be made for evaporation losses. After water has been added., the material shall be processed by mechanical or other approved means like disc harrows, rotavators until the layer is uniformly wet. Immediately thereafter, rolling shall s=. If the thickness of the compacted layer does not exceed 100 mm, a smooth wheeled roller of 80 to 100 kN weight may be used. For a compacted single layer upto 225 mm the compaction shall be done with the help of a vibratory roller of minimum 80 to 100 kN static weight with plain drum or pad footdrum or heavy pneumatic tyred roller of minimum 200 to 300 kN weight having a minimum tyre pressure of 0.7 MN/m2 or equivalent capacity roller capable of achieving the required compaction. Rolling shall commence at the lower edge and proceed towards the upper edge longitudinally for portions having unidirectional crossfall and super-elevation and shall commence at 6 the edges and progress towards the centre for portions having crossfall on both sides. Each pass of the roller shall uniformly overlap not less than onethird of the track made in the preceding pass. During rolling, the grade and crossfall (camber) shall be checked and any high spots or depressions, which become apparent, corrected by removing or adding fresh material. The speed of the roller shall not exceed 5 kin per hour. Rolling shall be continued fill the density achieved is at least 98 per cent of the maximum dry density for the material determined as per IS:2720 (Part 8). The surface of any layer of material on completion of compaction shall be well closed, free from movement under compaction equipment and from compaction planes, ridges, cracks or loose material.. All loose, segiegated or otherwise defective areas shall be made good to the full thickness of layer and re-compacted. 140.10 Surface Finish and Quality Control of Work The surface finish of construction shall conform to the requirements of Clause 902. Control on the quality of materials and works shall be exercised by the Engineer in accordance with Section 900. 140.11 Arrangements for Traffic During the period of construction, arrangement of traffic shall be maintained in accordance with Clause 112. 140.12 Measurements for Payment Granular sub-base shall be measured as finished work in position in cubic metres.

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

The protection of edges of granular sub-base extended over the full formation as shown in the drawing shall be considered incidental to the work of providing granular sub-base and as such no extra payment shall be made for the same. 140.13 Rate The Contract unit rate for granular sub-base shall be payment in full for carrying out the required operations including full compensation for
(i) making arrangements for traffic to Clause 112 except for initial treatment to verges, shoulders 'and construction of diversions; (ii) furnishing all materials to be incorporated in the work including all royalties, fees, rents where necessary and all leads and lifts; (iii) (iv) (v) all labour, tools, equipment and incidentals to complete the work to the Specifications-, carrying out the work in pan widths of road where directed-, and carrying out the required tests for quality control.

141 141.1 Scope

LIME TREATED SOIL FOR IMPROVED SUB-GRADE/SUB-BASE

This work shall consist of laying and compacting an improved subgrade/lower sub-base of soil treated with lime on prepared sub-grade in accordance with the requirements of these Specifications and in conformity with the lines, grades and cross-sections shown on the drawings or as directed by the Engineer. Lime treatment is generally effective for soils which contain a relatively high percentage of clay and silty clay. 141.2 Materials 141.2.1 Soil : Except when otherwise specified, the soil used for stabilisation shall be the local clayey soil having a plasticity index greater *= 9. 141.2.2 Lime : Lime for lime-soil stabilisation work shall be commercial dry lime slaked at site or pre-slaked lime delivered to the site in suitable packing. Unless otherwise permitted by the Engineer, the lime shall have purity of not less than 70 per cent by weight of Quicklime (CaO) when tested in accordance with IS :1514. Lime shall be properly stored to avoid prolonged exposure to the atmosphere and consequent carbonation which would reduce its binding properties. 141.2.3 Quantity of lime in stabifised mix : Quantity of lime to be added as percentage by weight of the dry soil shall be as specified in the Contract. The quantity of lime used shall be related to its calcium oxide content which shall be specified. Where the lime of different calcium oxide content is to be used, its quantity shall be suitably adjusted to the approval of the Engineer so that equivalent calcium oxide is incorporated in the work. The mix design shall be done to arrive at the appropriate quantity of lime to be added, having due regard to the purity of lime, the type of soil, the moisture-density relationship, and the design CBR/Unconfined Compressive Strength (UCS) value specified in the Contract. The laboratory CBRJUCS value shall be at least 1.5

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

times the minimum field value of CBR/UCS stipulated in the Contract. 141.2.4 Water : The water to be used for time stabilisation shalt be clean and free from injurious substances. Potable water shall be preferred. 141.3 Construction Operations 141.3.1 Weather limitations : Lime-soil stabilisation shall nnot done when the air temperature in the shade is less than 100 C. 141.3.2 Degree of pulverisation For lime stabilisation, the soil before addition of stabiliser, shall be pulverised using agricultural im. plements like disc harrows and rotavators to the extent that it passes the requirements set out in Table 400-3 when tested in accordance, with the method described in Appendix 3.
TABLE 400-3. SOIL PULVERISATION REQUIREMENTS FOR LIME STABILISATION IS Sieve designation passing the IS Sieve 26.5 mm 5.6 mm 100 80 Minimum per cent by weight

141.3.3 Equipment for construction: Stabilised soil sub-bases shall be constructed by mix-in-place method of construction or otherwise approved by the Engineer. Manual mixing shall be permitt only where the width of laying is not adequate for mechanical operations, as in small-sized jobs. The equipment used for mix-in-place construction shall be a rotavatorl or similar approved equipment capable of pulverising and mixing the'; soil with additive and water to specified degree to the full thickness of the layer being processed, and of achieving the, desired degree of., mixing and uniformity of the stabilised material. If so desired by the, Engineer, trial runs with the equipment shall be carried out to establish its suitability for work. The thickness of any layer to be stabilised shall be not less than 100 mm when compacted. The maximum thickness shall be 200 mm, provided the plant used is accepted by the Engineer. 141.3.4 Mix-in-place method of construction: Before deploying the equipment, the soil after it is made free of undesirable vegetation or other deleterious matter shall be spread uniformly on the prepared' subgrade in a quantity sufficient to achieve the desired compacted thickness of the stabilised layer. Where single-pass equipment is to be employed, the soil shall be lightly rolled at the discretion of the Engineer. The equipment used shall either be of single-pass or multiple pass type. The mixers shall be equipped with an appropriate device for controlling the depth of processing and the mixing blades shall be maintained or reset periodically so that the correct depth of mixing is obtained at all times.

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

With single-pass equipment the forward speed of the machine shall be so selected in relation to the rotor speed that the required degree of mixing, pulverisation and depth of processing is obtained. In multiplepass processing, the prepared subgrade shall be pulverised to the required depth with successive passes of the equipment and the moisture content adjusted to be within prescribed limits mentioned hereinafter. The blending or stabilising material shall then be spread uniformly and mixing continued with successive passes until the required depth and uniformity of processing have been obtained. The mixing equipment shall be so set that it cuts slightly into the edge of the adjoining lane processed previously so as to ensure -that all the material forming a layer has been properly processed for the full width. 141.3.5 Construction with manual means: Where manual mixing is permitted, the soil from borrow areas shall first bi freed of all vegetation 'and other deleterious matter and placed on the prepared subgrade. The soil shall then be pulverised by means of crow-bars, pick axes or other means approved by the Engineer. Water in requisite quantities may be sprinkled on the soil for aiding pulverisation. On the pulverised soil, the blending material(s) in requisite quantifies shall be spread uniformly and mixed thoroughly by working with spades or other similar implements till the whole mass is uniform. After adjusting the moisture content to be within the limits mentioned later, the mixed material shall be levelled up to the required thickness so that it is ready to be rolled. 141.3.6 Addition of lime: Lime may be mixed with the prepared material either in slurry form or dry state at the option of the Contractor with the approval of the Engineer. Dry lime shall be prevented from blowing by adding water to the lime or other suitable means selected by the Contractor, with the approval of the Engineer. The tops of windrowed material may be flattened or slightly trenched to receive the lime. The distance to which lime may be spread upon the prepared material ahead of the mixing operation shall be determined by the Engineer. No traffic other than the mixing equipment shall be allowed to pass' over the spread lime until after completion of mixing. Mixing or remixing operations, regardless of equipment used, shall continue until the material is free of any white streaks or pockets of lime and the mixture is uniform. Non-uniformity of colour reaction, when the treated material is tested with the standard phenolphthalein alcohol indicator, will be considered evidence of inadequate mixing, 141.3.7 Moisture content for compaction: The moisture content at compaction checked vide IS :2720 (Part 2) shall neither be less than the optimum moisture content corresponding to IS: 2720 (Part 8) nor more than 2 per cent above it. 141.3.8 Rolling: Immediately after spreading, grading and levelling of the mixed

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

material, compaction shall be carried -out with approved equipment preceded by a few passes of lighter rollers if necessary. Rolling shall commence at edges and progress towards the centre, except at superelevated portions, where it shall commence at the inner edge and progress towards outer edge. During rolling the surface shall be frequently checked for grade and crossfall (camber) and any irregularities corrected by loosening the material and removing/ adding fresh material. Compaction shall continue until the density achieved is at least 98 per cent of the maximum dry density for the material determined in accordance with IS: 2720 (Part 8). Care shall be taken to see that the compaction of lime stabilised material is completed within three hours of its mixing or such shorter period as may be found necessary in dry weather. During rolling it shall be ensured that roller does not bear directly on hardened or partially hardened treated material previously laid other than what may be necessary for achieving the specified compaction at the joint. The final surface shall be well closed, free from moverhent under compaction planes, ridges, cracks or loose material. All loose or segregated or otherwise defective areas shall be made good to the full thickness of the layer and recompacted. 141.3.9 Curing: The sub-base course shall be suitably cured for a minimum period of 7 days after which subsequent pavement courses shall be laid to prevent the surface from drying out and becoming friable. No traffic of any kind shall ply over the completed sub-base unless permitted by the Engineer. 141.4 Surface Finish and Quality Control of Work The surface finish of construction shall conform to the requirements of Clause 902. Control on the qpality of materials and works shall be exercised by the Engineer in accordance with Section 900. 141.5 Strength When lime is used for improving the subgrade, the soil-lime mix shall be tested for its CBR value. When lime stabilised soil is used in a sub-base, it shall be tested for unconfined compressive strength (UCS) at 7 days. In case of variation from the design CBR/UCS, in situ value being lower, the pavement design shall be reviewed based on the actual CBR/UCS values. The extra pavement thickness needed on account of lower CBR/UCS value shall be constructed by the Contractor at his own cost. 141.6 Arrangements of Traffic During the period of construction, arrangement of traffic shall be maintained in accordance with Clause 112. 141.7 Measurements for Payme nt Stabilised soil sub-base shall be measured as finished work in position in cubic metres. 141.8 Rates

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

The Contract unit rate for lime stabilised soil sub-base shall be payment in full for carrying out the required, operations including full compensation for all components listed in Clause 401.8 (i) to (v). 142 142.1 Scope This work shall consist of laying and compacting a sub-base/base course of soil treated with cement on prepared subgrade/sub-base, in accordance with the requirements of these Specifications and in conformity with the lines, grades and cross-sections shown on the drawings or as directed by the Engineer. 142.2 Materials 142.2.1 Material to be stabilised: The material used for cement treatment shall be soil including sand and gravel, laterite, kankar, brick aggregate, crushed rock or slag or any combination of these. For use in a sub-base course, the material shall have a grading shown in Table 400-4; it shall have a uniformity coefficient not less than 5, capable of producing a well closed surface finish. For use in a base course, the material shall be sufficiently well graded to ensure a well-closed surface finish and have a grading within the range given in Table 400-4. If the material passing 425 micron sieve is plastic, it shall have a liquid limit not greater than 45 per cent and a plasticity index not grater than 20 per cent determined in accordance with IS:2720 (Part 5). The physical requirements for the material to be treated with cement for use in a base course shall be same as for Grading I Granular Sub-base, Clause 401.2.2. 142.2.2 Cement: Cement for cement stabilisation shall comply with the requirements of IS: 269, 455 or 1489.
Table 400-4. GRADING LIMITS OF MATERIAL FOR STABILISATION WITH CEMENT IS Sieve size Sub-base Finer than: 53.0 mm 37.5 mm 19.0 mm 9.5 mm 4.75 mm 600 micron 300 micron 75 micron 100 95 45 35 25 8 5 0 Base Within the range: 100 95-100 45-100 35-100 25-100 8-65 5-40 0-10 Percentage by mass passing

CEMENT TREATED SOIL SUB-BASE/BASE

142.2.3 Lime: If needed for pre-treatment of highly clayey soils, Clause 402.2.2. shall apply.

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

142.2.4 Quantity of cement in stabilised mix: The quantity of cement to be added as per cent by weight of the dry soil shall be specified in the Contract. Also if lime is used as pretreatment for highly clayey soils, the quantity as per cent by weight of dry soil shall be specified in the Contract. The mix design shall be done on the basis of 7-day unconfined compressive strength (UCS) and/or durability test under 12 cycles of wet-dry conditions. The laboratory strengt~ values shall be at least 1.5 times the minimum field UCS value stipulated in the Contract. 142.2.5 Water: The water to be used for cement stabilisation shall be clean and free from injurious substances. Potable water shall be preferred. 142.3 Construction Operations 142.3.1 Weather limitations : Stabilisation shall not be done when the air temperature in the shade is less than 100C. 142.3.2 Degree of pulverisation : For stabilisation,the soil before addition of stabilizer, shall be pulverised, where necessar~, to the extent that it passes the requirements as set out in Table 400-5 when tested in accordance with the method described in Appendix 3.
TABLE 400-5. SOIL PULVERISATION REQUIREMENTS FOR CEMENT STABILISATION IS Sieve designation 26.5 mm 5.6 mm Minimum per cent by weight passing the IS sieve 100 80

142.3.3 Clauses 402.3.3 to 402.3.5 shall apply as regards spreading and mixing the stabiliser except that cement or time plus cement as the case may be, shall be used as the stabilising material. , 142.3.4 Moisture content for compaction: The moisture content at compaction checked vide IS: 2720 (Part 2) shall not be less than the optimum moisture content corresponding to'IS: 2720 (Part 8) nor more than 2 per cent above it. 142.3.5 Rolling : Clause 402.3.8 shall apply except that care shall be taken to see that the compaction of cement stabilised material is completed within two hours of its mixing or such shorter period as may be found necessary in dry weather. 142.3.6 Curing : The sub-baWbase course shall be suitably cured for 7 days. Subsequent pavement course shall be laid soon after to prevent the sur.ace from drying out and becoming friable. No traffic of any kind shall , ply~ over the completed sub-base unless permitted by the Engineer. 142.4 Surface Finish and Quality Control of Works The surface finish of construction shall conform to. the requirements of Clause 902.

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

142.5 Strength Control on the quality of materials and works shall be exercised by the Engineer in accordance with Section 900. Cement treated soil sub-base /base shall be tested for the unconfined compressive strength (UCS) value at 7 days, actually obtained in situ, In case of variation from the design UCS, in situ value being on Iowa side, prior to proceeding with laying of base/surface course on the pavement design shall be reviewed for actual UCS value. The ext4rR pavement thickness needed on account of lower UCS shall be construct by the Contractor at his own cost. 142.6 Arrangements for Traffic During the period of construction, arrangement of traffic shall be maintained in accordance with Clause 112. 142.7 Measurements for Payment Stabilised soil sub-base/ base shall be measured as finished wod in position in cubic metres. 142.8 Rates The Contract unit rate for cement treated soil sub-baselbase wit pretreatment with lime if required shall be payment in full -for carry~g out the required operations including full compensation for all co~-ponents listed in Clause 401.8 (i) to (v). 143 143.1 Scope 143.1.1 This work shall consist of clean, crushed aggregates me. chanically interlocked by rolling and bonding together with screenin& binding material where necessary and water laidonaproperly prepaied subgrade/ sub-base/ base or existing pavement, as the case maybo and finished in accordance with the requirements of these Specificatiom; and in close conformity with the lines, grades, cross-sections and thick as per approved plans or as directed by the Engineer. 143.1.2 It is, however, not desirable to lay water bound macadam on an existing thin black topped surface without providing adequ* drainage facility for water that would get accumulated , at the interfaa of existing bituminous surface and water bound macadam. 143.2 Materials 143.2.1 Coarse aggregates : Coarse aggregates shall be either crushed or broken stone, crushed slag, overburnt (Jhama) brick aggregates or any other naturally occurring aggregates such as kankar and laterite of suitable quality. Materials other than crushed or broken stone and crushed slag shall be used in sub-base courses only. If crushed gravel/ shingle is used, not less than 90 WATER BOUND MACADAM SUB-BASFYBASE

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

per cent by weight of the gravel/ shingle pieces.retained on 4.75 mm sieve shall have at least two fractured faces. The aggregates shall conform to the physical requirements set forth in Table 400-6. The type and size range of the aggregate shall be specified in the Contract or shall be as specified by the Engineer. If the water absorption value of the coarse aggregate is greater than 2 per cent, the soundness test shall be carried out on the material delivered to site as per IS : 2386 (Part 5). 143.2.2 Crushed or broken stone: The crushed or broken stone shall be hard, durable and free from excess flat, elongated, soft and disintegrated particles, dirt and other deleterious material. .
TABLE 400-6. PHYSICAL REQUIREMENTS OF COARSE AGGREGATES FOR WATER BOUND MACADAM FOR SUB-BASEIBASE COURSES Test 1. * Los Angeles Abrasion value Or * Aggregate Impact value 2. Combined Flakiness and Elongation Indices (Total) *** * Aggregate may satisfy requirements of either of the two tests. ** Aggregates like brick metal, kankar, laterite etc. which get softened in presence of water shall be tested for Impact value under wet conditions in accordance with IS: 5640. *** The requirement of flakiness index and elongation index shall be enforced only in the case of crushed broken stone and crushed slag. IS:2386 (Part- 1) 30 per cent (Max) IS: 2386 (Part-4) or IS:5640** 30 per cent (Max) Test Method IS:23 86 (Part-4) Requireinents 40 per cent (Max)

143.2.3 Crushed slag : Crushed slag shall be made from aircooled blast furnace slag. It shall be of angular shape, reasonably uniform in quality and density and generally free from thin, elongated and soft pieces, dirt or other deleterious materials. The weight of crushed slag shall not be less than 11.2 kN per M3 and the percentage of glossy material shall not be more than 20. It should also comply with the following requirements:
(i) Chemical stability (ii) Sulphur content (iii) Water absorption To comply with requirements of appendix of BS : 1047 Maximum 2 per cent Maximum 10 per cent

143.2.4 Overburnt (Jhama) brick aggregates : Jhama brick aggregates shall be made from overburnt bricks o r brick bats and be free from dust and other objectionable and deleterious materials. 143.2.5 Grading requirement of coarse aggregates : The coarse aggregates shall

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

conform to one of the Gradings given in Table 400-7 as specified, provided, however, the use of Grading No.1 shall be restricted to sub-base courses only.

TABLE 400-7. GRADING REQUIREMENTS OF COARSE AGGREGATES Grading No. 1. 90 mm to 45 rmn Size Range IS Sieve Designation 125 90 63 45 22.4 2. 63 mm to 45 mm 90 63 53 45 22.4 3. 53 nun to 22.4 rmn 63 53 45 22.4 11.2 mm mrn mm mm mm mm mm mm mm mm mm mm mm mm mm Per cent by weight passing 100 90-100 25-60 0-15 0-5 100 90-100 25-75 0-15 0-5 100 95-100 65-90 0-10 0-5

Note The compacted thickness for a layer with Grading I shall be 100 mm while for layer with other Gradings i.e. 2 & 3, it shall be 75 mm.

143.2.6 Screenings: Screenings to fill voids in the coarse aggregate shall generally consist of the same material as the coarse aggregate. However, where permitted, predominantly non-plastic material such as moorurn or gravel (other than rounded river borne material) may be used for this purpose provided liquid limit and plasticity index of guch material are below 20 and 6 respectively and fraction passing 75 micron sieve does not exceed 10 per cent. Screenings shall conform to the grading set forth in Table 400-8. The consolidated details of quantity of screenings required for various grades of stone aggregatc.s are given in Table 400-9. The table also gives the quantities of materials (loose) required for 10 m2 for sub-base/base compacted thickness of 100n5 mm. The use of screenings shall be omitted in the case of soft aggregates such as brick metal, kankar, latezites, etc. as they are likely to get crushed to a certain extent under rollers.
TABLE 400-8. GRADING FOR SCREENINGS Grading Size of IS Sieve Designation Per cent by weight

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders


Classiflcation A 13.2 mm 11.2 5.6 180 B 5.6 ISO 13.2 mm mm rnm 100 95-100 15-35 Screenings passing the IS Sieve

Section 400

micron 0-10 11.2 mm11.2 mm mm 90-100 100

micron 15-35

TABLE 400-9. APPROXIMATE QUANTITIES OF COARSE AGGREGATES AND SCREENINGS REQUIRED FOR I00nS MM COMPACTED THICK. NESS OF WATER BOUND MACADAM (WBM) SUB-BASE/BASE COURSE FOR 10M2 AREA Screenings classiflcation Grading Classff1cation & Size quantity) Grading 1 90 mm to 100 nun Not 0.30 to 45 mm Grading 2 45 rom -do11.2 mm Grading 3 0.18 to -do22.4 mm 115 Section 400 Sub-Bases, Bases (Non-Bimminous) and Shoulders -doI 1 0.21 m3 1.43 m3 13.2 mm 0.30 M3 uniform 0.32 M3 63 nun to 75 nun 0.91 to Type A 0.12 to 1.07 m3 13.2 mm 0.15 m3 0.24 ml -do-do-doType B 0.20 to -do0.22 M3 53 mm to 75 mm -do-do-do -do0.22 to 1.21 to Type A 0.27 to Size Compacted Loose Stone Screening Range For. WBM Grading Loose Sub-base/ Classi- Qty. base course fication (Loose Size thickness QtyCrushable Type such 'ks Moorum or Gravel

143.2.7 Binding material : Binding material to be used for water bound macadam as a filler material meant for preventing ravelling, shall comprise of a suitable material approved by the Engineer having a Plasticity Index(PI) value oi less than 6 as determined in accordance with IS: 2720 (Part-5).

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

The quantity of binding material where it is to be used, will depend on the type of screenings. Generally, the quantity required for 75 mm compacted thickness of water bound macadam will be 0.06-0.09 ml/lOml and 0.08-0.10ml/lOml for 100 mm compacted thickness. The above mentioned quantities should be taken as a guide only, for estimation of quantities for construction etc. Application of binding materials may not be necessary when the screenings used are of crushable type such as moorum or gravel. 143.3 Construction Operations 143.3.1 Preparation of base: The surface of the subgrade/ sub-base/base to receive the water bound macadam course shall be prepared to the specified lines and crossfall (camber) and made free of dust and other extraneous material. Any ruts or soft yielding places shall be corrected in an approved manner and rolled until firm surface is obtained if necessary by sprinkling water. Any sub-base/base/surface irregularities, where predominant, shall be made good by providing appropriate type of profile corrective course (levelling course) to Clause 501 of these Specifications. As far as possible, laying water bound macadam course over an existing thick bituminous layer may be avoided since it will cause problems of internal drainage of the pavement at the interface of two courses. It is -desirable to completely pick out the existing thin bituminous wearing course where water bound macadam is proposed to be laid over it. However, where the intensity of rain is low and the interface drainage facility is efficient, water bound macadam can be laid over the existing thin bituminous surface by cutting 50 mm x 50 mm furrows at an angle of 45 degrees to the centre line of the, pavement at one metre intervals in the existing road. The directions and depth of furrows shall be such that they provide adequate bondage and also serve to drain water to the existing granular base course beneath the existing thin bituminous surface. 143.3.2 Inverted choke : If water bound macadam is to be laid direc tly over the subgrade, without any other intervening pavement course, a 25 mm course of screenings (Grading B) or coarse sand shall be spread on the prepared subgrade before application of the aggregates,is taken up. In case of a fine sand or silty or clayey subgrade, it is advisable to lay 100 min insulating layer of screening or coarse sand on top of fine grained soil, the gradation of which will depend Upon whether it is intended to act as a drainage layer as well. As a preferred alternative to inverted choke, appropriate geosynthetics performing functions of separation and drainage may be used over the prepared subgrade as directed by the Engineer. Section 700 shall be applicable for use of geosynthetics. 143.3.3 Spreading coarse aggregates : The coarse aggregates shall be spread uniformly and evenly upon the prepared subgrade/sub-basel base to proper profile by using templates placed across the road about 6 in apart, in such

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

quantities that the thickness of each compacted layer is not more than 100 mm for Grading I and 75 mm for Grading 2 and 3, as specified in Clause 404.2.5. Wherever possible, approved mechanical devices such as aggregate spreader shall be used to spread the aggregates uniformly so as to minimise the need for manual rectification afterwards. Aggregates placed at locations which are inaccessible to the spreading equipment, may be spread in one or more layers by any approved means so as to achieve the specified results. The spreading shall be done from stockpiles along the side of the roadway or directly from vehicles. No segregation of large or fine aggregates shall be allowed and the coarse aggregate as spread shall be of uniform gradation with no pockets of fine material. The surface of the aggregates spread shall be carefully checked with templdtes and all high or low spots remedied by removing or adding aggregates as may be required. The surface shall be checked frequently with a straight edge while spreading and rolling so as to ensure a finished surface as per approved drawings. The coarse aggregates shall not normally be spread more than 3 days in advance of the subsequent construction operations. 143.3.4 Rolling: Immediately following the spreading of the coarse aggregate, rolling shall be started with three wheeled power rollers of 80 to 100 kN capacity or tandem or vibratory roll6rs of 80 to 100 kN static weight. The type of roller to be used shall be approved by the Engineer based on trial run. Except on superelevated portions where the rolling shall proceed from inner edge to the outer, rolling shall begin from the edges gradually progressing towards the centre. First the edge/edges shall be compacted with roller running forward and backward. The roller shall then move inward parallel to the centre line of the road, in successive passes uniformly lapping preceding tracks by at least one half width. Rolling shall be discontinued when the aggregates are Tartially compacted with sufficient void space in them to permit application of screenings. However, where screenings are not to be applied, as in the case of crushed aggregates like brick metal, laterite and kankar, compaction shall be continued until the aggregates are thoroughly keyed. During rolling, slight sprinkling of water may be done, if necessary. Rolling shall not be done when the subgrade is soft or yielding or when it causes a wave-like motion in the subgrade or subbase course. The rolled surface shall be checked transversely and longitudinally, with templates and any irregularities corrected by loosening the surface, adding or removing necessary amount of aggregates and re-rolling until the entire surface conforms to desired crossfall (camber) and grade. In no case shall the use of screenings be permitted to make up depressions. Material which gets crushed excessively during compaction or becomes segregated shall be removed and replaced with suitable aggregates.

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

It shall be ensured that shoulders are built up simultaneously along with water bound macadam courses as per Clause 407.4.1. 143.3.5 Application of screenings: After the coarse aggregate has been rolled to Clause 404.3.4, screenings to completely fill tthe interstices shall be applied gradually over the surface. These shall not be damp or wet at the time of application. Dry rolling shall be done while the screenings are being spread so that vibrations of the roller cause them to settle into the voids of the coarse aggregate. The screenings shall not be dumped in piles but be spread uniformly in successive thin layers either by the spreading motions of hand shovels or by mechanical spreaders, or directly from tipper with suitable grit spreading arrangement. Tipper operating for spreading the screenings shall be so driven as not to disturb the coarse aggregate. The screenings shall be applied at a slow and uniform rate (in three or more applications) so as to ensure filling of all voids. This shall be accompanied by dry rolling and brooming with mechanical brooms, hand.brooms or both. In no case shall the screenings be applied so fast and thick as to form cakes or ridges on the surface in such a manner as would prevent filling of voids or prevent the direct bearing of the roller on the coarse aggregate. These operations shall continue until no more screenings can be forced into the voids of the coarse aggregate. The spreading, rolling, and brooming of screenings shall be carried out in only such lengths of the road which could be completed within one day's operation. 143.3.6 Sprinkling of water and grouting : After the screenings have been applied, the surface shall be copiously sprinkled with water, swept and rolled. Hand brooms shall be used to sweep the wet screenings into voids and to distribute them evenly. The sprinkling, sweeping and rolling operation shall be continued, with additional screenings applied as necessary until the coarse aggregate has been thoroughly keyed, well-bonded and firmly set in its full depth and a grout has been formed of screenings. Care shall be taken to see that the base or subgrade does not get damaged due to the addition of excessive quantities of water during construction. In case of lime treated soil sub-base, construction of water bound macadam on top of it can cause excessive water to flow down to the lime treated sub-base before it has picked up enough strength (is still 11 green") and thus cause damage to the sub-base layer. The laying of water bound macadam layer in such cases shall be done after the subbase attains adequate strength, as directed by the Engineer. 143.3.7 Application of binding material: After the application of screenings in accordance with Clauses 404.3.5 and 404.3.6. the binding material where it is required to be used (Clause 404.2.7) shall be applied successively in two or more thin layers at a slow and uniform rate. After each application, the surface shall be copiously sprinkled with water, the resulting slurry swept in with hand brooms, or mechanical brooms to fill the voids properly, and rolled during which water shall be applied to the wheels of the rollers if necessary to

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

wash down the binding material sticking to them. These operations shall continue until the resulting slurry after filling of voids, forms a wave ahead of the wheels of the moving roller. 143.3.8 Setting and drying: After the final compaction of water bound macadam course, the pavement shall be allowed to dry overnight. Next morning hungry spots shall be filled with screenings or binding material as directed, lightly sprinkled with water if necessary and rolled. No traffic shall be allowed on the road until the macadam has set. The Engineer shall have the discretion to stop hauling traffic from using the completed water bound macadam course, if in his opinion it would cause excessive damage to the surface. The compacted water bound macadam course should be allowed to completely dry and set before the next pavement course is laid over it. 143.4 Surface Finish and Quality Control of Work 143.4.1 The surface finish of construction shall conform to the requirements of Clause 902. 143.4.2 Control on the quality of materials and works shall be exercised by the Engineer in accordance with Section, 900. 143.4.3 The water bound macadam work shall not be carried out when the atmospheric temperature is less than OOC in the shade. 143.4.4 Reconstruction of defective macadam: The finished surface of water bound macadam shall conform to the tolerance of surface regularity as prescribed in Clause 902. However, where the surface irregularity of the course exceeds the tolerances or where the course is otherwise defective due to subgrade soil mixing with the aggregates, the course to its full thickness shall be scarified over the affected area, reshaped with added material or removed and replaced with fresh material as applicable and recompacted. In no case shall depressions be filled up with screenings or binding material. 143.5 Arrangement for Traffic During the period of construction, the arrangement of traffic shall be done as per Clause 112. 143.6 Measurements for payment Water bound macadam shall be measured as finished work in position in cubic metres. 143.7 Rate The Contract unit rate for water bound macadam sub-base/base course shall be payable in full for carrying out the required operations including full compensation for all components listed in Clause 401.8 (i) to (v) including arrangement of water used in the work as approved by the Engineer. 144 CRUSHED CEMENT CONCRETE SUB-BASE/BASE

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders 144.1 Scope

Section 400

This work shall consist of breaking and crushing the damaged cement concrete slabs and recompacting the same as sub-base/base. course in one or more layers. Where specified, it shall also include treating the surface of the top layer with a penetration coat of bitumen. The work shall be performed on such widths and lengths as may be specified, in accordance with the requirements of these Specifications and in conformity with the lines, grades and cross-sections shown on the drawings or as otherwise directed by the Engineer. 144.2 Materials 144.2.1 Coarse aggregate : Coarse aggregate for this work shall be broken cement concrete slabs crushed to a size not exceeding 75 mm and as far as possible, conforming to one of the gradings given in, Table 400-7. 144.2.2 Key aggregate : Key aggregate for the penetration coat shall consist of crushed stone, crushed gravel, shingle or other stones. It shall be clean, strong, durable, of fairly cubical shape and free of disintegrated pieces, organic or other deleterious matter and adherent coatings. The aggregate shall be hydrophobic and of low porosity. The aggregate shall be of 11.2 mm size defined as 100 per cent passing through 13.2 mm sieve and retained on 5.6 mm sieve and shall satisfy the physical requirements set forth in Table 500-3. 144.2.3 Binder: Binder for the penetration coat for the top layer shall be bitumen of a suitable grade, as- directed by the Engineer and satisfying the requirements of IS: 73,217 or 454, as applicable or any approved cutback or emulsion, satisfying the requirements of IS:8887. 144.3 Construction Operations 144.3.1 General: Crushed cement concrete sub-base/base course may be constructed in one or two layers, depending upon the thickness of the concrete slabs dismantled and crushed. The thickness of each layer shall, however, not exceed 100 mm in case of sub-base and 75 mm in case of base course. The course shall be constructed as water bound macadam to Clause 404, using crushed cement concrete as coarse aggregate except that no screenings or binding material need be applied. Where specified, the top layer shall be treated with a penetration coat of binder described in Clause 405.3.2. 144.3.2 Application of penetration coat over the top layer: Before the application of -the penetration coat, the surface shall be cleaned of dust, dirt and other foreign matter, using mechanical broom or any other equipment specified by the Engineer. Dust removed in the process shall be blown off with the help of compressed air.

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

The binder shall be heated to the temperature appropriate to the grade of bitumen used and sprayed on the dry surface in a uniform manner at the rate of 25 kg per 10 m2 area in terms of the residual bAumen with the help of either self-propelled or towed bitumen pressure sprayer with self-heating arrangement and spray nozzle capable of spraying bitumen at specified rates and temperatures so as to provide a uniform, unbroken spread of bitumen. Excessive deposits of binder caused by stopping or starting of the sprayer or through leakage or any other reason shall be suitably corrected. Immediately after the application of binder, the key aggregates, in a clean and dry state shall be spread uniformly on the surface at the rate of 0.13 ml per 10 ml area, preferably by means of a mechanical gritter, capable of spreading aggregate uniformly at specified rates or otherwise manually with the approval of the Engineer, so as to cover the surface completely. Immediately after the application of the key aggregates, the entire surface shall be rolled to Clause 506.3.8. 144.4 Surface Finish and Quality Control of Works The surface finish of construction shall conform to the requirements of Clause 902. Control on the quality of material and works shall be exercised by the Engineer in accordance with Section 900. 144.5 Arrangements for Traffic During the period of construction, arrangement of traffic shall be done as per Clause 112. 144.6 Measurements for Payment Breaking the existing cement concrete pavement slabs, crushing and recompacting the slab material as sub-base/base course shall be measured as a single item in terms of the volume of sub-base/base laid in position in cubic metres. Penetration coat shall be measured as finished work in square metres. 144.7 Rates 144.7.1 The Contract unit rate for crushed cement concrete subbase/base course shall be payment in full for carrying out the required operations including full compensation for:
(i) making arrangements for traffic to Clause 112 except for initial treatment to verges/shoulders and construction of diversions; (ii) breaking the cement concrete slabs, 'crushing, sieving and recompacting the slab material as sub-base/base course; (iii) (iv) all labour, tools, equipment and incidentals to complete the work to the Specifications; and carrying out the work in part widths of road where directed.

144.7.2 The Contract unit rate for penetration coat shall be payment in full for carrying out the required operations including full compensation for all components listed in Clause 504.8. 145 WET MIX MACADAM SUB-BASE/BASE

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

145.1 Scope This work shall consist of laying and compacting clean, crushed, graded aggregate and granular material, premixed with water, to a dense mass on a prepared subgrade/sub-base/base or existing pavement as the case may be in accordance with the requirements of these Specifications. The material shall be laid in one or more layers as necessary to lines, grades and cross-sections shown on the approved drawings or as directed by the Engineer. The thickness of a single compacted Wet Mix Macadam layer shall not be less than 75 mm. When vibrating or other approved types of compacting equipment are used, the compacted depth of a single layer of the sub-base course may be increased to 200 min upon approval of the Engineer. 145.2 Materials 145.2.1 Aggregates 145.2.1.1 Physical requirements: Coarse aggregates shall be crushed stone. If crushed gravel/shingle is used, not less than 90 per cent by weight of the gravel/shingle pieces retained on 4.75 mm sieve shall have at least two fractured faces. The aggregates shall conform to the physical requirements set forth in Table 400-10 below.
TABLE400-10. PHYSICAL REQUIREMENTS OF COARSE AGGREGATES FOR WET MIX MACADAM FOR SUB-BASE/BASE COURSES Test I. *Los Angeles Abrasion value or *Aggregate Impact value 2. Elongation indices (Total) IS: 2386 (Part4) 30 per cent (Max.) or IS:5640 Test Method Requirements

IS: 2386 (Part-4) 40 per cent (Max.)

Combined Flakiness and IS: 2386 (Part-1) 30 per cent (Max.)**

Aggregate may satisfy requirements of either of the two tests. To determine this combined proportion, the flaky stone from a representative sample should first be separated out. Flakiness index is weight of flaky stone metal divided by weight of stone sample. Only the elongated particles be separated out from the remaining (non-flaky) stone metal. Elongation index is weight of elongated particles divided by total non-flaky particles. The value of flakiness index and elongation index so found are added up. If the water absorption value of the coarse aggregate is greater than 2 per cent, the soundness test shall be carried out on the material delivered to site as per IS: 2386 (Part-5). 145.2.1.2 Grading requirements : The aggregates shall conform to the

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders grading given in Table 400-11.

Section 400

TABLE 400-11. GRADING REQUIREMENTS OF AGGREGATES FOR WET MIX MACADAM IS Sieve Designation 53;00 mm 45.00 mm 26.50 mm 22.40 mm 11.20 mm 4.75 mm 2.36 mm 600.00 micron 75.00 micron Per cent by weight passing the IS sieve 100 95-100 60-90 40-60 25-40 15-30 8-22 0-8

Materials finer than 425 micron shall have Plasticity Index (PI) nott exceeding 6. The final gradation approved within these limits shall be well graded from coarse to fine and shall not vary from the low limit on one sieve to the high limit on the adjacent sieve or vice versa. 145.3 Construction Operations 145.3.1 Preparation of base: Clause 404.3. 1. shall apply. 145.3.2 Provision of lateral confinement of aggregates: While constructing wet mix macadam, arrangement shall be made for the lateral confinement of wet mix. This shall be done by laying materials in adjoining shoulders along with that of wet mix macadam layer and following the sequence of operations described in Clause 407.4.1. 145.3.3 Preparation of mix : Wet Mix Macadam shall be prepared in an approved mixing plant of suitable capacity having provision for controlled addition of water and forced/positive mixing arrangement like pugmill or pan type mixer of concrete batching plant. For small quantity of wet mix work, the Engineer may permit the mixing to be done in concrete mixers. Optimum moisture for mixing shall be determined in accordance with IS:2720 (Part-8) after replacing the aggregate fraction retained on 22.4 mm sieve with material of 4.75 mm to 22.4 mm size. While adding water, dw allowance should be made for evaporation losses. However, at the time of compaction, water in the wet mix should not vary from the optimum value by more than agreed limits. The mixed material should be uniformly wet and no segregation should be permitted. 145.3.4 Spreading of mix : Immediately after mixing, the aggregates shall be spread uniformly and evenly upon the prepared subgrade/sub- base/base in required quantities. In no case should these be dumped in heaps directly on the area where these are to be laid nor shall their hauling over a partly completed stretch be permitted. The mix may be spread either by a paver finisher or motor grader. For portions where mechanical means cannot be used, manual means as approved by the Engineer shall be used. The motor grader shall be capable of spreading the material uniformly all over

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

the surface. Its blade shall have hydraulic control suitable for initial adjustments and maintaining the same so as to achieve the specified slope and grade. The paver finisher shall be self-propelled, having the fol!owing features :
(i) Loading hoppers and suitable distribution mechanism (ii) The screed shall have tamping and vibrating arrangement for initial compaction to the layer as it is spread without rutting or otherwise marring the surface profile. (iii) The paver shall be equipped with necessary control mechanism so as to ensure that the finished surface is free from surface blemishes.

The surface of the aggregate shall be carefully checked with templates and all high or low spots remedied by removing or adding aggregate as may be required. The layer may be tested by depth blocks during construction. No segregation of larger and fine particles should be allowed. The aggregates as spread should be of uniform gradation with no pockets of fine materials. 145.3.5 Compaction: After the mix has been laid to the required thickness, grade and crossfall/camber the same shall be uniformly compacted, to the full depth with suitable roller. If the thickness of single compacted layer does not exceed 100 mm, a smooth wheel roller of 80 to 100 kN weight may be used. For a compacted single layer upto 200 mm, the compaction shall be done with the help of vibratory roller of minimum static weight of 80 to 100 kN or equivalent capacity roller. The speed of the roller shall not exceed 5 km/h. In portions having unidirectional cross fall/superelevation, rolling shall commence from the lower edge and progress gradually towards the upper edge. Thereafter, roller should progress parallel to the centre line of the road, uniformly over-lapping each preceding track by at least one third width until the entire surface has been rolled. Alternate trips of the roller shall be terminated in stops at least I in away from any preceding stop. In portions in camber, rolling should begin at the edge with the roller running forward and backward until the edges have been firmly compacted. The roller shall then progress gradually towards the centre parallel to the centre line of the road uniformly overlapping each of the preceding track by at least one-third width until the entire surface has been rolled. Any displacement occurring as a result of reversing of the direction of a roller or from any other cause shall be corrected at once as specified and/or removed and made good. Along forms, kerbs, walls or other places not accessible to the roller, the mixture shall be thoroughly compacted with mechanical tampers or a plate compactor. Skin patching of an area without scarifying the surface to permit proper bonding of the added material shall not be permitted. Rolling should not be done when the subgrade is soft or yielding or when it causes a wave-like motion in the sub-base/base course or subgrade. If irregularities develop during rolling which exceed 12 mm when tested with a 3 metre straight edge, the surface should be loosened and premixed material added or removed as required before rollihg again so as to achieve a uniform surface conforming to the desired grade and crossfall. In no case should the use of unmixed material be permitted to make up the depressions.

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

Rolling shall be continued till the density achieved is at least 98 per cent of the maximum dry density for the material as determined by the method outlined in IS: 2720 (Part-8) After completion, the surface of any finished layer shall be wellclosed, free from movement under compaction equipment or any compaction planes, ridges, cracks and loose material. All loose, segregated or otherwise defective areas shall be made good to the full thickness of the layer and recompacted. 145.3.6 Setting and drying: After final compaction of wet mix macadam course, the road shall be allowed to dry for 24 hours. 145.4 Opening to Traffic Preferably no vehicular traffic of any kind should be allowed on the finished wet mix macadam surface till it has dried and the wearing course laid. 145.5 Surface Finish and Quality Control of Work 145.5.1 Surface evenness : The surface finish of construction shall conform to the requirements of Clause 902. 145.5.2 Quality control : Control on the quality of materials and works shall be exercised by the Engineer in accordance with Section 900. 145.6 Rectification of Surface Irregularity Where the surface irregularity of the wet mix macadam course exceeds the permissible tolerances or where the course is otherwise defective due to subgrade soil getting mixed with the aggregates, the full thickness of the layer shall be scarified over the affected area, reshaped with added premixed material or removed and replaced with fresh premixed material as applicable and recompacted in accordance with Clause 406.3. The area treated in the aforesaid manner shall not be less than 5 in long and 2 in wide. In no case shall depressions be filled up with unmixed and ungraded material or fines. 145.7 Arrangement for Traffic During the period ot construction, arrangement of traffic shall be done as per Clause 112. 145.8 Measurements for Payment Wet mix macadam shall be measured as finished work in position in cubic metres, 145.9 Rates The Contract unit rate for wet mix macadam shall be payment in full for carrying out the required operations including full compensation for all components listed in Clause 401.8. 146 146.1 Scope SHOULDERS, ISLANDS AND MEDIAN

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

The work shall consist of constructing shoulder (hard/paved/ earthen with brick or stone block edging) on either side of the pavement, median in the road dividing the carriageway into separate lanes and islands for channelising the traffic at junctions in accordance with the requirements of these Specifications and in conformity with the lines, grades and cross-sections shown on the drawings or as directed by the Engineer, 146.2 Materials Shoulder on either side of the road may be of selected earth/ granular material/ paved conforLng to the requirements of Clause 305/401 and the median may be of selected earth conforming to the requirements of Clause 305. Median/Traffic islands shall beraised and kerbed at theperimeter and the enclosed area filled with earth and suitably covered with grass turf/shrubs as per Clause 307 and/or paved as per Clause 409.3.4 or 409.3.5. Paved shoulders shall consist of sub-base, base and surfacing courses, as shown in the drawings and materials for the same shall conform to relevant Specifications of the corresponding items. Where paved or hard shoulders are not provided, the pavement shall be provided with brick/stone block edgings as shown in the drawings. The bricks shall conform to Clause 1003 of these Specifications. Stone blocks shall conform to Clause 1004 of these Specifications and shall be of size 225 mm x 110 mm, x. 75 mm. 146.3 Size of Sh oulders/Median/Is lands Shoulder (earthen/bard/paved)/median/traffic island dimensions shall be as shown on, the drawings or as directed by the Engineer. 146.4 407.4. Construction Operations 146.4.1 Shoulder: The sequence of operations shall be such that the construction of paved shoulder is done in layers each matching the thickness of adjoining pavement layer. Only after a layer of pavement and corresponding layers in paved and carth shoulder portion have been laid and compacted, the construction of next layer of pavement and shoulder shall be taken up. Where the materials in adjacent layers are different, these shall be laid together and the pavement layer shall be compacted first. The corresponding layer in paved shoulder portion shall be compacted thereafter, which shall be followed by compaction of earth shoulder layer. The adjacent layers having same material shall be laid and compacted together. In all cases where paved shoulders have to be provided along side of existing carriageway, the existing shoulders shall be excavated in fuII width and to the required depth as per Clause 301.3.7. Under no circumstances, box cutting shalt be done (,zr consisuction of shoulders. Compaction requirement of earthen shoulder shall be as per Table 300-2. In the case of bituminous courses, work on shoulder (earthen/ hard/paved), shall start only after the pavement cou-se has been laid and compacted.

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

During all stages of shoulder (earthen/hard/paved) construction, the required crossfall shall be maintained to drain off surface water. Regardless of the method of laying, all shoulder construction material shall be placed directly on the shoulder. Any spilled material dragged on to the pavement surface shall be immediately removed, without damage to the pavement, and the area so affected thoroughly cleaned. 146.4.2 Median and Islands : Median and Islands shall be constructed in a manner similar to shoulder up to the road level. Thereafter the median and islands, if raised, shall be raised at least 300 mm by using kerb stones of approved material and dimensions and suitably finished and painted as directed by the Engineer. If not raised, the median and islands shall be differentiated from the shoulder/ pavement as the case may be, as directed by the Engineer. The confined .area of the median and islands shall be filled with local earth or granular material or any other approved material and compacted by plate compactor/power rammer. The confined area after filling with earth shall be turfed with grass or planted with shrubs and in case of granular fill it can be finished with tiles/slabs as directed by the Engineer, 146.4.3 Brick/stone block edging: The bricks/stone blocks shall be laid on edge, with the length parallel to the transverse direction of the road. They shall be laid on a bed of 25 mm sand, set carefully, rolled into position by a light roller and made flush with the finished level of the pavement. 146.5 Surface Finish and Quality Iffontrol of Works The surface finish of construction shall conform to the requirements of Clause 902. Control on the quality of materials and works shall be exercised by the Engineer in accordance with Section 900. 146.6 Measurements for Payment Shoulder (earthen/hard/paved), island and median construction shall be measured as finished work in position as below:
(i) For excavation in cu. rn. (ii) For earth work/granular fill in cu. in. (iii) For sub-base, base, surfacing courses in units as for respective items. (iv) For kerb in rtmning metres. (v) For turfing and tile/slab finish in sq.m. (vi) For brick/stone block edging in sq.m.

146.7 Rate The Contract unit.rate for shoulder (hard/paved/earthen with brick or stone block edging), island and median construction shall be payment in full for carrying out the required operations including fun compensation for all components listed in Clause 401.8 (i) to (v) as applicable. The rate for brick/stone block edging shall include the cost of sand cushion. 147 CEMENT CONCRETE KERB AND KERB WITH CHANNEL

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders 147.1 Scope

Section 400

This work shall consist of constructing cement.concrete kerbs and kerbs with channel in the central median and/or along the footpaths or separators in conformity with the lines, levels and dimensions as specified in the drawings. 147.2 Materials KerbE and kerb with channel shall be provided in cementconcrete of Grade M20 in accordance with Section 1700 of these Specifications. 147.3 Type of Construction These shall be cast-in-situ construction with suitable kerb casting machine in all situations except at locations where continuous casting with equipment is not practicable. In those situations, precast concrete blocks shall be used. 147.4 Equipment A continuous kerb casting equipment of adequate cap4city and controls, capable of laying the kerbs in required cross-sections and producing a well-compacted mass of concrete free. of voids and honeycombs, shall be used. 147.5 Construction Operations 147.5.1 Kerb shall be laid on firm foundation of minimum 150 mm thickness of cement concrete of M10 grade cast in-situ or on extended width of pavement. The foundation shall have a projection of 50 mm beyond the kerb stone. Before laying the foundation of lean concrete, the base shall be levelled and slightly watered to make it damp. 147.5.2 In the median portions in the straight reaches, the kerb shall be cast in continuous lengths. In the portions where footpath is provided and/or the slope of the carriageway is towards median (as in case of superelevated portions), there shall be sufficient gap/recess left in the kerb to facilitate drainage openings. 147.5.3 After laying the kerbs and just prior to hardening of the concrete, saw cut grooves shall be provided at 5 m intervals or as specified by the Engineer. 147.5.4 Kerbs on the drainage ends such as along the footpath or the median in superelevated portions, shall be cast with monolithic concrete channels as indicated in drawings. The slope of the channel towards drainage pipes shall be ensured for efficient drainage of the road surface. 147.5.5 Vertical and horizontal tolerances with respect to true line and level shall be 6 mm. 147.5.6 Measurements for Payment Cement concrete kerb/kerb with channel shall be measured in linear metre for the complete item of work. Foundation of kerb, where separately provided shall be measured in linear metre for complete item of work.

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders 147.5.7 Rates

Section 400

The Contract unit rates for cement concrete kerb/kerb with channel and foundation for kerb shall be payment in full compensation for furnishing . all materials, labour, tools, equipment for construction and other incidental cost necessary to complete the work. 148 148.1 Scope The 'work shall consist of constructing footpaths and/or separators at locations as specified in the drawings or as directed by the Engineer. The lines, levels and dimensions shall be as per the drawings. The scope of the work shall include provision of all drainage arrangements as shown in the drawings or as directed. 148.2 Materials The footpaths and separators shall be constructed with any of the following types
(a) Cast-in-situ cement concrete of Grade M20 as per Section 1700 of the Specifications. (b) Precast cement concrete blocks/tiles of Grade M20 as per Section 1700 of the Specifications. The minimum thickness of the cement concrete blockAile shall be 25 min and minimum size shall be 300 mm x 300 mm. (c) Natural stone slab cut and dressed from stone of good and sound quality, uniforrn in texture, free from defects and at least equal to a sample submitted by the Contractor and approved by the Engineer. The minimum thickness of the natural stone slab shall he 25 mm and minimum size shall be 300 nun x 300 mm.

FOOTPATHS AND SEPARATORS

148.3 Construction Operations 148.3.1 Drainage pipes below the footpath originating from the kerbs shall be first laid in the required slope and connected to the drains/sumps/storm water drain/drainage chutes as per provisions of the drawings, or as specified. 148.3.2 Portion on back side of kerbs shall be filled and compacted with granular_ sub-bast material as per Clause 401 of the Specifications in specified thickness. 148.3.3 The base shall be prepared and finished to the required lines, levels and dimensions as indicated in the drawings with the following :(a) Minimum 150 mm thick, compacted granular sub-base material as per Clause 401 of the Specifications. (b) Minimum 25 mm thick cement concrete of Grade M 15.

Over the prepared base, precast concrete blocks/tiles/natural stone slabs and/or cast-in-situ slab shall be set/laid as described in Clauses 409.3.4 and 409.3.5. 148.3.4 Precast cement concrete blocks/files/natural stone slab: The blocks/tiles/slabs shall be set on a layer of average 12 mm thick cementsand mortar (1:3) laid on prepared base in such a way that there is no rocaung. The gaps between the blocks/tiles/slabs shall not be more than 12 mm and shall be filled with cement-sand mortar (1:3). 148.3.5 Cast-in-situ cement concrete: The minimum thickness of the cement concrete shall be 25 mm and it shall be cast on the prepared base in panels

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

of specified size in a staggered manner. Constrituion joints shall be provided as per Section 1700 of the Specifications. 148.4 Measurements for Payment Footpaths and separators shall be measured in sq.metre between inside of kerbs. 148.5 Rates Contract unit rates shall be inclusive of full compensation of all labour, materials, tools, equipment and incidentals to construction of footpaths. Cost of providing pipes and arrangement for their discharge into appropriate drainage channels shall be incidental to the construction of footpaths. 149 149.1 Scope This work shall consist of furnishing, placing and compacting crushed stone aggregate sub-base and base courses constructed in accordance with the requirements set forth in this Specification and in conformity with the lines, grades, thicknesses and cross-sections shown on the plans or as directed by the Engineer. 149.2 Materials The material to be used for the work shall be crushed rock. If crushed gravel/shingle is used, not less than 90percentby weight of the gravel/shingle pieces retained on 4,75 mm sieve shall have at least two fractured faces. It shall be free from any organic matter and other deleterious substances and shall be of such nature that it can be compacted readily under watering and rolling to form a firm, stable base. The aggregate shall conform to the grading and quality requirements shown in Tables 400-12 and 400-13. At the option of the Contractor, the grading for either 53 mm maximum size or 37.5 mm maximum size shall be used, except that once a grading is selected, it shall not be changed without the Engineer's approval.
TABLE 400.12. AGGREGATE GRADING REQUIREMENTS Sieve size 53 mm max. size 63 45 22.4 5.6 710 90 Per cent passinit by weiRht /.3 min max. size mm min mm min micron micron 100 87-100 100 50-85 25-45 10-25 2-9 90-100 35-55 10-30 2-9

CRUSHER-RUN MACADAM BASE

TABLE 400-13. PHYSICAL REQUIREMENTS OF COARSE AGGREGATES FOR CRUSHER-RUN MACADAM BASE Test I. *Los Angeles Test Method IS: 2386 Requirements 40 maximum

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders


Abrasion value or *Aggregate Impact value 2. Combined Flakiness and 3. * *Water absorption IS: 2386 IS: 2386 (Part-3) 4. 5. Liquid Limit of Plasticity Index IS: 2720 IS: 2720 30maxiinum*** 2 per cent Maximum Not more than 25 Not more than 6 Elongation Indices (Total) (Part-1) IS: 2386 (Part-4) or IS: 5640 30maximum (Part-4)

Section 400

material passing 425 micron(Part-5) of material passing 425 micron(Part-5)

Aggregate may satisfy requirements of either of the two tests. If the water absorption is more than 2 per cent, soundness test shall be carried out as per IS:2386 (Part-5). To determine this combined proportion, the flaky stone from a representative. sample should first be separated out. Flakiness index is weight of flaky stone .... metal divided by weight of stone sample. Only the elongated particles be,' separated out from the remaining (non-flaky) stone metal. Elongation index is weight of elongated particles divided by total non-flaky particles. The value of flakiness index and elongation index so found are added up. 149.3 Construction Operations 149.3.1 Preparation Of subgrade: Any ruts, deformations or soft yielding Places which occur in the lub-base or subgrade shall be Corrected and Compacted to the required density before the aggregate base course is Placed thereon. 149.3.2 Spreading, watering, mixing and compaction: The aggregate shall be uniformly deposited on the approved subgrade by means of the hauling vehicle with or without Spreading devices. Aggregate will be distributed Over the surface to the depth specified on as directed by the Engineer. the plans or the After the base course material has been deposited, it shall be theoreonutgirhelylabylearde-mixed to full depth of the layer by alternately blading to the centre and back to the edges of the road. It shall then be spread and finished to the of a motor grader required Cross-section by means Water shall be applied Prior to and during all Processing operations blading and to moisten the material sufficiently to prevent segregation of the fine and coarse particles. Water shall be applied in sufficient amounts during construction to assist in compaction. Alternatively, mixing of the crusher run material and water may be done in a mixing plant as Per Clause 406.3.3.

Sub-Bases, Bases. (Noh-Bitaminous) and Shoulders

Section 400

Compaction shall commen I ce immediately after the Spreading operation. If the thickness of single compacted layer does not exceed 100 mm, a smooth wheel roller of 80 MOO kN weight may be used. For a compacted single layer upto 200 mm the compaction shall be done with the elp of vibratory roller of minimum static weight of 80 to 100 kN or equivalent capacity roller. The speed of the roller shall not exceed 5.km/h. Each layer of material shall be Compacted to not less Umn 98 per cent of the maximum density as determined by IS: 2720 (Part -8). 149.4 Surface Flnish and Quality Control of Work The surface finish of construction shall conform to the requirements of Clause 902. Control on the quality of materials and works shall be exercised by the Engineer in accordance with section 900. 149.5 Arrangements for Traffic During the period of construction, arrangement of traffic shall be maintained in accordance with Clause 112. 149.6 Measurements for Payment Crusher-run macadam base shall be measured as finished work in position in cubic metres. 149.7 Rate The Contract unit rate for crusher run macadam base shall be payment in full for carrying out the required operations including full compensation for items as in Clause 401.8 (i) to (v).

Base and Surface Courses (Bituminous) Base and Surface Courses (Bituminous) 500 Base and Surface Courses (Bituminous)

Section 500

Base and Surface Courses (Bituminous)

Section 500

501

GENERAL REQUIKEMENTS FOR BITUMINOUS PAVEMENT LAYERS

149.8 General Bituminous pavement courses shall be made using the materials described in the following Specifications. The use of machinery and equipment mentioned in various Clauses of these Specifications is mandatory. Details of the machinery and equipment are available in the Manual for Construction and Supervision of Bituminous Works. Equipment mandatory for any particular project shall be in accordance with the Contract Specification for-that project. 149.9 Materials 149.9.1 Binder: The binder shall be an appropriate type of .bituininous material complying with the relevant Indian Standard (IS), as defined in the appropriate Clauses of these Specifications, or as otherwise specified herein. The choice of binder shall be stipulated in the Contract or by the Engineer. Where penetration grades of bitumen are specified, they are referred to by a single-figure designation in accordance with IS:73. Thus bitumen grade 35 refers to a bitumen in the penetration range 30 to 40. Where Modified Binder is specified, the Clause 521 of these Specifications shall apply. 149.9.2 Coarse Aggregates: The coarse aggregates shall consist of crushed rock, crushed gravel or other hard material retained on the 2.36 min sieve. They shall be clean, hard, durable, of cubical shape, free from dust and soft or friable matter, organic 6r other deleterious matter. Where &.e Contractor's selected source of aggregates have poor affinity for bitumen, as a condition for the approval of that source, the bitumen shall be treated with approved anti-stripping agents, as per the manufacturer's recommendations, without additional payment. Before approval of the source the aggregates shall be tested for stripping. The aggregates shall satisfy the physical requirements set forth in the individual relevant clause for the material in question. Where crushed gravel is proposed for use as aggregate, not less than 90% by weight'of the crushed material retained on the 4.75 mm sieve shall have at least two fractured faces. 149.9.3 Fine Aggregates: Fine aggregates shall consist of crushed or naturally occurring material, or a combination of the two, passing 2.36mm sieve and retained on the 75 micron sieve. They shall be clean, hard, durable, dry and free from dust, and soft or friable matter, organic or other deleterious matter. 149.9.4 Source of material: The source of all materials to be used on the project must be tested to the satisfaction of and be expressly approved by the Engineer. The Engineer may from time to time withdraw approval of a specific

Base and Surface Courses (Bituminous)

Section 500

source, or attach conditions to the existing approval. Any change in aggregate source for bituminous mixes, will require a new mix design, and laying trials, where the mix is based on a job mix design. Stockpiles from different sources, approved or otherwise, shall be kept separate, such that there is no contamination between one material and another. Each source submitted for approval shall contain sufficient material for at least 5 days work. 149.10 Mixing Pre-mixed bituminous materials, including bituminous macadam, dense bituminous macadam, semi-dense bituminous concrete and bituminous concrete, gliall be prepared in a hot mix plant of adequate capacity and capable of yielding a mix of proper and uniform quality with thoroughly coated aggregates. Appropriate mixing temperatures can be found in Table 500-5 of these Specifications; the difference in temperature between the binder and aggregate should at no time exceed 14'C. In order to ensure uniform quality of the mix and better coating of aggregates, the hot mix plant shall be calibrated from time to time. If a continuous mixing plant is to be used for mixing the bituminous bound macadam, the Contractor must demonstrate by laboratory analysis that the cold feed combine.d grading is within the grading limits specified for that bituminous bound material. In the case of a designedjob mix, the bitumen and filler content shall be derived using this combined grading. Further details are available in the Manual for Construction and Supervision of Bituminous Works. 149.11 Transporting Bituminous materials shall be transported in clean insulated vehicles, and unless otherwise agreed by the Engineer, shall be covered while in transit or awaiting tipping. Subject to the approval of the Engineer, a thin coating of diesel or lubricating oil may be'applied to the interior of the vehicle to prevent sticking and to facilitate discharge of the material. 149.12 Laying 149.12.1 Weather and seasonal limitations: Laying shall be suspended while free-standing water is present on the surface to be covered, or during rain, fog and dust storms. After rain, the bituminous surface, prime or tack coat, shall be blown off with a high pressure airjet to remove excess moisture, or the surface left to dry before laying shall start. Laying of bituminous mixtures shall not be carried out when the air temperature at the surface on which it is to be laid is below I O*C or when the wind speed at any temperature exceeds 40 km/h at 2m height unless specifically approved by the Engineer. 149.12.2 Cleaning of surface: The surface on which the bituminous work is to be laid shall be cleaned of all loose and extraneous matter by means of a mechanical broom or any other approved equipment / method as specified in the contract. The use of a high pressure air jet from a compressor to remove

Base and Surface Courses (Bituminous)

Section 500

dust or loose matter shall be available ftill time on the site, unless otherwise specified in the Contract. 149.12.3 Spreading: Except in areas where a mechanical paver cannot access, bituminous materials shall be spread, levelled and tamped by an approved self-propelled paving machine. As soon as possible after arrival at site, the materials shall be supplied continuously to the paver and laid without delay. The rate of delivery of material to the paver shall be regulated to enable the paver to operate continuously. The travel rate of the paver, and its method of operations, shall be adjusted to ensure an even and uniform flow ofbituminous material across the screed, free from dragging, tearing and segregation of the material. In areas with restricted space where a mechanical paver cannot be used, the material shall be spread, raked and levelled with suitable hand tools by experienced staff, and compacted to the satisfaction of the Engineer. The minimum thickness of material laid in each paver pass shall be in accordance with the minimum values given in the relevant parts of these Specifications. When laying binder course or wearing course approaching an expansion joint of a structure, machine laying shall stop 300mm short of the joint. The remainder of the pavement up to the joint, and the corTesponding area beyond it, shall be laid by hand, and the joint or joint cavity shall be kept clear of surfacing material. Bituminous material, with a temperature greater than 145'C, shall not be laid or deposited on bridge deck waterproofing systems, unless precautions against heat damage have been approved by the Engineer. Hand placing of pre-mixed bituminous materials shall only be permitted in the following circumstances:
(i) For laying regulating courses of irTegular shape and varying thickness. (ii) In confined spaces where it is impracticable for a paver to operate. (iii) For footways. (iv) At the approaches to expansion joints at bridges, viaducts or other structures. (v) For laying mastic asphalt in accordance with Clause 515. (vi) (vii) For filling of potholes. Where directed by the Engineer.

Manual. spreading of pre-mixed wearing course material or the add ition of such material by hand-spreading to the paved area, for adjustment of level, shall only be permitted in the following circumstances: (i) At the edges of the layers of material and at gullies and manholes.
(ii) At the approaches to expansion joints at bridges, viaducts or other structures. (iii) As directed by the Engineer.

149.12.4 Cleanliness and overlaying: Bituminous material shall be kept clean and uncontaminated. The only traffic permitted to run on bituminous material to be overlaid shall be that engaged in laying and compacting the next course or, where a binder course is to be sealed or surface dressed, that engaged on such surface treatment. Should any bituminous material become contaminated the Contractor shall make it good to the satisfaction of the

Base and Surface Courses (Bituminous) Engineer, in compliance with Clause 501.8.

Section 500

Binder course material shall not remain uncovered by either the wearing course or surface treatment, whichever is specified in the Contract, for more than three consecutive days after being laid. The Engineer may extend this period, by the minimum amount of time necessary, because of weather conditions or for any other reason. If the surface of the base course is subjected to traffic, or not covered within three days, a tack coat shall be applied, as directed by the Engineer. 149.13 Compaction Bituminous materials shall be laid and compacted in layers which enable the specified thickness, surface level, regularity requirements and compaction to be achieved. Compaction of bituminous materials shall commence as soon as possible after laying. Compaction shall be substantially completed before the temperature falls below the minimum rolling temperatures stated in the relevant part of these Specifications. Rolling of the longitudinal joints shall be done immediately behind the paving operation. After this, rolling shall commence at the edges and progress towards the centre longitudinally except that on super elevated and unidirectional cambered portions, it shall progress from the lower to the upper edge parallel to the centre line of the pavement. Rolling shall continue until all roller marks have been removed from the surface. All deficiencies in the surface after laying shall be made good by the attendants behind the paver, before initial rolling is commenced. The initial or breakdown rolling shall be done with 8-10 tonnes dead weight smooth-wheeled rollers. The intermediate rolling shall be done with 8-10 torines dead weight or vibratory roller or with a pneumatic tyred roller of 12 to 15 tonnes weight having nine wheels, with a tyre pressure of at least 5.6 kg/sqcm. The finish rolling shall be done with 6 to 8 tonnes smooth wheeled tandem rollers. Where compaction is to be determined by density of cores the requirements to prove the performance of rollers shall apply in order to demonstrate that the specified density can be achieved. In such cases the Contractor shall nominate thb plant, and the method by which he intends to achieve the specified level of compaction and finish at temperatures above the minimum specified rolling temperature. Laying trials shall then demonstrate the acceptability of the plant and method used. Bituminous materials shall be rolled in a longitudinal direction, with the driven rolls nearest the paver. The roller shall first compact material adjacent to joints and then work from the lower to the upper side of the layer, overlapping on successive passes by at least one-third of the width of the rear roll or, in the case of a pneumatic-tyred roller, at least the nominal width of 300mm. In portions with super-elevated and uni-directional camber, after the edge has been rolled, the roller shall progress from the lower to the upper edge. Rollers should move at a speed of not more than 5 Ian per hour. The roller shall not be permitted to stand on pavement which has not been fully compacted, and necessary precautions shall be taken to prevent dropping of oil, grease, petrol or other foreign matter on the pavement either when the rollers are operating or standing. The wheels of

Base and Surface Courses (Bituminous)

Section 500

rollers shall be kept moist with water, and the spray system provided with the machine shall be in good working order, to prevent the mixture from adhering to the wheels. Only sufficient moisture to prevent adhesion between the wheels of rollers and the mixture should be used. Surplus water shall not be allowed to stand on the partially compacted pavement. 149.14 Joints Where longitudinal joints are made in pre-mixed bituminous materials, the materials shall be fully compacted and the joint made flush in one of the following ways; only method (iii) shall be used for transverse joints:
(i) by heating thejoints with an approved joint beater when the adjacent width isheing laid, but without cutting back or coating with binder. The heater shall raise the temperature of the ftill depth of material, to within the specified range of minimum rolling temperature and maximum temperature at any stage for the material, for a width not less than 75 mm. The Contractor shall have equipTuent available, for use in the event ofa heater breakdown, to fornijoints by method (iii); (ii) by using two or more pavers operating in echelon, where this is practicable, and in sufficient proximity foradjacent widths to be fully compacted by continuous rolling; (iii) by cutting back the exposedjoint, fora distance equal to the specified layer thickness, to a vertical face, discarding all loosened material and coating the vertical face completely with 80/100 penetration grade hot bitumen, or cold-applied bitumen, or polymer modified adhesive bitumen tape with a minimum thickness of2 mm, before the adjacent width is laid.

All joints shall be offset at least 300 mm from parallel joints in the layer beneath or as directed, and in a layout approved by the Engleer. Joints in the wearing course shall coincide with either the lane edge or the lane marking, which ever is appropriate. Longitudinal joints shall not be situated in wheel track zones. 149.15 Preparation of Surface 149.15.1 Scope : This work shall consist of preparing an 'existing granular or black-topped surface bituminous course. The work shall be performed on such widths and lengths as shown on the drawings or as instructed by the Engineer. The existing surface shall be firm and clean, and treated with Prime or Tack coat as shown on the drawings as otherwise stated in the Contract. 149.15.2 Materials 149.15.2.1 For scarifying and re-laying the granular surface: The material used shall be coarse aggregate salvaged from the scarification of the existing granular base course supplemented by fresh coarse aggregate and screenings so that aggregates and screenings thus supplemented correspond to Clause 404: Water Bound Macadam or Clause 406: Wet Mix Macadam. 149.15.2.2 For patching potholes and sealing cracks: Where the existing surface to be overlaid is bituminous, any existing potholes and cracks shall be repaired and sealed in accordance with Clauses 3004.2 and 3004.3, or as directed by the Engineer. 149.15.2.3 For profile corrective course: A profile corrective course for

Base and Surface Courses (Bituminous)

Section 500

correcting the existing pavement profile shall be laid to varying thickness as shown on the Drawings, or as indicated in the Contract Documents. The profile corrective course shall be laid to tolerances and densities as specified for wearing course if a single layer, or base course, if it is to be covered with a wearing course layer. 149.15.2.4 Profile corrective course and its application: The type of material for use as profile corrective course shall be as shown on the drawings or as directed by the Engineer. Where it is to be laid as part of the overlay/strengthening course, the profile corrective course material shall be of the same specification as that of the overlay/ strengthening course. However, if provided as a-separate layer, it shall be of the specification and detailsgiven in the contract drawings.
(i) Any high spots in the existing surface shall be removed by a milling machine or other approved method, and all loose material shall be removed to the satisfaction ofthe Engineer. (ii) Where the maximum thickness of'profile corrective course will be not more than 40 mm, the profile corrective course shall be constructed as an integral part ofthe overlay course. In other cases, the profile corrective course shall be constructed as a separate layer, adopting such construction procedures and using such equipment as approved by the Engineer, to lay the specified type ofmaterial, to thickness and tolerance as specified, for the course, to be provided.

149.15.3

Construction Operations

149.15.3.1 Preparing existing granular surface: Where the existing surface is granular, all loose materials shall be removed, and the surface lightly watered where the profile corrective course to be provided as a separate layer is also granular. Where the profile corrective course bituminous material is to be laid over the existing granular surface, the latter shall, after removal of all loose material, be primed in accordance with Clause 502. The surface finish of all granular layers on which bituminous works are to be placed, shall, unless otherwise specifically instructed by the Engineer, be free from dust. All such layers must be capable of being swept, after the removal of any non-integral loose material, by means of a mechanical broom, without shedding significant quantities of material and dust removed by air jet, washing, or other means approved by the Engineer. After cleaning the surfa ' ce shall be correct to line and level, within the tolerances specified for base course. 149.15.3.2 Scarifying existing bituminous surface: Where specified or shown on the drawings, the existing bituminous layer in the specified width shall be removed ~vjth care and without causing undue disturbance to the underlying layer, by a suitable method approved by the Engineer. After removal, all loose and disintegrated material, the underlying layers which might have been disturbed should be suitably reworked and compacted to line and level. After suppl ementing the base material as necessary with suitable fresh stone, the compacted finished surface shall be primed in

Base and Surface Courses (Bituminous)

Section 500

accordance with Clause 502. Reusable materials shall be stacked as directed by the Engineer within 1000 m of their origin. 149.15.3.3 Patching of potholes and sealing of cracks: Where the existing surface to be overlaid is bituminous, any existing potholes and cracks shall be repaired and sealed in accordance with clauses 3004.2 and 3004.3, or as directed by the Engineer. 149.15.3.4 Laying the profile corrective course Laying on granular base: After preparing the granular surface in accordance with Clauses 501.8.3.1 and 501.8.3.2, the profile corrective course shall be laid using material as described in Clauses 501.8.2.3 and 501.8.2.4, or as otherwise described in the Contract, and compacted to the requirements of the particular Specification. Laying on existing bituminous surface: The existing bituminous surface shall be prepared in accordance with Clause 501.8.3.3, and after applying a tack coat conforming to Clause 503, the bituminous profile corrective course shall be laid and compacted to the requirements of the particular Specification. Correction of local depressions: Where local sags or depressions occur in the existing pavement, a specific filling operation shall be instructed by the Engineer, which should be laid in accordance with Figure 500-1. Normally, the maximum layer thickness at any point should not exceed 100 mm. In placing multiple lifts, they should be arranged according to the correct method as illustrated. For correction of camber or super-elevation of the existing carriageway, the method shown in Figure. 500-2 shall be adopted, depending on the profile of the existing carriageway. 149.15.3.5 Covering the profile corrective courses: Profile corrective course particularly shall be so planned that the layer shall be covered by the designed base/wearing course at the earliest opportunity, before opening to regular traffic. 149.15.4 Surface finish and quality control of work: The relevant provisions of Section 900 shall apply. 149.15.5 Arrangements for traffic: During construction operations, arrangements for traffic shall be made in accordance with the provisions of Clause 112. 149.15.6 Environmental protection: The provisions of Clause I I I and the p rovision of Annexure A to Clause 501 shall apply. 149.15.7 Measurement for payment 149.15.7.1 Potholes and cracks: The work of filling potholes shall be measured separately and be paid for in square metres. The work of filling cracks by applying fog spray or emulsion slurry seal shall be measured in square metres, for the area covered by the spray. UFTS-1 -

Base and Surface Courses (Bituminous) EDaMNC IAYPI? -2 -3 (A) CORRECT METHOD ..... . . . . . . EaSTING 1AYER, -2 W INCORRECT METHOD

Section 500

Note: Profile corrective course material to be in accordance with the lift thickness Figure. 500-1. Methods for providing corrective course for short sags and depressions 148 Base and Surface Courses (Bituminous) 31H 8 0 0 0 Figure. 500-2. Correction of Camber or Superelevation The work in filling cracks larger than 3mm in width shall be measured and paid for on a linear metre basis. 149.15.7.2 Scarifying: Scarifying the existing bituminous surface shall be measured on a square metre basis. 149.15.7.3 Profile corrective course: Profile corrective course shall be measured as the volume instructed and comppcted in position and 8 Section 500

Base and Surface Courses (Bituminous)

Section 500

measured in cubic metres, or in tonnage, as stipulated in the Contract. The volume shall be calculated by plotting the exact profile of profile corrective course as required, and laid, superimposed on the existing pavement profile. Cross-sectional areas of the profile corrective course shall be measured at intervals as used in the design, or as detern-lined by the Engineer, and the volume shall be calculated using the method of end areas. 149.15.7.4 Prime coat: Prime coat is to be measured and paid for on a per square metre basis. 149.15.7.5 Tack coat: This is to be a PROVISIONAL item, which may be used in-part or not at all, at the Engineers direct~on, and is to be measured and paid for, if used, on a square metre basis. 149.15.8 Rates

149.15.8.1 Rate for scarifying: The contract unit rate for scarifying existing bituminous surfaces, including repairing / reworking disturbed underlying layers and removing and stacking reusable / unusable materials, shall include for but not necessarily be limited to, the cost of all labour, supply of materials needed for repair / reworking, hire charges of tools and plant, and transportation of scarified materials within 1000 m of their origin. 149.15.8.2 Rate for premixed bituminous material: The contract unit rate for premixed bituminous material shall be payment in full for carrying out the required operations including full compensation for, but not necessarily limited to:
(i) Making arrangements for traffic to Clause 112 except for initial treatment to verge, shoulders and construction of diversions; (ii) (iii) (iv) Preparation of the surface to receive the material. Providing all materials to be incorporated in the work including arr4ngement for stock yards, all royalties, fees, rents where necessary and all leads and lifts; Mixing, transporting, laying and compacting the mix, as specified. (v) All labour, tools, equipment, plant including installation of hot mix plant, power supply units and all machinery, incidental to complete the work to these Specifications; (vi) (vii) Carrying out the work in part widths of the road where directed; Carrying out all tests for control of quality; and

(viii) The rate shall cover the provision of bitumen at the rate specified in the contract, with the provision that the variation in actual percentage of bitumen used will be assessed and the payment adjusted accordingly. (ix) The rates for premixed material are to include for all wastage in cutting of joints etc. (x) The rates are to include for all necessary testing, mix design, transporting and testing of samples, and cores. If there is not a project specific laboratory, the Contractor must arrange to carry out all necessary

Base and Surface Courses (Bituminous)

Section 500

testing at an outside Laboratory, approved by the Engineer, and all costs incurred are deemed to be included in the rate quoted for the material. (xi) The cost of all plant and laying trials as specified to prove the mixing and laying methods is deemed to be included in the Contractor's rates for the material.

149.15.8.3 501.8.8.3. Rate for potholes and crack sealing: The rate for patching potholes shall include for breaking out, trimming edges, cleaning out, painting edges and bottom with bitumen, and filling and compacting the excavation with the specified material. The rate should be inclusive of all plant, tools, labour and materials, transport, and disposal of surplus material, The contract unit rate for sealing cracks by applying fog spray shall be inclusive of providing all materials, tools, labour and plant and carrying out the work. The contract unit rate for sealing cracks by providing emulsion slurry seal shall be as set forth in Clause 516.9. The contract unit rate for crack sealing 3mm, to 6mm cracks with straight run or other specified bitumen, shall be based on either a square metre basis, or linear metre of cracks as measured, as stipulated by the Contract. The contract unit rate for cracks between 6mm. and 15mm is to be measured on a linear metre basis, and the rate is to include for all materials, tools, plant, labour, and transport.

Base and Surface Courses (Bituminous) Annexure 'A'to Clause 501 Annexure'A' PROTECTION OF THE ENVIRONMENT 1. General

Section 500

1. 1. This section of the Specification sets out limitations on the Contractor's activities specifically intended to protect the environment. 1.2. The Contractor shall take all necessary measures and precautions and otherwise ensure that the execution of the works and all associated operations on site or off-site are carried out in conformity with statutory and regulatory environmental requirements including those prescribed elsewhere in this document. 1.3. The Contractor shall take all measures and precautions to avoid any nuisance or, disturbance arising from the execution of the, Works. This shall wherever possible be achieved by suppression of the nuisance at source rather than abatement of the nuisance once generated. 1.4. In the event of any spoil, debris, waste or any deleterious substance from the Site being deposited on any adjacent land, the Contractor shall immediately remove all such material and restore the affected area to its original state to the satisfaction of the Engineer. 2. Water Quality 2.1. The Contractor shall prevent any interference with the supply to or abstraction from, and prevent any pollution of, water resources (including underground percolating water) as a result of the execution of the Works. 2.2. Areas where water is regularly or repetitively used for dust suppression purposes shall be laid to fall to specially-constructed settlement tanks to permit sedimentation of particulate matter. After settlement, the water may be re-used for dust suppression and, rinsing. 2.3. All water and other liquid waste products arising on the Site shall be collected and disposed of at a location on or off the Site and in a manner that shall not cause either nuisance or pollution. 2.4. The Contractor shall not discharge or deposit any matter arising from the execution of the Works into any waters except with the permission of the Engineer and the regulatory authorities concerned. 2.5. The Contractor shall at all times ensure that all existing stream courses and drains within, and adjacent to, the Site are kept safe and free from any debris and any materials arisitig from the Works. 2.6. The Contractor shall protett all watercourses, waterways, ditches, canals, drains, takes and the like from pollution as a result of the execution of the Works. 3. Air Quality

Base and Surface Courses (Bituminous)

Section 500

3.1. The Contractor shall devise and arrange methods of working to minimise dust, gaseous or other air-borne emissions and carry out the Works in such a manner as to minimise adverse impacts on air quality. 3.2. The Contractor shall utilise effective water sprays during delivery manufacture, processing and handling of materials when dust is likely to be created, and to dampen stored materials during dry and windy weather. Stockpiles of friable materials shall be covered with clean tarpaulins, with application of sprayed water during dry and windy weather. Stockpiles of material or debris shall be dampened prior to their movement, except where this is contrary to the Specification. 3.3. Any vehicle with an open load-carrying area used for transporting potentially dust producing material shall have properly fitting side and tail boards. Materials having the potential to produce dust shall not be loaded to a level higher than the side and tail boards, and shall be covered with a clean tarpaulin in good condition. The tarpaulin shall be properly secured and extend at least 300 mm over the edges of the side and tail boards. 3.4 In the event that the Contractor is permitted to use gravel or earth roads for haulage, he shall provide suitable measures for dust palliation, if these are, in the opinion of the Engineer, necessary. Such measures may include spraying the road surface with water at regular intervals. 4. Noise 4.1. The Contractor shall consider noise as an environmental constraint in his planning and execution of the Works. 4.2. The Contractor shall take all necessary measures so that the operation of all mechanical equipment and construction processes on and off the Site shall not cause any unnecessary or excessive noise, taking into account applicable environment requirements. The Contractor shall use all necessary measures and shall maintain all plant and silencing equipment in good condition so as to minimise the noise emission during construction works. 5. Control of Wastes 5.1. The Contractor shall control the disposal of all forms of waste generated by the construction operations and in all associated activities. No uncontrolled deposition or dumping shall be permitted. Wastes to be so controlled shall include, but shall not be limited to, all forms of fuel and engine oils, all types of bitumen, cement, surplus aggregates, gravels, bituminous mixtures etc. The Contractor shall make specific provision for the proper disposal of these and any other waste products, conforming to local regulations and acceptable to the Engineer. 6. Emergency Response 6.1. The Contractor shall plan and provide for r e-medial measures to be implemented in the event of occurrence of emergencies such as spillages of oil or bitumen or chemicals.

Base and Surface Courses (Bituminous) 6.2.

Section 500

The Contractor shall provide the Engineer with a statement of the measures he intends to implement in the event of such an emergency which shall-include a statement of how he intends to provide personnel adequately trained to implement such measures.

7. Measurement 7.1. No separate measurement, shall be made in respect of compliance by the Contractor with the provisions of this Section of the Specification. The Contractor shall be, deemed to have made allowance for such compliance with these provisions in the preparation of his prices for items of work included in the Bills of Quantities and full compensation for such compliance will be deemed to be covered by them.

Base and Surface Courses (Bituminous)

Section 500

150 150.1 Scope

PRIME COAT OVER GRANULAR BASE

This work shall consist of the application of a single coat of low viscosity liquid bituminous, material to a porous granular surface preparatory to the superimposition of biturnitious treatment or~mix. 150.2 Materials 150.2.1 Primer: The choice of,a bituminous primer shall depend upon the porosity characteristics of the surface to be primed as classified in IRC: 16. These are:
(i) Surfaces of low porosity; such as wet mix macadam and water bound macadam, (ii) Surfaces of medium porosity; such as cement stabilised soil base, (iii) Surfaces of high porosity; such as a gravel base.

150.2.2 Primer viscosity: The type and viscosity of the primer shall comply with the requirements of IS 8887, as sampled and tested for bituminous primer in accordance with these standards. Guidance on viscosity and rate of spray is given in Table 500-1.
TABLE 500-1. VISCOSITY REQUIREMENT AND QUANTITY OF LIQUID BITUMINOUS PRIMER Type of surface Kinematic Viscosity Quantity of Liquid Bituminous Material per 10 Sq.m. (Centistokes) Low porosity Medium porosity High porosity ft) 30-60 70-140 250-500 6 to 9 9 to 12 12 to 15

of Primer at 60*C

150.2.3 Choice of primer: The primer shall be bitumen emulsion, complying with IS 8887 of a type and grade as specified in the Contract or as directed by the Engineer. The use of medium curing cutback as per IS 217 shall be _' restricted only for sites at sub-zero temperatures or for emergency applicat;ons as directed by the Engineer. 150.3 Weather and Seasonal Limitations Bituminous primer shall not be applied to a wet surface (see 502.4.2) or during a dust storm or when the weather is foggy, rainy or windy or when the temperature in the shade is less than I O'C. Surfaces which are to receive emulsion primer should be damp, but no free or standing water shall be present. 150.4 Construction 150.4.1 Equipment: The primer distributor shall be a self-propelled or towed bitumen pressure sprayer equipped for spraying the material uniformly at specified rates and temperatures. Hand spraying of small areas, inaccessible

Base and Surface Courses (Bituminous)

Section 500

to the distributor, or in narrow strips shall be sprayed with a pressure hand sprayer, or as directed by the Engineer. 150.4.2 Preparation of road surface: The surface to be primed shall be prepared in accordance with Clauses 501.8. and 902 as appropriate. Immediately prior to applying the primer the surface shall be carefully swept clean of dust and loose particles, care being taken not to disturb the interlocked aggregate. This is best achieved when the surface layer is slightly moist (lightly sprayed with water and the surface allowed to dry) and the surface should be kept moist until the primer is applied. 150.4.3 Application of bituminous primer: The viscosity and rate of application of the primer shall be as specified in the Contract, or as determined by site trials carried out as directed by the Engineer. Where a geosynthetic is proposed for use, the requirements of Clauses 703 .3.2 and 70-3.4 shall'. apply. - The bituminous primer shall be sprayed uniformly in accordance with Clause 501.The method for application of the primer will depend on the type of equipment to be used, size of nozzles, pressure at the spray bar and speed of forward movement. The Contractor shall demonstrate at a spraying trial, that the equipment and method to be used is capable of producing a uniform spray, within the tolerances specified. 150.4.4 Curing of primer and opening to traffic: A primed surface shall be allowed to cure for at least 24 hours or such other period as is found to be necessary to allow all the volatiles to evaporate before any subsequent surface treatment or mix is laid. Any unabsorbed primer shall first be blotted with an application of sand, using the minimum quantity possible. A primed surface shall not be opened to traffic other than that necessary to lay the next course. A very thin layer of clean sand may be applied to the surface of the primer, to prevtnt the primer picking up ujider the wheels of the paver and the trucks delivering bituminous material to the paver. 150.4.5 Tack coat: Over the primed surface, a tack coat should be applied in accordance with Clause 503. 150.5 Quality Control of Work For control of the quality of materials supplied and the works carried out, the relevant provisions of Section 900 shall apply. 150.6 Arrangements for Traffic During construction operations, arrangements for traffic shall b e made in accordance with the provisions of Clause 112. 150.7 Measurement for Payment Prime coat shall be measured in terms of surface area of application in square metres. 150.8 Rate

Base and Surface Courses (Bituminous)

Section 500

The contract unit rate for prime coat with adjustments as described in Clause 502.7 shall be payment in Ul for carrying out the required operations including full compensation for all components listed in Clause 401.8 (i) -to (v) and as applicable to the work specified in these Specifications. Payment shall be made on the basis of the provision of prime coat at an application rate of 0.6 kg per square metre, with adjustment, plus or minus, for the variation between this amount and the actual amount approved by the Engineer after the preliminary trials referred to in Clause 502.4.3. 151 151.1 Scope This work shall consist of the application of a single coat of low viscosity liquid bituminous material to an existing bituminous road surface preparatory to the superimposition of a bituminous mix, when specified in the Contract or instructed by the Engineer. 151.2 Materials Binder: The binder used for tack coat shall be bitumen emulsion complying with IS 8887 of a type and grade as specified in the Contract or as directed by the Engineer. The use of cutback bitumen as per IS 217 shall be restricted only for sites at sub-zero temperatures or for emergency applications as directed by the Engineer. 151.3 Weather and Seasonal Limitations Bituminous material shall not be applied to a wet surface or during a dust storm or when the weather is foggy, rainy or windy or when the temperature in the shade is less than 10'C. Where the tack coat consists of emulsion, the surface shall be slightly damp, but not wet. Where the tack coat is of cutback bitumen, the surface shall be dry. 151.4 Construction 151.4.1 Equipment: The tack coat distributor shall be a selfpropelled or towed bitumen pressure sprayer, equipped for spraying the material uniformly at a specified rate. Hand spraying of small areas, inaccessible to the distributor, or in narrow strips, shall be sprayed with a pressure hand sprayer, or as directed by the Engineer. 151.4.2 Preparation of base: The surface on which the tack coat is to oe applied shall be clean and free from dust, dirt, and any extraneous material, and be otherwise prepared in accordance with the requirements of Clauses 501.8 and 902 as appropriate. Immediately before the application of the tack coat, the surface shall be swept clean with a mechanical broom, and high pressure airjet, or by other means as directed by the Engineer. 151.4.3 Application of tack coat: The application of tack coat shall be at the rate specified in the Contract, and shall be applied uniformly. If rate of application of Tack Coat is not specified in the contract then it shall be at the rate specified in Table 500-2. The normal range of spraying TACK COAT

Base and Surface Courses (Bituminous)


TABLE 500-2. RATE OF APPLICATION OF TACK COAT Type of Surface i) ii) iii) iv)

Section 500

Quantity of liquid bituminous material in Kg per sq. m. area 0.20 to 0.25 0.25 to 0.30 0.25 to 0.30 0.35 to 0.40 0.30 to 0.35

Normal bituminous surfaces Dry and hungry bituminous surfaces Granular surfaces treated with primer Non bituminous surfaces a) Granular base (not primed) b) Cement concrete pavement

temperature for a bituminous emulsion shall be 20'C to 70'C and for a cutback, 50*C to 80*C if RC-70/MC-70 is used. Where a geosynthetic is proposed for use, the provisions of Clauses 703.3.2 and 703.4.4 shall apply. The method of application of tKe tack coat will depend on the type of equipment to be used, size of nozzles, pressure at the spray bar, and speed of forward movement. The Contractor shall demonstrate at a spraying trial, that the equipment and method to be used is capable of producing a uniform spray, within the tolerances specified. Where the material to receive"an overlay is a freshly laid bituminous layer, that has not been subjected to traffic, or contaminated by dust, a tack coat is not mandatory where the overlay is completed within two days. 151.4.4 Curing of tack coat: The taCk coat shall be left to cure until all the volatiles have evaporated before any subsequent construction is started. No plant or vehicles shall be allowed on the tack coat other than those essential for the construction. 151.5 Quality Control of Work For control of the quality of materials supplied and the works carried out, the relevant provisions of Section 900 shall apply, 151.6 Arrangements for Iraffic During the period of construction, arrangements for traffic shall be inade in accordance with the provisions of Clause 112. 151.7 Measurement for Payment Tack coat shall,be measured in terms of surface area ot application in square metres. 151.8 Rate The contract unit rate for tack coat shall be payment in full for carrying out the required operations including for all components listed in Clause 401.8 (i) to' (v) and as applicable to the work specified in these Specifications. The rate shall cover the provision of tack coat at 0.2 kg per square metre, with the provision that the variance in actual quantity of bitumen used will be assessed and the payment adjusted accordingly. 152 BITUMINOUS MACADAM

Base and Surface Courses (Bituminous) 152.1 Scope

Section 500

This work shall consist of construction in a single course having 50mm to I 00mm thickness or in multiple courses of compacted crushed aggregates premixed with a bituminous binder on a previously prepared base to the requirements of these Specifications. Bituminous macadam is more open graded than the dense graded bituminous materials described in Clauses 507, 508 and 509. 152.2 Materials 152.2.1 Bitumen: The bitumen shall be paving bitumen of Penetration Grade complying with Indian Standard Specifications for "Paving Bitumen" IS:73, and of the penetration indicated in Table 5004. 152.2.2 Coarse aggregates: The coarse aggregates shall consist of crushed rock, crushed gravel or other hard material retained on the 2.36 mm, sieve. They shall be clean, hard, durable, of cubical shape, free from dust and soft or friable matter, organic or other deleterious matter. Where the Contractor's selected source of aggregates have poor affinity for bitumen, as a condition for the approval of that source, the bitumen shall be treated with approved anti-stripping agents, as per the manufacturer's recommendations, without additional payment. Before approval of the source, the aggregates shall be tested for stripping. The aggregates shall satisfy the physical requirements set forth in Table 500-3. Where crushed gravel is proposed for use as aggregate, not less than 90% by weight of the crushed material retained on the 4.75 mm sieve shall have at least two fractured faces. 152.2.3 Fine aggregates: Fine aggregates shall consist of crushed or naturally occurring material, or a combination of the two, passing, 2.36 mm sieve and retained on 75 micron sieve. They shall be clean, hard, durable, dry and free from dust, and soft or friable matter, organic. or other deleterious matter.
TABLE 500-3. PHYSICAL REQIREMENTS FOR COARSE AGGREGATES FOR BITUMINOUS MACADAM Property Cleanliness Particle shape Strength* Durability Test Grain size analysis' Flakiness and Elongation Index (Combined)' Los Angeles Abrasion Value' Aggregate Impact Value' Soundness:' Sodium Sulphate Magnesium Sulpbate Water Absorption Stripping Water absorption3 Coating and Stripping of Bitumen Max 12 % Max 18 % Max 2 % Minimum retained coating Max 40 % Max 30 % Specification Max 5 % passing 0.075 mm sieve Max 30 %

Base and Surface Courses (Bituminous)

Section 500
Aggregate Mixtures'95%

Water Sensitivity' Notes: 1. IS: 2386 Part 1 2. IS: 2386 Part 1

Retained Tensile Strength 4. IS: 2386 Part 5 5. IS: 2386 Part 3 6. IS: 6241

Min 80 %

(the elongation test to be done only on non-flaky aggregates in the sample) 3. IS: 2386 Part 4* 7. The water sensitivity test is only to be carried out if the minimum retained coating in the stripping test is less than 95%. Aggregate may satisfy requirements of either of these two tests.

152.2.4 Aggregate grading and binder content: When tested in accordance with IS: 2386 Part I (wet sieving method), the combined aggregat6 grading for the particular mixture shall fall within the limits shown in Table 500-4 for the grading specified in the Contract. The type and quantity of bitumen, and appropriate thickness, are also indicated for each mixture type. 152.2.5 Proportioning of material: The aggregates shall be proportioned and blended to produce a uniform mixture complying with the requirements of Table 500-4. The binder content shall be within a tolerance of t 0.3 per cent by weight of total mixture when individual specimens are taken for quality control tests in accordance with the provisions of Section 900. 152.3 Construction Operations 152.3.1 Weather and seasonal limitations: The provisions of Clause 501.5.1 shall apply.
TABLE 5004. COMPOSITION OF BITUMINOUS MACADAM Mix designation Nominal aggregate size Layer thickness IS Sieve (mm) 45 37.5 26.5 19 13.2 4.75 2.36 0.3 0.075 Bitumen content, % by weight 35-61 13-22 4-19 2-10 0-8 Grading I 40 mm 80 - 100 mm 100 90-100 75-100 100 90-100 56-88 16-36 4-19 2-10 0-8 3.1-3.4 3.3-3.5 Grading 2 19 mm 50 - 75 min

Cumulative% by weight of total aggregate passing

Base and Surface Courses (Bituminous)


of total mixture' Bitumengrade 35 to 90 35 to 90

Section 500

Notes: 1. Appropriate bitumen contents for conditions in cooler areas of India may be up to 0.5% higher subject to the approval of the Engi;eer.

152.3.2 Preparation of the base: The base on which bituminous macadam is to be laid shall be prepared, shaped and compacted to the required profile in accordance with Clauses 501.8 and 902.3 as appropriate, and a prime coat, shall be applied in accordance with Clause 502 where specified, or as directed by the Engineer. 152.3.3 Tack coat : A tack coat in accordance with Clause 503 shall be applied as required by the Contract documents, or as directed by the Engineer. 152.3.4 Preparation and transportation of the mixture: The provisions of Clauses 501.3 and 501.4 shall apply. 152.3.5 Spreading: The provisions of Clauses 501.5.3 shall apply.

TABLE 500-5. MANUFACTURING AND ROLLING TEMPERATURES Bitumen Penetration 35 65 Minimum 90 140-160 140-165 155Maximum 80Minimum 115Minimum Bitumen Mixing (C) 160-170 150-165 Aggregate Mixing ('C) 160-175 Mixed Material (*C) Rolling VC) Laying CC)

170Maximum I00Minimum 130Minimum 150-170 165Maximum 90Minimum 125

152.3.6 Rolling: Compaction shall be carried out in accordance with the provisions of Clauses 501.6 and 501.7. Rolling shall be continued until-the specified density is achieved, or where no density is specified, until there is no further movement under the roller. The required frequency of testing is defined in Clause 903. 152.4 Surface Finish and Quality Control of Work The surface finish of the completed construction ~shall conform to the requirements of Clause 902. For control of the quality of materials supplied and the works carried out, the relevant provisions of Section 900 shall apply. 152.5 Protection of the Layer The bituminous macadam shall be covered with either the next pavement course or wearing course, as the case may be~ within a maximum offorty-eight hours. If there is to be any delay, the course shall be covered by a seal coat to the requirement of Clause 513 before opening to any traffic. The seal coat in such cases shall be considered incidental to the work and shall not be paid for separately. 152.6 Arrangements for Traffic

Base and Surface Courses (Bituminous)

Section 500

During the period of construction, arrangements for traffic shall be made in accordance with the provisions of Clause 112 152.7 Measurement for Payment Bituminous macadam shall be measured as finishedwork in cubic metres, or by weight in metric tonnes, where used as regulating course, or square metres at the specified thickness as indicated in the Contract or shown on the drawings, or as otherwise directed by the Engineer. 152.8 Rate The contract unit rate for bituminous macadam shall be payment in full for carrying out the required operations as specified. The rate shall include for, all components listed in Clause 501.8.8.2. (i) to (xi). 153 153.1 Scope The work shall consist of construction of one or more layers of compacted crushed coarse aggregates with alternate applications of bituminous binder and key aggregates in accordance with the requirements of these Specificatiorff to be used as a base course on roads, subject to the requirements of the overall pavement design, in conformity with the lines, grades and cross-sections shown on the drawings or as directed by the Engineer. Thickness of an individual course shall be 50 min or 75 mm, or other as specified. 153.2 Materials 153.2.1 Bitumen: The binder shall be paving bitumen of suitable penetration grade within the range of S-3~ to S-90 or A-35 to A-90 (30/ 40 to 80/100) as per Indian Standards Specifications for"Paving Bitumen" IS :73, or approved cutback satisfying the requirements of IS : 217 or 454. The actual grade of bitumen or cutback to be used shall be as specified or as directed by the Engineer. 153.2.2 Aggregates: The aggregates shall satisfy the physical requirements set out in Clause 504.2.2. and Table 500-3. The coarse and key aggregates shall conform to the grading given in Table 500-6. 153.2.3 Quantities of materials: The quantities of materials used for this work shall be as specified in Table 500-6. 153.3 Construction Operations 153.3.1 Weather and Seasonal Limitations: The provisions of Clause 501.5. 1. shall apply. 153.3.2 Equipment : A mechanical broom, compressor, self propelled or trailed bitumen heater/distributor, mechanical aggregate spreader and 8 to 10 tonrie smooth steel wheel roller or vibrating roller are required for the preparation of Penetration Macadam. BITUMINOUS PENETRATION MACADAM

Base and Surface Courses (Bituminous)

Section 500

153.3.3 Preparation of the base: The base on which the Penetration Macadam Course is to be laid shall be prepared, shaped and compacted to the specified lines, grades and sections to Clauses 501 and 902 as appropriate, or as directed by the Engineer. A prime coat, where specified, shall be applied over the base in accordance with Clause 502 or as directed by the Engineer. A tack coat as per Clause 503 shall be applied. 153.3.4 Spreading coarse aggregates: The coarse aggregate shall be dry and clean and free from dust, and shall be spread uniformly and evenly at the rate specified in Table 500-6. It shall be spread by a selfpropelled or tipper tail mounted aggregate spreader capable of spreading aggregate uniformly at the specified rates over the required widths. The surface of th6 layer shall be carefully checked with camber templates to ensure correct line and level and cross fall. The spreading shall be carried out such that the rolling and penetrating operations can be completed on the same day. Segregated aggregates or aggregates contaminated with foreign material shall be removed and replaced.
TABLE 500-6. COMPOSITION OF PENETRATION MACADAM Cumulative per cent by weight of total aggregate passing For 50 mm compacted Thickness IS Sieve Designation (mm) Aggregate 63 45 26.5 22.4 13.2 11.2 5.; 2.8 Approx. Loose aggregate quantities cumW Binderquantity (penetration grade)"' (kg/m2) Note:(I) If cutback bitumen is used, adjust binder quantity such that the residual bitumen is equal to the values in this table. 5 6.8 0.06 0.015 0.09 0.018 Coarse Aggregate Aggregate 100 37-72 2-20 0-5 58-82 100 50-75 5-25 0-5 5-27 5-25 0-5 0-5 100 50-75 For 75 mm compacted Thickness Key Coarse Key Aggregate

Base and Surface Courses (Bituminous)

Section 500

153.3.5 Compaction: After the spreading of coarse aggregates, dry rolling shall be carried out with an 8 - 10 tonne smooth steel wheel roller. The requirements given in Clause 501.6 and 501.7 shall apply. After initial dry rolling, the surface shall be checked with a crown template and a 3 metre straight-edge. The surface shall not vary more ,than 10 mm from the template or straight-edge. All surface irregularities exceeding the above limit shall be corrected by removing or adding aggregates as required. The rolling shall continLke until the compacted coarse aggregate has a firm surface true to the cross section shown on the plans and has a texture that will allow free and uniform penetration of the bituminous material. 153.3.6 Application of bituminous material: After the coarse aggregate has been rolled and checked, the bituminous bi i nder shall be applied, at the rate given in Table 500-6, in accordance with Clause 501, and at a temperature directed by the Engineer. At the time of applying the binder, the aggregates shall be surface dry for the full depth of the layer. In certain circumstances, depending on the type andsize of aggregate used, the Engineer may direct the placing of a bed of clean sand or quarry fines, not exceeding I Omm in thickness, on the prepared~ foundationbefore placing the coarse aggregate. The sand or fine material shall be slightly wetted, just sufficient for it to slurry up during the compaction process. Where cut back is used, if flooding of the -binder occurs it should be applied in two operations, or as directed by the Engineer. 153.3.7 Application of key aggregates: Immediately after the first application of bitumen, the key aggregates, which shall be clean, dry, and free from dust shall be spread uniformly over the surface by means of an approved mechanical spreader or by approved ifianual methods at the rate specified in Table 500-6. Where directed by the Engineer, the surface shall be swept and the quantity of key aggregate adjusted to ensure uniform application, with all the surface voids in the coarse aggregate being filled without excess. The entire surface shall, then be rolled with a 8 10 tonnes smooth steel wheel roller (or vibrating roller operating in non-vibratory mode) in accordance with the procedure specified in Clause 505.3.5. 153.4 Surface Finish and Quality Control The surface finish of the completed construction shall conform to the requirements of Clause 902. For control of the quality of materials supplied and the works carTied out the relevant provisions of Section 900 shall apply. 153.5 Surfacing The Penetration Macadam shall be provided with a surfacing (binder/ wearing course) within a maxirrn~n of forty-eight hours. If there is to be any delay, the penetration macadam shall be covered by a seal coat to the requirements of Clause 513 before

Base and Surface Courses (Bituminous)

Section 500

opening to traffic. The seal coat in such cases shall. be considered incidental to the work and shall not be paid for separately. 153.6 Arrangements for Traffic During the period of construction, arrangements for traffic shall be made in accordance with the provisions of Clause 112.. 153.7 Measurement, for Payment Penetration Macadam base course shall be measured as finished work in square metres. 153.8 Rate The contract unit rate for Penetration Macadam course shall be payment in full for carrying out the required operations including, but not necessarily limited to, all components listed in Clause 501.9 8.2.(i) to (Xi). 154 154.1 Scope This work shall consist of a two-layer composite construction of compacted crushed coarse aggregates with application of bituminous binder after each layer, and with key aggregates placed on top of the second layer, in accordance with the requirements of these Specifications, to serve as a base course and in conformity with the lines, grades and cross-sections shown on the drawings or as directed by the Engineer. 7he thickness of the course shall be 75 mm. Built-up spray grout shall be used in a single course in a pavement meture. 154.2 Materials 154.2.1 Bitumen: Clause 504.2. 1. shall apply. Where permitted by the Engineer, an appropriate grade of emulsion. complying with IS 8887 may be used. 154.2.2 Aggregates: The coarse aggregate shall conform to Clause 504.2.2. The aggregate shall satisfy the physical requirements set out in Table 500-3. The coarse and key aggregates for built-up spray grout shall conform to the grading given in Table 500-7.
TABLE 500-7. GRADING REQUIREMENTS FOR COARSE AND KEY AGGREGATES FOR BUILT-UP SPRAY GROUT IS Sieve 53.0 26.5 22.4 13.2 5.6 2.8 Cumulative per cent by weight of total aggregate passing Designation (mm) 100 40 75 0-20 0-5 100 40 -75 0-20 0-5 Coarse Aggregate Key Aggregate

BUILT-UP SPRAY GROUT

Base and Surface Courses (Bituminous)

Section 500

154.3 Construction Operations 154.3.1 Weather and seasonal limitations: The provisions of Clause 501.5.1 shall apply. 154.3.2 Equipment: The provisions of Clause 505.3.2 shall apply. 154.3.3 Preparation of base: The base on which the built-up spray grout cotose is to be laid shall be prepared, shaped and compacted to the specified lines, grades 'and cross-sections in -accordance with Clauses 501 and 902 as appropriate. A prime coat shall be applied in accordance with Clause 502 with approved primer as directed by the Engineer. 154.3.4 Tack coat: A tack coat shall be applied in accordance with the procedure described in Clause 503, as directed by the Engineer. 154.3.5 Spreading and rolling coarse aggregates for the first layer: Immediately after the application of prime or tack coat, the clean, dry and dust free coarse aggregates shall be spread unifornily and evenly, by mechanical means, at the rate of 0.5 cu.m. per 10 sq.m. area. Immediately after spreading of the aggregates, the entire surface shall be rolled with an 8 - 10 tonnes smooth wheel steel,roller. Rolling shall commence at the edges and progress towards the centre except in superelevated and uni-directional cambeged portions where it shall proceed from the lower edge to the higher edge. Each pass of the roller shall uniformly overlap not less than one-third of the track made in the preceding pass. The surface of the layer shall be carefully checked, after rolling, with a template and straight edge and shall be within the tolerances specified, and any deficiencies corrected by reworking and recompacting the layer. Care shall be taken not to over-compact the layer. 154.3.6 Application of binder - first spray: The binder shall be heated to the temperature appropriate to the grade of bitumen approved by the Engineer and sprayed on the aggregate at the rate of 15 kg/10 sq.m. (measured in terms of residual bitumen content) at a uniform rate of spray by mechanical sprayers capable of spraying bitumen uniformly at the specified rates and temperatures. Excessive deposits of binder caused by stopping or starting of the sprayers or through leakage or for any other reason shall be removed and made good. 154.3.7 Spreading and rolling of coarse aggregate for the second layer: Iminediately after the first application of the binder, the second layer of coarse aggregates shall be spread and rolled in accordance with the procedure detailed in Clause 506.3.5. 154.3.8 Application of binder - second spray: The second aggregate layer shall then be sprayed with binder at the rate of 15 kg/10 sq. m. (measured in terms of residual bitumen content) in accordance with Clause 506.3.6.

Base and Surface Courses (Bituminous)

Section 500

Application of key aggregate: Immediately after the second application of binder, key aggregates shall be spread uniformly and evenly, preferably by mechanical means, at the rate of 0. 13 cu.m./10 sq.m. so as to cover the surface completely. The key aggregate shall be clean, dry and free from dust and deleterious matter. If necessary, the surface shall be swept to ensure uniform application of the key aggregates. The entire surface shall then be rolled with an 8- 10 tonnes smooth wheel steel roller in accordance with Clause 506.3.5. While rolling is in progress, additional key aggregAtes, where required, shall be spread by hand. Rolling shall continue until the entire course is thoroughly compacted and the key aggregates are firmly in position. 154.4 Surface Finish and Quality Control The surface finish of construction shall conform to the requirements of Clause 902. All materials shall comply with the requirements of the relevant provisions in Section 900 of the Specifications. 154.5 Final Surfacing . The built-up-spray-grout shall be provided with final surfacing within a maximum of forty-eight hours. If there is to be any delay, the course shall be covered by a seal coat to the requirement of Clause 513 before it is open to traffic. Where the seal coat is required as a result ofthe selected method of performing this operation, then it shall be considered incidental to the work and shall not be paid for separately. 154.6 Arrangements for Traffic During the period of construction, arrangements for traffic shall be -made in accordance with the provisions of Clause 112. 154.7 Measurement for Payment Built-up spray grout shall be measured as finished work in square metres. 154.8 Rate The contract unit rate for built-up spray grout sh all'be payment in full for carrying out the required operations as specified. The rate shall include for, but not necessarily be limited to the components listed in Clause 501.8.8.2. (i) to (xi). 155 155.1 Scope This clause specifies the construction of Dense Graded Bituminous Macadam, (DBM), for use mainly, but not exclusively, in base/binder and profile corrective courses. DBM is also intended for use as road base material. This work shall consist of construction in a single or multiple layers of DBM on a previously prepared base or sub-base. The thickness of a single layer shap be 50mm. to 100mm. 155.2 Materials 155.2.1 Bitumen: The bitumen shall be paving bitumen of Penetration Grade complying with Indian Standard Specifications for "Paving Bitumen" IS: 73, DENSE GRADED BITUMINOUS MACADAM

Base and Surface Courses (Bituminous)

Section 500

and of the penetration indicated in Table 50010 for dense bitumen macadam, or this bitumen as modified by one of the methods specified in Clause 521, or as otherwise specified in the Contract. Guidance on the selection of an appropriate grade of bitumen is given in The Manual for Construction and Supervision of Bituminous Works.. 155.2.2 Coarse aggregates: The coarse aggregates shall consist of crushed rock, crushed gravel or other hard material retained on the 2.36 min sieve. They shall be clean, hard, durable, of cubical shape, free from dust and soft or friable matter, organic or other deleterious substances. Where the Contractor's selected source of aggregates have poor affinity for bitumen, as a condition for the approval of that source, the bitumen shall be treated- with an approved anti-stripping agent, as per the manufacturer's recommendations, without additional payment. Before approval of the source, the aggregates shall be tested for stripping. The aggregates shall satisfy the physical requirements specified in Table 5008, for dense bituminous macadam. Where crushed gravel is proposed for use as aggregate, not less than 90% by weight of the crushed material retained on the 4.75 mm sieve shall have at least two fractured faces. 155.2.3 Fine aggregates: Fine aggregates shall consist of crushed or naturally occurring mineral material, or a combination of the two, passing the 2.36mrn sieve and retained on the 75 micron sieve. They shall be clean, hard, durable, dry and free from dust, and soft or friable matter, organic or other deleterious matter. The fine aggregate shall have a sand equivalent value of not. less .than 50 when tested in accordance with the requirement of IS:2720 (Part 37). The plasticity index of the fraction passing the 0.425 Min sieve shall not exceed 4. when tested in accordance with IS: 2720 (Part 5)
TABLE 50".,PHYSICAL REQUIREMENTS FOR COARSE AGGREGATE FOR DENSE GRADED BITUMINOUS MACADAM Property Cleanliness (dust) Particle shape Strength* Durability Test Grain size analysis' Flakiness and Elongation Index (Combinedy Los Angeles Abrasion Value3 Agregate Impact Value4 Soundness:' Sodium Sulphate Magnesium Sulphate Max 12% Max 18% Max 35% Max 27% Specilicadon Max 5% passing 0.075mm sieve, Max 30%

Base and Surface Courses (Bituminous)


WaterAbsorption Stripping Water Sensitivity" Notes: 1. IS: 2386 Part 1 2. 3. IS: 2386 Part 4* 4. Water absorptiore Coating and Stripping of Bitumen Aggregate MiXtUrCS7 Retained Tensile Strengthl 5. IS: 2386 Part 5 IS: 2386 Part 1 6. IS: 2386 Part 3 Max 2% Minimum retained coating 95% Min 80%

Section 500

(the'elprigation test to be done only on non-flaky aggregates in the sample) 7. IS: 6241 IS: 2386 Part 4* 8. AASHTOT283** Aggregate may satisfy requirements of either of these two tests. The water sensitivity test is only required if the minimum retained coating in the stripping test is less than 95%.

155.2.4 Filler : Filler shall consist of finely divided mineral matter such as rock dust, hydrated lime or cement approved by the Engineer. The filler shall be graded within the limits indicated in Table 500-9.
TABLE 500-9. GRADING REQUIREMENTS FOR MINERAL FILLER IS Sieve (mm) 0.6 0.3 0.075 Cumulative per cent passing by weight of total aggregate 100 95-100 85-100

The filler shall be free from organic impurities and have a Plasticity Index not greater than 4. The Plasticity Index requirement shall not apply if filler is cement or lime. When the coarse aggregate is gravel, 2 per cent by weight of total aggregate, shall be Portland cement or h ydrated lime and the percentage of fine aggregate reduced accordingly. Cement or hydrated lime is not required when the limestone aggregate is used. Where the aggregates fail to meet the requirements of the water sensitivity test in Table 500-8, then 2 per cent by total weight of aggregate, of hydrated lime shall be added without additional cost. 155.2.5 Aggregate grading and binder content: When tested in accordance with IS:2386 Part I (wet sieving method), the combined grading of the coarse and fine aggregates and added filler for the particular mixture shall fall within the limits shown in Table 500-10, for dense bituminous macadam grading I or 2 as specified in the Contract. The type and quantity of bitumen, and appropriate thickness, are also indicated for each mixture type.
TABLE 500-10. COMPOSITION OF DENSE GRADED BITUMINOUS MACADAM PAVEMENT LAYERS

Base and Surface Courses (Bituminous)

Section 500

Grading Nominal aggregate size LayerThickness IS Sieve' (mm) 45 37.5 26.5 19 13.2 9.5 4.75 2.36 1.18 0.6 0.3 0.15 0.075 Bitumen content % by mass of total mix2 Bitumen grade (pen)

1 40 mm 80-100 narn

2 25 mm 50-75 mm 100

Cumulative % by weight of total aggregate passing 95-100 63-93 55-75 38-54 28-42 7-21 2-8 Min4.0 65 or 90 100 90-100 71-95 56-80 38-54 28-42 7-21 2-8 Min4.5 65 or 90

Notes: 1. The combined aggregate grading shall not vary from the low limit on one sieve to the high limit on the adjacent sieve. 2. Determined by the Marshall method.

155.3 Mixture Design 155.3.1 Requirement for the mixture: Apart from conformity with the grading and quality requirements for individual ingredients, the mixture shall meet the requirements set out in Table 500-11.
TABLE 500-11. REQUIREME NTS FOR DENSE GRADED BITUMINOUS MACADAM Minimum stability (kN at 600C) Oinimum flow (mm) Maximum flow (mm) Compaction level (Number of blows) Per cent air voids Per cent voids in mineral aggregate (VMA) Per cent voids filled with bitumen (VFB) 9.0 2 4 75 blows on each of the two faces of the specimen 3-6 See Table 500-12 below. 65-75

The requirements for minimum per cent voids in mineral aggregate (VMA) are set out in Table 500-12. TABLE 500-12. MINIMUM PER CENT VOIDS IN MINERAL AGGREGATE (VMA)

Base and Surface Courses (Bituminous)

Section 500

Nominal Maximum Particle Size' (mm) 3.0 9.5 12.5 19.0 25.0 37.5

Minimum VMA, Per cent Related to Design Air Voids, Per cent' 4.0 14.0 13.0 12.0 11.0 10.0 5.0 15.0 14.0 13.0 12.0 1 16.0 15.0 14.0 13.0 11.0 12.0

Notes: 1. The nominal maximum particle size is one size larger than the first sieve to retain more than 10 percent. 2. Interpolate minimum voids in the mineral aggregate (VMA) for design air voids values between those listed.

155.3.2 Binder content: The binder content shall be optimised to achieve the requirements of the mixture set out in Table 500-11 and the traffic volume specified in the Contract. The Marshall method r determining the optimum binder content shall be adopted as described in The Asphalt Institi46 Manual MS-2, replacing the aggregates retained on the 26.5 mm sieve by the aggregates passing the 26.5 mm. sieve and retained on the 22.4 mm sieve, where approved by the Engineer. Where 40 mm dense bituminous macadam mixture is specified, the modified Marshall method described in MS-2 shall be used. This method requires modified equipment and procedures; particularly the minimum stability values in Table 500-11 shall be multiplied by 2.25, and the minimum flow shall be 3 mm. 155.3.3 Job mix formula: The Contractor shall inform the Engineer in writing, at least 20 days before the start of the work, of the job mix formula proposed for use in the works, and shall give the following details:
(i) (ii) (a) Source and location of all materials; Proportions of all materials expressed as follows where each is applicable: Binder type, and percentage by weight of total mixture;

(b) Coarse aggregate/Fine aggregate/Mineral filler as percentage by weight of total aggregate including mineral filler; (iii) A single definite percentage passing each sieve for the mixed aggregate; (iv) The individual gradings of the individual aggregate fractions, and the proportion of each in the combined grading. (v) (vi) batch, (vii) (viii) The results of tests enumerated in Table 500-11 as obtained by the Contractor; Where the mixer is a batch mixer, the individual weights of each type of aggregate, and binder per Test results of physical characteristics of aggregates to be used; Mixing temperature and compacting temperature.

Base and Surface Courses (Bituminous)

Section 500

While establishing the job mix formula, the Contractor shall ensure thatit is based on a correct and truly representative sample of the materials that will actually be used in the work and that the mixture and its different ingredients satisfy the physical and strength requirements of these Specifications. Approval of the job mix formula shall be based on independent testing by the Engineer for which -samples of all ingredients of the mix shall be fumished by the Contractor as required by the Engineer. The approved job mix formula shall remain effective unless and until a revised Job Mix Formula is approved. Should a change in the source of inaterials be proposed, a new job mix formula shall be forwarded to the 'Engineer for approval before the placing of the material. 155.3.4 Plant trials - permissible variation in job mix formulaOnce the laboratory job mix formula is approved, the Contractor shall carry out plant trials at the mixer to establish that the plant can be set up to produce a uniform mix conforming to the approved job mix formula. The permissible variations of the individual percentages of the various ingredients in the actual mix from thejob mix formula to be used shall be within the limits as specified in Table 500- 13. These variations are intended to apply to individual specimens taken for quality control tests in accordance with Section 900.
TABLE 500-13. PERMISSIBLE VARIATIONS FROM THE JOB MIX FORMULA Description Permissible variation

Baselbinder course Wearing course Aggregate passing 19mm sieve or larger Aggregate passing 13.2mm, 9.5mm Aggregate passing 4.75mm Aggregate passing 2.36mm, 1. 18mm, 0.6mm Aggreiate passing 0.3mm, 0. 15mm Aggregate passing 0.075mm Binder content Mixing temperature 0.3% 0.3% 101C 100C 4% 2% 3% 1.5% 7% 6% 8% 6% 5% 5% 4% 7%

Once the plant trials have demonstrated the capability of the plant, and the trials are approved, the laying operation may commence. Over the period of the first month of production for laying on the works, the Engineer shall require additional testing of the product to establish the reliability and consistency of the plant. 155.3.5 Laying Trials: Once the plant trials have been successfully completed and approved, the Contractor shall carry out laying trials, to demonstrate that the proposed mix can be successfully laid, and compacted all in accordance with Clause 50 1. The laying trial shall be carried out on a suitable area which is

Base and Surface Courses (Bituminous)

Section 500

not to form part of the works, unless specifically approved in writing, by the Engineer. The area of the laying trials shall be a minimum of 100 sq.m. of construction similar to*that of the project road, and it shall be in all respects, particularly compaction, the same as the project construction, on which the bituminous material is to be laid. The Contractor shall previously inforrn the Engineer of the proposed method for laying and compacting the material. The plant trials shall then establish if the proposed laying plant, compaction plant, and methodology is capable of producing satisfactory results. The density of the finished paving layer shall be determined by taking cores, no sooner than 24 hours after laying, or by other approved method. Once the laying trials have been approved, the same plant and methodology shall be applied to the laying of the material on the project, and no variation of either shall be ac ceptable, unless'approved in writing by the Engineer, who may at his discretion require further laying trials. 155.4 Construction Operations 155.4.1 Weather and seasonal limitations: The provisions of Clause 501.5.1 shall apply. 155.4.2 Preparation of base: The base on which Dense Graded Bituminous Material is to be laid shall be prepared in accordance with Clauses 501 and 902 as appropriate, or as directed by the Engineer. The surface shall be thoroughly swept clean by a mechanical broom, and the dust removed by compressed air. In locations where -mechanical broom cannot access, other approved methods shall be used as directed by the Engineer. 155.4.3 Geosynthetics: Where Geosynthetics are specified in the Contract this shall be in accordance with the requirements stated in Clallse 703 155.4.4 Stress absorbing layer: Where a stress absorbing layer is specified in the Contract, this shall be applied in accordance with the requirements of Clause 522. 155.4.5 Prime coat: Where the material on which the dense bituminous macadam is to be laid is other than a bitumen bound layer, a prime coat shall be applied, as specified, in accordance with the provisions of Clause 502, or as directed by the Engineer. 155.4.6 Tack coat: Where the material on which the dense bituminous macadam is to be placed is a bitumen bound surface, a tack coat shall be applied as specified, in accordance with the provisions of Clause 503, or as directed by the Engineer. 155.4.7 Mixing and transportation of the mixture: The provisions as specified in Clauses 501.3 and 501.4 shall apply. 155.4.8 Spreading: The provisions of Clauses 501.5.3 and 501.5.4. shall apply. 155.4.9 Rolling: The general provisions of Clauses 501.6 and 501.7 shall apply, as modified by the approved laying trials. The compaction process shall be

Base and Surface Courses (Bituminous)

Section 500

carried out by the same plant, and using the same method, as approved in the laying trials, which may be varied only with the express approval of the Engineer in writing. 155.5 Opening to Traffic The newly laid surface shall not be open to traffic for at least 24 hrs after laying and completion of compaction, without the express approval of the Engineer in writing. 155.6 Surface Finish and Quality Control of Work The surface finish of the completed construction shall conform to the requirements of Clause 902. All materials and workmanship shall comply with the provisions set out in Section 900 of this Specification 155.7 Arrangements for Traffic During the period of construction, arrangements for traffic shall be made in accordance with the provisions of Clause 112 155.8 Measurement for Payment Dense Graded Bituminous Materials shall be measured as finished work either in cubic metres, tons or by the square metre at a specified thickness as detailed on the Contract drawings, or documents, or as directed by the Engineer. 155.9 Rate The contract unit rate for Dense Graded Bituminous Macadam shall be payment in full for carrying out the all required operations as specified, and shall include, but not necessarily limited to all components listed in Clause 501.8.8.2 (i) to (xi). The rate shall include the provision of bitumen, at 4.25 per cent by weight of the total mixture. The variance in actual percentage of bitumen used will be assessed and the payment adjusted, up or down, accordingly. 156 156.1 Scope This clause specifies the construction of Semi Dense Bituminous Concrete, for use in wearing/binder and profile corrective courses. This work shall consist of construction in,a single or n~ultiple layers of semi dense bituminous concrete on a previously prepared bituminous bound surface. A single layer shall be 25mm to 100mm in thickness. 156.2 Materials 156.2.1 Bitumen: The bitumen shall be paving bitumen of Penetration grade complying with Indian Standard Specification for Paving Bitumen, IS: 73 and of the penetration indicated in Table 500-15, for semi dense bituminous concrete, or this bitumen as modified ')y one of the methods specified in Clause 52 1, or as otherwise specified in the Contract. Guidance on the selection of an appropriate grade of bitumen is given in The Manual for Construction and Supervision of Bituminous Works. SEMI-DENSE BITUMINOUS CONCRETE

Base and Surface Courses (Bituminous)

Section 500

156.2.2 Coarse aggregates: The coarse aggregates shall be generally as specified in Clause 507.2.2, except that the aggregates shall satisfy the physical requirements of Table 500-14. 156.2.3 Fine aggregates: The fine aggregates shall be all as specified in Clause 507.2.3. 156.2.4 Filler: Filler shall be generally as specified in Clause 507.2.4. Where the aggregates fail to meet the requirements of the water sensitivity test in Table 500-14 then 2 per cent by total weight of aggregate, of hydrated lime shall be added without additional cost. 156.2.5 Aggregate grading and binder content: When tested in accordance with IS:2386 Part I (Wet sieving method), the combined grading of the coarse and fine aggregates and added filler shall fall within the limits shown in Table 500-1-5-for gradings' I or 2 as specified in the Contract. 156.3 Mixture Design 156.3.1 Requirements for the mixture: Apart from confort-nity with the grading and quality requirements for individual ingredients the mixture shall meet the requirements set out in Table 500-16.
TABLE 500-14. PHYSICAL REQUIREMENTS FOR COARSE AGGREGATE FOR SEMI DENSE BITUMINOUS CONCRETE PAVEMENT LAYERS Property Test Specification Grain size analysis' Flakiness and Elongation Index Los Angeles Abrasion Value' Max 27% Min 55 Soundness:' Sodium Sulphate Magnesium Sulphate Water Absorption Stripping Water Sensitivity" Notes: 1. IS: 2386 Part 1 2. IS: 2386 Part 1 Max 12% Max 18% Minimum Retained Min 80% Water absorption' Max 2% Coating and Stripping of Bitumen Aggregate Mixtures9 Coating 95% 6. IS: 2386 Part 5 7. IS: 2386 Part 3 Polished Stone Value 5 Max 5% passing Max30% Max 35%

Cleanliness (dust) 0.075mm sieve Particle shape (Combined)2 Strength* Polishing Durability Aggregate Impact Value 4

Retained Tensile Strengthg

(the elongation test may be done only on non-flaky aggregates in the sample) 3. IS: 2386 Part 4* 8. AASHTOT283**

Base and Surface Courses (Bituminous)


4. IS: 2386 Part 4* 5. BS: 812 Part 114 9. IS: 6241

Section 500

Aggregate may satisfy requirements of either of these two tests. The water sensitivity test is only required if the minimum retained coating in the stripping test is less than 95%. The requirements for minimum per cent voids in mineral aggregate (VMA) are set out in Table 500-12. 156.3.2 Binder content:The binder content shall be optimised to achieve the requirements of the mixture set out in Table 500-16 and the traffic volume as specified in the Contract. The Marshall method for determining the optimum binder content shall be adopted as described in the Asphalt Institute Manual MS-2, replacing the aggregates retained on the 26.5mm sieve and retained on the 22.4mm sieve, where approved~y the Engineer.
TABLE 500-15. COMPOSITION OF SEMI DENSE BITUMINOUS CONCRETE PAVEMENT LAYERS Grading Nominal aggregate size Layer Thickness IS Sieve' (mm) 45 37.5 26.5 19 13.2 9.5 2.36 1.18 0.6 0.3 0.15 0.075 90-100 70-90 35-51 24-39 15-30 9-19 3-8 100 100 90-100 35-51 24-39 15-3Y 9-19 3-8 Min 4.5 Min 5.0 65* 65* 1 2 13 mm 10 turn 35-40 mm 25-30 turn Cumulative % by weight of total aggregate passing

Bitumen content % by mass of ttal mix, Bitumen grade (pen)

Notes: 1. The combined aggregate grading shall not vary from the low limit on one sieve to the high limit on the adjacent sieve.

Base and Surface Courses (Bituminous)

Section 500

2. Determined by the Marshall method. Only in exceptional circumstances, 80/100 penetration grade may be used, as approved by the Engineer. TABLE 500-16. REQUIREMENTS FOR SEMI DENSE BITUMINOUS PAVEMENT LAYERS 8.2

Nfinimum stability (kN at 60'C) Minimum flow (mm) Maximum flow (mm) 2 4

Compaction level (Number of blows) faces of the specimen Per cent air voids 3-5 Per cent voids in mineral aggregate (VMA) Per cent voids filled with bitumen (VFB)

75 blows on each of the two

See Table 500-12 65-78

156.3.3 Job mix formula: The procedure for formulating the job mix formula shall be generally as specified in Clause 507.3.3 and the results of tests enumerated in Table 500-16 as obtained by the Contractors. 156.3.4 Plant trials - permissible variation in job mix formula: The requirements for plant trials shall be all as specified in Clause 507.3.4, and permissible limits for variation as shown in Table 500-13. 156.3.5 Laying trials: The requirements for laying trials shall be all as specified in Clause 507.3.5. 156.4 Construction Operations 156.4.1 Weather and seasonal limitations: The provisions of Clause 501.5.1 shall apply. 156.4.2 Preparation of base: The surface on which the Semi Dense Bituminous material is to be laid shall be prepared in accordance with Clauses 501 and 902 as appropriate, or as directed by the Engineer. The surface shall be thoroughly swept clean by mechanical broom and dust removed by compressed air. In locations where a mechanical broom cannot access, other approved methods shall be used as directed by the Engineer. 156.4.3 Geosynthetics: Where Geosynthetics are specified in the Contract this shall be in accordance with the requirements stated in Clause 703. 156.4.4 Stress absorbing layer: Where a stress absorbing layer is specified in the Contract, this shall be applied in accordance with the requirements of Clause 522. 156.4.5 ack coat: Where specified in the Contract, or otherwise required by the Engineer, a tack coat shall be applied in accordance with the requirements of Clause 503.

Base and Surface Courses (Bituminous)

Section 500

156.4.6 Mixing and transportation of the mixture: The provisions as specified in Clauses 501.3.and 501.4 shall apply. 156.4.7 Spreading: The general provisions of Clauses 501.5.3 and 501.5.4 shall apply. 156.4.8 Rolling: The general provisions of Clauses 501.6 and 501.7 shall apply, as modified by the approved laying trials. The compaction process shall be carried out by the same plant, and using the same method, as approved in the laying trials, which may be varied only with the express approval of the Engineer in writing. 156.5 Opening to Traffic The newly laid surface shall not be open to traffic for at least 24 hours after laying and the completion of compaction, without the express approval of the Engineer in writing. 156.6 Surface Finish and Quality Control The surface finish of the completed construction shall conform to the requirements of Clause 902. All materials and workmanship shall comply with the provisions set out in Section 900 of this Specification. 156.7 Arrangements for Traffic During the period of construction, arrangements for traffic shall be made in accordance with the provisions of Clause 112. 156.8 Measurement for Payment The measurement shall be all as specified in Clause 507.8. 156.9 Rate The contract unit rate shall be all as specified in Clause 507.9, except that the rate shall include the provision of bitumen at 4.75 per cent, by weight of total mixture. The variance in actual percentage of bitumen used will be assessed and the payment adjusted up or down, accordingly. 157 157.1 Scope This clause specifies the construction of Bituminous Concrete, for use in wearing and profile coffective courses. This work shall consist of construction in a single or multiple layers of bituminous concrete on a previously prepared bituminous bound surface. A single layers shall be 25mrn to 100mm in thickness. 157.2 Materials 157.2.1 Bitumen: The bitumen shall be paving bitumen of Penetration grade complying with Indian Standard Specification for Paving Bitumen, IS: 73 and of the penetration indicated in Table 500-18, for bituminous concrete, or this bitumen as modified by one of the methods specified in Clause 521, or as otherwise specified in the Contract. Guidance on the selection of an BITUMINOUS CONCRETE

Base and Surface Courses (Bituminous)

Section 500

appropriate grade of bitumen is given in The Manual for Construction and Supervision of Bituminous Works. 157.2.2 Coarse aggregates: The coarse aggregates' shall be generally as specified in Clause 507.2.2, except that the aggregates shall satisfy the physical requirements of Table 500-17. 157.2.3 Fine aggregates: The fine aggregates shall be all as specified in Clause 507.2.3. 157.2.4 Filler: Filler shall be generally as specified in Clause 507.2.4. Where the aggregates fail to meet the requirements of the water sensitivity test in Table 500-17 then 2 per cent by total weight of aggregate, of hydrated lime shall be added without additional cost. 157.2.5 Aggregate grading and binder content: When tested in accordance with IS:2386 Part I (Wet grading method), the combined grading of the coarse and fine aggregates and added filler shall fall within the limits shown in Table 500-18 for gradings I or 2 as specified in the Contract. 157.3 Mixture Design 157.3.1 Requirements for the mixture: Apart from conformity with the grading and quality requirements for individual ingredients, the mixture shall meet the requirements set out in Table 500-19. The requirements for minimum per cent voids in mineral aggregate (VMA) are set out in Table 500-12. 157.3.2 Binder content: The binder content shall be optimised to achieve the requirements of the mixture set out in Table 500-19 and the traffic volume as specified in the Contract. The Marshall method for determining the optimum binder content shall be adopted as described in the Asphalt Institute Manual MS-2, replacing the aggregates retained on the 26.5min sieve and retained on the 22.4mm sieve, where approved by the Engineer. 157.3.3 Job mix formula: The procedure for formulating the job

TABLE 500-17. PHITYUSMICANOURSECOUNIREM . ENTS FOR COARSE AGG Property Cleanliness (dust) Particle shape Strength* Polishing Durability Test Grain size analysis, 0.075mm sieve Flakiness and Elongation Index (Combined)' Los Angeles Abrasion Value3 Aggregate Impact Value4 Polished Stone Value5 Soundness:' Sodium Sulphate Magnesium Sulphate Max 12% Max 18% Max 30% Max 24% Min 55 Max 30% Specirication Max 5% passing

Base and Surface Courses (Bituminous)


Water Absorption Stripping Water Sensitivity** Water abSorption7 , Coating and Stripping of Retained Tensile Strength' 6. IS: 2386 Part 5 7. IS: 2386 Part 3 8. AASHTO T283** 9. IS: 6241 Minimum retained coating 95% Min 80% Bitumen Aggregate Mixtures, Max 2%

Section 500

Notes: 1. IS: 2386 Part 1 2. IS: 2386 Part 1 3. IS: 2386 Part 4* 4. IS: 2386 Part 4* 5. BS: 812 Part 114

(the elongation test to be done only on non-flaky aggregates in the sample)

Aggregate may satisfy requirements of either of these two tests. The water sensitivity test is only required if the minimum reWned Coating in the Stripping test is less than 95%. mix formula shall be generally as specified in Clause 507.3.3 and the results of tests enumerated in Table ~00- 19 as Obtained by the Contractors. 157.3.4 Plant trials - permissible variation in job mix formula: The requirements for platirtrials shall be all as specified in Clause 507.3.4, and permissible limits for variation as ShoWn in Table 500-13. 157.3.5 Laying trials: T he requirements for laying trials shall be all as specified in Clause 507.3.5. 157.4 Construction Operations 157.4.1 Weather and seasonal limitations: The provisions of Clause 501.5.1 shall apply.
TABLE 500-18. COMPOSITION OF BITUMINOUS CONCRETE PAVEMENT LAYERS Grading 1 2 19 rum 13 rum 50-65 ram 30-45 rum Cumulative % by weight of total aggregate passing

Nominal aggregate size Layer Thickness IS Sieve' (mm) 45 37.5 26.5 19 13.2 9.5 4.75 2.36 1.18 0.6 15-27 52-72 35-55 28-44 20-34 79-100 59-79 100 100 79-100 70-88 53-71 42-58 34-48 26-38

Base and Surface Courses (Bituminous)


0.3 0.15 0.075 10-20 5-13 2-8 18-28 12-20 4-10 5.0-6.0 5.0-7.0 65 65

Section 500

Bitumen content % by mass of total mix' ' Bitumen grade (pen)

Notes: L. The combined aggregate grading shall not vary from the low limit on one sieve to the high limit on the adjacent sieve. 2. Determined by the Marshall method. TABLE 500-19. REQUIREMENTS FOR BITUMINOUS PAVEMENT LAYERS Minimum stability (kN at 600C) Minimum flow (mm) Maximum flow (mm) 2 4 75 blows on each of the two 9.0

Compaction level (Number of blows) faces of the specimen Per cent air voids 3-6 Per cent voids in mineral aggregate (VMA) Per cent voids filled with bitumen (VFB) Loss of stability on immersion it. water at 60-C (ASTM D 1075) retained strength

See Table 500-12 65-75 Min. 75 per cent

157.4.2 Preparation o f base: The surface on which the bituminous concrete is to be laid shall be prepared in accordance with Clauses 501 and 902 as appropriate, or as directed by the Engineer. The surface shall be thoroughly swept clean by mechanical broom and dust removed by compressed air. In locations where a mechanical broom cannot access, other approved methods shall be used as directed by the Engineer. 157.4.3 Geosynthetics: Where Geosynthetics are specified in the Contract this shall be in accordance with the requirements stated in Clause 703. 157.4.4 Stress absorbing layer. Where a stress absorbing layer is specified in the Contract, this shall be applied in accordance- with the requirements of Clause 522. 157.4.5 Tack coat: Where specified in the Contract, or otherwise required by the Engineer, a tack coat shall be applied in accordance with the requirements of Clause 503. 157.4.6 Mixing and transportation of the mixture: The provisions as specified in Clauses 501.3 and 501.4 shall apply. 157.4.7 Spreading: The general provisions of clauses 501.5.3 and 501.5.4 shall apply.

Base and Surface Courses (Bituminous)

Section 500

157.4.8 Rolling: The general provisions of clauses 501.6 and 501.7 shall apply, as modified by the approved laying trials. 157.5 Opening to Traffic The newly laid surface shall not be open to traffic for at least 24 ~ours after laying and the completion of compaction, without the express approval of the Engineer in writing. 157.6 Surface Finish and Quality Control The surface finish of the completed construction shall conform to the requirements of Clause 902. All materials and workmanship shall comply with the 'provisions set out in Section 900 of this Specification. 157.7 Arrangements for Traffic During the period of construction, arrangements for traffic shall be made in accordance with the Orovisions of Clause 112 157.8 Measurement for Payment The measurement shall be all as specified in Clause 507.8. 157.9 Rate The contract unit rate shall be all as specified in Clause 507.9, except that the rate shall include the provision of bitumen at 5.0 per cent, by weight of total mixture. The variance in actual percentage of bitumen used will be assessed and the payment adjusted up or down, accordingly. 158 158.1 Scope This work shall consist of the application of one coat or two coats of surface dressing, each coat consisting of a layer of bituminous binder sprayed on a previously prepared base, followed by a cover of stone chips rolled in to form a wearing course to the requirements of these Specifications. For information on the Design of Surface ' Dressing refer to the Manual for Construction and Supervision of Bituminous Works. 158.2 Materials 158.2.1 Binder: The binder shall have a kinematic viscosity lying in the range lxlO' to 7xlO1 centistokes at the expected range of road surface temperatures at the construction site during the period of laying. The type of binder to be used will be stated in the Contract documents and shall comply with one of the following:
Paving Bitumen IS:73 Bitumen Emulsion IS:8887

SURFACE DRESSING

158.2.2 Aggregates: The chips shall conform to the requirements of Clause 504.2.2., except that their water absorption shall be restricted to a maximum of I per cent and they shall have a Polished Stone value, as measured by the method given in BS812 (Part 114), of not less than 60. The chips shall be

Base and Surface Courses (Bituminous)

Section 500

single sized, clean, hard, durable, of cubical shape, free from dust and soft or friable matter, organic or other deleterious matter i.nd conforming to one of the gradings given in Table 500-21. 158.2.3 Rates of spread of binder and chips: For the purpose of pricing the Bill of Quantities the rates of spread given in Table 500-20 shall be priced.
TABLE 500-20. NOMINAL RATES OF SPREAD FOR BINDER AND CHIPPINGS Nominal Chipping Size mm kg/M2 19 13 lo 6 1 1.2 1.0 0.9 0.75 0,015 0.010 0.008 1 0.004 bitumen)Cum/m2 Binder (penetration grade Chips

Note: (1) These rates of spread are for pricing purposes - see Clause 510.2.3 and Clause 510.8 (2) For ' emulsion, these rates of spread are for the residual bitumen and appropriate adjustment must be made to determine the total quantity. (3) Refer to Manual for Construction and Supervision of Bituminous Works for the procedure of determining the rates of spread of binder and chips.

158.2.4 Anti-stripping agent: Where the proposed aggregate fails to pass the stripping test then an approved adhesion agent (Appendix 5 for details) may be added to the binder in accordance with the manufacturer's instructions. The effectiveness of the proposed antistripping agent must be demonstrated by the Contractor, before approval by the Engineer. 158.2.5 Pre-coated chips: As an alternative to the use of an adhesion agent the chips may be pre-coated before they are spKead except when the sprayed binder film is a bitumen emulsion. Pre-coating the chips may be carried out in any one of the two methods:
(a) Mixing them with 0.75 to 1.0 per cent of paving bitumen by weight of_chips in a suitable mixer, the chips being heated to 160'C and the bitumen to its application temperature. The pre-coated chips shall be allowed to cure for at least one week or until they become non sticky and can be spread easily. (b) Spraying the chips with a light application of creosote, diesel oil orkerosene at ambient temperature. 17his spraying can be done in a concrete mixer or on a belt conveying the chips from stockpile to gritting lorries.

158.3 Construction operations 158.3.1 Weather and seasonal limitations : Clause 501.5.1 shall apply.

TABLE 500-21. GRADING REQUIREMENTS FOR CHIPS FOR SURFACE DRESSING

Base and Surface Courses (Bituminous)

Section 500

IS Sieve Designation passing n" 19 26.5 19.0 13.2 9.5 6.3 4.75 3.35 2.36 0.60 0.075 0-2 100 0-40 0-7 -

Cumulative per cent by weight of total aggregate

for the following nominal sizes (mm) 13 85-100 100 0-40 0-7 0-2 10 85-100 0-35 0-10 0-2 Passing 13.2 mm, 85-100 100 0-35 0-10 0-2 6

85-100 100

0-1.5 0-1.5 0-1.5 0-1.5 Passing 19 mm,

Minimum 65% Passing 9.5 Passing 6.3 by weight of aggregate 6.3 mm

retained 13.2 mm retained 9.5 mm mm, retained mm, retained 3.35 mm

158.3.2 Preparation of base: The base on which the surface dressing is to be laid shall be prepared, shaped and conditioned to the specified lines, grade and cross section in accordance with Clause 501 or as directed by the Engineer. Prime coat, where needed, shall be provided as per Clause 502 or as directed by the Engineer. Where the existing surface shows signs of fatting up, the excess bitumen shall be removed by burning off, or manually, as specified in the Contract or directed by the Engineer. The bituminous surface to be dressed shall be thoroughly cleaned either by using a mechanical broom and / or compressed air, or any other approved equipment / method as specified in the Contract or by the Engineer. The prepared surface shall be dust free, clean and dry, (except in the case of cationic emulsion where the surface shall be damp). 158.3.3 Application of binder : The equipment and general procedures shall all be in accordance with the Manual for Construction and Supervision of Bituminous Works. The application temperature for the grade of binder used shall be as given in Table 500-22 and the rate of spray as given in 510.2.3. 158.3.4 Application of stone chips : The equipment and general

TABLE 500-22. SPRAYING TEMPERATURES FOR BINDERS

Base and Surface Courses (Bituminous)


Binder grades Min'C Penetration Grades 400/500 280/320 180/200 80/100 1 160 165 170 180 1 200 1 170 175 190 165 Whirling slotjets spray jets Max'C

Section 500

Min'C 140 150 155 1

Max'C 150 160 165 175

procedure shall all be in accordance with the Manual for Construction and Supervision of Bituminous Works. For relatively small areas of surface dressing, careful application of chips by hand may be acceptable if approved by the Engineer. The rate of application of chips shall be as determined by the procedure given in the Manual for Construction and Supervision of Bituminous Works. Immediately after application of the binder, clean, dry chips (in the case of emulsion binder the chippings may be damp) shall be spread uniformly on the surface so as to cover the surface completely with a single layer of chips. 158.3.5 Rolling : Rolling of the chips should preferably be carried out by a pneumatic tyred roller in accordance with Clause 501.6 and Clause 501.7. Traditional steel wheeled rollers tend to crush the aggregates and if their use cannot be avoided their weight should be limited to 8 tonnes. Rolling shall commence at the edges and progress towards the centre except in superelevated and uni-directional cambered portions where it shall proceed from the lower edge to the higher edge. Each pass of the roller shall uniformly overlap not less than one-third of the track made in the preceding pass. While rolling is in progress additional chips shall be spread by hand in necessary quantities required to make up irregularities. Rolling shall continue until all aggregate particles are firmly embedded in the binder and present a uniform closed surface. 158.3.6 Application of second coat of surface dressing : Where surface dressing in two coats is specified, the second coat should not be applied until the first coat has been open to traffic for 2 or 3 weeks. The surface on which the second coat is laid must be clean and free of dust. The construction operations for the second coat shall be the game as described in Clauses 510.3.3 to 510.3.5. 158.4 Opening to Traffic Traffic shalI not be permitted to run on any newly surface dressed area until the following day. In special circumstances, however, the Engineer may allow the road to be opened to traffic immediately after rolling, but in such cases traffic speed shall be limited to 20 km per hour until the following day.

Base and Surface Courses (Bituminous) 158.5 Surface Finish and Quality Control of Work

Section 500

The surface finish of construction shall conform to the requirements of Clause 902. For control on the quality of materials supplied and the works carried out, the relevant provisions of Section 900 shall apply. 158.6 Arrangements for Traffic During the period of construction, arrangements for traffic shall be made in accordance with the,provisions of Clause 112. 158.7 Measurement for Payment Each coat of surface dressing shall be measured as finished work, for the area instructed to be covered, in square metres. 158.8 Rate The Contract unit rate for surface dressing, based on the notional rates of spread for binder and each. size of chippings given in Clause 510.2.3, which shall be adjusted, plus or minus, for the difference between the notional rates of spread and the rates of spread determined as described in the Manual for Construction and Supervision of Bituminous Works, and approved by the Engineer, multiplied by the rates entered in the Bill of Quantities for binder,and each size of chipping. The adjusted rate shall be payment in full for carrying out the required operations including full compensation for all components listed in Clause 501.8.8.2. (i) to (xi). 159 OPEN-GRADED PREMIX SURFACING

159.1 Open-graded Premix Surfacing using Penetration Bitumen or Cutback. 159.1.1 Scope : This work shall consist of the preparation, laying and compaction of an open-graded premix surfacing material of 20 mm thickness composed of small-sized aggregate premixed with a bituminous binder on a previowly prepared base, in accordance with the requirements of these Specifications, to serve as a wearing course. 159.1.2 Materials 159.1.2.1 Binder : The binder shall be a penetration bitumen of a suitable grade as specified in the Contract, or as directed by the Engineer, and satisfying the requirements of IS: 73. 159.1.2.2 Aggregate: The aggregate shall conform to Clause 504.2.2 except that the water absorption shall be limited to a maximum of I per cent. The Polished Stone Value, as measured by the test in BS 812- (Part 114), shall not be less than 55. 159.1.2.3 Proportioning of materials: The materials shall be proportioned in accordance with Table 500-23.

Base and Surface Courses (Bituminous)

Section 500

159.1.3

Construction operations Weather and seasonal limitations: Clause 501.5,1-shall apply.

159.1.3.1

159.1.3.2 Preparation of surface: The underlying surface on which the bituminous surfacing is to be laid shall be prepared, shaped and conditioned to the specified lines, grade and cross-section in accordance with Clause 501. A prime coat where needed shall be applied in
TABLE SOO-23. QUANTITIES OF MATERIALS REQUIRED FOR 10 ml OF ROAD SURFACE FOR 2(knm THICK OPEN-GRADED PREMIX SURFACING USING PENETRATION BITUMEN OR CUTBACK Aggregates (a) (b) Total (a) (b) Total Nominal Stone size 13.2trun (passing 22.4 mm sieve and retained on 11.2 mm sieve ) Nominal Stone size 11.2mm (passing 13.2 mm sieve and retained on 5.6 mm sieve 0.27M3 For 0. 18 M3 Of 13.2 min nominal size stone 9.5 kg at 52 kg bitumen per M3 For 0.09 m3 of 11.2 mmi nominal size stow Its at 56 kg bitumen per m3 14.6kg Binder (quantities in terms of straight run bitumen) 0.09m3 0.18m,

accordance with Clause 502 as directed by the Engineer. 159.1.3.3 Tack coat: A tack coat complying with Clause 503, shall be applied over the base preparatory to laying of the surfacing. 159.1.3.4 Preparation of premix : Hot mix plant of appropriate capacity and type shall be used for the preparation of the mix material. The hot mix plant shall have separate dryer arrangement for heating aggregate. The temperature of the binder at the time of mixing shall be in the range of 150'C to 1630 C and that of the aggregate in the range of 155V to 163*C provided that the difference in temperature between the binder and aggregate at no time exceeds 14'C. Mixing shall be thorough to ensure that a homogeneous mixture is obtained in which all particles of the aggregates are coated uniformly and the discharge temperature of mix shall be between 1300C and 16011C. The mix shall be immediately transported from the mixer to the point of use in suitable vehicles or hand barrows. The vehicles employed for transport shall be clean and the mix being transported covered in transit if so directed by the Engineer.

Base and Surface Courses (Bituminous)

Section 500

159.1.3.5 Spreading and rolling : The pre mixed material shall be spread by suitable means to the desired thickness, grades and cross-full (camber) making due allowance for any extra quantity required to fill up depressions, if any, The cross-fall should be checked by means of camber boards and irregularities levelled out. Excessive use of blades or rakes should be avoided. As soon as sufficient length of bituminous material has been laid, rolling shall commence with 8 - 10tonne rollers, smooth wheel tandem type, or other approved equipment. Rolling shall begi . n at the edge and progress toward the centre longitudinally, except that on superelevated and uni-directional cambered portions, it shall progress from the lower to upper edge parallel to the centre line of the pavement. When the roller has passed over the whole area once, any high spots or depressions, which become apparent, shall be corrected by removing or adding premixed materials. Rolling shall then be continued until the entire surface has been rolled and all the roller marks eliminated. In each pass of the roller the preceding track shall be overlapped uniformly by at least 1/3 width. The roller wheels shall be kept damp to prevent the premix from adhering to the wheels. In no case shall fuel / lubricating oil be used for this purpose. Excess use of water for this purpose shall also be avoided. Rollers shall not stand on newly laid material. Rolling operations shall be completed in every respect before the temperature of the mix falls below 1000 C. Joints along and transverse to the surfacing laid and compacted earlier shall be cut vertically to their full depth so as to expose fresh surface which shall be painted with a thin coat of appropriate binder before the new mix is placed against it. 159.1.3.6 Seal coat : A seal coat conforming to Clause 513 of the type specified in the Contract shall be applied to the surface immediately after laying the surfacing. 159.1.4 Opening to traffic: No traffic shall be allowed on the road until the seal coat has been laid. After the seal coat is laid, the road may be opened to traffic according to Clause 513.4. 159.1.5 Surface finish and quality control of work: The surface finish of construction shall conform to the requirements of Clause 902. For control of the quality of materials supplied and the works carried out, the relevant provisions of Section 900 shall apply. 159.1.6 Arrangements for traffic : During the period of construction, arrangement of traffic shall be made in accordance with the provisions of Clause 112. 159.1.7 Measurement for payment: Open graded premix surfacing shall be

Base and Surface Courses (Bituminous)

Section 500

measured as finished work, for the area instructed to be covered, in square metres. The area will be the net area covered, and all allowance for wastage and cutting of joints shall be deemed to be included in the rate. 159.1.8 Rate : The contract unit rate for open-graded premix surfacing shall be payment in full for carrying out the required operations including full compensation for all components. listed in Clause 501.8.8.2. (i) to (Xi). 159.2 Open graded premix surfacing using cationic bitumen emulsion 159.2.1 Scope : This work shall consist of the preparation, laying and compaction of an open graded premix surfacing of 20 mm thickness composed of small-sized aggregate premixed with a cationic bitumen emulsion on a previously prepared surface, in accordance with the requirements of these Specifications, to serve as a wearing course. 159.2.2 Materials 159.2.2.1 Binder : The binder for Premix wearing course shall be cationic bitumen emulsion of Medium. Setting (MS) grade complying with I.S.8887 and having a bitumen content 65 per cent minimum by weight. For liquid seal coat RS grade of Cationic bitumen emulsion shall be used. Where expressly specified in the Contract NIS grade emulsion shall be used or otherwise directed by the Engineer. Slow Setting (SS) grade Cationic bitumen Emulsion shall be used for premix seal coat. 159.2.2.2 Aggregate : The requirements of Clause 511.1.2.2. shall apply. 159.2.3 Proportioning of materials: The materials shall be proportioned as quantities given in Tables 500-24 and 500-25.
TABLE 500-24. QUANTITIES OF AGGREGATE FOR 10 M2 AREA (A) (a) (b) (13) Premix Carpet Coarse aggregate no minal k3.2 mm size; passing IS 22.4 mm sieve and retained on IS 11.2 mm sieve sieve and retained on IS 5.6 mm sieve For Seal Coat: Refer to Clause 513. TABLE 500-25. QUANTITIES OF EMULSION BINDER For 10ml area (A) For Premix Carpet: 20 to 23 kg 0. 18 M3 0.09 M3 Coarse aggregate nominal 11.2 nun size; passing IS 13.2 mm

Base and Surface Courses (Bituminous)


(B) For Seal Coat: (a) for liquid seal coat (b) for premix seal coat 12 to 14 kg 10 to 12 kg

Section 500

159.2.4

Construction operations

159.2.4.1 Weather and seasonal limitations Clause 501.5.1 shall apply except that the miqjinum air temperature for laying shall be I O'C. Cationic biiiimen emu1si,`6"ns` shall 'riot normally be stored below O'C. 159.2.4.2 Preparation of surface: The underlying surface on which the premix surfacing is to be* laid shall be prepared, in accordance with the requirements of Clause 504.3.2 for a newly primed surface, and in accordance with Clause 507.4.2 where an existing bituminous surface is to be overlaid. 159.2.4.3 Preparation of binder : Before opening, the cationic bitumen emulsion drums shall be rolled at slowspeed, to and fro, at least .5 times, for a distance of about 10 metres, to distribute any storage sedimentation. 159.2.4.4 Tack coat: A tack coat complying with Clause 503, shall be applied over the surface preparatory to laying of the surfacing where specified in the Contract, or directed by the Engineer. 159.2.4.5 Preparation of premix : Premixing of cationic bitumen emulsio '. and aggregates can be carried out in a suitable mixer such as cold mixing plant as per IS: 5435 (Revised) or concrete mixer or by pay loaders in exceptional cases where approved by the Engineer. Where specified in the Contract continuous mixing operation shall be done either in batch or continuous hot mix plant suitable for emulsion mixes. When using concrete mixer for preparing the premix, 0. 135 cu.m. (0.09 cu.m. of 13.2 min size and 0.045 cu.m. of 11.2 min size) of aggregates per batch shall be used which quantity will cover 5 sq.m. of road surface with 20 min average thickness. The aggregates required for one batch shall be prepared adjacent to the mixer. First the coarse aggregate of 13.2 mm size shall be placed into the mixer followed by 5 to 6.5 kg of Cationic bitumen emulsion and then the 11.2 mm size aggregate shall be added, followed by 5 to 6.5 kg of Cationic bitumen emulsion. After the materials have been mixed thoroughly, the mix shall be immediately transported to the laying site in suitable vehicles. Too much mixing shall be avoided. When mixed manually by shovels, with the approval of the Engineer, 0.06 cu.m. of aggregates can be conveniently mixed in one heap, with appropriate quantity of emulsion. It is preferable to make the aggregates damp before mixing as it reduces the effort required for mixing and also helps to get better coating of aggregates. The 13.2 nim size aggregates and emulsion are mixed first and then the 11.2 min size aggregates and remaining quantity of emulsion are added and mixed. Too much mixing shall be avoided.

Base and Surface Courses (Bituminous)

Section 500

159.2.4.6 Spreading and rolling: The premixed cationic bitumen emulsion and aggregates shall be spread within 10 minutes of applying the tack coat. All levelling, raking, etc. should be completed within 20 minutes of the time of mixing. The mix should be spread uniformly to the desired thickness, grades and crossfall (camber) making due allowance for any extra quantity required to fill up depressions, if any. The crossfall should be checked by means of camber boards and irregularities leveled out. Too much raking is to be avoided. The rolling shall start immediately after laying the premix. A smooth wheeled tandem roller of 8-10 tonnes shall be used, unless other compaction methods are approved by the Engineer, based on the results of laying trials, if necessary. While rolling, wheels of roller should be clean and kept moist to prevent the premix from adhering to the wheels. In no case shall fuel / lubricating oil be used for this purpose. Use of water for this purpose shall be strictly limited to an absolute minimum. Rolling shall commence at the edges and progress towards the centre longitudinally except in the case of superelevated and uni-directional cambered sections where rolling shall be carried out from the lower edge towards the higher edge parallel to the centre line of the road. After one pass of roller over the whole area, depressions or uncovered spots should be corrected by adding premix material. Rolling shall be continued until the entire surface has been rolled to maximum compaction and all the roller marks eliminated. In each pass of the roller the preceding track shall be overlapped uniformly by at least 1/3 width. Roller(s) shall not stand on newly laid material. Joints both longitudinal and transverse to the road sections laid and compacted earlier, shall be cut vertically to their full depth so as to expose fresh surface which shall be painted with a thin surface coat of binder before the new mix is placed against it. 159.2.4.7 Seal coat : A seal coat, conforming to Clause 5 10 or Clause 513, as specified in the Contract, shall be applied 4 to 6 hours after laying the premix carpet. 159.2.5 Opening to traffic : Traffic should not be allowed over the premix surface with or without seal coat, for 6 to 8 hours after rolling. In. case of single lane roads, traffic shall be allowed onto the surface once it has reached ambient temperature, but speed must be rigorously restricted to not more than16 kni per hour. If any premix material is picked up by vehicle tyres, the spot shall be filled up by new mix. If traffic conditions permit, the road shall not be opened until a full 24 hours after laying. 159.2.6 Surface finish and quality control : The surface finish of construction shall conform to the requirements of Clause 902. For control of the quality of materials supplied and the works carried out, the relevant provisions of Section 900 shall apply. 159.2.7 Arrangements for traffic : During the period of construction, arrangements

Base and Surface Courses (Bituminous)

Section 500

for traffic shall be made in accordance with the provisions of Clause 112. 159.2.8 Measurement for payment : Open graded premix carpet shall be measured as finished work, for the area specified to be covered, in square metres at the specified thickness, in cubic metres, or in tonnes weight as specified in the Contract. The area will be the net area covered, and all allowances for wastage and cutting of joints shall be deemed to be included in the rate. 159.2.9 Rate : The contract unit rate for premix carpet and seal coat shall be payment in full for carrying out the required operations including full compensation for all components listed in Clause 501.8.8.2. (i) to (xi). Bitumen quantities are to be as stated in Table 500-23 for premix, 3.0 Kg per 10 sq.m., for tack coat, 13Kg per 10 sq.m. for liquid seal coat and 11 Kg per 10 sq.m. for premix seal coat. The rate will be adjusted according to actual material used. 160 CWSE-GRADED PREMIX SURFACING/MIXED SEAL SURFACING

160.1 Scope 160.1.1 This work shall consist of the preparation, laying and compaction of a close-graded premix surfacing material of 20 min thickness composed of graded aggregates premixed with a bituminous binder on a previously prepared surface, in accordance with the requirements of these Specifications, to serve as a wearing course. 160.1.2 Close graded premix surfacing shall be of Type A or Type B as specified in the Contract documents. 160.2 Materials 160.2.1 160.2.2 Binder: The provisions of Clause 511.1.2.1 shall apply. Coarse aggregates : The provisions of Clause 511.1.2.2 shall apply.

160.2.3 Fine aggregates : The fine aggregates shall consist of crushed rock quarry sands, natural gravel / sand or a mixture of both. These shall be clean, hard, durable, un-coated, mineral particles, dry and free from injurious, soft or flaky particles and organic or deleterious substances. 160.2.4 Aggregate gradation: The coarse and fine aggregates shall be so graded or combined as to conform to one or the other gradings shown in Table 500-26, as specified in the contract.
TABLE 500-26. AGGREGATE GRADATION IS Sieve Designation (mm) 13.2 nun Cumulative per cent by weight of -total aggre rate passing Type A Type B 100

Base and Surface Courses (Bituminous)


11.2 mm 5.6 nun 2.8 mm 6.090 mm 100 52-88 14-38 88-100 31-52 5-25 0-5 0-5

Section 500

160.2.5 Proportioning of materials: The total quantity of aggregates used for Type A or B close-graded premix surfacing shall be 0.27 cubic metre per 10 square metre area. The quantity of binder used for premixing in terms of straight-run bitumen shall be 22.0 kg and 19.0 kg per 10 square metre area for Type A and Type B surfacing respectively. 160.3 Construction Operations The provisions of Clause 511.1.3.1 through 511.1.3.5 shall apply. 160.4 Opening to Traffic Traffic may be allowed after completion of the final rolling when the mix has cooled down to the surrounding temperature. Excessive traffic speeds should not be permitted. 160.5 Surface Finish and Quality Control of Work The surface finish of construction shall conform to the requirements of Clause 902. For control on the quality of materials supplied and the works carried out, the relevant provisions of Section 900 shall apply. 160.6 Arrangements for Traffic During the period of construction, arrangements for traffic shall be in accordance with the provisions of Clause 112. 160.7 Measurements for Payment Close-graded premix surfacing, Type A or B shall be measured as finished work, for the area specified to be covered, in square metres at a specified thickness. The area will be the net area covered, and all allowances for wastage and cutting ofjoints shall be deemed to be included in the rate. 160.8 Rate The contract unit rate for close-graded premix surfacing, Type A or B shall be payment in full for carrying out the required operations including full compensation for all components listed in Clause 501.8.8.2. (i) to (xi). 161 161.1 Scope 161.1.1 This w6rk shall consist of the application of a seal coat for sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall (camber). 161.1.2 Seal coat shall be of either of the two types specified below:
(A) Liquid seal coat comprising ofan application ofa layer ofbiturninous binder followed I by a cover ofstone chips.

SEAL COAT

Base and Surface Courses (Bituminous)

Section 500

(B) Premixed seal coat comprising ofa thin application offine aggregate premixed with bituminous binder.

161.2 Materials 161.2.1 Binder: The requirements of Clauses 511.1.2.1 and 511.2.2.1 shall apply.

The quantity of bitumen per 10 square metres, shall be 9.8 kg for Type A, and 6.8 kg for Type 13 seal coat. Where bituminous emulsion is used as a binder the quantities for Type A and Type B seal coats shall be 15 Kg and 10.5 Kg respectively. 161.2.2 Stone chips for Type A seal coat : The stone chips shall consist of angular fragments of clean, hard, tough and durable rock of uniform quality throughout. They should be free of soft or disintegrated stone, organic or other deleterious matter. Stone chips shall be of 6,7mm size defined as 100 per cent passing through 11.2 mm sieve and retained on 2.36 mm sieve. The quantity used for spreading shall be 0.09 cubic metre per 10 square metre area. The chips shall satisfy the quality requirements in Table 500-3 except that the upper limit for water absorption value shall be I per cent. 161.2.3 Aggregate for Type B seal coat : The aggregate shall be sand or grit and shall consist of clean, hard, durable, uncoated dry particles and shall be free from dust, soft or flaky / elongated material, organic matter or other deleterious substances. The aggregate shall pass 2.36mm sieve and be retained on 180 micron sieve. The quantity used for prermixing shall be 0.06 cubic, metres per 10 square metres area. 161.3 Construction Operations 161.3.1 Weather and seasonal limitations: The requirements of Clause 501.5.1 shall apply. 161.3.2 Preparation of surface : The seal coat shall be applied immediately after laying the bituminous course which is required to be sealed. Before application of seal coat materials, the surface shall be cleaned free of any dust or other extraneous matter. 161.3.3 Construction of Type A seal coat: Bitumen shall be heated to 150'C163'C and sprayed at the rate specified on the dry surface in a uniform manner with a self-propelled mechanical sprayer as described in the Manual for Construction and Supervision of Bituminous Works. Immediately after the application of binder, stone chips, which shall be clean and dry, shall be spread uniformly at the rate specified on the surface preferably by means of a self-propelled or towed mechanical grit spreader so as to cover the surface completely. If necessary, the surface shall be brushed to ensure uniform spread of chips. Immediately after the application of the cover material, the entire surface shall be rolled with a 8 - 10 tonne smooth wheeled steel roller, 8 - 10 tonne,static weight vibratory roller, or other equipment approved by the Engineer after laying trials if required. Rolling shall

Base and Surface Courses (Bituminous)

Section 500

commence at the edges and progress towards the centre except in superelevated and unidirectional cambered portions Where it shall proceed from the lower edge to the higher edge. Each pass of the roller shall uniformly overlap not less than one-third of the track made in the preceding pass. While rolling is in progress, additional chips shall be spread by hand in necessary quantities required to make up irregularities. Rolling shall continue until all aggregate particlesare firmly embedded in the binder and present a uniform closed surface. 161.3.4 Construction of Type B seal coat: A mixer of appropriate capacity and type approved by the Engineer shall be used for preparation of the mixed material. The plant shall have separate dryer arrangements for heating aggregate. The binder shall be heated in boilers of suitable design, approved by the Engineer to the temperature appropriate to the grade of bitumen or as directed by the Engineer. The aggregates shall be dry and suitably heated to a temperature between 150'C and 165'C or as directed by the Engineer before these components are placed in the mixer. Mixing of binder with aggregates to the specified proportions shall be continued untill the latter are thoroughly coated with the former. The mix shall be immediately transported from the mixing plant to the point of use and spread uniformly on the bituminous surface to be scaled. As soon as a sufficient length has been covered with the premixed material, the surface shall be rolled with an 8-10 tonne smooth-wheeled roller. Rolling shall be continued until the premixed material completely seals the voids in the bituminous course and a smooth uniform surface is obtained. 161.4 Opening to Traffic In the case of Type B seal coat, traffic may be allowed soon after final rolli ng when the premixed material has cooled down to the surrounding temperature. In the case of Type A seal coat, traffic shall not be permitted to run on any newly sealed area until the following day. In special circumstances, however, the Engineer may open the road to traffic immediately after rolling, but in such cases traffic speed shall be rigorously limited to 16 km per hour until the following day. 161.5 Surface Finish and Quality Control of Work The surface finish of construction shall.conform to the requirements of Clause 902. For control on the quality of materials supplied and the works carried out, the relevant provisions of Section 900 shall apply. 161.6 Arrangements for Traffic During the period of construction, arrangements for traffic shall be made in accordance with the provisions of Clause 112. 161.7 Measurement for Payment

Base and Surface Courses (Bituminous)

Section 500

Seal coat, Type A or B shall be measured as finished work, over the area specified to be covered, in square metres at the thickness specified in the Contract. 161.8 Rate The contract unit rate for seal coat Type A or B shall be payment in full for carrying out the required operations including full compensation for all components listed in Clause 501.8.8.2. (i) to (xi). 162 SUPPLY OF STONE AGGREGATES FOR PAVEMENT COURSES

162.1 Scope This Specification Clause shall apply to the supply of stone aggregates only. The work shall consist only of collection, transportation and stacking the stone aggregates and stone filler for subsequent use in pavement courses. The actual work of laying the pavement courses shall, however, be governed by the individual Specification Clause for the actual work, given elsewhere in this Specification. The size and quantities of the aggregates to be supplied shall be so selected by the Engineer that the grading requirements set forth in the individual Specification Clauses for the pavement courses, for which the supply is intended, are satisfied. All the materials shall be procured from approved sources and shall conform to the physical requirements, specified in the respective Specification Clauses for the individual items given elsewhere in this Specification. 162.2 Sizes of Stone Aggregates The stone aggregates shall be designated by their standard sizes in the Contract and shall conform to the requirements shown in Table 50027.
TABLE 500-27. SIZE REQUIREMENTS FOR COARSE STONE AGGREGATES S.No. Nominal size of aggregate Designation of sieve through which the aggregates shall wholly pass (i) (ii) (iii) (iv) (V) (A) (Vii) (Viii) 75 mm 63 mm 45 mrn 26.5 mm 22.4 mm 13.2 mm 11.2 mm 6.7 mm 106 mm 90 mm 53 mm 45 mm 26.5 mm 22.4 mm 13.2 mm 11.2 mm 63 mrn 53 mm 26.5 mm 22.4 mm 13.2 mm 11.2 mm 6.7 mm 2.8 mm Designation of sieve on which the aggregates shall be wholly retained

Base and Surface Courses (Bituminous) 162.3 Stacking 1. Coarse Aggregates:

Section 500

Only the aggregates satisfying the Specification requirements shall be conveyed to the roadside and stacked. Each size of aggregate shall be stacked separately. Likewise, materials obtained from different quarry sources shall be stacked separately and in such a manner that there is no contamination of one source with another.. 2. Fine Aggregate, As stated in the individual relevant Specification Clauses. The aggregates shall be stacked entirely clear of the roadway on even clear hard ground, or on a platform prepared.in advance for the purpose by the Contractor at his own cost and in a manner that allows correct and ready measurement. If the stockpile is placed on.ground where the scraping action of the loader can contaminate the material with underlying soil, then the stockpile shall be rejected by the Engineer. Materials shall not be stacked in locations liable to inundation or flooding. The dimensidns of the stockpiles and their location shall be approved by the Engineer. Where the material is improperly stacked, the Engineer shall direct complete re-stacking of the materials in an approved manner at the Contractor's cost. Stone filler shall be supplied in a dry state in bags or other suitable containers approved by the Engineer and shall be protected from the environment, so as to prevent deterioration in quality. 162.4 Quality Control of Materials The Engineer shall, exercise control over the quality of the materials so as to ascertain their conformity with the Specification requirements, by carrying out tests for the specified properties. Testing shall be to the following frequencies and the Engineer may, at his discretion, direct these to be modified according to requirements: Coarse and fine: One test for each specified property per 50 in' of stone aggregates. Stone filler: One test for each specified property for every five tonnes, subject to a minimum of one test for each consignment. Materials shall only be brought to site from a previously tested and approved source, and any materials not conforming to the requirements of the Specification shall be rejected by the Engineer and removed from the work site. 162.5 Measurement for Payment Coarse and fine aggregates supplied to the site shall be paid for in cubic metres. The actual volume of the aggregates to be paid for shall be computed after deducting the specified percentages in Table 500-28, from the volume computed by stack measurements, to allow for bulking. Unless otherwise directed by the Engineer, measurements shall not be taken until sufficient materials for use on the road have been collected and stacked. Immediately

Base and Surface Courses (Bituminous)

Section 500

after measurement, the stacks shall be marked by white wash or other means as directed by the Engineer. Stone filler as delivered to the site shall be measured in tonnes.
TABLE 500-28. PER CENT REDUCTION IN VOLUME OF AGGREGATES S.No. Standard size of aggregates Percentage reduction in volume

computed by stock measurements to

arrive at the volume to be paid for 1 2. 4. 75 min and 63 mm 45 min and 26.5 mm Fine aggregate 5.0 12.5 10.0 5.0

22.4 mm, 13.2 mm, 11.2 mm and 6.7 mm

162.6 Rates The contract unit rates for different sizes of coarse aggregate, fine aggregate and stone filler shall be payment in full for collecting, conveying and stacking or storing at the site including full compensation for:
(i) (ii) (iii) all royalties, fees, rents where necessary; all leads and lifts; and all labour, tools, equipment and incidentals to comple!e the work to the Specifications.

(iv) all necessary testing of material, both initial, to approve the source, and regular control testing thereafter.

163 163.1 Scope

MASTIC ASPHALT

This work shall consist of constructing a single layer of mastic asphalt wearing course for road pavements and bridge decks. Mastic asphalt is an intimate homogeneous mixture o s ect -we -graded aggregates, filler and bitumen in such proportions as to yield a plastic and voidless mass, which when applied hot can be trowelled and floated to form a very dense impermeable surfacing. 163.2 Materials 163.2.1 Binder: Subject to the approval of the Engineer, the binder shall be a paving grade bitumen meeting the requirements given in Table 500-29. Coarse aggregate : The coarse aggregate shall consist of crushed stone, crushed gravel/shingle or other stones. They shall be clean., hard, durable, of fairly cubical shape, uncoated and free from soft, organic or other deleterious substances. They shall satisfy the physical requirements given in Table 500-3.
TABLE 500-29. REQUIREMENTS FOR PHYSICAL PROPERTIES OF BINDER

Base and Surface Courses (Bituminous)


Property ,Penetration at 25'C Softening point, 'C Loss on heating for 5h at 163'C, % by mass Solubility in trichloroethylene, % by mass Ash (mineral matter), % by mass Max. Test method Requirement

Section 500

IS1203 15 5* IS 1205 65 10 Max. Min. IS1212 2.0 IS 1216 95

IS 1217 1.0

* In cold climatic regions (temperature <I O'~), a softer peretration grade of 30/40 may be used.

The percentage and grading of ~the coarse aggregate to be incorporated in the mastic asphalt depending uppn the thickness of the finished course shall be as specified in Table 500-30.
TABLE 500-30. GRADE AND THICKNESS OF MASTIC ASPHALT PAVING, AND GRADING OF COARSE AGGREGATE Application range (mm) aggregate (mm) Roads and carriageways Heavily stressed areas i.e. junctions and toll plazas Nontinal size of coarse aggregate IS Sieve (mm) 19 13.2 2.36 100 88-96 0-5 13mm Cumulative % passing by weight Thickness Nominal size Coarse aggregate

of coarse of total mix

content, % by mass

25-50 40-50 I

13 13 I

40 10 45 10 I

Fine aggregate : The fine aggregate shall be the fraction passing the 2.36 mm, and retained on the 0.075 mm sieve consisting of crusher screening, natural sand or a mixture of both. These shall be clean, hard, durable, uncoated, dry and free from soft or flaky pieces and organic or other deleterious substances. Filler : The filler shall be limestone powder passing the 0.075 inm sieve And shall have a calcium carbonate content of not less than 80 percent by weight when determined in accordance with IS: 1514. The grading of the fine aggregate inclusive of filler shall be as given in Table 500-3 1.
TABLE 500-31. GRADING OF FINE AGGREGATE (INCLUSIVE OF FILLER) IS. Sieve Percentage by weight of aggregate 0-25 10-30 10-30

Passing 2.36 mm but retained on 0.600 mm Passing 0.600 mm but retained on 0.212 mm Passing 0.212 mm but retained on 0.075 mm

Base and Surface Courses (Bituminous)


Passing 0.075 30-55

Section 500

163.3 Mix Design 163.3.1 Hardness number: The mastic asphalt shall have a hardness number at the time of manufacture of 60 to 80 at 25*C prior to the addition of coarse aggregate and 10 to 20 at 250C at the time of laying after the addition of coarse aggregate. The hardness number shall be determined in accordance with the method specified in IS: 1195-1978. 163.3.2 Binder content : The binder content shall be so fixed as to achieve the requirements of the mixture specified in Clause 515.3. 1. and shall be in the range of 14 to 17 per cent by weight of total mixture as indicated in Table 500-32.
TABLE 500-32. COMPOSITION OF MASTIC ASPHALT BLOCKS WITHOUT COARSE AGGREGATE IS Sieve Percentage by weight of mastic asphalt Minimum Maximum 0 4 8 45 17 22 30 18 Passing 2.36 mm but retained on Q.600 min Passing 0.600 mm but retained on 0.212 mm Passing 0.212 mm but retained on 0.075 mm Passing 0.075 mm Bitumen Content 14 25

163.3.3 Job mix formula : The Contractor shall inform the Engineer in writing at least I month before the start of the work of the job mix formula proposed to be used by him for the work, indicating the source and location of all materials, proportions of all materials such as binder and aggregates, single definite percentage passing each sieve for the mixed aggregate and results of the tests recommended in the various Tables and Clauses of this Specification. 163.4 Construction Operations 163.4.1 Weather and seasonal limitations: The provisions of Clause 501.5. 1 shall apply, except that laying shall not be carried out when the air temperature at the surface on which the Mastic Asphalt is to be laid is below IO'C. 163.4.2 Preparation of the base: The base on which mastic asphalt is to be laid shall be prepared, shaped and conditioned to the profile required, in accordance with Clause 501 or 902 as appropriate or as directed by the Engineer. In the case of a cement concrete base, the surface shall be

Base and Surface Courses (Bituminous)

Section 500

thoroughly power brushed clean and free of dust and other deleterious matter. Under no circumstances shall mastic asphalt be spread on a base containing a binder which might soften under high application temperatures. If such material exi sts, the same shall be cut out and repaired before the mastic asphalt is laid. 163.4.3 Tack coat: A tack coat in accordance with Clause 503 shall be applied on the base or as directed by the Engineer. 163.4.4 Preparation of mastic asphalt: Penetration of mastic asphalt consists of two stages. The first stage shall be mixing of filler and fine aggregates and then heating the mixture to a temperature of 170'C to 2 1 O'C. Required quantity of bitumen shall be heated to 170'C to 1800C and added to the heated aggregated. They shall be mixed and cooked in an approved type of mechanically agitated mastic cooker for some time till the materials are thoroughly mixed. Initially the filler alone is to be heated in the cooker for an hour and then half the quantity of binder is added. After heating and mixing for some time, the fine aggregates and the balance of binder are to be added and further cooked for about one hour. The second stage is incorporation of coarse aggregates and cooking the mixture for a total period of 3 hours. During cooking and mixing, care shall be taken to ensure that the contents in the cooker are at no time heated to a temperature exceeding 2 1 OOC. Where the material is not required for immediate use it shall be cast into blocks consisting of filler, fine aggregates and binder, but without the addition of coarse aggregate, weighing about 25 Kgs each. Before use, these blocks shall be reheated to a temperature of not less than 175C and not more than 2100C, thoroughly incorporated with the requisite quantity of coarse aggregates and mixed continuously. Mixing shall be continued until laying operations are completed so as to maintain the coarse aggregates in suspension. At no stage during the process of mixing shall the temperature exceed 2100C. The mastic asphalt blocks (without coarse aggregate) shall show on analysis a composition within the limits as given in Table 500-32. The mixture shill be transported to the laying site in a towed mixer transporter having arrangement for stirring and keeping the. mixture hot during transportation. 163.4.5 Spreading : The mastic asphalt shall be laid, normally in one coat, at atemperature between 175T and2lO*C and spread uniformly by hand using wooden floats or by machine on the prepared and regulated surface. The thickness of the mastic asphalt and the percentage of added coarse aggregate shall be in accordance with Table 500-30 or as specified by the Engineer. Where necessary, battens of the requisite dimensions should be employed. Any blow holes that appear in the surface shall be punctured while the material is hot, and the surface made good by further floating. 163.4.6 Joints : All construction joints shall be properly and truly made. These joints shall be made by warming existing mastic asphalt by the application of

Base and Surface Courses (Bituminous)

Section 500

an excess quantity of the hot mastic asphalt mixture which afterwards shall be trimmed to leave itflush with the surfaces on either side. 163.4.7 Surface finish : The mastic asphalt surface can have poor skid resistance after floating; in order to provide resistance to skidding, the mastic asphalt after spreading, while still hot and in a plastic condition, shall be covered with a layer of stone aggregate. This aggregate shall be 13.2 mm size (passing the 19.0 mm sieve and retained on the'9.5 nim sieve) or 9.5mm size (passing the 13.2 min sieve and retained on the 6.7 mm. sieve) subject to the approval of the Engineer. Hard stone chips, complying with the quality requirements of Table 500-17, shall be precoated with bitumen at the rate of 2 0.4% of S-65 penetration grade. The addition of 2% of filler complying with Table 500-9 may be required to enable this quantity of binder to be held without draining. The chips shall then be applied at the rate of 0.005 cu. m. per 10 sq. m. and rolled or otherwise pressed into the surface of the mastic layer when the temperature of the mastic asphalt is not less than I 00,'C. 163.5 Opening to Traffic Traffic may be allowed after completion of the work when the mastic asphalt temperature at the mid-depth of the completed layer has cooled to the daytime maximum ambient temperature. 163.6 Surface Finish and Quality Control of Work The surface finish of the completed construction shall conform to the requirements of Clause 902. For control of the quality of materials supplied and the works carried out, the relevant provisions of Section 900 shall apply. The surface of the mastic asphalt, tested with a straight edge 3.Om long, placed parallel to the centre line of the carriageway, shall have no depression greater than 7mm. The same limit shall also apply to the transverse profile when tested with a camber template. 163.7 Arrangements for Traffic During the period of construction, arrangements for traffic shall be made in accordance with the provisions of Clause 112. 163.8 Measurement for Payment Mastic asphalt shall be measured as finished work in square metres at a specified thickness, or by weight in tonnes as stated in the Contract. 163.9 Rate The contract unit rate for mastic asphalt shall be payment in full for carrying out the required operations including full compensation for all components listed under Clause 601.8.8.2. (i) to (ix). 164 164.1 Scope SLURRY SEAL

Base and Surface Courses (Bituminous)

Section 500

Slurry seals are mixtures of fine aggregate, portland cement filler, bitumen emulsion and additional water. When freshly mixed, they have a thick consistency and can be spread to a thickness of 1.5 - 5 nim. They may be used to seal cracks, arrest fretting and fill voids and minor depressions, t6 provide a more even riding surface or a base for further treatment; they may also be used on top of a single coat surface dressing. 164.2 Materials The materials for slurry seal immediately prior to mixing shall conform to the following requirements: 164.2.1 Emulsified bitumen: The emulsified bitumen shall be a cationic rapid setting type as approved by the Engineer, conforming to the requirements of IS: 8987. Where special mobile mixing machines are available, Class A4* rapid setting or Class K3* road emulsions to BS 434: Part I should be used to obtain very early resistance to traffic and rain. Generally, emulsion for slurry seal should be capable of producing a slurry that will develop early resistance to traffic and rain and is sufficiently stable to permit mixing with the specified aggregate, without breaking during the mixing and laying processes. If approved by the Engineer, a slow setting emulsion may be used. Guidance on selection of an appropriate grade of emulsion is given in the Manual for Construction and Supervision of Bituminous Works. 164.2.2 Water: Water shall be of such quality that the bitumen will not separate from the emulsion before the slurry seal is in place. The pH of the water must lie in the range 4 to 7, and if the total dissolved solids in the water amount to more than 500ppm, the Engineer may reject it, or order the Contractor to conduct a trial emulsion mix to demonstrate that it does not cause early separation. 164.2.3 Aggregate: The aggregate shall be crushed rock, or slag and may be blended, if required, with clean, sharp, naturally occurring sand free from soft pieces and organic and other deleterious substances to produce a grading as given in Table 500-33. The aggregates shall meet the requirements of the film stripping test (IS: 624 1), and a suitable amount and type of anti-stripping agent added, as may be needed (details given in Appendix 5). 164.2.4 Additives: It is usual to use ordinary Portland cement, hydrated lime or other additives to control consistency, mix segregation and setting rate. The proportion ofthe additive should not non-nally exceed 2 per cent by weight of dry aggregates. The corresponding grades in IS:8887 are only broadly classified as RS, MS and SS and further sub-classification is not available at present. 164.3 Mixture Design A range of residual binder contents for each aggregate grading is given in Table 500-33. The optimum mixture design for the aggregate, additive, water and bitumen emulsion mixture should be determined in accordance with ASTM D 3910.

Base and Surface Courses (Bituminous) 164.4 Construction Operations 164.4.1

Section 500

Weather and seasonal limitations: Clause 501.5.1 shall apply.


APPROXIMATE COVERAGE

TABLE 500-33. AGGREGATE GRADING, BINDER CONTENT AND RATE Sieve Size (mm) 5 mm~ 9.5 4.75 3.35 2.36 1.18 0.600 0.300 0.150 0.075 Quantity of residual binder, percentage by mass of aggregate Approximate coverage rate (kg/m2) 8-15 4-6 5-15 100 90-100 65-90 45-70 30-50 18-30 10-21

Percentage by mass passing finished thickness of sealing 3mm 100 80-100 100 75-100 95-100 55-90 35-70 20-45 10-25 5-15 70-95 55-75 30-50 10-30 5- 15 12-20 1.5mm

7.5-13.5 10-16

2-4

164.4.2 Surface preparation: Any necessary remedial work to the road surface and structure shall be completed either prior to or as part of the Contract and agreed as acceptable by the Engineer, according to the provisions of Clause 501. Before slurry- seal is applied, street furniture and, where directed by the Engineer, road markings, shall be masked using self-adhesive masking material or other material firmly secured against the passage of the spreader box or the tools used for hand laying. Any packed mud or other deposits on the surface shall be removed, all organic growth shall be removed by suitable means, and the surface shall be swept free of -all loose material. 164.4.3 Tack coat: If required by the Engineer, a tack coat may be applied prior to the slurry seal, with or without grit or chips, in order to seal the existing substrata and enhance the bond to the existing road surface. Unless otherwise agreed by the Engineer, the rate of spread of tack coat shall be 0. 15 to 0.30 litres/nil for bituminous surfaces and 0.4 to 0.6 litres/m~ for concrete surfaces 164.4.4 Mixing and transportation of mixture: Mixing (and laying) techniques vary according to the type of emulsion used. For class A4 rapid setting and K3 emulsions, only special mobile mixing machines should be used. These carry

Base and Surface Courses (Bituminous)

Section 500

supplies of aggregate, emulsion, water and filler (e.g. ordinary Portland cement or hydrated lime) and are fitted with metering devices to feed the ingredients in their correct proportions to a mixer fitted to the rear of the machine. From the mixer the slurry is fed into the screed box towed by the machine. For all other emulsions, mixing may be by hand, concrete mixer or other mixer which effectively coats the aggregate uniformly and produces a slurry seal of suitable consistency for satisfactory laying. For large areas, a bulk transit concrete mixer may be used into which the ingredients (including water) are measured and mixed as the mixer travels to the area to be treated. A screed box fitted with an adjustable rubber screed should be towed by the mixer which feeds it during laying. The special mobile mixing machine, when used, shall be capable of uniform application to provide a continuous surface without ridges or segregation. Before laying begins, the Contractor shall provide the Engineer with a test certificate showing test results for rate of application carried out under the supervision of a competent authority, demonstrating that the machine has been tested, using the system to be used in the Contract, not more than six weeks before the commencement of the work. Where the material is to be hand laid, the slurry may be supplied to site pre-mixed in suitable containers and steps shall be taken to ensure that the material in each container is of an even consistency throughout the container immediately prior to use. 164.4.5 Application: Transverse joints for machine laid areas shall be formed with spreading, starting and finishing on a protective strip not less than 100 mm wide at each end of the lane length being treated. Transverse joints shall be formed such that there shall be no ridges or bare strips. Unless otherwise approved by the Engineer, longitudinal joints shall coincide with lane markings. Longitudinal joints shall be formed such that there shall be no ridges or bare strips. Hand work around street furniture and other obstructions should meet the same performance requirements and form a homogeneous surface with the rest of the treated carriageway. Footways and other confined areas may be spread by hand using squeegees and brooms. Transverse joints shall be formed with spreading, starting and finishing on a protective strip not less than 100 mm wide at each end of the lane length being treated. TransverseJoints shall be formed such that there shall be no ridges or bare strips. Kerb edges and other areas not being treated shall be suitably masked with self adhesive masking material. Footways shall be finished by dragging a dampened broom transversely over the footway under its own weight. All voids, cracks and surface irregularities shall be completely filled. In-warm dry weather the surface, immediately ahead of the spreading, shall be slightly damped by mist water

Base and Surface Courses (Bituminous)

Section 500

spray applied mechanically, or for hand laying by a hand operated pressure sprayer, unless otherwise approved by the Engineer. 164.4.6 Rolling: The need for rolling shall be as instructed by the Engineer. Where rolling is required, a pneumatic-tyred roller having an individual wheel load between 0.75 and 1.5 tormes shall be used, or as may be directed by the Engineer. Rolling shall commence as soon as the slurry has set sufficiently to ensure that rutting or excessive movement will not occur. 164.5 Opening to Traffic Masking shall be removed after the slurry seat has been applied, without damage to the edge of the surfacing, and before opening the road or footway to traffic. The Contractor shall remove surplus aggregate from the treated areas using a method agreed by the Engineer. The Contractor shall monitor the slurry seal closely for a minimum period of 2 hours and if necessary the lane shall be swept again. The monitoring shall continue until the slurry seal has reached sufficient stability to carry unrestricted traffic. If there are signs of distress, the Engineer shall require the Contractor to reinstate traffic safety and management procedures or other such remedial action where necessary im order to prevent further damage. Further operations to remove subsequently loosened aggregate shall be carried out over the next 48 hours. The areas treated and adjacent side roads, footways and paved areas shall be kept substantially free of loose aggregate for a period of 30 days after completion of the work. 164.6 Surface Finish and Quality Control of Work Generally, the surface finish of the completed construction shall conform to the requirements of Clause 902. For control of the quality of materials supplied and the works carried out, the relevant provisions of Section 900 shall apply. In addition, the finished slurry shall have a uniform surface texture throughout the work, without variations of texture within the lane width, or from lane to lane, due to segregation of aggregates,,or due to variations in the emulsion/water content of the mixture. The finished surface shall be free from blow holes and surface irregularities in excess of 3 mm beneath a I metre straight edge due to scraping, scabbing, dragging, droppings, excess overlapping or badly aligned longitudinal or transverse joints, damage by rain or frost, or other defects which remain 24 hours after laying. 164.7 Arrangements for Traffic During the period of construction, arrangements for traffic shall be made in accordance with the provisions of Clause 112. 164.8 Measurement for Payment Slurry seal shall be measured as finished work as specified, in square metres. 164.9 Rate

Base and Surface Courses (Bituminous)

Section 500

The contract unit rate for slurry seal shall be payment in full for carrying out the required operations including full compensation for all components listed in Clause 501.8.8.2. (1) to (xi). 165 165.1 Scope This Clause of the Specifications covers the recycling of existing bituminous pavement materials to upgrade an existing bituminous pavement which has served its first-intended purpose. The work shall be performed on such widths and lengths as may be directed by the Engineer and may consist of pavement removal, stockpiling of materials from the old pavement, addition of new bitumen and untreated aggregate in the requisite proportions, mixing, spreading and compaction of the blended materials. Recycling processes can be categorised into in-situ recycling (where processing takes place on site), and central plant recycling (where reclaimed material is processed off site). The processes can be further sub-divided into hot and cold processes. This Specification covers the hot process only. However, reclaimed aggregate from cold insitu recycling can be used in the Bituminous Cold Mix process specified in Clause 519, subject to the resultant mixes achieving the specified standards. 165.2 Reclaimed Bituminous Materials for Ce~tral Plant' Recycling 165.2.1 Proportion of reclaimed materials less than 10 per cent: If not more than 10% of reclaimed bituminous material is to be used in the production of bituminous macadam or dense graded bituminous base or binder course material, then Clauses 517.2.2 to 517.2.9 do not apply. However:
a) all reclaimed bituminous material shall be pre-treated before use such that the material is homogeneously mixed and the maximum particle size of reclaimed material does not exceed 40 mm. b) the mixed material shall comply with the requirements of Clauses 504 or 507 as appropriate.

RECYCLING OF BITUMINOUS PAVEMENT

165.2.2 Proportions of reclaimed materials greater than 10 per cent: Reclaimed bituminous material of an amount greater than 10 per cent, may be used in the production of bituminous macadam and dense graded bituminous base and binder course material, subject to the requirements of Clauses 517.2.3 to 517.2.9 and subject to the satisfactory completion of full trial investigations in respect of all related materials, layer thickness, machine operations and finished works on a case-by-case basis entirely at the contractors cost and subject to the approval of the Engineer. For estimating purposes, a maximum amount not greater than 30 per cent reclaimed bituminous material should be assumed. 165.2.3 Materials for recycled pavement: The recycled materials shall be a blend of reclaimed and new materials proportioned to achieve a paving mixture with the specified engineering properties. The reclaimed materials shall be tested and evaluated to find the optimum blend meeting the mixture requirements. Such testing and evaluation shall be carried out on representative samples,

Base and Surface Courses (Bituminous)

Section 500

either cores sampled from the carriageway or . samples taken from stockpiles in accordance with current practice. The sampling frequency should be sufficient to determine how consistent the reclaimed material is and to provide representative samples for composition analysis and measurement of properties of recovered binder. As an absolute minimum, one sample to represent 500m of lane carriageway shall be taken. 165.2.4 Bitumen extraction : The procedure described in ASTM D-2172 shall be used to quantitatively separate aggregate and bitumen from any representative sample of reclaimed bituminous pavement. 165.2.5 Aggregate evaluation: Mechanical sieve analysis (IS: 2386, Part 1, wet sieving method) shall be performed on the aggregate portion of the reclaimed bituminous pavement sample to determine the grading. It is essential that the reclaimed materials to be recycled are consistent, as variable materials will cause problems with the control of quality and impede the efficiency of the recycling operation. Suitable sources of consistent material of sufficient quantity for the scheme being considered need-to be identified either in existing pavements, from stockpiled planings of known origin or from another suitable source, before a decision can be made on the optimum percentage of reclaimed material. After selecting the proportion of reclaimed materials to be recycled, the grading of the mixture may need adjustment, to meet Specification requirements, by the addition of selected aggregate sizes. 165.2.6 Evaluation of bitumen : When the amount of reclaimed bituminous materials to be used in the mixture exceeds 10%, the penetration value of the recovered binder from the reclaimed bituminous material, before mixing, shall exceed 15 pen, after recovery of binder in accordance with the requirements of BS 2000 : Part 397, when tested in accordance with IS : 1203. Provided the above requirement is met, hardening of the old binder, during the original mixing process or through ageing, can be compensated for by adding a softer bitumen, to obtain the appropriate final grade of binder. The determination of the type and amount of binder required to be added in the final mix is essentially a trial and error procedure. After mixing with recycled materials, the binder recovered from the mixture shall have a recovered penetration value not less than the value specified in Table 500-34.
TABLE 500-34. MINIMUM RECOVERED BINDER PENETRATION OF RECYCLED MIXTURE Minimum Recovered Penetration Value of Binder after Mixing 27 39 54

Speciried Grade of Binder (Penetration) 45 65 90

Base and Surface Courses (Bituminous)

Section 500

165.2.7 Rejuvenators: The use of rejuvenators, and a test to measure their effectiveness, is described in Clause 517.6.3. 165.2.8 Untreated aggregate : If necessary, fresh untreated aggregate shall be added to the reclaimed bituminous pavement to produce a mix with the desired grading. The aggregate shall be checked for quality requirements in accordance with Table 500-3 or Table 500-8 as appropriate. Reclaimed aggregate, if any, or any aggregate normally used for the desired bituminous mixture, or both, may be used for this purpose. 165.2.9 Combined aggregate grading : The blend of reclaimed and new aggregate shall meet the grading criteria specified in the relevant parts of Clause 504 or 507, as appropriate and as approved by the Engineer. The blend of aggregates shall be checked for resistance to stripping as specified in Tables 500-3 or 500-8 as appropriate. 165.3 Mixture Design The combined aggregate grading and binder content shall comply with the relevant tables in Clauses 504 or 507. For dense graded bituminous mixtures the mixture design shall also comply with the requirements of Table 500-11. 165.4 Reclaiming Old Pavement Materials The removal of pavement materials to the required depth shall be accomplished either at ambient temperature (cold process) or at an elevated temperature (hot process), as approved by the Engineer. 165.4.1 Cold removal process: In the cold process, the ripping and crushing operations shall be carried out using scati fiers, grid rollers, or rippers or by any other means as directed by the Engineer. The removed materials shall be loaded and hauled for crushing to the required size as directed by the Engineer. Alternatively, cold milling or planing machines can be used to reclaim bituminous pavement to controlled depths. After the bituminous layers are removed, any remaining aggregate materials that are to be incorporated in the recycled hot mixture shall be scarified and remove . en t e pavement materia remova s completed, any drainage deficiencies shall be corrected. After that, the base/sub-base as the case may be shall be cut, graded and compacted to the required profile and density. 165.4.2 Hot removal process: In this process, the road surface shall be heated, by any suitable means approved by the Engineer, before scarification. A self propelled plant shall be used, and a milling drum that follows the planer removes the heated soft bituminous layer. The depth, width and speed of travel shall be adjusted to suit specific requirements as directed by the Engineer. During the heating process, the surface temperature of the road shall not exceed 200'C for more than 5 minutes.

Base and Surface Courses (Bituminous)

Section 500

165.4.3 Stockpiling : In the cold process, the reclaimed bituminous pavement material shall be stockpiled with the height of stockpiles not exceeding 3 n,. The reclaimed untreated aggregate base/sub-base material shall be stockpiled in the same manner as new aggregate. The number and location of stockpiles shall be carefully planned for efficient operation of the hot-mix plant. 165.5 Mixing and Laying Generally, the requirements of Clauses 504.3 or 507.4, as appropriate, shall apply. 165.6 In Situ Recycling - The Remix and Repave Processes These processes are suitable for the production of bituminous concrete wearing course in accordance with the provisions of Clause 509. 165.6.1 Scope: In the process of repaving, the existing surface is preheated and scarified but the scarified material is not removed. A layer of fresh bituminous mix material prepared in the integrated mixing unit of the plant is then spread evenly on the scarified surface to give a uniform profile. The spread material should be compacted as soon as possible after laying. In the process the total thickness of the pavement is increased by up to 50mm. In the remix process, the scarified material should be taken from the mixing unit of the plant where it is recycled with fresh binder, aggregate and recycling agent. Then the recycled mixture is spread on the preheated surface and tamped and compacted to the required profile. 165.6.2 Heating and scarifying: Surfaces to be treated shall be heated by plant with surfaces insulated and fully enclosed. The heated width of surfacing shall exceed the scarified width by at least 75 min. on each side, except against the edge of the carriageway or kerb face. When new surfacing material is spilled onto the road surface it shall be removed before the existing surface is heated and scarified. Areas of unscarified material shall not exceed 50 mm x 50 mm. The depth of scarification shall be such that the bottom of the scarified layer is parallel to and below the finished road surface level by the thickness of wearing course material specified. A tolerance of 6 mm is permissible Where street furniture and other obstructions occur, these shall be suitably protected or removed and the void'covered. Surface dressing and large areas of road markings shall be removed by milling, planing, scarifying or by similar approved processes. The heated surface shall be evenly scarified to comply with the requirements of this Clause. When street furniture is left in place or raised, the adjacent areas shall be scarified by other means, with the material either left in place or removed, prior to passage of the machine. If furniture needs to be repositioned on completion of work, the new wearing course material shall be used to make good the road surface for a maximum width of 200 min. around the obstruction.

Base and Surface Courses (Bituminous)

Section 500

During the reheating process the surface temperature of the road shall not exceed 200'C for more than 5 minutes. 165.6.3 Rejuvenator: For Remix, when required, rejuvenator shall be uniformly sprayed across the full-width of the processed material. The machine shall incorporate a meter for continuous verification of quantities which shall be within 5% of the specified rate. The volume of rejuvenator shall vary in relation to the operating speed of the machine, which shall be related to the volume of material mixed or scarified. The rejuvenator shall be a non-emulsified aromatic extract. Its properties shall be verified using the Rolling Thin Film Oven Test. Rejuvenation of the existing pavement may also be performed by adding new hot-mix bituminous material containing a soft binder of suitable penetration for restoring the binder in the existing pavement to the required penetration. 165.6.4 Mixing: When required, new hot-mix material shall be mixed with the heated and scarified road pavement material in a pugmill within the Remix machine, observing the mixing temperatures specified in Table 500-5. After-mixing, the recycled bituminous materials shall be automatically fed to a finishing unit, which spreads and levels the mixture to the specified thickness and cross-section. The new bituminous concrete wearing course shall be material complying with Clause 509. 165.6.5 Additional material (general): The proportion of new hotmix bituminous material, and the proportion of existing bituminous pavement material shall be as directed by the Engineer, together with the amount the road surface level is to be raised (if any). The type and quantity of the new hot-mix material shall be determined by using the Marshall Mix Design procedure specified in The Asphalt Institute Manual MS-2, before work commences. Remix designs shall incorporate the stated proportion of material sampled from the existing road surface. When additional coarse or fine aggregate or filler are required to be added, they shall comply with the requirements of Clause 509.2. The amount of additional coarse or fine aggregate or filler to be added to the existing bituminous pavement material shall be notified to the Engineer. 165.6.6 Additional aggregate (remix process): The coarse aggregate, fine aggregate and filler added to the Remixed material shall comply with the requirements of Clause 509.2. 165.6.7 New surfacing (repave and rernix/repave processes): New surfacing material shall be bituminous concrete wearing course complying with Clause 509, or other wearing course material approved by the Engineer. The new surfacing material shall be laid on, and compacted with, the reprofiled surfacing, which shall be at a temperature within the range of IOOOC to 1500C. 165.6.8 Binder: The binder shall be recovered from samples taken from each

Base and Surface Courses (Bituminous)

Section 500

layer of material laid. The method of recovery shall be in accordance with BS 2000: Part 397 or an equivalent test. The penetration of the binder shall be in the range 35-70 pen. 165.6.9 Mixture design: The surfacing material shall be sampled from the paver hopper or augers. Care shall be taken that only the material forming the new surface layer is sampled. The sample shall be reduced on site by rifling or quartering to approximately 5 kg and placed loose in an air-tight container. The sample shall only be reheated once whilst within the container. As soon as the sample reaches the required temperature, the reheated material shall be remixed and three Marshall test specimens prepared in accordance with the procedures specified in MS-2. The bulk density of each specimen shall be measured before Marshall Stability testing. The mean stability and flow of the three specimens, measured in accordance with the procedures specified in MS-2, shall comply with the requirements of Table 500-19. Finally the 3 Marshall specimens shall be combined and the maximum theoretical specific gravity (G..) of the mixture is determined in accordance with ASTM D 2041. This maximum theoretical specific gravity (G,,,.) corresponds to 0% air voids in the mixture. The actual bulk specific gravity of a Marshall specimen determined in the Laboratory (G.b) will naturally be less than G,,,. The percent air voids (Pa) in the specimen of the compacted'mixture given by p = G_,, - G~,b x, 00 should meet the requirements of air voids laid down in Table 500-19. 165.7 Opening to Traffic For recycled material forming the base or binder course layer, Clause 504.5 or 507.5 shall apply as appropriate. For recycled material forming the wearing course layer, Clause 509.5 shall apply. 165.8 Surface Finish and Quality Control The surface finish of the completed construction shalt conform to the requirements of Clause 902. For control of the quality of materials supplied and the works carried out the-relevant provisions of Section 900 shall apply. 165.9 Arrangements for Traffic During the period of construction, arTangements for traffic shall be made in accordance with the provisions of Clause 112. 165.10 Measurement for Payment The recycled pavement work shall be measured in cubic metres or tonnes of finished work as stated in the Contract.. 165.11 Rate

Base and Surface Courses (Bituminous)

Section 500

The contract unit rate for recycled pavement shall be payment in full for carrying out the required operations including full compensation for all items as Clause 50J.8.8.2. (i) to (xi) 166 166.1 Scope Fog spray is a very light application of low viscosity bitumen emulsion for purposes of sealing cracks less than 3min wide or incipient fretting or disintegration in an existing bituminous surfacing, and to help reduce loosening . of chips by traffic on newly finished surface dressing, 166.2 Material The biturnen emulsion shall be as specified in the Contract or as instructed by the Engineer. The emulsion shall be SS-lh* (SS-1 can be used if the fort-ner is not available) complying with the requirements of ASTM D-977, or, CSS- I h* (CSS- I can be used if the former is not available) complying with the requirements of ASTM D-2397. Before use these emulsions shall be diluted, I part emulsion to I part water. Alternatively, Class A 1 -40* or K 1 -40* emulsions complying with the requirements of BS434:Part 1:1984 may be used. These emulsions have a lower viscosity than the above ASTM grades, they are rapid setting and they do not require to be diluted. Because of their low viscosity they should be used as soon as possible after delivery. If this is not possible, the drums should be very thoroughly rolled before use. 166.3 Weather and Seasonal Limitations Spraying shall not take place when the temperature is below 10'C, nor in windy or dusty conditions, nor when it is raining or the surface to be sprayed is wet (a damp surface is acceptable but refer to Clause 518.4.2.). 166.4 Construction Operations 166.4.1 Equipment: The fog spray shall be applied by means of a self-propelled or towed bitumen pressure sprayer complying with the requirements of the Manual for Construction and Supervision of Bituminous Works. The spray bar should be protected from gusts of wind by means of a hood. 166.4.2 Preparation of surface: The surface on which the fog spray is to be applied shall be thoroughly cleaned with compressed air, scrubbers etc. The cracks shall be cleaned with a pressure air jet to remove all dirt, dust etc. 166.4.3 Application: The fog seal shall be applied at a rate of 0.5 -1.0 litreS/M2, using equipment such as pressure tank, flexible hose and spray bar or lance. 166.5 Blinding If specified in the Contract or ordered by the Engineer, the fog spray shall be blinded with graded grit of 3mm size and under, coated with about 2 per cent of the emulsion by weight. The pre coated grit shall be The grades in IS:8887 are only broadly classified as RS, MS and SS and further sub-classification is not available at present. FOG SPRAY

Base and Surface Courses (Bituminous)

Section 500

allowed to be cured for at least one week or until they become non-sticky and can be spread easily. 166.6 Quality Control of Work For control of the quality of materials supplied and the works carried out, the relevant provisions of Section 900 shall apply. 166.7 Arrangements for Traffic During the spraying operations, arrangements for traffic shall be made in a ccordance with the provisions of Clause 112. The surface should not be opened to traffic for 24 hours after spraying. If pick-up does occur a light blinding of crusher dust or sand should be applied. 166.8 Measurement for Payment Fog spray and blinding (if used) shall be measured in terms of surface area of application, for the area covered, in square metres. 166.9 Rate The contract unit rate for fog spray and blinding (if used) shall be payment in full for carrying out the required operations including full compensation for all components listed in Clause 501.8.8.2. (i) to (xi) as applicable to the work specified in these Specifications. 167 BITUMINOUS COLD MIX (INCLUDING GRAVEL EMULSION))

167.1 The Design Mix Bituminous Cold Mix consists of a mixture of unheated mineral aggregate and emulsified or cutback bitumen. This Specification deals only with plant mix (as opposed to mixed-in-place). Two types of mix are considered, namely Designed Cold Mix and Recipe Cold Mix. The Design Mix procedure shall be used unless the Recipe Mix procedure is specifically approved by the Engineer. This Specification Clause has been introduced for the first time. Difficulties in using this Clause and suggestions for improvement may be forwarded to DG(RD), Ministry of Road Transport & Highways, Transport Bhavan, Parliament Street, New Delhi- I 10 00 1. Fax # 3710236. 167.2 Designed Cold Mix This Specification is based on The.Asphalt Institute Manual MS-1144, which contains additional information for guidance. These mixes are considered suitable for use as base course, appropriate to their stability, in new work or major repair work. 167.2.1 Materials 167.2.1.1 Binder: The binder shall be a bituminous emulsion as specified in AASHTO M 140 (ASTM D977)* or AASHTO M 208 (ASTM D2397)*, namely MS-2, MS-2h, HFMS-2, HFMS-2h, HFMS-2s, SS-1, SS-1h, CMS-2, CMS-2h, CSS-I and CSS-Ih. Alternatively, a cutback bitumen as

Base and Surface Courses (Bituminous)

Section 500

specified in AASHTO M 82 (ASTM D2027) or ASTM D 2026, namely MC 70, 250, 800 & 3000 and SC 250, 800 and 3000 may be used, or, if approved by the Engineer, an equivalent material which conforms with IS:8887 and IS:217. A general guide for the use of these binders is given in Table 500-35 and in the Manual for Construction and Supervision of Bituminous Works. However the final selection shall be made only after laboratory evaluation
TABLE 500-35'. USES OF BITUMEN IN COLD MIX T~pe of Construction Cold-Laid Plant Mix Pavement Base and Surfaces C' .4 e.4 Ell) &n UUUU Open-Graded Aggregate Well-Graded Aggregate Patching, Immediate Use Patching, Stockpile The corresponding grades in IS:8887 are only broadly classified as RS, NIS and SS and further sub-classification is not available at present. N 00 enC~ Emulsified Bitumen Anionic Cutback Bitumen Cationic Medium Slow Curing (MC) Curing (SQ)

with the aggregates to be used. The binder with the highest residual viscosity at ambient temperatures that can reasonably be handled by the mixing and laying equipment proposed shall be used. 167.2.1.2 Aggregates: The aggregates shall comply with the requirements of Clause 504.2.2. and 504.2.3. If the aggregates are not properly coated with anionic emulsion or cutback bitumen, a small amount of hydrated lime, an approved antistripping agent (see Appendix 5) or a change to cationic emulsion shall be proposed by the Contractor, for the approval of the Engineer. 167.2.1.3 Aggregate grading and binder content: The combined aggregate grading for the particular mixture, when tested in accordancc with IS:2386 Part 1, (wet sieving method), shaH fall within the limit~ shown in Table 500-36. 167.2.2 Mixture Design

Base and Surface Courses (Bituminous)

Section 500

167.2.2.1 Requirements for 4he mixture: Apart from conformity with the grading and quality requirements for individual ingredients, the mixture shall meet the requirements set out in Table 500-37. 167.2.2.2 Binder content: The binder content shall be optimised to achieve the requirements of the rnixture set out in Table 500-41. The method adopted shall be that described in Appendix F and H of Asphalt Institute's Manual, MS-14. 167.2.2.3 Job Mix Formula: The Contractor shall inform the Engineer in writing, at least one month before the start of the work, the job mix formula proposed for use in the works and shall give the following details:
(i) Source and location of all materials; (ii) Proportions of all materials expressed as follows where each is applicable: (a) Binder, as percentage by weight of total mixture; (b) Coarse aggregatelfine aggregate as percentage by weight of total aggregate; A single definite percentage passing each sieve for the mixed aggregate; The results of tests enumerated in Table 500-39 as obtained by the Contractor; Test results of the physical characteristics of the aggregates to be used;

(iii) (iv) (v) (vi)

Spraying temperature of binder if appropriate.

While working out the job mix formula, the Contf actor shall ensure that it is based on a correct and truly representative sample of the materials that will actually be used in the work and that the mixture and its different
TABLE 500-36. AGGREGATE GRADING AND BITUMEN CONTENT Nominal maximum size (mm) Allowable thickness (mm) IS Sieve (mm) 37.5 26.5 19.0 13.2 9.5 4.75 2.36 0.30 0.075 Cutback Emulsion 100 60-80 35-65 6-25 2-10 Min 4 to Max 6 Min 7 to Max 10 100 100 Cumulative % by weight of total aggregate passing 100 90-100 56-80 29-59 1945 5-17 1-7 25-35 36-50 51-75 76-100 9.5 13.2 19.0 26.5

90-100 60-80 35-65 20-50 3-20 2-8

90-100 45-70 25-55 5-20 2-9

90-100 -

'Guide to binder content, % by weight of total mixture

'To be determined by the modified Marshall Test. TABLE 500-37. MIX~URE REQUIREMENTS FOR DESIGNED COLD MIX

Base and Surface Courses (Bituminous)

Section 500

Parameter

Emulsion'

Cutback'

Minimum Stability (kN at 22.2*C) Emulsion (kN at 25*C) Cutback 3.3 for paving Percent maximum stability loss on soaking Minimum flow (mm) Compaction level (number of blows) Per cent air voids Per cent minimum coating" Notes 3-55 3-5 SeeTahle500-38 50 Percent voids in mineral aggregate (VMA) 2 2 50 75 503 25 4 2.2 for paving 2.2 for maintenance

'Using "Marshall method for emulsified asphalt-aggregate cold mixture design", Appendix F, MS - 14. 'Using "Marsball method for cut-back asphalt-aggregate cold mixtiire design", Appendix H, MS-14. 3Witb Vacuum saturation and immersion. 4Four days soak at 250C. sRefers to total voids in the mix occupied by air and water. 'Coating Test, Appendix F, MS- 14.

TABLE 500-38. MINIMUM PER CENT VOIDS IN MINERAL AGGREGATE (VMA) Nominal Maximum Particle Size IS Sieve (mm) 9.5 12.5' 19.0 25.0 37.5 16.0 15.0 14.0 13.0 12.0 Minimum VMA (per cent)

Approval of the job mix formula shall be based on independent testing by the Engineer for which samples selected jointly with the Engineer of all ingredients of the mix shall be furnished by the Contractor as required by the former. The approved job mix formula shall remain effective unless and until modified by the Engineer. Should a change in the source of materials be proposed, a new job mix formula shall be established and approved by the Engineer before actually using the materials.

Base and Surface Courses (Bituminous)

Section 500

167.2.2.4 Permissible variation from'the job mix formula : It shall be the responsibility of the Contractor to produce a uniform mix conforming to the approved job mix formula, subject to the permissible variations of the individual percentages of the various ingredients in the actual mix from the job mix formula to be used, within the limits as specified in Table 500-39. These variations are intended to apply to individual specimens taken for quality control tests in accordance with Section 900. 167.2.3 Construction operations 167.2.3.1 Weather end seasonal limitations: Construction with cold mix must not be undertaken when ambient temperatures below I O'C are expected, during rain, in standing water, or generally when poor weather. is predicted. Bitumen emu4sions and cutbacks depend on the evaporation of water and/or solvent for the development of their curing and adhesion characteristics. Cold weather, rain and high humidity slow down the rate of curing. Extra manipulation may be required to remove
TABLE 500-39. PERMISSIBLE VARIATIONS FROM THE JOB MIX FORMULA Description Permissible variation

Baselbinder course Wearing course' Aggregate passing 19mm sieve or larger Aggregate pa ssing 13.2mm, 9.5mm Aggregate passing 4.75mm Aggregate passing 0.3mm, 0. 15mm Aggregate passing 0.075mm Binder content 0.3% 0.3% 2% 6% Aggregate passing 2.36mm, 1. 18mm, 0.6mm 4% 1.5% 3% 7% 5% 5% 4% t8% 6% t7%

167.2.3.2 Preparation of the base: The base on which cold mix is to be laid shall be prepared, shaped and levelled to the required profile in. accordance with Clauses 501 and 902 as appropriate, and a prime coat where specified, shall be applied in accordance with Clause 502 or as directed by the Engineer. 167.2.3.3 Tack coat: A tack coat in accordance with Clause 503 shall be applied over the base on which the cold mix is to be laid where specified in the Contract. 167.2.3.4 Preparation and transportation of the mixture: Mixing -can be carried out using one of the following types of mixer, which is provided with equipment for spraying the binder at a controlled rate and, if necessary, for heating the binder to a temperature at which it can be applied uniformly to the aggregate:

Base and Surface Courses (Bituminous)


(a) rotary drum type concrete mixer; (b) single or twin shaft concrete or macadam mixer; (c) batch or continuous type mixer without dryer or screens other than a scalping screen.

Section 500

A sufficient number of haul trucks with smooth, clean beds should be available to ensure continuous operation of the mixing plant. The type of truck used for transporting the mixture from the mixer to the road site must be suited to the Contractor's nominated laying procedure methodology. 167.2.3.5 Spreading: Designed cold mix shall be placed only when the specified density can be obtained.] hc. mi xture shall not be placed on any wet surface or when weather conditions will otherwise prevent its proper handling or finishing. If spreading by motor grader, the grader must have a blade that is straight and sharp and long enough to ensure finishing to close, straight, transverse tolerances and all joints and linkages must be in good condition. The grader must be heavy enough to hold the blade firmly and uniformly on the surface while spreading the mixture. If climatic conditions and aggregate grading permit evaporation of moisture or volatiles without aeration b~ manipulation, a conventional self-propelled asphalt paver shall be used to place designed cold mix. Other methods of spreading may be used as approved by the Engineer. 167.2.3.6 Compaction: Initial compadion of the laid material shall be carried out using a pneumatic-tyred roller of a weight appropriate to the layer thickness to be compacted with single layer thicknesses being 25-100mi-n and all compaction being in accordance with Clause 501.6 and Clause 501.7. Smooth tyres shall be used. Final rolling and smoothing of the surface should be completed using steel wheel'rollers. The Contractor shall demonstrate at laying trials that his proposed laying and compaction methods can achieve a satisfactory result. 167.2.4 Opening to traffic: Traffic shall not be allowed to run on new work until all the water or volatiles in the mixture have evaporated, as determined by the Engineer. The rate of evaporation will be influenced by the temperature, humidity and wind conditions. 167.2.5 Surface finish and quality control of work: The surface finish of construction shall conform to the requirements of Clause 902. For control of the quality of supplied materials and the works carried out, the relevant provisions of Section 900 shall apply. 167.2.6 Arrangements for traffic: During the period of construction, arrangements for traffic shall be made in accordance with the provisions of Clause 112. 167.2.7 Measurement for payment: Designed Cold Mix shall be inc- -,ured Ps finished work, for the area covered, in cubic metres, by ~wi,-ht in n.atric tonnes, or by square metres at a specified thickness as ~1;,~cified in the Contract.

Base and Surface Courses (Bituminous)

Section 500

167.2.8 Rate : The contract unit rate for Designed Cold Mix shall be payment in full for carrying out the required operations including full compensation for all components listed in Clause 501.8.8.2. (i) to (xi). The rate shall cover the provision of the specified grade of cutback in the mix at 5 per cent of the weight of the total mix or emulsion at 8 per cent of the weight of the total mix, with the provision that the variation of quantity of binder will be assessed on the basis of the amount agreed by the Engineer and the payment adjusted as per the rate for cutback or emulsion quoted in the Bill of Quantities. 167.3 Recipe Cold Mix This Specification is based on BS434:Part 2:1984 which contains additional information. These are premixes made with emulsion binder which are laid immediately after mixing and while the emulsion is still substantially in an unbroken state. These mixes are considered suitable for use only for emergency and minor repair work and temporary road surface improvement. 167.3.1 Materials 167.3.1.1 Binder: Emulsions of sufficient stability for mixing with the particular graded aggregate should be used. Grades of emulsion quoted are in accordance with BS434: Part 1: 1984 but comparable grades to IS or AASHTO specifications may be used. Guidance on selection of an appropriate grade of emulsion is given in the Manual for Construction and Supervision of Bituminous Works. The corresponding grades in IS:8887 are only broadly classified as RS, MS and SS and further subclassification is not available at present. 167.3.1.2 Aggregates: Any normal, clean, but not necessarily dry, aggregate can be used, provided that it has a sufficiently high crushing strength with regard to the traffic to be carried. Typical gradings are given in Table 500-40. 167.3.1.3 Aggregate grading and binder content: When tested in accordance with IS:2386 Part I (wet sieving method)the combined aggregate grading for the particular mixture shall fall within the limits shown in Table 500-40. The grade and range of quantity of emulsion are also indicated in this table. The actual quantity of emulsion to be used shall be approved by the Engineer after seeing the results of trial mixes made in the laboratory.
TABLE 500-40. COMPOSITION OF RECIPE MIXES Nominal Size (mm) and Type coated ofMacadam wearing course 40 Single 40 14 6 Medium Fine

Open textured0pen textured textured

course base course wearing course

Base and Surface Courses (Bituminous)


Allowable Thickness (mm) 75-100 IS Sieve Size mm 45 37.5 26.5 19 112 9.5 6.3 3.35 2.36 1.18 0.60 0.30 0.15 0.075 Emulsion grade and quantity Generally Under some circumstances Quantity"' litms/tonne 55 to 70 45 to 65 70 to 90 A3 85 t 0 too A3 100 to (21 (11 120 A2 - 57(4) or A-2 - 5 0(4) 2-10 2-6 Cumulative % by weight oftotal aggregate passing 100 90-100 55-90 35-55 20-30 10-20 100 90-100 55-85 15-35 0-10 100 90-100 55-75 25-45 15-25 10-30 too 45-65 2-8 10-25 5-15 30-55 75-100 90-100 100 75-100 31-50 21-30 15-20

Section 500

Note:(l) For pricing purposes the lower quantity in these ranges should be assumed. (2) With coarser grading quantity may sometimesbe reduced to 90 litres/tonne andwith finer grading it may sometimes be increased up to 13.5 litres/tonne. (3) (4) Use 0 - 70 litres/tonne ofwater as necessary. A2-50 and A2-57 are British grades ofemulsion and theirgrading system is explained in the Manual.

167.3.2

Construction operations

167.3.2.1 Weather and seasonal limitations: Construction with cold mix must not undertaken when ambient temperatures below 10*C are expected of generally when poor weather is predicted. Bitumen emulsion and cutbacks depend on the evaporation of water and/or solvent for the development of their curing and adhesive characteristics. Cold weather,

Base and Surface Courses (Bituminous)

Section 500

rain, and high humidity slow down the rate of curing. Extra manipulation may be required to remove volitiles in cool or humid conditions. Wind increases the rate of evaporation. 167.3.2.2 Preparation of base: The base on which the cold mix is to be laid shall be prepared shaped and graded to the required profile in accordance with Clauses 501 and 902 as appropriate, and a prime coat if specified in the contract, or required by the Engineer, shall be applied in accordance with Clause 502, or as directed by the Engineer. 167.3.2.3 Tack coat: A tack coat in accordance with Clause 503 shall be applied over the base on which the 'cold mix is to be laid if specified in the Contract or required by the Engineer. 167.3.2.4 Preparation and transportation of the mixture: Mixing shall be carried out using one of the following types of mixer, which is provided with equipment for spraying the binder at a controlled rate, and, if necessary, for heating the binder to a temperature at which it can be applied uniformly to the aggregate:
(a) rotary drum type concrete mixer; (b) single or twin shaft concrete or macadam n-dxer (c) batch or continuous type mixer without dryer or screens other than a scalping screm.

A sufficient number of haul trucks with smooth, clean beds should be available to ensure continuous operation of the mixing plant. The type of truck used for transporting the mixture from the mixer to the road site must be suited to the chosen laying procedure. 167.3.2.5 Spreading: The mixed material should be spread immediately after preparation. The mixture shall be placed only when the specified density can be obtained. The mixture shall not be placed on any wet surface or when weather conditions will otherwise prevent its proper handling or finishing. If spreading by motor grader, the grader must have a blade that is straight and sharp and long enough to ensure finishing to close straight transverse tolerances and alljoints and linkages must be in good condition. The grader must be heavy enough to hold the blade fin-nly and uniformly' on the surface while spreading the mixture. On surface courses, the tyres must be smooth. The methodology for spreading shall be approved by the Engineer prior to laying, and if required a laying trial conducted to prove the laying method satisfactory before approval. 167.3.2.6 Compaction: Initial compaction of the laid material shall be carried out using a pneumatic-tyred roller of a weight appropriate to the layer thickness to be compacted with single layer thicknesses being 25-100mm and all compaction being in accordance with Clause 501.6 and 501.7. Smooth tyres shall be used. Final rolling and smoothing of the surface should be completed using steel wheel rollers. The Contractor shall

Base and Surface Courses (Bituminous)

Section 500

demonstrate at laying trials that his proposed laying and compaction methods can achieve a satisfactory result. 167.3.3 Opening to traffic: Traffic shall not be allowed to run on new work until all the water or volatiles in the mixture have evaporated. The rate of evaporation will be influenced by the temperature, humidity and wind conditions. 167.3.4 Surface finish and quality control of work: The surface finish of construction shall conform to the requirements of Clause 902. For control of the quality of materials supplied and the works carried out, the relevant provisions of Section 900 shall apply. 167.3.5 Arrangements for traffic: During the period of construction, arrangements for traffic shall be made in accordance with the provisions of Clause 112. 167.3.6 Measurement for payment: Recipe Cold Mix shall be measured as finished work, for the area instructed to be covered, in cubic metres, by weight in metric tonnes, or in square metres at a specified thickness, as specified in the Contract. 519.3.7. Rate The contract unit rate for Recipe Cold Mix shall be payment in full for carrying out the required operations including full compensation for all components listed in Clause 501.8.8.2. (i) to (xi). The rate shall cover provision of the specified grade of emulsion at the lower quantity in the range for each type of mix indicated in Table 500-44 with the provision that the variation of quantity of emulsion Will be assessed on the basis of the amount agreed by the Engineer and the payment adjusted as per the rate for emulsion quoted in the Bill of Quantities. 168 168.1 Scope This work shall consist of a base course composed of a mixture of sand, mineral filler where required and bituminous binder, placed and compacted upon a prepared and accepted subgrade in accordance with these Specifications and the lines, levels, grades dimensions and cross sections shown on the Drawings or as directed, by the Engineer,
Note: Sand Asphalt Base course is used in special situations like quality coarse aggregates not being available within economical leads and/or water needed for conventional base course not being readily available, as in desert areas.

SAND ASPHALT BASE COURSE'

168.2 Materials 168.2.1 Bitumen: The bitumen shall be paving bitumen of Penetration Grade S65 (60/70) or S90 (80/100), as specified in the Contract, both as per Indian Standard Specifications for "Paving Bitumen" IS:73.

Base and Surface Courses (Bituminous)

Section 500

168.2.2 Sand: The sand shall be clean, naturally occurring or blended material free from any deleterious substances, dry and well graded within the limits given in Table 500-41 and with other physical properties conforming to the requirements of this table. 168.2.3 Filler: When required, filler shall consist of finely divided mineral matter such as rock dust, hydrated lime or cement as approved by the Engineer. The filler shall conform to Clause 507.2.4. 168.3 Mix Design 168.3.1 Requirements for the mixture: Apart from confon-nity with the grading and quality requirements for individual ingredients, the mixture shall meet the requirements set out in Table 500-42. This Specification Clause has been introduced for the first time. Difficulties in using this Clause and suggestions for improvement may be forwarded to DG(RD), Ministry of Road Transport & Highways, Transport l3havan, Parliament Street, New Delhi - I 10 00 1. Fax No. # 3 710236.
TABLE 50041. SAND GRADING AND PHYSICAL REQUIREMENTS Sieve Size 9.5 4.75 2.36 1.18 0.60 0.30 0.15 0.075 Plasticity Index (%) Sand equivalent (IS:2720, Part 37) Los Angeles Abrasion Value (IS:23 86, part 4) Note: Maximum thickness for sand asphalt is 80 mm. TABLE 50042. REQUIREMENTS FOR SAND ASPHALT BASE COURSE Parameter Minimum stability (kN at 60'C) Minimum flow (min) Compaction level (Number of blows) Per cent air voids Percent voids in mineral aggregate (VMA) Pcrcentvoids filled with bitumen (VFB)' Requirement 2.0 2 2 x 75 3-5 > 16 65-75 Cum~lative percentage by weight of total aggregate passing 100 85-100 80-100 70-98 55-95 30-75 10-40 4-10 6 max. 30 min. 40 max.

Base and Surface Courses (Bituminous)

Section 500

168.3.2 Binder content: The binder content shall be optimised to achieve the requirements of the mixture set out in Table 500-46. The Marshall method for deterrnining~the optimum binder content shall be adopted as described in The Asphalt Institute Manual MS-2. 168.3.3 Job mix formula : The Contractor shall develop the job mix formula proposed for use in the works and shall give the following details:
(i) (ii) (a) (b) (iii) (iv) (v) (vi) Source and location of all materials; Proportions of all materials expressed as follows where each is applicable: Binder, as percentage by weight of total mixture; Sand/Mincral filler as percentage by weight of total aggregate including mineral filler; A single definite percentage passing each sieve for the mixed aggregate; The results of tests enumerated in Table 500-46 as obtained by the Contractor; Test results of physical characteristics of aggregates to be used; Mixing temperature and compacting temperature.

While working out the job mix formula, the Contractor shall ensure that it is based on a correct and truly representative sample of the materials that will actually be used in the work- and that the mixture and its different ingredients satisfy the physical and strength requirements of these Specifications. Approval of the job mix formula shall be based on independent testing by the Engineer for which joint samples of all ingredients of the mix shall be furnished by the Contractor as required by the fon-ner. The approved job mix formula shall remain effective unless and until modified by the Engineer. Should a change in the source of materials be proposed, a new Job mix formula shall be established and approved by the Engineer before actually using the materials. 168.3.4 Permissible variation from job mix formula : The Contractor shall produce a uniform mix confon-ning to the approved job mix formula, subject to the permissible variations of the individual percentages of the various ingredients in the actual mix from the job mix formula to be used, within the limits as specified in Table 500-43. These variations are intended to apply to individual specimens taken for quality control tests as described in Section 900. 168.4 Construction Operations 168.4.1 Weather and seasonal limitations : Clause 501.5.1 shall apply. 168.4.2 Preparation of base : The surface on which Sand Asphalt Basecourse Material is to be laid shall be piepared, shaped and graded to the profile required for the particular layer in accordance with Clauses 501 and 902 as appropriate or as directed by the Engineer. The surface shall be thoroughly swept clean free from dust and foreign matter using a mechanical brush, and the dust blown off by compressed air. In confined locations where mechanical plant cannot access, other methods shall be .used as approved by the

Base and Surface Courses (Bituminous)

Section 500

Engineer. A prime coat, where specified, shall be applied in accordance with Clause 502 or as directed by the Engineer.
TABLE 500-43. PERMISSIBLE VARIATIONS FROM THE JOB MIX FORMULA Description Aggregate passing 4.75mm Aggregate passing 2.36mm, 1. 18mm, 0.6mm Aggregate passing 0.3mm, 0, 15mm Aggregate passing 0.075mm Bindercontent _i: Mixing temperature Permissible variation 6% 5% 4% 2% 0.3% 100C

168.4.3 Tack coat : A tack coat over the base shall be applied in accordance with Clause 503, or otherwise as directed by the Engineer. 168.4.4 Preparation. and transportation of the mixture : The provisions of Clauses 501.3 and 501.4 shall apply. 168.4.5 Spreading: The provisions of Clauses 501.5.2 to 501.5.4. shall apply. Mixing must be accomplished at the lowest temperature and in the shortest time that will produce a mixture with complete coating of the aggregate and at a suitable temperature to ensure proper compaction. The ideal mixing and compaction temperatures for the particular bitumen in use shall be obtained from the Bitumen Test Data Chart given in the Manual for Construction and Supervision of Bituminous Works and shall correspond to a viscosity of 2 Poise (0.2 Pa.s) and 3 Poise (0.3 Pa.s) respectively, based on the original (unaged) bitumen properties. For guidance, the ranges of acceptable mixing and rolling temperatures for some typical penetration grade bitumen are shown in Table 500-5. 168.4.6 Rolling : Clause 501.6 shall apply. Generally the initial or breakdown rolling shall be done with 8-10 tonne deadweight smoothwheeled rollers. The intennediate rolling shall be done with 8 -10 torme deadweight or vibratory rollers or with a pneumatic tyred roller of 12-15 tonne weight having a tyre pressure of at least 5.6 kg / sq.cm.. The finish rolling shall be done with 8 - 10 tonne deadweight smooth wheeled tandem rollers, The exact pattern of rolling shall be established at the laying trials. 168.5 Opening to Traffic Traffic may be allowed after completion of the final rolling when the temperature of the mixture at the mid-depth of the completed layer has cooled to the daytime maximum arnbient temperature. When daytime maximum ambient temperatures are in excess of 35'C, great care is needed to ensure that this criterion is met, particularly where slow moving heavy traffic is involved. 168.6 Surface Finish and Quality Control of Work

Base and Surface Courses (Bituminous)

Section 500

The surface finish of the completed construction shall conform to the requirements of Clause 902. For control of the quality of materials supplied and the works carried out, the relevant provisions of Section 900 shall apply. 168.7 Arrangements for Traffic During the period of construction, arrangements for traffic shall be made in accordance with the provisions of Clause 112. 168.8 Measurement for Payment Sand Asphalt Basecourse materials shall be measured as finished work, for the area covered, in cubic metres, metric tonnes, or in square metres at a specified thickness, as stated in the Contract. 168.9 Rate The contract unit rate for Sand Asphalt Basecourse materials shall be payment in full for carrying out the required operations including full compensation for all components listed in Clause 501.8.8.2 (i) to (xi). The rate shall cover the provision of 5 per cent of bitumen by weight of the total mixture. The variation from the actual percentage of bitumen approved by the Engineer and used will be assessed and the rate adjusted, plus or minus, using the rate for bitumen in the Bill of Quantities. 169 169.1 Scope Modified binders comprise a base binder, to which is added either natural rubber, crumb rubber or a polymer such as Styrene-ButadieneThis Specification Clause has been introduced for the first time. Difficulties in using this Clause and suggestions for improvement may be forwarded to DG(RD), Ministry of Road Transport & Highways, Transport Bhavan, Z-Parliament Street, New Delhi - I 10 00 1. Fax No. # 3710236. Styrene (SBS), Ethy lene-Vinyl -Acetate (EVA) or Low Density Polyethylene (LDPE). The purpose is to achieve a high performance binder with improved properties, particularly at extremes of temperature. 169.2 Materials 169.2.1 Base Binder : The base binder into which the modifier is incorporated shall conform to IS:73. The choice of grade shall be such that it is compatible with the modifier and, when mixed shall have the properties described in Clause 521.3. MODIFIED BINDER

Base and Surface Courses (Bituminous)

Section 500

169.2.2 Modifier : The modifier shall be a natural rubber, crumb rubber or any other polymer which is compatible with the base binder and which allows the properties given in Clause 521.3 to be achieved. For further details, IRC:SP:53-1999 may be referred to. The modifier, in the required quantity shall be blended at the refinery or at the site plant capable of producing modified binder. 169.3 Modifler Proportions The quantity of modifier to be added shall be determined by tests on the base binder and the modified binder and the properties desired. A reference may be made to the Manual for Construction and Supervision of Bituminous Works for indicative dosage of different types of modifiers. The properties of the modified binder shall be as given in Table 500-44, 500-45 or 500-46 according to the requirements of the Contract. 169.4 Mixing The modifier shall be blended with the base binder so that it disperses thoroughly prior to use. The type of mixing equipment used shall be suited to the modifier type. Further guidance is given in the Manual for Construction and Supervision of Bituminous Works. 169.5 Quality Control of Materials 169.5.1 Binder Properties : For control of the quality of the base binder, the relevant provisions of Section 900 shall apply. Additionally, the modified binder shall be tested for all the properties listed in Table 500-44, 500-45 or 500-46 as appropriate and certificates produced prior to-use. During use, the requirements for softening point, penetration and elastic recovery shall be tested regularly. If the modified binder is produced
TABLE 500-44. REQUIREMENTS OF POLYMER MODIFIED BINDERS (ELASTOMERIC THERMOPLASTICS AND RUBBER LATEX) Designation Grade and Requirements Method of Test PMB 120 Penetration at 25T, 0.1mm, IS:1203-1978 100g, 5 sec. Penetration at 4"C, 0. Imm, IS: 1205-1978 200g, 60 sec., Minimum* Softening Point, (R&B), 'C, Minimum IS:1205-1978 Fraass Breaking Point,C, Maximum* IS:9381-1978 Ductility at 27*C, cm, Minimum IS: 1208-1978 38 -24 75 48 -16 50 59 -12 50 35 22 18 90 to 150 PMB 70 50 to 89 PMBQ 30 to 49

Base and Surface Courses (Bituminous)


Flash Point, COC,'C, Minimum IS: 1209-1979 Elastic Recovery of Half Thread in ASTM Ductilometer at 15*C, %, Minimum D5976-1996 Separation, Difference in Softening ASTM Point, R&B, *C, Maximum Viscosity at 150*C, Poise IS:1206-1978 1-3 220 70 (50)** 4 220 60 (40)** 4 D5976-1996 2-6

Section 500
220 50 (30)** 4

4-8

Test on Thin Film Oven Test Residue, TFOT (IS:9382-1979) Designation PMB 120 PMB 70 PMB40 Penetration at 4*C, 0. 1 trun, 200g, IS:1203-1978 60 sec., Minimum* Loss in Weight, %, Maximum IS.9382-1979 Increase in Softening Point, 'C, IS:1205-1978 Maximum Reduction in Penetration at 25*C, IS:1,203-1978 %, Maximum Elastic Recovery of Half Thread in Ductilometer at 15*C, %, Minimum D5976-1996 60 (35)** 40 (30)** .35 (25)** ASTM 35 35 35 1.0 7 1.0 6 1.0, 5 18 is 12 Grade and Requirements Method of Test

Relevant to snow bound cold climate areas Natural Rubber Modified Bitumen on site then tests shall be carried out daily. If pre-blended modified binder is used tests shall be carried out weekly. 169.5.2 Storage Stability : Pre-blended modified binders whieb are to be stored without circulation or agitation facility shall be tested for storage stability prior to use, in accordance with Appendix I of IRC:SP:53199. The mean of the differences in softening point, top to bottom, of
TABLE 500-45. REQUIREMENTS OF POLYMER MODIFIED BINDERS (PLASTOMERIC THERMOPLASTICS) Designation Grade and Requirements Method of Test

Base and Surface Courses (Bituminous)


PMB 120 Penetration at 25*C, 0. 1 mm, I 00g, 49IS:1203-1978 5 sec. Penetration at 4*C, 0. 1 mm, 200g, IS:1205-1978 60 sec., Minimum* Softening Point, (R&B), *C, Minimum IS:1205-1978 Fraass Breaking Point, *C, Maximum* IS:9381-1978 Ductility at 27*C, cm, Minimum IS:1208-1978 Flash Point, COC, 'C, knimum IS: 1209-1978 Elastic Recovery of Half Thread in ASTM Ductilometer at 15*C, %, Minimum D5976-1996 Separation, Difference in Softening ASTM Point, R&B, *C, Maximum Viscosity at 150'C, Poise IS:1206-1978 D5976-1996 1-2 2-4 3 3 38 -20 50 220 60 48 -15 40 220 50 90 to 150 35 PMB 70 50 to 89 22

Section 500
PMB40 30 18 to

59 -10 30 220 40

4-8

Test on Thin Film Oven Test Residue, TFOT (IS.-9382-1979) Designation PMB 120 PMB 70PMB40 Penetration at 4*C, 0. 1 mm, 200g, IS: 1203-1978 60 sec., Minimum* Loss in Weight, %, Maximum IS:9382-1979 Increase in Softening Point, *C, IS:1205-1978 Maximum Reduction in Penetration at 25*C, IS:1203-1978 %, Maximum Elastic Recovery of Half Thread in ASTM Ductilometer At 15*C, %, Minimum 1.0 7 35 45 1.0 6 35 35 D5976-1996 1.0 5 35 30 18 15 12 Grade and Requirements Method of Test

* Relevant to snow bound cold climate areas not less than three pairs of samples shall not exceed 5'C.

Other pre-blended modified binders shall be stored with appropriate circulation or agitation facility, according to the manufacturer's instructions. 169.6 Measurement for Payment Modified binder supplied for the Contract shall be paid for in Tonnes.

Base and Surface Courses (Bituminous)

Section 500

TABLE SOO-46. REQUIREMENTS OF POLYMER MODIFIED BINDERS (TREATED WITH MODIFIED CRUMB RUBBER) Designation Grade CRMB 60 Penetration at 25oC, 0. 1 mm, 100 g, 5 sec. Softening Point, (R&B), 'C, Minimum Elastic Recovery of Half Thread in Ductilometer at 15*C, % Minimum Test on Thin Film Oven Test Residue (IS:9382 - 1979) Reduction in Penetration at 25C, %, Maximum Increase in Softening Point (R&B), 'C, Maximum Elastic Recovery of Residue of Half Thread in Ductilometer at 15oC, Minimum CRMB - Crumb Rubber Modified Bitumen 25 20 15 ASTM D 5976 - 1996 5 5 5 IS: 1205 - 1978 60 60 60 IS: 1203 - 1978 40 35 30 ASTM D5976 - 1996 50 55 60 IS:1205-1978 50-70 CRMB 55 50-60 CRMB 50 40-60 IS: 1203-1978 Method of Test

169.7 Rate The contract rate for modified binder shall be as per contract agreement. 170 170.1 Scope This clause covers the provision of Stress Absorbing Membrane (SAM) and Stress Absorbing Membrane Interlayer (SAMI) as measures to inhibit the propagation of cracks. A SAM is an elastomeric bitumen rubber membrane, which is laid.over a cracked road surface, together with a covering of aggregate chips, in order to extend the life of the pavement before major treatment is carried out. SAM can be laid as a This Specification Clause has been introduced for the first time. Difficulties in using this Clause and suggestions for improvement may be forwarded to DG(RD), Ministry of Road Transp.6~ & Highways, Transport Bhavan, Parliament Street, New Delhi - I I ffOO 1. Fax No. # 3710236. CRACK PREVENTION COURSES'

Base and Surface Courses (Bituminous)

Section 500

single coat or a double coat. A SAMI is a layer which is applied to a cracked pavement surface but which is followed (within 12 months) by the application of an overlay course. A SAMI may be a material similar to that used for a SAM. It may alternatively consist of a bitumen impregnated geotextile. 170.2 Materials 170.2.1 Binder: Binder shall be a modified binder complying with the requirements of Clause 52j, according to the requirements of the on ract, except that paving grade bitumen of 80-100 penetration complying with the requirements of IS:73 shall be used in the case of a bitumen impregnated geotextile. 170.2.2 Aggregate : The requirements of Clause 510.2.2 apply except that the Polished Stone Value requirement does not apply in the case of a SAMI. Where required by the contract, aggregate shall he precoated using either of the techniques permitted by Clause 510.2.5. 170.2.3 Rates of spread of binder and aggregate : The rates of spread of binder and aggregate shall be according to one of the size alternatives in Table 500-47, as required by the Contract. 170.2.4 Geotextile: The use of geotextile as prescribed for S1. No. 7 in Table 500-47 shall conform to the requirements of Clause 703J. 170.3 Construction Operations 170.3.1 Weather and seasonal limitations: Clause 501.5.1 shall apply. 170.3.2 Preparation of base: The base on which the SAM, SAMI or bitumen impregnated geotextile is to be laid shall be prepared, in accordance with Clause 501 and as directed by the Engineer. The surface shall be thoroughly cleaned either by using a mechanical brush or any other equipment / method approved by the Engineer. Dust removed in the process shall be blown off with compressed air. 170.3.3 Application of binder: The equipment and general procedures shall all be in accordance with the Manual for Construction and Supervision of Bituminous Works. The application temperature for modified binder shall be 160-170'C. Binder for bitumen impregnated
TABLE 500-47. QUANTITY OF MATERIALS REQUIRED FOR 10 SQ.M. OF ROAD SURFACE FOR STRESS ABSORBING MEMBRANE SI. No applied 1. upto 3mm width coat SAM 2. Map cracks or alligator Single coat SAM 10-12 0.1 Iml of 5.6mm chips Type and Width of Crack Specification of Quantity Quantity of chipping SAM to be Kg/10m' Single coat SAM 8-10 0. 10 m-1 of 5.6mm chips or 2nd Coat Of two Hair cracks and map cracks of binder

Base and Surface Courses (Bituminous)


cracks 3mm to 6rmn width 3. Map cracks or alligator 21d coat 4. and cracked area above 50% 211 coat 5. 6. All types of cracks with crack width below 6mrn All types of cracks with crack width above 6mm 7. Bitumen Impregnated Geotextile 8-10 Two coat SAM I" coat 8-10 12-14 0.12ml of 5.6mm and cracks 6mm to 9mm, width , 11.2mm chips in 1: 1 ratio 0. 103 of 5.6mm chips 0. 12m' of 11.2mm chips

Section 500

'Cracks above 9mm width Two coat SAM 11 coat 14-16 0. 101 of 5.6inm chips 0. 10 ml of 5.6mm chips. 0. 10 m3 of 11.2mm, chips.

Single coat SAM 8-10 as interlayer Single coat SAM 10-12 as interlayer

Note: 1. Binder quantities for bitumen impregnated geotextile shall be in the range 0.9 to 1.2 litres/m2. Binder quantities outside this rangeare permitted according tothegeotextile manufacturer's instructions and subject to the agreement of the Engineer. geotextile shall be applied according to Clause 502.4. The surface on which the binder is to be applied shall be dry.

170.3.4 Application of aggregates : The equipment and general procedures shall all be in accordance with the Manual for Construction and Supervision of Bituminous Works. Immediately after application of the modified binder, clean, dry aggregate shall be spread uniformly on the surface. 170.3.5 Sweeping: The surface of SAMs and SAMIs shall be swept to ensure uniform spread of aggregate and that there are no loose chips on the surface. 170.3.6 Two coat SAM or SAMI: Where a two coat SAM or SAMI is required by the Contract, the second coat shall be applied within 90 days of the first. 170.3.7 Geotextile placement: For bitumen impregnated geotextile,

Concrete Pavement Concrete Pavement 600, Concrete Pavement

Section 600

Concrete Pavement

Section 600

601 170.4 Scope

DRY LEAN CEMENT CONCRETE SUB-BASE

170.4.1 The work shall consist of construction of dry lean concrete subbase for cement concrete pavement in accordance with the requirements of these Specifications and in conformity with the lines, grades and cross-sections shown on the,drawings or as directed by the Engineer. The work shall include furnishing of all plant and equipment, materials and labour and performing all operations, in connection with the work, as approved by the Engineer. 170.4.2 The design parameters of dry lean concrete sub-base, viz., width, thickness, grade of concrete, details of joints, if any, etc. shall be as stipulated in the Contract drawings. 170.5 Materials 170.5.1 Source of Materials: The Contractor shall indicate to the Engineer the source of all materials with relevant test data to be used in the lean concrete work sufficiently in advance and the approval of the Engineer for the same shall be obtained at least 45 days before the scheduled commencement of the work. If the Contractor later proposes to obtain the materials from a different source, he shall notify the Engineer for his approval at least 45 days before such materials are to be used., 170.5.2 Cement: Any of the following types of cement may be used with prior approval of the Engineer:
(i) Ordinary Portland Canent (ii) Portland Slag Cement (iii) Portland Po~zolana Cement IS IS IS 269 455 1489

If the subgiade is found to consist of soluble sulphates in a concentration more than 0.5 per cent, cement used shall be sulphate resistant and shall conform to IS: 6909. Cement to be used may preferably be obtained in bulk form. It shall be stored in accordance with stipulations contained in Clause 1014 and shall be subjected to acceptance test prior to its immediate use. 170.5.3 Aggregates: 170.5.3.1 Aggregates for lean concrete shall be natural material complying with IS: 383. The aggregates shall not be alkali reactive. The limits of deleterious materials shall not exceed the requirements set out in IS: 383. In case the Engineer considers that the aggregates are not free from dirt, the same may be washed and drained for at least 72 hours before batching, as directed by the Engineer. 170.5.3.2 Coarse aggregate: Coarse aggregate shall consist of clean, hard, strong, dense, non-porous and durable pieces of crushed stone or

Concrete Pavement

Section 600

crushed gravel and shall be devoid of pieces of disintegrated stone, soft, flaky, elongated, very angular or splintery pieces. The maximum size of the coarse aggregate shall be 25 mm. The coarse aggregate shall comply with Clause 602.2.4.2. 170.5.3.3 Fine aggregate: The fine aggregate shall consist of clean, natural sand or crushed stone sand or a combination of the two and shall conform to IS : 383. Fine aggregate shall be free from soft particles, clay,, shale, loam, cemented particles, mica, organic and other foreign matter. The fine aggregate shall comply with Clause 602.2.4.3. 170.5.3.4 The coarse and fine aggregates may be obtained in either of the following manner:
(i) In separate nominal sizes of coarse and fine aggregates and mixed together intimately before use. (ii) Separately as 25 mm nominal single size, 12.5 mm nominal size graded aggregates and fine aggregate of crushed stone dust or sand or a combination of these two.

The material after blending shall conform to the grading as indicated in Table 600-1.
TABLE 600-L AGGREGATE GRADATION FOR DRY LEAN CONCRETE Sieve Designation 26.50 mm 19.00 mm 9.50 mm 4.75 mm 600.00 micron 75.00 micron Percentage passing the sieve by weight 100 80-100 55-75 35-60 10-35 0-8

170.5.4 Water: Water used for mixing and curing of concrete shall be clean and free from injurious amounts of oil, salt, acid, vegetable matter or other substances harmful to the finished concrete. It shall meet the requirements stipulated in IS : 456. 170.5.5 Storage of materials: All materials shall be stored in advance with the provisions of Clause 1014 of these Specifications and other relevant IS Specifications. All efforts must be made to store the materials in proper places so as to prevent their deterioration or contamination by foreign matter and to ensure their satisfactory quality and fitness for use in the work. The storage place must also permit easy inspection, removal and storage of materials. All such materials even though stored in approved godwAns-inust be subjected to acceptance test immediately prior to their use. The requirement of storage yard specified in Clause 602.2.9 shall also be applicable. 170.6 Proportioning of Materials for the Mix

Concrete Pavement

Section 600

170.6.1 The mix shall be proportioned with a maximum aggregate cement ratio of 15 : 1. The wawr content shall be adjusted to the optimum as per Clause 601.3.2 for facilitating compaction by rolling. The strength and density requirements of concrete shall be determined in accordance with Clause 601.6 by making trial mixes. 170.6.2 Moisture content: The right amount of water for the lean concrete in the main work shall be decided so as to ensure full compaction under rolling and shall be assessed at the time of rolling the trial length. Too much water will cause the lean coner-efe--to be heaving up before the wheels and picked up on the wheels of the roller and too little will lead to inadequate compaction, a low in-situ strength* and an open-textured surface. The optimum water content shall be determined and demonstrated by rolling during trial length construction and the optimum moisture content and degree of compaction shall be got approved from the Engineer. While laying in the main'work, the lean concrete shall have a moisture content between the optimum and optimum +2 per cent, keeping in view the effectiveness of compaction achieved and to compensate for evaporation losses. 170.6.3 Cement content : The minimum cement content in the lean concrete shall not be less than 150 kg/cu.m. 'of concrete. If thiminimum cement content is not sufficient to produce concrete of th'. specified strength, it shall be increased as necessary without additional cost compensation to the Contractor. 170.6.4 Concrete strength: The average compressive strength of each consecutive group of 5 cubes made in accordance with Clause 903.5.1.1 shall not be less than 10 Wi at 7 days. In addition, the minimum compressive strength of any individual cube shall not be less than 7.5 MPa at 7 days. The design mix complying with the above Clauses shall be got approved from the Engineer and demonstrated in the trial length construction. 170.7 Subgrade The subgrade shall conform to the grades and cross sections shown on the drawings and shall be uniformly compacted to the design strength in accordance with these Specifications and Specification stipulated in the Contract. The lean concrete subbase shall not be laid on a subgrade softened by rain after its final preparation; surface trenches and soft spots, if any, must be properly back-filled and compacted to avoid any weak or soft spot. As far as possible, the construction traffic shall be avoided on the prepared gubgrade. A day before placing of the sub-base, the subgrade surface shall be given a fine spray of water and rolled with one or two passes of a smooth wheeled roller after a lapse of 2-3 hours in order to stabilise loose surface. If Engineer feels it necessary, another fine spray of water may be applied just before placing sub-base. 170.8 Construction 170.8.1 General: The pace and programme of the lean concrete subbase

Concrete Pavement

Section 600

construction shall be matching suitably with the prograrnme of construction of the cement concrete pavement over it. The sub-base shall be overlaid with cement concrete pavment only after 7 days after sub-base construction. 170.8.2 Batching and mixing: The batching plant shall be capable of proportioning the materials by weight, each type of material being weighed separately in accordance with Clause 602.9.3.2. The cement from the bulk stock shall be weighed separately from the, aggregates. The capacity of batching and mixing plant shall be at least 25 per cent higher than the proposed capacity f~r the laying arrangements. The batching and mixing shall be carried out preferably in a forced action central batching and mixing plant having necessary automatic controls to ensure accurate proportioning and mixing. Other types of.mixers shall be permitted subject to demonstration of their satisfactory -performance during the trial length. The type and capacity of the plant shall be got approved by the Engineer before commencement of the trial length. The weighing balances shall be calibrated by weighing the aggregates, cement, water and admixtures physically either by weighing with large weighing machine or in a weigh bridge. The accuracy of weighing scales of the batching plant shall be within 2 per cent in the case of aggregates and 1 per cent in the case of cement and water. The design features of Batching Plant should be such that the shifting operations of the plant will not take very long time, when they are to be shifted from place to place with the progress of the work. 170.8.3 Transporting: Plant mix lean concrete shall be discharged immediately from the mixer, transported directly to the point where it is to be laid and protected from the weather by covering the tippers/ dumpers with tarpaulin during transit. The concrete shall be transported by tipping trucks, sufficient in number to ensure a continuous supply of material to feed the laying equipment to work at a uniform speed and in an uninterrupted manner. The lead of the batching plan't to paving site shall be such that the travel time available from mixing to paving as specified in Clause 601.5.5.2 will be adhered to. 170.8.4 Placing: Lean concrete shall be laid/placed by a paver with electronic sensor. The equipment shall be capable of laying the material in one layer in an even manner without segregation, so that after compaction the total thickness is as specified. The paving machine shall have high amplitude tamping bars to give good initial compaction to the sub-base. The laying of the two-lane road subbase may be done either in full width or lane by lane. Preferably the lean concrete shall be placed and compacted across the full width of the road, by constructing it in one go or in two lanes running forward simultaneously. Transverse and longitudinal construction joints shall be staggered by 500-1000 mm and 200-400 mm respectively from the corresponding joints in the overlaying concrete slabs. 170.8.5 Compaction

Concrete Pavement

Section 600

170.8.5.1 The compaction shall be carried out immediately after the material is laid and levelled. In order to ensure thorough compaction which is essential, rolling shall be continued on the full width till there is no further visible movement under the roller and the surface is closed. The minimum dry density obtained shall be 97 per cent of that achieved during the trial length construction vide Clause 601.7. The densities achieved at the edges i.e 0.5 in from the edge shall not be less than 95 per cent of that achieved during the trial construction vide Clause 601.7. 170.8.5.2 The spreading, compacting and finishing of ' the lean concrete shall t~e carried outas rapidly as possible and theoperation shall be so arranged as to ensure that the time between the mixing of the first batch of concrete in any transverse section of the layer and the final finishing of the same shall not exceed 90 minutes when the concrete temperature is above 25 and below 30 degree Celsius aandd 120 minutes if less than 25 degree Celsius. This period may be reviewed by the Engineer in the light of the results of the trial run but in no case shall it exceed 2 hours. Work shall not proceed when the temperature of the concrete exceeds 30 degree Celsius. If necessary, chilled water or addition of ice may be resorted to for bringing down the temperature. It is desirable to stop concreting when the ambient temperature is above 350C. After compaction has been completed, roller shall not stand on the compacted surface for the duration of the curing period except during commencement of next day's work near the location where work was terminated the previous day. 170.8.5.3 Double drum smooth-wheeled vibratory rollers of minimum 80 to 100 kN static weight are considered to be suitable for rolling dry lean concrete. In case any other roller is proposed, the same shall be got approved from the Engineer, after demonstrating its performance. The number of passes required to obtain maximum compaction depends on the thickness of the lean concrete, the compactibility of the mix, and the weight and type of the roller etc., and the same as well as the total requirement of rollers for the job shall be determined during trial run by measuring the in-situ density and the scale of the work to be undertaken. 170.8.5.4 In addition to the number of passes required for compaction there shall be a preliminary pass without vibration to bed the lean concrete down anA again a final pass without vibration to remove roller marks and to smoothen the surface. Special care and attention shall be exercised during compaction near joints, kerbs, channels, side forms and around gullies and manholes. In case adequate compaction is not achieved by the roller at these points, use of plate vibrator shall be made, if so directed by the Engineer. 170.8.5.5 The final lean concrete surface on.completion of compaction and

Concrete Pavement

Section 600

immediately before overlaying, shall be well closed, free from movement under roller and free from ridges, low spots, cracks, loose Paterial, pot holes, ruts or other defects. The final sufface shall be' inspected immediately on completion and all loose, segregateAd or defemctive areas shall be corrected by 'using fresh lean concrete material laid and compacted as per Specification. For repairing honeycombed surface, concrete with aggregates of size 10 mm and below shall be spread and compacted. It is necessary to check the level of the rolled surface for compliance. Any levellthickness deficiency should be corrected after applying concrete with aggregates of size 10 mm and below after roughening the surface. Similarly the surface regularity also should be checked with 3m straight edge. The deficiency should be made up with concrete with aggregates of size 10 mm and below. 170.8.5.6 Segregation of concrete in the dumpers shall be controlled by premixing each fraction of the aggregates before loading in the bin of the 'batching plant, by moving the dumper back and forth while discharging the mix on it and other means. Even paving operation shall be such that the mix does not segregate. 170.8.6 Joints: Contraction and longitudinal joints shall be provided as per the drawing. At longitudinal or transverse construction joints, unless vertical forms are used, the edge of compacted material shall be cut back to a vertical face where the correct thickness of the properly compacted material has been obtained. 170.8.7 Curing: As soon as the lean concrete surface is compacted, curing shall commence. One of the following two methods shall be adopted:
(a) The initial curing shall be done by spraying with liquid curing compound. The curing compound shall be white pigmented or transparent type with water retention index of 90 per cent when tested in iccordance with BS 7542. Curing compound " be sprayed immediately after rolling is complete. As soon as the curing compound has lost its tackiness, the surface shall be covered with wet hessian for three days. (b) Curing shall be done by covering the surface by gunny bags/hessian, which shall be kept continuously moist for 7 days by spritdding water.

170.9 Trial Mixes The Contractor shall make trial mixes of dry lean concrete with moisture contents like 5.0, 5.5, 6.0, 6.5 and 7.0 per cent using cement content specified and the specified aggregate grading but without violating the requirement of aggregate-cement ratio specified in Clause 601.3.1. Optimum moisture and density shall be established by preparing cubes with varying moisture contents. Compaction of the mixshall be done in Om layers with vibratory hammer fittedwith asquare or rectangular foot as described in Clause 903.5. 1. 1. After establishing the optimum moisture, a set of six cubes shall be cast at that moisture for the determination of compressive strength on the 3rd and the seventh day. Trial mixes shall be repeated if the strength is not satisfactory either by

Concrete Pavement

Section 600

increasing cement content or using higher grade of cement. After the' mix design is approved, the Contractor shall construct a trial section in accordance with Clause 601.7. If during the construction of the trial length, the optimum moisture content determined as above is found to be unsatisfactory, the Contractor may make suitable changes in the moisture content to achiive a satisfactory mix. The cube specimens prepared with the changed moisture content should satisfy the strength requirement. Before production of the mix, natural moisture content of the aggregate should be determined on a day-to-day basis so that the moisture content could be adjusted. The mix finally designed should neither stick to the rollers nor become too dry resulting in ravelling of surface. 170.10 Trial Length 170.10.1 The trial length shall be constructed at least 14 days in advance of the proposed date of commencement of work. At least 30 days prior to the construction of the trial length, the Contractor shall submit for the Engineer's approval a "Method Statement" giving detailed description of the proposed materials, plant, equipment, mix proportion, and procedure for batching, mixing, laying, compaction and other construction procedures. The Engineer shall also approve the location and length of trial constructiori which shall be a minimum of 60 m length and for full width of the pavement. The trial length shall contain the construction of at least one transverse construction joint involving hardened concrete and freshly laid sub-base. The construction of trial length will be repeated till the Contractor proves his ability to satisfactorily construct the subbase. 170.10.2 In order to determine and demonstrate the optimum moisture content, which results in the maximum dry density of the mix compacted by the rolling equipment and the minimum cement content that is necessary to achieve the strength stipulated in the drawing, trial mixes shall be prepared as per Clause 601.6. 170.10.3 After the construction of the trial length, the in-situ density of the freshly laid material shall be determined by sand replacement method with 20 cm dia density cone. Three density holes shall be made at locations equally spaced along a diagonal that bisects the trial length; average of these densities shall be determined. These main density holes shall not be made in the strip 50 cm from the edges. The average density obtained from the three samples collected shall be the reference density and is considered as 100 per cent, The field density of regular work will be compared with this reference density in accordance with Clauses 601.5.5.1 and 903.5.1.2. A few cores may be cut as per the instructions of the Engineer to check segregation or any other deficiency. 170.10.4 The hardened concrete shall be cut over 3 in width and reversed to inspect the bottom surface for any segregation taking place. The trial length shall be constructed after making necessary changes in the gradation of the

Concrete Pavement

Section 600

mix to eliminate segregation of the mix. The lower surface shall not have honey-combing and the aggregates shall not be held loosely at the edges. 170.10.5 The trial length'shall be outside the main works, The main work shall not start until the trial length has been approved by the Engineer. After approval has been given, the material&, mix proportions, moisture content, mixing, laying, compaction plant and construction procedures shall not be changed without the approval of the Engineer. 170.11 Tolerances for Surface Regularity, Level, Thickness, Density and Strength The tolerances for surface regularity, level, thickness, density and strength shall conform to the requirements given in Clause 903.5. Control of quality of materials and works shall be exercised by the Engineer in accordance with Section 900. 170.12 Traffic No heavy commercial vehicles like trucks and buses shall be permitted on the lean concrete sub-base after its construction. Light vehicles if unavoidable may, however, be aflowed after 7 days of its construction with prior approval of the Engineer. 170.13 Measurements' for Payment The unit of measurement for dry lean concrete pavement shall be the cubic metre of concrete placed, based on the net plan areas for the specified thickness shown on the drawings or as directed by the Engineer. 170.14 Rate The Contract unit rate payable for dry lean concrete sub-base shall be payment in full for carrying out the required operations including full compensation forall labour, materials and equipment, mixing, trafisport,,placing, compacting, finishing, curing, testing and incidentals to complete the work as per Specifications, all royalties, fees, storage and rents wh ere necessary and all leads and lifts. 171 171.1 Scope 171.1.1 The work shall consist of construction of unreinforced, dowel jointed, plain cement concrete pavement in accordance ~Vith -the requirements of these Specifications and in conformity with the lines, grades and cross sections shown on the drawings. The work shall include furnishing of all plant and equipment, materials and labour and performing all operations in connection with the work, as approved by the Engineer. 171.1.2 The design parameters, viz., thickness of pavement slab, grade of concrete, joint details etc. shall be as stipulated in the drawings. 171.2 Materials 171.2.1 Source of materials: The Contractor shall indicate to the Engineer the source of all materials to be used in the concrete work with relevant test data sufficiently in advance, and the approval of the Engineer for the same shall CEMENT CONCRETE PAVEMENT

Concrete Pavement

Section 600

be obtained at least 45 days before the scheduled commencement of the work. If the Contractor later proposes to obtain materials from a different source, he shall notify the Engineer for his approval, at least 45 days before such materials are to be used with relevant test data. 171.2.2 Cement : Any of the following types of cement capable of achieving the design strength may be used with prior approval of the Engineer, but the preference should be to use at least the 43 Grade or higher.
(i) Ordinary Portland Cement, 33 Grade, IS 269. (ii) Ordinary Portland Cement, 43 Grade IS 8112. (iii) Ordinary Portland Cement, 53 Grade, IS 12269.

If the soil around has soluble salts like sulphates in excess of 0.5 per cent, the cement used shall be sulphate resistant and shall conform to IS: 12330. Guidance may be taken from IS: SP: 23, Handbook for Concrete Mixes for ascertaining the minimum 7 days strength of cement required to match with the design concrete strength. Cement to be used may preferably be obtained in bulk form. If cement in paper bags are proposed to be used, there shall be bag-splitters with the facil"y to separate pieces of paper bags and dispose them of suitably. No paper pieces shall enter the concrete mix. Bulk cement shall be stored in accordance with Clause 1014. The cement shall be subjected to acceptance test just prior to its use. 171.2.3 Admixtures : Admixtures conforming to IS:6925 and IS: 9103 shall be permitted to improve workability of the concrete or extension of setting time, on satisfactory evidence that they will not have any adverse effect on the properties of concrete with respect to strength, volume change, durability and have no deleterious effect on steel bks. The particulars of the admixture and the quantity to be used, must be furnished to the Engineer in advance to obtain his approval before use. Satisfactory performance of the admixtures should beproved both on' the laboratory concrete trial mixes and in trial paving works. If air entraining admixture is used, the total quantity of air in' air-entrained concrete as a percentage of thv volume of the mix shall be 5 1.5 percent for 25 mm nominal size aggregate. 171.2.4 Aggregates 171.2.4.1 Aggregates for pavement concrete shall be natural material complying with IS : 383 but with a Los Angeles~ Abrasion Test result not more than 35 per cent. The limits of deleterious materials shall not exceed the requirements set out in IS : 383. The aggreptes.shall be free from chert, flint, chalcedony or other silica in a form that can react with the allWies in the cement. In addition, the total chlorides content expressed as chloride ion content shall not exceed 0.06 per cent by weight and the total sulphate content expressed as sulphuric anhydride (SO) shall not exceed 0.25 per cent by weight. 171.2.4.2 Coarse aggregate: Coarse aggregate shall consist of clean, hard, strong, dense, non-porous and durable pieces of crushed stone or

Concrete Pavement

Section 600

crushed gravel and shall be devoid of pieces of disintegrated stone, soft, flaky, elongated, very angular or splintery pieces. The maximum size of coarse aggregate shall not exceed 25 mm for pavement concrete. Continuously graded or gap graded aggregates may be used, depending on the grading of the fine aggregate. No aggregate which has water absorption more than 2 per cent shall be used in the concrete mix. The aggregates shall be tested for soundness in accordance with IS : 2386 (Part -5). After 5 cycles of testing the loss shall not be more than 12 per cent if sodium sulphate solution is used or 18 per cent if magnesium sulphate solution is used. Dumping and stacking of aggregates shall be done in an approved manner. In case the Engineer considers that the aggregates are not free from din, the same may be washed and drained for at least 72 hours before batching as directed by the Engineer. 171.2.4.3 Fine aggregate: The fine aggregate shall consist of clean natural sand or crushed stone sand or a combination of the two and shall conform to IS : 383. Fine aggregate shall be free from soft particles, clay, shale, loam, cemented particles, mica and organic and other foreign matter. The fine aggregate shall not contain deleterious substances more than the following :
Clay lumps Coal and lignite Material passing IS Sieve No. 75 micron 4.0 per cent 1.0 per cent 4.0 per cent

171.2.5 Water: Water used for mixing and curing of concrete shall be clean and free from injurious amount of oil, salt, acid, vegetable matter or other substances harmful to the finished concrete. It shall meet the requirements stipulated in IS: 456. 171.2.6 Mild steel bars for dowels and tie bars These shall conform to the requirements of IS : 432, IS : 1139 and IS : 1786 as relevant. The dowel bars shall conforrn to Grade S 241D and tie bars to Grade S 415 of I.S. 171.2.7 Premoulded joint filler: Joint filler board for expansion joints which are proposed for use only at some abutting structures like bridges and culverts shall be of 20-25 mm thickness within a tolerance of 1.5 min and of a firm compressible material and complying with the requirements of IS:1838, or BS Specification Clause No. 2630 or Specification for Highway Works, Vol. I Clause 1015. It shall be 25 min less in depth than the thickness of the slab within a tolerance of 3 mm and provided to the full width between the side forms. It shall be in suitable lengths which shall not be less than one lane width. Holes to accommodate dowel bars shall be accurately bored or punched out to give a sliding fit on the dowel bars. 171.2.8 Joint sealing compound: The joint sealing compound shall be of hot poured, elastomeric type or cold polysulphide type having flexibility,

Concrete Pavement

Section 600

resistance to age hardening and durability. If the sealant is of hot poured type it shall conform to AASHTO M282 and cold applied sealant shall be in accordance with BS 5212 (Part 2). Storage of materials: All materials shall be stored in accorda nce with the provisions of Clause 1014 of the Specifications and other relevant IS Specifications. All efforts must be made to store the materials in proper places so as to prevent their deterioration or contamination by foreign matter and to ensure their satisfactory quality and fitness for the work. The platform where aggregates are stock piled shall be levelled with 15 cm of watered, mixed and compacted granular sub-base material. The area shall have slope and drain to drain off rain water. The storage space must also permit easy inspection, removal and storage of the materials. Aggregates of different sizes shall be stored in partitioned stack-yards. All such materials even though stored in approved godowns must be subjected to acceptance test as per Clause 903 of these Specifications immediately prior to their use. 171.3 Proportioning of Concrete 171.3.1 After approval by the Engineer of all the materials to be used in the concrete, the Contractor shall submit the mix design based on weighed proportions of all ingredients for the approval of the Engineer. The mix design shall be submitted at least 30 days prior to the paving of trial length and the design shall be based on laboratory trial mixes using the approved materials and methods as per IS:10262 (Recommended Guidelines for Mix Design) or on the basis of any other rational method agreed to by the Engineer. Guidance in this regard can also be obtained from IS:SP:23 Handbook on Concrete Mixes. The target mean strength for the design mix shall be determined' as indicated in Clause 903.5.2. The mix design shall be based on the flexural strength of concrete. 171.3.2 Cement content: The cement content shall not be less than 350 kg per cu.m.of concrete. If this minimum cement content is not sufficient to pToduce in the field, concrete of the strength specified in the drawings/design, it. shall be increased as necessary without additional compensation under the Contract. The cement content shall, however, not exceed 425 kg per cu.m.of concrete. 171.3.3 Concrete strength

171.3.3.1 While designing the mix in the laboratory, correlation between flexural and. compressive strengths of concrete shall be established on the basis of at least thirty tests on samples. However, quality control in the field shall be exercised on the basis of flexural strength. It may, however, be ensured that the materials and mix proportions remain substantially unaltered during the daily concrete production. The water content shall be the minimum required to provide the agreed workability

Concrete Pavement

Section 600

for full compaction of the concrete to the required density as determined by the trial mixes or other means approved by the Engineer and the,maximum free water cement ratio shall be 0.50. 171.3.3.2 The ratio between the 7 and 28 day strengths shall be established for the mix to be used in the slab in advance, by testing pairs of beams and cubes at each stage on at least six batches of trial mix. The average strength of the'7 day cured specimens shall be divided by the average strength of the 28 day specimens for each batch, and the ratio 'R' shall be determined. The ratio 'R' shall be expressed to three decimal places. If during the construction of the trial length or during normal working, the average value of any four consecutive 7 day test results falls below the required 7 day strength as derived from the value of 'R', then the cement content of the concrete shall, without extra payment, be increased by 5 per cent by weight or by an amount agreed by the Engineer. The increased cement content. shall be maintained at least until the four corresponding 28 day strengths have been assessed for its conformity with the requirements as per Clause 6023.1. Whenever the cement content is increased,the concrete mix shall be adjusted to maintain the required workability. 171.3.4 Workability 171.3.4.1 The workability of the concrete at the point of placing shall be adequate for the concrete to be fully compacted and finished without -undue flow. The optimum workability for the mix to suit the paving. plant being used shall be determined by the Contractor and approved by the Engineer. The control of workability in the field shall be exercised by the slump test as per IS : 1199. 171.3.4.2 The workability requirement at the Batching Plant and paving site shall be established by slump tests carried during trial paving. These requirements shall be established from season to season and also when the lead from Batching plant site to the paving site changes. The workability shall be established for the type of paving equipment avallable. A slump value in the range of 30:t 15 mm is reasonable for paving works but this may be modified depending upon the site requirement and got approved by the Engineer. These tests shall be carried out on every truck/dumper at Plant site and paving site initially when the work commences but subsequently the frequency can be reduced to alternate trucks or as per the instructions of the Engineer. 171.3.5 Design mix

171.3.5.1 The Contractor shall carry out laboratory trials of design mixes with the materials from the approved sources to be used. Trial mixes shall be made in presence of the Engineer or his representative.and the design mix shall be subject to the approval of the Engineer. They shall be

Concrete Pavement

Section 600

repeated if necessary until the proportions that will produce a concrete which complies in all respects with this Specification, and conforms to the requirement of the design/drawings have been determined. 171.3.5.2 The proportions determined as a result of the laboratory trial mixes May be adjusted if necessary during the construction of the trial length. Thereafter, neither the materials nor the mix proportions shall be varied in any way except with the written approval of the Engineer. 171.3.5.3 Any change in the source. of materials or mix proportions proposed by the Contractor during the course of work shall be assessed by making laboratory trial mixes and the construction of a further'trial length unless approval is given by the Engineer for minor adjustments like compensation for moisture content in aggregates or minor fluctuadons in the grading of aggregate. 171.4 Sub-base The cement concrete pavement shall be laid over the sub-base constructed in accordance with the relevant drawings and Specifications contained in Clause 601. If the sub-base is found damaged at some places or it has cracks wider than 10 mm, it shall be repaired with Fine cement concrete or bituminous concrete. before laying separation ayer. Prior to laying of concrete it shall be ensured that the separation nembrane as per Clause 602.5 is placed. in position and the same is clean )f dirt or other extraneous materials and free from any damage.. 171.5 Separation Membrane A separation membrane shall be used between the concrete stab and the subbase. Separation membrane shall be impermeable plastic sheeting 125 microns thick laid flat without creases. Before placing the separation membrane, the sub-base shall be swept clean of all the extraneous materials using air compressor. Wherever overlap of plastic sheets is necessary, the same shall be at least 300 mm and any damaged sheeting shall be replaced at the Contractor's expense. The separation membrane may be nailed. to the lower layer with concrete nails. 171.6 Joints 171.6.1 The location and type of joints shall be as shown in the drawing. Joints shall be constructed depending upon their functional requirement as detailed in' the following paragraphs.The location of the joints should be transferred accurately at the site and mechanical saw cutting of joints done as per stipulated dimensions. It should be ensured that the full required depth of cut is made from edge to edge of the pavement. Transverse and longitudinal joints in the ' pavement and subbase shall be staggered so that they are not coincident vertically and are at least Im and 0.3 m apart respectively. Sawing of joints shall be carried out with diamond studded blades soon after the concrete has hardened to take the load of the sawing machine and personnel without damaging the texture of the pavernent,, Sawing operation could start

Concrete Pavement as early as 6-8 hours depending upon the season. 171.6.2 Transverse joints

Section 600

171.6.2.1 Transverse joints shall be contraction and expansion joints constructed at the s~acing described in the Drawings. Transverse joints shall be straight within the follow,ing't6leran-ces along the'intended line of joints which is the straight line transverse to thelongitudinal axisof the carriageway at the position proposed by the Contractor and agreed to by the Engineer, except at road junctions or roundabouts where the position shall be as described in the drawings:
(i) Deviations of the filler board in the case of expansion joints from the intended line of the joint shall not be greater than 10 mm. (ii) The best fit straight line through the joint grooves as constructed shall be not more than 25 mm from the intended line of the joint. (iii) mm. Deviations of the joint groove from the best fit straight line of the joint shall not be greater than 10

(iv) Transverse joints on each side of the longitudinal joint shall be in line with each other and of the same qW and width. Transverse joints shall have a sealing groove which shall be sealed in compliance with Clause 602.11.

171.6.2.2 Contraction joints : Contraction joints shall consist of a mechanical sawn joint groove, 3 to 5 mm wide and 1/4 to 1/3 depth of the slab 5 mm or as stipulated in the drawings and dowel bars complying with Clause 602.6.5 and as detailed in the drawings. The contraction joints shall be cut as soon as the concrete has undergone initial hardening and is hard enough to take the load of joint sawing machine without causing damage to the slab. 171.6.2.3 Expansion joints: The expansion joints shall consist of a joint filler board complying with Clause 602.2.7 and dowel bars complying with Clause 602.6.5 and as detailed in the drawings. The filler board shall be positioned vertically with the prefabricated joint assemblies along the line of the joint within the tolerances given in Clause 602.6.2. 1 . and at such depth below the surface ,V will not impede the passage of the finishing straight edges or oscillating beams of the paving machines. The adjacent slabs shall be completely separated from each other by pioviding joint filler board. Space around the -dowel bars, between the sub-base and the filler board shall be packed with a suitable compressible material to block the flow of cement slurry. 171.6.3 Transverse construction joint: Transverse construction joints shall be placed whenever concreting is completed after a day's work or is suspended for more than 30 minutes. These joints shall be provided at the regular location of contraction joints using dowel bars. The joint shall be made butt

Concrete Pavement

Section 600

type. At all construction joints, steel bulk heads shall be used to retain the concrete while the surface is finished. The surface of the concrete laid subsequently shall contorm to the grade and cross sections of the previously laid pavement. When positioning of bulk head/ stop-end is not possible, concreting to. an additional I or 2 m length may be carried out to enable the movement of joint cutting machine so that joint grooves may be formed and the extra - I or 2 m length is cut out and removed subsequently after concrete has hardened. 171.6.4 Longitudinal joint 171.6.4.1 The longitudinal joints shall be saw cut as per details of the joints shown in the drawing. The groove may be cut after the final set of the concrete. Joints should be sawn to at least 1/3 the depth of the slab 5 mm as indicated in the drawing. 171.6.4.2 Tie bars shall be provided at the longitudinal joints as per dimensions and spacing shown in the drawing and in accordance with Clause 602.6.6. 171.6.5 Dowel bars 171.6.5.1 Dowel bars shall be mild steel rounds in accordance with Clause 602.2.6 with details/dimensions as indicated in the drawing and free from oil, dirt, loose rust or scale. They shall be straight, free of irregularities and burring restricting slippage in the concrete. The sliding ends shall be.sawn or cropped cleanly with no protrusions outside the normal diameter of the bar. The dowel bar ihall be supported on cradles/dowel chairs in pre-fabricated joint assemblies positioned prior to the construction of the slabs or mechanically inserted with vibration into the plastic concrete by a method which ensures correct placement of the bars besides full re-compaction of the concrete around the dowel bars. 171.6.5.2 Unless shown otherwise on the drawings, dowel bars shall be positioned at mid depth of the slab within a tolerance of :t 20 mm, and centered equally about intended lines of the joint within a tolerance of 25 mm. They shall be aligned parallel to the finished surface of the slab and to the centre line of the carriageway and to each .other within tolerances given hereunder, the compliance of which shall be checked as per Clause 602.10.7.
i) For bars supported on cradles prior to the laying of the slab: (a) (b) All bars in a joint shall rbe within 3 mm per 300 nim length of bar 2/3rd of the bars shall be within 2 nun per 300 mm length of bar

(c) No bar shall differ in alignment from an adjoining bar by more than 3 mm per 300 mm length of bar in either. the horizontal or vertical plane (d) Cradles supporting dowel bar' shall riot extend across the line of joint i.e. no steel bar of the cradle assembly shall be continuous across the joint. (ii) For all bars inserted after laying of the slab:

Concrete Pavement
(a) Twice the tolerance for alignment as indicated in (i) above

Section 600

171.6.5.3 Dowel bars, supported on cradles in assemblies, when subject to a load of 110 N applied at either end and in either the vertical or horizontal direction (upwards and downwards and both directions horizontally) shall conform to be within the following limits:
(i) Two-thirds of the number of bars of any assembly tested shall not deflect more than 2 mm per 300 min length of bar (ii) bar. The remainder of the bars in that assembly shall not deflect more than 3 mrn per 300 mrn length of

171.6.5.4 The assembly of dowel bars and supporting cradles, including the joint filler board in the case of expansion joints, shall have the following degree of rigidity when fixed in position:(i) For expansion joints, the deflection of the top edge of die filler board shall be not greater than 13 mm, when a load of 1.3 kN is applied perpendicular to the vertical face of the joint filler board and distributed over a length of 600 min by means of a bar or timber packing, at mid depth and midway between individual fixings, or 300 nun from either end of any length of filler board, if a continuous fixing is used. The residual deflection after removal of the load shall be not more than 3 nun. (ii) The joint assembly fixings to sub-base shall not fail under the 1.3kN load applied for testing the rigidity of the assembly but shall fail'before the load reaches 2.6 kN. (iii) The fixings for contraction joint shall not fail under 1.3 kN load and shall fail before the load reaches 2.6 kN when applied over a length of 600 mm by means of a bar or timber packing placed as near to the level of the line of fixings as practicaKe.

(iv) Fixings shall be deemed to fail when them is displacement of the assemblies by more than 3 min with any form of fixing. under the test load. -The displacement shall be measured at the nearest part of the assembly to the centre of the bar or timber packing. 171.6.5.5 Dowel bars shall be covered by a thin plastic sheath for at least two~thirds of the length from one end for dowel bars in contraction joints or half the length plus 50 mm for expansion joints. The sheath shall be tough, durable and of an average thickness not greater than 1.25 mm. The sheathed bar shall comply with the following pull-out tests:
(i) Four bars shall be taken at random from stock and without any special preparation shall be covered by sheaths as required in this Clause. The ends of the dowel bars which have been sheathed shall be cast centrally into concrete specimens 150 x 150 x 600 mm, made of the same mix proportions to be used in the pavement, but with a maximum nominal aggregate size of 20 min and cured in accordance with IS: 516. At 7 days a tensile load shall be applied to achieve a movement of the bar of at least 0.25 mm. ne average bond stress to achieve this movement WWI not be greater than 0.14 UP&

171.6.5.6 For expansion joints, a closely fitting cap 100 mm long consisting of waterproofed cardboard or an approved synthetic material like PVC or GI pipe shall'be placed over the sheatfied end of each dowel bar. An expansion space at least equal in length to the thickness of the joint filler board shall be formed between the end of the cap and the end of the dowel bar by using compressible sponge. To block the entry of cement.sltiffy between dowel and cap it may be taped. 171.6.6 Tie bars Tie bars in longitudinal joints shall be deformed steel bars of 171.6.6.1

Concrete Pavement

Section 600

strength 415 MPa complying with IS: 1786 and in accordance with the requirements. given below. The bars shall be free from oil, dirt,loose rust and scale. 171.6.6.2 Tie ban projecting across the longitudinal joint shall be protected from corrosion for 75mm on each side of the joint by a protective coating of bituminous paint with the approval of the Engineer. The coating shall be dry when the tie bars are used." 171.6.6.3 Tie bars in longitudinal joints shall be made up into rigid assemblies with adequate supports and fixings to remain firmly in position during the construction of the slab. Alternatively, tie bars at longitudinal joints may be mechanically or manually inserted into the plastic concrete from above by vibration using a method which ensures correct placement of the bars and recompaction of the concrete around the tie bars. 171.6.6.4 Tie bars shall be positioned to remain within the middle third of the slab depth as indicated in the drawings and approximately parallel to the surface and approximately perpendicular to the line of * the joint, with the centre of each bar on the intended line of the joints within a tolerance of 50mm, and with a minimum cover of 30 mm below the joint groove. 171.7 Weather and Seasonal Limitations 171.7.1 Concreting during monsoon months: When concrete is being placed during monsoon months and when it may be expected to rain, sufficient supply of tarpaulin or other water proof cloth shall be provided along the line of the work. Any time when it rains, all freshly laid concrete which had not been coveted for curing purposes shall be adequately protected. Any concrete damaged by rain shall be removed and replaced. If the damage is limited to texture, it shall be retextured in accordance with the directives of the Engineer, 171.7.2 Concreting in hot weather: No concreting shall be done when the concrete temperature is above 30 degree Centigrade. Besides, in adverse conditions like high temperature, low relative humidity, excessive wind velocity, imminence of rains etc., if so desired by the Engineer, tents on mobile trusses may be provided over the freshly laid concrete for a mininium period of 3 hours as directed by the Engineer. The temperature of the concrete mix on reaching the paving site shall not be more than 300 C. To bring down the temperature, if necessary, chilled water or ice flakes should be made use of. No concreting shall be done when the concrete temperature is below 5 degree Centigrade and the temperature is descending. 171.8 Side Forms, Rails and Guidewires 171.8.1 Side forms and rai)5: All side forms shall be of mild steel of depth equal to the thickness of pavement or slightly less to accommodate the surface

Concrete Pavement

Section 600

regularity of the sub-base. The forms can be placed on series of steel packing plates or shims to take care of irregularity of subbase. They shall be sufficiently robust and rigid to support the weight and pressure caused by a paving equipment. Sideforms for use with wheeled paving machines shall incorporate metal rails firmly fixed at a constant height below the top of the forms. The forms and rails shall be firmly secured in position by not less than 3 stakes/pins-per each 3 m length so as to prevent movement in any direction. Forms and rails shall be straight within a tolerance of 3 mm in 3 m and when in place shall not settle in excess of 1.5 min in 3 in while paving is being done. Forms shall be cleaned and oiled'immediately before each use. The forms shall be bedded on a continuous bed.of low moisture content lean cement mortar or concrete and set to the line and levels shown on the drawings within tolerances :k 10 mm and 1 3 mm respectively. The bedding shall not extend under the slab and there shall be no vertical stJop between adjacent forms of more than 3 mm. The forms shall be got inspected from the Engineer for his apploval before 12 hours on the day before the construction of the slab and shall not be removed until at least 12 hours afterwards. 171.8.2 At all times sufficient forms shall be used and set to- the required alignment for at least 200 m1ength of pavement immediately in advance of the paving operations, or the anticipated length of pavement to be laid within the next 24 hrs whichever is more. 171.8.3 Use of guidewires 171.8.3.1 Where slip form paving is proposed, a guidewire shall be provided along both sides of the slab. Each guidewire shall be at a constant height above and parallel to the required edges of the slab as described in the contractldrawing within a vertical tolerance of 3mm. Additionally, one of the wires shall be kept at a constant horizontal distance from the required edge of the-pavement as indicated in the contract/drawing within a lateral tolerance of 10 mm. 171.8.3.2 The guidewires shall be supported on stakes not more than 8 in apart by connectors capable of fine horizontal and vertical adjustment. The guidewire shall be tensioned on the stakes so that a 500 gram weight shall produce a deflection of not more than 20 mm when suspended at the mid point between any pair of stakes. The ends of the guidewires shall be anchored to fixing point or winch and not on the stakes. 171.8.3.3 The stakes shall be positioned and the connectors maintained at their correct height and alignment from 12 hours on the day before concreting takes place until 12 hours after finishing of the concrete. The guidewire shall be erected and tensioned on the connectors at any section for at least 2 hours before concreting that section. 171.8.3.4 The Contractor shall submit to the Engineer for his approval of line and level, the stakes and connectors which are ready for use in the length

Concrete Pavement

Section 600

of road to be constructed by 12 hours on the working day before the day of construction of slab. Any deficiencies noted by the Engineer shall be rectified by the Contractor who shall then re-apply for approval of the affected stakes. Work shall not proceed until the Engineer has given his approval. It shall be ensured that the stakes and guidewires are not affected by the construction equipment when concreting is in progress. 171.9 Construction 171.9.1 General: A systems approach may be adopted for construction of the pavement, and the Method Statement for carrying out the work, detailing all the activities including indication of time-cycle, equipment, personnel etc., shall be got approved from the Engineer before the commencement of the work. The above shall include the type, capacity and make of the batching and mixing plant besides the hauling arrangement' and paving equipment. The capacity of paving equipment, batching plant as well as all the ancillary equipment shall be adequate for a paving rate of atleast 300 rn in one day. 171.9.2 Batching and mixing: Batching and mixing of the concrete shall be done at a central batching and mixing plant with' automatic controls, located at a suitable place which takes into account sufficient space for stockpiling of cement, aggregates and stationary water tanks. This shall be, however, situtated at an approved distance, duly considering the properties of the mix and the transporting arrangements available with the Contractor. 171.9.3 Equipment for proportioning of materials and paving 171.9.3.1 Proportioning of materials shall be done in the batching plant by weight, each type of material being weighed separately. The cement from the bulk stock may be weighed separately from the aggregates and water shall be measured by volume. Wherever properly graded aggregate of uniform quality cannot be maintained as envisaged in the mix design, the grading of aggregates shall be controlled by appropriate blending techniques. The capacity of batching and mixing plant shall be at least 25 per cent higher than the proposed capacity of the laying/paving equipment. 171.9.3.2 Batching plant and equipment:
(1) General- The batching plant shall include minimum four bins, weighing hoppers, and scales for the fine aggregate and for each size of coarse aggregate. If cement is used in bulk, a separate scale for cement shall be included. The weighing hoppers shall be Properly sealed and vented to preclude dust during operation. Approved. safety devices shall be provided and maintained for the protection of all personnel engaged . in plant operation, inspection and testing. The batch plant shall be equipped with a suitable non-resettable batch counter which will correctly indicate the number of batches proportioned. (2) Bins and hoppers- Bins with minimum number of four adequate separate compartments shall be prpvided in the batching plant. (3) Automatic weighing devices-Batching plant shall be equipped to proportion aggregates and bulk cement by means of automatic weighing devices using load cells.

Concrete Pavement

Section 600

(4) Mixers- Mixers shall be pan type, reversible type or any other mixer capable of combining the aggregates, cement, and water into a thoroughly mixed and uniform mass within the specific mixing period, and of discharging the mixture, without segregation. Each stationary mixer shall be equipped with an approved timing device which will automatically lock the discharge lever when the drum has been charged and release it at the end of the mixing period. The device shall be equipped with a bell or other suitable warning device adjusted to give a clearly audible signal each time the lock is released. In case of failure of the timing device, the mixer may be used for the balance of the day while it is being repaired, provided that each batch is mixed 90 seconds or as per the manufacturer's recommendation. The mixer shall be equipped with a suitable non-resettable batch counter which shall correctly indicate the number of batches mixed. The mixers shall be cleaned at suitable intervals. The pickup and throw-over blades in the drum or drums shall be repaired or replaced when they are worn down 20 mm or more. The Contractor shall (1) have available at the job site a copy of the manufacturer's design, showing dimensions and arrangements of blades in reference to original height and depth, or (2) provide permanent marks on blade to show points of 20 mm wear from new conditions. Drilled holes of 5 min diameter near each end and at midpoint of each blade are recommended. Batching Plant shall be calibrated in the beginning and thereafter at suitable interval not exceeding month. (5) Control cabin - An air-conditioned centralised control cabin shall be provided for automatic operation of the equipment.

171.9.3.3 Paving equipment : The concrete shall be placed with an approved fixed'form or slip from paver with independent units designed to (i) spread,(ii) consolidate, screed and float-finish, (iii) texture,and cure the freshly placed concrete in one complete pass of the machine in such a manner that a minimum of hand finishing will be - necessary and so as to provide a dense and homogeneous pavement in conformity with the plans and Specifications.The paver shall be equipped with electronic controls to control/sensor line and grade from either or both sides of the machine. Vibrators shall operate at a frequency of 8300 to 9600 impulses per minute under load at a maximum spacing of 60 cm. The variable vibration setting shall be provided in the machine. 171.9.3.4 Concrete saw : The Contractor shall provide adequate number of concrete saws with sufficient number of diamond-edge saw blades. The saw machine shall be either electric or petrol/diesel driven type. A water tank with flexible hoses and pump shall be made available in this activity on priority basis. The Contractor shall have at least one standby saw in good working condition. The concreting work shall not commence if the saws are not in working condition. 171.9.4 Hauling and placing of concrete 171.9.4.1 Freshly mixed concrete from the central batching and mixing plant shall be transported to the paver site by means of trucks/tippers of sufficient capacity and approved design in sufficient numbers to ensure a constant supply of concrete. Covers shall be used for protection of concrete against the weather. The trucks/tippers shall be capable of maintaining the mixed concrete in a homogeneous state and discharging the same without segregation and loss of cement slurry. The feeding to the paver is to be regulated in such a way that the paving is done in an

Concrete Pavement

Section 600

uninterrupted manner with a uniform speed throughout. the days work. 171.9.4.2 Placing of concrete Concrete mixed in central mixing plant shall be transported to the site without delay and the concrete which, in the opinion of the Engineer, has been mixed too long before laying will be rejected and shall] be removed from the site. The total time taken from the addition of the water to the mix, until the completion of the surface finishing and texturing "I not exceed 120 minutes when concrete temperature is less than 250C and 90 minutes when the concrete temperature is between 25oC to 300C , Trucks/tippers delivering concrete shall not run on plastic sheeting nor shall they run on completed slabs until after 28 days of placing the concrete. The Paver shall be capable of paying the carriageway as shown, in the drawings, in a single pass and lift. 171.9.4.3 Where fixed form pavers are to be used, forms shall be fixed in advance as per Clause 602.8. of the Specifications. Before any paving is done, the site shall be shown to the Engineer, in order to verify the arrangement for paving besideg placing of dowels' 'tie-bars etc., as per the relevant Clauses of this Specification. The mixing and placing of concrete shall progress only at such a rate as to permit proper finishing, protecting and curing of the pavement. 171.9.4.4 In all cases, the temperature of the concrete ' shall be measured at the point of discharge from the delivery vehicle. 171.9.4.5 The addition of water to the surface of the concrete to facilitate the finishing operations will not be permitted except with the approval of the Engineer when it shall be applied as a mist by means of approved equipment. 171.9.4.6 If considered necessary by the Engineer, the paving machines shall be provided with approved covers to protect the surface of the slab under construction from direct sunlight and rain or hot wind. 171.9.4.7 While the concrete is still plastic, its surface shall be brush texturedin compliance with Clause 602.9'.8 and the surface and edges of the slab cured by the application of a sprayed liquid curing membrane in compliance with Clause 602.9.9. After the surface texturing, but before the curing compound is applied, the concrete slab shall be marked with the chainage at every 100 in interval. 171.9.4.8 As soon as the side forms are removed, edges of the slabs shall be corrected wherever irregularities have occurred by using fine concrete composed of one part of cement to 3 parts of fine chips and fine aggregate under the supervision of the Engineer. 171.9.4.9 If the requirement of Clause 902.4. for surface regularity Us to be achieved on two consecutive working days, then normal working shall cease until the cause of the excessive irregularity has been identified and remedied.

Concrete Pavement 171.9.5 Constr uction by fixed form paver

Section 600

171.9.5.1 The fixed form paving train shall consist of separate powered machines which spread, compact and finish the concrete in a continuous operation. 171.9.5.2 The concrete shall be discharged without segregation into a hopper spreader which is equipped with means for controlling its rate of deposition on to the subbase. The spreader shall be operated to strike off concrete uptq a level requiring a small amount of cutting down by the distributor of the spreader. The distributor of spreader shall strike off the concrete to the surcharge adequate to ensure that the vibratory compactor thoroughly compacts the layer. If necessary, poker vibrators shall be used adjacent to the side forms and edges of the previously constructed slab. The vibratory compactor shall be. set to strike off the surface slightly high so that it is cut down to. the required level by the oscillating beam. The machine shall be capable of being rapidly adjusted for changes in average and differential surcharge necessitated by changes in slab thickness or cross fall. The final finisher shall be able to finish the surface to the required level and smoothness as specified, care being taken to avoid bringing up of excessive mortar to the surface by overworking. 171.9.6 Construction by slip form paver 171.9.6.1 The slip form paving train shall consist of power machine which spreads, compacts and finishes the concrete in a continuous operation. The slip form paving machine shall compact the concrete by internal vibration and shape it between the side forms with either a conforming plate or by vibrating and oscillating finishing beams. The concrete shall be deposited without segregation in front of slip form paver across the whole width and to a height which at all times is ih excess of the required surcharge. The deposited concrete shall be struck off to the necessary average and differential surcharge by means of the strike off plate or a screw auger device extending across the whole width of the slab. The equipment for striking-off the concrete shall be capable of being rapidly adjusted for changes of the average and differential surcharge necessitated by change in slab thickness or crossfall. 171.9.6.2 The level of the conforming plate and finishing beams shall be controlled automatically from the guide wires installed as per Clause 602.8 by sensors attached at the four comers of the slip form paving machine. The alignment of the paver shall be controlled automatically from the guide wire by at least one set of sensors attached to the paver. The alignment and level of ancillary machines for 'finishing, texturing and curing of the concrete shall be automatically controlled relative to the guide wire or to the sudace, %nd, eA%t r4k %~\e,

Concrete Pavement

Section 600

171.9.6.3 -SUp-lorm paving majcWjnt% %'Rallnave vibrators of variable output, with a maximum energy output of not less than 2.5 KW per metre width of stab per 300 mm depth of slab for a laying speed upto 1.5 in per minute or pro-rata for higher speeds. The machines shall be of sufficient mass to provide adequate reaction during spreading and paving operations on the traction units to maintain forward movements during the placing of concrete in all situations. 171.9.6.4 If the edges of the slip formed slab slump to the extent that the surface of the top edge of the slab does not comply with the requirements of Clause 602.14, then special measures approved by the Engineer shall be, taken to support the edges to the required levels and work shall be stopped until such time as the Contractor can demonstrate his ability to slip form the edges to the required levels. 171.9.7 Construction by hand-guided method: Areas in w hich hand-guided methods of construction become indispensable shall be got approved by the Engineer in writing in advance. Such work may be permitted only in restricted areas in small lengths. Work shall be carried out by skilled personnel as per methods approved by the Engineer. 'the acceptance criteria regarding level, thickness, surface regularity, texture, finish, strength of concrete and all other quality control measures shall be the same as in the case of machine laid work. 171.9.8 Surface texture 171.9.8.1 After the final regulation of the slab and before the application of the curing membrane, the surface of concrete slab shall be brush-textured in a direction at right angles to the longitudinal axis of the carriageway. 171.9.8.2 The brushed surface texture shall be applied evenly across the slab in one direction by the use of a wire brush not less than 450 mrn wide but longer brushes are preferred. The brush shall be made of 32 gauge tape wires grouped together in tufts spaced at 10 mm centres. The tufts shall contain an average of 14 wires and initially be 100 mm long. The brush shall have two rows of tufts. The rows shall be 20 mm apart and the tufts in one row. shall be opposite the centre of the gap between tufts in the. other row. The brush shall be replaced when the shortest tuft wears down to 90 mm long. 171.9.8.3 The texture depth shall be determined by the Sand Patch Test as described in Clause 602.12. This test shall be performed at least once for each day's paving and wherever the Engineer considers it necessary at times after construction as under: Five individual measurements of the texture depth shall be taken at liast 2 m apart anywhere along a diagonal line across a lane width between points 50 m apart along the

Concrete Pavement

Section 600

pavement. No measurement shall be taken within 300 -mm of the longitudinal edges of a concrete slab constructed in one pass. 171.9.8.4 Texture depths shall not be less than the minimum required when measurements are taken as given in Table -600-2 nor -greater than a maximum average of 1.25 mm.
TABLE: 606-2. Texture Depth Number of Time of Test Spec1W Value 1. Between 24 hours and 7 days after the constn., of the slab or until 4he dab ts first used by vishidm 2, Not later than 6 weeks before the road is opened to public udfic. An average of 1.00 +0.25 5 measurements -0.35 An average of 1.00 0.25 Required Measurements Tolerance Texture Depth (mm)

5 measurements

171.9.8.5 After the application of the brushed texture, the surface of the slab shall have a uniform appearance. 171.9.8.6 Where the texture depth requirements are found to be deficient, the Contractor shall make good the texture across the full lane width over length directed by the Engineer, by retexturing the hardened concrete surface in an approved manner. 171.9.9 Curing 171.9.9.1 Immediately after the surface texturing, the surface and sides of the slab shall be cured by the application of approved resin- based aluminised reflective curing compound which - hardens into an impervious film or membrane with the help of a mechanical sprayer. Curing compounds shall contain sufficient flake aluminium in finely divided dispersion to produce a complete coverage of the sprayed surface with a metallic finish. The compound shall become stable and impervious to evaporation of water from the surface of the concrete within 60 minutes of application and shall be of approved type. The curing compounds shall have a water retention -efficiency index of 90 per cent in accordance with BS Specification No. 7542. 171.9.9.2 The curing compound shall not react chemically with the concrete and the film or membrane shall not crack, peel or disintegrate within three weeks after application. Immediately prior to use, the curing .compound shall be thoroughly agitated in its containers..The rate of spread shall be in accordance with the manufacturer's instructions checked during the construction of the trial length and subsequently whenever required by

Concrete Pavement

Section 600

the Engineer. The mechanical sprayer shall incorporate an efficient mechanical device for continuous agitation and mixing of the compound during spraying. 171.9.9.3 In addition to spraying of curing compound, the fresh concrete surface shall be protected for at least 3 hours by covering the finished concrete pavement with tents as described in Clause 602.7.2, dufing adverse weather conditions as directed by . the Engineer. After three hours, the pavement shall be covered by moist hessian and the same shall then be kept damp for a.minimum period of 14 days after which time the hessian may be removed. The hessian shall be kept continuously moist. All damaged/torn hessian shall be removed and replaced by new hessian on a regular basis. 171.9.9.4 The,Contractor shall be liable at his expense to replace any concrete damaged as a result of incomplete curing or cracked on a line other than that of a joint. 171.10 Trial Length 171.10.1 The trial length shall be constructed at least one month in advance of the proposed start of concrete paving work. At least one month prior to the construction of the trial length, the Contractor shall submit for the Engineer's approval a detailed method * statement giving description of the proposed materials, plant, equipment and construction methods. All the major equipments like paving train, batching plant, tippers etc., proposed in the construction are to be approved by the Engineer before their procurement. No trials of new materials, plant, equipment or construction methods, nor any development of them shall be permitted either during the construction of trial length or in any subsequent paving work, unless they form part of further, approved trials. These trial lengths shall be constructed away from the carriageway but with at least a subbase layer below it. 171.10.2 The Contractor shall demonstrate the materials, plan t, equipment and methods of construction that are proposed for concrete paving, by first constructing a trial length of slab, at least 60 m but not more than 300 m long for mechanised construction and at least 30 in long for hand guided methods. If the first trial is unsatisfactory, the Contractor shall have to demonstrate his capability to satisfactorily construct the pavement in subsequent trials. 171.10.3 The trial length shall be constructed in two parts over a pcliod compting at least put Of two separate working days, with a minimum of 30 m constructed each day for- mechanised construction and a minimum of 15 m on each day for hand guided construction. The trial length shall be constructed at a similar rate (speed, around lm/hr) to that which is proposed for the main work. 171.10.4 Transverse joints and longitudinal joints of each type that are proposed for dowel-jmnted unreinforced concrete slabs in the main work shall be

Concrete Pavement

Section 600

constructed and assessed in the trial length. If in the trial length the construction of expansion joint and longitudinal joint is not demonstrated, the first 2 expansion joints and at least,the first 150 m of longitudinal construction joint for mechanised paving in the main work, shall be considered as the trial length for these joints. 171.10.5 The trial length shall comply with the Specification in all respects, with 'he following additions and exceptions: 171.10.5.1 Surface levels and regularity
(i) In checking for compliance with Clause 903.5 the levels shall be taken 4t iotervals at the locations specified in this Clause along any line or lines parallel to the longitudinal centre line of the trial length. (ii) The maximu;n number of permitted irregularities of pavement surface, shall comply with the requirements of Clause 902.4. Shorter trial lengths shall be assessed promta based on. values for a 300 in length.

171.10.5.2

Joints

(iii) Alignment of dowel bars shall be inspected as described in Clause 602.10.7 in any two consecutive transverse joints. If the position or alignment of the dowel bars at one of these joints does not comply with Clause 602.6.5, if that joint remains the only one that does not comply after the next 3 consecutive joints of the same type have been inspected, then the method of placing dowels shall be deemed to be satisfactory. In order to check sufficient joints for dowel bar alignment without extending the trial length unduly, the Contractor may, by agreement with the Engineer, construct joints at more frequent joint intervals than the nonnal spacing required in the Contract. (iv) If there are deficiencies in the first expansion joint that is constructed as a tria ' 1, the' next expansion joint shall be a tjial joint. Should this also be deficient. further trial expansion joints shall be made as part of the trial leno which shall not form part of the permanent works, unless agreed by the Engineer.

171.10.5.3

Density

(v) Density shall be assessed as described in * Clause 602.3.3. from al.least 3 cores drilled from each part of the, trial length.

171.10.5.4

Position of tie bars

(vi) Compliance with Clause 602.6.6 , for the position and alignment of fie bars shall be checked by drilling additional cores from the slab unless they can be determined from cores taken for density.

171.10.6

Approval and acceptance

171.10.6.1 Approval of the materials, plant, equipment and construction methods shall be given when a trial length complies with the Specification. The Contractor shall not proceed with normal working until the trial length has been approved and any. earlier defective trial lengths have been removed, unless that can be remedied to the satisfacdon of the Engineer.. If the Engineer does not notify the Contractor of any deficiencies in any trial length within 10 days after the completion of that trial length, the Contractor may assume that the trial length, and the materials, plant, equipment and construction methods adopted are acceptable. 171.10.6.2 When approval has been given, the materials, plant, equipment and construction methods shall not thereafter be changed, except for normal adjustments and maintenance of plant, without the approval of the

Concrete Pavement

Section 600

Engineer. Any changes in materials, plant, equipment, and construction methods shall entitle the Engineer to require. the Contractor to lay a further trial length as described in this Clause to demonstrate that the changes will not adversely affect the permanent works. 171.10.6.3 Trial lengths which do not comply with the Specification, with the exception of areas which are deficient only in surface texture and which can be, remedied in accordance with Clause 602.9.8.6 shall be removed immediately upon notification of deficienciegby the Engineer, and the Contractor shall construct a further trial length. 171.10.7 Inspection of dowel bars 171.10.7.1 Compliance with Clause 602.6.5. for the position and alignment of dowel bars at construction and expansion joints shall be checked by measurements relative to the side forms or guide wires. 171.10.7.2 When the slab has been constructed, the position and alignment of dowel bars and any filler board shall be measured after carefully exposing them in the plastic concrete across the whole width of the slab. When the joirt is an expansion joint, the top of the filler board shall first be exposed sufficiently in the plastic concrete to permit measurement of any Lateral or vertical displacement of the board. During the course of normal working, these measurements shall be carried out in the pavement section at the end of day's work by extending slab length by 2 in. After sawing the transverse joint groove, the extended 2 m slab shall be removed carefully soon after concrete has set to expose dowels over half the length. These dowels can be tested for tolerances. 171.10.7.3 If the position and alignment of the bars in a single joint in the slab is unsatisfactory then the next two joints shall be inspected. If only one joint of the three is defective, the rate of checking shall be increased to one joint per day until the Engineer is satisfied that compliance is being achieved. In the event of non-compliance in two or more successive joints, the Contractor shall revert to the construction of fresh trial lengths and make any necessary alteration to concrete mix, paving plant or methods until the dowel bar position and alignment are satisfactory. 171.10.7.4 After the dowel bars have been examined, the remainder of the concrete shall be removed over a width of 500 mm on each side of the line of the joint and reinstated to the satisfaction of the Engineer. The dowels shall be inserted on both sides of the I m wide slab by drilling holes and grouting with epoxy mortar. Plastic sheath as per Clause 602 6.5.5 *shall be provided on dowels on one of the joints. The joint groove shall be widened and sealed as per Clause 602.11. 171.11 Preparation and Sealing of Joint Grooves 171.11.1 General

Concrete Pavement

Section 600

All transverse joints in surface slabs shall be sealed using sealants described in Clause 602.2.8. Joints shall not be sealed before 14 days after construction. 171.11.2 Preparation of joint grooves for sealing

171.11.2.1 Joint grooves usually are not constructed to provide the minimum width specified in the drawings when saw cut joints are opted. They shall be widened subsequently by sawing before sealing. Depth/width gauges shall be used to control the dimension of the groove. 171.11.2.2 If rough arrises develop when grooves are made, they shall be ground to provide a chamfer approximately 5 mm wide. If the groove is at an angle upto 10 degree from the perpendictilar to the surface, the overhanging edge of the sealing groove shall be sav or ground perpendicular. If spalling occurs or the angle of the fori-ner is greater than 10 degrees, the joint se * aling groove shall be sawn wider and perpendicular to the surface to encompass the defects upto a maxi mum width, including any chamfer, of 35 mm for transverse joints and 20 mm for longitudinal joints. If the spalling cannot be so eliminated then the arrises shall be repaired by an approved thin bonded arris repair using cementitious materials. 171.11.2.3 All grooves shall,be cleaned of any dirt or loose material by air blasting with filtered, oil-free compressed air. If need ises the an Engineer may instruct cleaning by pressurised water jets. Depending upon the requirement of the sealant manufacturer, the sides of the grooves may have to be sand blasted to increase the bondage between sealant and concrete. 171.11.2.4 The groove shall be cleaned and dried at the time of priming and sealing. 171.11.2.5 Before sealing the temporary seal provided for blocking the ingress of dirt, soil etc., shall be removed. A highly compressible heat resistant paper-backed debonding strip as per drawing shall be inserted in the groove to serve the purpose of breaking ' the bond between sealant and the bottom of the groove and to plug the joint groove so that the sealant may not leak through the cracks. The width of debonding strip shall be more than the joint groove width so that it is held tightly in the groove. In the case of longitudinal joints, heat resistant tapes may be inserted to block the leakage through bottom of the joint. 171.11.3 Sealing with sealants 171.11.3.1 When sealants'are applied, an appropriate primer shall also be used if recommended by the manufacturer and it shall be applied in accordance with their recommendation. The sealant shall be applied within the minimum and maximum dfy;..--, times of the primer

Concrete Pavement

Section 600

recommended by the manufacturer. Priming and sealing with applied sealants shall not' be' carried out when the naturally occurring temperature in the joint groove to be sealed is below 70 C. 171.11.3.2 If hot applied sealant is used it shall be heated and applied from a thermostatically controlled, indirectly heated* preferably with oil jacketed melter and pourer having recirculating pump and extruder. For large road projects, sealant shall be applied with extruder having flexible hose and nozzle. The sealant shall not be heated to a temper ature higher than the safe heating temperavrrz and r9i fc a period longer than the safe beating period, as, specified by the manufacturer. The dispenser shall be cleaned out at the end of each day in accordance with the manufacturer's recommendations and reheated material shall not be used. 171.11.3.3 Cold applied sealants with chemical formulation like polysulphide may be used. These shall be mixed and applied within the' time limit specified by the manufacturer. If primers are recommended they shall be applied neatly with an appropriate brush. The Movement Accommodation Factor (MAF) shall be more than 10 per cent.. 171.11.3.4 The sealants applied at contraction phase of the slabs would result in bulging of the sealant over and above the slab. Therefore, the Contractor in consultation with the Engineer, shall establish the right temperature and time for applying the sealant. Thermometer shall be hung on a pole in the site for facilitating control during the sealing operation. 171.11.3.5 Sealant shall be applied, slightly to a lower level than the slab with a tolerance of 5 2 mm. 171.11.3.6 During sealing operation, it shall be seen that no air bubbles are introduced in the sealant either by vapours or by the sealing process. 171.11.4 Testing of applied sealants: Manufacturer's certificate shall be produced by the Contractor for establishing that the sealant is not more than six months old and stating that the sealant complies with the relevant stan~ard as in Clause 602.2.8. The samples shall meet the requirement of AASHTO M 282 for hot applied sealant or BS 5212: (Part2) for cold applied sealant. 171.12 Measurement of Texture Depth - Sand Patch Method 171.12.1
(i)

The following apparatus shall be used:

A cylindrical container of 25 n-d internal capacity

(ii) A flat wooden disc' 64 mm diameter with a hard rubber disc, 1.5 mm thick, stuck to one face, the reverse face being provided with a handle (iii) Dry natural sand with a rounded particle shape passing a 300 micron IS sieve and retained on a 150 micron IS sieve.

171.12.2 Method: The surface to be measured shall be dried, any extraneous mortar and loose material removed and the surface swept clean using a wire

Concrete Pavement

Section 600

brush both at right angles and parallel to the carriageway. The cylindrical container shall be filled with the sand, tapping the base 3 times on the surface to ensure compaction, and striking off the sand level with the top of the cylinder. The sand shall be poured into a heap on the surface to be treated. The. sand shall be spread over the surface, working the disc with its face kept flat in a circular motion so that the sand is spread into a circular patch with the surface depressions filled with sand to the level of peaks. 171.12.3 The diameter of the patch shall be measured to the nearest 5 mm. The texture depth of concrete surface shall be calculated from 31000/(DxD) mm where D is the diameter of the patch in mm. 171.13 Opening to Traffic No vehicular traffic shall be allowed to run on the finished surface of a concrete pavement within a period of 28 days of its construction and until the joints are permanently sealed. The road may be opened to regular traffic after completion of the curing period of 28 days and after sealing of joints is completed including the construction of shoulder, with the written permission of the Engineer. 171.14 Tolerances for Surface Regularity, Level, Thickness and Strength The tolerances for surface regularity, level, thickness and strength shall conform to the requirements given 'in Clause 903.5. Control of quality of materials and works shall be exercised by the Engineer in accordance with Section 900. 171.15 Measurements for Payment 171.15.1 Cement Concrete pavement shall be measured as a finished work in square metres with specified thickness. The volume to be paid for will be calculated on the basis of thickness and plans shown on the project drawings and adjusted for the deficiency in thickness. No additional payment shall be made for extra thickness of the slab. The full payment will be made to this item after 28 days strength of the concrete is found to be satisfactory. The unit for measurement for concrete pavement shall be the cubic metre of concrete placed, based on the net plan areas for the specified thickness shown on the Drawings or directed by the Engineer. The rate shall include all provisions of this Specification and shall include the pr?vision of all materials including Polythene film, concrete, stock piling, mixing, transport, placing, compacting, finishing, curing together with all formwork, and including testing and submission of test certificates and records. No deduction shall be made in measurement for openings provided that the area of each is less than 0.5 sq. m. The unit rate as entered in the Bill of Quantities shall also include the full costs of contraction, expansion, construction, and longitudinal joints. It shall -also include joint filler, keys, caulking rod, debofiding - strip, sealant primer, joint sealant, dowel bar and tie, rod. 171.15.2 Pavement thickness

Concrete Pavement

Section 600

All precautions and care shall be taken to construct pavement having uniform thickness as called for on the plans. Thickness of the cement concrete pavement shall be calculated on the basis of level data of the cement concrete pavement and the underlying sub-base taken on a grid of 5 in x 3.5 in or 6.25 in x 3.5 in, the former measurement being in longitudinal direction. A. day's work is considered as a 'lot' for calculating the average thickness of the slab. In calculating the average thickness, individual measurements which are in excess of the specified thickness by more, than 10 mm shall be considered as the specified thickness plus 10 mm. Individual areas deficient by more than 25 min shall be verified by the Engineer by ordering core cutting and if in his opinion the deficient areas warrant removal, they shall be removed and replaced with concrete of the thickness shown on the plans. When the average thickness for the lot is defici ' ent by the extent shown in Table 600-3, the Contract unit price will be adjusted as per this Table.
TABLE 600-3. PAYMENT ADJUSTMENT FOR DEFICIENCY IN THICKNESS Deficiency in the average thickness of day's work Up to 5 nun 6 - 10 nun 11 - 15 nun 16 - 20 nun 21 - 25 nun Per cent of Contract unit price payable 100 87 81 75 70

In the stretch where deficiency of average thickness is more than 25 min, the section whose thickness is deficient by 26 mm or more is identified with the help of cores. Such slabs shall be removed and recon~tructed at the cost of the Contractor. During such rectification work," care shall be taken to replace full slab and to the full depth. 171.16 Rate The Contract unit rate for the construction of the cement concrete shall be payment in full for carrying out the operations required for the different items oi the work as per these Specifications including full compensation for all labour, tools, plant, equipments, testing and incidentals to complete the work as per Specifications, providing all materials to be incorporated in -the work including all royalties, fees, storage, rents where necessary and all leads and lifts. 172 172.1 Scope 172.1.1 The work shall consist of construction of rolled concrete base course for cement concrete pavement in accordance with the requirements of these Specifications *and in conformity with the lines, grades and cross sections shown on the drawings or as directed by the Engineer. The workshall include ROLLED CEMENT CONCRETE BASE

Concrete Pavement

Section 600

furnishing of all plant and equipment, material and labour and performing all operations in connection with the woTk, as approved by the Engineer. 172.1.2 The design parameters of rolled cement concrete base course viz., width, thickness, grade of concrete, details of joints, if any, etc. shall be as stipulated in the contract drawings. 172.2 Materials 172.2.1 Source of materials: The Contractor shall indicate to the Engineer the source of all materials to be used in the lean concrete work with relevant test data sufficiently in advance and the approval of the Engineer for the same shall be obtained at least 60 days before the scheduled commencement of the work. If the Contractor later proposes to obtain the materials from a different source, he shall notify the Engineer for his approval at least 60 days before such materials are to be used. 172.2.2 Cement : Any of the following types of cement may be used with prior approval of the Engineer.
(i) Ordinary Portland Cement (ii) Portland Sing Cement (iii) Portland Pozzolang Cement IS : 269, 8112 or 12269 IS :455 IS : 1489

If the subgrade is found to consist of soluble sulphates in a concentration more than 0.5 per cent, cement used shall be sulphate resistant and shall conform to IS : 12230. Cement to be used may preferably be obtained in bulk form. It shall be stored in accordance with stipulations contained in Clause 1014 and shall be subjected to acceptance test prior to its immediate use. 172.2.3 Aggregates 172.2.3.1 Aggregates for lean concrete shall be natural material complying with IS: 383. The aggregates shall not be alkali reactive. The limits of deleterious materials shall not exceed the requirements set out in IS: 383. In case the Engineer considers that the aggregates are not free from dirt, the same may be washed and drained for at least 72 hours before batching as directed by the Engineer. 172.2.3.2 Coarse aggregate : Coarse aggregates shall consist of clean, hard, strong, dense, non-porous and durable pieces of crushed stone or crushed gravel and shall be devoid of pieces of disintegrated stone, soft, flaky, elongated, very angular or splintery pieces. The maximum size of the coarse aggregate shall be 25 mm. The coarse aggregate shall comply with the Clause 602.2.4.2. ' 172.2.3.3 Fine aggregate.: The fine aggregate shall consist of clean natural sand or crushed stone sand or a combination of the two and shall conform to IS:383. Fine aggregate shall be free from soft particles, clay, shale, loam, cemented particles, mica, organic and other foreign matter. The fine aggregate shall comply-with the Clause 602.2.4.3.

Concrete Pavement

Section 600

172.2.3.4 The coarse and fine aggregates may be obtained in either of the following manner:(i) In separate nominal sizes of coarse and fine aggregates and mixed together intimately before use. (ii) Separately as 25 mm nominal single size, 12.5 mm nominal size graded aggregate and fine aggregate of crushed stone dust or sand or a combination of these two.

The material after blending shall conform to the grading as indicated in Table 6W-4 below:
TABLE 600-4. AGGREGATE GRADATION FOR DRY LEAN CONCRETE Sieve Designation sieve by weight 37.5 mm 19.0 m 9.5 mm 4.75 mm 600 micron 75 micron 0-8 100 80-100 55-80 35-60 10-35 Percentage Passing the

172.2.4 Water: Water used for mixing and curing of concrete shall be clean and free from injurious amount of oil, salt, acid, vegetable matter or other substances harmful to the finished concrete. It shall meet the requirements stipulated in IS: 456. 172.2.5 Storage of materials: All materials shall be stored in accordance with the provisions of Clause 1014 of these Specifications, and other relevant IS Specifications. All efforts must be made to store the materials in proper places so as to prevent their deterioration or contamination by foreign matter and to ensure their satisfactory quality and fitness for the work. The storage place must also permit easy inspection, removal and storage of materials. All such materials even though stored in approved godowns must be subjected to acceptance test immediately prior to their use. The requirement of storage yard specified in Clause 602.2.9 shall be applicable. 172.3 Proportioning of Materials for the Mix 172.3.1 The mix shall be proportioned with a maximum aggregate: cement ratio of 15:1. After the approval of all the materials to be used in the concrete, the Contractor shall submit the mix design based on weighed proportion of all ingredients for the approval of the Engineer. The mix design shaU be submitted at least 30 days prior to the paving of trial length and design shall be done based on the laboratory trials using approved materials and methods. The water content shall be adjusted to the optimum as per Clause 603.3.2. for facilitating compacdon by rolling. The target mean strength for the design mix as well as acceptance Specification of concrete shall be in accordance with Clause 903.5.2. The mix design shall be based on the

Concrete Pavement flexural strength of concrete.

Section 600

172.3.2 Moisture content: The right amount of water for the rolled concrete in the main work shall be decided for ensuring full compaction under rolling and shall be assessed at the time of rolling the trial length. Too much water will cause the concrete to be picked up on the wheels of the roller and too little will lead to inadequate compaction, a low in-situ strength and an open textured surface. The optimum water content shall be determined in accordance with Clause 603.7. and demonstrated by rolling during trial length construction; and the optimum moisture content and degree of compaction shall. be got approved by the Engineer.", While laying, in the main work, the rolled concrete shall have a moisture content between the optimum and optimum + 2 percent keeping in view the effectiveness of compaction achieved and to compensate for evaporation losses. 172.3.3 Cement content: The minimum cement content in the rolled concrete shall not be less than 150 kg/cu.m. of concrete. If this minimum cement content is not sufficient to produce concrete of the specified strength, it shall be increased as necessary without additional compensation under the Contract. 172.3.4 Concrete strength: The flexural strength as specified shall be the governing criteria for approval of the mix. While designing the mix in the laboratory, correlation between flexural and compressive strengths of concrete shall be established on the basis of tests on samples for use at a later date to verify the in situ flexural strength of rolled concrete through testing of cores. At least a batch of two beam and cube specimens, one each for 3 day and 7 day strength testing shall be cast for every 100 cum or part thereof of concrete placed during construction. On each day's work not less than four beams and four cubes shall be made. A ratio between the 3 and 7 day strengths shall be established for the mix to be used. This will help in assessing the fall in strength, if any- in advance so that coffective action can be taken for the future work. 172.4 Subgrade The subgrade shall conforin to the grades and cross sections shown on the drawings and shall be uniformly compacted to the design strength in accordance with these Specifications and the Specification stipulated in the Contra~t. The rolled concrete base shall not be laid on a subgrade softened by rain after its final preparation; any surface trenches, soft spots etc., must be properly back-filled and compacted to avoid any weak or soft spot. As far as possible, the construction traffic shall be avoided on the prepared subgrade. A day before placing of the sub-base, the subgrade surface shall be given a fine spray of water and rolled with one or two passes of a smooth wheeled roller after a lapse of 2-3 hours in order to stabilise the loose surface. If the Engineer feels it

Concrete Pavement

Section 600

necessary, another fine spray of water may be applied just before placing the base course. 172.5 Construction Clause 601.5 shall apply. 172.6 Trial Mix Using the specified cement content and proportioned aggregates, the Contractor shall make trial mixes at water contents ranging from 5 per cent to 7 per cent by weight of dry materials at 0.5 per cent intervals using an aggregate /cement ratio of not greater than 15.0. Optimum moisture and density shall be established by preparing cubes with varying moisture contents. The compaction of mould shall be done in three layers as explained in Clause 903.5.2.1. The optimum moisture content determined - normally gives an indication about the moisture content which after minor adjustment may provide satisfactory mix which could be rolled. After determining the moisture content from the above trial mix, a set of six beams and cubes shall be prepared for testing them on 3rd and 7th day. If the flexural strength achieved is lower than the desired strength, the above trial shall be repeated after increasing the cement content and adjusting the mix appropriately. During the construction of trial length as per Clause 603.7 minor modifications may have to be carried out to the moisture content of the mix. But such modified mix shall have to satisfy the flexural strength requirement. Flexural strength to be achieved shall be the governing criteria for the design ~of mix. 172.7 Trial Length Clause 601.7 shall apply. 172.8 Traffic No heavy commercial vehicles like trucks and buses shall be permitted on the rolled concrete base after its construction. Light vehicles may be, however, allowed after 7 days of its construction with prior approval of the Engineer. 172.9 Tolerances for Surface Regularity, Level, Thickness and Strength The tolerances for surface regularity, level, thickness and strength shall conform to the requirements given in Clause 903.5. Control of quality of materials and works shall be exercised by the Engineer in accordance with Section 900. 172.10 Measurements for Payment The unit of measurement for concrete and rolled concrete pavement shall be the cubic metre of concrete placed, based on the net plan areas for the specified thickness shown on the drawings as directed by the Engineer. 172.11 Rate The Contract unit rate payable for rolled cement , concrete for base course shall be payment in full for carrying out the required operations including full compensation for all

Concrete Pavement

Section 600

labour, materials and equipment, mixing, transport, placing, compacting, finishing, curing, testing and incidentals to complete the work as per Specifications, all royalties, fees, storage and rents where necessary and all leads and lifts.

Geosynthetics Geosynthetics 700 Geosynthetics

Section 700

Geosynthetics

Section 700

701 172.12 Scope

GEOSYNTHETICS IN ROAD AND BRIDGE WORKS

This specification covers the various applications of Geosynthetic materials in road and bridge works including supplying and laying as per special provisions. "Geosynthetic is a general classification for all synthetic materials used in geotechnical engineering application. It includes geotextiles, geogrids, geonets, geomembranes and geocomposites.
(i) Geotextile : Any permeable textile natural or Synthetic, used with foundation, soil, rock, earth, or any other geotechnical engineering related material. In the present chapter, it is related to synthetic material only. (ii) Geogrid : A deformed or non-deformed grid of polymeric material used primarily for reinforcement purposes with foundation, soil, rock, earth, or any other geotechnical engineering related material. (iii) Geonets : These am net made of polymeric material used for drainage of fotmdation, soil, rock, earth or any other geotechnical engineering related material. (iv) Geomembrane : An essentially impermeable membrane of polymeric material used with foundation, soil. rock, earth or any other geotechnical engineering related material, to control fluid migration.(v) Geocomposite : A manufactured material using geotextiles, geogrids, geonets and/ or geomembrane in laminated or composite form."

172.13 Material Testing and Acceptance. Unless otherwise stated, these Geosynthetic materials shall confonn to the requirements as under : 172.13.1 Geotextile : Geotextile shall be made of polyethylene or polypropylene or polyester or similar fibres, either woven or nonwoven in variety, through machine made process of heatbonding or needle punching or weaving techniques. These fabrics are required to pass water through but retain the soil particles, which require specific cross-plane permeability or permittivity and apparant opening size or equivalent opening size or 095. The above two requirements alongwith the requirement of strength and durability denote general characteristics of geotextiles to be used. The type of geotextile to be used in a particular application shall be decided on the basis of design. 172.13.2 Geogrid : Geogrid shall be made from integrally jointed, mono or bi-directionally orientated or stretched meshes made from polyethylene or polypropylene or polyester or similar polymer, with high secant modulus, in square, rectangular, hexAgonal'or -oval mesh form. Their junction strength shall be high with high creep resistance, and dimensional stability. Their open structure shall permit effective interlocking with soil,. aggregates, rock etc., they shall be used as a tensile member or reinforcement. Charactdristics strength of such Geogrids varies from 40 kN/m to 200 WA peak strength at a maximum elongation of 15 per cent in the direction of the length.of the roll. 172.13.3 Geonet : Geonet shall be made from a single extruded unoriented process from polyethylene or polypropylene or similar polymer. It shall have

Geosynthetics

Section 700

square or rectangular net shape aperture when used for protective works like gabions and mattresses. While in polygonal aperture it shall be used as a separator. It shall not be used as soil reinforcement due to its high creep characteristics, neither as a slope reinforcement or soil retaining wall or asphaltic reinforcement. Geonets used in protective works for highway structures shall be atleast 650 gm/ sq.m. in unit weight. It shall be black in colour, available in roll form in suitable width. 172.13.4 Geomembrane : Gcomembrane shall be made from PVC or polyethele ne sheets of atleast 0.8 mm thickness, duly protected from ultraviolet exposure with 2.5 per cent carbon black, in black colour, supplied in roll form with 3 m or above width. The joints of these sheets shall be heatbonded or seamed for effective permeation cut off, at site using standard equipment as part of the laying process. While fixing on to a slope, they shall not be punctured or stappled to impair their use. 172.13.5 Geocomposite : Geocomposites shall be made from combination of geonets, geogrids or geomembranes of above description using heat bonded, seamed stitched or wrap techniques. Their principal use shall be to regulate drainage in cross-plane or in-plane directions. Minimum unit weight of such material shall conform to the special provisions or as per Contract drawing. 172.13.6 Testing and acceptance : Geosynthetics shall be tested in accordance with tests prescribed by BIS. In absence of IS Codes, tests prescribed either by ASTM or British Standards or International Standards Organisation, shall be conducted. 172.14 Application Areas Some of the application areas for gpotextiles and related materials and their functions are given below in table 700-1.
Table 700-1. Applications and Functions of Geosynthetics S. No. Application Area Involved 1. 2. 3. 4. 5. 6, 7. Note : Geosynthetics Performance Functions for

Embankments on soft soilsGT, GG R, S Retaining walls GG, GT R GT GT F, S GC, GN D, F, S, B F, S GT B, R, S Drainage and Filtration Erosion Control rip rap Asphalt overlay GT = geotextile GG = geogrid, GC = geocomposite

-Drainage-prefab, composite SedL-nent control-silt fence GT, GC B, R, S S

= separation R = reinforcement F = filtration

Geosynthetics
GN = geonet B = barrier D = drainage

Section 700

173 173.1 Scope

GEOTEXTILES IN SUB-SURFACE DRAINS

The work covers the use of geotextiles in subsurface drains, such as fin drains or narrow. filter drains. The fin drain shall mean a planar geocomposite structure designed to perform the same function as a narrow filter drain. The work shall be carried out as per design drawings. 173.2 Materials 173.2.1 The geotextile fabric shall be a woven or non-woven fabric consisting of long-chain polymeric filaments or yams such as polypropylene, polyethylene or polyester or any combination thereof, formed into a stable network such that the filaments or yams retain their relative position to each other. 173.2.2 The geosynthetic material of which the drain is made shall. be treated with carbon black so that they are protected from the deleterious effects of short term exposure to ultraviole ' t light, and shall be resistant to degradation by acid, alkalis, common chemicals, bacteria, fungi and moulds occurring in soils and highway construction materials. ln case of exposure to ultraviolet light, the Engineer may require evidence that the geosynthetic material still complies with the requirements of this Clause. Where necessary, the side intended for entry of water and direction of inplane flow shall be identified. 173.2.3 The geotextile shall
(a) Sustain a load of not less than lOkN/m at break and have a minimum failure strain of 10 percent when determined in accordance with BS:6906 (Part 1) orshall havea grab tensile strength more than 0.4 kN/rn and grab elongation corresponding to this limit in accordance with ASTM D 4632. (b) Test Method <15 ASTM D 4751 *These default filtration property values ire based on the predominant particle size of in-situ soil. In addition to the default permittivity value, the Engineer may require geotextile permeability and/or performance testing based on engineering design for drainage systems in problematic soi I environments. Site specific geotextile design should be performed especially if one or more of the following problematic soil environments are encountered; unstable or highly erodible soils such as non-cohesive silts; gap graded soils; alternating sand/silt)aminated soils; dispersive clays; and/or rock flout. "Forcoliesive soils with a plasticity index greater than 7, gootextile maximum average roll values for apparent opening size is 0.30 mm. mm 0.43 The apparent opening size*(", shall satisfy the following: Units Requirements percent in-situ soil passing 0.075 mm 15 to 50 > 50 0.25 0.22**

Geosynthetics

Section 700

(c) allow watertg flOW through itat night angles to its principal plane, in eitherdirection at a rate of not less than 10 litreS/M2/SCC. under a constant head of water of 100 mim, determined in accordance wiih BS:6906 (Part 3) or ASTM D 4491 or as stated in the design drawing. The flow rate determined in the test shall be corrected to that applicable to a tdmperature of 15'C using published data on variation in viscosity of water with temperature. (d) have a minimum puncture resistance of 200 N when determined in accordance w Ith BS:6906 (Part 4) or ASTM D 4833. (e) 4533. have a minimum tear resistance of 150 N when determined in accordance with ASTM Standard D

173.2.4 The composite drain shall have a flow rate through each face of the drain of more than 75 per cent of the value specified in subClause 702.2.3 (c), determined by direct measurement of the composite drain using BS:6906 (Part 3). The composite drain shall have values of long-term in-plane flow rates as stated in the design drawing. 173.3 Installation 173.3.1 The installation of fin drains shall be as per the design drawings. Where fin drains are assembled on site, the assembly area shall be clean and dry and free of any wind-borne pollutants. No geotextile or care material shall be exposed to daylight (or any source of ultraviolet radiation) for a period exceeding a cumulative total of 50 hours. Where fin drains are laid in trench, the bottom of the trench shall be free of irregularities and shall be brought to the required level. Rock and other hard protrusions shall be removed and any excess cut in the trench bottom filled and compacted back to the required grade with suitable excavated or imported material as directed by the Engineer. Fin drains shall be capable of being jointed longitudinally or laterally into pipe systems or chambers for inflow and outflow purposes. Joints parallel to the direction of flow and any exposed edged shall be protected from the ingress of soil by a geotextile wrapping with a minimum overlap of 150 mm or other measures as agreed by the Engineer. 173.4 Narrow filter drains consisting of a porous or perforated pipe laid in a narrow trench surrounded by a layer of geotextile filter shall have the same properties of geotextile as specified in Clause 702.2. The spicing of lengths of geotextile and minimum overlap shall be as per the design drawing or as approved by the Engineer. Such drains shall be installed as per the design drawing to Clauses 702.3 and 309.3.5. 173.5 Measurements. for Payment Measurement for fin drain/narrow filter drains shall be per running metre length of the drain. Disposal of surplus material beyond 1000 m shall be measured in cu.m. 173.6 Rates

Geosynthetics

Section 700

The Contract unit rates for subsurface drains shal be payment in full for all items such as excavation, dressing the sides and bottom, providing geotextile composites, laying and jointing pipes etc. including full compensation for all materials, labour, tools, equipment incidental to complete the work as shown on drawings with all leads and lifts except fbr removal of unsuitable material for which the lead shall be 1000 m. Provision of inlets, outlet pipes, bedding, etc., wherever required shall be incidental to construction of drain. The Contract unit for disposal of surplus and unsuitable material beyond the initial 1000 m lead shall be in accordance with Clause 301.3.11. 174 174.1 Scope This work shall consist of laying geosynthetic materials over existing biutuminous surface, including preparation of surface and joining, stitching or overlapping of geosynethetic fabric etc., as part of highway pavement strengthening in layers as shown on drawings. 174.2 Paving Fabrics 174.2.1 Description : This work shall consist of furnishing and placing as asphalt/bitumen overlay textile (paving fabric) beneath a pavement overlay or between pavement layers to provide a water resistant membrane and crack retarding layer. 174.3 Material Requirements 174.3.1 Paving fabric : The paving fabric will be a nonwoven heat set material consisting of at least 85 per cent by weight polyolefins, polyesters or polyamides. The paving fabric shall be resistant to chemical attack, rot and mildew and shall have no tears or defects which will adversely alter its physical properties. The fabric shall be specifically designed for pavement applications and be heat bonded only on one side to reduce bleed-through of tack coat during installation. The fabric shall meet the physical requirements of Table 704-2. Heavy duty paving fabrics should be used in areas experiencing unusally high impact forces or heavy loads such as airport runways and taxiways :
Table 704.2. Physical Requirements-Paving Fabrics Property Tensile Strength Elongation Asphalt Retention Melting Point Surface Texture one side only % Units Requirements Kg so oc 36.3 ASTM D 432 10 Texas DOT 3099 ASTM D 4632 150 ASTM D 276 Standard Test Method

GEOSYNTHETICS FOR HIGHWAY PAVEMENTS

Kg/lOsq.m.

Heat bonded on Visual Inspection

Geosynthetics
Notes 1. Certification of conformance from paving fabric manufacturer may be required.

Section 700

2. All numerical values represent minimum average roll values (average of test results from any sampled roll in a lot shall meet or exceed the minimum values) in weaker principal direction. Lot shall be sampled according to ASTM D 4354, "Practice for Sampling of Geosynthetics for Testing". 3. Conformance of paving fabrics to specification property requirements shall be determined as per ASTM D 4579, "Practice for Detennining the Specification Conformance of Geosynthetics".

174.3.2 Tack coat: The tack coat used to impregnate the fabric and bond the fabric to the pavement shall be a paving grade Bitumen of 80100 penetration. A cationic or anionic emulsion may be used as approved by the Engineer. The use of cutbacks or emulsions which contain solvents shall not be used. 174.4 Construction and Installation Requirements 174.4.1 Shipment and storage: The paving fabric shall be kept dry and wrapped such that it is protected from the elements during shipping and storage. At no time shall the paving fabric be exposed to ultraviolet light for a period exceeding fourteen days. Paving fabric rolls shall be stored in a manner which protects them from i' the elements. If stored outdoors, they shall be elevated and protected with a waterproof cover. The paving fabric shall be labeled as per ASTM D 4873, "Guide for identification, storage, and handling of geotextiles". 174.4.2 Weather limitations : Minimum air and pavement temperature shall be at least IO'C and rising for placement of bitumen and shall be at least 15'C and rising for placement bitumen emulsion. Neither bitumen tack coat nor paving fabric shall be placed when weather conditions, in the opinion of the Engineer, are not suitable. 174.4.3 Surface preparation : The pavement surface shall be thoroughly cleaned of all dirt, water, and oil to the satisfaction of the Engineer. Cracks 3 mm wide or greater shall be cleaned and filled with suitable bituminous material or by a method approved by the Engineer. Crack filling material shall be allowed to cure prior to paving fabric placement. Potholes and other pavement distress shall be repaired. Repairs shall be performed as directed by the Engineer. 174.4.4 Tack coat application : The tack coat shall be spread by means of a calibrated distributor spray bar. Hand spraying and brush application may be used in locations of fabric overlap. Every effort shall be made to keep hand spraying to a minimum. The tack coat shall be applied, uniformly to the prepared dry pavement surface at the rate of I kg/sq.m. or as recommended by the paving fabric manufacturer and approved by the Engineer. When using emulsions, the application rate must be increased as directed by the Engineer to offset the water content of the emulsion. Within street intersections, on steep grades, or in other zones where vehicle speed

Geosynthetics

Section 700

changes are common place, the normal application rate shall be reduced by about 20 per cent as directed by the Engineer. The tack coat application rate must be sufficient to saturate the fabric and to bond the fabric to the existing pavement surface. The temperature of the tack coat shall be sufficiently high to permit a uniform spray pattern. For bitumen, the minimum temperature shall be 14&C. To avoid damage to the fabric, distributor tank temperatures shall not exceed 160'C. For bitumen emulsions, the distributor tank temperatures shall be maintained between 55'C and 70'C. The target width of tack coat application shall be equal to the paving fabric width plus 150 mm. The tack coat shall be applied only as far in advance of paving fabric installation as is appropriate to ensure a tacky surface at the time ofpaving fabric placement. Traffic shall not be allowed on the tack coat. Excess tack coat shall be cleaned from the pavement. 174.4.5 Paving fabric placement: The paving fabric shall be placed onto the tack coat using mechanical or manual laydown equipment capable of providing a smooth installation with a minimum amount of wrinkling or folding. The paving fabric shall be placed prior to the tack coat cooling and losing tackiness. Paving fabric shall not be installed in areas where the overlay asphalt tapers to a thickness of less than 40 mm. Excess paving fabric which extends beyond the edge of existing pavement or areas of tack coat application shall be trimmed and removed. When bitumen emulsions are used, the emulsion shall be allowed to cure properly such that essentially no water moisture remains prior to placing the paving fabric. Wrinkles or folds in excess of 25 mm shall be slit and laid flat. All transverse joints and slit folds or wrinkles shall be shingle-lapped in the direction of the paving operation. Brooming and/or pneumatic rolling will be required to maximize paving fabric contact with the pavement surface. Additional hand-placed tack coat may be required at laps and repairs as determined by the Engineer to satisfy bitumen retention of the lapped paving fabric. All areas with paving fabrics placed will be paved the same day. No traffic except necessary construction equipment will be allowed to drive on the paving fabric. Turning of the paver and other vehicles shall be done gradually and kept to a minimum to avoid movement and damage to the paving fabric. Abrupt starts and stops shall also be avoided. Damaged fabric shall be removed and replaced with the same type of fabric. Overlaps shall be shingle-lapped in the direction of paving. Additional tack coat shall be placed between the overlap to satisfy saturation requirements ofthe fabric. Overlap shall be sufficient to ensure full closure of the joint but not exceed 150 m. 174.4.6 Overlay placement: Bituminous overlay construction shall closely follow fabric placement. All areas in which paving fabric has been placed will be paved during the same day. Excess tack coat which bleeds through the pavm*g fabric shall be removed. Excess tack coat can be removed by

Geosynthetics broadcasting hot mix or sand on the paving fabric. 175 175.1 Scope PROTECTION WORKS WITH GEOSYNTHETICS

Section 700

This work shall consist of laying boulder Gabions/Mattresses in wraps of Geosynthetics in the form of bolsters, on slopes of embankments or in apron. Gabions or Mattresses are also used for stone spurs. Geotextiles are used for prevention of migration of fme soil particles. 175.2 Gabions/Mattresses with Geogrids and Geonets Mattresses constructed with Geogrids or Geonets shall be used for thickness of 300 mm or above as shown in the drawings. While adopting a particular size for gabions or mattresses width of the roll of geogrid/ geonet may be kept in view to minimise wastage of the geosynthetic in cutting off pieces. The mesh opening may vary depending on functional requirement but shall have aperture between 35 mm and 100 nim. The mesh/net shall have following characteristics
Aperture Rectangular, square or oval shaped (and not in diamond, round or polygonal shape). Colour Mechanical Properties Stands/Fabric Black Peak strength not less than 10 kN/m at maximum elongation of 15 per cent. Not more than 5 per cent elongation at half peak load. integral joints with junction strength of 100 per cent of plain

Form strands as measured by GRI-GG3 standards. Material shall have ISO 9002 certification. Life Atleast 8 years in case ofcontinuous exposure and 5 years for buried applications (defined as capable of retaining atleast 75 per cent of its original strength after the life span stated).

175.3 Construction 175.3.1 Assembly: Gabion and mattress boxes shall be assembled in situ, on a level.surface. After fabrication is done in situ they shall be correctly filled in layers in dense packed state. The bottom, sides and end panels shall be erected after removal of 411 kinks, kept in an upright position to form rectangular boxes by joining the, sides with connectors of 40 mm x 6 mm size, or by ring staples. The top com.ers shall be tie tensioned from sides to,keep it erect for filling. For gabions of 600 mm or more height, suitable cross internal ties shall ~e placed in layers of 300 mm connecting opposite sides in lateral braces tied with polymer braids of ultra-violet stabilised variety so as to ensure protection against bulging of the gabions during filling with stones.

Geosynthetics

Section 700

175.3.2 Construction and. installation : The filling of the gabion/ mattress shall be done by hand in layers so as to minimise voids and achieve specified density. The stones in contact with the surface of the geogrids/geonets shall be placed in such a way that their sharp edges are kept turned inside so that they do not damage the material of the geogrids/ geonets. The opposite panels of the boxes shall be firmly secured with lateral ties to withstand the design forces. The bottom of the gabion mesh shall be secured in a key type excavation for preventing slide. The space between the gabion and earthen sides shall be filled with sand and the filling compacted. In most of the cases design shall be supplemented with a layer of geotextile under the gabion/mattress to prevent migration of fines. 175.3.3 Laying boulder apron in crates : Mattresses of minimum height 300 nun shall be used. The typical size of a single continuous unit shall be I in x 5 in size with baffles at I in centres. The size of boulders shall- be at least 100 mm or double the size of the aperture whichever is larger. The density of boulder filling shall be as stated in the drawing and the specific gravity of stones not less than 2.65. Methodology of laying boulders shall be as per Clause 2503.3. Gabions if placed in the apron shall be of size I in x 5 in in plan with height at least 600 mm, with baffles in I in centres. Gabions or mattresses made with polymer geogrids/geonets shall always be laid in situ and shall not be performed, filled and transported to be dropped in deep waters. Where depth of water is low or dry bed is available, the boxes shall be filled in situ. In streams or water body having running boulders'in the bed, the gabions/mattresses shall be armoured with placement of loose large boulders alongside the gabion wall to protect against impact hit of stray boulders. Stakes or keying shall'Mways be provided in the founding recess, where the gabion.be located, especially in case the ground is assessed to be sloping or yielding type. 175.3.4 Groynes or spurs with crat * es : Gr6ynes or spurs of gravity retaining variety shall be constructed using geogrid/geonet gabions placed in stable configuration one over the other to form a well. They shall be filled in situ on a shallow depth of water or dry bed with firm founding and level strata. The provision of a layer of geotextile/geocompositi! Shall be made while placing the structure if resting over a bed of fine soil to prevent passage of fines and sinking. 175.3.5 Measurements for payment : The fabric of geotextilel geocomposite shall be measured. in sq. metres of plan area of actual use (as per drawing). The connecting rods or polymer braids shall be measured in metres' Ring staples shall be measured in number provided per linear metre. The boulder fill shall be measured in cubic metres. The excavation for keying of gabions in the ground trenches shall be measured in cubic metres.

Geosynthetics

Section 700

The backfilling in side trenches shall be deemed part ofthe excavation work. 175.3.6 Rate : The cost of Geosynthetic material for fabrication of Gabions/Mattresses shall be all inclusive of supply, transportation and storage. The contract rate per cubic metre of crate fill shall consist of cost of boulders and their transportation. The contract rate for excavation and backfilling of trenches, seating trench upto 15 cm (included in rate), shall include cost of labour, tools and plant for completion of the work. The cost of making a crate shall include preparation of box of geogrid/ geonet, tensioning and staking arrangements, tying, internal crossbraids, etc., for forming of the crates in an engineered manner and filling the crate by laying boulders. The cost shall include transportation of material from store to site. Wherever composite system using Geosynthetics with natural material like stone revetment etc. shall be used, the provision of measurement and rate as per Clauses 2509 and 25 10 are applicable.

Traffic Signs, Markings and I Other Road Appurtenances Traffic Signs, Markings and I Other Road Appurtenances 800 Traffic Signs, Markings and I Other Road Appurtenances

Section 800

Traffic Signs, Markings and I Other Road Appurtenances

Section 800

801 175.4 General

TRAFFIC SIGNS

175.4.1 The colour, configuration, size and location of all traffic signs for highways other than Expressways shall be in accordance with the Code of Practice for Road Signs,-IRC: 67 or as shown on the drawings. For Expressways, the size of the signs, letters and their placement shall be as specified in the Contract drawings and relevant Specifications. In the absence of any details or for any missing details, the signs shall be provided as directed by the Engineer. 175.4.2 The signs shall be either reflectorised or non-reflectorised as shown on the drawings or as directed'by the Engineer. When they are of reflectorised type, they shall be of ietro-reflectorised type and made of encapsulated lens type reflective sheeting vide Clause 801.3, fixed over aluminium sheeting as per these Specifications. 175.4.3 In general, cautionary and mandatory signs shall be fabricated through process of screen printing. In regard to informatory signs with inscriptions, either the message could be printed over the reflective sheeting, or cut letters of non-reflective black sheeting used for the purpose which must be bonded. well on the base sheeting as directed by the Engineer. 175.5 Materials The various materials and fabrication of the traffic signs shall conform to the following requirements: 175.5.1 Concrete : Concrete shall be of the grade shown on the Contract drawings or otherwise as directed by the Engineer. 175.5.2 Reinforcing steel : Reinforcing steel shall conform to the requirement of IS:1786 unless otherwise shown on the drawing. 175.5.3 Bolts, nuts, washers: High strength bolts shall conform to IS : 1367 whereas precision bolts, nuts, etc., shall conform to IS: 1364. 175.5.4 Plates and supports : Plates and support sections for the, sign posts shall conform -to IS: 226 and IS: 2062 or any other relevant IS Specifications. 175.5.5 Aluminium: Aluminium sheets used for sign boards shall be of smooth, hard and corrosion resistant aluminium alloy conforming to IS : 736-Material designation 24345 or 1900. 175.5.6 Signs with a maximum side dimension not exceeding 600 mm shall not be less than 1.5 mm thick. All others shall be at least 2 mm thick. The thickness of the sheet shall be related to the size of the sign and its support and shall be such that it does not bend or deform under the prevailing wind and other loads. 175.5.7 In respect of sign sizes not covered by IRC:67, the structural details

Traffic Signs, Markings and I Other Road Appurtenances (thickness, etc.) shall be as per the approved drawings. 175.6 Traffic Signs Having Retro-reflective Sheeting

Section 800

175.6.1 General requirements: The retro-reflective sheeting used on the sign shall consist of the white or coloured sheeting having a smooth outer surface which has the property of retro-reflection over its entire surface. It shall be weather-resistant and show colour fastness. Jt shall be new and unused and shall show no evidence of cracking, scaling, pitting, blistering, edge lifting or curling and shall have negligible shrinkage or expansion. A certificate of having tested the sheeting for these properties in an unprotected outdoor exposure facing the sun for two years and its having passed these tests shall be obtained from a reputed laboratory, by the manufacturer of the sheeting. The reflective sheeting shall be either of Engineering Grade material with enclosed lens or of High Intensity Grade with encapsulated lens. The type of the sheeting to be used would depend upon the type, functional hierarchy and importance of the road. 175.6.2 High intensity grade sheeting : This sheeting shall be of encapsulated lens type consisting of spherical glass lens, elements adhered to a synthetic resin and encapsulated by a flexible, transparent water-proof plastic having a smooth surface. The retro-reflective surface after cleaning with soap and water and in dry condition shall have the minimum co-efficient -of retro-rep_ec4ion (determined in accordance with ASTM Standard E : 810) as indicated in Table 800-1. TABLE 800-1. ACCEPTABLE MINIMUM COEFFICIENT OF RETRO. REFLECTION FOR HIGH INTENSITY GRADE SHEETING (CANDELAS PER LUX PER SQUARE METRE) Observation angle (in degrees) 0.2 0.2 0.5 0.5 Entrance Angle Red (in degrees) -4 +30 -4 +30 250 150 95 65 170 100 62 45 100, 60 30 25 45 25 15 10 20 11 7.5 5.0 White Yellow Orange Green/ Blue

When totally wet, the sheeting shall not show less than 90 per cent of the values of retro-reflectance indicated in Table 800-1. At the end of 7 years, the sheeting shall retain at least 75 per cent of its original retro-reflectance. 175.6.3 Engineering grade sheeting : This sheeting shall be of enclosed lens type

Traffic Signs, Markings and I Other Road Appurtenances

Section 800

consisting of microscopic lens elements embedded beneath the surface of a smooth, flexible, transparent, water-proof plastic, resulting in a non-exposed lens optical reflecting system. The retroreflective surface after cleaning with soap and water and in dry condition shall have the minimum coefficient of retro-reflection (determined in accordance with ASTM Standard : E-810) as indicated in Table 800-2.
TABLE 900-2. ACCEPTABLE MINIMUM COEFFICIENT OF RETROREFLECTION FOR ENGINEERING GRADE SHEETING (CANDELAS PER LUX PER SQUARE METRE) Observation angle In degree 0.2 0.2 0.5 0.5 Entrance White Yellow Orange Green Red Blue angle in degree -4 +30 -4 +30 70 30 30 15 50 22 25 13 25 7.0 13.5 4.0 9.0 3.5 4.5 2.2 14.5 6.0 7.5 3.0 4.0 1.7 2.0 0.8

When totally wet, the sheeting shall not show less than 90 per cent of the values, of retro-reflection indicated in Table 800-2. Atthe end of 5 years, the sheeting shall retain at least 50 per cent of its original retro-reflectance. 175.6.4 Messages/borders: The messages (legends, letters, numerals etc.) and borders shall either be scre6n-printeo-or-of cut-outs. Screen printing shall be processed and finished with materials and in a manner specified by the sheeting manufacturer. Cut-outs shall be of materials as specified by the sheeting manufacturer and shall be bonded with the sheeting in the manner specified by the manufacturer. 175.6.5 For screen-printed transparent coloured areas on white sheeting, the co-efficient' of retro-reflection shall not be less than 50 per cent of the values of corresponding colour in Tables 800-1 and 800-2, as applicable. 175.6.6 Cut-out messages and borders, wherever used, shall be made out of retro-reflective sheeting (as per Clause 801.3.2 or 801.3.3 as applicable), except those in black which shall be of non-reflective sheeting. 175.6.7 Colour: Unless otherwise specified, the general colour schbm6 shall be as stipulated in IS 5 "Colour for Ready Mixed Paints", viz.
Blue Red Green Orange is is is IS Colour Colour Colour Colour No. 166: French Blue No. 537: Signal Red No. 284: India Green No. 591: Deep Orange.

The Colours shall be durable and uniform in acceptable hue when viewed in day light or under normal headlights at night.

Traffic Signs, Markings and I Other Road Appurtenances

Section 800

175.6.8 Adhesives : Th`e$eeting shall either have a pressuresensitive ' adhesive of the aggressive-tack type requiring no heat, solvent or other preparation for adhesion to a smooth clean surface, or a tack free adhesive activated by heat, applied in a heat-vacuum applicator, in a manner recommended by the sheeting manufacturer. The adhesive shall be protected by an easily removable liner (removable by peeling without soaking in water or other solvent) and shall be suitable for the type of material of the base plate used for the sign. The adhesive shall form a durable bond to smooth, corrosion and weather resistant surface of the base plate such that it shall not be possible to remove the sheeting from the sign base in one piece by use of sharp instrument. In case of pressure-sdnsitive adhesive sheeting, the sheeting shall be - applied in accordance with the manufacturer's Specifications. Sheeting with adhesives requiring use of solvents or other preparation for adhesive shall be applied strictly in accordance with the manufacturer's instructions. 175.6.9 Refurbishment: Where existing signs are specified for refurbishment, the sheeting shall have a semi-rigid aluminium backing pre-coated with aggressive-tack 'type pressure sensitive adhesive. The adhesive shall be suitable f6r the type of material used for the sign and should thoroughly bond with that material. 175.6.10 Fabrication 175.6.10.1 Surface to be reflectorised shall be effectively prepared to receive the retro-reflective sheeting. The aluminium sheeting shall be de-greased -either by acid or hot alkaline etching and all scale,/dust removed to obtain a smooth plain surface before the application of retroreflective sheeting. If the surface is rough, approved surface primer may be used. After cleaning, metal shall not be handled, except by suftable device -or clean canvas gloves, between all cleaning and preparation operation and application of reflective sheeting/primer. There shall be no opportunity for metal to come in contact with grease, oil or other contaminants prior to the application of retro-reflective sheeting. 175.6.10.2 Complete sheets of the material shall be used. on the si8ns except AM it h MlMaftlt!, At Splitea, sheetIng 'with pressure sensitive adhesives shall be overlapped not lea than 5 mm. Sheeting with heat-activated adhesives may be spliced with an overlap not less than 5 mm or butted -with a gap not exceeding 0.75 mm. Where screen printing with transparent colours is proposed, only butt jointing shall be used. The material shall cover the sign surface evenly and shall be free from twists, cracks and folds. Cut-outs to produce legends and borders shall be bonded with the sheeting in the I man er specified by the manufacturer. 175.6.11 Warranty and d 111 y : The Contractor shall obtain from the manufacturer a seven-year warranty for satisfactory field performance including stipulated

Traffic Signs, Markings and I Other Road Appurtenances

Section 800

retro-reflectance of the'retro-reflective sheeting of high intensity grade and a five year warranty for the adhesive sheeting of engineering grade, and submit the same to the Engineer. In addition, a seven year and a five year warranty for satisfactory in-field performance of the finished sip with retro-reflective sheeting of high intensity grade and engineering grade respectively, inclusive of the screen PriAw or cut out letters/legends and their bonding to the retto-reflective sheeting shall be obtained from the Contractor/supplier and passed on to the Engineer. The Contractor/supplier shall also furnish a certification that the signs and materials supplied against the assigned work meets all the stipulated requirements and carry the stipulated warranty. Processed and applied in accordance with recommended procedures, the reflective material shall be weather resistant and, following cleaning, shall show no appreciabk discolouration, cracking, blistering or dimensional change and shall not have less than 50 per. cent of the specified minimum reflective *intensity values (Tables 800-1 and 800-2) when subjected to accelerated weathering for 1000 hours, using type E or EH Wbatherometer (AASHTO Designation M 268). 175.7 Installation 175.7.1 Sign posts, their foundations and sign mountings shall be so constructed as to hold these in a proper and permanent position against the normal stonn wind loads or displacement by vandalism. Normally, signs with an area upto 0.9 sq. in. shall be mounted on a single post, and for greater area two or more supports shall be provided. Sign supports may be of mad steel, reinforced concrete or galvanised iron (G.1). Post-end(s) shall be firmly fixed to the ground by means of properly designed foundation. The work of foundation shall conform to relevant Specifications as specified. 175.7.2 AU components of signs and supports, other than the reflective portion and G.I. posts shall be thoroughly descaled, cleaned, primed and painted with two coats of epoxy paint. Any part of mild steel (M.S.) post below ground shall be painted with three coats of red lead paint. 175.7.3 The signs shaU be fixed to the posts by welding in the case of steel posts and by bolts and washers,of suitable size in the case of reinforced concrete or GI posts. Akr the nuts have been tighten ' ed, the tails of the bolts shall be furred over with a hammer to prevent removal. 175.8 Measurements for Payment The measurement of standard cautionary, mandatory and information signs shall be in numbers of different types of signs supplied and fixed, while for direction and place identification signs, these shall be measured by area in square metres. 175.9 Rate The Contract unit rate shall be payment in full for the cost of making the road sign, including all materials, installing it at the site and incidentals to complete the work in accordance with the Specifications.

Traffic Signs, Markings and I Other Road Appurtenances 176 176.1 General OVERHEAD SIGNS

Section 800

176.1.1 Overhead signs may be used in lieu of, or as an adjunct to, ground signs where the situation so warrants for proper information and guidance of the road user.The following conditions may be considered while deciding about the provision of overhead signs: (1) Traffic volume at or near capacity (2) Complex interchange design (3) Three or mom lanes in each direction (4) Restricted sight distance (5) Closely spiced interchanges (6) Multi-lant exits (7) Large percentage of commercial vehicles (8) High speed traffic (9) Consistency of sign message location through A series of interchanges (10) Insufficient space for ground mounted signs (11) Background of street lighting (12) Distances of important 'Places enroute highways at suitable intervals. 176.1.2 From safety and aesthetic standpoints, overhead signs shall be mounted on overhead bridge structures wherever possible. Where these are required to be provided at some other locations, the support system should be properly designed based on sound engineering principles, to safely sustain the dead load, live load and wind load on the completed sign system. For this purpose, the overhead signs shall be designed to withstand a wind loading of 150 kg/ml rformal to the face of the sign and 30 kg/m2 transverse to the face of the sign. In addition to the dead load of the structure, w way loading of 250 kg concentrated live load shall also be considered for the design of the overhead sign structure. 176.2 Height Overhead signs shall,provide a vertical clearance of not less than 5.5 m over the entire width of the pavement and shoulders except where a lesser vertical clearance is used for the design of other structures. The vertical clearance to overhead sign structures or supports need not be greater than 300 mm in excess of the minimum design clearance of other structures. 176.3 Lateral Clearance 176.3.1 The minimum clearance outside the usable roadway shoulder for expressway signs mounted at the road side or for overhead sign supports either to the right or left side of the roadway shall be 1.80 m. This minimum clearance of 1.80 m shall also apply outside of an unmountable kerb. Where practicable, a sign should not be less than 3 rn from the edge of the nearest traffic lane. Large guide signs should be farther removed preferably 9 m or more from the nearest traffic lane, unless otherwise specified. Lesser clearances, but not generally less than 1.80 m, may be used on connecting roadways or ramps at inter-changes. 176.3.2 Where a median is 3.6 m or less in width, consideration should be given to spanning over both roadways without a central support. Where overhead

Traffic Signs, Markings and I Other Road Appurtenances

Section 800

sign supports cannot be placed at a safe distance away from the line of traffic or in an otherwise Protected site, they should either be so designed as to minimise the impact forces or protect motorists adequately by a physical barrier or guard rail of suitable design. 176.4 Number of Signs at an Overhead Installation In no case should there be more than three signs displayed at any one location, including regulatory or warning signs, either on the overhead structure or on its support. 176.5 Materials for Overhead Sign and Support Structures 176.5.1 Aluminium alloy or galvanized steel to be used as truss design supports shall conform to relevant IS. These shall be of sections and type as per structural design requirements as shown on the plans. 176.5.2 After steel trusses have been fabricated and all required holes punehed or drilled on both the horizontal truss units and the vertical and support units, they shall be galvanized in accordance with IS Specifications. 176.5.3 Where aluminium sheets are used for road signs, they shall be of smooth, hard and corrosion resistant aluminium alloy conforming to IS. 736' Material Designation 24345 or 1900. The thickness of sheet shall be related to the size of the sign with minimum thickness of sheet as 1.5 nim. 176.5.4 Fligh strength bolts shall conforin to IS: 1367 whereas precision bolts, nuts etc. shall conform to IS: 1364. 176.5.5 Plates and support sections for sign posts shall conform to IS: 226 and IS: 2062. 176.5.6 The overhead signs shall be reflectorised with high retro-reflective sheeting preferably of encapsulated lens type. 176.6 Size, Locations, etc. of Signs 176.6.1 The size of the signs, letters and their placement shaIll 'be as specified in the Contract drawings and Specifications. 176.6.2 In the absence of details or for any missing details in the Contract documents, the signs shall be provided as directed by the Engineer. 176.7 Installation 176.7.1 Thesupporting structure and signs shall be fabricated and erected as per details given in the plans. 176.7.2 Sign posts, their foundations and sign mountings shall be so constructed as to hold signs in a proper and permanent position to adequately resist swaying in the wind or displacement by vandalism. 176.7.3 The work of construction of foundation for 'sign supports including excavation and backfill, forms, steel reinforcement, concrete and its placement shall conform to the relevant Specifications given in these Specifications. intensity

Traffic Signs, Markings and I Other Road Appurtenances

Section 800

176.7.4 The structures shall be erected with.the specifio camber and in such a manner as to prevent excessive stresses, injury and defacement.. 176.7.5 Brackets shall be provided for mounting signs of the type to . be supported by the structure. For better visibility, they shall be adjustable to permit mounting the sign faces at any angle between a truly vertical position and three degree from vertical. This angle shall be obtained by rotating the frontlowler edge of the sign forward. All brackets shall be of a length equal to , the heights of the'signs being supported. 176.7.6 Before erecting support structures, the bottom of each base plate shall be protected with an approved material which will adequately prevent any harmful reaction -between the plate and the concrete. 176.7.7 The end supports shall be plumbed by the use of levelling nuts and the space between the foundation and base plate shall be completely filled with an anti-shrink grout. 176.7.8 Anchor bolts for sign supports shall be set to proper locations and elevation with templates and carefully checked after' construction of the sign foLmdation and before the concrete has set. 176.7.9 All nuts on aluminium trusses, except those used on the flanges, shag be tightened only until they are snug. This includes the nuts on the anchor bolts. A thread lubricant shall be used with each aluminium nut. 176.7.10 All nuts on galvanized steel trusses, with the exception of high strength bolt connections, shall be tightened only to a snug condition. 176.7.11 Field welding shall not be permitted, 1 1 176.7.12 After installation of signs is complete, the sign shall be inspected by the Engineer. If specular reflection is apparent on any sign, its positioning shall be adjusted by the Contractor to eliminate or minimize this condition. 176.8 Measurements for Payment 176.8.1 Aluminiurn or steel overhead sign structure will be measured for payment by the specific unit (each) complete in'place or for each component of the overhead sign structure as indicated in the Bill of Quantities and the detailed drawing(s). 176.8.2 Flat sheet aluminiurn signs with retro-reflective sheeting thereon shall be measured for payment by the -square metre for each thicknpss, complete in place. 176.9 Rate 176.9.1 The structural steel part of the overhead sign shall be measured in tonnes while the sign board shall be measured in sq. in. Other items like excavation for foundation and concrete in foundation to be measured and paid in cu. in. separately. The Contract unit rate for overhead sign structure shall be

Traffic Signs, Markings and I Other Road Appurtenances

Section 800

payment in full compensation for furnishing all labour, materials, tools, equipment, excavation, fabrication and installation and all other incidental costs necessary to complete the work t9___ihe Specifications. 176.9.2 The Contract unit rate for aluminium sheet signs shall include the cost of making the sign including all materials and fixing the same in position and all other incidental costs necessary to complete the work to the Specifications. 177 177.1 General The colour, width and layout of road markings shall be in accordance with the Code of Practice for Road Markings with paints, IRC : 35, and as specified in the drawings or as directed by the Engineer. 177.2 Materials Road markings shall be of ordinary road marking paint, hot applied thermoplastic compound, or reflectorised paint as specified in the item and the material shall meet the requirements as specified below. 177.3 Ordinary Road Marking Paint 177.3.1 Ordinary paint used for road marking shall conform to. GrMade I as per IS: 164. 177.3.2 The road marking shall preferably be laid with appropriate road marking machinery. 177.3.3 Laying thickness of road marking paint shall be as specified by the Engineer. 177.4 Hot Applied Thermoplastic Road Marking 177.4.1 General :
(i) The work under this section consists of marking traffic stripes using a thermoplastic compound meeting the requirements specified herein. (ii) The thermoplastic compound shall be screededlextruded on to the pavement surface in a molten state by suitable machine capable of controlled preparation and laying with surfisce application of glass beads at a specific rate. Upon cooling to ambient pavement temperature, it shall produce an adherent pavement marking of specified thickness and width and capable of resisting deformation by traffic. (iii) The colour of the compound shall be white or yellow OS colour No. 356) as specified in the drawings or as directed by the Engineer. (iv) Where the compound is to be applied to cement concrete pavement, a scaling primer is recommended by the manufacturer, shall be applied to the pavement in advance of placing of the stripes to ensure proper bonding of the compound. On new concrete surface any laitance and/or curing compound shall be removed before die-ftrwkings am applied.

ROAD MARKINGS

177.4.2

Thermoplastic Material

177.4.2.1 General : The thermoplastic material shall be homogeneously composed of aggregate, pigment, resins and glass reflectorizing beads. 177.4.2.2 Requirements

Traffic Signs, Markings and I Other Road Appurtenances

Section 800

(1) Composition : The pigment, beads, and aggregate shall be uniformly dispersed in the resin. The material shall be free from all skins, dirt and foreign objects and shall comply with requirements indicated in Table 800-3. TABLE 900-3. PROPORTIONS OF CONSTITUENTS OF MARKING MATERIAL (Percentage by weight) Component Binder Glass Beads Titanium Dioxide Calcium Carbonate and Inert Fillers Yellow Pigments 42.0 max. See Note White 18.0 min. 30-40 10.0 min. Yellow 18.0 min. 30-40

Note Amount of yellow pigment~ calcium carbonate and inert fillers shall be at the option of the manufacturer, provided all other requirements of this Specification are met. (to Properties: The properties of thermoplastic material, when tested in accordance with ASTM D36/BS-3262-(Pait 1), shall be as below: (a) Luminance : White : Daylight luminance at 45 degries-65 per cent min. as per AASHTO M 249 Yellow: Daylight luminance it 45 degien-45 per cent min. as per AASHTO M 249 (b) Drying time : When applied at a temperature specified by the manufacturer and to the required thickness, the material shall set to ben traffic in not mom than 15 minutes. (c) Skid resistance : not less than 45 as per BS 6044.

(d) Cracking resistance at low temperature: 7be material shall show no cracks on application to concrete blocks. (e) (1) (ii) Softening point 102.5 :t 9.50 C as per ASTM D 36. Flow resistance Not more than 25 per cent as per AASHTO M 249. Yellowness Inda (for white thermoplastic paint): not more than 0.12 as per AASHTO M 249

(iii) Storage Iffe : The material shall meet the requirements of these Specifications for a period of one year. T'he thermoplastic material must also melt uniformly with no evidence of skins or unmelted particles for the one year storage period. Any material not meeting the above requirements "I be replaced by the manufacturer/ supplier/Contractor. (iv) Reflectorisation : Shall be achieved by incorporation of beads. the grading and other properties of the bonds shall be as specified--irr-Clause 803.4.3. (v) Marking : Each container of the thermoplastic material shall be clearly and indelibly marked with the following information: 1. The name, trade mark or other means of identification of manufacturer 2, Batch number 3. Date of manufacture 4. Colour (white or yellow) 5. NUximum application temperature and maximum safe beating temperature. (vi) Sampling and testing: 7be thermoplastic material shall be sampled and tested in accordance with the appropriate ASTM/BS method. The Contractor shall furnish to the Employer a copy of certified test

Traffic Signs, Markings and I Other Road Appurtenances

Section 800

reports from the manufacturers of the thermoplastic material showing results of all tests specified herein and shall certify that the material meets all requirements of this Specification.

177.4.3

Renectorising glass beads

177.4.3.1 General : This Specification covers two types of glass beads to be used for the production of reflectorised pavement markings. Type I beads -are those which are a constituent of the basic thermoplastic compound vide Table 800-3 and Type 2 beads are those which are to be sprayed on the surface vide Clause 803.6.3. 177.4.3.2 The glass beads shall be transparent, colourless and free from milkiness, dark particles and excessive air inclusions. These shall conform to the requirements spelt out in Clause 803.4.3.3. 177.4.3.3 Specific requirements A. Gradation: Ile glass beads shall meet the gradation requirements'for the two types as given in Table 8W-4.
TABLE 800-4. GRADATION REQUIREMENTS FOR GLASS BEAD Sieve size Type I 1.18 mm 850 micron 600 -do425 -do300 -do180 -dobelow 180 micron B. C. 65 to 95 30 to 75 0 to 10 10 to 30 0 to 15 Roundness: The glass beads shall have a minimum of 70 per cent true spheres. Refractive index: The glass beads. shall have a minimum refi-Active index of 1.50. Type 2 0 to 3 5 to 20 0 to 5 5 to 20 Per cent retained

A Free flowing properties : The glass beads shall be free of hard lumps and clusters and shall dispense readily under any conditions suitable for paint striping. They shall pass the free flow-test.

177.4.3.4 Test methods: The specific requirements shall be tested with the following methods:
(i) Free-flow test: Spread 100 grams of beads evenly in a 100 mm diameter glass dish. Place the (fish in a 250 nun inside diameter desiccator which is filled within 25 mm of the top of a desiccator plate with sulphuric acid water solution ( specific gravity 1. 10). Cover the desiccator and lot it stud for 4 hours at 20 to 29 degree C. Remove sample from desiccator, transfer beads to a pan and inspect for lumps or clusters. Then pour beads into a clean, dry glass funnel having a 100 nun stem and 6 nun orifice. If necessary, initiate flow by lightly tapping the funnel. 1"he glass spheres shall be essentially free of lumps and clusters and shall flow freely through the funnel. (ii) The requirements of gradation, roundness and refractive index of glass beads and the amount of glass beads in the compound shall be tested as per BS 6088 and BS 3262 (Part 1). (iii) The Contractor shall fumish to the Employer a copy of certified test reports from the manufacturer of glass beads obtained from a reputed laboratory showing results of all tests'specified herein and shall

Traffic Signs, Markings and I Other Road Appurtenances

Section 800

certify that the material meets all requirements of this Specification. However, if so required. these tests may be carried out as directed by the Engineer.

177.4.4

Application properties of thermoplastic material

177.4.4.1 The thermoplastic material shall readily get screeded/ extruded at temperatures specified by the manufacturers for respective method of application to produce a line of specified thickness which shall be continuous and uniform in shape having clear and sharp edges. 177.4.4.2 The material upon heating to application temperatures, shall not exude fumes, which are toxic, obnoxious or injurious to persons_ or property. 177.4.5 Preparation:
(i) 7he material shall be melted in accordance with the manufacturer's instructions in a heater fitted with a mechanical stirrer to give a smooth consistency to the thermoplastic material to avoid local overheating. The temperature of the mass shall be within the range specified by the manufacturer, and shall on no account be allowed to exceed the maximum temperature stated by the manufacturer. 7be molten material should be used as expeditiously as possible and for thermoplastic material which has natural binders or is otherwise sensitive to prolonged heating, the material shall not be maintained in a molten condition forAore than 4 hours. (ii) After transfer to the laying equipment, the material shall be maintained within the temperature range specified by the manufacturer for achieving the desired consistency for laying.

177.4.6
(a) (b)

Properties of finished road marking

The stripe shall not be slippery when wet. The marking shall not lift from the pavement in Freezing weather.

(c) After application and proper drying, the stripe shall show no appreciable deformation or discolouration under traffic and under road temperatures upto 600C. (d) 'Me marking shall not deteriorate by contact with sodium chloride, calcium chloride or oil drippings from traffic. (e) The stripe or marking shall maintain its original dimensions and position. Cold ductility of the material shall be such as to permit normal. movement with the road surface without chopping Or cracking. (f) The colour of yellow. marking shall conform to IS Colour No. 356 as given in IS: 164.

177.5 Reflectorised Paint Reflectorised paint, if used, shall conform to the Specification by the manufacturers and approved by the Engineer. ReflectorisinAglass beads for reflectorising paints where used shall conform to the uirement of Clause 803.4.3. 177.6 Application 177.6.1 Marking shall be done by machine. For locations where painting cannot be done by machine, approved manual methods shall be used with prior approval of the Engineer. The Contractor shall maintain control over traffic while painting operations are in progress so as to cause minimum inconvenience to wffic compatible with protecting the workmen. 177.6.2 The thermoplastic material shall be applied hot either by screeding or extrusion process. After transfer to the laying apparatus, the material shall be laid at a temperature *ithin the range specified by the manufacturw-Tor the

Traffic Signs, Markings and I Other Road Appurtenances

Section 800

particular method of laying being used. The paint shall be applied using a screed or extrusion machine. 177.6.3 The pavement temperature shall not be less than 10'C during application. All surfaces to be marked shall be thoroughly cleaned of all dust, dirt~ grease, oil and all other foreign matter before application of the paint. The material, when formed into traffic stripes, must be readily renewable by placing an overlay.of new material directly over an old' line of compatible material. Such new material shall so bond itself to the old line that no splitting or separation takes place. Thermoplastic paint shall be applied in intermittent or continuous lines of uniform thickness of at least 2.5 mm unless specified otherwise. 'Where arrows or letters are to be provided, thermoplastic compound may be hand-sprayed. In addition to the beads included in the material, a further quantity of ghiss beads of Type 2, conforming to the above noted Specification shall be sprayed uniformly into a mono-layer on to the hot paint line in quick succession of the paint spraying operation. The glass beads shall be applied at the rate of 250 grams per square metre area. 177.6.4 The minimum thickness specified is exclusive of surface applied glass beads. The method of thickness measurement shall be in accordance with Appendices B and C of BS - 3262 (Part 3). 177.6.5 The finished lines shall be free from ruggedness on sides and ends and be parallel to the general alignment of the carriageway. The upper surface of the lines shall be level, uniform and free from streaks. 177.7 Measurements for Payment 177.7.1 The painted markings shall be measured in sq. metres of actual area marked (excluding the gaps, if any). 177.7.2 In respect of markings like directional arrows and lettering, etc., the measurement shall be by numbers. 177.8 Rate The Contract unit rate for road markings shall be payment in full compensation for furnishing a labour, materials, tools, equipment, including all incidental costs necessary for carrying out the work at the site conforming to these Specifications complete as per the approved drawing(s) or as directed by the Engineer and all other incidental costs necessary to complete the work to these Specifications. 178 178.1 General The work covers the supply, painting, lettering and fixing of distance measurement stones and shall include:
(i) Hectometm stones (ii) Kilornetre stones (iii) 5th Kilometm stones

HECTOMETREIKILOMETRE STONES

178.2 The dimensions of the stones and the size, colour, arrangement of letters and

Traffic Signs, Markings and I Other Road Appurtenances

Section 800

script shall be as per IRC : 26 "Type Designs for 200 Me" Stones" and IRC: 8 "Type Designs for Highway Kilometre Stones". 178.3 The hectometre/kilometre stones may be made of local stones, concrete or any other material available locally and approved by the Engineer. The stones shall be bedded into the ground with adequate foundations as indicated in the drawings or in the relevant I.R.C. Specifications or as directed by the Engineer. The orientation and location of the stones shall be as indicated in the drawings or in the relevant I.R.C. Specifications or as directed by the Engineer. 178.4 Measurements for Payment The measurement will be in numbers of 200 metre, kilometre and 5th kilometre stones fixed at site. 178.5 Rate The Contract unit rate for hectometre/kilometre/5th kilometre stones shall be payment in full compensation for furnishing all labour, materials, tools, equipment and making the stones, painting and lettering and fixing at site and all other incidental costs necessary to complete the work to these Specifications. 179 179.1 General The work covers supplying and fixing roadway indicators, hazard markers and object markers. 179.2 The design, materials to be used and the location of the road delineators shall conform to Recommended Practice for Road Delineators, IRC: 79, and to relevant drawings or as otherwise directed by the Engineer. 179.3 Measurements for Payment The measurement shall be made in numbers of delineators fixed at site. 179.4 Rate The Contract unit rate for Road Delineators shall be payment in fun compensation for furnishing all labour, materials, tools, equipment for preparing, supplying and fixing at site and all other incidental costs necessary to complete the work to these Specifications. 180 180.1 General The work comprises of supplying and fixing boundary stoneA as per designs and Specifications given in IRC: 25 "Type Desip.s for Bdkindary Stones" and at locations indicated. iii the drawings or-a& 4irecto by the Engineer. 180.2 Measurements for Payment The measurement shall be made in numbers of boundaty.stones fixed at Site. BOUNDARY STONES ROAD DELINEATORS

Traffic Signs, Markings and I Other Road Appurtenances 180.3 Rate

Section 800

The Contract unit rate for boundary stones shall, be payi~&~ in full compensation for furnishing all labour, materials, tools, equipment for preparing, supplying and fixing and all other incidental costs necessary to complete the work to these Specification& 181 181.1 General The work comprises of fixing Mild Steel (M.S.) posts- 'md providing barbed wire fencing including necessary stays and entry,gates as shown in the drawing (s) and as directed by the Engineer. 181.2 The M.S. posts shall conform to IS:226 and shall be of angle iron of size indicated in the drawings. The angle iron shall be embedded in concrete ' to a sufficient depth below ground as indicated in the drawings. The steel shall be fabricated and painted to conform to Section' 1900 of these Specifications. 181.3 The barbed wire shall be of galvanised iron and shall conform to IS:278. 181.4 Entry gate(s) shall be made of M.S. rods or other metal as per the design shown in the drawing(s). 181.5 Measurements for Payment The measurement shall be in running metre of fencing including the entry gates. 181.6 Rate The Contract unit rate for fencing shall be payment in full compensation for furnishing all labour, materials, tools, equipment for fabrication and fixing at site and all other incidental costs necessary to complete the work to these Specifications. 182 182.1 General The work shall consist of supplying, fixing and erecting tubular steel railings as shown on the drawings and as directed by the Engineer. 182.2 The railings shall be of tubular steel in conformance to IS:1239. The fabrication and painting except for the final coat shall be completed before despatch to the site. Prior to the painting, all surfaces shall be grit blasted to the satisfaction of the Engineer and pickled. The priming coat of paint shall be applied as soon as the steel has dried. 182.3 The posts shall be vertical and of the type as shown in the drawing with a tolerance not exceeding 6 min in a length of 3 m. The railing shall be erected true to line and grade. 182.4 Measurements for Payment TUBULAR STEEL RAILING FENCING.

Traffic Signs, Markings and I Other Road Appurtenances

Section 800

The railing shall be measured in linear metre from end to end along the face of the railing, including end and intermediate posts, with no deductions for gaps as shown on the drawings. 182.5 Rate The Contract unit rate for Tubular Steel Railing shall be payment n full compensation for furnishing all labour, materials, tools, equipment and plant required for fabrication, connection, oiling, painting, temporary erection, inspection, test and final erection at site and all other incidenud costs necessary to complete the work to these Specifications. 183 183.1 General 183.1.1 This work shall consist of construction, provision and installation of concrete crash barrier at the edges of the road and median at locations and of dimensions as shown on the drawings or as directed by the Engineer. 183.1.2 Concrete barrier shall generally be located on approaches to bridge structures, at locations where the embankment height is more than 3 metres and at horizontal curves. 183.2 Materials 183.2.1 All materials shall conform to Section 1000-Materials for Structures as applicable, and relevant dauses in Section 1600 shall govern the steel reinforcement. The concrete barriers shall be constructed either by the "cast-in-place with fixed forms" method or the "extrusion or slip form" method or a combination thereof at the Contractor's option with the approval of the Engineer. Where "extrusion or slip form" method is adopted, full details of the method and literature shall be furnished. 183.2.2 Concrete barriers shall be constructed with M *120 grade concrete and with High Yield Strength deformed reinforcement conforming to IRC: 21. 183.2.3 An expansion joint with pre-moulded asphalt filler board shall be provided at the junction of crash barrier un structure and crash barrier on the fill. The crash barrier on the fill shall be constructed in pieces of length not exceeding 20 in, with pre-moulded asphalt filler board joints. 183.3 Construction Operations 183.3.1 The location of crash barrier shall be strictly adhered to as shown on the drawing and as dir ' ected by the Engineer. Concrete crash barriers shall present a smooth, uniform appearance in their fbial position, conforming to the horizontal and vertical lines shown on the plans or as ordered by the Engineer and shall be free of lumps, sags or other irregularities. The top and exposed faces of the barriers shall conform to the specified tolerances, as defined in Clause R09A, when tested with 3 m straight edge, laid on the surface. CONCRETE CRASH BARRIER

Traffic Signs, Markings and I Other Road Appurtenances

Section 800

183.3.2 When concrete barriers are to be constructed on recently completed bridges, the height of the barriers shall be Adjusted to compensate for the camber and dead load deflection of the superstructure. The amount of adjustment shall be determined by the Engineer and shall be ordered before the concrete is placed. Such barriers shall be placed after form work has been released and as long after the superstructure construction as possible without hampering the progress of the work. 183.3.3 Backfilling to the concrete barriers shall be compacted in layers to the compaction of the surrounding earthwork. 183.4 Tolerance The overall horizontal alignment of rails shall not depart from the road alignment by more than 30 mm, nor deviate in any two successive lengths from straight by more than 6 mm and the faces shall not vary more than 12 mm from the edge of a 3 m straight edge. Barriers shall be at the specified height as shown in the plans above the edge of the nearest adjacent carriageway or shoulder, within a tolerance of 30 mm. 183.5 Measurements for Payment All barriers will be measured by linear metres of completed and accepted length in Place, corresponding end to end along the face of concrete barriers including approach and departure ends. 183.6 Rate The Contract unit rate shall include full compensation for furnishing all labour, materials, tools, equipment and incidental costs necessary for doing all the work involved in constructing the concrete barrier complete in place in all respects as per these Specifications. 184 184.1 General 184.1.1 This work shall consist of furnishing and erection of metal beam crash barrier of dimensions and at locations as shown on the drawing (s) or as directed by the Engineer. 184.1.2 Metal beam crash barrier shall generally be located on approaches to bridge structures, at locations where the embankment height is more than 3 metres and at horizontal curves. 184.2 Materials 184.2.1 Metal beam rail shall be corrugated sheet steel beams of the class, type, section and thickness indicated on the plans. Railing posts shall be made of steel of the section, weight and length as shown on the plans. All complete steel rail elements, terminal sections, posts, bolts, nuts, hardware and other steel fittings shall be galvanised. All elements of the railing shall be free from abrasions, rough or sharp edges and shall not be kinked, twisted or bent. METAL BEAM CRASH BARRIIER

Traffic Signs, Markings and I Other Road Appurtenances

Section 800

184.2.2 Steel beam elements and terminal sections shall be galvanised (zinc coated, 6.55 kg per square metre; minimum single spot) unless otherwise specified. The galvanising on all other steel parts shall conform to the relevant IS Specifications. All fittings (bolts, nuts, washers) shall conform to the IS : 1367 and IS : 1364. All galvanizing shall be done after fabrication. 184.2.3 Concrete for bedding and anchor assembly shall conform to Section 1700 of these Specifications. 184.3 Construction Operations 184.3.1 The line andgrade of railing shall be true to that shown on the plans. The railing shall be carefully adjusted prior to fixing in place, to ensure proper matching at abutting joints and correct alignment and camber throughout their length. Holes for field connections shall be drilled with the railing in place in the structure at proper grade and alignment. 184.3.2 Unless otherwisb specified on the drawing, railing steel posts shall be given one shop coat of paint (primer) and three coats of paint on structural steel after erection, if the sections are not galvanised. Any part of assembly below ground shall be painted with three coats of red lead paint. I 184.3.3 Splices and end connections shall be of the type and designs specified or shown on the plans and shall be of such strength as to develop full design strength of the rail elements. 184.4 Installation of Posts 184.4.1 Holes shall be dug or drilled to the depth indicated on the plans or posts may be driven by approved methods and equipment, provided these are erected in proper position and are free from distortion and buffing or any other damage. 184.4.2 All post holes that are dug or drilled shall be of such size as will permit proper setting of the posts and allow sufficient room for backfilling and tapping. 184.4.3 Holes shall be backfilled with selected earth or stable materials in layers not exceeding 100 mm thickness and each layer shall be thoroughly tamped and rammed. When backfilling and tamping are completed, the posts or anchors shall be held securely in place. 184.4.4 Post holes that are drilled in rock and holes for anchor posts shall be backfilled with concrete. 184.4.5 Posts for metal beam guardrails on bridges shall be bolted to the structure as detailed on the plans. The anchor bolts shall be set to proper location and elevation with templates and carefully checked. 184.5 Erection 184.5.1 All guardrail anchors shall be set and attachments made and placed as

Traffic Signs, Markings and I Other Road Appurtenances indicated on the plans or as directed by the Engineer.

Section 800

184.5.2 All bolts or clips used for fastening the guardrail or fittings to the posts shall be drawn up tightly. Each bolt shall have sufficient length to extend atleast 6 mm through and beyond the full nut, except where such. extensions might interfere with or endanger traffic in which case the bolts shall be cut off flush with the nut. 184.5.3 All railings shall be erected, drawn and adjusted so that the longitudinal tension will be uniform throughout the entire length of the rail. 184.6 Tolerance The posts shall be vertical with a tolerance not exceeding 6 min in a length of 3 metre. The railing barrier shall be erected true to line and grade184.7 Measurements for Payment 184.7.1 Metal beam railing barriers will be measured by linear metre of completed length as per plans and accepted in place. Terminals/ anchors of various types shall be paid for by numbers. 184.7.2 No measurement for payment shall be made for projections or anchors beyond the end posts except as noted above. Furnishing and placing anchor bolts and/or devices for guard rail posts on bridges shall be considered incidental to the construction and the costs thereof shall be included in the price for other items of construction. 184.7.3 No measurement for payment will be made for excavation or backfilling performed in connection with this construction. 184.8 Rate The Contract unit rate shall include full compensation for furnishing of labour, materials, tools, equipments and incidental costs necessary for doing all the work involved in constructing the metal beam railing barrier complete in place in all respects as per these Specifications. 185 185.1 General The, traffic signal, its configuration, size and location shall be in accordance with IRC: 93 and IS: 7537 and as shown in the drawings or as directed by the Engineer. Prior to installation of signals, the Contractor shall submit to the Engineer, for approval, detailed proposals showing the signal type, sizes, paint and structural details of the signal posts including control s ystem. 185.2 The traffic signals sW1 have a complete electronic mechanism for. controlling the operation of traffic with an auxiliary manual controller. The time plan of signals shall be as per drawing and shall be modified as directed by the Engineer. 185.3 Materials ROAD TRAFFIC SIGNALS

Traffic Signs, Markings and I Other Road Appurtenances

Section 800

The various materials and fabrication thereof shall conform to the following: 185.3.1 Signal foundation: The signal foundations shall be constructed as per Specifications given in Clause 13 of IRC : 93 or as shown in the drawings. 185.3.2 Constructional requirements: The constructional requirements for post, signal head assembly, signal head, optical system, lamp and holder, visor, post, supports for overhead mounted signals, equipment housing, locks, inter-connecting cables, earthing, mairis termination, controller electrical components, etc., shall conform to IS: 7537 unless otherwise. stated in IRC: 93. The post shall be painted and protected as per Clause 3.7. of IS: 7537. 185.3.3 Optical requirements: The shape of all signal lenses shall be circular and shall be of specified colour and size and as shown in the drawing. Quality of lenses, arrangement of lenses, illuminations, visibility and shielding of signals shall be as per relevant Clauses of IRC : 93 and IS:7537. 185.4 Tests Tests shall be carried out on all * components of traffic signal including tests on complete system for its performance as per relevant Clauses of IRC : 93 and IS: 7537. 185.5 Maintenance of Traffic Signals It shall be the responsibility of the Contractor to provide for maintenance of the signal section system throughout the warranty period for at least five (5) years after installation and as per Clause 18 of IRC : 93. 185.6 Measurements for Payment The measurement for traffic signalisation system shall be by unit for complete work as specified and as per drawing for complete road junction. 185.7 Rate The Contract unit rate for the traffic sipalisation system as a whole shall be payment in full compensation for furnishing all labour, materials, tools, equipment for preparing, supplying, fixing at site, testing and maintenance throughout warranty period and all other incidental costs necessary to complete and maintain the work to these Specifications.

Quality Control for Road Works Quality Control for Road Works 900 Quality Control for Road Works

Section 900

Quality Control for Road Works

Section 900

901

GENERAL

185.8 All materials to be used, all methods adopted and all works performed shall be strictly in accordance with the requittments of dwse Specifications. The Contractor shall set up a field laboratory at locations approved by,the Engineer and equip the same with adequate equipment and personnel in order to carry out all required tests and Quality Control work as per Specifications and/or as directed by the Engineer. The internal layout of the laboratory shall be,as per Clause 121 and/or as directed by the Engineer. The list of equipment and the facilities to be provided shall be got~ approved from the Engineer in advance. 185.9 The Contractor's laboratory should be manned by a qualified Materials Engineer/Civil Enginee; assisted by experienced technicians, and the set-up should be got approved by the Engineer. 185.10 The Contractor shall carry out quality control tests on the materials and work to the frequency stipulated in su'bsequentparagmphs. In the absence of clear indications about method and or frequency of tests for any item, the instructions of the Engineer shall be followed. 185.11 For satisfying himself about the quality of the materials and work, quality control tests will also be conducted by the Engineer (by himself, by his Quality Control Units or by any other agencies deemed fit by him), generally to the frequency set forth hereinunder. Additional tests may also be conducted where, in the opinion of the Engineer, need for such testsexists. 185.12 The Contractor shall provide necessary co-operation and assistance in obtaining the samples for tests and carrying out thefield tests as required by the Engineer from time to time. This may include provision of labour, attendants, assistance in packing and despatching and any other assistance considered necessary in connection with the tests. 185.13 For the work of embankment, subgrade and pavement, construcdon of subsequent layerof same or other material over the finished layershall be done after obtaining permission from the Engineer. Similar permission from the Engineer shall be obtained in respect of all other items of works prior to proceeding with the next stage of construction. 185.14 The Contractor shall carry out "fications in the procedure of work, if found necessary, as directed by the Engineer during inspection. Works falling short of quality shall be rectified/redone by the Contractor at his own cost, and defective work shall also be removed from the site of works by the Contractor at his own coft.

Quality Control for Road Works

Section 900

185.15 The cost of laboratory building including services, essential supplies like water, electricity, sanitary services and their maintenance and cost of all equipment, tools, materials, labour andincidentals toperform tests and other operations of quality control according to the Specification requirements shall be deemed to be incidental to the work and no extra payment shall be made for the same. If, however, there is a separate item in the Bill of Quantities for setting up of a laboratory and installing testing equipment, such work shall be paid for separately. 185.16 For testing of samples of soils/soil mixes, granular materials, and mixes, bituminous materials and mixes, aggregates, cores etc., samples in the required quantity and form shall be supplied to the Engineer by the Contractor at his own cost. 185.17 For cement, bitumen, mild steel, and similar other materials where essential tests are to be carried out at the manufacturer's plants or at laboratories other than the site laboratory, the cost of samples, sampling, testing and furnishing of test certificates shall be home by the Contractor. He shall also furnish the test certificates to the Engineer. 185.18 For testing of cement concrete at site during construction, arrangements for supply of samples, sampling, testing and supply of test results shall be made by the Contractor as per the frequency and number of tests specified in the Handbook of Quality Control for Construction of Roads andRunways (IRC: SP: 11) andrelevant IS Codes or relevantclauses of these Specifications, the cost of which shall be borne by the Contractor. 185.19 The method of sampling and testing of materials shall be as required by the "Handbook of Quality Control for Construction of Roads and Runways" (IRC : SP: 11), and these MOST Specifications. Where they are conti-Adicting, the provision in these Specifications shall be followed. Where they are silent, sound engineering practices shall be adopted. The sampling and testing procedure to be used shall be 8 approved by the Engineer and his decision shall be final and binding on the Contractor. 185.20 The materials for embankment construction shall be got approved from the Engineer. The responsibility for arranging and obtaining the land for borrowing or exploitation in any other way shall rest with the Contractor who shall ensure smooth and uninterrupted supply of materials in the required quantity during the construction period. Similarly, the supply of aggregates for construction of road pavement shall be from quarries approved by the Engineer. Responsibility for arranging uniterrupted supply of materials from the source shall be that of the Contractor. 185.21 Defective Materials

Quality Control for Road Works

Section 900

All materials which the Engineer/his representative has determined as not conforming to the requirements of the Contract shall be rejected whether in place or not; they shall be removed immediately from the site as directed. Materials, which have been subsequently corrected, shall not be used in the work unless approval is accorded mi writing by the Engineer. Upon failure of the Contractor to comply with any order of the Engineer/his representative, given under this Clause, the Engineer/his representative shall have authority to cause the removal of rejected material and to deduct the removal cost thereof from any payments due to the Contractor. 185.22 Imported Materials At the time of submissio~ of tenders, the Contractor shall furnish a list of materials/finished products manufactured, produced or fabricated outside India which he proposes to use in the work. The Contractor shall not be entitled to extension of time for acts or events occurring outside India and it shall be the Contractor's responsibility to make timely delivery to the job site of all such materials obtained from outside India. The materials imported from outside India shall conform to the relevant Specifications of the Contract. In case where materials/ finished products are not covered by the Specifications in the Contract, the details of Specifications proposed to be followed and the testing procedure as well as laboratories/ establishments where tests are to be carried out shall be specifically brought out and agreed to in the Contract. The Contractor shall furnish to the Engineer a certificate of compliance of the tests carried out. In addition, certified mill test reports clearly identified to the lot of materials shall be furnished at the Contractor's cost. 186 CONTROL OF ALIGNMENT, LEVEL AND SURFACE REGULARITY

186.1 General All works performed shall conform to the lines, grades, cross sections and dimensions shown on the drawings or as directed by the Engineer, subject to the permitted tolerances described herein-after. 186.2 Horizontal Alignment Horizontal alignments shall be reckoned with respect to the centre line of the carriageway as shown on the drawings. The edges of the carriageway as constructed shall be correct within a tolerance of 10 mm therefrom.The corresponding tolerance for edges of the roadway and lower layers of pavement shall be 25 mm. 186.3 Surface Levels The levels of the subgrade and different pavement courses as constructed, shall not vary from those calculated with reference to the longitudinal and cross-profile of the road shown on the drawings or as directed by the Engineer beyond the tolerances mentioned in Table 900-1.

Quality Control for Road Works


TABLE 900-1. TOLERANCES IN SURFACE LEVELS 1. 2(a) (b) 3. (a) (b) Subgrade Sub-base Flexible pavement Concrete pavement [Dry lean con or Rolled con] Bituminous course Other than bituminous (i) Machine laid (ii) Manually laid 4. (a) (b) 5. Machine laid Manually laid + 20 mm - 25 mm + 10 mm + 20 mm + 6mm - 10 mm + 6 mm - 6mm + 10 mm - 10 mm + 15 mm -15 mm + 6 mm - 6 mm + lo mm - 10 mm Cement concrete pavement - 6 nim, + 5 nun Wearing course for flexible pavement

Section 900

Base-course for flexible pavement

Ibis may not exceed - 8 mm at 0 - 30 cm from ft edges... Provided, however, that the negative tolerance for wearing course shall not be permitted in conjunction with the positive tolerance for base course, if the thickness of the former is thereby reduced by more than 6 mrn for flexible pavements and 5 mm for concrete pavements. For checking compliance with the above requirement for subgrade, Sub-base and base courses, measurements of the surface levels shall be taken on a grid of points placed at 6.25 m longitudinally and 3.5 m transversely. For any 10 consecutive measurements taken longitudinally or transversly, not more than one measurement shall be permitted to exceed the tolerance as above, this one measurement being not in excess of 5 mm above the permitted tolerance. For checking the compliance with the above requirement for bituminous wearing courses and concrete pavements, measurements of the surface levels shall be taken on a grid of points, spaced at 6.25 m along the centre length and at 0.5 in from the edges and at the centre of the pavement. In any length of pavement, compliance shall be deemed to be met for the final road surface, only if the tolerance given above is satisfied for any point on the, surface. 186.4 Surface Regularity of Pavement Courses

Quality Control for Road Works

Section 900

The longitudinal profile shall be chocked with a 3 metre long straight edge/moving straight-edge as desired by the Engineer at the middle of each traffic lane along a line parallel to the centre line of the road. The maximurn permitted number of surface irregulari1es shall be as per Table 900-2. TABLE "S-2. MAXIMUM PERMITTED NUMBER OF SURFACE IRREGULARITIES Surfaces of earrhqpways and paved dmidera intswarity LWOW Evmswjkys* ca~eloq* 4m= 300 20 40 7 nun 4nm 75 9 is 300 2 4 7 mm 75 1 2 300 40 60 75 18 27 300 4 6 75 2 3 Surfacesollaybysservke arm and an b1tan2bwasbase courns

Njuional Highwayst Roads of lower

*Category of each section of road as descn1W in dw Contract. The maximum allowable difference between the road surface and underside of a 3 m straight-edge when placed parallel with, or at rightangles to the centre line of the road at points decided by the Engineer shall be: for pavement surface (bituminous and cement concrete) for bituminous base courses for granular sub-base- base courses for sub-bases under concrete pavements 186.5 Rectification Where the surface regularity of subgrade and the various pavement courses fall outside the specified tolerances, the Contractor shall be liable to rectify these in the manner described below and- to the satisfacion of the Engineer.
(1) Subgrade: Where the surface is high, it shall be trimmed and suitably compacted. Where the same is low, the deficiency shall be corrected by scarifying the lower layer and adding fresh material and recorripacting to the required density. Ile d6gree of compaction and the type of material to be used shall conform to the requirements of Clause 305. (il) Granular Sub-base: Same as at (i) above, except that the degree of compaction and the type of material to be used shall conform to the requirements of Clause 401. (Iii) Lime/Cement Stabilized Soil Sub-base: For limckement treated materials where the surface is high, the same shall be suitably trimmed while taking care that the material below is not disturbed due to this operation. However, where the surface is low, the same shal I be corrected as described herein below. For cement treated material, when the time elapsed between detection of irregularity and the time of mixing of the material is less than 2 hours, the surface shall be scarified to a'- depth of 50 nun supplemented with

3 mm 6 mm 8 mm 10 mm

Quality Control for Road Works

Section 900

freshly mixed materials as necessary and recompacted to the relevant specification. When this time is mom than 2 hours. the full depth of the layer shall be removed from the pavement and replaced with fresh material to Specification. This shall also apply to lime treated material except that the time criterion shall be 3 hours instead of 2 hours. (iv) Water Bound Macadam/Wet Mix Macadam Sub-base/Base: Where the surface is high or low, the top 75 mm shall be scarified, reshaped with added material as necessary and recompacted to Clause 404. This shall also apply to wet mix macadam to Clause 406. (y) Bituminous Constructions: For bituminous construction other than wearing course, where the surface is low, the deficiency shall be corrected by adding fresh material overa suitable tack coat if needed and recompacting to specifications. Wherethe surface is high, the full depLhof the layer shall be'removed and replaced with fresh material and compacted to specifications. For wearing course, where the surface is high or low, the full depth of the layer shall be removed and replaced with fresh material and compacted to specifications. In all cases where the removal and replacement of a bituminous layer is involved, the area treated shall not be less than 5 m in length and not less dun 3.5 m in width. (vi) Dry Lean Concrete Sub-base/Rolled Cement Concrete: The defective length of the course shall be removed to full depth and replaced with material conforming to Clauses 601 or 603, as applicable, 1U area treated shall be at least 3 to long, not less than I lane wide and extend to the full depth. Before relaying the course. the disturbed subgrade or layer below shall be corrected by levelling. watering and compacting. (vil) Cement concrete pavement, The defective areas having surface irregularity exceeding 3 mm but not greater than 6 mm may be rectified by bump cutting or scrabbling or grinding using approved equipment. When required by the Brigineer, areas which have been reduced in level by the above operation(s) shall be retextured in an approved mama either by cutting grooves ( 5 mm deep) or roughening the surface by hacking the surface. If high areas in excess 6 mm or low awn in excess of 3 nun occur. exceeding the permitted numbers and if the Contractor cannot rectify, the slab shall be demolished and recoristructed at the Contractor's expense and in no case the area removed shall be less than the full width of the lane in which the irregularity occurs and full length of the slab. If deemed necessary by the Engineer, any section of the slab which deviates from the specified levels and tolerances shall be demolished and reconstructed at the Contractor's expense.

187 187.1 General

QUALITY CONTROL TESTS DURING CONSTRUCTION

The materials supplied and the works carried out by the Contractor shall conform to the specifications prescribed in the preceding Clauses. For ensuring the requisite quality of construction, the materials and works shall be subjected to quality control tests, as described hereinafter. The testing frequencies set forth are the desirable minimum and the Engineer shall have the full authority to carry out additional tests as frequently as he may deem necessary, to satisfy himself that the materials and works comply with the appropriate specifications. However, the number of tests recommended in Tables 900-3 and 900-4 may be reduced at the discretion of the Engineer if it is felt that consistency in the quality of materials can still be maintained with the reduced number of tests. Test procedures for the various quality control tests are indicated in the respective Sections of these Specifications or for certain tests within this Section. Where no specific

Quality Control for Road Works

Section 900

testing procedure is mentioned, the tests shall be carried out as per the prevalent accepted engineering practice to the directions of the Engineer. 187.2 Tests on Earthwork for Embankment, Subgrade Construction and Cut Formation 187.2.1 Borrow, material : Grid the borrow area at 25 m c/c (or closer, if the variability is high) to full depth of proposed working. These-pits should be logged and plotted for proper identification of suitable sources of material. The following tests on representative samples shall be carried oqt
(a) (b) (c) (d) (e) Sand Content [IS: 2720 (Part-4)1: 2 tests per 3000 cmt of soil. Plasticity Test[IS: 2726 (Part Sfl: Eachtype to be tested, 2 tests per3000 cmt of soil. Density Test [IS:2720 (Pot 8)1: Each soil type to be tested, 2 tests per 3000 cmt of soil. Deleterious Content Test [IS:2720 (Part-27)1: As and when required by the Engineer. Moisture Content Test [IS :2720 (Part,2)1: One test for every 250 cmt of soil.

(f) CBR Test on materials to be incorporated in the subgrade on soaked/unsoaked samples [IS : 2720 (Part-16)1: One CBR test for every 3000 cmt atleast or closer as and when required by the Engineer.

187.2.2 Compaction Control: Control shall be exercised on each layer by taking at least one measurement of density for each 1000 square metres of compacted area, or closer as required to yield the minimum number of test results for evaluating a day's work on statistical basis. The determination of density shall be in accordance with IS: 2720 (Part-28). Test locations shall be chosen only through random sampling techniques. Control shall not be based on the result of any one test but on the mean value of a set of 5- 10 density determinations. The number of tests in one set of measurements shall be 6 (if non-destructive tests are carried out, the number of tests shall be doubled) as long as it is felt that sufficient control over borrow material and ' the method of compaction is being exercised. If considerable variations are observed between individual density results, the minimum number of tests in one set of measurement shall be increased to 10. The acceptance criteria shall be subject to the condition that the mean density is not less than the specified density plus: However, for earthwork in shoulders (earthen) and in the subgrade, at least one density-measurement shall be taken for every 500 square metres for the compacted area provided further that the number of tests in each set of measurements shall be atleast 10. In other respects, the control shall be similar to that described earlier. 187.2.3 Cut formation : Tests for the density requirements of cut formation shall be carried out in accordance with Clause 903.2.2. 187.3 Tests on Sub-bases and Bases (excluding bitumen bound bases) The tests and their frequencies for the different types of bases and subbases shall be as given in Table 900-3. The evaluation of density results and acceptance criteria for compaction control shall be on lines similar to those set out in Clause 903.2.2. 187.3.1 Acceptance criteria: The acceptance criteria for tests on the strength of cement/lime stabilised soil and distribution of stabiliser content shall be

Quality Control for Road Works

Section 900

subject to the condition that the mean value is not less than the specified value plus: F.65 1.65 (No. of samples)" TABLE 900-3. CONTROL TESTS AND THEIR MINIMUM FREQUENCY FOR SUB. BASES AND BASES (EXCLUDING BITUMEN BOUND BASES) St. Type of No. Constniction I (i) Granular Gradation (ii) (iii) (iv) (v) (vi) 2. (i) Lime/Cement Quality of limel One test for each Stabilised cement consignment subject Soil Sub-base (ii) (iii) (iv) content Degree of pulverisation CBR or Unconfined test on a set of 3 specimens (v) (vi) (vii) Moisture content prior One test per 250 sq. m. to compaction Density of compacted One test per 500 M2 layer Deleterious constituents As required one test per 5 t0uneg procedural checks Periodically as considered necessary As required Lime/Cement Regularly, through One test per 200 m3 Atterberg limits Moisture content prior to compaction Density of compacted layer Deleterious constituents C.B.R. As required As required One test per 500 m2 One test per 200 ml One test per 25Om2 Test Frequency (min.) times the standard deviation.

Compressive Strength

Quality Control for Road Works

Section 900

3. (i)

Water Bound Macadam Aggregate Impact (ii) (iii) One test per 200 W of One test per 100 0 One test per 200 m' of Value aggregate Grading Flakiness Index Index (iv) Atterberg limits of binding material (v) Atterberg limits of portion of aggregate passing 425 micron sieve One test per 25 W of binding material One test per 100 cubic metre of aggregate

and Elongation aggregate

4.

Wet Mix Macadam (i) (ii) (iii) (iv) Aggregate Impact Vidue of aggregate Grading ofaggregate Flakiness and One test per 200 in' Elongation Index Atterberg limits of portion of aggregate passing 425 micron sieve (v) Density of compacted One test per 500 in'layer. of aggregate One test per 100 m3 of aggregate One test per 100 M3 One test per 200 M3

187.4 Tests on Bituminous Construction 187.4.1 Tests and frequency : The tests and their minimum frequencies for the different types of bituminous works shall be as given in Table 900-4. The Engineer may direct additional testing as required. 187.4.2 Acceptance criteria : The acceptance criteria for tests on density and Marshall stability shall be subject to the condition that it& mean value is not less than the specified value plus 1.65 (No. of samples) 1.65 7

,,).5 ] times the standard deviation

Quality Control for Road Works

Section 900

TABLE 9004. CONTROL TESTS FOR BITUMINOUS WORKS, AND THEIR MINIMUM FREQUENCY S1. Type of No. Const. cdon I. Prime Coat/Tack Coat/ Fog Spray (i) Quality of binder Number of samples per lot and tests as per IS: 73, IS:217 and IS:8887 as applicable. (ii) (iii) Binder temperature forapplication Rate of spread of Binder 2. Sea] Coat/Surface Dressing Same as mentioned under Serial No. I (ii) Value/Los Angeles Abrasion Value (iii) Elongation Index (iv) Stripping value of aggregates Initially one set of 3 representative specimens for each source of supply. Flakiness Index and -do Aggregate Impact aggregate One test per 50 M3 Of One test per 5OOm' and not less than two tests per day. (i) Quality of Binder At regular close intervals Test Frequency (min.)

(Immersion Tray Test) Subsequently when wan-anted by changes in the quality of aggregates (v) Water absorption of -do aggregates

(vi) Water sensitivity of mix Initially one set of 3 representative specimens for each source of supply. Subsequently when warranted by changes in the quality of aggregates (if required) (vii) Gradingofaggregates One test per 25 m3 of aggregate

Quality Control for Road Works

Section 900

(viii) Soundness (Magnesium Initially, one determination and Sodium Sulphate) by each method for each source of supply, then as warranted by change in the quality of the aggregates. (ix) (x) (xi) materials tests per day (xii) Percentage of fractured faces 3. under When gravel is used, one test per 50ml of aggregate Open-graded Premix (i) Quality of binder Surfacing/ Close-graded Premix Surfacing (ii) Aggregate Impact Value/Los Angeles Abrasion Value (iii) (iv) (v) aggregates (vi) Water sensitivity of mix (vii) Grading of aggregates Flakiness Index and -do Elongation Index Stripping value Serial No.2 Water absorption of Serial No.2 Same as mentioned under Serial No. 2 Same as mentioned under Serial No.2 Same as mentioned under Same as mentioned under Same as mentioned under Serial No.2 Serial No. I Same as mentioned Polished stone value As required Temperature ofbinder At regular close intervals at application Rate of spread of One test per 500 in' of work, and, not less than two

(viii) Soundness (Magnesium Same as mentioned under and Sodium Sulphate) Serial No.2 (ix) (x) Polished stone value As required Temperature of binder At regular close intervals at application (xi) Bindcrcontent 347 Section 900 (xii) mixed material (xiii) Percentage of fractured faces Serial No.2 Quality Control for Road Works Rate of spread of Regular control through One test per 50OM3 and not less than two tests per day

checks of layer thickness Same as mentioned under

Quality Control for Road Works 4. Bituminous Macadam mentioned under Serial No. I (ii) Aggregate Impact Value/Los Angeles Abrasion Value (iii) (iv) Stripping Value Flakiness Index and Same as mentioned under Elongation Index (v) Water sensitivity of mix -doSerial No. 2 Same as mentioned under Serial No.2 (i) Quality of binder

Section 900 Same as

Same as mentioned under

Serial No. 2

(vi) Grading of aggregates Two tests per day per plant both on the individual constituents and mixed aggregates from the dryer (vii) Water absorption of Same as in Serial No. 2 aggregates (viii) Soundness (Magnesium Same as mentioned under and Sodium Sulphate) Serial No.2 (ix) faces (x) Percentage of fractured Serial No.2 Binder content and aggregate grading day per plant (xi) Control of temperature At regular close intervals of binder and aggregate for mixing and of the ntix at the time of laying and rolling (xii) material Rate of spread of mixed Regular control through checks of layer thickness Periodic, subject to minimum of two tests per Same as mentioned under

(xiii) Density of compacted One test per 250ml of area layer 5. Bituminous Penetration as mentioned under Macadarn/Built-up Spray-Grout (ii) of Value/L.os Angeles Abrasion Value aggregate Aggregate Impact One test per 200 ml (i) Quality of binder Serial No. I Same

Quality Control for Road Works (iii) Elongation Index 348 Quality Control for Road Works (iv) (v) aggregates (vi) Water sensitivity of mix Same as Serial No. 2 (vii) Aggregate grading One test per 100 ml of aggregate Stripping value Serial No. 2 Water absorption of Same as Serial No. 2 Section 900 Flakiness Index and -do

Section 900

Same as mentioned under

(viii) Soundness (Magnesium Same as mentioned under and Sodium Sulphate) Serial No.2 (ix) faces (x) Percentage of fiwtured Serial No.2 Same as mentioned under

Temperature of binder At regular close intervals at application Dense Bituminous (i) Quality of binder Serial No. I (ii) Aggregate Impact Serial No.2 Same as Same as

(xi) Rate of spread of binder Same as mentioned under Serial No.2 6. mentioned under

Macadam/Semi Dense Bituminous Concrete/ Bituminous Concrete mentioned under Value/Los Angeles Abrasion Value (iii) (iv) (v) No.2 (vi) (vii) Flakiness Index and -do Elongation Index Stripping Value Serial No.2

Same as mentioned under

Soundness (Magnesium Same as mentioned under and Sodium Sulphate) Serial Water absorption of As in Serial No. 2 aggregates Sand equivalent test As required As required As required, for Semi Dense Bituminous Concrete/ Same as mentioned under

(viii) Plasiticity Index (ix) Polished stone value Bituminous Concrete (x)

Percentage of fi-actured

Quality Control for Road Works faces Serial No.2

Section 900

(xi) Mix grading One set of tests on individual constituents and mixed aggregate from the dryer for each 400 tonnes of mix subject to a minimum of two tests per plant perday (xii) StabilityofMix mix produced, a set of 3 Marshall specimens to be prepared and tested for stability, flow value, density and void content subject to a minimum of two sets being tested per plant per day (xiii) Water sensitivity of mix Same as mentioned under (Retained Tensile Strength) (xiv) Swell test on the mix (xv) of binder in boiler, aggregate in the dryer and mix at the time of laying and rolling (xvi) Control of binder content and grading ofthe mix per day per plant (xvii) Rate of spread of mixed Regular control through material checks on the weight of mixed material and layer thickness (xviii) Density of compacted One test per 250 ml area layer 7. Mastic Asphalt under Serial No. I (ii) Aggregate Impact Value/Los Angeles Same as mentioned under Serial No.2 (i) Quality of binder Same as mentioned One test for each 400 tonnes of mix subject to a minimum of two tests As required for the Bituminous Concrete Control of temperature At regular close intervals Serial No.2 For each 400 tonnes of

Quality Control for Road Works Abrasion Value (iii) (iv) Stripping Value Flakiness Index and -do Elongation Index -do(v) Water sensitivity of mix -do-

Section 900

(vi) Grading of aggregates Two tests per day per plant both on the individual constituents and mixed aggregates from the dryer (vii) Water absorption of aggregates (viii) Soundness (Magnesium Same as mentioned under and Sodium Sulphate) Serial No.2 (ix) faces (x) Percentage of fractured Serial No.2 Binder content and aggregate grading per day per plant (xi) Control of temperature At regular close intervals of binder and aggregate for mixing and of the mix at the time of laying and rolling (xii) material (xiii) Hardness number of two tests per day 8. Slurry seal (ii) Rate of spread of mixed Regular control through checks of layer thickness One test for each 400 tonnes of mix subject to a minimum (i) Serial No. 1. Film stripping test representative specimens for each source of supply, then as warranted by changes in the quality of aggregates 9. Recycled material per aggregate grading (i) Binder content and Minimum of one test Initially one set of 3 Quality of binder Same as mentioned under Periodic, subject to minimum of two tests Same as mentioned under Same as in Serial No. 2

25 m' of recycled material

Quality Control for Road Works (i i) penetration (iii) Repave) Recovered binder 50ml of recycled material Mix stability (Remix/ For each 400 tonnes of mix recycled, a set of 3 Marshal I specimens to be prepared and tested for stability, flow, density and void content, subject to a minimum of two sets of tests per day 10. ColdMix (ii) (i) Serial No. I Aggregate Impact Value/Los Angeles Abrasion Value (iii) Flakiness Index and Elongation Index (iv) Stripping Value -do(v) Water sensitivity of mix -do-doQuality of binder

Section 900 Minimum of one test per

Same as mentioned under

Same as mentioned under

Serial No.2

(vi) Grading of aggregates Two tests per day per plant both on the individual constituents and mixed aggregates from the dryer (vii) Percentage minimum Two tests per day per plant coating I Same as in Serial No. 2

(viii) Water absorption of aggregates (ix) No.2 (x) faces (xi) day per plant (xii) Mix stability produced, one set of 3 Marshall specimens to be prepared and tested for stability, flow, density and

Soundness (Magnesium Same as mentioned under and Sodium Sulphate) Serial Percentage of fractured test per 50m' of aggregate Binder content and aggregate grading Periodic, subject to minimum of two tests per For each 400 tonnes of mix When gravel is used, one

Quality Control for Road Works void content, subject to a minimum of two sets of tests per plant per day 11. Sand Asphalt Base Course Same as mentioned under Serial No. I (ii) Value (iii) (iv) Plasiticity Index (i) Quality

Section 900

of

binder

Los Angeles AbrasionSame as mentioned under Serial No.2 Sand equivalent test As required Asrequired

(v) Mix grading One set of tests on individual constituents and mixed aggregate from the dryer for each 400 tonnes of mix subject to a minimum of two tests per plant perday (vi) StabilityofMix produced, a set of 3 Marshall specimens to be prepared and tested for stability, flow value, density and void content subject to a minimum of two sets being tested per plant perday (vii) Control of temperature At regular close intervals of binder in boiler, aggregate in the dryer and mix at the time of laying and rolling (viii) Control of binder , content and grading ofthe mix (ix) material mixed material and layer thickness per day per plant Rate of spread of mixed Regular control and through checks on the weight of One test for each 400 gonna of mix subject to a minimum of two tests For each 400 tonnes of mix

Quality Control for Road Works (x) Density of compacted One test per 250 ml area layer (i) Softening Point Initially on submission thereafter daily if site blended, weekly if pre-blended (ii) and 4*C (iii) (iv) (v) (vi) (vii) Elastic Recovery Ductility Flash Point -do -do Initially on submission -do-do Penetration at 25C -do

Section 900

12. Modified Binder

Fraass Breaking Viscosity at 150'C -do penetration, softening point, elastic recovery of residue, loss on heating

(viii), Thin film oven test,

13. Geotextiles Clause 704.3.1 of the

(i)

The requirements of

Ministry's Specification for Road and Bridge Works (third revision) shall apply 187.5 Quality Control Tests for Concrete Road Construction 187.5.1 Dry lean concrete sub-base : 187.5.1.1 Sampling and 'testing of cubes: Samples of dry lean concrete for making cubes shall be taken from the uncompacted material from different locations immediately before compaction at the rate of 3 samples for each 1000 sq. m. or part thereof laid each day. The sampling of mix shall be done from the paving site. Test cubes of 150 mm size shall be made immediately from each mix sample. Cubes shall be made in accordance with the methods described in IS: 516 except that the cubes shall be compacted by means of a vibratory hammer with the moulds placed on a level and rigid base. The vibrating hammer shall be electric or pneumatic type fitted with a square or rectangular foot having an area of between 7500 to 14000 sq.mm. The compaction shall be uniformly applied for 60 5 seconds with a downward force of between 300 N and 400 N on to each of the three layers of the lean concrete material placed into the mould. The surface of each compacted layer shall be scarified before the

Quality Control for Road Works

Section 900

next layer is added to give key for the next layer. The final layer shall be finished flush with the top of the cube mould. The dry lean concrete cubes shall be cured in accordance with IS:516. 187.5.1.2 In-situ density: The dry density of the laid material shall be determined from three density holes at locations equally spaced along a diagonal that bisects each 2000 square metre or part thereof laid each day and shall comply with the requirements as per Clause 601.5.5.1. This rate of testing may be increased at the discretion of the Engineer in case of doubt or to determine the extent of defective area in the event of non-compliance. Density holes at random may be made to check the density at edges. 187.5.1.3 Thickness: The average thickness of the subbase layer a.4 computed by the level data of sub-base and subgrade or lower sub-base shall be as per the thickness specified in the contract drawings. The, thickness at any single location shall notbe 10 mm less than the specified thickness. Such areas shall be corrected as stated in Clause 601.5.5.5. Areas which cannot be repaired should be, replaced over full width. The extent of deficient area should be decided based on cores. 187.5.1.4 Frequency of quality control tests: The frequency of quality control tests for levels, alignment and materials shall be as in Table 900-6. 187.5.2 Pavement concrete 187.5.2.1 Sampling and testing of beam and cube specimens: At least two beam and two cube specimens, one each for 7 day and 28 day strength testing shall be cast for ever 150 cu.m (or part thereof) of concrete placed during construction. On each day's work, not less than three pairs of beams and cubes shall be made for each type of mix from the concrete delivered to the paving planL Each pair shall be from a different delivery of concrete and tested at a place to be designated by the Engineer in accordance with the testing procedure as outlined in Clause 602.3.3. Groups of four consecutive results from single specimens tested at 28 days shall be used for assessing the strength for compliance with the strength requirements. The specimens shall be transported in an approved manner to prevent sudden impact causing fractures or damage to the specimen. The flexural strength testresults shall prevail over compressive strength tests for compliance. A quality control chart indicating the strength values of individual specimens shall be maintained for continuous quality assurance. Where the requirements are not met with, or where the quality of the -concrete or its compaction is suspect, the actual strength of the concrete in the slab shall be ascertained by carrying out tests on cores cut from the hardened concrete at such locations. The cores shall be cut at the rate of 2 cores for every 150 cu. m. of concrote. The results of crushing strength tests on these cores shall not be less than 0.8 times the corresponding crushing strength of cubes, where the

Quality Control for Road Works

Section 900

height to diameter ratio of the core is two. Where height to diameter ratio is varied,. then the necessary corrections shall be made in calculating the crushing strength of cubes in the following manner. The crushing strengths of cylinders with height to diameter ratios between I and 2 may be corrected to correspond to a standard cylinder of height to diameter ratio of 2 by multiplying with the correction factor obtained frorn'the following equation: f = 0.11 n+0.78 where f = correction factor and n = height to diameter ratio Thecorrected testresults shall be analysed forconformity with the specification requirements for cube samples. Where the core tests are satisfactory, they shall have precedence for assessing concrete quality over the results of moulded specimens. The diameter of cores shall not-be less than 150 mm. If, however, the tests on cores also confirm that the concrete is not satisfying the strength requirements, then the concrete corresponding to the area from which the cores were cut, should be replaced, i.e., atleast over an area extending between two transverse joints where the defects could be isolated or over larger areas, if necessary, as assessed by additional cores and their test results. The equivalent flexural strength at 28 days shall be estimated in accordance with Clause 602.33.2. In order to ensure that the specified minimum strength at 28 days is attained in 99 per cent of all test beams, the mix shall be proportioned to give an average strength at 28 days exceeding the specified strength by 2.33 times.the standard deviation calculated first from the flexural strengths of test beams made from the trial mix and subsequently from the accumulating result of flexural strengths of job control test beams. The standard deviation shall be re-calculated from the test results obtained after any change in t~e source or quality of materials and the mix shall be adjusted as necessary to comply with the requirements. An individual 28 day test strength below the specified strength shall not be evidence for condemnation of the concrete concerned if the average 28 day strength of this beam plus the preceding 5 and succeeding 4 beams exceeds the specified strength by 2.33 times the standard deviation and provided that there is no other evidence that the concrete mix concerned is substandard. Beams shall be made each day in pairs at intervals, each pair being from a different batch of concrete. At the start of the work, and until such time as the Engineer may order a reduction in the number of beams required, at least six pairs of beams and cubes shall be made each day, one of each pair for 'testing at 28 days for determination of -;he minimum permissible flexural strength and the other for testing at an early age for the Engineer to assess the quality of the mix. When the first thirty number of28-day results are available, and for so long as the Engineer is satisfied with the quality of the mix, he may reduce the number of beams and cubes required.

Quality Control for Road Works

Section 900

During the course df construction, when the source of any material is to be changed, or if there is any variation in the quality of the materials furnished, additional tests and necessary adjustmentg in the mix shall be made as required to obtain the specified strength. The flexural strengths obtained on beams tested before 28 days shall be used in conjunction with a correlation between them and the 28 day flexural strengths to detect any deterioration in the quality of the concrete being produced. Any such deterioration shall be remedied without awaiting the 28 day;! strengths but. the earlier strengths shall not constitute sole evidence of non-compliance of the concrete from which they were taken. Concrete shall not comply with the Specification when more than one test beam in a batch has a 28 day strength less than the specified strength and the average 28 day flexural strength of the batch of bems is less than the specified strength plus 2.33 times the standard deviation of the batch. Should the concrete fad to pass the Specification for strength as described above, the Contractor may, all at his own expense, elect to cut cores from the suspect concrete as the Engineer shall direct. From the relation between cube strength and flexural strength, the core strength shall be converted to flexural strength. The equivalent flexural strength at 28 days shall be the estimated insitu strength multiplied by 100 and divided by the age-strength relation obtained from Table 900-5. Any concrete that fails to meet the strength specification shall be removed and replaced at Contractor's expense. TABLE "0-5. AGE -'STRENGTH RELATION OF CONCRETE (RELATED TO 100 PER CYM.AT 25 DAYS) DAYS 0 10 20 30 40 50 60 70 so 90 IOD 110 120 0 81.5 94.0 2 41b 85.0 Wo 4 60.0 87.5 97.5 6 71.0 90.0 98.5 .8 77.5 92.0 100.0

101.0 102.0 103.5 104.5 105.5 106.5 107.0 108.0 109.5 110.0 1 loj 111.0 112.0 112.5 113.0 114.0 114-5 115.0 115.5 116.0 116-5 117.0 117.5 118.0 118.5 119.0 119-5 119.5 120.0 120.5 121.0 121.5 122.0 122.0 122.5 123.5 123.5 123.5 124.0 124.5 1254 125D 123.5 125-5 126.0 126.0 126.5 127.0 127.0 127.5

Quality Control for Road Works 130 140 150 160 170 ISO 190 200 210 220 230 240 250 260 270 290 290 300 310 320 330 340 350 360 127.5 129.0 128.5 129.5 129.0 129.0 129J 130.5 IMS 1321 1325 129J 130.0 130.0 131.0 131.0 131.5 133.0 133.0 133.5 134.5 134.5

Section 900

131.5 131.5 132.0 132.0 132.5 133.5 134.0 134a

135.0 135A 135.0 135.5 135.5 135.5 135.5 136-6. 136.0 136.5 136.5 136.5 137.0 137.0 137.0 137.5 137.5 137.5 138.0 138.0 138.5 133.5 138.5 138.5 139.0 139.0 139.0 139.5 139.5 139.5 140.0 140.0 140.0 140.0 140.5 140.5 140.5 140.5 141.0 141.0 141.0 141.5 14i.5 141.5' 142.0 142.0 142.0 142.0 142.0 142.5 142.5 142.5 142.5 142.5 .143.0 143.0 143.0 143.0 143.5 143.5 143.5 144.0 144.0 144.0 144.0 144.5 144.5 144.5 144.5 144.5, 14S.0 145.0 145.0 145.0 145.0 145.5 14S.5 145.5 145.5 146.0 146.6 146.0 146.0 146.0 146.0 146.0 146.5 149.5 146.5

187.5.2.2 In -situ density : The density of the compacted concrete shall be such that the total air voids are not more than 3 per cwL Ile air voids shall be derived from the difference between the theoretical maximum dry density of the concrete calculated from the specific gravities of the constituents of the concrete mix and the average value of three direct density measurements made on cores at least 150 min diameter. Three cores shall be taken from trial lengths and in first two kin length of the pavement, while the slab is being constructed during normal working. The proportions of the mix and the vibratory effort imparted Le the frequency and magnitude of vibration shall be adjusted to achieve the maximum density. All cores taken for density measurement in the trial section shall also be checked for thickness. The same cores shall be made use of for determining in-situ strength. In cast

Quality Control for Road Works

Section 900

of doubt. additional cores may be ordered by the Engineer and taken at locations decided by him to check the density of concrete slab or the position of dowel/tic bars without any compensation being paid for the saint. In calculating the density, allowance shall be made for any steel in cores. Cores removed froni the main carriageway shall be reinstated with, com*ted concrete with mix proportions of I pot of portland cement: 2 -parts of fine aggregate : 2 parts of 10 mm nominal size single sized coarse aggregate by weighL Before filling the fine mix, the sides shall be hacked and cleaned with water. Thereafter cement-sand slurry shall be applied to the sides just prior to filling' the concrete mix. 187.5.2.3 Thickness : Thickness shall be controlled by taking levels as indicated in Clause 902.3. Thickness of the slab at any point chocked as mentioned above shall be within a tolerance of -5 mm to + 25 min of the specified thickness as per Drawing. Thickness deficiency more than 5 min may be w=pted and paid for at a reduced rate given in Clause 602.15.2. In no case, however, thickness deficiency shall be more than 25 min. 187.5.2.4 Summary of control tests: Table 900-6 gives a summary of frequency of testing of pavement quality concrete.
TABLE M4. FREQUENCY OF QUALITY CONTROL TESTS FOR PAVING QUALITY CONCRETE L Levels, allgonwnt and texture (i) Level tolerance paving edges (iii) Pavernerathickness Civ) Alipment of joints, widths, depths of dowel grooves (y) surface regularity both and lorteitudinaily (vi) Alignment of dowel bars and their accuracy/de ban (vii) Tomm depth Clam 602.9.8 Clauses 902.3 and 903.5.2.3 To be chocked @ one Joint per 400 m length or a day's Once a day or one day's work. without disturbing To be checked in trial length as per Clause 602.10.5.2 the Cams operation. Clause 902,3 Clause 902.2

(H) VrW& of pavement and position of

work whichever is mom

and once on every 2 km. 2. Quallity of Materials and Concrete Control tests for materials and concrete shall be as under: L C~at tests IS :1489 IS: 9112 IS : 12269 Physical and chemical IS: 269 Once for ewh sonrce of IS: 455 supply and occasionally whm called for in cm of longfunproper storage. nsides, the Contractor Am

Quality Control for Road Works


will submit daily test due an cement released by the Manufacturer. L day's FIN Coarse and (PL 1) (i) Gradabon

Section 900

IS: 2386 One test for every

work of each fraction of

coarse aggregate md fine aggregate. initially-. may be relaxed law at the discrt tion of the Engineer. (H) Deleterious constituents IS: 2386 -do (pt. 2)

(iii) Water absorption (PL 3)

IS-2386 so4ject to a minimum of one test a day for coarse aggrr got & two tests a day for fine, aggregate. This data shall be used for correcting themater demand of the ink on daily basis.

Regularly as required

I source of Aggregate and subsequently impact test

Coarse(i) Los Angeles Abrasion

M2396 Once for each (PL 4) supply

value or Aggregate on monthly basis.

(ii) Soundness (PL5) (iii) Alkali aggregate reactivity 4. approval of source Water

IS:2386 subsequently

Before approving the

aggregates and every month IS:2386 (PL 7) Chemical Tests of supply. subsequently only in cue of doubL IS:456 Once for -do

Concrete per concrete

(i) Strength of IS:516 2 cubes and 2 bums 15D ml or pan thersof (me for7dayand otherfor2gday strength) or minimum 6 cubes and 6 beams per day's

Quality Control for Road Works work whichever is more. (6) Core strength on hardened concrete doubt. ON) Workability Of fresh each dumper concrete-ShuM Test IS: 1199

Section 900

IS:516 As per the requirement of the Engineer, only in cue of One test per

load at both Batching plant

site and paving site- initially when work starts. Suble quendy . sampling may be done from alternate dumper. (1y) IMckness determination Frorn the level data of con crete pavement surface and sub-base at grid points of 51 6.25 m x 3.5 m (v) Ibickness measurement for trial length (vi) Verification of level of string line in die case of slip form paving and awl forms in the case of fixed form paving an interval of 5.0 m or 6.25 m. The level tolerance allowed shall be * Nora. These shallbe gotapproved 1-2 hours before the corn mencement of the concret ing activity. 187.5.3 Rolled Concrete Base 187.5.3.1 Sampling and testing of beams and cubes: Clause9O3.5.2.1 shall apply 187.5.3.2 Thickness : Thickness shall be controlled by taking levels as indicated in Clause 903.5.1.3. 187.5.3.3 In-situ density : The dry density of the laid material shall be determined from three density holes at locations equally spaced along a diagonal that bisects each 2000 square metre orpart thereof laid each day and shall comply with the requirements as per Clause 601.5.5. 1. This rate of testing may be increased at the discretion of the Engineer in case of doubt or to determine the extent of defective area in the event of non compliance. Density holes at random may be made to check the density at edges. length. String line or steel forms shall be checked for level 9 3 cores per trial

Quality Control for Road Works

Section 900

187.5.3.4 Summary of control tests : Table 900-6 gives the summary of tests for levels, alignment and materials. 187.5.4 Summary of rate of sampling and testing: (i) Strength 3 beams and 3 cubes for each 100 sq. m. or part thereof 1W each day. (ii) Density 3 density holes for each 2000 sq.m. or put thereof laid eacls day. (iii) Cores: Only when Engineer instruicts. They shall not be cut on iegWw basis. A relation between flexural strength and compressive strength may be developed by regression analysis using the available data. This may be updated from time to time.

Materials for Structures Materials for Structures 1000 Materials for Structures

1000

Materials for Structures

1000

1001

GENERAL

Materials to be used in the work shall conform to the specifications mentioned on the drawings, the requirements laid down in this section and specifications for relevant items of work covered under these specifications. If any material, not covered in these specifications, is required to be used in the work, it shall conform to relevant Indian Standards, if there are any, or to the requirements specified by the Engineer. 188 SOURCES OF MATERIAL

The Contractor shall notify the-Engineer of his proposed sources of materials prior to delivery. If it is found after trial that sources of supply previously approved do not produce uniform and satisfactory products, or if the product from any other source proves unacceptable at any time, the Contractor shall furnish acceptable material from other sources at his own expense. 189 BRICKS

Burnt clay bricks shall.conform to the requirements of IS:1077, except that the minimum compressive strength when tested flat shall not be less than 8.4 Mh for individual bricks and 10.5 Wa for average of 5 specimens. They shall be free from cracks and flaws and nodules of free lime. The brick shall have smooth rectangular faces with sharp'corners and emit a clear ringing sound when struck. The size may be according to local practice with a tolerance of 5 per cent. 190 STONES

Stones shall be of the type specified. It shall be hard, sound, free from cracks, decay and weathering and shall be freshly quarried from an approved quarry. Stone with round surface shall not be used. The stones, when immersed in water for 24 hours, shall not absorb water by more than 5 per cent of their dry weight when jested in accordance with. IS:1124. The length of stones shall not exceed 3 times its height nor shall they be less than twice its height plus one joint. No stone shall be less in width than the height and width on the base shall not be greater than three-fourth of the thickness of the wall nor less than 150 mm. 191 CAST ERON

Cast iron shall conform to IS:210. The grade number of the material shall not be less than 14. 192 CEMENT

Cement to be used in the works shall be any of the following types with the prior approval of the Engineer

Materials for Structures


a) b) c) d) e) Ordinary Portland Cement, 33 Grade, conforming to IS:269. Rapid Hardening Portland Cement. conforming to IS:8041. Ordinary Portland Cement, 43 Grade, conforming to IS:8112. Ordinary Portland Cement, 53 Grade, conforming to IS:12269. Sulphate Resistant Portland Cement, conforming to IS:12330.

1000

Cement conforming to IS:269 shall be used only after ensuring that the minimum required design strength can be achieved without exceeding the maximum permissible cement content of 540 kg/cu.m. of concrete. Cement conforming to IS:8112 and IS:12269 may be used provided the minimum cement content mentioned elsewhere from durability considerations is not reduced. From strength considerations, these cements shall be used with a certain caution as high early strengths of cement in the I to 28-day range can be achieved by finer grinding and higher constituent ratio of C 3 S/C.S, where C3S is Tricalciurn Silicate and C2S is Dicalcium Silicate. In such cements, the further growth of strength beyond say 4 weeks may be much lower than that traditionally expected. Therefore, further strength tests shall be carried out for 56 and 90 days to fine tune the mix design from strength considerations. Cement conforming to IS:12330 shall be used when sodium sulphate and magnesium sulphate are present in large enough concentration to be aggressive to concrete. The recommended threshold values as per IS:456 are sulphate concentration in excess of 0.2 per cent in soil substrata or 300 ppm (0.03per cent) in ground water. Tests to confirm actual values of sulphate concentration are essential when the structure is located near the sea coast, chemical factories, agricultural land using chemical fertilizers and sites where there are effluent discharges or where soluble sulphate bearing ground water level is high. Cement conforming to IS:12330 shall be carefully selected from strength considerations to ensure that the minimum required design strength can be achieved without exceeding the maximum permissible cement content of 540 kg/ cu.m. of concrete. Cement conforming to IS:8041 shall be used only for precast concrete products after specific approval of the Engineer. Total chloride content in cement shall in no case exceed 0.05 per cent by mass of cement. Also, total sulphur content calculated as sulphuric anhydride (SO 3) shall in no case exceed 2.5 per cent and 3.0 per cent when tri-calciurn aluminate per cent by mass is upto 5 or greater than 5 respectively. 193 COARSE AGGREGATES

For plain and reinforced cement concrete (PCC and RCC) or prestressed concrete (PSC) works, coarse aggregate shall consist of clean, hard, strong, dense, non-porous and durable pieces of crushed stone, crushed gravel, natural gravel or a suitable combination thereof or other approved inert material. They shall not consist pieces of disintegrated stones, soft, flaky, elongated particles, salt, alkali, vegetable matter or other deleterious materials in such quantities as to reduce the strength and durability of

Materials for Structures

1000

the concrete, or to attack the steel reinfor6ement. Coarse aggregate having positive alkalisilica reaction shall not be used. All coarse aggregates shall conform to IS:383 and tests for conformity shall be carried out as per IS:2386, Parts I to VIII. The contractor shall submit for the approval of the Engineer, the entire information indicated in Appendix A of IS:383. Maximum nominal size of coarse -aggregate for various structural components in PCC, RCC or PSC, shall conform to Section 1700. The maximum value for flakiness index for coarse aggregate shall not exceed 35 per cent. The coarse aggregate shall satisfy the following requirements of grading : TABLE 1000-1 REQUIREMENTS OF COARSE AGGREGATE IS Sieve Size 40mm 63 mm 40 mm 20 nun 12.5 nun 10 MM 4.75 mm 194 100 Per cent by Weight Pusing the Sieve 20MM 12.5mm 0-10 90-100 0-10 95-100 .100 0-5

30-70 95-100 100 10-35 25-55 40-95

SANDMINE AGGREGATES

Fm masonry work, sand shall conform to the requirements of IS:2116. For plain . and reinforced cement concrete (PCC and RCQ or presuessed concrete (PSC) works, fine aggregate shall consist of clean, hard, smmg and durable pieces of crushed stone, crushed gravel, or a suitable combination of natural sand, crushed stone or gravel. They shall not contain dust, lumps, soft or flaky, materials, mica or other delewrious materials in such quantities as to reduce the strength and durability of the concrete, or to attack the embedded steel. Motorised sand washing machines should be used to remove impurities from sand. Fine aggregate having positive allmfi-silica reaction shall not be used. All fmc aggregates shall conform to IS:383 and tests for conformity shall be carried out as per IS:2386, (Parts I to VIII). The Contractor submit to the Engineer the entire information indicated in Appendix A of IS:383. The fineness modulus of fine aggregate shall neither be less thim 2.0 nor greater than 3.5. Sand/fine aggregate for structural concrete shall conform to the.following grading requirements TABLE 1000-2 is Sleve size Zone I 10 Usa 100 Per cent by Weight Passing the Sieve zone ii Zone III IN) 100

Materials for Structures 4.75 nan 2.36 nan 1.13 IBM 600 nucron 300 15D InicMa 5-20 90-100 90-100 90-100, 60-95 75-100 85-100 30-70 55-90 75-100 15-34 35-59 60-79 8-30 0-10 12-40 0-10 0-10 STEEL

1000

195 195.1 Cast Steel

The use of cast steel shall be limited to bearings and other similar parts. Steel for castings shall conform to Grade 280-52ON of IS:1030. In case when subsequent welding is unavoidable in the relevant cast steel components, the letter N at the end of the grade designation of the steel casting shall be replaced by letter W. 0.3 per cent to 0.5 per cent copper may be added to increase the corrosion resistance properties. 195.2 Steel for Prestressing The prestressing steel shall conform to either of the following (a) Plain hard drawn steel wire conforming to IS:1785 (Pm 1) and IS:1785 (Part (b) Cold drawn indented wire conforming to IS:6003 (c) High tensile steel bar conforming to IS:2090 (d) Uncoated stress refieved strands conforming to IS-6". 195.3 Reinforcement / Untensioned Steel For Plain and reinforced cement concrete (PCC and RCQ or prestressed concrete (PSC) works, the reinforcement / untensioned steel as the case may be shall consist of the following grades of reinforcing bars.
TABLE 1000-3 Grade Designation Specification S 240 Mild Steel Bar S 415 Bus (HYSD) IS:1786 High Yield Strength Deformed 415 200 IS:432 Part 1 240 200 Bar Type conforming to governing IS Characteristic Str-ength fy MPa Modulus GPa Elastic

Other grades of bars conforming to IS:432 and IS:1786 shall not be permitted. All steel shall be procured from original producers, no re-rolled steel shall be incorporated in the work. Only new steel shall be delivered to the,site. Every bar shall be inspected before assembling on the work and defective, brittle or burnt bar shall be discarded. Cracked ends of. bars shall be discarded.

Materials for Structures

1000

Fusion-bonded epoxy coated reinforcing bars shall meet the requirements of IS: 13620. Additional requirements for the use of such reinforcement bars have been given below :
(a) Patch up mataials shall be procured in scaled containers with certificates fim die agency who has supplied the fusion bonded epoxy ban. (b) bars. (c) (d) PVC coated 0.1. binding wires of 18G shall only be used in conjunction with fusion bonded epoxy Chain for supporting the reinforcement shall also be of fusion bonded epoxy coated ban. The cut ends and damaged portions shall be touched up with nqxdr patch up material.

(e)

Ile ban shall be cut by saw-cuning rather than flame cutting.

(f) While bending the ban, the pins of work benches shall be provided with PVC or plastic sleeves. (g) The coated steel shall not be directly exposed to sun rays or rains and shall be protected with opaque polyethelene sheets or such other approved materials. (h) While concreting, the workmen or trolleys shall not directly move on coated bars I but can move on wooden planks placed on the bars. When specified in the contract, protective coating prescribed by CECRI shall be provided in conformance to specifications given in Appendix 10001L The CECRI coating process. shall b e allowed to be implemented at the site of works provided a representative of the Institute is present throughout the duration of the coating process who shall certify that the materials and workmanship are in accordance with prescribed specifications developed by the Institute. 195.4 Grey Iron Castings Grey Iron castings to be used for bearings shall have the following minimum properties :
(i) (ii) (iii) (iv) (v) Minimum ultimate tensile strength Modulus of Elasticity Brinell Hardness 230 Wa Shear Strength 370 MPa 1370 MPa Compressive Strength 370 MPa 141-000 Wa

The testing shall be as specified in IS:210. 195.5 Steel ForgiBgS Forged steel pins shall comply with clause 3, 3A or 4 of IS:1875 and steel forgings shall comply with clause 3, 3A or 4 of IS:2004. Raw materials of the forging will be taken as per IS:1875 with minimum reduction ratio of 1.8:1. Alternatively, if forging is made from ingot, a minimum reduction ratio between the ingot and forging will be 4:1. Forging shall be normalised. 195.6 Structural Steel Unless otherwise permitted herein, all structural steel' shall before fabrication comply with the requirements of the following Indian Standards:
IS:226 IS:961 Structural Steel (Standard Quality) Structural Steel (High Tensile)

Materials for Structures


IS:2062 IS:8500 IS: 1148 IS: 1149 IS: 1161 ISA923 IS:11587 IS:808 IS:1239 IS:1730 IS:1731 IS:1732 IS:1852 Weldable Structural Steel Weldable Structural Steel (medium & high strength qualities) Hot rolled rivet ban (upto 40mm dis) for structural purposes High tensile rivet ban for structural purposes Steel tubes for structural purposes Hollow Steel sections for structural use Structural weather resistant steel Specifications for Rolled Steel Beam, Channel and Angle Sections Mild Steel Tubes Dimension for Steel Plate, sheet and strip for structural and gentral engineering purposes Dimension for Steel flats for structural and general engineering purposes Dimension for round and square steel bars for structural and general engineering purposes Rolling and caning tolerances for hot rolled steel products

1000

The use of structural steel not covered by the above standards may be permitted with the specific approval of the authority. Refer to Section 1900 for further details. 195.7 Stainless Steel Stainless steel shall be austenitic chromium-nickel steel, possessing rust, acid and heat resistant properties conforming to IS:6603 and IS:691 1. Mechanical properties/grade for such stainless steel shall be as specified by the accepting authority, but in no case be inferior to mild steel. Generally, stainless steel is available as per AISI grades. AISI 304 which is equivalent to grade 04Crl8NillO of IS:6911 satisfies the requirements of mechanical properties of structural steel. Other grades of stainless steel for specific purposes may be provided as per specific requirements. For application in. adverse/ corrosive environment, stainless steel shall conform to AISI 3f6L or 02G17 Ni Mo2 of IS:6911. 196 WATER

Water used for mixing and curi ng shall be clean and free from injurious amounts of oils, acids, allWis, salts, sugar, organic materials or other substances that may be deleterious to concrete or steel. Potable water is generally considered satisfactory for mixing concrete. Mixing and curing with sea water shall not be permitted. As a guide, the following concentrations represent the maximum permissible values :
(a) To neutralist 200 ml sample of weer, using phenolpthalein as an indicator, it should not require more than 2 ml of OLI normal Na0H. (b) To neutralist 200 m! sample of water, using methyl orange As an indicator, it should not require mom than 10 ml of 0.1 normal HC1. (c) The permissible limit's for solids shall be as follows when tested in accordance with IS:3025

Permissible Limits (mix) Organic 200 mgAit

Materials for Structures


Inqrganic Sulphates (SO) Chlorides (Cl) Suspended matter 3000 mg/lit 500 mgAit 500 mg/lit 2000 mg/lit

1000

* In case of structures of lengths 3(kn and below, the permissible limit of chlorides may be increased upto 1000 mg/lit.,

All samples of water (including potable water) shall be tested and suitable measures taken where necessary to ensure conformity of the water to the requirements stated herein.
(d) The pH value shall not be less than 6.

197

TIMBER

The timber used for structural purposes shall conform to IS:883. 198 198.1 General Admixtures are rpaterials added to the concrete before or during mixing with a view to modify one or more of the properties of concrete in the plastic' or hardened state. Concrete admixtures are proprietary items of manufacture and shall be obtained only from established manufacturers with proven track record, quality assurance and full fledged laboratory facilities for the manufacture and testing of concrete. The contractor shall provide the following information concerning each admixture after obtaining the same from the manufacturer
(a) (b) (c) Normal dosage and detrimental effects, if any, of under dosage and over dosage. The chemical names of the main ingredients in the admixtures. The chloride content, if any. expressed as a percentage by the weight of the admixture.

CONCRETE ADMIXTURES

(d) Values of dry material conten t. ash content and relative density of the admixture which can be used for Uniformity Tests. (e) Whether or not the admixture leads to the entertainment of air when used as per the manufacturer's recommended dosage, and if so to what extent. (f) Where two or mom admixtures.are proposed to be used in any one mix, confirmation as to their compatibility. (g) Them would be no increase in risk of corrosion of the reinforcement or other embedments as a result of using the admixture.

198.2 Physical and Chemical Requirements Admixtures shall conform to the requirements of IS:9103. In addition, the following conditions shall be satisfied
(a) "Plasticistre' and "Supet-Plasticiistre' shall meet the tequirtments indicated for "Water reducing Admixture% (b) Except where resistance to freezing and thawing and to disruptive action of deicing salts is necessary, the air content of freshly mixed concrete in accordance with the pressure method given in

Materials for Structures

1000

IS-1199 shall not be more than 2 per cent higher than that of the corresponding control mix and in any case not more than 3 per cent of the test mix. (c) The chloride content of the admixture shall not exceed 0.2 per cent when tested in accordance with IS:6925. In addition, the maximunt permissible limit of chloride content of all the constituents as indicated in Section 1700 shall also be observed. (d) Uniformity tests on the admixtures are essential to compare qualitatively the composition of different samples taken from batch to batch ot from the same batch at different times. The tests that shall be performed along with permissible variations in the same are indicated below : Dry Material Content : to be within 3 per cent and 5 per cent of liquid and solid admixtures respectively of the value stated by, the manufacturer. Ash content to be within I per cent of the value stated by the manufacturer. Relative Density (for liquid admixtures) : to be within 2 per cent of the value stated by the manufacturer. (e) All tests relating to the concretes admixtures shall be conducted periodically at an independentlaboratory and compared with the data given by the manufacturer.

199

REINFORCED CONCRETE PIPES

Reinforced concrete pipes for highway structures shall be of NP4 type conforming to the requirements of IS:458. 200 200.1 General All materials may be stored at proper places so as to prevent their deterioration or intrusion by foreign matter and to ensure their satisfactory quality and fitness for the work. The storage space must also permit easy inspection, removal and restomge of the materials. All such materials even though stored in approved godowns/places, must b~ subjected to acceptance test prior to their immediate use. 200.2 Brick Bricks shall not be dumped at site. They shall be stacked in regular tiers as they are unloaded, to minimise breakage and defacement. The supply of bricks shall be available at site at any time. Bricks selected for use in different situations shall be stacked separately. 200.3 Aggregates Aggregate stockpiles may be made on ground that is denuded of vegetation, is hard and well drained. If necessary, the ground shall be covered with 50 min plank. Coarse aggregates, unless otherwise agreed by the Engmeer in writing, shall be delivered to the site in separate sizes (2 sizes when nominal size is 25 mm or less and 3 sizes when the nominal size is 32 mm or more). Aggregates placed directly on the ground shall not be removed fiom the stockpile within 30. cm of the ground until the final cleaning up of the work, and then only the clean aggregate will be permitted to be used. In the case of fine aggregates, these shall be deposited at the mixing site not less than 8 hours before use and shall have been tested and approved by the Engineer. 200.4 Cement STORAGE OF MATERIALS

Materials for Structures

1000

Cement shall be transported, handled and stored on the site in such a manner as to avoid deterioration or contamination. Cement shall be stored above ground level in perfectly dry and water-tight sheds and shall be stacked not more than eight bags high. Wherever bulk storage containers are used their capacity should be sufficient to cater to the requirement at site and should be cleaned at least once every 3 to 4 months. Each consignment shall be stored separately so that it may be readily identified and inspected and cement shall be used in the sequence in which it is delivered at site. Any consignment or part of a consignment of cement which had deteriorated in any way, during storage, shall not be used in the works and shall be removed from the site by the Contractor without charge to the Employer. The Contractor shall prepare and maintain proper records on site in respect of delivery, handling, storage and use of cement and these records shall be available for inspection by the Engineer at all times. The Contractor shall make a monthly return to the Engineer on the date corresponding to the interim certificate date, showing the qu4ntifies of cement received and issued during the month and in stock at the end of the month. 200.5 Reinforcement /Un.tensioned Steel The reinforcement bars, when delivered on the job, shall be stored above the surface of the ground upon platforms, skids, or other supports, and shall be protected from mechanical injury and from deterioration by exposure. 200.6 Prestressing Materials All prestressing steel, sheathing, anchorages and * sleeves or coupling must be protected during transportation, handling and storage. The prestressing steel, sheathing and other accessories must be stored under cover from rain or damp ground and protected from the ambient atmosphere if it is likely to be aggressive. Storage at site must be kept to the absolute minimum.
(a) Tendou : Wire, strand and bar from which tendons am to be f"cated shall be stored about 300mm above the ground in a suitably covered and closed space so a to avoid direct climatic influences and to protect them from splashes from my other materials and from the cutting operation of an oxy-acetylene torch or am welding process in the vicinity. Under no circumstances, tendon material shall be subjected t~ any welding operation or on site beat treatment or metallic coatins such as galvani-:ng. Storage facilities and the procedures for transporting masaW into or out of store, shall be such that the material does not becom kinited or notched. Wire or strand shall be stored in large diameter coils which ezabk the tendons to be laid out straight. As a guide, for wims above 5mm d* coils of gout 2m dia without breaks or joints shall be obtained from manufacmu and store& Protective wrapping for tendons shall be chemically neutral. All prestressing Mel must be provided with temporary pro"on during storage. (b) Ancberage Components : The handling and storing procedures shall maintain die anchorage components in a condition in which they can subsequendy perform their fbisetion to an adequate degreeComponents shall be handled and stored so dist mechanical damage anu detrimental corrosion are prevented. 7be cor. aion of the gripping and securing system shall be prevented. Ihe use of correctly forroulated oil% and greases or of other corrosion preventing material is nwommanded where prolonged storage is required. Such protective material shall be guaranteed by the producer to be non-ugSressive and non-degrading.

Materials for Structures

1000

Prestressing steel shall be stored in a closed store having single door with double locking arrangements and no windows. Also the air inside the store shall be kept dry as far as possible by using various means to the satisfaction of the Engineer. Also instrument measuring the air humidity shall be installed inside the store. This is with a view to eliminating the possibility of initial rusting of prestressing steel during storage. The prestressing steel shall be coated with water solvable-grease. The prestressing steel should be absolutely clean and without any sips of nist. All prestressing steel shall be stored at least 30 cm above ground level and it shall be invariably wrapped by protective cover of tar paper or polythene or any other approved material. The Contractor should see that prestressing steel shall, be used within 3 months of its manufacture. He should chalk out his programme in this respect precisely, so as to avoid initial corrosion before placing in position. 200.7 Water Water shall be stored in containers/tanks covered at top and cleaned at regular intervals in order to prevent intrusion by foreign matter or growth of organic matter. Water from shallow, muddy or marshy surface shall not be permitted. The intake pipe shall be enclosed.to exclude silt, mud, grass and other solid materials and there shall be a minimum depth of 0.60 m of water below the intake at all times. 201 TESTS AND STANDARD OF ACCEPTANCE

All materials, even though stored in an approved manner shall be subjected to an acceptance test prior to their immediate use. Independent testing of cement for every consignment shall be done by the Contractor at site in the laboratory approved by the Engineer before use. Any cement with lower quality than those shown in manufacturer's certificate shall be debarred from use. In case of imported cement, the same series of tests shall be carried out before acceptance. 201.1 Testing and Approval of Material The Contractor shall furnish test certificates from the manufacturer/ supplier of materials along with each batch of material(s) delivered to site. The Contractor shall set up a field laboratory with necessary equipment for testing of all materials, finished products used in the construction as per requirements of conditions of conua and the relevant specifications. 71be testing of all the materials shall be carried out by the Engineer or his representative for which the Contractor shall make all the necessary arrangements and bear the entire cost. Tests which cannot be carried out in the field laboratory have to be got done at the Contractor's cost at any recognised laboratory / testing establishments approved by the Engineer. 201.2 Sampling of Materials

Materials for Structures

1000

Samples provided to the Engineer or his representative for their retention are to be in labelled boxes suitable for storage. Samples required for approval and testing must be supplied well in advance by at least 48 hours or minimum period required for carrying out relevant tests to Cow for testing and approval. Delay to works arising from the late submission of samples will not be acceptable as a reason for delay in the completion of the works. If materials are brought from abroad, the cost of sampling/testing whether in India or abroad shall be borne by the Contractor. 201.3 Rejection of Materials not Conforming to the Specifications Any stack or batch of material(s) of which sample(s) does not conform to the prescribed tests and quality shall be rejected by the Engineer or his representative and such materials shall be removed from site by the Contractor at his own cost. Such rejected materials shall not be made acceptable by any modifications. 201.4 Testing and Approval of Plant and Equipment All plants and equipment used for preparing, testing and production of materials for incorporation into the permanent works shall be in accordance with manufacturer's specifications and shall be got approved by the Engineer before use.

Pile Foundations Pile Foundations 1100 Pile Foundations

1100

Pile Foundations

1100

1101

DESCRIPTION

201.5 This work shall consist of construction of all types of piles for structures in accordance with the details shown on the drawings and conforming to the requirements of these specifications. 201.6 The construction of pile foundations requires a careful choice of the piling system depending upon sub-soil conditions and loading characteristics and type of structure. The permissible limits of total and differential settlements, unsupported length of pile under scour, impact/ entanglement of floating bodies and any other special requirements of project are also equally important criteria for selection of the piling system. The method of installing the piles, including details of the equipment shall be submitted by the Contractor and got approved from the Engineer. 201.7 The work shall be done as per IS:2911 except as modified herein. 202 SUB-SURFACE INVESTIGATION

202.1 The complete -p*-=fhce investigation of strata in which pile foundations are proposed shall be carried out in advance and by in-situ pile tests. For details of geotechnical sub-surface explorations reference mAy be made to Section 2400. At least one bore-hole for every foundation of the bridge shall be executed. Borings should be carried Opto sufficient depths so as to ascertain the nature of strata around the pile shaft and below the pile tip. However, depth of boring shall not be less than :
i) ii) iii) 1.5 times estimated lengdi of pile in soil but not less thin 15 rn beyond the probable length of Pile 15 times diameter of pile in weal0jointed rock but minimum 15, m in such rock 4 times diameter of pile in sound, hard roick but minimum 3 m in such rock

202.2 The sub-surface investigation shall define adequately stratification of sub-strata including the nature and type of strata, its variation and extent and specific properties of the same. The investigation shall be adequate for the purpose of selection of appropriate piling system and for estimating design capacities for different diameters and length of piles. 202.3 Pressure meter tests may be used in the case of rock, gravel or soil for direct evaluation of strength and compressibility characteristics. Though these tests are of specialised nature they are most appropriate for difficult/uncertain sub-strM especially for important projects. 202.4 For piles socketed into rocks, it is necessary to determine the uniaxial compressive strength of the rock and its quality.

Pile Foundations

1100

The investigation shall also include location of ground water table and other parameters including results of chemical tests showing sulphate and chloride content and any other deleterious chemical content in soil and/or ground water, likely to affect durability. 203 TYPE OF PILES

The piles may be of reinforced concrete, prestressed concrete, steel or timber. The piles may be of solid or hollow sections or steel cased piles filled with concrete. Concrete piles may be driven castin-situ or precast or bored cast-in-situ or precast piles driven into preformed bores. The shape of piles may be circular, square, hexagonal, octagonal, "H" or "I" Section. 204 MATERIALS

204.1 The basic materials shall conform to the specifications for m*zrials given in Section 1000. The specifications for steel reinforcement , structural concrete, prestressed concrete and structural steel to be used in pile foundations shall be as given in the relevant sections. 204.2 Concrete in Piles Grade of concrete to be used in cast-in-situ piles shall not be less than M 20 and the cement content shall not be less than 400 kg per cubic meter of concrete. Grades of concrete for precast reinforced and prestressed concrete piles shall not be. less than M 25 and M 35 respectively. Maximum water cement ratio shall be 0.5 for cast-in-situ piles and 0.45 for precast piles. The minimum slump of concrete for driven cast-in-situ piles shall be 100 mm to 150 min and that of bored cast-in-situ piles 15C mm to 200 mm. The slump should not exceed 200 mm in any case. Concrete mix should have homogeneous mixture with required workability for the system of piling adopted. Suitable and approved admixtures may be used in concrete mix where necessary. Where piles are exposed to acti6n of harmful chemicals or severe conditions of exposure due to presence of sulphate, chloride etc, it may be preferable to opt for higher grades of concrete restricting water cement ratio to 0.45. Special types of cement, such as sulphate resistant cement may- be used where considered appropriate. 205 TEST PJFLLES

205.1 Test piles which are shown on the drawings or specified in the contract or installed by the Contractor on his own to determine the tengths of piles to be furnished shall conform to the requirements for piling as inIcated in these specifications, if they are to be incorporated in the completed structure. Test piles that are to become a part* of the completed structure shall be installed with the same type of equipment that is proposed to be used for piling in the actual structure.

Pile Foundations

1100

Test piles which are not to be incorporated in the completed structure shall be removed to at least 600 mm below the proposed soffit level of pile cap and the remaining hole shall be backfilled with earth or other suitable material. The piles shall be load tested in accordance with provisions laid down in this section. 206 206.1 General Precast concrete piles shall be of the size and shape as shown in the approved drawings. If a square section is employed, the comers shall be chamfered at least 25 mm unless otherwise specified. on the drawings. The length of pile shall not normally exceed 25 metres. However, where special equipments for handling and installation are available to. the satisfaction of the Engineer, longer length could b6 permitted. Piles shall be ' cast with a driving point and for hard driving, shall be shod with a metal shoe approved by the Engineer. 206.2 Stacking, Storing and Handling Care shall be taken that at all stages of transporting, lifting and handling, piles are not damaged or cracked. During u=port and stacking of piles, they shall be supported at the same points as those provided for lifting purposes. If the piles are put down temporarily during handling, they shall be placed on trestles or blocks located at the same points. Piles shall be stored at least 300 nun above firm level ground which is not liable to unequal subsidence or settlement under the weight of the stack of piles. They shall be placed on timber supports which are level and spaced so as to avoid bending. The supports OWI be verti cally one above the other. Spaces shall be left round the piles to enable them to be lifted without difficulty. The order of stacking shall be such that the older piles can be withdrawn without disturbing newer piles. Separate stacks shall be provided for different lengths of piles. Where piles are stacked in layers, the number of layers shall not exceed three. Whbnever curing is needed during storage, arrangements shall be made to enable the piles to be watered. For detailed precautions with regard to curing operations specifications for structural concrete given in Section 1700 shall apply. Before ft operation of handling and driving the piles, the minimum periods counted from the time of casting shall be allowed for as indicated in Table 1100-1. Prestressed piles shall not be lifted or handled until fully stressed.
TABLE 1100-1 TIME FOR CURING PRECAST PILES Minimum periods from time of casting Type of cement used fit casting the pile (hours) Strike side(d4ys) End of Lift from Drive casting (days)

PRECAST\CONCRETE PILES

shutters wet curing bed (days)

Pile Foundations

1100

Ordinary Portland Rapid hardening Portland 10

24

10

28 12 7 1 7

206.3 Lengthening of Piles Where a pile is to have another length cast on it during driving, the longitudinal reinforcement shall preferably be joined by full penetration butt welding. The concrete at the top of the original pile shall be cut down to expose not less than 200 min of the bars to avoid spalling of the concrete by heat. The added bars have to be held accurately and rigidly in position during welding. Where facilities on site are insufficient to make proper butt welding practicable, the joint may be made by lapping. The reinforcement at the head of pile will need to be exposed for full anchorage length or 600 mm whichever is greater and the new bars over-lapped for this distance. Unless otherwise specified, the extension of the pile shall be formed to the same cross-sectional profile and with concrete of at least the same strength as that specified for the original pile. The stirrup spacing shall in no case be greater than, 150 mm. Not more than one extension shall be permitted. In caso more than one extension is permitted by the Engineer, only approved mechanical couplers shall be used. Driving shall not be resumed until
(i) At strength of the concrete in the extension is at least equal to the specified characteristic strength of concrete in pile, and (ii) The approval of the Engineer has been obtained.

206.4 Removal of Surplus Length Any length of pile surplus to that required for incorporation in the structure shall be cut off neatly and removed. During the process of cutting off, it shall be ensured that projecting reinforcement to be anchored into the pile cap and the prestressing strands/wires are not damaged. When stripping prestressed concrete piles, shock release of tendons shall be avoided. Reference may also be made to clause 7.7.1. of IS:2911 (Part I Section'3) in this connection. 206.5 Risen Piles Level reading should be taken on each pile after driving and again after all the piles are driven. Piles which are found *to have risen to ground heave or as a result of driving adjacent piles, shall be re-driven to the original depth or resistance unless rerdriving tests on adjacent piles have shown this to be unnecessary. 206.6 Manufacture The pile should- be cast in one continuous operation from end to end of each pile. Manufacture of precast concrete piles shall conform to the guidelines contained in clause Nos. 7.1,7.2 and 7.3 of IS:2911 (Part 1, Section 3).

Pile Foundations

1100

Pile shall be provided with suitable shoe for protecting the point of the pile during driving in hard ground. Piles "I not be moved'from casting bed until the concrete has hardened sufficiently. Piles shall not be driven in less than 28 d,ays after casting or unless their strength at the time of driving is at least that specified for 28 days. 206.7 Prestressed Concrete Piles Additional specifications for precast prestressed concrete piles shall conform to those contained in clause 8 of IS:2911 (Part I Section 3). 207 CAST-IN-SITU CONCRETE PILES

Cast-in-situ concrete piles may be, either installed by making a bore into the ground by removal of material or by driving a metal casing with a shoe at the tip and displacing the material laterally. The two types of piles are termed as "bored piles" and "driven piles" respectively. Cast-in-situ concrete piles may be cast in metal shells which may remain permanently in ~lace. However, other types of cast-in-situ concrete piles, plain or reinforced, cased or uncased, may be used if in the opinion of the Engineer the soil conditions permit their use and if their design and the methods of placing are satisfactory. The metal casing shall be of sufficient thickness and strength to hold its orighW form and show no harmful distortion after it and adjacent casings have been driven and the driving core, if any, has been withdrawn. Cast-in-situ concrete driven piles shall be installed using a properly designed detachable shoe at the bottom of the casing. Certain specific requirements of cast-in-situ driven piles shall be as per Clauses I 110 Any liner or bore-hole which is improperly located or shows partial collapse that would affect the load carrying capacity ofthe pile, shall be rejected or repaired as directed by the Engineer at the cost of the Contractor. Wherever practicable, concrete should be placed in a clean dry hole. - Where concrete is placed in dry and there, is casing present, the top 3 m of the pile shall be compacted using internal vibrators. The concrete should invariably be poured , through a tremie with a funnel so that the flow is directed and concrete can be deposited in the hole without segregation. Where the casing is withdrawn from cohesive soils for the formation of cast-in-situ pile, the concreting should be done with necessary precautions to minimise the softening of the soil by excess water. Where mud'flow conditions exist, the casing of cast-in-situ piles shall not be allowed to be withdrawn., Care shall be taken during concreting to prevent as far as poseible the segregation of the ingredients. The displacement or distortion of , reinforcement during concreting and also while extracting the tuix shaii be avoided. If the concrete is - placed *inside precast concrete 'tubes or consists of precast sections, these shall be free Erom cracks or other damage before being installed.

Pile Foundations

1100

The concrete shall be properly graded, shall be self-compacting and -shall not get mixed with soil, excess water, or other extraneous matter. Special care shall be taken in silty clays and other soils with the tendency to squeeze into the newly deposited concrete and cause necking. Sufficient head of green concrete shall be maintained to prevent inflow of soil or water into the concrete. The placing of concrete shall be a continuous process from the toe level to the top of the pile. To prevent segregation, a tube or tremie pipe as appropriate shall be used to place concrete in all piles. To ensure compaction by hydraulic static heads, rate of placing concrete in the pile shaft shall not be less than 6 m (length of pile)' per hour. Bored cast-in-situ piles in soils which are stable, may often be installed with only a small casing length at the top: A minimum of 2.0 m length of top of bore shall invariably be provided with casing to ensure against loose soil falling into the bore. In cases in which the side soil can fall into the hole, it is,necessary to stabilise the side of the bore hole with drilling mud, or a suitable steel casing. The casing may be left in position permanently specially in cases where- the aggressive action of the ground water is to be avoided, or in the cases of piles built in water or in cases where significant length of piles could be exposed due to scour. For bored cast-in-situ piles, casing/liner shall be driven open ended with a pile driving hammer capable of achieving penetration of the liner to the length shown on the drawing or as approved by the Engineer. Materials inside the casing shall be removed progressively by air lift, grab or percussion equipment or other approved means. Where bored cast-in-situ piles are used in soils liable to flow, the bottom of the casing shall be kept enough in advance of the boring tool to prevent the entry of soil into the casing, thus preventing the formation of cavities and settlements in the adjoining grou:..d. The water level in the casing should generally be maintained at the. natural ground water level for the same reasons. The joints- 'of the casing. shall be made as tight as possible to minimise inflow of water or leakage of slurry during concreting. Boring shall be carried Out using rotary or percussion type equipment. Unless otherwise approved by the Engineer, thediameter of the bore-holes shall be not more than the inside diameter of the liner. Prior to the lowering of the reinforcement cage into the pile* shaft, the shaft shall be cleaned of all loose materials. Cover to reinforcing steel shall be maintained by suitable spacers. The diameter of the finished pile shall not be less than that specified and a continuous record shall be kept by the Engineer as to the volume of concrete placed in relation to the pile length cast. Before concreting under water, the bottom of the hole shall be cleaned of drilling mud and all soft or loose material very carefully. In case a hole is bored with use of drilling mud, concreting should not be taken up when the specific gravity - of bottom slurry is

Pile Foundations

1100

more than 1.2. The drilling mud should be maintained at 1.5m above the ground water level. Concreting under water for cast-in-situ concrete piles may be done either with the use of tremie method or by the use of an approved method specially designed to permit under water placement of concrete. General requirements and precautions for concreting under water are as follows :
(a) The concreting of a pile must be compktad in one continuous operation. Also, for bored holes, the finishing of the bore. cleaning of the bore, lowering of reinforcement cage and concreting of pile for full height must be accomplished in one continuous operation without any stoppage. (bj 1he concrete should be coherent, rich in cement with high slump and restricted water cement ratio. (c) The tremie pipe will have to be larg@ enough with due regard to the size of, aggregate. For 20 nun aggregate the tremic pipe should be of diameter not less than 150 nim and for larger aggregate, larger diameter tremic pip" may be necessary. (d) The fiat charge of concrete should be placed with a sliding plug pushed down the tube ahead of it to prevent mixing of water and concrete, (e) The tmmie pipe should always penetrate well into the concrete with an adequate margin of safety against accidental withdrawal if the 9:ipe is surged to discharge the concrete. (f) The pile should be concreted wholly by tremic and the method of deposition should not be changed part way up the pile to pmVent the laitance from being entrapped within the pile. (g) All tTemie tubes should be scrupulously cleaned after use.

The minimum embedment of cast-in-situ concrete piles into pile cap shall be 150 mm. Any defective concrete at the head of the completed pile shall be cut away and made good with new concrete. The clear cover between the bottom reinforcement in pile cap from the top of the pile shall be not less than 25 mm. The reinforcement in the pile shall be exposed for full anchorage length to permit it to be adequately bonded into the pile cap. Exposing such length shall be done carefully to avoid damaging the rest of the pile. In cases where the pile cap is to be laid on ground, a levelling course of M 15 nominal mix concrete 100 mm.thick shall be provided. Defective piles shall be removed or left in place as judged convenient without affecting the performance of adjacent piles or pile cap. Additional piles shall be provided to replace the defective piles. 208 STEEL PILES

Steel piles shall be "IT' or "I" sections as shown on the drawings and shall be of structural steel conforming to the specifications given in Section 1000. Steel piles shall be protected by suitable anti-corrosive paintmg as specified on the drawing. Piles shall be stored above the ground using protective packing to minimise damage to surface coating. Each pile shall be supplied preferably in one piece without splices. At the option of the Contractor, steel piling consisting of structural steel plates welded together may be substituted for the rolled sections specified, provided that the depth, width and average thicknesses are at least equal to those of the rolled sections, the steel plates conform to specification given in Section 1000, the flanges are welded to the web

Pile Foundations

1100

with continuous fillet welds on either side of the web, and the welding conforms to Clause 1904.8 of these specifications. The length of the steel pile may be built up in sections either before or during driving operations. The sections shall be of identical cross-section. Pile splices shall be made with full penetration butt welds over the whole cross-section. Pile splices shall develop at least the yield strength of pile. The connections shall be made by butt-welding the entire crosssection in accordance with the provisions in Clause 1904.8 of these specifications. Care shall be taken to properly align the sections connected so that the axis of the pile will be straight. The number of welded connections in the length of pile shall be as few as possible. 209 TIMBER PILES

The Engineer shall stamp,each pile on the butt with a stamp which shall make an impression that is readily legible. Treated timber piles will be inspected by the Engineer after treatment. Untreated timber may be used as test piles. Untreated timber piles and treated timber piles shall be of approved quality. Treated timber piles shall be driven within 6 months after treatment. Timber piles shall be furnished with tip protection and shall be protected by the use of steel straps as hereinafter specified. Tip protection shall be suitable for use on timber piling of the size to be driven. Details of tip protection shall be furnished to the Engineer for review and approval before driving piles. Not less than 2 separate steel straps shall be placed within 600mm of the butt of each pile after the pile is square cut. Not less than 2 separate steel straps shall be placed within 300 mm of the tip of each pile. Additional intermediate steel straps shall be placed at not more than 3 metres centre measured along the length of the pile. Timber piles which are to be capped shall be separately cut off so that true bearing is obtained on every pile. Piles inaccurately cut off shall be replaced. Splicing of timber piles shall not be permitted except by written permission of the Engineer. 210 DRIVING EQUEPMENT

Piles or their casings may be driven with any type of drop hammer, diesel hammer or single-acting steam or compressed air hammer, provided they penetrate to the prescribed depth or attain the designed resistance without being damaged. The weight or power of the hammer should be sufficient to ensure~ a penetration of at least 5 mm per blow, unless rock has been reached. It is always preferable to employ the heaviest hammer practicable and to limit the stroke, so as not to damage the pile. The minimum weight of the hammer shall be 2.5t. In the c ase of precast concrete piles the mass of the hammer shall be not less than 30 times the mass of 300 mm length of pile. Steam or air hammers shall be furnished along with boiler or air compressor of capacity at least equal to that specified by the manufacturer of the hammers. The boiler or air

Pile Foundations

1100

compressor shall be equipped with an accurate pressure gauge at all times. The valve mechanism and other parts of steam, air or diesel hammers shall be maintained in first class condition so that the length of stroke and number of blows per minute for which the hammer is designed, will be obta ined. Inefficient steam, air or diesel hammers shall be removed from the work. 211 211.1 General Procedure Details of the equipment and the method proposed for driving the piles shall be submitted with the tender for scrutiny and approval of the Engineer. Piles shall be installed from firm ground or from temporary supports or from fixed platform. The arrangement shall provide sufficient rigidity to ensure accuracy of pile driving under all conditions of tide, stream flow or hammer drop. During driving the top of pile shall be protected by a suitable helmet of substantial steel construction. The helmet shall provide, uniform bearing across the top of the pile and shall hold the pile centrally under the hammer. No pile shall be driven unless inspected and approved by the Engineer. Piles shall be driven from a fixed frame of sufficient rigidity to ensure accuracy of driving within specified tolerances. Forces producing undue bending or torsional stresses in piles shall notbe applied during driving. The force of the hammer shall be directed centrally and axially during driving. The stroke of a single acting or drop hammer shall be limited to 1.2 m unless otherwise permitted by the Engineer. A shorter stroke may be necessary when there is danger of damaging the pile. Piles shall not be bent or sprung into position but shall be effectively guided and held on-line during the initial stages of driving. Attempts to correct any tendency for the pile to run off-line by the application of significant horizontal restraint will not be permitted. Shortly after the commencement of driving and at regular intervals throughout the driving operation, checks shall be made to ensure that the pile frame does not exert any undue lateral force on the pile due to restraint within the helmet.' If the indications are that a pile will finish outside the specified tolerances, driving operations on that pile will cease. The pile shall be withdrawn, the hole filled and the pile re-driven atpo extra cost. To avoid the possibility of premature "set-up" pile driving shall be continuous in the later stages, without any deliberate stops. (Delays of an hour or less may lead to significant "set-up" in piles i.e. resistance to further driving increases after driving is stopped). If any pile is damaged in any way during driving, it shall be repaired or replaced as directed by the Engineer, at no extra cost. If daring driving, the head of a pile is damaged to the extent that further driving -is not possible, the head shall be cut off and driving continued. The cost of cutting off shall be bome by the Contractor and where, as DRIVING

Pile Foundations

1100

a result of such cutting off the head, the pile is too short, the Contractor, shall, at his own cost, supply and splice on sufficient length of pile to restore the pile to its correct length. Piles should be driven to the minimum acceptable penetration shown on the drawings. This may require preboring and/or jetting as indicated in these specifications with the full approval of the Engineer. Piles shall be driven to nominal refusal or the required ultimate dynamic capacity nominated on the drawings or until the top of the pile is at the level required and specified on the drawing whichever gives the lowest toe elevation. The Engineer's decision in these matters shall be final. Nominal refusal shall be taken as equivalent to 25 min total penetration for the final 20 b lows using a hammer of driving energy as specified and shall be used as the criterion for acceptance for piles founded on rock. Severe driving which results in an average set.L)er blow less than 0.5 mm will not be permitted. Where hard drilling is encountered because of dense strata or obstructions located above the predetermined pile tip level, nominal refusal shall not be considered to have been achieved unless the Engineer is satisfied that the total number of blows, as the average driving resistance specified for nominal refusal, indicates that further driving will not advance the pile through dense strata or obstructions. The pile shall be driven as accurately as possible to the vertical or to specified batter. Straining the pile into position can damage it and the driving equipment should be adjusted as much as possible to follow the position of the pile. Any deviation fi-om the proper alignment shall b ' e -noted and promptly reported to the Engineer. If the deviation is to such an extent that the resulting eccentricity cannot be taken care of by strengthening the pile cap or pile ties, such a pile shall, at the discretion of the Engineer, be replaced or supplemented by an additional pile. Unless otherwise 'specified, the permissible positional deviation for piles A" be limited to those indicated in Clause 1116. Care shall be taken not to damage the pile by over-driving. Any sudden change in the rate of penetration which cannot be ascribed to the nature of the ground shall be noted and its cause ascertained, if possible, before driving is continued. When employing a tube which is subsequently withdrawn for the formation of cait-in-situ pile, consideration shall be given to the possibility of doing harm to a pile recently formed by driving the tube nearby before the concrete has sufficiently set. The danger of doing harm is greater in compact soils than loose soils. No pile shall be bored or driven within 3 in of a newly cast pile until at least 24 hours after completion of its installation. Driving piles in loose sand tends to compact the sand which in turn increases the skin friction. Therefore, driving a number of friction piles in a group shall proceed outward from the centre as otherwise it will be difficult to drive the inner piles to the same depth as the others.

Pile Foundations

1100

In the case of stiff clay also, the driving for a group of piles shall proceed outward from the centre. However, in case of very soft soil, the driving may proceed from outside to inside, so that the soil is restrained from flowing out during driving operations. If there is a major variation between the depth at which adjacent foundation piles in a group meet refusal, a boring shall be made nearby to ascertain the cause of this difference. If the boring shows that the soil contains pockets of highly compressive material below the level of the shorter pile, it will be necessary to enforce penetration of all the piles to a level below the bottom of the zone which shows such ~ pockets. 211.2 Preboring and Jetting Driving of the piles may be assisted by preboring holes or by the use of jets or both subject to the approval of the Engineer. These may be used essentially to achieve the minimum penetration shown on the drawings where such penetration is not reached under normal conditions of driving indicated in Clause 1111.1. The diameter of the hole shall not be greater than the diagonal dimension of the pile less 100 mm. The maximum depth of the preboring shall be such that the specified set (or less is obtained when the toe of the pile is at founding level. Preboring shall be as approved by the Engineer and shall not extend below one metre above the founding level and the pile shall be driven to at least one metre below the prebored hole. To ensure that the pile is properly . supported laterally in the hole, any 'space remaining around the pile at the ground level after driving is finished shall be backfilled with approved granular material. When water,jetting is used, at least two jets shall be attached to the pile symmetrically when this type of technique is used. The volume and pressum of water at the outlet nozzles shall be sufficient to freely erode material adjacent to the toe of the pile. The maximum depth of jetting shall be such that the specified set (or less) is obtained when the toe of the pile is at founding level. Jetting shall cease as directed by die. Engineer and shall not proceed below one metre above the founding level and the pile shall be driven at least one metre below the pre-bored hole. To avoid very hard driving and vibration in materials such as sand, jetting of piles by means of water may be carried out only by express permission of the Engineer and in such a manner as not to impair the bearing capacity of piles already in place, the stability of the soil or the safety of any adjoining buildings. Details of the arrangement for jetting shall be got approved from the Engineer in advance. If, for jetting, large quantities of water are used, it may be necessary to make provision for collection of water when it comes to the 'ground surface, so that the stability of the piling plant is not endangered by the. softening of the ground. Jetting shall be stopped before completing the driving which shall always be finished by ordinary methods. Jetting shall be stopped if there is any tendency for- the pile tips to be drawn towards the pile already driven owing to the disturbance to . the ground. 212 RAKER (INCLINED) PILES

Pile Foundations The maximum rake to be permitted in piles shall not exceed the following :
i) ii) iii) I in 8 for large diameter cast-in-situ piles viz 0.75 m diameter arid above I in 5 for smaller diameter cast-in-situ piles I in 4 for precast driven piles

1100

213 213.1 General,

PILE TESTS

The bearing capacity of a single pile may be determined ftom test loading a pile. The load test on a condrete pile may not be carried out earlier than 28 days from the time of casting of the pile. There shall be two categories of tests on piles, namely, initial tests and routine tests. Initial tests should be carried out on test piles which are not to be incorporated in the work. Routine tests shall be carried out as a check on working piles. The -number of initial and routine tests on piles shall be as determined by die Engineer depending upon the number of foundations, span length, ripe of superstructure --and uncertainties of founding strata. In any case, the initial load tests shall not be less than 2 in number, while the routine load tests shall not be less than 2 per cent of the total number of piles in the structure nor less than 2 in number. The above stipulations hold good for both vertical as well as lateral load tests on pile foundations. However, both initial and routine tests may be suitably increased for iTportant structures or cases with large variation in the subsurface st~mta. The methodology of carrying out load tests and of arriving at safe load on piles shall conform to IS:2911 (Part IV). In case of any doubt of workmanship or load carrying capacity of working piles not subjected to routine tests, or when ordered . by the Engineer, or when provided in the contract, load tests on working piles may be supplemented by non-destructive testing. Such tests may include "Integrity Testing" of concrete in the installed pile and utilisation of "Me Driving Analyser" which gives an indication of pile capacity in end bearing and side friction. 214 PELE CAP

Pile Caps shall be of reinforced concrete. A minimum offset of 150 mm shall be provided beyond the outer faces of the outer most piles in the group. If the pile cap is in contact with earth at the bottom, a levelling course. of minimum 100 mm thickness of M 15 nominal mix concrete shall be provided. The attachment of the pile head to the cap shall be adequate for the transmission of loads and forces. A portion of.pile top may be stripped of concrete and the reinforcement anchored into the cap. Manual chipping may be permitted after three days of pile casting, while pneumatic tools for chipping shall not. be used before seven days after

Pile Foundations

1100

pile casting. The top of pile after stripping shall project at least 150 mm into the pile cap. A, layer of surface reinforcement may be provided with a cover of 25 mm to retain the integrity of concrete below the main cap reinforcement which is to be laid 25 mm above the pile top. Concreting of the pile cap shall be carried out in dry conditions. The bottom of the pile cap shall be laid preferably as low as possible taking account of the water level prevalent at the time of casting. The top of concrete in a pile shall be brought above cut-off level to permit removal of all laitance and weak concrete before pile cap is laid. This will ensure good concrete at the cut-off level. 215 IMPORTANT CONSIDERATIONS, INSPECTION PRECAUTIONS FOR DIFFERENT TYPES OF PILES

215.1 Driven Cast-in-Situ Piles 215.1.1 Specialist literature and the guidelines from the pile construction industry shall be consulted regarding the method of installation, equipment and accessories for pile driving and recording of data. 215.1.2 During installation of piles the final "set" of penetration of pile per blow of hammer shall be checked taking an average of last 10 blows. 215.1.3 The pile shoes which may be of either cast iron conical type or mild steel flat type shall have double reams for proper seating of the removable casing tube inside the space between the reams. 215.1.4 Before commencement of pouring of concrete, it shall be ensured that there is no ingress of water in the casing tube from the bottom. Further adequate control during withdrawal of the casing tube is essential so as to maintain sufficient head of concrete inside the casing tube at all stages of withdrawal. 215.1.5 Concrete in piles shall be cast up to a minimum height of 600 mm above the designed top level of pile, which shall be stripped off at the time of construction of pile cap. 215.2 Bored Cast-in-Situ Piles 215.2.1 While 'concreting uncased piles, voids in concrete shall be avoided and sufficient head of concrete is to be maintained to prevent inflow of soil or water into the concrete. It is also necessary to take precautions during concreting to minimise the softening of the soil by excess water. Uncased cast-in-situ piles shall not be allowed where mudflow conditions exist. 215.2.2 The drilling mud such as bentonite suspension shall be maintained at a level sufficiently above the surrounding ground water level to ensure the stability of the strata which is being penetrated throughout the boring process until the pile has 'been concreted.

Pile Foundations

1100

215.2.3 Where bentonite suspension is used to maintain the stability of the bore-hole, it is essential that the properties of the. material b ' e carefully controlled at stages of mixing, supply to the bore-hole and immediately before concrete is placed. It is usual to limit
i) ii) iii) iv) v) The density of bentonite suspension to 1.05 glee 7b~ marsh cone viscosity between 30 and 40 7he pH value between 9.5 and 12 The silt, content less than 1 per cent The liquid limit of bentonite not less than 400 per cent

These aspects shall act as controlling factors for preventing contamination of bentonite slurry for clay and silt. 215.2.4 The bores shall be washed by bentonite flushing to ensure clean bottom at two stages viz. after completion of boring and prior to concreting after placing of reinforcement cage. Flushing of bentonite shall be done continuously with fresh bentonite slurry till the consistency of inflowing and out-flowing slurry is similar. 215.2.5 Tremie of 150 mm to 200 mm diameter shall be used for concreting. The tremie should have uniform and smooth cross-section inside, and shall be withdrawn slowly ensuring adequate height of concrete outside the tremie pipe at all stages of withdrawal. .6ther recommendations for tremie concreting are
(i) The sides of the bore-hole have to be stable throughout. (ii) The tremie shall be water-tight throughout its length and have a hopper attached at its head by a waier-tight connection (iii) The tremie pipe shall be large enough in relation to the size of aggregates. For 20 nun aggregate the tremie pipe shall be of diameter not less than 150 mm and for larger size aggregate tranie pipe of larger diameter is require& (iv) The tremic pipe shall be lowered to the bottom of the bore-hole, allowing water or drilling mud to rise inside it before pouring ~oncrete. (v) The tremie pipe shall always b& kept full of concrete and shall penetrate well into the concrete in the bore-hole with adequate margin of safety against accidental withdrawal if the pipe is surged to discharge the concrete.

215.2.6 For very long or large diameter piles, use of retarding plasticiser in concrete is desirable. 215.2.7 For large diameter piles, it may be, essential to conduct non-destructive pile integrity tests to evaluate integrity of the pile. 215.2.8 Where possible, it may be desirable to grout the base of pile with cement slurry under suitable pressure after concrete in the pile attains the desired strength. For this purpose, conduit pipes with easily removable plugs at the bottom end should be placed in the bore alongwith reinforcement cage before concreting. 216 TOLERANCES

Pile Foundations 216.1 Permissible Tolerances for Pile


i) Precast Concrete Piles : a) b) c) d) ii) a) b) c) d) iii) a) b) c) d) Variation in cross-sectional dimensions Variation in length Bow for length in nun + 25 mm Pile Length in mm 1000 + 5 mm

1100

Surface irregularities measured with 3 in straight edge 5 mm

Driven Piles Variation in cross-sectional dimensions mm, -10 mm Variation from vertical or specified rake Variation of level of top of piles 25 mm + 50 mm,-10 m I in 50 I in 50 75 mm Variation in the final position of the head in plan

Bored Piles Variation in cross-sectional dimensions Variation from vertical or specified take Variation in the final position Variation of level of top of piles 25 inna

50 mm of the head in plan

216.2 Permissible Tolerances for Pile,Caps


(a) (b) (c) (d) Variation in dimensions +50 nun - 10 mm 5 nun Msplacement fi-om specified position in plan 15 mm Surface irregularities measured with 3 m straight edge Variation of levels at the top + 25 turn

217

TESTS AND STANDARDS OF ACCEPTANCE

The materials shall be tested in accordance with these Specifications and shall meet the prescribed criteria. The work shall conform to these Specifications and shall meet the prescribed standards of acceptance. 218 MEASUREMENTS FOR PAYMENT

For supply of precast concrete, timber or steel piles of specified cross-section, the measurement shall be in metres of the length of piles ordered in writing by the Engineer measured from the head to the butt of the shoe or die tapered point. Reinforcement in pre-cast concrete piles shall not be measured for payment. For cast-in-situ driven and bored concrete piles of . specified crosssection, the measurement shall be the length in metres of the accepted pile that remamis in the finished structure complete in place. Reinforcement in cast-in-situ driven and bored concrete piles shall be measured for payment as per Section 1600. Routine and Initial Pile Load Tests shall not be measured for payment. For installation of the pile, i.e. by driving in the case of precast concrete, timber, steel and cast-in-situ driven piles, and by boring. in the case of cast-in-situ bored piles the measurement shall be the length in metres that remains in the finished structure complete in place, limited to that shown on drawings or ordered by the Engineer. No

Pile Foundations

1100

distinction shall be made for penetration through hard strata or rock and socketing * into rock. For steel liners/casing shown on the drawings to be permanently left in place, the measurement shall be by weight in tonnes that remains in the finished structure complete in place, limited to that shown on drawings or ordered by the Engineer. For the pile cap, the quantity of concrete shall be measured in cubic metres as per Section 1700. While reinforcement in pile cap shalI be measured in tonnes asper Section 1600. 219 RATE

The contract unit rate for supplying precast concrete, timber or steel piles shall include cost of all labour, materials, tools and equipment, and other work involved in making or fabricating the pile complete as shown on the drawing, and where required its loading, transport, delivery to site unloading and stacking it at the place indicated by the Engineer. The cost of reinforcement as -per Seciton 1600 in precast concrete piles shall be deemed to be included in the quoted rate for supply of piles. The contract unit rate for cast-in-situ driven and bored piles shall include the cost of concrete and all other items as per Section 1700. The contract unit rate shall also include costs Qf ail labour, materials, equipments and all other incidentals involved in conducting routine and initial pile load tests including installation of piles for initial load tests. ' The contract unit rate for reinforcement in cast-in-situ driven and bored piles shall be as per Section 1600. The contract unit rate for installation of piles shall include full compensation for furnishing all labour, materials, tools and equipment, and incidentals for doing all the works involved in driving- timber, precast concrete and steel piles, driving or making bores for cast-in-situ driven and bored concrete piles, cutting off pile heads, all complete in place to the specified penetration of piles. Providing temporary liner/casing and its withdrawal and placing reinforcement in position shall also be deemed to be included in the rate for installation of piles and no additional payment shall be made for the same. The contract unit rate for permanent steel liners shalt incude cost of all labour, fabrication and placing the steel liner to the required depth as shown on the drawings and as ordered by the Engineer. The contract unit rate for concrete in pile cap shall cover all costs of labour, materials, tools, plant and equipment, formwork and staging including placing in position, sampling and testing and supervision, all as per Section 1700. Reinforcement in the pile cap shall be paid for separately as per Section 1600.

Well Foundations Well Foundations 1200 Well Foundations

1200

Well Foundations

1200

1201

DESCRIUPTION

This work consists of construction of well foundation, taking it down to the founding level through all kinds of gub-strata, plugging the bottom, filling the inside of the well, plugging the top and providing, a well cap in accordance with the details shown on the drawing -and as per these specifications, or as directed by the Engineer., In cam of well foundations of size larger than 12 in diameter, supplemental construction specifications will be necessary. 220 GENERAL

220.1 Wells may have a circular, rectangular, or D-shape in plan and may consist of one, two or more comp%,vtments in plan. The outer wall of the well is known as well stein;.-ig, which may be cellular. The process of taking d9wn the weli .*.) the founding level is known as well sinking. Afttr reaching the founding level, the hollow inside the well. C'dredge hole) is plugged at the bottom by concrete C'bottom plug'). The dredge hole is then filled with approved filling upto the level indicated on the drawings and provided with a concrete plug Ctop plug'). To facilitate sinking of well, steel cutting edge is fabricated and connected to a concreto well curb of required shape. On top of the well curb, adequate height of well steining is cast and the process of sinking is carried OUL After a portion of the well has been sunk, another height of well steining is cast on top of the previous section andL further sinking carried out. This process is continued till the bottom level of the well, reaches the founding level. At the top of the well steining, an adequately designed "well cap" is laid which transmits the loads and forces from the sub-structure (piers or abutments) to the foundations. 220.2 At least one bore-hole must be 6ailable/carried out in accordance with these specifications at each well foundation location, prior to commencement of work. The depth of bore-holes should extend upto a depth equal to one and a half times the outer Oiameter/least dimension of the well below the anticipated founding- level. The resultsof soil exploration should be presented in accordance with clause 7.4 of IRC:78. In case the well foundation is to rest on a rocky strata, it may be necessary to undertake additional borings /probings prior to commencement of work to ascertain the actual profile and the quality of the rocky strata, at the level at which. the vell has to be seatid, etc. 220.3 Blasting may have to be resorted to in order to facilitate sinking through difficult strata, such as boulders and rocks etc. In*, case blasting it anticipated, protective/strengthening measures specified. in clause 710.6 (IV) of IRC:78, shall be taken. The grade of.concrete in bottom 3 metres of steining shall not be leaner than

Well Foundations M 20 or as shown on the drawings.

1200

220.4 In case the bore hole data shows the presence of. Steeply dipping rock, chiselling may have to be resorted to so as to obtain proper seating of the foundation. For this purpose, the well may require to be, dewatered completely under high air pressure inside the well. This process is. known as pneumatic sinking. Pneumatic sinking may also ha ' ve to be resorted to in cases where obstacles such as tree trunks, large sized boulders or hard strata etc. cannot be removed by open dredging. The necessity of adoptipg pneumatic sinking shall be decided by the Engined. The curb and steining have to be specifically designed for special loadingi When pneumatic sinking is adopted. 221 SETTING OUT AND PREPARATIONS FOR SINKING

221.1 Necessary reference points shall be fixed, away from the zone of blow-ups or possible settlements resulting from well sinking operations. Such reference points shall be connected to the permanent theodolite stations with the base line on the. banks. The centre of the individual wells shall be marked with reference to these stations. The distance, wherever practicable, shall be checked-,with the help,of accurate tapes and precision distomat. Reference points shall also be fixed to mark X-X axis (usually traffic direction) and Y-Y axis (normal to X-X axis) accurately. A temporary bench mark shall also be established near the well foundation, away from. the zones of bliow-ups or possible settlement. The bench mark shall be checked ~'regularly with respect to the permanent bench mark established at the bridge site. 221.2 For wells'which are'to be pitched in water, an earthen or' sand island shall be constructed. Sand islands are practicable for water depths of about 5 metres under stable bed soil conditions. For greater' depths or in fast flowing rivers or for locations where soil is too weak to sustain sand island, floating caissons may have to be adopted. The plan dimensions. of sand islands shall be such as to have a working space of at least 2 metres all around the steining. The dimension of the sand islands shall however be not less than twice the dimension in plan of the well or caisson. Sand islands shall be maintained to perform their functions, until -the well is sunk to a depth below the bed level at least equal to the depth of water. Sand island shall be protected against scour and the top level shall be sufficiently above the prevailing water level to be-decided by the Engineer so that it is safe against wave action. While sand islands are constructed at well location, floating caissons are generally fabricated at or near the banks on dry land or dry docks. Floating caissons are towed into position in floating condition.

Well Foundations

1200

Floating caissons may be, of steel, reinforced concrete or a combination of the two. They should have at least 1.5 m free board above water level and increased, if considered necessary, in case there is a possibility of caissons sinking suddenly owing to reasons such as scour likely to result from the lowering of caissons, effect of waves, sinking in very soft strata etc. Stability of floating caissons shall be ensured against overturning and capsizing while being towed and during sinking for the action of water current, wave pressure, wind etc. For floating caissons, a detailed method statement for fabrication, floating and sinking of caissons shall be prepared and furnished to the Engineer. Such statement shall include the total tonnage of steel involved, fabrication and welding specifications, list of materials and plant and a description of operations and manpower required for the work. The caisson, shall be tested for leakages before being towed to site. 221.3 Equipment Equipment, shall be deployed for construction of well foundation as required and as directed by the Engineer. Generally, the following equipments may be required for the work
(a) (b) (c) (d) Crane with grab bodws - capacity 0.5 to 2.0 canx Subroersible pomps Air compressors, air lodu and other accessories where pneutnatic sinking of well is anticipated. Chisels of appropriate sizes

(e) Aqua-header for cutting rocky strata (0 Diving helmets and accessories (9) Equiptuent for concrete production, transportation planing and compaction.

222

CUTTING EDGE

222.1 The mild steel cutting edge shall be made from structural steel sections. The cutting edge shall weigh not less than 40 kg per metre length and be properly anchored into the well curb, as shown in the drawing. . When there are two or more compartments in a well, the bottom end of the cutting edge of the inner walls of such wells shall be kept at about 300 mm above that of outer walls. 222.2 The parts of cutting edge shall be erected on level firm ground. Temporary supports shall be provided to facilitate erection and maintaining the assembly in true shape. The fabrication may be -carried out in the shop or at site. Steel sections shall not be heated and forced into shape. However, "V" cuts may be made in the horizontal portion, uniformly throughout the length, to facilitate cold bending. After bending, such "V" cuts should be closed by welding. Joints in the lengths of structural sections, unless otherwise specified shall be fillet welded using single cover plate to ensure the.requisite strength of the original section. 222.3 The cutting edge shall be laid about 300 mm above .prevalent water level.

Well Foundations 223 WELL CURB

1200

223.1 The well curb may be precast or cast- in-situ. Steel formwork for well curb shall be fabricated strictly in conformity with the drawing. The outer face of the curb shall be vertical. Steel reinforcements shall be assembled as shown on the drawings. The bottom ends of vertical bond rods of steining shall be fixed securely to the cutting edge with check nuts or by welds. The formwork on outer face of curb may be removed within N hours. after concreting. The formwork orl inner face shall be removed after 72 hours. 223.2 All concreting in the well curb shall be done in one continuous operation. 224 WELL STEINING

224.1 The dimensions, shape, concrete strength and reinforcements of the well shall strictly conform to those shown on the drawings. The formwork shall preferably be of M.S. sheets shaped and stiffened suitably. In case timber forms are used, they shall be lined with plywood or M.S. sheets. 224.2 Steining built in the first lift above the well curb shall not be more than 2 metres and in subsequent lifts it shall not exceed the diameter of the well or the depth of well sunk below the adjoining bed level at any time. For stability, the first lift of steining shall be cast only after sinking the curb at' least partially for stability. Concreting of steining may be carried out in subsequ ent lifts of about 2 to 2.5 metres. Attempts should be made to minimise the number of construction joints. The concreting layers shall be limited to about 450 -mm restricting the free fall of concrete to not more than 1.5 m. Laitance formed at the top surface of a lift shall be removed to expose coarse aggregates before setting of concrete at the proposed construction joint. As far as possible, construction joints shall not be kept at the location of laps in the vertical steining bars. 224.3 The steining of the well shall be built in one straight line from bottom to top such that if the well is tilted, the next lift of steining will be aligned in the direction of the tilt. The work will be checked carefully with the aid of straight edges of lengths approved by the Engineer. Plumb bob or spirit level shall not be used for alignment. After sinking of a stage is complete, damaged portions if any, of steining at top of the previous stage shall be properly repaired before constructing the next stage. 224.4 The height of steining shall be calibrated by making at least 4 gauges (preferably in traffic direction and in a direction normal to traffic direction) distributed equally on the outer periphery of the well each in the form of a 100 mm wide strip painted on the well, with every metre mark shown in ' black paint. The,.gauges shall start with zero at the bottom of the cutting edge. Marking of the gauges shall be done carefully with a steel tape.

Well Foundations

1200

224.5 After reaching the founding level, the well steining shall be inspected to check for any damage or cracks. The Engineer will direct and the Contractor shall execute the remedial measures before acceptance of the well steining. In cam the well cannot be accepted even with any remedial measures, then the well shall stand rejected. 225 225.1 General The well shall as far as possible be sunk true and vertical through all rypes of strata. Sinking or loading of the well with kentledge shall be commenced only*after the steining has been cured for at least 48 hours or as specified in the drawings. No well. shall be permitted to~ be placed in a pre-dredged hole. The well shall be sunk by excavating material uniformly from inside the dredge hole. Use of water jetting, explosives and divers may be adopted for sinking of wells through difficult strata with prior approval of the Engineer. Normally dewatering of well should not be permitted as a means for sinking the well. It also shall never be resorted to if there is any danger of sand blowing under the well. Dewatering shall however be done when well is to be founded into rock. Pneumatic sinking may have to be resorted to where obstacles such as tree trunks, large size boulders, etc. are met at the bottom or when there is hard strata which cannot be removed by open dredging. The necessity for pneumatic sinking shall 'be decided by the Engineer. Sinking history of well shall be maintained in the format given in Appendix 1200/1. 225.2 Use of Kentledge as Sinking Load Kentledge shall be placed in an orderly and safe manner on the loading platform and in such a way that it does not interfere with the excavation of the material from inside the dredge hole and also does not in any way damage the steining of the well. Where tilts are present or there is a danger of well developing a filtthe position of the load shall be regulated in such a manner as to provide greater sinking effort on the higher side of the well., 225.3 Use of Water Jetting Water jetting may be employed for well sinking wherever necessary225.4 Use of Explosives Mild explosive charges may be used as an aid for sinking of the well only with prior permission of the Engineer. Blasting of any sort shall only be done in the presence of the Engineer and not before the concrete in the steining has hardened sufficiently and is more than 7 days,old. When likelihood of blasting is predicted in advance, protection of the bottom portion of the well shall be done as per these specifications. After blasting operations are completed, the well curb and steining should be examined for any cracks and remedial measures taken. WELL SINKING

Well Foundations

1200

If blaWng has been used after the well has reached the design foundation level, normally 24 hours shall be allowed to lapse before the bottom plug is laid. The charges shall be exploded well below the cutting edge by making a sump so as to avoid chances of any damage to the curb or to the steining of the well. A minimum sump of I metre depth should be made before resorting to blasting. Use of large charges, 0.7 kg or above, may not be allowed except under expert direction and with the permission from the Engineer. Suitable pattern of charges may be arranged with delay detonators to reduce the number of charges fired at a time. The burden of the charge may be limited to I metre and the spacing of holes may normally be kept as 0.5 to 0.6 metres. All prevalent laws concerning handling, storing . and using of explosives shall be strictly followed. All safety precautions shall be taken " per IS:4081 "Safety Code for Blasting and related Drilling Operations", to the extent applicable, whenever blasting is resorted to. There should be no equipment inside the well nor shall. there be any labour in the close vicinity of the well at the time of exploding the charges. If rock blasting is to be done for seating of the well, the damagecaused by flying debris should be minimised by covering blasting holes by rubber mats before blasting. 225.5 Use of Divers Use of divers may be made both for sinking purpose like removal of obstructions, rock blasting and for inspection. All safety precautions shall be taken as per any acceptable safety code for sinking with divers or any statutory regulations in force. Only persons trained for the. diving operation shall be employed and shall be certified to be fit for diving by an approved doctor. They shall work under expert supervision. The diving and other equipments shall be of acceptable standard and certified to this effect by an approved independent agency. It shall be well maintained for safe use. Arrangement for ample supply of low pressure clean coot air shall be ensured - through an armoured flexible hose pipe. Standby compressor plant shall be provided in case of breakdown. Separate high pressure connection for use of pneumatic tools shall. be. made.. Electric lights where provided shall be at 50 volts (maximum). Ile raising of the diver from the bottom of wells shall be controlled so that decompression rate Qonforms to the rate as-laid down. in aporopriate regulations. 225.6 Use of Pneumatic Sinking General 225.6.1

The Engineer shall familiarise himself with particular reference to caisson diseases and working of the medical air-lock. A doctor competent to deal with cases of "Caisson Diseases" or other complications. wising as a result of working under high pressure, shall be stationed at the construction site when pneumatic sinking is under progress.

Well Foundations

1200

The contractor shall provide complete facilities including the issuing of orders to ensure strict enforcement of the requirements outlined in these specifications. Safety provisions as contained in ISA138 and in these specifications shall be strictly followed. Pneumatic. sinking shall be restricted to a depth of 30.0 in. 225.6.2 Man-Locks and Shafts Locks, reducers, and shaft used in connection with caissons shall b6 of riveted construction throughout. The material used in their manufacture shall be steel plate with thickness not less than 6 mm. Shafts shall be. subjected to hydrostatic or air pressure test of at least 0.5 M111a, at which pressure they shall be tight. The pressure at which testing has been done shall be clearly and visibly displayed. Shafts shall be provided, with a safe, proper and suitable staircase .for its entire length including landing platforms which are not more than 6 metrei apart. Where this is impracticable due to space constraint, suitable ladders along with landing platforms shall be installed. These shall be kept clear and in good condition at all times and shall, be conshwted, inspected and maintained to the entire satisfaction. of the Engineer. A 1.0 m wide platform with 1.0 rn high railing shall be provided all round tht caisson an locks Where 15 or more men are employed, caissons shall have two locks, one of which shall be used as a man lock. Locks shall be located so that the lowest, part of the bottom door shall not be less than I metre above high water level. The supply of fresh air to the working chamber shall at all times be sufficient to permit work to be done without any danger or excessive discomfort. All air supply lines shall be supplied with check valves and carried as near to the face as practicable. A man-lock shall be used solely for the compression or decompression of persons, and not for the pas~age of plant and material and shall be maintained in a reasonably c1dim and sufficiently warm state. However, any hand tool or hand instruments used for the purpose of the work may be carried into the man-lock. Where it is not reasonably practicable to provide a separate manlock for use by persons only, the lock When it is in actual use for compression or decompression of a person or persons shall not be put, simultaneously, to any other use and shall be in a reasonably clean and sufficiently warm state. 225.6.3 Valves Exhaust valves shall be provided, having risers extending to the upperpartof the chamber. These shall be operated, whenever necessary specially after a blast. Precautions shall be taken that men are not allowed to resume work after a blast until the gas and smoke are cleared. 225.6.4 Medical supervision and certification

Well Foundations

1200

Every employee absent -from work for 10 or more consecutive days due to illness or any other disability shall be required to pass the regular physical examination by the doctor before being permitted to return to work. After a person has been employed continuously in compressed air for a period of 2 months, he shall be re-examined by the doctor and shall, not be *permitted to work until such re-examination has been made and.ihe.report is satisfactory. No irson, known to be addicted to the excessive use - of intoxican shall be permitted to work in compressed air. The doctor shall, at all times, keep a complete and full record of examinations made by him, which shall contain dates of examinations, a clear and full description of the person examined, his age and physical condition at the time of examination and a statement as to the period such a person has been engaged in such employment. Records shall be kept at the place where the work is in progress and shall be subject to inspection by authorised officers. Every man lock shall always have a doctor or a responsible person in attendance. In case the person in charge is not a doctor he must have positive means of promptly communicating with and securing the services of a competent doctor in case of emergency. Such arrangements shall invariably be subject to the approval of the Engineer. If the air pressure exceeds,0.2 M?a gauge or if 50 or more men are employed, it is obligatory forthe person in charge of medical lock to be a doctor experienced in this type of work. All cases of-compressed-air illness shall be reported and copies of all -such reports shall'be kept on file at the place of work. 225.6.5 Lighting All lighting in compressed air chambers shall be operated only by electricity. Two independent electric lighting. systems with independent sources of supply shall be used. These shall be so arranged that the emergency source shall- become automatically operative in case of failure of the regularly used source. The minimum intensity of light on any walkway ladder, staimay, or lower working level shall be one-quarter (1/4) candlepower. In all work places, the lighting shall always be such as to enable workmen to see their way about clearly. All external parts of lighting fixtures and electrical equipment lying within 2.5 metres above the floor shall be constructed of non-combustible, non-absorbing insulating materials. If metal is used it must be effectively earthed. Portable lamp shall have non-combustible, non-absorbing insulating s9ckets, approved handles basket guards and approved cables. The use of worn or defective portable and pendant conductors, shall be prohibited. 225.6.6 Safety against fire hazard No oil, gasoline, or other combustible material shall be stored within 30 metres of any shaft, caisson, or tunnel opening. However, oil may be stored in suitable tanks in.

Well Foundations

1200

isolated fireproof buildings, provided such-buildings are not. less thari 15 metres from any shaft, caisson, gr tunnel opening or any building directly connected thereto. Positive means shall be taken to prevent leaking flammable liquids from flowing into areas specifically mentioned in the preceding paragraph. Where feasible, a fire hose connected to a suitable source of water shall be provided at the top of every caisson. Where fire mains are not accessible,. a supply of water shall be stored in tanks near the top of every caisson, provided fire pails or suitable pumps are kept available. Approved fire extinguishers shall also be provided. 225.6.7 Sanitation Properly heated, lighted and ventilated dressing rooms shall be provided for all employees engaged in compressed air work. Such rooms shall contain lockers and benches and be open and accessible to men during intermission between shifts. Adequate toilet accomod.ation of one for every twenty five employees shall be provided. Care shall be taken to keep all parts of the caissons and other working compartments, including locker rooms, dry rooms, rest rooms, and other equipment in a good sanitary condition and free from refuse, decaying, or other objectionable matter. No nuisance shall be tolerated in the air chamber. -Smoking shall be striWy prohibited and all matches and smoking materials shall be left out of the locker rooms. A separate dry-room'shall be provided where working clothes may be dried within reasonable time. 225.6.8 Protection against gases In all cases where gas is expected including alluvium impregnated with decayed vegetable matter.the use of Davy Safety Lamp shall be compulsory225.6.9 Additional safety provisions
a) The weight of the pneumatic platform and that of steining and kentledge, if any,'shall be sufficient to itsist the uplift from air inside, skin friction being neglected in. this case. If, at any -section the total weight acting downwards is less than the uplift pressure of air inside, additional kendedge shall be placed on the well. If it is not possible to n4ke the well heavy enough during excavation, "blowing down" may be used. Ihe men should be withdrawn and air pressure reduced The well should then begin to move with small reduction in air pressure. "Blowing down" should only be used when the ground is such that it will not heave up inside the chamber when the pressure is reduced. When the well does not move with the reduction in air pressure, kendedge should be added. "Blowing down" should be in short stages and die drop should not exceed. 0.5 metre at any stage. To control sinking during blowing down; use of packings are recommended. b) The pneumatic sinking plant and other allied machinery shall not only be of proper design and make, but also shall be worked by competent and well trained personnel. Every part of the machinery and its fixtures shall be minutely examined before installation and use. Availability of appropriate spares, standbys. safety of personnel as recommended in IS.4138 for working in compressed air must be ensured at site. Codes for safety and for working in compressed air and other labour laws and practices prevalent in the country, as specified to provide safe, efficient and expeditious sinking shall be followed. c) Inflammable materials shall not be taken into air locks and smoking shall be prohibited. Wherever gases am suspected to be issuing out of dredge hole, the same shall be analysed by trained personnel and necessary precautions adopted to avoid hazard to life, and equipment.

Well Foundations

1200

d) Where blasting is resorted to. it shall be carefully controlled and all precautions regarding blasting shall be observed. Workers shall be allowed inside after blasting only when a competent and qualified person has examined the chamber and steining thoroughly and found the same to be safe.

225.7 Precautions During Sinking


a) When the wells have to be sunk close to each other and clear distance between them is not greater than the diameter of wells, sinking shall be taken up on all wells and they shall be sunk alternately so that sinking of wells proceeds uniformly. Simultaneous and even dredging shall be carried out in the wells in such a manner that the difference in the levels of the surnp and cutting edge in the adjacent wells does not exceed half the clear gap between them. Plugging of all the wells shall be done together. b) During sinking of dumb-bell or double D-shaped wells, the excavation in both the dredge holes should be carried out simultaneously and equally. c) Bore chart shall be referred to constantly during sinking for taking adequate care while piercing different types of strata. The type of soil as obtained during the well sinking should be cornpared with bore chan so as to take prompt decisions. d) Before seasonal floods all wells on which sinking is in progress shall be sunk to sufficient depths below the designed scour level. Further, they shall be temporarily filled and plugged so that they do not suffer any tilt or shift during die floods. e) All necessary precautions shall be taken against any possible damage to the foundations of existing structures in the vicinity of the wells, prior to commenceminfot dredging 'from inside the well. f) The dredged material shall not be allowed to accumulate over the well. It shall be durnped and spread, as far away as possible, and then continuously and simultaneously removed, as directed by the Engineer. In case the river stream flows Ac#ig one edge of the well being sunk, the dredged material shall not be dumpe&\on the dry side of the bank but on the side on which the river current flows. g) Very deep sump shall not be made below the well curb, as it entails risk of jumping (sudden sinking) of the well. The depth of sump shall be generally limited to one-sixth of the outer diameter/least lateral dimension of the well in plan. Normally, the depth of sump shall not exceed 3.0 metres below the level of the cutting edge unless otherwise specifically permitted by the Engineer. h) In case a well sinks suddenly with a jerk, the steining of the well shall be examined to the satisfaction of the Engineer to see that no damage has occurred to it. i) In pneumatic sinking, the well shall not, at any time, be dropped to a depth greater than 500 nun by the method of "blowing down". j) Dewatering shall be avoided if sand -blows are expected. Any equipment and men working inside the well shall be brought out of the well as soon as there am any indications of a sand-blow. k) Sand blowing in wells can often be minimised by keeping the level of water inside the well higher than the water table and also by adding heavy kendedge. 1) In soft strata prone to senlement/creep, the eDnstrucLion of the abutment wells shall be taken up only after the approach embankment for a sufficient distance near the abutment has been completed.

225.8 Tilts and Shifts The inclination of the well from the vertical is known as tilt and the horizontal displacement of the centre of the well at the founding level from its theoretical position is known as shift. Unless otherwise specified, the tilt of any well shall not exceed 1 (horizontal) in 80 (vertical), and the shift at the well base shall not be more than 150 mm in any resultant direction. Tilts and shifts shall be carefully chocked and recorded in the format vide Appendix 1200111 regularly during sinking operations. For the purpose of measuring the tilts along

Well Foundations

1200

the two axes of the bridge, reduced level of the marks painted on the surface of the steining of the well shall be taken. For determination of shift, locations of the ends of the two diameters shall be precisely measured along the two axes, with reference to fixed reference points. Whenever any Olt is noticed, adequate preventive measures like placing eccentri.~' kentledge, pulling, strutting, anchoring or dredging une venly and depositing dredge material unequally, putting obstacles below cutting edge. Water jetting etc., shall be adopted before any further sinking. After -correction, the dredged material shall be spread out uniformly. A pair of wells clow.,to each other have a tendency to come closer while sinking. Timber Lruts may be introduced in between the steining of these wells to prevent tilting. Tilts occurring in a well during sinking in dipping rocky strata can be safegumded by suitably supporung tht curb. In the event of a well developing tilt or shift beyond t~e specified permissible values, the Contractor shall have'to carry out, :at his own cost, suitable remedial measures to the satisfaction of the Engineer, to bring the tilt and shift within permissible values, as -far as practicable. If the resultant tilt and / or.shift of any well exceeds the specified permissible values, generally it should not exceed I in 50 and 300 mm respectively. The well so sunk shall Ne regarded as not conforminga to specifications and a sub-standard work. The Engineer in his sole discretion, may consider accepting such a well, provided :
(i) Calculations,for foundation pressures. and steining stresses, accounting for the actual tilt and shift furnished by the Contractor show that the well is safe. Any remedial measures required to bring the stresses within permissible values (such as increase in the dimension of the well cap, provision of dummy weights on the well cap etc), shall be carried out by the Contractor without claiming for any CXEM cost. (ii) The Contractor shall agree to reduction in rates in accordance with Clause 1215W.

In case the Engineer, in his discretion; rejects the well, the Contractor. shall dismantle the rejected well to the extent directed by the Engineer and -remove the debris. Further, the Contractor shall, at his own risk and expense complete the bridge with modified span arrangement acceptable to the Engineer. 225.9 Seating of Wells The well shall be7 uniformly seated at the founding strata. It shall be ensured by test borings that the properties of the soil.encountered at the founding strata and upto a depth of one and a half times the well diameter is -identical to that adopted in the design. The procedure for test borings shall satisfy the provisions of these specifications. In case the soil encountered is, inferior. to that adopted in design, the well shall be re-designed by the Engineer adopting the soil properties actually encountered and the founding level intimated to the Contractor, who shall carry out the work. In case of seating of ' wel~s in hard rocky strata, where the rock profile is steeply sloping, pneun~atic methods of 'sinking may be adopted to seat the well evenly as direcied by the Engineer. The, decision of adopting pneumatic sinking shall be taken by the Engineer. The cutting edge may also be embedded for a suitable depth in the rocky

Well Foundations

1200

strata, as decided by the Engineer keeping in view the quality of rock. As an additional measure of safety, the well shall be anchored to the rocky strata by anchor bars provided in the stpining of the well, as shown on the drawing irrespective of the fact that tension develops or not at the base of the well under design loads. After the well has been evenly seated on good hard rock, arrangements shall be made to facilitate proper inspection in dry and visible conditions before the bottom plug is laid. 226 BOTTOM PLUG

For bottom plug, the concrete mix shall be designed (in dry condition) to attain the concrete strength as mentioned on the drawing and shall contain 10 per cent more cement than that required for the same mix placed dry, to cater for underwater concreting. However, the total cement content shall not be less than 363 kg/cu.m. of concrete with a slump in the range of 150 min to 200 mm. Admixtures may be added to the concrete to impart the required characteristics indicated herein. Concrete for the bottom plug shall be laid by tremie pipe method. Tremie concrete when started shall be continued without interruption for full concreting. in the bottom plug. The concrete production equipment and placement equipment should be sufficient to enable under water .concreting within stipulated time. Necessary standby equipment should be available for emergency situation. Before commencin g plugging, all loose material from the bottom of the well shall be removed. Concreting shall be done in one continuous operation till the dredge hole is filled upto the required height and thereafter sounding shall be taken upto ensure that the concrete has been laid to the required height. Least disturbance shall be caused to the water inside the well while laying concrete in the bottom plug. Concrete 'IT I not be disturbed in any way for at least 14 days. In order, check any rise in the level of the bottom plug soundings should be taken at the close of concreting and once every day for the subsequent 3 days. The soundness of the bottom plug may be tested by dewatering the will by 5 metres below the surrounding water level and checking the rise of water. The rate of rise shall preferably be less than 10 cms per hour. In case the rate is higher, suitable remedial measures as directed by the Engineer, shall be taken by the Contractor at his own cost. 227 SAND FILLING

Sand filling shall commence after a period of 3 days of laying of bottom plug. Also, the heigbt of the bottom plug shall be verified before starting sand filling. Sand shall -be clean and free from earth, clay clods, roots, boulders, shingles, etc. and shall be compacted as directed. Sand filling shall be carried out upto the level shown on the drawing, or as directed by the Engineer.

Well Foundations 228 TOP PLUG

1200

After filling sand upto the required level a plug of concrete shall be provided over it as shown an the drawing, or as directed by the Engineer. 229 WELL CAP

A reinforced cement concrete well cap will be provided over the top of the steining in accordance with the drawing. Formwork will be prepared conforming to the shape of well cap. Concreting shall be carried out in dry condition. A properly designed false steining may be provided where possible to ensure that the well cap is laid in dry conditions. The bottom of the well cap shall be laid preferably as low as possible,taking account the water level prevalent at the time of casting, Bond rods of, steining shall be anchored into the well cam. 230 TOLERANCES

The permissible tilt and shift shall not exceed I (horizontal) in 80 (vertical) and the shi" the well base shall not be more than 150 mm in any resultant di*tion. For the well steining and well cap the permissible tolerances shall be as follows
a) Variation in dimension +50 min - 10 turn 15 mm b) Nfisplacement from specified position in plan d) Variation of levels at the top 25 min

c) Surface irregularities measured with 3 in straight edge: 5 min

231

TESTS AND STANDARDS OF ACCEPTANCE

The materials shall be tested in accordance with these Specificalions and shall meet the prescribed criteria. The work shall conform to these Specifications and shall meet the prescribed vandards of acceptance. 232 MEASUREMENTS FOR PAYMENT

All quantities shall be measured from the drawing, or as ordered by the Engineer, excepting those required to be provided by the Contractor at his cost. a) The cutting edge shall be measured in tonnes based on the net weight of metal used in it, as per Section 1900. b) The concrete in curb, well steining and well cap shall be measured in cubic metres in each of the items as per Section 1700. The reinforcements shall be measured in tonnes separriftly in each of the items, as per Section 1600. c) The measurement for well sinking shall be made in turming metres for different depths and in different types of strats. (for example~ predominantly sand/ clay soil, roft rock, hard rock, etc) as specified in the Contract. 7be depth of sinking shall bt measured from the level specified in the Contract. If no level has been specified in the Contract,

Well Foundations

1200

sinking shall be measured from the low water level or from the level at which the cutting edge was laid, whichever is higher. d) The quantity - of concrete in bottom and top plug shall be measured in cubic metres as per Section 1700. e) The quantity. of and filling shall be meas ured in cubic mattes. f) Pneumatic siriking. where required shall be paid as a separate itern and shall be measured in cubic metres of material to be excavatrA 233 RATE

a) The Contract unit rates of cuning edge shall cover all costs of labour, material, tools, plarif and equipment, including placing in position, sampling and, testing, said, supervision, all as per respective Section of Structural Steel Wod; and as described in this section. b) The Contract unit rates for concrete in curb, steimis, bottom plug, top Plat and well cap, shall cover all costs of tabour, material, tools, plant equipm-tn%~,,,formwork and staging including placing in position, sampling testing, and, supervision, all as per respective Section of Structural Conc and as described in this section. c) The Contract unit rates for reinforcement in curb, steining, &M well cap, sh* coier all costs of labour, material, tools, plant and equipment, including to. shape, jolac-g in positicA sanWfing, testing and supervision, all as per respective Section of Steel Reinforcement and as described in this section. d) The Contract unit rates for sand filling shall *over all costs of tabour, material, tools, plant and equipment, including placiQ' in position, sampling, testing sn~ supervision, all as describ~cl in this section. e) The Concrete unit rates for sinking shall covex the costs of tabour, toots, and equipmerit ahd plant and for all operations and other incidentals for sinking of well including seating excepting provisions of pneumatic sinking as described in this Section. 17ho unit rates shall specify the strata such as types of soil, rock, etc. The rate shall cover all testing and supervision required for the work. f) The Contract unit rate of material to be excavated by pneurnatic sinking shall cover all costs. of tabour, material, tools. plant and other equipment and other incidentals and safety provisions and supervision required for pneumatic, sinking as per this Secdon. g) Reduction in contract unit raw for sbiking as a penalty, in pursuance of clause IM7.8. If any well with tilt and/or shift exceeding beyond pemissible values is accepted by the Engineer, the Contractor shall give a reduction in the rates as follows S.No. Amount of tilt and/or AM on the rate(s) for Per- cent deduction

Well Foundations sinking of whole well L z 3. 4. 5. Tilt exceeding the specified permissible value but equal io or within I in 60 Tilt exceeding I in 60 ~10 per cent but equal to or within I in 50 Tilt exceeding I in 50 20 per cent Shift exceeding the specified permissible value but -equal to or within 200 nun Shift exceeding 200 nun but equal to or within 300 nun Shift exceeding 300 min 10 per cent 5 per cent 2 per cent 5 per cent

1200

Penalties for excessive tilt and shift shall be deducted separately. 420'

Brick Masonry Brick Masonry 1300 Brick Masonry

1300

Brick Masonry

1300

1301

BRICK MASONRY

This work shall consist of construction of structures with bricks Jointed together by cement mortar in accordance with the details shown on the drawings or as approved by the Engineer. 234 MATERIALS

All materials to be used in the work shall conform. to the requirements laid down in Section 1000. 235 PERSONNEL

Only trained personnel shall be employed for construction and supervision. 236 CEMENT MORTAR

Cement and sand shall be mixed in specified proportions given in -the drawings. Cement shall be proportioned by weight, taking the unit weight of cement as 1.44 tonne per cubic metre. Sand shall be proportioned by volume taking into account due allowance for bulking. All mortar shall be mixed with a thinimurn quantity of water to produce desired workability consistent with maximum density of mortar. 'Me mix shall be clean and free from injurious type of soil/acid/alkali/ organic matter or deleterious substances. The mixing shall preferably be done in a mechanical mixer operated manually or by power. Hand mixing can be resorted to as long as uniform density of the mix and its strength are assured subject to prior approval of the Engineer. Where permitted, specific permission is to be given by the Engineer. Hand mixing operation shall be carried out on a clean water-tight pWonn, where cement and sand shall be fast mixed dry in the required proportion by being turned over and over, backwards and forwards several times till the mixture is of uniform colour. Thereafter, minimum quantity of water shall be added to bring the mortar to the consistency of a stiff paste. The mortar shall bo mixed for at least two minutes after addition of water. Mortar shall be mixed only in such quantity as required for immediate use. The mix which has developed initial set shall not be -used. Initial set of mortar with ordinary Portland Cement shall normaUy be considered to have taken place in 30 minutes after mixing. In case the mortar has stiffened during initial setting time bod'huse of evaporation of water, the same can be re-tempered by adding water as frequently as needed to restore the requisite consistency, but this re-tempering shall not be permitted after 30 minutes. Mortar unused for more than 30 minutes sh I be rejected and removed from site of work. 237 SOAKING, OF BRICKS

All bricks shall be thoroughly soaked in a tank filled with water for a minimum period of one hour prior to being laid. Soaked bricks 'shall be removed from the tank sufficiently in advance so that they are skin dry at the time of a * ctual laying. Such soaked bricks shall be stacked. on a clean place where they are not contaminated with dirt, earth, etc.

Brick Masonry 238 JOINTS

1300

The thickness of joints shall not exceed 10mm. All joints on exposed faces shall be tooted to give concave finish. 239 LAYING

All brick-work shall be laid in an English bond, even and true to line, in accordance with the drawing or as directed by the Engineer, plumb and level and all joints accurately kept. Half and cut bricks shall not be used except when necessary to complete the bond. Closer in such cases shall be cut to the required size and used near the ends of the walls. The bricks used at the face and also at all angles forming the junction of any two walls shall be selected whole bricks of uniform size, with true and rectangular faces. All bricks shall be laid with frogs up, on a full bed of mortar except in the case -of tile bricks. Each brick shall be properly bedded and set in position by slightly pressing while laying, so that the mortar gets into all their surface pores to ensure proper adhesion. All head and side joints shall be -completely.filled by applying sufficient mortar to brick already placed and on brick to be placed. All joints shall be properly flushed and packed with mortar so that no hollow spaces am Ick No bats or cut bnrks shaU be used except to obtmu dimpnsigns of the different courses for specified bonds or wherever a desired shape' so requires. The brick work shall be built in uniform layers, and for this purpose wooden straight edge with graduations indicating thickness of each course including joint shall be used. Corners and other advanced work shall be raked back. Brickwork shall be done true to plumb or in specified batter. All courses shall be laid truly horizontal and vertical joints shall be truly vertical. Vertical joints in altmmft courses shall come directly one over the other. During constructiolf,. no part of work shall rise more than one metre above the general construction level, to avoid unequo settlement and improW jointing. Where this is not possible in the o0inion of the Engineer, the works shall be raked back according to th6 bond (and not toothed) at an angle not steeper than 45 degrees with prior approval of the Engineer. Toothing may also be permitted where future extension is contemplated. Before laying bricks in foundation, the foundation slab shall be thoroughly hacked, swept clean ana wetted. A layer of mortar not less th.an 12 mm thick shall be spread on the surface, of the foundation slab and the first course of bricks shall -be laid. 240 JOINTING OLD AND NEW WORK

Where fresh masonry is to join with masonry that is partially/entirely set, the exposed jointing surface of the set masonry shall be cleaned, roughened and wetted, so as to effect the best possible bond with the new work. All loose bricks and mortar or other-material shall be removed.

Brick Masonry

1300

In the case of vertical or inclined joints, it shall be furdw ensured that proper bond between the old and new masonry is obtained by interlocking, the bricks. Any portion of the brickwork that has been completed shall remain undisturbed until thoroughly set. In case of sharp corners specially in skew bridges, a flat cutback of 100 mm shall be provided so as to have proper and bonded laying of bricks. 241 CURING

Green work shall be protected from rain by suitable covering and shall be kept I constantly moist on all faces for a minimum period of seven days. Brick work carried out during the day shall be suitably marked indicating the date on which the work jS done so as to keep a watch on the curing period. The top of the masonry work shall be left flooded with water at the close of the day. Watering may be done carefully so as not to disturb or wash out the green mortar. During hot weather, all finished or partly completed work shall be covered or wetted in such a mann er as will prevent rapid drying of the brickwork. During the period of curing of brick work, it shall be suitably protected fn~m all damages. At the close of day's work or for other period of cessation, watering and curing shall have to be maintained. Should the mortar perish i.e. became dry, white or powdery through neglect of curing, work shall be pulled down and rebuilt as directed by the Engineer. -If any stakii -appear during watering, the same shall be removed from the face. 242 SCAFFOLDING

The scaffolding shall be sound, strong and safe to withstand all loads likely to come upon it. The holes which provide resting space for horizontal members shall not be left in masonry under one metre in width or immediately near the skew backs of arches. The holes left in the masonry work for supporting the scaffolding shall be filled and made good. Scaffolding shall be got approved by the Engineer. However the Contractor shall be responsible for its safety. 243 EQUIPMENT

All tools and equipment used for mixing, transporting and *ing of mortar and bricks shall be clean and free from set mortar, dirt or other injurious foreign substances. 244 244.1 General All brickwork shall be finished in a workmanlike manner with the thickness of joints, manner of striking or tooling as described in these above specifications. The surfaces can be finished by "jointing" or "pointing" or by "plastering" as given'in the drawings. For a surface which is to be subsequently plastered or pointed, the joints shall be squarely raked out to a depth of 15 mm, while the mortar is still green. The raked joints FINISHING OF SURFACES

Brick Masonry

1300

shall be well brushed to remove dust and loose particles and the surface shall be thoroughly washed with watix, cleaned and wetted. The mortar for finishing sh all be prepared as per Clause 1304. 244.2 Jointing In jointing, the face of the mortar shall be worked out while still green to give 9 finished surface flush with the face of the biick work. The faces of brick work shall be cleaned to remove any splashes Of mortar during the course of raising the brick work. 244.3 Pointing Pointing shall be carried out using mortar not leaner than 1:3 by volume of cement and sand"or as shown on the drawing. The mortar shall be filled and pressed-intoF the raked joints before giving the required finish. Ile pointing shall W ruled type for which it shall, while still green, be ruled along the centre with half round tools of sbch width as may be specified by the Engineer. The super flush mortar shall then be. taken off from the edges of the lines and the surface of the masonry shall be cleaned of all mortar. The work shall conform to IS:2212. 244.4 Plastering Plastering shall be done where shown on the drawing. Superficial plastering may be done, if necessary, only in structures situated in fast flowing rivers or in severely aggressive environment. Plastering shall be started from top and worked down. All putlog holes shall be properly filled in advance of the plastering -while the scaffolding is being taken down.. Wooden screeds; 75 mm wide and of the thickness of the p1wer shall be fixed vertically 2.5 to 4 metres apart, to act as gauges and guides in applying the plaster. The mortar shall be laid -on the wall between the screeds using the plaster's float and pressing the mortat so that the raked joints a re properly filled. The plaster shall then be finished off with a wooden straight edge reaching across the screeds. The straight edge shall be worked on the screeds with a small upward and sideways motion 50 mm to 75 min atla time. Finally, the surface shall be finished off with a plasterer's wooden float. Metal floats shall not be used. When recommencing the plastering beyond the'work suspended earlier, the edges of the old plaster shall be scrapped, cleaned and wetted before plaster is applied to the adjacent areas. No portion of the surface shall be left unfinished for patching up at a later period. The plaster shall be finished true to plumb surface and to the proper degree of smoothness as directed by the Engineer. The average thickness of pWter shall not be less -than the specified thickness. The minimum thickness over any portion of the surface shall not be less than the specified thickness by more than 3 mm.

Brick Masonry

1300

Any cracks which appear in the surface and all portions which sound hollow when tapped, or are found to be soft or otherwise defective, shall be cut in reIrgular shape and re-done as directed by the Engineer. 244.5 Curing of Finishes. Curing shall be commenced as soon as the mortar used for finishing has hardened sufficiently not to be damaged during curing. It shall be kept wet for a period of at least 7 days. During this period, it shall be suitably protected from all damages. 244.6 Scaffolding for Finishes Stage scaffolding shall be provided for the work. This shall be independent of the structure. 245 ARCHITECTURAL COPING FOR WING/RETURN/PARAPET WALL

This work shall consist of providing an Architectural coping for wingtretum/parapet walls. The material used shall be cement mortar 1:3 or as shown on the drawings prepared in accordance with Clause 1304. The cement mortar shall be laid evenly to an average thickness of 15 mm to the full width of the top of the wall and in continuation a band of 15 mm thickness and 150 mm, depth shall be made out of the mortar along the top outer face of the'walls. 246 ACCEPTANCE OF WORK

All. work shall be true to the lines and levels as indicated on the drawing or as directed by the Engineer, subject to tolerances as indicated in these specifications. Mortar cubes shall be tested in accordance with IS:2250 for compressive strength, consistency of mortar and its water retentivity. The frequency of testing shall be one sample for every 2 cubic metres of mortar, subject to a minimum 3 samples for a day's work. In case of plaster finish, the minimum surface thickness shall not be less than the specified thickness by more than 3mm. 247 MEASUREMENT:S FOR PAYMENT

All brick work shall be measured in cubic metres. Any extra work done by the Contractor over the specified dimensions shall be ignored. In arches, the length of~rch shall be measured as the mean length between the extrados and ifitrados. The work of plastering and pointing shall be measured in square metres of the surface treated. Architectural coping shall be measured in linear metres. 248 RATE

Brick Masonry

1300

The contract unit rate for brick work shall include the cost of all tabour, materials, tools and plant, scaffolding and other expenses incidental to the satisfactory completion of the work, sampling, testing and supervision as described in these specifications and as shown on the drawings. The contract unit rate for plastering shall include the cost of all tabour, materials, tools and plant, scaffolding and all incidental expensei, sampling and testing and supervision as described in these specifications. The contract unit rate for -pointing WWI include erecting and removal of scaffolding.'all tabour, materials, and equipment incidental to complete the pointing, raking out joints, cleaning, wetting, filling with mortar, trowelling; pointing and watering, sampling and testing and supervision as desdibed in these specifications. The contract unit rate for architectural coping shall include cost of all tabour, materials, tools and plant, sampling and testing and supervision as described in these specifications.

Stone Masonry Stone Masonry 1400 Stone Masonry

1400

Stone Masonry

1400

1401

DESCRIPTION

This work shall consist of the construction of structures withstones jointed together by cement mortar in accordance with thedetails shown on the drawings and these specifications or as approved by the Engineer. 249 MATERIALS

All materials used in stone masonry shall conform to Section 1000 except cement mortar for stone masonry which shall conform to Clause 1304. 250 PERSONNEL

Only trained personnel shall be employed for construction and supervision. 251 TYPE OF MASONRY

The type of masonry used for structures shall be random masonry (coursed or uncoursed) or coursed rubble masonry (First sort). However, for bridge work generally, course rubble stone masonry shall be used. The actual type of masonry used for different parts of structures shall be specified on the drawings. For facing work, ashlar masonry shall be used where indicated on the drawings. 252 252.1 General Requirements The dressing of stone shall be as specified for individual type masonry work and it shall also conform to the general requirements of IS: 1597 and requirement for dressing of stone covered in IS: 1129. Other specific requirements are covered separately with respect to particular types of rubble stone work. 252.2 Laying 252.2.1 The masonry work shall be laid to lines, levels, curves and shapes as shown in the plan. The height in cacli course shall be kept same and every stone shall be fine tooled on A beds joints and face full and true. The exposed faces shall be gauged out, grooved, regulated and sunk or plain moulded as the case may be. The faces of each stone between the draft be left rough as the stone comes from quarry except where sacrificial layer is to be provided or plastering is resorted to due to aggressive environment. 252.2.2 Stones shall be sufficiently wetted before laying to prevent absorption of water from mortar. Stratifiect stones Tnust be laid on their natural beds. All bed joints shall be normal to the pressure upon them. Stones in the hearting shall be laid on their broadest face that gives a better opportunity to fill the spaces~ between stones. CONSTRUCTION OPERATIONS

Stone Masonry

1400

The courses of the masonry shall ordinarily . be pre-determined. They shall generally be of the same height. When there is to be variation in the height of courses, the larger courses are to be placed at lower levels, heights of courses decreasing gradually towards the top of the wall. The -practice of placing loose mortar on the course and pouring water on it. to fill the gaps in stones is not acceptable. Mortar may be fluid mixed thoroughly and then poured in the joints. No dry or hollow space shall be left anywhere in the masonry and each stone shall have all the embedded faces completely covered with mortar. In tapered walls, the beds of the stones and the planes of course should be at right angles to the batter. In case of bridge piers with batter on b6th sides, the course shall be horizontal. The bed which is to receive the stone shall be cleaned, wetted and covered with a layer of fresh mortar. All stones shall ' be laid full in mortar both in bed and vertical joints and settled carefully in place with a wooden mallet immediately on placement and solidly embedded in mortar before it has set. Clean chips and spalls shall be wedged into the mortar joints and bed wherever necessary to avoid thick beds or joints of mortar. When the foundation masonry is laid directly on rock, the face stones of the first course shall be dressed to fit into rock snugly when pressed down in the mortar bedding over the rock. No dry or hollow space shall be left anywhere in the masonry and each stone shall have all the embedded faces completely covered with mortar. For masonry works over rock, a levelling course of 100 mm thickness and in concrete M 15 shall be laid over rock and then stone masonry work shall be laid without foundation concrete block. ' Face works and hearting shall be brought up evenly but the top of each1course shall not be levelled up by the use of flat chips. For sharp comers specially in skew bridgesthrough stones shall be used in order to avoid spalling of comers. In case my stone already set in mortar is disturbed or the joints broken, it ihall be taken out without disturbing the adjoining stones and joints. Dry mortar and stones thoroughly cleaned from the joints and stones and the stones reset in fresh mortar. Attempt must never be made to slide one stone on top of another, freshly laid. Shaping and dressing shall be done before the stone is laid in the work. No dressing and hammering, which will loosen the masonry, will be allowed after it is once placed. Allnecessary chases for joggles, dowels and clamps should be formed before hand. Sufficient transverse bonds shall be provided by the use of bond stone extending from the front to the back of the wall and in case of thick wall from outside to the interior and vice versa. In the latter case, bond stones shall overlap each other in their arrangement. In case headers are not available, precast headers of M 15 concrete shall be used. Cast-in-situ headers are not permitted. Stones shall break joint on the face for at least half the height of the course and the bond shall be carefully maintained throughout.

Stone Masonry

1400

In band work at all angle junctions of walls, the stones at each alternate course shall be carried into each of the respective walls so as to unite the work thoroughly. The practice of building up thin faces tied with occasional through stones and filling up the middle with small stuff or even dry packing is not acceptable. All quoins and the angles of the opening shall . be made from selected stones, carefully squared and bedded and arranged to bond alternately long and short in both directions. All vertical joints shall be truly vertical. Vertical joints shall be staggered as far as possible. Distance between the nearer vertical joints of upper layer and lower shall not be less than half the height of the course. Only rectangular shaped bond stones or headers shall be used. ,Bond stones shall overlap each other by 150 mm or more. All connected masonry in a structure shall be carried up nearly at one uniform level throughout but when breaks are unavoidable the masonry shall be raked in sufficiently long steps to facilitate jointing of old and new work. The stepping of raking shall not be more than 45 degrees with the horizontal. 252.3 Random Masonry (Uncoursed and Coursed) 252.3.1 Dressing : Stone shall be hammer dressed on the face, the sides and beds to enable it to come in proximity with the neighbouring stone. The bushing on the exposed face shall not be more than 40 mm. 252.3.2 Insertion of chips : Chips and spalls of stone may be used wherever necessary to avoid thirk morm beAs or joints and it shall be ensured that no hollow spaces are left anywhere in the masonry. The chips shall not be used below hearting stones to bring these upto the level of face stones. Use of chips shall be restricted to filling of interstices between the adjacent stones in hearting and they shall not exceed 20 per cent of the quantity of stone masonry. 252.3.3 Hearting stones : The hearting or interior filling of the wall face shall consist of rubble stones not less than 150 min in any direction, carefully laid, harnmered down with a wooden mallet into position and solidly bedded in mortar. The hearting should be laid nearly level with facing and backing. 252.3.4 Bond stones : Through bond stones -shall be provided in masonry upto 600 mm thickness and in case of masonry above 600 mm thickness, a set of two or mbre bond stones overlapping each other at least by 150 mm shall be provided in a line from face to back In case of highly absorbent types of stones (porous limestone and sandstones, etc.,) the bond stone shall extend only about two-third into the wall, as through stones in such cases may give rise to penetration of dampness and therefore, for all thicknesses of such masonry, a set of two or more bond stones overlapping each other by at least 150 mm shall be provided. One bond stone or a set of bond stones shall be provided for every 0.50 sq. in. of the masonry surface. 252.3.5 Quoin stone : Quoin stone i.e. stone speci#11y selected and neatly

Stone Masonry

1400

dressed for forming an external angle in masonry work, shall not be less than 0.03 cubic metre in voldme. 252.3.6 Plum stone : The plum stones are selected long stones embedded vertically in the interior of the masonry to form a bond between successive courses and shall be provided at about 900 mm intervals. 252.3.7 Laying: The masonry shall be laid with or without courses as specified. The quoins shall be laid header and stretcher alternately. Every stone shall be fitted to the adjacent stone so as to form neat and close joint. Face stone shall extend and bond well in the back., These shall be arranged to break joints, as much as possible, and to avoid long vertical lines of joints. 252.3.8 Joints : The face joints shall not be more than 20 mm thick, but shall be sufficiently thick to prevent stone-to-stone contact and shall be completely filled with mortar. 252.4 Square Rubble - Coursed Rubble (First Sort) 252.4.1 Dressing : Face stones shall be harnmer dressed on all beds and joints so as to give them rectangular shape. These shall be square on all joints and beds. The bed joints shall be chisel drafted for at least 80 mm back from the face and for at least 40 mm for the side joints. No~_portion of the dressed surface shall show a depth of gap more than 6 mm from the straight edge placed on it. The remaining unexposed portion of the stone shall not project beyond the surface of bed and side joints. The requirements regarding bushing shall be the same as for random rubble masonry.. 252.4.2 Hearting stones : The hearting or interior filling of the wall face shall consist of flat bedded stone carefully laid, on prepared beds- in mortar. The use of chips shall be restricted to the filling of interstices between the adjacent stones in hearting and these shall not exceed 10 per cent of the quantity of masonry. While using chips it shall be ensured that no hollow spaces are left anywhere in the masonry. 252.4.3 Bond stones : The requirements regarding through or bond stone shall be the same as for random rubble masonry, but these, shall be provided at 1.5 metre to 1.8 metrt apart clear in every course. 252.4.4 Quoin stone : The quoins shall be of the same height of the course in which these occur and shall be formed of header stones not less than 450mm in length. They shall be laid lengthwise alternately along each face, square in their beds which shall be fairly dressed to a depth of at least 100 mm. 252.4.5 Face stone : Face stones shall tail into the work for not less than their heights and at least one-third of the stones shall tail into the work for a length not less than twice their height. These shall be laid as headers and stretchers alternately. 252.4.6 Laying : The stones shall be laid on horizontal courses and all vertical

Stone Masonry

1400

joints should be truly vertical. The quoin stones should be laid header and stretcher alternately and shall be laid square on their beds, which shall be rough chisel dressed to a depth of at least 100 mm. 252.4.7 Joints The face joints shall not be more than 10 mm thick, but shall be sufficiently thick to prevent stone-to-stone contact and shall be completely filled with mortar. 252.5 Ashlar Masonry (Plain Ashlar) 252.5.1 Drqssing : Every stone shall be cut to the required size and shape, chisel dressed on all beds and joints so as to be free from all bushing. Dressed surface shall not show a depth of gap of more than 3 mm from straight edge placed on it. 'Me exposed faces and joints, 6 mm from the face shall be fine tooled so that a straight edge can be laid along the face of the stone in contact with every point. All visible angles and edges shall be true and square and free from chippings. The corner stones (quoins) shall be dressed square and comer shall be straight and vertical. 252.5.2 Bond stones : Through bond stones shall be provided in masonry upto 600 mm thickness and in case of masonry above 600 mm thickness, a set of two or more bond stones overlapping each other at least by 150 mm shall be provided in a line from face to back. In case of highly absorbent types of stones (porous limestone and sandstones, etc.,) the bond stone shall extend only about two-third into the wall, as through stones in such cases may give rise to penetration of dampness and, therefore, for all thicknesses of such masonry a set of two or more bond stones overlapping each other by at least 150 mm shall be provided. One bond stone or a set of bond stones shall be 1.5 metres to 1.8 metres apart clear in every course. 252.5.3 Laying : The face stone shall be laid header and stretcher alternately, the header being arranged to come as nearly as possible in the middle of stretchers above and below. Stones shall be laid in regular courses not less than 300 mm in height and all courses of the same height unless otherwise specified. No stone shall be less in width than its height or less in length than twice its height, unless otherwise specified. 252.5.4 Joints : All joints shall be full of mortar. These shall not be less than 3 mm thick. Face joints shall be uniform throughout, and a uniform recess of 20 mm depth from face shall be left with the help of a stone plate during, the progress of work. 252.6 Pointing Pointing shall be carried out using mortar not leaner than 1:3 by volume of cement and sand pr as shown on the drawing. The mortar shall be filled and pressed into the raked out joints .,before giving the required finish. The pointing shall conform to Clause 1312.3 of the specification. The work shall conform to IS:2212. Tim thickness of joints shall not

Stone Masonry

1400

be less than 3 mm for Ashlar masonry. However, the maximum thickness of joints in different works shall be as follows:
Random Rubble Coursed Rubble Ashlar Masonry 1405.7. Curing Curing shall conform to Clauses 1309 and 1312.5 20 mm 15 nun 5 turn

252.7 Scaffolding For scaffolding Clause 1310 shall apply. 252.8 Weep Holes Weep holes shall conform to Clause 2706. 252.9 Jointing with Existing Structures For Joind ng with existing structures, the specifications given under Clause 1308 shall apply. 253 ARCHITECTURAL COPING FOR WING/RETURN/ PARAPET WALLS

Architectural coping for wing/return/parapet walls shall conform to :1ause 1313. 254 TESTS AND STANDARD OF ACCEPTANCE

All work shall be done to the lines and levels as indicated on he drawing or as directed by the Engineer subject to tolerances as pecified in these specifications. Mortar cubes shall betakenin accordance with IS:2250 for compressive strength, consistency of mortar and its water retentivity. The frequency of testing shall be one sample for every two cubic metres of mortar subject to a minimum 3 samples for a day's work. 255 MEASUREMENTS FOR PAYMENT

Stone masonry shall be measured in cubic metres. In arches, the length of arch shall b~ measured as the mean length between the extrados and intrados. The work of pointing shall be measured in square metres. Architectural coping shall be measured in linear metres. 256 RATE

The contract unit rate for stone masonry shall include the cost of all labour, materials, tools and plant, scaffolding, sampling and testing, supervision and other expenses incidental to the satisfactory completion of the work 8 described herein above. The contract unit rate for pointing shall include erecting and removal of scaffolding, all labour, materials and equipment incidental to complete pointing, raking out joints, cleaning, wetting, filling with mortar, trowelling, pointing and watering, sampling and testing and supervision as described in these specifications.

Stone Masonry

1400

The I tontrad )ratd for architectural coping shall include the cost of all labour, materials, tools and plant, sampling and testing and supervision as described in these specifications.

Formwork Formwork 1500 Formwork

1500

Formwork

1500

1501

DESCRIPTION

Formwork shall include all temporary or permanent forms required for forming the concrete of the shape, dimensions and surface finish as shown on the drawing or as directed by the Engineer, together with all props, staging, centering, scaffolding and temporary construction required for their support. The design, erection and removal of formwork shall conform to IRC:87 "Guidelines for Design and Erection of Falsework for Road Bridges" and these specifications. 257 MATERIALS

All materials shall comply with the requirements of IRC:97. Materials ahd components used for formwork shall be examined for damage or excessive deterioration before use / re-use and shall be used only if found suitable after, necessary repairs. In case of timber formwork, the inspection shall not only cover physical damages but also signs of attacks by decay, rot or insect attack or the development of splits. Forms shall, be constructed with metal or timber. The metal used for forms shall be of such thickness that the forms remain true to shape. All bolts should be countersunk. The use of approved internal steel ties or steel or plastic spacers shall be permitted. Structural steel tubes used as support for forms shall have a minimum wall thickness of 4 mm. Other materials conforming to the requirements of IRC:87 may also be used if approved by the Engineer. 258 DESIGN OF FORMWORK

258.1 The Contractor shall furnish the design and drawing of complete formwork (i.e. the forms as well as their supports) for approval of the Engineer before any erection is taken up. If proprietary system of formwork is used, the Contractor shall furnish detailed information as per Appendix 150011 to the Engineer for approval. Notwithstanding any approval or review of drawing and design by the Engineer, the Contractor shall be entirely responsible for the adequacy and safety for formwork. 258.2 The design of the formwork shall conform to provisions of IRC:87. It shall ensure that the forms can be conveniently/ removed without disturbing the concrete. The design shall facilitate proper and safe access to all parts of formwork for inspection. 258.3 In the case of prestressed concrete superstructure, careful consideration shall be given to redistribution of loads on props due to prestressing. 259 WORKMANSHEP

259.1 The formwork shall be robust and strong and the joints shall be leak-proof. Balli shall not be used as staging. Staging must have cross bracings and diagonal bracings in both directions. Staging shall be provided with an appropriately designed base plate resting on firm strata. 259.2 The number of joints in the formwork shall be kept to a minimum by - using large

Formwork

1500

size panels. The design shall provide for proper "soldiers" to facilitate alignment. All joints shall be leak proof and must be properly sealed. Use of PVC JOINT sealing tapes, foam rubber or PVC T-section is essential to prevent leakage of grout. 259.3 As far as practicable, clamps shall be used to hold the forms together. Where use of nails is unavoidable minimum number of nails shall be used and these shall be left projecting so that they can be withdrawn easily. Use of double headed nails shall be preferred. 259.4 Use of ties shall be restricted, as far as practicable. Wherever ties are used they shall be used with HDPE sheathing so that the ties can easily be removed. No parts prone to corrosion shall be left projecting or near the surface. The sheathing shall be grouted with cement mortar of the same strength as that of the structure. 259.5 Unless otherwise specified, or directed, chanifers or fillets of sizes 25 mm x 25 mm shall be provided at all angles of the formwork to avoid sharp comers. The charrifers, bevelled edges and mouldings shall be made in the formwork itself. Opening for fixtures and other fittings shall be provided in the shuttering as directed by the Engineer. 259.6 Shuttering for walls, sloping members and thin sections of considerable height shall be provided with temporary openings to permit inspection and cleaning out before placing of concrem. 259.7 The f6rmwork shall be constructed with precamber to the soffit to allow for deflection of the formwork. Pre-camber to allow for deflection of formwork shall be in addition to that indicated for the permanent structure in the drawings. 259.8 Where centering trusses or launching trusses are adopted for casting of superstructure, the joints of the centering trusses, whether welded, riveted or bolted should be thoroughly checked periodically. Also, various members of the centering trussSs should be periodically examined for proper alignment and unintended deformation before proceeding with the concreting. They shall also be periodically checked for any deterioration in quality due to steel corrosion. 259.9 The formwork shall be so made as to produce a finished concrete true to shape, line and levels and dimensions as shown on the drawings, subject to the tolerances. specified in- respective sections of these specifications, or as directed by the Engineer. 259.10 Where metal forms are used, all bolts and rivets shall be countersunk and well ground to provide a smooth, plane surface. Whem, timber is used it shall be well seasoned, free from loose knots, projecting nails, splits or other defects that may mar the surface of concrete. 259.11 Forms shall be, made sufficiently rigid by the use of ties and bracings to prevent any displacement or sagging between supports. They shall be strong enough to

Formwork

1500

withstand all pressure, ramming and vibration during and after placing the concrete. Screw jacks or hard wood wedges where required shall be provided to make up any settlement in the formwork either before or during the placing of concrete. 259.12 The formwork shall take due account of the calculated amount of positive or negative camber so as to ensure the correct final shape of the structures, having regard to the deformation of false work, scaffolding or propping and the instantaneous or deferred deformation due to various causes affecting prestressed structures. 259.13 Suitable camber shall be provided to horizontal members of structure, specially in long spans to counteract the effects of deflection. The formwork shall be so fixed as to provide for such camber. 259.14 The formwork shall be coated with an. approved release agent that will effectively prevent sticking and will not stain the concrete surface. Lubricating (machine oils) shall be prohibited for use as coating. 260 FORMED SURFACE AND FE41SH

The formwork shall be lined with material approved by the Engineer so as to provide a smooth finish of uniform texture and appearance. This material shall leave no stain on the concrete and so fixed to its backing as not to impart any blemishes. It shall be of the same type and obtained from only one source throughout for the construction of any one structure. The contractor shall make good any imperfections in the resulting finish as required by the Engineer. Internal ties and -embedded metal parts shall be carefully detailed and their use shall be subject to the approval of the Engineer. 261 PRECAUTIONS

(i) Special measures in the design of formwork shall be taken to ensure that it does not hinder the shrinkage of concrew The soffit of the formwork shall be so designed as to ensure that the formwork does not restrain the shortening and/or hogging of beams during prestressing. The forms may be removed at the earliest opportunity subject to the minimum time for removal of forms with props retained in, position. (ii) Where necessary, formwork shall be so arranged that the soffit fom properly supported on props only can be retained in position for such period as may be required by maturing conditions. (iii) Any cut-outs or openings provided in any structural member to facilitate erection of formwork shall be closed with the same grade of concrete as the adjoining structure immediately after removal of formwork ensuring watertight joints. (iv) Provision shall be made for safe access on, to and about the formwork at the levels as required. (v) Close watch shall be maintained to check for settlement of formwork during concreting. Any settlement of formwork during concreting shall be promptly rectified. (vi) Water used for curing should not be allowed to stagnate near the base plates supporting the staging and should be properly drained.

262

PREPARATION OF FORMWORK BEFORE CONCRETING

Formwork

1500

The inside surfaces of forms shall, except in the case of permanent form work or where otherwise agreed to by the Engineer be coated with a release agent supplied by approved manufacturer or of an approved material to prevent adhesion of concrete to the formwork. Release agents shall be applied strictly in accordance with the manufacturer's instructions and shall not be allowed to come into contact ,with any reinforcement or prestressing tendons and anchorages. Different release agents shall not be used in formwork for exposed concrete. Before re-use of forms, the following actions shall be taken
(i) The contact surfaces of the forms shall be cleaned carefully and dried before applying a release agent.~ (ii) It should be ensured that the release agent is appropriate to the surface to be coated. The same type and make of release agent shall be used throughout on similar f0TMW0Tk materials and different types should not be mixed. (iii) The form surfaces shall be evenly and thinly coated with release agent. The vertical.surface shall be treAted before horizontal surface and any excess wiped out. (iv) The release agent shall not come in contact with reinforcement or the hartlened concrete.

All forms shall be thoroughly cleaned immediately before concreting. The Contractor shall give the Engineer due notice before placing any concrete in the forms to permit him to inspect and approve the formwork, but such inspection shall not relieve the contractor of his Yesponsibility for safety of formwork, men, machinery, materials and finish or tolerances of concrete. 263 REMOVAL OF FORMWORK

The scheme for removal of formwork (i.e. de-shuttering and decentering) shall be planned in advance and furnished to the Engineer for scrutiny and approval. No formwork or any part thereof shall be removed without prior approval of the Engineer. The formwork shall be so removed as not to cause any damage trjyjtR%. CMZift %t&l bc %radually and uniformly lowered in such a manner as to permit the concrete to take stresses due to iis own weight uniformly and gradually to avoid any shock or vibration. Where not specifically approved, the time of removal of formwork (when ordinary Portland Cement isused without any admixtures at an ambient temperatures exceeding 10 degrees Celsius) shall be as under a) Walls. piers. abutments, columns and vertical faces of structuml members b) c) d) Soffits of Slabs (with props left under) Props Oeft under slabs) Soffit of Girders 7 days (with props left under) e) Props aeft under girden) 21 days 14 days 3 days 12 to 48 hours as may tr decided -by the Hngirieer

Formwork

1500

Where there are re-entrant,angles in the concrete sections, the formwork should be removed at these sections as soon as possible after the concrete has set, in order to avoid cracking due to shrinkage of concrete. 264 RE-USE OF FORMWORK

When formwork is dismantled, its individual components shall be examined for damage and damaged pieces shall, be removed for rectification. Such examination shall always be carried out before being used again. Before re-use all components shall be cleaned of deposits of soil, concrete or other unwanted materials. Threaded parts shall be biled after cleaning. All bent steel props shall be straightened before re-use. The maximum deviation from straightness is 1/606 of the length. The maximum permissible axial loads in used props shall be suitably reduced depending upon their conditiofi. The condition of the timber components, plywood and steel shuttering plates shall be examined closely for distortion and defects before re-use. 265 SPECIALISM FORMWORK

Specialised formwork may be required in the case of slipform work, underwater concreting, segmental construction etc. Such specialised formwork shall be designed and detailed by competent agencies and a set of complete working drawings and installation instructions shall be supplied to the Engineer. The site personnel shall be trained in the erection and dismantling as well as operation of such specialised formwork. In case proprietary equipment is used, the supplier shall supply drawings, details, installation instructions, etc, in the form of manuals along with the formwork. Where specialised formwork is used, close co-ordination with the design of permanent structure is necessary. For slipform the rate of slipping the formwork shall be designed for each individual case taking into account various parameters including the grade of concrete, concrete strength, concrete temperature, ambient temperature, concrete admixtures,, etc. In the case of segmental construction, the concrete mix shall be normally designed for developing high early strength so that the formwork is released as early as possible. In order to verify the time and sequence of striking/removeaal of specialised formwork, routine field tests for the consistency of concrete and strength development are mandatory and shall be carried out before adoption. For specialised formwork,, the form lining material may be either plywood or steel sheet of appropriate thickness. Plywood is preferred where superior quality of surface is desired, whereas steel sheeting is normally used where large number of repetitions are involved. 266 TESTS AND STANDARDS OF ACCEPTANCE

The materials shall be tested in accordance with these Specifications and shall meet the prescribed criteria.

Formwork

1500

The work shall conform to these Specifications and shall meet the prescribed standards of acceptance. 267 MEASUREMENTS FOR PAYMENT

Unless stated otherwise the rate for concrete in Plain Concrete or Reinforced Concrete or Prestressed Concrete shall be deemed to include all formwork required in accordance with this section and shall not be measured separately. Where it is specifically stipulated in the Contract that the formwork shall be paid for separately, measurement of formwork shall be taken in square metres of the surface area of concrete which is in contact with formwork. 268 RATE

The unit rate of the Plain Concrete or Reinforced Concrete or Prestressed C oncrete as defined in respective sections shall be deemed to cover the costs of all formwork, including cost of all materials, labour, tools and plant required for design, construction and removal of formwork and supervision as described in this section including properly supporting the members - until the concrete is cured, set and hardened as required. Where the contract unit rate for formwork is specifically provided as a separate item, it shall include the cost of all materials, labour, tools and plant required for design, construction and removal of formwork and supervision as described in this Section including properly supporting the members until the concrete is cured, set and hardened as required.

Steel Reinforcement (Untensioned) Steel Reinforcement (Untensioned) 1600 Steel Reinforcement (Untensioned)

1600

Steel Reinforcement (Untensioned)

1600

1601

DESCRIPTION

This work shall consist of furnishing and placing coated or uncoated mild steel or high strength deformed reinforcement bars (untensioned) of the shape and dimensions shown on the drawings and conforming to these Specifications or as approved by the Engineer. 269 GENERAL

Steel for reinforcement shall meet with the requirements of Section 1000. Reinforcements may be either-m.ild steel/medium tensile steel or high strength deformed bars. They may be uncoated or coated with epoxy or with -approved protective coatings. 270 PROTECTION OF REINFORCEMENT

Uncoated reinforcing steel shall be protected from rusting or chloride contamination. Reinforcements shall be free from rust, mortar, loose mill scale, grease, oil or paints. This may be ensured either by using reinforcement fresh from the factory or thoroughly cleaning all reinforcement to remove rust using any suitable method such as sand blasting, mechanical wire brushing, etc., as directed by the Engineer. Reinforcements shall be stored on blocks, racks or platforms and above the ground in a clean and dry condition and shall be suitably marked to facilitate inspection and identification. Portions of uncoated reinforcing steel and dowels projecting from concrete, shall be protected within one week after initial placing of concrete with a brush coat of neat cement mixed with water to a consistency of thick paint. This coating shall be removed by lightly tapping with a hammer or other tool not more than one week before placing of the adjacent pour of concrete. Coated reinforcing steel shall be protected against damage to the coating. If the coating.on the bars is damaged during transportation or handling and cannot be repaired, the same shall be rejected. 271 BENDING OF REINFORCEMENT

Bar bending schedule shall be furnished by the Contractor and got approved by the Engineer before start of work. Reinforcing steel shall conform to the dimensions and shapes given in the approved Bar Bending Schedules. Bars shall be bent cold to the specified shape and dimensions or as directed by the Engineer using a proper bar bender, operated by hand or power to obtain the correct radii of bends and shape. Bars shall not be bent or straightened in a manner that will damage 'the parent material or the coating. Bars bent during transport or handling shall- be straightened before being used on work and shall not be heated to facilitate straightening.

Steel Reinforcement (Untensioned) 272 PLACING OF REINFORCEMENT

1600

a) The reinforcement cage should generally be fabricated in the yard at ground level and then shifted and placed in position. The reinforcement shall be placed strictly in accordance with the drawings and shall be assembled in position only when the structure is otherwise ready for plicing of concrete. Prolonged time gap between assembling of reinforcements and casting of concrete, which may result in rust formation on the surface, shall not be 'permitted. , b) Reinforcement bars shall be placed accurately in position as shown on the drawings. The bars, crossing one another shall be tied together at every intersection with binding wire (annealed), conforming to IS:280 to make the skeleton of the reinforcement rigid such that the reinforcement does not get displaced during placing of concrete, or any other operation. T11e diameter of binding wire shall not be less than I min. c) Bars shall be kel;t in position usually by the following methods: (i) In case of beam and slab construction, industrially produced polymer oover blocks of thickriess equal to the specified cover shall be placed between the bars and formwork subject to satisfactory evidence that the polymer composition is not harmful to concrete and reinforcement. Cover blocks -made of concrete may be permitted by the Engineer, provided *they have the same strength and specification as those of the member. (ii) In case of dowels for columns and walls, the vertical reinforcement shall be kept in position by means of timber templates with slots cut in them accurately, or with cover blocks tied to, the reinforcement. Timber templates shall be removed after the concreting has'progressed upto a level just below their location. (iii) Layers of reinforcements shall be separated by spacer bars at approximately one metre intervals. The minimurn diameter of spacer bars shall be 12 mm or equal to maximum size of main reinforcement or maximum size of, coarse aggregate, whichever is greater. Horizontal reinforcement shall not be allowed to sag. between supports. (iv) Necessary stays, blocks, metal chairs, spacers, metal hangers, supporting wires etc, or other subsidiary reinforcement shall be provided to fix the reinforcements firmly in its correct position. (v) Use of pebbles, broken stone, metal pipe, brick. mortar or wooden blocks etc., as devices for positioning reinforcement shall not be'permitted. d) Bars coated with epoxy or any other approved protective coating shall beplaced on supports that do not damage the coating. Supports shall be installed in a manner such that planes of weakness are not created in hardened concrete. The coated reinforcing steel shall be held in place by use of plastic or plastic coated binding wires especially manufactured for the purpose. Reference shall be made to Section 1000 for other requirements.

e) Placing and fixing of reinforcement shall be inspected and approved by the Engineer before concrete is deposited. 273 273.1 Lapping All reinforcement shall be furnished in full lengths as indicated on the drawing. No splicing of bars, except where shown on the drawing, will be permitted without approval of the Engineer. The lengths of the splice shall be as indicated on drawing or as approved by the Engineer. Where practicable, overlapping bars shall n * ot touch each other, and shall be kept apart by 25 mm oi 1 1/4 times the maximum size of coarse aggregate, whichever is greater. If this is not feasible, overlapping bars shall be bound with annealed steel binding wire, notless than I mm diameter and twisted fight in such a manner as to BAR SPLICES

Steel Reinforcement (Untensioned)

1600

maintain minimum clear cover to the reinforcement from the concrete surface. Lapped splices shall be staggered or located at points, along the span where stresses are low. 273.2 Welding 273.2.1 Splicing by welding of reinforcement will be permitted only if detailed on the drawing or approved by the Engineer. Weld shall develop an ultimate strength equal to or greater than that of the bars connected. 273.2.2 While welding may be permitted for mild steel reinforcing bars conforming. to IS:432, welding of deformed bars conforming to IS:1786 shall in general be prohibited. Welding may be permitted in case of bars of other than S 240 grade including special welding grade of S 415 grade bars conforming to IS: 1786, for which necessary chemical analysis has been secured and the carbon equivalent (CE) calculated from the chemical composition using the formula CE = C + Mn . + ~jr+Mg+V Ni+Cu 6 is 0.4 or less. 273.2.3 The method of welding shall conform to IS:2751 and IS:9417 and to any supplementall specifications to the satisfaction of the Engineer. Welding may be carried out by metal arc Welding process. Oxyacetelene welding shall not be permissible. Any other process may be used subject to the approval of the Engineer and necessary additional requirements to ensure satisfactory joint performance. Precautions on over heating, choice of electrode, selection of correct current in arc welding etc., should be strictly observed. All bars shall be butt welded except for smaller diameter bars (diameter of less than 20 mm) which may be lap welded. Single-V or Double-V butt joints may generally be used. For vertical bars single bevel or double bevel joints may be used. Welded joints shall be located well away from bends and not less than twice the bar diameter away from a bend. Generally, shop welding in controlled conditions is to be preferred, where feasible. Site welding where necessary shall, however, be permitted when the facilities, equipment, process, consumables, operators, welding procedure are adequate to produce and maintain uniform quality at par with that attainable in shop welding to the satisfaction of the Engineer. Joint welding procedures which are to be employed shall invariably be established by a procedure specification. All welders and welding operators to be employed shall have to be qualified by tests prescribed in IS:2751. Inspection of welds shall conform to IS:822 and destructive or non-destructive testing may be undertaken when deemed necessary. 5 15

Steel Reinforcement (Untensioned)

1600

Joints with weld defects detected by visual inspection or dimensional check inspection shall not be accepted. Suitable means shall be provided for holding the bars securely in position during welding. It must be ensured that no voids are left in welding. When welding is done in 2 or 3 stages, previous surface shall be cleaned properly. Bars shall be cleaned of all loose scale, rust, grease, paint and other foreign matter before carrying out welding. Only competent and - experienced welders shall be employed on the work with the approval of the Engineer. No welding shall be done on coated bars. M.S. electrodes used for welding shall conform to IS:814. 273.2.4 Welded joints shall preferably be located at points where steel will not be subject to more than 75 per cent of the 'maximum permissible stresses and welds so staggered that at any one section, not more than 20 per cent of the bars are welded. 273.2.5 Welded pieces of reinforcement shall be tested. Specimens shall be taken from the site and the number and frequency of tests shall be .' as directed by the Engineer. 273.3 Mechanical Coupling of Bars Bars may be joined with approved patented mechanical devices as indicated on the drawing or as approved by the Engineer e.g. by speclal grade steel sleeves swagged on to bars in end to end contact or by screwed couplers. In case such devices are permitted by the Enginl6er, they shall develop at least 125 per cent of the characteristic strength of the reinforcement bar. 274 TESTING AND ACCEPTANCE

The material shall be tested in accordance with relevant IS specifications and necessary test certificates shall be furnished. Additional tests, if required, will be got carried out,by the Contractor at his own cost. The fabrication, furnishing and placing of reinforcement shall be in accordance with these specifications and shall be checked and accepted. by the Engineer. 275 MEASUREMENTS FOR PAYMENT

Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work, excluding overlaps. From the length so measured, the weight of reinforcement shall be calculated in tonnes on the basis of IS: 1732. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods for binding and placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 276 RATE

The contract unit rate for coated/uncoated reinforcement shallcover the cost of material, fabricating, transporting, storing, bending, placing, binding and fixing in position as

Steel Reinforcement (Untensioned)

1600

shown'on the drawings as per these specifications and as directed by the Engineer, including all labour, equipment, supplies, incidentals, sampling, testing and supervision. The unit rate for coated reinforcement shall be deemed to also include cost df all material, labour, tools and 'plant, royalty, transportation and expertise required to carry out the work. The rate shall also cover sampling, testing and supervision required for the work.

Structural Concrete Structural Concrete 1700 Structural Concrete

1700

Structural Concrete

1700

1701

DESCRIPTION

The work shall consist of furnishing and placing structural concrete and incidental construction in accordance with these specifications and in conformity with the lines, grades and dimensions, as shown on the drawings or as directed by the Engineer. 277 MATERIALS.

All materials shall conform to Section 1000 of these Specifications. 278 GRADES OF CONCRETE

278.1 The grades- of concrete shall be designated by the characteristic strength as given in Table 1700-1, where the characteristic strength is defined'as the strength of concrete below which not more than 5 per cent of the test results are expected to fall. TABLE 1700-1. Grade Designation M 15 M 20 M 25 M 30 M 35 M 40 M 45 M 50 M 55 15 20 25 30 35 40 45 50 55 Specified characteristic Compressive strength of 150 mm cubes at 28 days, In MPa

278.2 The lowest grades of concrete in bridges and corresponding minimum cement contents and water-cement ratios shall be maintained as indicated in Tables 17M2 and 17M3. TABLE 1700-2 FOR BRIDGES WITH PRESTRESSED CONCRETE OR THOSE THOSE THAT WITH INDIVIDUAL SPAN LENGTHS MORE THAN 30 M OR ARE BUILT WITH INNOVATIVE DESIGN/CON STRUCTION (A) MINIMUM CEMENT CONTENT AND MAXIMUM WATER CEMENT RATIO Structural Member MbL cement content for all exposure conditions ft/cum) Exposure conditions Max. water cement ratio

Structural Concrete Normal a) by c) Severe 360 400 0.40 0.45 0.45 .0.45 0.40

1700

PCC mernbers RCC members PSC members400

(B) MINIMUM STRENGTH OF CONCRETE Member Moderate a) b) c) Conditions of Exposure Severe PCC members RCC members PSC membersM 35 M 25 M 35 M 40 M 30 M 40

TABLE 1700-3. FOR BRIDGES OTHER THAN THOSE MENTIONED IN TABLE 1700-2 AND FOR CULVERTS AND OTHER INCIDENTAL CON. STRUCTION (A) MINIMUM CEMENT CONTENT AND MAXIMUM WATER CEMENT RATIO Structural Member (kgtcu.m) Exposure conditions Normal 0.50 0.45 310 250 400 -F 0.45 310 0.40 ratio Exposure conditions Severe Normal Severe Min. cement content Max. water cement

b) RCC members a) PCC members

(B) MINIMUM STRENGTH OF CONCRETE Member Moderate a) PCC members b) RCC members Conditions of Exposure Severe M 15 M 20 M 20 M 25 7

Notes Applicable to Tables 1700-2 and 1700-3

Structural Concrete

1700

(i) The minimum cement content is based on 20 mm aggregate (nominal max. size). For 40 nun and larger size aggregates, it may be reduced suitably but the reduction shall not be more than 10 per cent. (ii) per cent For underwater concreting. the cement content shall be increased by 10

(iii) Severe conditions of exposure shall mean alternate wetting and drying due to sea spray, alternate wening and drying combined with freezing and buried in soil having corrosive effect. (iv) Moderate conditions of exposure shall mean other that those mentioned in (iii) above. The cement content shall be as low as possible but not less than the quantities specified above. In no case shall it exceed 540 kg/cu.m. of concrete. 278.3 Concrete used in any component or structure shall be specified by designation along with prescribed method of design of mix, i.e. "Design Mix" i or "Nominal Mix". For all items of concrete, only 'besign Mix" shall be used, except where "Nominal Mix" concrete is permitted as per drawing or by the Engineeir."Nominal Mix" may bepermitted only for minor bridges and culverts or other incidental construction where strength requirements are upto M 20 only. "Nominal Mix" may also be permitted for non-structural concrete or for screed below open foundations. 278.4 If the Contractor so elects, the Engineer may permit the use of higher grade concrete than that specified on the drawing, in which event the higher grade concrete shall meet the specifications applicable thereto without additional compensation. 279 PROPORTIONING OF CONCRETE

Prior to the start of construction, the Contractor shall design the mix in case of "Design Mix Concrete" or propose noininal mix in case of "Nominal Mix Concrete", and submit to the Engineer for opproval, the proportions of materials, including admixtures to be used. Water-reducing admixtures (including plasticisers or super-pilasticisers) may be used at the Contractor's option, subject to the approval of the Engineer. Other types of admixtures shall be prohibited, unless specifically permitted by the Engineer. 279.1 Requirements of Consistency The mix shall have the consistency which will allow proper placement and consolidation in the required position. Every attempt shall be made to obtain uniform consistency. The optimum consistency for various types of structures shall be as indicated in Table 1700-4, or as directed by the Engineer. The slump of concrete shall be checked as per IS:516. TABLE 1700-4.

Structural Concrete TYPE SLUMP (mm) I 25 slump concrete to allow proper compaction (b) 2. plain cement concrete 25 40 50 RCC structures with widely spaced reinforcements; e.g. solid columns, piers, abutments, footings, well steining 3. RCC structures with fair degree of congestion of 50 75 (a)

1700

Structures with exposed inclined surface requiring low

reinforcement; e.g. pier and abutment caps, box culverts well curb, well cap, walls with thickness greater than 300 mm 4. RCC and PSC structures with highly congested reinforcements e.g. deck stab girders, box girders, walls with thickness less than 300 mm 5. Underwater concreting through tremie e.g. bottom plug, cast-in-situ piling 279.2 Requirements for Designed Mixes 279.2.1 Target mean strength The target mean strength of specimen shall exceed the specified char-' acteristic compressive strength by at least the "current margin".
(i) The current margin for a concrete mix shall be determined by the Contractor and shall be taken as 1.64 times the standard deviation of sample test results taken from at least 40 separate batches of concrete of nominally similar proportions produced at site by the same plant under sirpilar supervision, over a period exceeding 5 days, but not exceeding 6 months. (ii) Where there is insufficient data to satisfy the above, the current margin for the initial design mix, shall be taken as given in Table 1700.5

15 125

100 200

TABLE 1700-5. Concrete Grade (Mpg) M 15 M 20 M 25 M 30 M 35 M 40 10 (Mpa) 25 to 11 12 12 12 30 36 42 .47 52 Current Margin Tanet Mean Strength

Structural Concrete M 45 M 50 M 55 13 13 14 58 63 69,.

1700

The initial current margin given in the Table 1700-5 shall be used till sufficient data is available to determine the current margin as per sub-clause (i) above. 279.2.2 Trial mixes The Contractor shall give notice to enable the Engineer to be present at the making of trial mixes and preliminary testing of the cubes. The Contractor shall prepare trial mixes, using samples of approved materials typical of those he proposes to use in the works, for aN grades to the Engineer's satisfaction prior to commencement of coAcreting. The initial trial mixes shall generally be carried out in an established laboratory approved by the Engineer. -In exceptional cases, the Engineer may permit the initial trial mixes to be prepared at' the site laboratory of the Contractor, if a full fledged concrete laboratory has been established well before the start of construction, to his entire satisfaction. In all cases') complete testing of materials forming the constituents of proposed Design Mix shali have been carried out prior to Making trial mixes. Sampling and testing procedures shall be in accordance with these specifications. When the site laboratory is utilised for preparing initial mix design, the concreting plant and means of transport employed to make the trial mixes shall be similar to that proposed to be used in the works. Test cubes shall be taken from trial mixes as follows. For each mix, set of six cubes shall be made from each of three consecutive batches. Three cubes from each set of six shall be tested at an age of 28 days and three at an earlier age approved by the Engineer. The cubes shall be made, cured, stored, transported and tested in accordance with these specifications. The average strength of the nine cubes at 28 days shall exceed the specified characteristic strength by the current margin minus 3.5 Wa. 279.2.3
a)

Control of strength of design mixes

Adjustment to Mix Proportions

Adjustments to mix proportions arrived at in the trial mixes shall be made subject to the Engineer's approval, in order to minimise the variability of strength and to maintain the target mean strength. Such adjustments shall not be taken to imply any change in the current margin. b) Change of Current Margin When required by the Engineer, the Contractor shall recalculate the current margin in accordance with Clause 1704.2.1. The recalculated value shall be adopted as directed by the Engineer, and it shall become the current margin for concrete produced subsequently. c) Additional Trial Mixes During production, the Contractor shall carry out trial mixes and tests, if required by the Engineer, before substantial changes are made in the material or in the proportions of the materials to be used, except when adjustments to the mix proportions are carried out in accordance with sub-clause (a) above.

279.3 Requirements of Nominal Mix Concrete Requirements for nominal mix concrete unless otherwise specified, shall be as detailed in Table 1700-6.

Structural Concrete TABLE 1700-6. PROPORTIONS FOR NOMINAL MIX CONCRETE Concrete Grade Total Quantity of dry aggregate by mass per 50 kg of cement to be taken as the sum of Individual masses of flne and coarse aggregata (kg) MIS 350 Generally 1:2, subject to upper limit 1:1.5 and lower limit of 1:2.5 M20 -465 Section 1700 Structural Concrete 279.4 Additional Requirements 250 -doProportion of fine to

1700

Coarse aggregate (by mass)

Concrete shall meet with any other requirements as specified on the drawing or as directed by the Engineer. Additional requirements shall also consist of the foHowing overall limits of deleterious substances in concrete : a) The total chloride content of all constituents of concrete as a percentage of mass of cement in mix shall be limited to values given below: Prestressed Concrete 0. 1 per cent 0.2 per cent 0.3 peT cent Reinforced concmte exposed to chlorides in service (e.g. structures located near sea coast) Other reinforced concrete construction b) The total sulphuric anhydride (SO~ content of all the constituents of conc i rete as a percentage of mass of cement in the mix shall be limited to 4 per cent 279.5 Suitability of Proposed Mix Proportions The Contractor shall submit the following information for the Engineer's approval a) b) Nature and source of each material Quantities of each material per cubic metre of fully compacted concrete

c) Either of the following : (i) appropriate existing data as evidence of satisfactory previous performance for the target mean strength, current margin, consistency and water/cement ratio and any other additional requirement(s) as specified. (ii) full details of tests on trial mixes. d) Statement giving the proposed mix proportions for nominal mix concrete. Any change in the source of material or in the mix proportions shall be subject to the Engineer's prior approval. 280 ADMIXTURES

Structural Concrete

1700

Use of admixtures such as superplasticisers for concrete may be made, with the approval of the Engineer. As the selection of an appropriate concrefe arimixture is an integral part of the mix design, the manufacturers shall recommend the use of any one of his products only after obtaining complete knowledge of all, the actual constituents of concrete as well as methodologies of manufacture, transportation and compaction of concrete proposed to be used in the project'. 281 SIZE OF COARSE AGGREGATE

The size (maximum nominal) of coarse aggregates for concrete to be used in various components shall be given as Table 1700-7. TABLE 1700-7. Components (m)") i) ii) iii) iv) RCC well curb 20 RCQPCC well staining Well cap or Pile Cap Solid type piers and abutments RCC work in girders,slabs, wearing cost, kerb, approach slab, hollow piers and abutments, pier/abutment caps, piles Y) vi) PSC work 20 Any other itemAs specified by Engineer 20 40 40 Maximum Nominal Size of Coarse Aggregate

Maximum nominal size of aggregates shall also be restricted to the smaller of the following values : a) 10 mm less than the minimum lateral clear distance between main reinforcements b) 10 mm less than the minimum clear cover to the reinforcements The proportions of the various individual size, of aggregates shal I be so adjusted that the grading produces densest mix and the grading curve corresponds to the maximum nominal size adopted for the'concrete mix. 282 EQUIPMENT

Unless specified otherwise, equipment for production, transportation and compaction of concrete shall be as under
a) For Production of Concrete :

Structural Concrete

1700

i) For overall bridge length of less than 200 metres - batch type concrete mixer diesel or electric operated, with a minimum size of 200 litres, automatic water measuring system and integral weigher (hydratilic/pneurnatic type) ii) For overall bridge length of 200 metres or more - concrete hatching and mixing plant fully automatic with minimum capacity of 15 cu.m-per hour. All measuring devices of the equipment shall be maintained in a clean and serviceable condition. Its accuracy shall be checked over the iange in use, when set up at each site and thereafter periodically as directed by the Engineer. The accuracy of the measuring devices shall fall within the following limits: Structural Concrete Measurement of Cement Measurement of Water Measurement of Aggregate Measurement of Admixture b) For Concrete Transportation i) ii) iii) iv) v) vi) vii) viii) ix) x) c) i) ii) iii) Concrete dumpers Powered hoists Chutes Buckets handled by cranes Transit truck mixer Concrete pump Concrete distributor booms Belt conveyor Cranes with skips Tremies 3 per cent of the quantity of cement in each batch 3 per cent of the quantity of water in each batch 3 per cent of the quantity of aggregate in each batch 5 per cent of the quantity of admixture in each batch depending upon actual requirement minimum 2 tonnes capacity minimum 0.5 tonne capacity

For Compaction of Concrete Internal vibrators size 25 mm to 70 mm Form vibrators (upto two lanes) minimum 500 watts Screed vibrators full width of carriageway

283

MIXING CONCRETE

Concrete shall be mixed either in a concrete mixer or in a batching and mixing plant, as per these specifications. Hand mixing shall not be permitted. The mixer or the plant shall be at an approved location, considering the properties of the mixes and the transportation arrangements available with the Contractor. The mixer or the plant shall be approved by the Engineer. Mixing'shall be continued till materials are uniformly distributed and a uniform colour of the entire mass is obtained, and each individual particle of the coarse aggregate shows complete coating of mortar containing its proportionate amount of cement. In no case shall mixing be done for less than 2 minutes. Nfixers which have been out of use for more than 30 minutes shall 'be thoroughly cleaned before putting in a new batch. Unless otherwise agreed to by the Engineer, the first batch of concrete from the mixer shall contain only two thirds of the normal quantity

Structural Concrete

1700

of coarse aggregate. Nfixing pla4it shall be thoroughly cleaned before changing from one type of cement to another. 284 TRANSPORTING, PLACING AND COMPACTION OF CONCRETE

The method of transporting and placing concrete shall be approved by the Engineer. Cbncrete shall be transported and placed as near as practicable to its final position, so that no contamination, segregation or loss of its constituent materials takes place. Concrete shall not be freely dropped into place from a height exceeding 1.5 metres. When concrete is conveyed by chute, the plant shall be of such size and design as to ensure practically cor;tinuous flow. Slope of the chute shall be so adjusted that the concrete flows without the use of excessive quantity of water and without any segregation of its ingredients. The delivery end of the chute shall be as close as possible to the point of deposit. The chute shall be thoroughly flushed with water before and after each working period and the water used for this purpose shall be discharged outside the formwork. All formwork and reinforcement contained in it shall be cleaned and made free from standing water, dust, snow or ice immediately before placing, of concrete. No concrete shall be placed in any part of the structure until the approval of the Engineer has been obtained. If concreting is not started within 24 hours of the approval being given, it shall have to be obtained again from the Engineer. Concreting then shall proceed continuously over the area between the construction joints. Fresh concrete shall not be placed against concrete which has been 'in position for more than 30 minutes unless a proper construction joint is formed. Except where. otherwise agreed to by the Engineer, concrete shall be deposited in horizontal layers to a compacted depth of not more than .450 mm when internal vibrators are used and not exceeding 300 mm in all other cases. Concrete when deposited shall have a temperature of not less than 5 degrees Celsius, and not more than 40 degrees Celsius. It shall be compacted in its final position within 30 minutes of its discharge from the mixer, unless carried in properly designed agitators, operating continuously, when this time shall be within I hour of the addition of cement to the mix and within 30 minutes of its discharge from the agitator. It may be necessary to add retarding admixtures to concrete if trials show that the periods indicated above are unacceptable. In all such matters, the Engineer's decision shall be final. Concrete shall be thoroughly compacted by vibration or other means during placing and worked around the reinforcement, *tendons or duct farmers, embedded fixtures and into corners of the formwork to produce a dense homogeneous void-free mass having the required surface finish. When vibrators are used, vibration shall be done continuously during the placing of each batch of concrete until the expulsion of air has practically ceased and in a manner that does not promote segregation. Over vibration shall be avoided to minimise the risk of forming a weak surface layer. When external vibrators

Structural Concrete

1700

are used, the design of formwork and disposition of vibrator shall be such as to ensure efficient compaction and to avoid surface blemishes. Vibrations shall not be applied through reinforcement and where vibrators of immersion type are used, contact with reinforcement and all inserts like ducts etc... shall be avoided. The internal vibrators shall be inserted in an orderly manner and the distance between insertions should be about one and a half times the radius of the area visibly affected by vibration. Additional vibrators in serviceable condition shall be kept at site so that they can be used in the event of breakdowns. Mechanical vibrators used shall comply with IS:2502, IS:2506, IS:2514 and IS:4656. 285 CONSTRUCTION JOINTS

Construction joints shall be avoided as far as possible and in no case the locations of such joints shall be changed or increased from those shown on the drawings, except with express approval of the Engineer. The joints shall be provided in a direction perpendicular to the member axis. Location, preparation of surface and concreting of construction joints shall conform to the additional specifications given in Appen&x 170011. 286 CONCRETING UNDER WATER

When it is necessary to deposit concrete under water, the methods, equipment, materials and proportions of mix to be used shall be got approved from the Engineer before any work is started. Concrete shall contain 10 per cent more cement than that required for the same mix placed in the dry. Concrete shall not be placed ~n water having a temperature below 5 degrees Celsius. The temperature of the concrete, when deposited, shall not be less than 16 degrees Celsius, nor more than 40 degrees Celsius. Coffer dams or forms shall be sufficiently tight to ensure still water conditions, if practicable, and in any case to reduce the flow of water to less than 3 metres per minute through the space into which concrete is to be deposited. Coffer dams or forms in still water shall be sufficiently tight to prevent loss of mortar through the joints in the walls. Pumping shall not be done while concrete is being placed, or until 24 hours thereafter. To minimise the formation of laitance, great care shall be exercised not to disturb the concrete as far as possible while it is being deposited. All under water concreting shall be carried out by tremie method only, using tremie of appropriate diameter. The number and spacing of the tremies should be worked out to ensure proper concreting. The tremie concreting when started should continue without interruption for the full height of the member being concreted. The, concrete production and placement equipment should be sufficient to enable the underwater concrete to be completed uninterrupted within the stipulated time. Necessary stand-by equipment should be available foy emergency situation. The top section of the tremie shall have a hopper large enough to hold one full batch of the mix or the entire contents of the transporting bucket as the case may be. The tremie

Structural Concrete

1700

pipe shall not be less than 200 mm in diameter and shall be large enough to allow a free flow of concrete and strong enough to withstand the external pressure of the water in which it is suspended, even if a partial vacuum develops inside the pipe. Preferably, flanged steel pipe of adequate strength for the job shall be used. A separate lifting device shall be provided for each tremie pipe with its hopper at the upper end. Unless the lower -nd of the pipe is equipped with an approved automatic check valve, the upper end of the pipe shall be plugged with a wadding of gunny sacking or other approved material before delivering the concrete to the tremie pipe through the hopper; so that when the concrete is forced down from the hopper to the pipe, it will force the plug (and along with it any water in the pipe) down the pipe and out of the bottom end, thus establishing a continuous stream of concrete. It will be necessary to raise slowly the tremie in order to allow a uniform flow of concrete, but it shall not be emptied so that water is not allowed to enter above the concrete in the pipe. At all times after placing of concrete is started and until all the required quantity has been placed, the lower end of the tremie pipe shall be kept below the surface of the plastic concrete. This will cause the concrete to build up from below instead of flowing out over the surface and thus avoid formation of layers of laitancc. If the charge in the tremie is lost while depositing, the tremie shall be raised above the concrete surface and unless sealed by a check valve, it shall be reptugged at the top end, as at the beginning, before refilling for depositing further concrete. 287 ADVERSE WEATHER CONDMONS

287.1 Cold Weather Concreting Where concrete is to be deposited at or near freezing temperature, precautions shall be taken to ensure that at the time of placing, it has a temperature of not less than 5 degrees Celsius and that the temperature of the concrete shalt be maintained above 4 degrees Celsius until it has thoroughly hardened. When necessary, concrete ingredients shall be heated before mixing but cement shall not be heated artificially other than by the heat transmitted to it from other ingredients of the concrete. Stock-piled aggregate may be heated by the use of dry heat or steam. Aggregates shall not be heated directly by gas or on sheet metal over fire. In general, the temperature of aggregates or water shall not exceed 65 degrees Celsius. Salt or other chemicals shall not be used for the prevention of freezing.- No frozen ' material or materials containing ice shall be used. All concrete damaged by frost shall be removed. It is recommended that concrete exposed to freezing weather shalf have entrained air and the water conont of the mix shall not exceed 30 litres per 50 kg of cement. 287.2 Hot Weather Conditions When depositing concrete in very hot weather, precautions shall be taken so that the temperature of wet concrete does not exceed 40 degrees Celsius while placing. This shall be achieved by stacking aggregate under the shade and keeping them moist, using cold water, reducing the time between mixing and placing to the minimum, cooling formwork by sprinkling water, starting curing before concrete dries out and restricting

Structural Concrete

1700

concreting as far as possible to early mornings and late evenings. When ice is used to cool mixing water, it will be considered a part of the water in design mix. Under no circumstances shall the mixing operation be considered complete until all ice in the mixing drum has melted. The Contractor will be required to state his methodology for the Engineer's approval when temperatures of concrete are likely to exceed 40 degrees Celsius during the work. 288 PROTECTION AND CURING

Concreting operations shall not commence until adequate arrangements for concrete curing have been made by the Contractor. Curing and protection of concrete shall start immediately after compaction of the concrete to protect it from
a) b) c) d) e) Premature drying out particularly by solar radiation and wind High internal thermal gradients Leaching out by rain and flowing water Rapid cooling during the first few days after placing Low temperature or frost

f) Vibration and impact which may disrupt the concrete and interfere with its bond to the reinforcement

Where members are of considerable size and length, with high cement content, accelerated curing methods may be applied, as approved by the Engineer. 288.1 Water Curing Water for curing -shall be as specified in Section 1000. Sea water shall not be used for curing. Sea water shall not come into contact with concrete members unless it has attained adequate strength. Exposed surfaces of concrete shall be kept continuously in a damp or wet condition by ponding or by covering with a layer of sacks, canva3, Hessian or similar materials and shall be kept constantly wet for a period of not less than 14 days from the date of placing of concrete. 288.2 Steam Curing Where steam curing is adopted, it shall be ensured that it is done in a suitable enclosure to contain the live steam in order to minimise moisture and heat losses. The initial application of the steam shall be after about four hours of placement of concrete to allow the initial set of the concrete to take place. Where retarders are used, the waiting period before application of the steam shall be increased to about six hours. The steam shall be at 100 per cent relative humidity to prevent loss of moisture and to provide excess moisture for proper hydration of the cement. The application of steam shall not be directly on the concrete and the ambient air temperature shall-increase at a rate not exceeding 5 degrees Celsius per hour until a maximum temperature of 60

Structural Concrete

1700

degrees Celsius to 70 degrees Celsius is reached. The maxim uim temperature shall be maintained until the concrete has reached the desired strength. When sw= curing is discontinued, the ambient air temperature shall not drop at a rate exceeding 5 degrees Celsius per hour until a temperature of about 10 degrees Celsius above the temperature of the air to which the concrete will be exposed, has been reached. The concrete shall not be exposed to temperatures below freezing for at least six days after curing. 288.3 Curing Compounds Curing compounds shall only be permitted in special circumstances and will require specific approval of the Engineer. Curing compounds shall not be used on any surface which requires further finishing to be applied. All construction joints shall be moist, cured and no curing compound will be permitted in locations where concrete surfaces are required to be bonded together. Curing compounds shall be continuously agitated during use. All concrete cured by this method shall receive two applications of the curing compound. The first coat shall be applied immediately after acceptance of concrete finish. If the surface is dry, the concrete shall be saturated with water and curing compound applied as soon as the surface film of water disappears. The second application shall be made after the first application has set. Placement in more than two coats may be required to prevent streaking. 289 FINISHING

Immediately after the removal of forms, exposed bars or bolts, if any, shall be cut inside the concrete member to a depth of g least 50 mm below the surface of the concrete and the resulting holes filled with cement mortar. All fins caused by form joints, all cavities produced by the removal of form ties and all other holes and depressions, honeycomb spots, broken edges or comers, and other defects, shall be thoroughly cleaned, saturated with water, and carefully pointed and rendered true with mortar of cement and fine aggregate mixed in the proportions used in the grade of concrete that is being finished and of as dry a consistency as is possible to use. Considerable pressure shall be applied in filling and pointing to ensure thorough filling in all voids. Surfaces which have been pointed shall be kept moist for a period of twenty four hours. Special pre-packaged proprietary mortars shall be used where appropriate or where specified in the drawing. All construction and expansion joints in the completed work shall be left carefully tooled and free from any mortar and concrete. Expansion joint filler shall be left exposed for its full length with clean and true edges. Immediately on removal of forms, the concrete work shall be examined by the Engineer before any defects are made good.
a) The work that has sagged or contains honcycombing to an'extent detrimental to structural safety or architectural appearance shall be rejected.

Structural Concrete

1700

b) Surface defect of a minor nature may be accepted. On acceptance of such work by the Engineer, the same shall be rectified as directed by the Engineer.

290

TOLERANCES

Tolerances for dimensions/shape of various components shall be as indicated in these specifications or shown on the drawings or as directed by the Engineer. 291 TESTS AND STANDARDS OF ACCEPTANCE

291.1 Concrete shall conform to the surface finish and tolerance as prescribed in these specifications for respective componenL 291.2 Random sampling and lot by lot of acceptance inspection shall be made for the 28 days cube strength of concrete. 291.2.1 Concrete under acceptance shall be notionally divided into lots for the purpose of sampling, before commencement of work. The delimitation of lots shall be determined by the following
(i) No individual lot shall be more than 30 cu.m. in volume (ii) At least one cube forming an item of the sample representing the lot shall be taken from concrete of the same grade and mix proportions cast on any day. (iii) (iv) Different grades of mixes of concrete shall be divided into separate lots Concrete of a lot shall be used in the same identifiable component of the bridge

291.2.2

Sampling and testing

1. Concrete for making 3 test cubes shall be taken from a batch of concrete at point of delivery into construction, according to procedure laid down in IS:1199. 2. A random sampling procedure to ensure that each of the concrete batches forming the lot under acceptance inspection has equal chance of being chosen for taking cubes shall -be adopted. 3. 150 min cubes shall be made, cured and tested at the age of 28 days for compressive strength in accordance with IS:516. The 28-day test strength result for each cube shall form an item of the sample.

291.2.3 Test specimen and sample strength Three test specimenss shall be made from each sample for testing at 28 days. Additional cubes may be required for various purposes such as to determine the strength of concrete at 7 days or for any other purpose. The test strength of the sample shall be the average of the strength of 3 cubes. The individual variation should not be more than 15 per cent of the average. 291.2.4 Frequency : The minimum frequency of sampling of concrete of each grade shall be in accordance with Table 1700-8
TABLE 1700.8 Quantity of Concrete in work, m3 I-5 6 - 15 16 - 30 31 - 50 No. of samples 1 2 3 4

Structural Concrete

1700

51 and above 4 plus one additional sample for each additional 50 ml or part thereof At least one sample shall be taken from each shift of work. 291.2.5 Acceptance criteria Compressive Strength When both the following conditions are met, the concrete complies with the specified compressive strength :
a) The mean strength determined from any group of four consecutive samples should exceed the specified characteristic compressive strength. b) Wa. Strength of any sample is not less than the sp-,cified characteristic compressive strength minus 3

The quantity of concrete represented by the test results include the batches from which the first and last samples wer~ taken, togetber with all intervening batches. Chloride and Sulphate Content The total chloride and sulphuric anhydride (SO) content of all the constituents of concrete as a percentage of mass of cement in the mix shall not exceed the values given in this section of the specifications. 291.3 Density of Fresh Concrete Where minimum density of fresh concrete is specified, the mean.of any four consecutive samples shall not be less than the specified value and any individual sample result shall not be less than 97.5 per cent of the specified value. 291.4 Density of Hardened Concrete Where minimum density of hardened concrete is specified, the mean of any four consecutive samples shall not be less than the specified value and any individual sample result shall not be less than 97.5 per cent of the specified value. 291.5 Permeability Test The concrete should pass the following test if it is properly compacted and is not considered permeable.
(i) Prepare a cylindrical test specimen 150 nun dia and 160 mm high (ii) After 28 days of curing, the test specimen is fitted in a machine such that the specimen can be placed in water under pressure upto 7 bars. A typical machine is shown in Appendix 1700111. (iii) At first a pressure of one bar is applied for 48 hours, followed by 3 bars for 24 hours and 7 bars for next 24 hours. (iv) After the passage of the above period. the specimen is taken out and split in the middle by compression appiied on two round bars on opposite sides above and below. (v) The water penetration in the broken core is to be measured with a scale and the depth of penetration assessed in mm (max. permissible limit 25 mm).

291.6 If the concrete is not able to meet any of the standards of acceptance as prescribed, the effect of such deficiency on the structure shall be investigated by the Contractor as directed by the Engineer. The Engineer may accept the concrete as sub-standard work. Any additional work required by the Engineer for such

Structural Concrete

1700

acceptance shall be carried out by the Contractor at his cost. In case the concrete is not found to be acceptable after investigation, the Contractor shall remove the rejected concrete forthwith. 292 MEASUREMENTS FOR PAYMENT

Structural concrete shall be measured in cubic metres. In reinforced or prestressed concrete,' the volume occupied by reinforcement or prestressing cables and sheathing shall not be deducted. The slab shall be measured as running continuously through and the beam as the portion below the slab. 293 RATE

The contract unit rate for structural concrete shall cover costs of all materials, labour, tools, plant and equipment required for mixing, transporting and placing in position, vibrating and compacting, finishing and curing as per this Section or as directed by the Engineer, including all incidental expenses, sampling and testing, quality assurance and supervision. Unless mentioned separately as an item in the Contract, the contract unit rate for concrete shall also include the cost of providing, fixing and removing formwork required for concrete work as per Section 1500. Where concrete is found to be acceptable as sub-standard work, the Contractor shall pay a discount over the contract unit rate, as decided by the Engineer. For deficiency in compressive strength of concrete when accepted by the Engineer, the reduction in rate may be applied as under Per cent reduction Design Strength - Observed Strength X 100 Design Strength

Prestressing Prestressing 1800 Prestressing

1800

Prestressing

1800

1801

DESCRIPTION

Structural concrete containing prestressed steel reinforcement to introduce precompre ss ion is temed as prestressed concrete. The work shall be carried out in accordance with the drawing and these specifications or as approved by the Engineer. Concrete and untensioned steel for the construction of prestressed concrete members shall conform to the requirements of sections 1700 and 1600 for Structural Concrete and Steel Reinforcement respectively in so far as the requirements of these Sections apply and are not specifically modified by requirements set forth herein. 294 MATERIALS

294.1 All materials shall conform to Section 1000. 294.2 Sheathing 294.2.1 The sheathing ducts shall be of the -spiral, corrugated type. Unless otherwise specified, the material sh all be Cold~;Rolled' Cold Annealed (CRCA) Mild Steel conforming to IS:513,intended for, mechanical treatment and surface refining but not for 4upach hardening or tempering. The material shall normally be bright finished. However, 'where specified, as in case of use in aggressive environment, galvanised or lead-coated mild steel strips sW be used. The thickness of sheathing shall be as shown on the'drawing, but, shall not be less than 0.3 mm, 0.4 mm and 0.5 mm for sheathing ducts having internal 'diameter of 50 mm, 75 mm an0,9P,,mm respectively. For bigger diameter of ducts, thickness of sheathing shall.be based on recommendations 1: of'Oestrewng; system supplier, or as dire cted by the Engineer. The shwthiw shalI conform to the requirement as per tests specifiq,4;J,q,,,App_,eP id : _14WIL, For major projects, the sheathing: ducts should preferably be manufactured .4, the; ~ project, site.-utilisigg appropriate machines. With such, ap,arz~pgm pt,j &t4s'of d up 0 con fe. nberi of J,64 .4pgi n4n nw ~:) ts an re slic4ioW, doc Joints W ,pnavoidaOle such joirio,:, shall, be, made slurry tight by the use of corrugated threaded sleeve couplers which may be tightly screwed onto the outer side of the sheathing ducts. r,,o lers.. Whe -len. sheadvin ducts may boused with,

Prestressing

1800

The length of the coupler should not be less than 150 mm but should be increased upto 200 mm wherever practicable. The' joints between the ends of the coupler and the duct shall be sealed with adhesive sealing tape to prevent penetration of cement slurry during concreting. The couplers of adjacent ducts should be staggered wherever practicable: As far as possible, couplers should not be located-in curved zones. The corrugated sleeve couplers are being conveniently manufactured using the sheath making machine with the next higher size of die set. 294.2.2 The internal area of the sheathing duct shall be in accordance with the recommendations of the system manufacturer and shall be about three times the area of the tendons. In case of 6T13, 12TI3 and 19T13 sizes of tendons comprising 12/13 mm dia strands, the inner diameter of the sheathing shall not be less than 50 mm, 75 mm and 90 mm respectively or those shown in the drawing, which ever is greater. Where prestressing tendons are required to be threaded after concreting the diameter of sheathing shall be about 5 mm larger than that required as above. 294.2.3 In severe environment, cables shall be threaded after concreting. In such cases a temporary tendon shall be inserted. in the sheathing or the sheathing shall be stiffened by other suitable method during concreting. 294.3 Anchorages 294.3.1 Anchorages shall be procured from authorised manufacturers only. Anchorages shall conform to 9S:4447. Test certificates, from a laboratory fully equipped to carry out the tests shall be furnished to the Engineer. Such test certificates shall not be more than 12 months old at the time of making the proposal for adoption of a particular system for the project. No damaged anchorages shall be used. Steel parts shall be protected from corrosion at all times. Threaded parts shall be protected by greased wrappings and tapped holes shall be protected by suitablq, plugs until used. The anchorage components shall be kept free from mortar and loose rust and ' any other deleterious coating. 294.3.2 Swages of prestressing strand and button-heads of prestressing wire, where provided shall develop a strength of.at least 95 per cent of the specified breaking load of the strand or wire as the case may be. Where swaging/button-heading is envisaged, the Contractor shall fumish details of his methodology and obtain approval of the Engineer, prior to his taking up the work. 294.3.3 Untensioned Steel reinforcements, around anchorages shall conform to the details of prestressing system and as shown on the drawing. 295 TESTING OF PRESTRESSING STEEL AND ANCHORAGES

All materials specified for testing shall be furnished 'free of cost and shall be delivered in time for tests to be made well in advance of anticipated time of use.

Prestressing

1800

All wire, strand or bars to be shipped to the site shall be assigned a lot number and tagged for identification purposes. Anchorage asserfiblies to be shipped shall be like-wise identified. All samples submitted shall be representative of the lot to be furnished and in the case of wire or strand, shall be taken from the same master roll. 'Me Contractor shall furnish samples of at least 5.0 m length selected from each lot for testing. Also, two anchorage assemblies, complete with distribution plates of each size or types to be used, shall be furnished alongwith short lengths of strands as required. 296 296.1 Cleaning Tendons shall be free from loose rust, oil, grease, tar, paint, mud or any other deleterious substance. Cleaning of the steel may be carried out by immersion in suitable solvent solutions, wire brushing or passing through a pressure box containing carborundum powder. However, the tendons shall not be brought to a polished condition. 296.2 Straightening High tensile steel wire and strand shall be supplied in coils of sufficiently large diameter such that tendons shall retain their physical properties and shall be straight as it unwinds from the coil. Tendons of any type that are damaged, kinked or bent shall not be used. The packing of prestressing wire/strand shall be removed only just prior to making of cable for placement. Suitable stands shall be provided to facilitate uncoiling of 'wires/strands without damage to steel. Care shall be taken to avoid the possibility of steel coming into.contact with the ground. 296.3 Positioning 296.3.1 Post-Tensioning Prestressing tendons shall be accurately located and maintained in position, both vertically and -horizontally, as per drawings. Tendons shall be so arranged that they have a smooth profile without sudden bends or kinks. ' The locationing of prestressed cables shall be such as to facilitate easy placement and vibration of concrete in between the tendons. High capacity tendon shall be used to reduce the number of cables thereby eliminating the necessity of grouping. The selected profiles of the tendons shall be such that their anchorages are not located in the top deck surface. Where two or more rows of cables have to ,be used, the cables shall be vertically in line to enable easy flow of concrete. The clear vertical and horizontal distances between any two cables shall in no case be less than 100mm anywhere along the length of the superstructure. Where precast segments are used, the clear distance shall be at least 150 mm. WORKMANSHIP

Prestressing

1800

Sheathing shall be placed in correct position and profile by providing suitable ladders and spacers. Such ladders may be provided at intervals of approximately 1.0 m. Sheathing shall be tied rigidly with such ladders/spacer bars so that they do not get disturbed during conoreting. The method of supporting and fixing shall be such that profile of cables is not disturbed during vibrations, by pressure of wet concrete, by workmen or by construction traffic. Sheathing in which the pen-nanent tendon will not be in place during concreting shall have a temporary tendon inserted or shall be stiffened by some other method to the approval of the Engineer. The temporary tendon shall be pulled out before threading the permanent tendon into place by a special threading machine or other contrivance. Where possible tendons sHall not be placed until immediately-prior to stressing. Tendons shall be handled with care to avoid damage or contamination, to either the tendon or the sheathing. Any tendons damaged or contaminated shall be cleaned or replaced. 296.3.2 Pre-Tensioning. Prestressing steel shall be accurately located and maintained in position, both "vertically and horizontally, as per drawings. 296.3.3 Each anchorage device shall be set square to the line of action of the corresponding prestressing tendon and shall be positioned securely to prevent movement during concreting. The anchorage devices shall be cleaned to the satisfaction of the Engineer prior to the placing of concrete. After concreting, any mortar or concrete which adheres to bearing or wedging surfaces, shall be removed immediately. 296.4 Cutting Cutting and trimming of wires or strands shall be done by suitable mechanical or flame cutters. When a flame cutter is used, care shall be taken to ensure that the flame does not come in contact with other stressed steel. The location of flame cutting of wire or strand shall be kept beyond 75 mm of where the tendon will be gripped by. the anchorage or jacks. In post-tensioning the ends of prestressing steel projecting beyond the anchorages, shall be cut after the grout has set. 296.5 Protection of Prestressing Steel Prestressing steel shall be continuously protected against corrosion, until grouted. The corrosion protector shall have no deleterious effect on the steel or concrete or , on the bond strength of steel to concrete. Grouting shall conform to these specifications or as directed by the Engineer. In the case of external prestressing, steel shall be encased in suitable polyethelene pipes before grouting. 296.6 Sheathing The joints of allsheathings shall be water-tight. Special attention shall be paid to the junction at the anchorage end, where the sheathing must tightly fit on the protruding

Prestressing

1800

trumpet end of anchorage and thereafter sealed preferably with heat shrink tape, to make it waterproof. The heat-shrink tape is supplied in the form of bandage rolls which can be used for all diameters of sheathing ducts. The bandag~ is coated on the underside with a heat sensitive adhesive so that after heating the bandage material shrinks on the sheathing duct and ensures formation of a leak-proof joint. The 'heating is effected by means of a soft gas flame. A sheath making machine should be positioned at the site of work for large projects so that sheathing can be prepared as and when it is required for construction. The sheathing and all joints shall be water tight. Any temporary opening in the sheathing shall be satisfactorily plugged and all joints between sheathing and any other part of the prestressing system shall be effectively sealed to prevent entry of mortar, dust, water or other deleterious matter. Sheathing shall be neatly fitted at joints without internal projection or reduction of diameter. Enluged portions of the sheathing at.couplings or anchorages shall be of sufficient length to provide for the extension of the tendons. 296.7 Grout Vents Grout vents of at least 20 mm diameter shall be provided at both ends of the sheathing and at all valleys and crests along its length. Additional vents with plugs shall also be provided along the length of sheathing such that the spacings of consecutive vents do not, exceed 20 in. Each of the grout vents shall be provided with a plug or similar device capable of withstanding a pressure of 1.0 MPa without the loss of water, air pressure or grout. 296.8 Anchorages All beaiing surfaces of the anchorages shall be cleaned prior to concrefing and tensioning. Anchor cones, blocks and plates shall be securely positioned and maintained during concreting such that the centre line of the duct passes axially through the anchorage assembly. The anchorages shall be recessed from the concrete surface by a minimum cover of 100 mm. After the prestressing operations are completed and prestressing. wires/strands are cut, the surface shall be painted with two coats of epoxy of suitable formulation having a dry film thickness of 80 microns per coat and entire recess shall be filled with concrete or non-shrink/pre-packaged mortar or epoxy concrete. 296.9 Structural Concrete Structural concrete shall conform to Section 1700. The fomwork shall conform to Section 1500. 297 SUPERVISION

Prestressing

1800

All prestressing and grouting operations shall be undertaken by trained personnel only. Arepresentativeof supplier of theprestressing system shall be present during all tensioning and grouting operations and shall ensure, monitor and certify their correctness. 298 ISM. TENSIONING EQUIPMENT

All tensioning equipment shall be procured from authorised manufacturers only and be approved by the Engineer prior to use. Where hydraulic jacks are used, they shall be power-driven unless otherwise approved by the Engineer. The tensioning equipment shall satisfy the following requirements : (i) The means of attachments of the prestressing steel to the jack or any other tensioning apparatus shall be safe and secure. (ii) Where two or more wires/strands constitute a tendon, a single multipull stressing jack shall be used which is capable of tensioning simultaneously all the wires/ strands of the tendon. Suitable facilities for handling and attaching the multipull jack to the tendons shall be provided. (iii) The tensioning equipment shall be such that it can apply controlled total force gradually on the concrete without inducing dangerous secondary stresses in steel, anchorage or concrete; and (iv) Means.shall be provided for direct measurement of the force by use of dynamometers or pressure gauges fitted in the hydraulic system itself to determine the pressure in the jacks. Facilities shal I also be provided for the linear measurement of the extension of prestressing steel to the nearest min and of any slip of the gripping devices at transfer.

All dynamo meters and pressure gauges including a master gauge shall be calibrated by an approved laboratory immediately prior to use and then at intervals not exceeding 3 months and the true force determined from the calibration curve. Pressure gauges shall be concentric scale type gauges accurate to, within two per cent of their full capacity. The minimum nominal size of gauge shall be 100 mm. The gauge shall be so selected that when the tendon is stressed to 75 per cent of its breaking load, the gauge is reading between 50 per cent and 80 per cent of its full capacity. Suitable safety devices shall be fitted to protect pressure gauges against sudden release of pressure. Provision shall be made for the attachment of the master gauge to be used as a check whenever requested for by the Engineer. 299 POST-TENSIONING

Tensioning force shall be applied in,gradual and steady steps and carried out in suchamannerthat the applied tensions and'elongations can be measured at all times. The sequence of stressing, applied tensions and elongations shall be in accordance with the approved drawing or as directed by -the Engineer. It shall be ensured that in no case, the load is applied totheconcrete before it attains the strength specified on the driwing or as stipulated by the prestressing system supplier, whichever is more. After prestressing steel has been anchored, the force exerted by the tensioning equipment shall be decreased gradually and steadily so as to avoid shock to the prestressing steel or anchorage.

Prestressing

1800

The tensioning force applied to any tendon shall bedetermined by direct reading of the pressure gauges or dynamo-meters and by comparison of the measured elongation with the calculated elongation. The calculated elongation shall be invariably adjusted with respect to the modulus of elasticity of steel for the particular lot as given by the manufacturer. The difference between calculated and observed tension and elongation during prestressing operations shall be regulated as followsa) If the calculated elongation is ' reached before the specified gauge pressure is obtained, continue tensioning till attaining the specified gauge pressure, provided the elongation does not exceed 1.05 times the calculated elongation. If 1.05 times the calculated elongation is reached before the specified gauge pressure is attained, stop stressing and inform the Engineer. b) If the calculated elongation has not been reached at the specified gauge pressure, continue tensioning by intervals 6f 5 kg/sq. eara. until the calculated elongation is reached provided the gauge pressure does not exceed 1.05 times ft specified gauge pressure. c) If the elongation at 1.05 times the specified gauge pressure is less than 0.95 times the calculated elongation, the following measures must be Laken, in succession, to determine the cause of this Is& of discrepancy i) Check the correct functioning of the jack, pump and leads. ii) Detension the cable. Slide it in its duct to check that it is not blocked by mortar which has entered through holes in the sheath. Retension the cable if free. iii) R9 -otinablish the modulus of elasticity of steel for the particular lot from an approved laboratory. If the required elongation is still not obtained, further finishing operations such as cutting or seating, should not be undertaken without the approval of the Engineer. d) When stressing fr6m one end only, the slip at the end remote from the jack shall be accurately measured and an appropriate allowance made in the measured extension at the jacking end.

A complete record of prestressing operations along with elongation and jack pressure data shall be maintained 'in the format given in Appendix 1800111. The number of stages of prestressing and grouting shall be reduced to a minimum, preferably 2 in the case of simply supported girders. 300 GROUTING OF PRESTRESSED TENDONS

Grouting shall conform to Appendix 18001111. A record of grouting operations shaU be maintained in the format given in Appendix 18001 IV. 301 301.1 General The planning and construction aspects of the tensioning bed, tensioning bench, abutments at location of anchorage, steam. curing system, formwork of the concrete elements and arrangements for demoulding, lifting, stacking and transportation, of the pre-tensioned concrete elements are, all specialised items and shall be entrusted to engineers specifically experienced in this type of work. 301.2 Stressing Bed for Pre-tensioning The abutments and bed for pre-tensioning of tendons shall be designed to withstand the, total tensioning force. PRE-TENSIONING

Prestressing

1800

A notice shall be displayed adjacent to the stressing bed showing the maximum tensioning. force permitted. Where concrete elements are cast and prestressed individually, the stressing bench or moulds shall be rigid enough to sustain the reaction of the prestressing force without distortion. In the long line method of prestressing, sufficient locator plates should be distributed throughout the length of the bed to ensure that the wires are maintained in their proper position during concreting. The moulds shall be free to slide in the direction of their length and thus permit the transfer of the prestressing force to all the concrete elements along the whole line. Sufficient space shall be left in between the ends of concrete elements to permit access for cutting the strands/wires after transfer. '- Holddowns or deflectors shall be used for holding or deflecting the tendons in required position firmly. Deflectors which are in contact.with the tendon shall have a diameter not less than the tendon or 15 mm, whichever is greater. The tensioning force required to be applied as stated on the drawings shall be the force remaining in the strands/wires after all strands/wires' have been anchored to the, abutments of the stressing bed and after the anchorage slip has already taken place. The tensioning force shall be determined by direct reading of the pressure gauges or dynamo-meters and by the measured elongation after slip. The Contractor shall submit method of tensioning the tendons including the arrangement and layout of prestressing beds and all tendon deflection points to the Engineer for approval before manufacture. commences. The Contractor shall carry out trial stressing operations to establish the fri~tio'nal resistance offered by the hold-downs and the slip during anchoring. ' Where sheathing of pre-tensioned tendons is required to prevent bond over a specified length, it shall consist of plastic tubing or other material approved by the Engineer and shall be of a quality, diameter and thickness such that bond shall be effectively prevented. The tubing shall be fastened to the tendon in such a manner that. cement mortar cannot enter. The Engineer may order that the pull-in of the tendon be measured during the transfer of prestress. The Contractor shall also submit calculations showing that the holddowns have been designed and constructed to withstand concentrated loads. resulting from the application of the tensioning force. 301.3 Tensioning Procedure The tensioning of the wires and strands shall be done ~ not too much in advance of concreting. The tensioning force shall be applied gradually and uniformly. In order to remove slack and to lift tendons off the bed floor, an initial force approved by the Engineer shall be applied to the tendons. Allowance shall be made for this force in calculating the required elongation.

Prestressing

1800

Tendons shall be marked for measurement of elongation after the initial force has been applied. When required by the Engineer, tendons shall be marked at both the jacking end and dead end of the stressing bed and at couplers if used so that slip and draw-in may be measured. Where deflected strands have been specified, the Engineer may direct the elongation or strain gauge measurements be taken at various positions along the tendon to determine the force in the tendon at those positions. 301.4 Transfer of Prestress While the process of tensioning can be accomplished by means of hydraulic jacks, some positive mechanical means shall be provided to maintain the tension during the entire period between the tensioning of the wires/strands and transfer of the prestressing force to the concrete element. Transfer of prestress shall not proceed until the Engineer has approved the proposed method. Tendons and deflection devices shall be released in such a pre-determined order that unacceptable tensile stresses are not induced in the concrete. Prior to transfer of the force to the units, all tendons shall be tested for tightness and any loose tendon shall be reported to the Engineer who will decide whether the units affected shall be rejected. The Engineer may require that tendons be marked at each end of any unit to allow measurement of the pull-in of the concrete. Tendons shall be released gradually and preferably simultaneously. Under no circumstances shall tendons be cut while under tension. On completion of the transfer of prestress, the projecting lengths of tendon shall be cut off flush with the end surface of the unit, unless otherwise shown, by a method approved by the Engineer. In no case shall the transfer of prestressing force to the concrete elements take place before concrete attains the strength specified in the drawings. To determine the specified strength, additional cube testing shall be undertaken at the Contractor's cost. In case steam curing is employed, the cubes shall be placed in the same environment as the concrete elements to obtain an accurate assessment of concrete strength at the time of transfer. The sequence of transfer of prestressing force shall be done strictly as indicated in the drawings and ensuring that eccentricities of the prestressing force in the vertical and horizontal directions of the concrete element is a minimum during the entire sequence. The maximum slip of any tendon during transfer shall not exceed 3 mm at any end of the concrete element. In case this slip is exceeded, the concrete element in question shall be rejected, 301.5 Protection of Ends The exposed ends of the tendons and the concrete surfaces of the ends, of the units shall be wire brushed clean of all rust, loose mortar, grease and dirt.

Prestressing

1800

The exposed ends of the-tendons and concrete surface within 50 mm of tendons shall be then abraded to provide a clean sound surface. An epoxy tar paint suitably formulated to give, a dry film thickness of 80 microns per coat shall then be immediately applied over the ends of the tendons unless otherwise directed. A second coat of paint shall be applied prior-to the drying I out of the first coat. 302 SAFETY PRECAUTIONS DURING TENSIONING

Care shall be. taken during tensioning to ensure the safety of all persons in the vicinity. Jacks shall be secured in such a manner that they will be held in position, should they lose their grip on the tendons. No person shall be'allowed to stand behind the jacks or close to the line of the tendons while tensioning is in progress. The operations of the jacks and-the measurement of the elongation and associated operations shall be carried out in such a manner and from. such a position that the safety of all concerned is ensured. A safety barrier shall be provided at both ends to prevent any tendon, which might become loose from recoiling unchecked.' During actual tensioning operation, warning sign shall be displayed at both ends of the tendon. After prestressing, concrete shall neither be drilled nor any portion cut nor chipped away nor disturbed, without express approval of the Engineer No welding shall be permitted on or near tendons nor shall any heat be applied to tendons. Any tendon which has been affected by welding, weld spatter or heat'shall be rejected. 303 TRANSPORTATION AND STORAGE OF UNITS

Precast girders shall be transported in an upright position. Points of support and the direction of reactions with respect to the girder shall approximately be the same during transportation, and storage as when the girder is placed in final position. When members are to be stacked, they shall be firmly supported at such bearing positions as will ensure that the stresses induced 'in them are always less than the permissible design stresses. Further, inclined side supports shall be provided at the ends and along the length of a precast girder to prevent lateral movements or instability. Care shall be taken during storage, -hoisting and handling of the precast units to prevent their cracking or being damaged. Units damaged by improper storing or handling shall be replaced by the Contractoi at his expense 304 TOLERANCES

Permissible tolerances for positional deviation.of Prestressing tendons 3hall be limited to the following a) Variation from the specified horizontal profile b) Variation from the specified vertical profile 5 min 5 min

Prestressing c) Variation from the "cified position in member 305 5 mm

1800

TESTS AND STANDARDS OF ACCEPTANCE

The materials shall be tested in accordance with these Specificadons and shall meet the prescribed criteria. The work shall conform to these Specifications and shall meet the prescribed standards of acceptance. 306 MEASUREMENTS. FOR PAYMENT

Prestressed Concrete shall be measured in cubic metres. The volume occupied by mild steel reinforcement / HYSD bars, high tensile steel, sheathing and anchorages shall not be deducted. High tensile (prestressing) steel shall be paid for separately and its length shall be measured as actually incorporated in the finished work. From the length so measured its weight shall be calculated in tonnes on theoretical basis and'paid for. Anchorage devices, additional length of cables for attaching jack, ducts or sheathing, grout, non-prqstressed steel reinforcement fixed to the ai,chorage devices, making of recesses and filling the same, protection by painting with epoxy and furnishing samples for testing shall all be deemed to be included in the item of high tensile steel and shall not be rpeasured separately. 307 RATE

The contract unit rate for cast-in-place prestressed concrete shall cover the -cost of all materials, labour, tools and plant required for mixing, placing in position, vibrating and compacting, finishing as per directions of the Engineer, curing and other incidental expenses for producing concrete of specified strength to complete the structure or its components as shown on the drawings and according to specifications. The contract unit rate shall also include the cost of making, fixing and removing of all centring and forms required for the work unless otherwise specified in the Contract. For precast prestressed concrete members, the rate in addition to above shall also include the cost of all materials, labour, tools and plant required to transport and place these members in their final position as shown on the drawings and as directed by the Engineer. The contract unit rate for high tensile steel shall cover the cost of material, labour, tools and plant required for manufacturing, placing, tensioning, anchoring and grouting the high tensile steel in the prestressed concrete as shown on the drawings and as per specifications herein above or as directed by the Engineer. The cost of anchorage devices, additional length of cables for attaching jack, ducts or sheathing, grout, non-prestressed steel reinforcement fixed to the anchorage devices, making of recesses and filling the same, protection by painting with epoxy and furnishing samples for testing shall all be included in the unit rate. Rate shall also include payments

Prestressing

1800

if any to be made to the supplier of the prestressing system who has to monitor, ensure and certify the correctness of all operations.

Structural Steel Structural Steel 1900 Structural Steel

1900

Structural Steel

1900

1901

DESCRIPTION

This work shall include furnishing, fabricating, transporting, erecting and painting structural steel, rivet steel, cast steel, steel 'forgings, cast iron and other incidental metal construction of the kind, size and quantity. in conformity with the drawings and these specifications or as desired by the Engineer. 308 GENERAL

General requirements relating to the supply of material shall conform to,the specifications of IS:1387, for the purpose of,which the supplier shall, be the Contractor and 'the purchaser shall be the Engineer. ' Finished rolled material, shall be free from cracks, flaws, injurious scams, laps, blisters, ragged and imperfect edges and other defects. It shall have a smooth and uniform finish, and shall be straightened in the mill before shipment. They shall also be free from loose mill scale, rust, pits or other defects affecting its strength and durability. The acceptance of any material on inspection at the mill i.e. rolling mills, foundry or fabricating plant where material for the work is manufactured, shall not be a bar to its subsequent rejection, if found defective. Unless specified otherwise, high tensile steel rivet conforming to IS:1149 shall be used for members of high tensile steel conforming to IS:961 and shall not be used for mild steel members. Unless specified otherwise, bolted connection of structural joints using high tensile friction grip bolts shall comply with requirements of IS:4000. Cast iron shall not be used in any portion of the bridge structure, except where it is subject to direet compression. 309 MATERIALS

309.1 All materials shall conform to Section 1000. Special requirements are given below : Mild steel for bolts and nuts shall conform to IS:226 but have a minimum tensile strength of 44 kg1sq. mm. and minimum percentage elongation of 14. High tensile steel for bolts and nuts shall conform to IS:961 but with a minimum tensile strength of 58 kg/sq. mm. High strength friction grip bolts shall be permitted for use only on satisfactory evidence of performance to the requirements (not covered by these specifications) specified by the. Engineer or included in the special provisions. For cast steel, the yield stress shall be determined and shall not be less than 50 per cent of the minimum tensile strength. Plain washers shall be of steel. Tapered or other specially shaped washers shall be of steel, or malleable cast iron. Parallel barrel drifts shall have a tensile strength not less than 55 kg/sq.mm. with elongation of not less than 20 per cent measured on a gauge length of 4~o (So = cross sectional area).

Structural Steel

1900

309.2 Materials for castings and forgings, fasteners and welding consurnables shall be as under 309.2.1 Castings and Forgings : Steel castings and forgings shall comply with the requirements of the following Indian Standards, as appropriate :
IS: 1030 IS: 1875 IS:2004 IS:2644 IS:4367 Carbon Steel Castings for General Engineering purposes Carbon Steel Billets, blooms, slabs, bars for forgings Carbon Steel Forgings for General Engineering purposes High Tensile Steel Casings Alloy & tool steel forgings for general industrial use

309.2.2 Fasteners : Bolts, nuts, washers and rivets shall comply with the following or relevant IS Standards as appropriate :
IS: 1929 IS:2155 IS: 1363 IS: 1364 IS: 1367 (Parts I to 18) IS:3640 Hexagon fit bolts IS:3757 High tensile friction grip bolts IS:6623 High strength structural nuts IS:6639 Hexagon bolts for steel structure IS:5624 Foundation bolts IS:7002 Prevailing torque type steel hexagon lock nuts IS:5369 Plain washers and lock washers - general requirements IS:5370 Plain washers with outside dia 3 X inside dia IS:5372 Taper washers for channels (ISMC) IS:5374 Taper Washers for I beams (ISMB) IS:6610 Heavy washers for steel structures IS:6649 Hardened and tempered washers for high strength structural bolts and nuts Hot forged steel rivets for hot closing (12-36mm dia) Cold,forged steel rivets for hot closing (6-16mm dia) Hexagon head bolts, screw and nuts product grade C Hexagon head bolts, screw & nuts product grade A & B Technical supply conditions for threaded steel fastener

309.2.3
IS:814 IS:814

Welding consumables

'Welding consurnables shall comply with -the following Indian Standards as appropriate :
Covered Electrodes for Metal Arc Welding of structural, (Part 1) steel for welding other than sheets For welding sheets (Part 2)

IS: 1278 Filler rods and wires for gas welding IS: 1395 Low and medium alloy Steel covered electrodes for manual Metal Arc Welding IS:3613 Acceptance Tests for wire flux combinations for submerged arc welding of structural steel IS:7280Bare wire electrodes for gas shielded arc 'welding of structural steel IS:6419Welding rods and ~bare electrodes for gas shielded arc welding of structural steel IS:6560 Molybdenum and chromium-molybdenum low alloy steel welding rods and bare electrodes for gas shielded arc welding

309.3 In aggressive environment, corrosion resistant steel can be used. These are low-alloyed steels containing a total of 1 per cent - 2 per cent alloys, in particular, copper, chromium, nickel and phosphorous.

Structural Steel 309.4 Paints

1900

All materials for paints and enamels shall conform to the requirements specified on the drawings or other special provisions laid down by the Engineer. The type of paints which can be used shall be as follows :
a) b) c) d) e) f) g) h) Ordinary i.e. paints based on drying oils, alkyd msin, modified alkyd resin, phenolic varnish epoxy Chemical Resistant - one pack type (ready for use) and two pack type (mixed before use). Vinyl Chlorinated rubber Bituminous Epoxy Polyurethane Zinc rich

Unless otherwise specified, paints shall conform to the relevant IS specifications. The paints which have been tested for the following qualities as per specifications given in the -relevant IS codes only shall be used : Weight test (weight for 10 litre of paint, thoroughly mixed) Drying time Consistency Dry thickness and rate of consumption. 310 310.1 General All work shall be in accordance with the drawings and as per these specifications with care being taken-that all parts of an assembly fit accurately together. All members shall carry mark number and item number and, if required, serial number. Unless specifically required under the contract, * corresponding parts need not be interchangeable, but the parts shall be match marked as required under Clause 1904.7. Templates, jigs and other appliances used for ensuring the acciiracy of the work shall be of mild steel; where specially required, these shall be bushed with hard steel. All ineasurements shall be made by means of steel tape or other device properly calibrated. Where bridge materials have been used as templates for drilling, these shall be inspected and passed by the Engineer before they are used in the finished structure. All structural steel members and parts shall have straight edges and blunt surfaces. If necessary, they shall be straightened or flattened by pressure unless they are required to be of curvilinear forms. They~ shall also be free from twist. Pressure applied for straightening or flattening shall be such as would not injure the materials. Hammering shall not be permitted. Adjacent surfaces or e dges shall be in close, contact or at uniform distance throughout. The Contractor shall submit his programme of work to the Engineer for his approval at least l5days before the commencement of fabrication. This programme shall include the propbsed system of identification and erection marks together with complete details of fabrication and welding procedures. FABRICATION

Structural Steel

1900

The Contractor shall prepare shop drawings for fabricating any member and obtain approval of the Engineer before the start of work. Complete information regarding the location, type, size and extent of all welds shall be clearly shown on the shop drawings. These drawings shall distinguish between shop and field welds. 310.2 Preparation of Edges and Ends All structural- steel-parts, where required, shall be sheared, cropped, sawn or flame cut and ground accurately to the required dimension and shape. End/edge planing and cutting shall be done by any one of the following prescribed methods or left as rolled :
a) b) Shearing, cropping, sawing, machining, machine flame cutting. Hand flame cutting with subsequent grinding to a smooth edge.

c) Sheared edges of plate not more than 16 nun thick with subsequent grinding to smooth profile, which are for secondary use such as stiffeners and gussets.

If ends of stiffeners are required to ' be fined, they shall be ground, so that the maximum gap over 60 per cent of the contact area does not exceed 0.25 mm. Where flame cutting or shearing is used, at least one of the following requiiements shall be satisfied.
a) b) c) The cut edge is not subjected to applied stress. The edge is incorporated in weld. The hardness of cut edge does not exceed 350 HV30.

d) The material is removed from edge to the extent of 2 nim or mmimum necessary, so that the hardness is less than 350 HV 30. e) Edge is suitably heat treated by approved method to the satisfaction of the Engineer and shown that cracks had not developed by dye penetrant or magnetic particle test,

f) Thickness of plate is less than 40 nun for machine flame cutting for materials copfonning to IS-.226 and IS-.2062. The requirement of hardness below.359 HV 30 of flame cut edges should be specified by the Engineer. Wherever specified by the Engineer, the flame cut edges shall be ground or machined over and above the requirement (a) to (f). , Where machining for edge preparation in butt joint is specified, the en~s shall be machined after the members have been fabricated. Outside edges of plate and section, which are prone to corrosion shall be smoothed by grinding or filing. In the case of high tensile steel at least 6 mm of the material from the flame cut edge shall be removed by machining. Longitudinal edges of a plates and cover plates in plate girders and built-up members shall be machined except in the following cases
a) b) Rolled edges of single universal plates or flats may not be machined. Covers to single flange plates may be left unniachined.

c) Machine flame cutting instead of machining is acceptable for edges of single plates in compression and for edges of single plates, 25 nun or less thick, in tension.

Structural Steel

1900

d) Edges of single shaped plates over 25 mm thick not capable of being machined by ordinary method may be machine flame cut and the end surface ground. e) Edges of universal plates or flats of the same nominal width used in tiers may be left unmachined, if ~o authorised by the Engineer.

All edges 'of splice and gusset plates 12 mm thick and over shall be machined and those less than 12 mm thick may be sheared and ground. The ends of.plates and sections forining the main components of plate girders or of built-up members shall be machined, machine flame cut, sawn or hand flame cut and ground. Where ends of stiffeners are required to be fitted, they shall be machined, machine flame cut, sawn, sheared and ground, or handflame cut and ground. The- ends of lacing bar shall be rounded unless otherwise required. Olher edges and ends of mild steel parts may be sheared and any burrs at edges shall be removed. 310.3 Preparation or Holes 310.3.1 Drilling and punching : Holes for rivets, black bolts, high strength bolts and countersunk bolts/rivets (excluding close tolerance and turn fitted bolts) stiall be either punched or drilled. The diameter of holes shall be 1.5 mm larger for bolts/rivets less than 25 mm dia and 2.0 mm for more than or equal to 25 mm. All holes shall be drilled except for secondary members such as, floor plate, hand rails etc. Members which do not carry the main load can be punched subject to the thickness of member not exceeding 12 mm for material conforming to IS:226. Holes through more than one thickness of material or when any of the main material thickness exceeds 20 mm for steel conforming to IS:2062 or 16 mm for steel conforming to IS:961, IS:8500, shall either be sub-drilled or sub-punched to a diameter of 3 mm less than the required size and then reamed to the required size. The reaming of material more than one thickness shall be done after assembly. Where several plates or sections form a compound member, they shall, where practicable, be firmly connected together by clamps or tacking bolts, and the holes be drilled through the group in one operation. Alternatively, and in the case of repetition work, the plates and sections may be drilled separately from jigs and templates. Jigs and templates shall be checked at least once after every 25 operations. All burrs shall be removed. In the case of repetition of spans, the erection of every span shall not be insisted upon, except where close tolerance or turned bolts are used, provided that methods are adopted to ensure strict interchangeability. In such cases, one span in ten or any number less than ten of each type shall be erected from pieces selected at random by the Engineer and should there be any failure of the pieces to fit, all similar spans shall be erected complete. In the event of spans being proved completely interchangeable, all

Structural Steel

1900

corresponding parts shall carry the same mark so that sorting of the materials at site is facilitated. 310.3.2 Block drilling : Where the number of plates to be riveted exceeds three or the total thickness is 90 mm or more, the rivet holes, unless they have been drilled through steel bushed jigs, shall be drilled out in place 3 mm all round after assembling. In such cases, the work shall be thoroughly bolted together. 310.3.3 Size of holes : The sizes of holes in millimetres are given in Table 1900-1 below:
TABLE 1900-1 : DIAMETER OF HOLES FOR RIVETS Nominal din of Rivets (mm) 12 14 16 18 20 22 24 27 30 33 Dia of Holes (mm)' 13.5 15.5 17.5 19.5 21.5 23.5 25.5 29.0 32.0 35.0

310.3.4 Close tolerance bolts and barrel bolts Holes for close tolerance and turn fitted bolts. The diameter of the holes shall be equal to the nominal diameter of the bolt shank minus 0.15 mm to 0.0 mm. The members to be connected with close tolerance or turn fitted bolts shall be firmly held together by service bolts or clamped,and drilled through all thicknesses in one operation and subsequently reamed to required size within specified limit of accuracy as specified in IS:919 tolerance grade H8. The holes not drilled through all thicknesses at one operation shall be drilled to smaller size and reamed after assembly. 310.3.5 Holes for high strength friction grip bolts : All holes shall be drilled after removal of burrs. Where the number of plies in the grip does not exceed three, the diameters of holes shall be 1.6 mm larger than those of bolts and for- more than three plies in grip, the diameters of hole in outer plies shall be as above and dia of holes in inner plies shall not be less than 1.6 mm and not more than 3.2 mm larger than those in bolts, unless otherwise specified by the Engineer. 310.3.6 Removal of burrs : The work shall be taken apart after drilling and all burrs left by drilling and the sharp edges of all rivet holes completely removed.

Structural Steel 310.4 Rivet and Riveting

1900

The diameter of rivets shown on the drawings shall be the size before heating. Each rivet shall be of sufficient length to form a head of the standard dimensions as given in IS handbook on Steel Sections, Part 1. It shall be free from burrs on the underside of the head. When countersunk heads are required, the heads shall fill the countersunk. The included angle of the head shall be as follows
a) b) For plates over 14 nun thickness For plates upto and including 14 nun thickness 90 degrees 120 degrees

The tolerance on the diameter of rivets shall-be in accordance with IS:1148 and,IS:1149 for mild steel rivets and high tensile steel rivets respectively and unless otherwise specified, the tolerance shall be minus tolerance. Rivets shall be driven when hot so as to fill the hole as completely as possible and shall be of sufficient length to - form a head of standard dimension. When counter-sunk head is required, the head shall fill the counter-sunk hole. Projection after counter-sinking "I be ground off wherever necessary. Rivets shall be heated uniformly to a "light cherry red" colour between 650 degrees Celsius to 700 degrees Celsius for hydraulic riveting and "orange colour" for pneumatic riveting of mild steel rivets and shall be red hot from head to the point when inserted and shall be upset in its entire length so as to fill the hole as completely as possible when hot. Rivets, after being heated and before being inserted in the hole shall be made free from scale by striking the hot rivet on a hard surface. Wherever possible, the rivets shall be machine driven, preferably by direct acting riveters. The driving pressure shall be maintained on the rivets for a short time after the upsetting is completed. High tensile steel rivets. shall be heated upto 1100 degrees Celsius. Any rivet whose point is heated more than prescribed, shall not be driven. Where flush surface is required, any projecting metal shall be chipped or ground off. Before riveting is commenced, all work shall be properly bolte, up so that the various sections and plates are in close contact thrOUghOUL Drifts shall only be used for drawing the work into position and shall not be used to such an extent as to distort the holes. Drifts of a larger size than the nominal diameter of the hole shall not be used. The riveting shall be done by hydraulic or pneumatic machine unless otherwise specified by the Engineer. Driven rivets, when struck sharply on the head by a quarter pound rivet testing hammer, shall be free from movement and vibrations. Assembled riveted joint surfaces, including those adjacent to the rivet heads, shall be free from scale, dirt, loose scale, burrs, other foreign materials and defects that would prevent solid stating of parts. All loose or burnt rivets and rivets with cracked or badly formed defective heads or with heads which are unduly eccentric with the shanks, shall be removed and replaced. In removing rivets; the head shall be sheared off and the rivet punched out so as not to

Structural Steel

1900

injure the adjacent metal and, if necessary, they shall be drilled out. Recupping or recaulking shall not be permitted. The parts not completely riveted in the shop shall be secured by bolts to prevent damage during transport and handling. 310.5 Bolts, Nuts and Washers 310.5.1 Black bolts iblack all over : Black bolts are forged bolts in which the shanks, heads and nuts do not receive any further treatment except cutting of screw threads. They shall be true to shape and size and shall have the standard dimensions as shown on the drawings. 310.5.2 Close tolerance bolts : Close tolerance bolts shall be faced under the head and turned on the shank. 310.5.3 Turned barrel bolts : The diameter of the screwed portion of turned barrel bolts shall be 1.5 mm smaller than the diameter of the barrel unless otherwise speCified by the Engineer. The diameter of the bolts as given on the drawing shall be the nominal diameter of the barrel. The length of the barrel shall be such that it bears fully on all the parts connected. The threaded portion of each bolt shall project through the nut by at least one thread. Faces of heads and nuts bearing on steel work shall be machined. 310.5.4 High strength friction bolts and bolted connections : The general requirement shall be as per relevant IS specifications mentioned in clause 5.3 of (Fasteners) of IRC:24. Unless otherwise specified by the Engineer, bolted connections of structural joints using high tensile friction grip bolts shall comply with requirements mentioned in IS:4000. 310.5.5 Washers : In all cases where the full bearing area of the bolt is to be developed, the bolt shall be provided with a steel washer under the nut of sufficient thickness to avoid any threaded portion of the bolt being within the. thickness of the parts bolted together and to prevent the nut When screwed up, from bearing on thebolt. For close tolerance or turned barrel.bolts, steel washers whose faces give a true bearing shall be provided under the nut. The washer shall have a hole diameter not less -than 1.5 mm larger than the barrel and a thickness of not lesi than 6 mm so that I the nut when screwed up, will not bear on the shoulder of the bolt. Taper washers with correct angle of taper shall be provided under all heads and nuts bearing on bevelled surfaces. Spring washers may be used under nuts to prevent slackening of the nuts when excessive vibrations occur. Where the heads or nuts bear on timber, square washers having a length of each side not less than three times the diameter of bolts or round washers having a diameter of 31/2 times the diameter of bolts and with a thickness not less than.one quarter of diameter shatl be provided. 310.5.6 Studs : Ordinary studs may be used for holding parts together, the holes in one of the parts being tapped to take the thread of the stud. Counter-sunk studs may be used for 'making connections where the surfaces are required

Structural Steel

1900

to be clear of all obstruction, such as protruding heads of bolts or rivets, studs may also be welded on the steel work in the positions required. 310.5.7 Service bolts : Service bolts shall have the same clearance as black bolts and where it is required that there should be no movement prior to final riveting, sufficient drifts or close tolerance bolts shall be used to locate the work. 310.5.8 Tightening bolts: Bolted connection joints with black bolts and high strength bolts shall be inspected for compliance of codal requirements. The Engineer shall observe the installation and tightening of bolts to ensure that correct tightening procedure is used and shall determine that all bolts are tightened. Regardless of tightening method used, tightening of bolts in a joint should commence at the most rigidly fixed or stiffest point and progress towards the free edges, both in initial snugging and in final tightening. The tightness of bolts in connection shall be checked by inspection wrench, which can be torque wrench, power wrench or calibrated wrench. Tightness of 10 per cent bolts, but not less than two bolts, selected at random in each connection shall be checked by applying inspection torque. If no nut or bolt head is turned by this application, connection can be accepted as properly tightened, but if any nut or head has turned all bolts shall be checked and, if necessary, re-tightened. 310.5.9 Drifts : The barrel shall be drawn or machined to the required diameter for a length of not less than one diameter over the combined thickness of the metal through which- the drifts have to pass. The diameter of the parallel barrel shall be equal to the nominal diameter of the hole subject to a tolerance of +0 mm and -0.125 mm. Both ends of the drift for a length equal to 11/2 times the diameter of the parallel portion of the bar shall be turned down with a taper to a diameter at the end equal to one-half that of parallel portion. 310.6 Pins and Pin Holes 310.6.1 Pins : The pins shall be parallel throughout and shall have a smooth surface free from flaws. They shall be of sufficient length to ensure that all parts connected thereby shall have a full bearing on them. Where the ends are threaded, they shall be turned to a smaller diameter at the ends for the thread and shall be provided with a pilot nut, where necessary, to protect the thread when being drawn to place. Pins more than 175 mm in length or diameter shall be forged and annealed. 310.6.2 Pin holes : Pin holes shall be bored true to gauge, smooth, straight at right angles to the axis of the member and parallel,with each other, unless otherwise required. The tolerance in the length of tension members from outside to outside of pin holes and of compression members from inside to inside of pin holes shall be one millimetre. In built-up members, the boring shall be done after the members have been riveted or welded.

Structural Steel

1900

The specified diameter of the pin hole shall be its minimum diameter. The resulting clearance between the pin and the hole shall not be less than 0.5 mm and not more than 1.0 mm. 310.7 Shop Erection and Match Marking Before being dispatched, the steel work shall be temporarily, erected in the fabrication shop for inspection by the Engineer either wholly or in such portion as the Engineer may require so that he may be satisfied both in respect of the alignment and fit of all connections. For this purpose, sufficient number of parallel drifts and service bolts tightly screwed up shall be employed. All parts shall fit accurately and be in accordance with drawings and specifications. The steel work shall be temporarily assembled at place of fabrication. Assembly shall be of full truss or girder, unless progressive ' truss or girder assembly, full chord assembly, progressive chord assembly or special complete structure assembly is specified by the Engineer. The field connections of main members of triisses, arches, continuous beams, spans, bends, plate girders and rigid frame assembled, aligned, accuracy of holes and camber shall be checked by Engineer and then only reaming of sub-size holes to specified size shall be taken up. After the -work has been passed by the Engineer andbefore it is dismantled, each part shall be carefully marked for re-erection with distinguishing marks and stamped with durable markings. Drawings showing these markings correctly shall be supplied to the Engineer. Unloading, handling and storage of steel work as per these specifications shall be the responsibility of the Contractor. The cost of repairs or of rejected material, its removal and the cost of transporting replacement material to the site shall be borne by the Contractor. Where close tolerance or turned barrel bolts are used for those cases where interchangeability is not insisted upon, each span shall. be erected. and members of each span marked distinctly. 310.8 Welding 310.8.1 All welding shall be done with the prior approval of the Engineer and the workmanship shall conform to the specifications of IS:823 or other relevant Indian Standards as appropriate. When material thickness is 20 mm or more, special precautions like preheating shall be taken as laid down in IS:823. Surfaces and edges to be welded shall be smooth, uniform and free from fins, tears, cracks and other discontinuities. Surface shall also be free from loose or thick scale, slag rust, moisture, oil and other foreign materials. Surfaces within 50 mm of any weld location shall be free from any paint or other material that may prevent proper welding or cause objectionable fumes during welding. The general welding procedures including particulars of the preparation of fusion faces for metal arc welding shall be carried out in accordance with IS:9595.

Structural Steel

1900

The welding procedures for shop and site welds including edge preparation of fusion faces shall be submitted in writing in accordance with Clause 22 of IS:9595 for the approval of the Engineer before commencing fabrication and shall also be as per details shown on the drawings. Any deviation from above has to be approved by Engineer. Preparation of edges shall, wherever practicable, be done by machine methods. Machine flame cut edges shall be siubstantially as smooth and regular'as those produced by edge planifrg and shall be left free of slag. Manual flame cutting shall be permitted by the Engineer only where machine cutting,is not practicable. Electrodes to be used for metal arc welding shall comply with relevant IS specifications mentioned in IRC:24. Procedure test shall be carried out as per IS:8613 to find out suitable wire-flux combination for welded joint. Assembly of parts for welding shall be in accordance with provisions of IS:9595. The welded temporary attachment should be avoided as far as possible, otherwise the method of making any temporary attachment shall be approved by the Engineer. Any scars from temporary attachment shall be removed by cutting, chipping and surface shall be finished smooth by grinding to the satisfaction of the Engineer. Welding shall not be done when the air temperature is less than 10 degrees Celsius. Welding shall not b-, done when the surfaces are 'moist, during periods of strong winds or in snowy weather unless the work and the welding operators are adequately protected. 310.8.2 For welding of any particular type of joint, welders shall qualify to the satisfaction of the Engineer in accordance with appropriate welders qualification test as prescribed in any of the Indian Standards IS:817, IS:1966, IS:1393, IS:7307 (part 1), IS:7310 (Part 1) and IS:7318 (part 1) as relevanL 310.8.3 In assembling and joining parts of a structure or of builtup members, the procedure and sequence of welding shall be such as to avoid distortion and minimise shrinkage stress. All requirements regarding pre-heating of parent material ' and interpass temperature shall be in accordance with provision of IS:9595. 310.8.4
a)

Peening of weld shall be carried out wherever specified by the Engineer :

If specified, peening may be employed to be effective on each weld layer except first.

b) Ilie peening should be carried out after weld has cooled by light blows from a power hammer using a round nose tool. Care shall be taken to prevent scaling or flaking of weld and base metal from over peening.

310.8.5 Where the Engineer has specified the butt welds are to be ground flush, the loss of parent metal shall not be greater than that allowed for minor surface defects. The ends of butt joints shall be welded so as to provide full throat thickness. This qiay be done by use of extension pieces, cross runs or other means approved by the Engineer. Extension pieces shall be removed after the joint has cooled and the ends of the weld shall be finished smooth and flush with the faces of the abutting parts.

Structural Steel

1900

The joints and welds listed below are prohibited type, which do not perform well under cyclic loading.
a) b) d) e) Butt joints not fully welded throughout their cross-section Groove welds made from one side only without any backing grip c) Intermittent groove welds Intermittent fillet welds Bevel-grooves and J-grooves in butt joints for other than horizontal posit.ion. f) Plug and slot welds

310.8.6 The run-on and run-off plate extension shall be used providing full throat thickness at the end of butt welded joints. These plates shall comply with the following requirements.
(i) One pair of "run-on" and one pair of "run-off" plates prepared from same thickness and profile as the parent metal shall be attached to start and finish of all butt welds preferably by clamps. (ii) When "run-on" and "run-off' plates sMI be removed by flame cutting,,it should be cut at mom than 3 nun from parent metal and remaining metal shall be removed by grinding or by an-, other method approved by the Engineer.

310.8.7 Welding of stud shear connectors : The stud shear connectors shall be welded in accordance with the manufacturer's instructions including preheating. The stud and the surface to which studs are welded shall be free from scale, moisture, rust and other foreign material. The stud base shall not be painted, galvanised or cadmium plated prior to welding. Welding shall not be carried out when temperature is below 10 degrees Celsius or surface is wet or during periods of strong winds unless the work and the welder is adequately protected. The welds shall be visually free from cracks and shall be capable of developing at least the nominal ultimate strength of studs. The procedural trial for welding the stud shall be carried out when specified by the Engineer. 310.9 Tolerances Tolerances in dimensions of components of fabricated structural steel work shall be specified on the drawings and shall- be subject to the approval of the Engineer before fabrication. Unless- specified, all parts of,a.n assembly shall fit t~gether accurately within tolerances specified in Table 1900-2. A machined bearing surface, where specified by the Engineer, shall be machined within a deviation of 0.25 min for surfaces that can be inscribed within a square of slide 0.5 m. TABLE 1900.2 FABRICATION TOLERANCES A. 1. INDIVIDUAL COMPONENTS Length a) b) Member with both ends finished for I mm contact bearing Individual components of members with + 0 mm

Structural Steel end plate connection c) Other members i) Upto and including 12 M ii) Over 12 M 2. a) b) Width Width of built-up girders 3 mm +0.mm -3 nun Deviation in the width of members 3.5 mm. 2 turn - 2 mm

1900

required to be inserted in other members 3. Depth Deviation in the depths of solid web and open web girders 4. Straightness a) Deviation from stniglaness of L/3000 subject to a colurrms where L is length of i) In elevation ii) In plan +5 nun -0 nim Maximum of 15 nun member -2 mm +3 nun

L/1000 subject to a maximum of 10 mm

5. Deviation of centre line of web from center line of flanges in built-up members at contact surfaces 3 mm 6. Deviation from flatness of plate of webs of 0.005 d to a maximum built-up members in a length equal to the of 2 nun where d is depth of the member of the member 7. Tilt of flange of plate girders a) t splices and stiffeners, at 0.005 b to a supports, at the top flanges of minimum of 2 mm where b plate girders and at bearings is width of the member b) at other places 0.015 b to a maximum of 4 rum where b is width of the member 8. Deviation from squareness ofIJ1000, where flange to web of columns aid L nominal length box girders of the diagonal 9. is

Deviation from squareness ofD/500, where D is fixed base plate (not machined) the distance from to axis of column. This dimension the colulm axis to the point under consideration on the but plate

shall be measured paxotel to the longitudinal axis of the column at points where the outer surfaces of the column sections make contact with the base plate

Structural Steel 10. Deviation from squarentess of machined ends to axes of columns 11. or girder 11 D/1000, where D is as defined in 9 above

1900

Deviation from squareness of machined ends to axes of beams above as defined in 9

D/1000, where D is

Ends of members abutting at joints 1/600 of depth of through clew or end plates, permissible deviation from squareness of ends 311 ERECTION member subject to 4 maximum of 1.5 nun

311.1 General The provisions of this item shall apply to erection of steel bridge superstructures or main members of bridge superstructures, composed of steel, which span between supports. If the sub-structure and the superstructure are built under separate contracts, the department will provide the substructure, constructed to correct lines, dimensions and elevations properly finished and will establish the lines and the elevation required for setting steel. The Contractor shall erect the structural steel, remove the temporary construction, and do all the work required to complete the construction included in the contract in accordance with the drawings and the specifications and to the entire satisfaction of the Engineer. 311.2 Organisation and Equipment The Contractor shall submit erection plans prepared by the fabricator, showing a method and procedure of erection, compatible with the details of fabrication. A detailed scheme must be prepared showing stage-wise activities, with completedrawings and working phase-wise instructions. This should be based on detailed stage-wise calculation and take into account specifications and capacity of erection equipment machinery, tools, tackles to be used and temporary working loads as per Codal provisions. The scheme should be based on site conditions e.g. hydrology, rainfall, flood timings and intensity, soil and sub-sod conditions in the river bed and banks, maximum water depth, temperature and climatic conditions and available working space, etc. The scheme should indicate precisely the type of temporary fas.teners to be used as also the minimum percentage of permanent fasteners to be fitted during the stage erection. Mie working drawings should give clearly the temporary jigs, fixtures, clamps, spacer supports, etc.

Structural Steel

1900

Unless otherwise provided in the contract, the contractor shall supply and erect all necessary falsework and staging and shall supply all labour, tools, erection plant and other materials necessary to carry out the work complete in all respects. The Contractor shall supply all rivets, bolts, nuts, washers, etc. required to complete erection at site with an allowance for wastage, etc., of 12 1/2 per cent of the net number of field rivets, bolts, washers required, or a minimum of five number of each item. Service bolts and nuts, ordinary platters, washers and drifts for use in the erection of work shall be supplied at 60 per cent (45 per cent bolts and 15 per cent drifts) of the number of field rivets per span in each size (this includes wastage). A reduction in the quantities of service bolts, etc., may however, be specified by the Engineer if more than one span of each type is ordered. Prior to actual commencement of erection all equipment, machinery, tools, tackles, ropes, etc. need to be tested to ensure their efficient working. Frequent visual inspection is essential in vulnerable areas to detect displacements, distress, drainages, etc. Deflection and vibratory tests shall be conducted in respect of supporting structures, launching truss as also the structure under erection and unusual observations reviewed; looseness of fittings are to be noted. For welded structures, welders' qualificatons and skill are to be checked as per standard norms. Non-destructive tests of joints as per designer's directives are to be carried out. Precision non-destructive testing instruments available in the market should be used for noting various important parameters of the structures frequently and systematic record is to be kept. Safety requirements should conform to IS:7205, IS:7273 and IS:7269 as applicable, and should be a consideration of safety, economy and rapidity. Erection work should start with complete resources mobilised as per latest approved drawings and after a thorough survey of foundations and other related structural work. In case of work of magnitude, maximum mechanisation is to be adopted. The structure should be divided into erectable modules as per the scheme. This should be pre-assembled in a suitable yard/platform and its matching with members of the adjacent module checked by trial assembly before erection. The structure shall be set out to the required lines and levels. The stocks and masses are to be carefully preserved. The steelwork should be erected, adjusted and completed in the required. position to the specified line and levels with sufficient drifts and bolts. Packing materials are to be available to maintain this condition. Organised "Quality Surveillance" checks need to be exercised frequently. Before starting work, the Contractor shall obtain necessary approval of the Engineer as to the method adopted for erection, the number and character of tools and plants. The approval of the Engineer shall not relieve the Contractor of his responsibility for the safety of his method or equipment or from carrying out the work fully in accordance with the drawings and specifications.

Structural Steel

1900

During the progress of work, the Conuxtor shall have a competent Engineer or foreman in charge of the work, who shall be adequately experienced in steel erection and acceptable to the Engineer. 311.3 Handling and Storing of Materials Suitable area for storage of structures and components shall be located near the site of work. The access road should be free from water logging during the working period and the storage area should be on levelled and firm ground. The store should be provided with adequate handling equipments e.g road mobile crane, gantries, derricks, chain pulley blocks, winch of capacity as required. Stacking area should be planned and have racks, stands sleeper, access tracks, etc., and properly lightedi, Storage should be planned to suit erection work sequence and avoid damage or distortion. Excessively rusted, bent or damaged steel shall be rejected. Methods of storage and handling steel, whether fabricated or not shall be subject 'to the approval of the Engineer.. Fabricated materials are to be stored with erection marks visible, such as not to come into contact with earth surface or water and should be accessible to handling equipment. Small fitting hand tools are to be kept in containers in covered stores. All materials, consurnables, including raw steel or fabricated material shall be svred specification-wise and size-wise above the ground upon platforms, skids or other supports. It shall be kept free from dirt and other foreign matter and shall be protected as far as possible from corrosion and distortion. The electrodes shall be stored specificationwise and shall be kept in dry warm condition in properly designed racks. The bolts, nuts, washers and other fasteners shall be stored on racks above the ground with protective oil coating in gunny bags. The paint shall be stored under cover in,air-tight containers. IS:7293 and IS:7969 dealing with handling of materials and equipments for safe -working should be followed. Safety nuts and bolts as directed are to be used while working. The Contractor shall be held responsible for loss or damage to any material paid for by the Department while in his care or for any damage to such material resulting from his work. 311.4 Formwork The formwork shall be properly designed, substantially built and maintained for all anticipated loads. The Contractor, if required, shall submit plans for approval to the Engineer. Approval of the plans, however, shall not relieve the Contractor of his responsibility. 311.5 Straightening Bent Material The straightening of plates, angles and other shapes shall be done by methods not likely to produce fracture or any injury. The metal shall not be heated unless permitted by the Engineer for special cases, when the heating shall not be to a temperature higher than that producing a dark "cherry red" colour, followed by as slow cooling as possible.

Structural Steel

1900

Following the straightening of a bend or buckle the surface shall be carefully investigated for evidence of fracture. Sharp kinks and bends may be the cause for rejection of material. 311.6 Assembling Steel The parts shall be accurately assembled as. shown on the drawings and match marks shall be followed. The material shall be carefully handled so that no parts will be bent, broken or otherwise damaged. Hammering which-will injure or distort the members shall not be done. Bearing surface or surfaces to be in permanent contact shall be cleaned, before the members are assembled. The truss spans shall be erected on blocking, so placed as to give the proper camber. The blocking shall be left in place ' until the tendon chord splices are fully riveted and a other truss connections pinned and bolted. Rivets in splices of butt joints of compression members and rivets in railings shall not be driven until the span has been swung. All joint surface for bolted connections including bolts, nuts,washers shall be free from scale, dirt, buffs, other foreign materials- and defects that would prevent solid seating of parts. The slope of surface of bolted parts in contact with bolt head and nut shall not exceed I in 20,_ plane normal to bolt axis, otherwise suitable tapered washer shall be used. All fasteners shall have a washer under nut or bolt head whichever is turned in tightening. Any connection to be riveted or bolted shall be secured in close contact with service bolts or with a sufficient number of permanent bolts before the rivets are driven or before the connections are finally bolted. Joints shall normally be made by filling not less am 50 per cent of holes with service bolts and barrel drifts in the ratio 4:1. The service bolts are to be fully tightened up as soon as the joint is assembled. Connections to be made by close tolerance or barrel bolts shall be completed as soon as practicable after assembly. Any connection to be site welded shall be securely held in position by approved methods to ensure accurate alignment, camber and elevation before welding is commenced. The field riveting, welding, bolted and pin connection shall conform to the requirements of Clause 1904 as appropriate. The correction of minor misfits involving harmless amounts of reaming, cutting and chipping will be considered a legitimate part of erection. However, any error in the shop fabrication or deformation resulting from handling and transportation which prevents proper assembling and fitting up of parts by moderate use of drifts or by a moderate amount of reaming and slight chipping or cutting shall be reported immediately to the Engineer and his approval of the method of correction obtained. The correction shall be made in the presence of -the Engineer. 311.7 Field Inspection 311.7.1 General

Structural Steel

1900

All materials, equipment and work of erection shall be subject to the inspection of the Engineer who shall be provided with all facilities including labour and tools required at all reasonable times. Any work found defective is liable to be rejected. 311.7.2 No protective treatment shall be applied to the work until the appropriate inspection and testing has been carried out. The stage inspection shall be carried out for all operations so as to ensure the correctness of fabrication and good quality. Girder dimensions and camber'shall not be finally checked until all welding and heating operations are completed and the member has cooled to a uniform temperature. 311.7.3 Testing of material : Structural steel shall be tested for mechanical and chemical properties as per various IS codes as may be applicable and shall conform to requirements specified in IS:226, IS:2062, IS:11587, IS:1977, IS:8500 and IS:961, etc. Rivets, bolts, nuts, washers, welding consurnables, steel forging, casting and stainless steel shall be tested for mechanical and chemical properties in the appropriate IS Code. Rolling and cutting tolerance shall -be as per IS:1852. The thickness tolerance check measurements for the plate and rolled sections shall be taken at not less than 15 mm from edge, Laminations in plates shall be carried out by ultra-sonic testing or any other specified methods. Steel work shall be inspected for surface defects and exposed edge laminations during fabrication and blast cleaning. Significant edge laminations found shall be reported to the Engineer for his decision. Chipping, grinding, machining or ultrasonic testing shall be used to determine depth of imperfection. 311.7.4 Bolted connections : Bolts and bolted connection joints with high strength friction grip bolts shall be inspected and tested according to ISA000. Rivets and riveted connection shall be inspected and tested for compliance of codal requirements. The firmness of joint shall be checked by 0.2 min filler gauge, which shall not go inside under the rivet head by more than 3 mm. There shall not be any gap between members to be riveted. Driven rivets shall be checked with rivet testing hammer. When struck sharply on head with rivet testing hammer, rivet shall be free from movement and vibration. All loose rivets and rivets with cracks, badly formed or deficient heads or with heads which are eccentric with shanks, shall be cut out and replaced. The alignment of plates at all bolted splice joints and welded butt joints shall be checked for compliance with codal requirements. Testing of flame cut and sheared edges is to be done, where the hardness criteria given in the code are adopted. Hardness testing shall be carried out on six specimens. 311.7.5 Welding and welding consumables :Welding procedure, welded connection and testing shall be in compliance with codal requirements. -

Structural Steel

1900

All facilities necessary for stage inspection during welding and on completion shall be provided to the Engineer or their inspecting Authority by manufacturer. Adequate means of identification either by identification mark or other record shall be provided-to enable each weld to be traced to the welder(s) by whom it was carried out. All metal arc welding shall be in compliance with IS:9595 provisions. The method of inspection shall be in accordance with IS:822 and extent of inspection and testing shall be in accordance with the relevant standards or in the absence of such a standard, as agreed with the Engineer. Procedure tests The Destructive and Non-Destructive test of weld shall be carried out according to IS:7307 (Pan I). Non-Destructive Testing of Welds One or more of the following methods may be applied for inspection or testing of weld
(i) Visual Inspection : All. welds shall be visually inspected, which should cover all defects of weld such as size, porosity, crack in the weld or in the HAZ (Hest Affected Zone) etc. Suitable magnifying glass may be used for visual inspection. A weld shall be acceptable by visual inspection if it shows that a) b) c) 7he weld has no.cracks. Through fusion exists between weld and base metal and between adjacent layers of weld metal. Weld profiles am in accordance with requisite clauses of IS -9595 or as agreed with the Engineer.

d) The weld shall be of full cross section, except for the ends of intermittent fillet welds outside their effective length. e) When weld is transverse to the primary stress, undercut shall not be more than 0.25 nun deep in the part that is undercut and shall not be more than all mm deep when the weld is paroel to the primary stress in the part that is undercut. f) The fillet weld in any single continuous weld shall be permitted to under Tun the nominal fillet weld size specified by 1.6 nun without correction provided that undersize portion of the weld does not exceed 10 per cut of the length of the weld. On the web-to-flange; welds on girders, no underrun is permittrA ;i the ends for a length -equal to twice the width of the flange. g) The piping porosity in fillet welds shall not exceed one in each 100 mm of weld length and the maximum diameter shall not exceed 2.4 turn, except for fillet welds connecting stiffeners to web where the sum of diameters of piping porosity shall not exceed 9.5 nun in any 25 nun length of weld and shall not exceed 19 nun in any 300 nun length of weld. h) The full penetration groove weld in butt joints tnwsvlrse so the direction of computed tensile stress shall have no piping porosity. For all other groove welds, the piping porosity shalf-not exceed one in 100 mm of length and the maximum diameter shall not exceed 2.4 nun. (ii) Magnetic Particle and Radiographic Inspection: Welds that are subject to radiographic or magnetic particle testing in addition to visual inspection shall have no crack. Magnetic particle test shall be carried out for detection of crack and other discontinuity in the weld according to IS:5334. Radiographic test shall be carried out for detection of internal flaws in the weld such as crack. piping porosity inclusion, lack of fusion, incomplete penetration. etc. This test mat be carried out as per ISA182 and IS:4853. Acceptance Criteria - The weld shall be unacceptable if radiographic or magnetic particle testing shows any of the type of discontinuities indicated in the code. (iii) Ultrasonic Inspection : The Ultrasonic testing in addition to visual inspection shall be carried out for detection of internal flaws in the weld such as cracks, piping porosity inclusion, lack of fusion, incomplete

Structural Steel

1900

penetration, etc. Acceptance criteria shall be as per IS:4260 or any other relevant IS Specification and as agreed to by the Engineer. iv) Liquid Penetration Inspection : The liquid penetrant test shall be carried out for detection of surface defect in the weld, as per IS:3658, in addition to visual inspection. The non-destructive- testing of following welds be carried out using one of the method or methods described at (ii),(iii) and (iv) above, as may be agreed to by the Engineer. a) b) c) d) All transverse butt welds in tension flange 10 per cent of the length of longitudinal and transverse butt welds in tension flanges. 5 per cent of the length of longitudinal and transverse butt welds in compression flanges. All transverse bun welds in webs adjacent to tension flanges as specified by the Engineer.

The particular length of welds in webs to be tested shall be igreed with the Engineer, in case of (b) or (c). Where specified by the Engineer, bearing stiffeners or bearing diaphragms adjacent to welds, flange plates adjacent to web/flange welds, plates at cruciform welds, plates in box girder, construction adjacent to comer welds or other details shall be ultrasonically tested after fabrication. Any lamiuation, lamellar tearing or other defect found shall be recorded and reported to Engineer for his decision. Testing of Welding for Cast Steel : The testing of weld for cast steel shall be carried out as may be agreed to by the Engineer. Stud Shear Connectors : Stud shear connectors shall be subjected to the following tests
a) The fixing of studs after being welded in position shall be tested by striking t~iiking the side of the head of the stud with a 2 kg hammer to the satisfaction of the Engineer. b) The seJected stud head stroked with 6 kg harnmer shall be capable of lateral displacement of approximately 0.25 the height of the stud from its original position. The stud weld shall not show any sign of crack or lack of fusion.

The studs whose welds have failed the tests given in (a) and (b) shall be replaced. 311.7.6 Inspection requirement : The fabricated member/comportent made out of rolled and built-up section shall be checked for compliance of the tolerances given in Table 1900-2. Inspection of member/components for compliance with tolerances, and the check for deviations shall be made over the full length. During checking, the inspection requirement shall be placed in such a manner that local surface irregularities do not influence the results. For plate, out-of-plane deviation shall be checked at right angle to the surface over the full area of plate. The relative cross-girder or-cross frame deviation shall be checked over the middle third of length of the cross girder or frame between each pair of webs and for cantilever at the end of member. The web of rolled beam or channel section shall be checked for out-of-plane deviation in longitudinal direction equal to the depth of the section. During inspection, the component/member shall not have any load or external restraint.

Structural Steel

1900

Inspection Stages : The inspection to be carried out for compliance of tolerances shall include but not be limited to the following stages:
a) For completed parts, component/members on completion of fabrication and before any Absequent operation such as surface preparation, painting, transportation, erection. b) For webs of plate and box girder. longitudinal compression flange stiffeners in box girders and orthotropic decks and all web stiffeners at site joints, on completion of site joint. c) For cross girders and frames, cantilevers in orthotropic decks and other parts in which deviations have apparently increased on completion of site assembly.

Where, od checking member/component for the deviations in respect of out-of-plane or out-of-straightness at right angles to the plate surface, and any other instances, exceed tolerance, the maximum deviation shall be measured and recorded. The recbrded measurements shall be submitted to the Engineer who will determine. whether the component/member may be accepted without rectification, with rectification or rejected. 312 312.1 General Unless otherwise specified, all metal work shall be given approved shop coats as well as field coats of painting. The item of work shall include preparation of metal surfaces, application of protective covering and drying of the paint coatings and supply of all tools, scaffolding, labour and materials necessary. Coatings shall be applied only to dry surfaces and the coated surfaces shall not be exposed to rain or frost before they are dry. The coatings-shall be applied to all surfaces excluding shear connectors and inner surfaces of fully sealed hollow sections. Care shall be taken during coating of adjacent surfaces to build up primer on the shear connectors. 312.1.1 Types of paints (i) Ordinary Paints These include paints based on drying oils, alkyd resin, modified alkyd resin, phenolic vamis epoxy, etc. Alkyd resin paints for the protection of steel structures are based partly on natural oils and partly on synthetic resins. These paints shall be used for steel structures in atmospheres which are not too aggressive. Oil based paints can be used for steel structures in cases where the surface preparation cannot be ideal. Ordinary painting can generally be sub-divided into two groups a) Primary Coats This shall be applied immediately after the surface preparation and should have the properties of adhesion, corrosion inhibition and imper.viousness to water and air. b) Finishing Coats These are applied over the primary coat and should have the properties of durability, abrasion resistance, aesthetic appearance and smooth finish. (ii) Chemical Resistant Paints The more highly corrosion resistant paints can be divided into two main groups PAINTING

Structural Steel a) b) One pack paints (ready'For use) Two pack paints (mixed before use)

1900

The two pack paints shall be mixed together, immediately before use since they are workable thereafter only for a restricted period of time and dry up as a result of a reaction between their components and yield hard tough films with resistance to abrasion. (iii) Vinyl Paints polyvinyl resins such as polyvinyl-chloride(PVC) and These are based on polyvinyl-acetate, etc.

Certain types of vinyl resin paints yield thick, relatively soft and rubber like coatings with good chemical resistance. They can be repainted without difficulty. (iv) Chlorinated Rubber Paints These paints also have good chemical resistance. The main fields of applications shall be in aggressive environments. In general, chlorinated rubber paints do not have a high gloss. (v) Bituminous Paints As a paint vehicle, bituminous is inferior, but because of the low price, this should be applied in greater thickness (upto several millimetres) and may be suitable for some situations. A significant advantage of bitumen paints is their impermeability to ingress of water. However, bituminous paints do not withstand effectively detrimental effects of oil. (vi) Epoxy Paints These resin paints have good adherence to a well prepared substrata. They are mechanically strong and resistant to chemicals. A disadvantage of epoxy resin paints is that it can rapidly become dull when exposed to strong sunlight. These disadvantages do not, however, greatly influence their protective power. (vii) Polyurethane Paints The chemical and mechanical behaviour of polyurethane paint resembles those of epoxy paint very much. However, polyurethane paint retains its gloss for a longer period. Because of the high price of polyurethane paint, a combination of the two viz., polyurethane and epoxy paints may sometimes be used. (viii) Zinc Rich Paints Instead of introducing an inhibitive pigment into paint, metallic zinc can be used and such paints can provide cathodic protection to steel. 312.1.2 Surfaces which are inaccessible for cleaning and painting after fabrication shall be painted as specified before being assembled for riveting. All rivets, bolts, nuts, washers etc., are to be thoroughly cleaned and dipped into boiling linseed oil conforming to IS:77. All machined surfaces are to be well coated with a mixture of white lead conforming to IS:34 and Mutton Tallow conforming to IS:887.

Structural Steel

1900

For site paintings, the whole of the steel work shall be given the second cover coat after final passing and after touching up the primer and cover coats, if damaged in transit. 312.1.3 Choice of painting system The choice of suitable painting system is dependent on factors such as: Available application methods viz. brush, roller or spray Durability in a specific environment Availability of skilled manpower Cost / benefit etc. It is therefore necessary to consult various manufacturers of paint and ascertain the above aspects while deciding on the appropriate choice of painting system. 312.1.4 Quality of paint : The paints which have been tested for the following qualities as per the specifications given in the relevant IS codes should only be used : Weight Test (weight per 10 litre of paint thoroughly mixed) Drying time Flexibility and Adhesion Consistency Dry thickness and rate of consumption 312.1.5 Unless otherwise specified, all painting and protective coaling work shall be done in accordance with IS:1477 (Part 1). 312.2 Surface Preparation Steel surface to be painted either at the fabricating shop or at the site of work shall be prepared in a thorough manner with a view to ensuring complete removal of mill scale by one of the following processes as agreed to between the fabricator and the Engineer
a) Dry or wet grit / Sand blasting b) Pidding which should be restricted to single plates, bars and sections c) Flame cleaning

Primary coat shall be applied as soon as practicable after cleaning and in case of flame cleaning, primary coat. shall be applied while the metal is still warm. All slag from welds shall be removed before painting. Surfaces shall be maintained dry and free from dirt and oil. Work out of doors in frosty or humid weather shall be avoided. 312.3 Coatings Prime coat to be used shall conform to the specification of primers approved by the Engineer. Metal coatings shall- be regarded as priming coatings. Primer shall be applied to the blast cleaned surface before any deterioration of the surface is visible. In any case, the surface shall receive one coat of primer within 4 hours of abrasive blast cleaning. All coats shall be compatible with each other. When metal coat,ings are used, the undercoat shall be compatible with the metal concerned. The undercoat and finishing coat shall preferably be from the same manufacturer. Successive coats of paints shall be of different shades or colours and each shall be allowed to dry thoroughly before the next is applied. Particular care shall be taken with the priming and painting of edges,

Structural Steel

1900

comers, welds and rivets. Typical guidelines for epoxy based paints and the conventional painting system for bridge girders as given below may be complied with
a) Epoxy Based Painting i) Surface preparation : Remove oil/grease by use of petroleum hydrocarbon solution OS:1745) and Grit blasting to near white metal surface. ii) Paint system: 2 coats of epoxy zinc phosphate primer = 60 micron ; Total 5 coats = 200 micron b) Conventional Painting System for areas where corrosion is not severe

Priming Coat One heavy coat or ready mixed paint, red lead primer conforming to IS: 102 or One coat of ready mixed zinc chrome primer conforming to IS: 104 followed by one coat of ready mixed red oxide zinc chrome primer conforming to IS:2074. or Two coats of zinc chromates red oxide primer conforming to IS:2074 Finishing Coats Two cover coats of red oxide paint conforming to IS: 123 or any other approved paint shall be applied over the primer coat. One coat shall be applied before the fabricated steel work leaves the shop. After the steel work is erected at site, the second coat shall be given after touching tip the primer and the cover coats if damaged in transit. c) Conventional Painting System for areas where corrosion is severe Priming Coat Two coats of ready mixed red lead primer conforming to IS:102 or One coat of ready mixed zinc chrome primer conforming to IS: 104 followed by one coat of zinc chromate conforming oxide primer to IS:2074.

Structural Steel Finishing Coats

1900

Two coats of aluminum paint conforming to IS:2339 shall be applied over the primer coat. One coat shall be applied before the fabricated steel work leaves the shop. After the steel work is erected at site, the second coat shall be given after touching up the primer and the cover coats if damaged in transit. 312.4 Painting in the Shop All fabricated steel shall be painted in the shops after inspection and acceptance with at least one priming coat, unless the exposed surfaces are subsequently to be cleaned at site or are metal coated. No primer shall be applied to galvanised surfaces. Shop contact surfaces, if specifically required to be painted, shall be brought together while the paint is still wet. Field contact surfaces and surfaces to be in contact with cement shall be painted with primer only. No paint shall be applied within 50mm of designed location of field welds. Paint shall be completely dried before loading and transporting to site. Surface not in contact but inaccessible after shop assembly shall receive the fully specified protective treatment before -assembly. Where surfaces are to be welded, the steel shall not be painted or metal coated within a suitable distance from any edges to be welded if the specified paint or metal coating would be harmful to welders or is expected to impair the quality of site welds. Exposed machined surfaces shall be adequately protected. 312.5 Painting at Site Surfaces which will be inaccessible after site assembly shall receive the full specified protective treatment before assembly. Surfaces which will be in cont act after site assembly shall receive a coat of paint (in addition to any shop priming) and ~hall be brought together while the paint is still wet. Damaged or deteriorated paint surfaces shall be first made good with the same type of coat as the shop coat. Where steel has received a metal coating-in the shop, this coating shall be completed on site so as to be continuous over any welds, bolts and site rivets. Specified protective treatment shall be completed after erection. 312.6 Methods of Application The methods of application of all paint coatings shall be in accordance with the manufacturer's written recommendation and shall be as approved by the Engineer. Spray painting may be permitted provided it will not cause inconvenience to the~ public and is appropriate to the type of structure being coated. Areas hard to gain access to for painting and areas shaded for spray application shall be coated first by brushing. Oil based red lead primers must be applied by brush only, taking care to work into all comers and crevices.

Structural Steel

1900

The primer, intermediate and finishing coats shall all be applied so as to provide smooth coatings of uniform thickness. Wrinkled or blistered coatings or coatings with pinholes, sags, lumps or other blemishes -shall not be accepted. Where the Engineer so directs, the coating shall be removed by abrasive blast cleaning and replaced at the Contractor's expense. 312.7 Guideline of Specifications for Protective Coating System in Different Environments Since the seriousness of the problem of corrosion depends upon atmospheric conditions and these vary enormously, there is no single protective system or method of application that is suitable for every situation. However, as a guide, broad recommendations are given in Table 1900-3 for various types of coatings in various environmental conditions which should be complied with. Approximate life to first maintenance is also indicated and can be used as a guide.
TABLE 1"0-3 : RECOMMENDATIONS FOR TYPES OF PROTECTIVE COATINGS System Environment

i) Wire brush to remove all loose rust Suitable for mild conditions where and scale; 2 cools drying oil tyx.m appearance is of some importance and primer under coat alkyd type where regular maintenance is intended. paint; I finishing coat alkyd This system may deteriorate to a marked type. Total dry fibn thickness extent if it is exposed to moderate 150 pin aggressive atmospheric conditions for lengthy period ii) Wire brush to remove all loose rust and scale; 2 coats drying oil type primer 2 under coats micaceous iron oxide (MXO) pigmented phenolic modified drying oil. Total dry film thickness = 170 pm iii) Blast clean the surface; 2 coats of quick drying primer, undercoat alkyd type Paint; I finishing coat alkyd type. Total dry film thickness 130 - 150 pm iv) Blast clean the surface; 2 coats of diying type oil primer I undercoat mica I ceous iron oxide pigmented drying oil type paint. Total dry film thickness 165 190 pm v) Blast clean the surface; 2 costs of metallic lead pigmented chlorinated rubber primer, I undercoat of high build chlorinated rubber, I finishing coat of chlorinated rubber. Total dry film thickness : 200 prn Suitable for structures in reasonably aggressive conditions e.g. near the coast Will provide long-term protection than (iv) in non-coastal situations. Also suitable for aggressive interior situations such as industrial areas. Compared to (i), this would provide a longer life in mild conditions and,could be used in less mild situation e-g. inland polluted, where maintenance could easily be carried out at regular intervals Suitable for general structural steel work exposed to ordinary polluted inland environments where appearance is not of primary importance. Similar to (i) but where appearance is not very important provides longer life in mild condition. Will provide upto 5 years life to first maintenance in polluted inland environment

Structural Steel
vi) Blast clean the surface; 350 - 450 pm-thickness. coal tar epoxy. vii) Pickle; hot dip galvanised (Zinc). Total thickness : 85 pm before first maintenance could be expected in many situations viii) ix) Grit blast, hot dip galvanised. (Zinc). Total thickness = 140 pm Grit blast; I coat of sprayed zinc/ aluminum followed by suitable sealer Total thickness = 150 ~Lrn Provides a longer life than (vii) because of thicker zinc coating Expected to provide long term protection appfox 15-20 years in aggressive atmosphere Suitable for sea water splash zones or for conditions of occurrence of frequent salt sprays. Suitable for steel work in reasonably mild conditions Life of 15-20 years

1900

313

TESTS AND STANDARDS OF ACCEPTANCE

The materials -shall be tested in accordance with relevant IS specifications and necessary test certificates shall be furnished. Additional tests, if required, shall be got carried out by the Contractor at his own cost. The fabrication, furnishing, erecting, painti ng of structural steel work shall be in accordance with these specifications and shall be checked and accepted by the Engineer. 314 MEASUREMENTS FOR PAYMENT

The measurements of this *item shall be in tonnes based on the net weight of metal in the fabricated structure computed on the basis of nominal weight of materials. The weight of rolled and cast steel and cast iron shall be determined from the dimensions shown on the drawings on the following basis Rolled or cast steel : 7.84 x 10-1 kg/cu. cm. Cast Iron : 7.21 x 10-' kg/cu. cm. Weight of structural sections shall be nominal weight Weight of castings shall be computed from the dimensions shown on the drawings with an addition of 5 per cent for fillets and over-runs. Weight of weld fillets and the weight of protective coatings s hall not be included. Weight of rivet heads shall be computed by taking the weight of 100 snap heads as given in Table 1900-4. When specially agreed upon, allowance for snap heads may be taken as a flat percentage of the total weight. This percentage may be taken as 3 per cent or modified by mutual agreement.
TABLE 1900-4 : WEIGHT OF RIVET HEADS Dia of Rivet as manufactured mm 12 14 16 Weight of 100 snap heads kg 1.3 2.1 3.4

Structural Steel
18 20 22 24 27 30 33 4.45 6.1 8.1. 10.5 15.0 20.5 27.2

1900

The Contractor shall supply detailed calculation sheets for the weight of the metal in the fabricated' structure. No additions shall be made for the weight of protec,tive coating or weld fillets. Where computed weight forms the basis for payment, the weight shall be calculated for exact cut sizes of members used in the structure, deductions being made for all cuts, except for rivet holes. Additions shall be made for the rivet heads as mentioned above. When specially agreed upon, the basis for payment may be the bridge weight complete, according to specifications included in special provisions of the Contract. 315 RATE

The contract unit rate for the completed structural steel work shall include the cost. of all materials, labour, tools, plant and equipment required for fabrication, connections, oiling, painting, temporary erection, inspection, tests and complete final erection as shown on the drawings and as specified in these Specifications.

Bearings Bearings 2000 Bearings

2000

Bearings

2000

2001

DESCRIPTION

This work Shall consist of furnishing and fixing bearings in position in accordance with the details shown on the drawings, to the requirements of these specifications or as directed by the Engineer. 316 GENERAL

i) Bearing plates. bars, rockers, assemblies and other expansion or fixed devices shall be constructed in accordance with the details shown on the drawings. ii) The bearings may either be supplied directly to the Engineer by the manufacturer to be installed by the Contractor or the C6ntractor is to supply and install the bearings as part of the contract. In the former case, the manufacturer shall be associated with the installation of the bearings to the full satisfaction of the Engineer, whereas in the latter case, the Contractor shall be solely responsible for the satisfactory supply and installation of the bearing. In the deta iled description af the specification, a general reference shall be made to the Contractor or manufacturer and the interpretation shall be as per terms of contract. iii) The Contractor shall exercise the utmost care in setting and fixing all bearings in their correct positions and ensuring that uniformity is obtained on all bearing surfaces. iv) Bearings shall be handled with Care and stored under cover. v) When bearing assemblies or plaies am shown on the drawings to be placed (not embedded) directly on concrete, the concmti bearing area shall be constructed slightly above grade (not exceeding 12 mm) and shall be finished by grinding. vi) It shall be ensured that the bearings am set , truly level and in exact position as indicated on the drawings so as to have full and even bearing on the seats. Thin mortar pads (not exceeding 12 mm) may even be made to meet with this requirement. vii) It shall be ensured that the bottorns of girders to be received on the bearings are plane at the locations of these bearings and cam shall be taken that the bearings am not displaced while placing the girders. viii) M.S. bearings sliding on M.S. Plates shall not be permitted. For sliding plate bearings stainless, steel surface sliding on stainless steel plate with mild steel matrix shall be used. The other option shall be to provide PITE surface sliding on stainless steel. ix) Some types of bearings which have been successfully used in various bridges in India have been covered by these Specifications. For innovative types of structures or in special cases, special types of bearings to suit the requirements may have to be provided for which special specifications may be laid down by the Engineer.

317 317.1 Materials -

STEEL BEARINGS

The material for steel bearings shall conform to the requirements of Section 1000. Some additional requirements for materials for steel bearings are indicated below
a) Railway axles (R 19) am also acceptable as forged steel for rollers. b) For the purpose of checking the soundness of cast steel components, castings shall be ultrasonically examined following procedures as per IS:7666 with acceptance standard as per IS:9565. The castings may also be checked by any other accepted method of non-destruciive testing as specified, in IS:1030. Quality level of castings shall be level 3 as per IS:9565.

The grease for bearings shall conform to the requirements of IS:503 (Grade 4). 317.2 Construction Operations

Bearings

2000

a) All work shall conform strictly to the drawings and shall be in accordance with the provisions of this section. Care shall be taken to ensure that all parts of an assembly fit accurately together. The workmanship shall satisfy all relevant provisions laid down in Section 1900. b) Knuckle pins, rolling surfaces of the rollers and bearing surface of the bearing plates shall be machined and all bolt holes shall be drilled. The whole bearings shall be fitted and finished as required for good quality machined work to the satisfaction of the Engineer. However, in case of bearings which are to be grouted or bedded on,& suitable yielding material on any surface which is to be in permanent contact with the grout or the yielding material may be left umnachined. c) In prestressed concrete construction where launching of girders is employed, in order to avoid slipping or jumping of rollers due to vibration or jolts, adequate measures may be taken to ensure that the roller assembly is not disturbed. It is normal practice to provide rockel bearings on the launching end and place the beam on the rocker end slightly in advance of placing on the"roller. d) During concreting of girders, the bearings shall be held in position securely by providing temporary connection between the top and bottom plates in case of fixed bearings and between top plate, base plate and saddle plate in case of rollercum-rocker bearing or by any other suitable arrangement which prevents the relative displacement of the components. e) In prestressed precast girders, where recesses are left on the underside of girders to receive the anchor bolts. grout holes extending to the beam sides or to the deck level shall be provided. T"he cement sand grout shall have a mix of 1:1.

317.3 Workmanship
a) Fabrication shall be carried out by an organisation experienced and qualified to undertake precision engineering of this type and be approved by the Engineer. b) Workmanship shall be of good quality. neatly finished and of good appearance. c) Castings shall be true to the forms and dimensions shown on the drawings and shall be free from pouring faults. sponginess, cracks, blo~/ holes and other defects on position, affecting their appearance or strength. Warped or distorted castings will not be accepted. Exposed surfaces shall be smooth and dense. d) All castings shall be cleaned by sand or shot blasting to remove sand or scale and to present a clean uniform surface. e) All irregularities, fing or risers shall b~ ground off flush with the adjacent surface. Castings with visible cracks, blow holes or similar blemishes shall be rejected if the imperfections are located in bearing surfaces or cannot be remedied to the approval of the Engineer. f) Imperfections which are not located in bearing surfaces shall be cleaned out, filled with weld metal of the appropriate composition and ground flush. g) All surfaces of major components like top plates, saddle plates, base plates, rollers of the bearings shall be machined all over for correct alignment, interchangeability, proper fitting, etc.

317.4 Tolerances Tolerances for its individual components or of the assembled bearings shall be as shown on the drawings or subject to the approval of the Engineer. Unless otherwise specified, the following tolerances shall be maintained Diameter of Rollers, Knuckle Pins and Bores Tolerances on diameter of rollers and all convex surfaces shall conform to K7 of IS:919. Tolerances on diameter of all concave surfaces shall conform to D8 of IS:919. Height of Bearings

Bearings

2000

Tolerances on height of any component casting shall not exceed +0.5mm. No minus tolerance shall be allowed. The edges of all ribs shall be parallel throughout their length. Base Plate Tolerance on length and width of the base plate shall not exceed +1.0 mm, tolerance on the thickness of the plate shall not exceed +0.5 mm. No minus tolerance shall be allowed. All rocking, rolling and sliding surfaces shall have a machine smooth finish to 20 micron maximum mean deviation as per IS:3073. Castings No minus tolerance shall be allowed in the thickness of any part of the castings. The edges of all ribs shall be parallel throughout their length. 317.5 Installation of Steel Bearings 317.5.1 General
a) Bearings shall be placed in the positions as shown on the drawings with all bearing surfaces in full contact and to the tolerances as specified. b) Roller and rocker bearings shall be placed so that their axles of rotations are horizontal and normal to the direction of movement of the members they support. Up per and lower bearing plates shall be set horizontal in both directions. c) During installation the bearings shall be pre-set with respect to the bearing axis to account for the movement due to the following i) Temperature variation between the average temperature prevailing at the time of installation and the mean design temperature. ii) d) Shrinkage, creep and elastic shortening. For bridges in gradient, the bearing plates shall be placed in a horizontal plane.

317.5.2

Placing

a) On supporting structures, pockets shall be provided to receive anchor bolts; one side of the pocket shall project beyond the bearing plate. Tbe pocket shall be filled with mortar of mix 1: 1 and the concrete bearing area also shall be finished level by a thin and stiff mortar pad of mix 1: 1 (the thickness not exceeding 12 mm) just before placing of bearing assemblies or bottom plate on Elie concrete seat. b) In case of precast girders a recess of 6 mm shall be provided on the un&rside with a level finish for housing the bearing plate. A thin and stiff mortar pad of mix 1:1 with thickness not exceeding 3 nun shall be provided over the top plate before lowering the precast beam in position in order to ensure full and even pressure on the plate surface. c) It shall be ensured that while placing the girders, the bearings are in their exact positions as indicated on the approved drawing and not displaced therefrom. d) All concrete surfaces to be in contact with the mortar shall be thoroughly cleaned and kept saturated with water for a period not less than 24 hours before placing mortar and operations are to be carried out when the surface temperatures of the exposed bearings are the minimum practical. e) No mortar that is more d= 30 minutes old after completion of mixing, shall be used. f) After placing and finishing die mortar, the bearing shall be checked for position and shims or other temporary supports removed and the mortar made good. If the bearing has moved, it or the plate shall be lifted, the mortar removed and the whole procedure repeated. g) h) Exposed faces of the mortar shall be cured under damp Hessian for 7 days. Placing of the bearing and mortar shall only be carried out in the presence of the Engineer.

317.5.3 Checking, cleaning and lubrication : Before erection, each bearing shall be uncrated, disassembled and checked. Any damaged parts shall be made

Bearings good for approval.

2000

All bearings with sliding surfaces shall be cleaned and lightly lubricated with an approved lubricant immediately before erection. 317.5.4 Testing
i) The materials to be used in the bearings shall conform to the specifications ~laid down in clause 2003.1. ii) If required, a suitable nurnber of complete bearings as specified by an accepting authority shall be tested to 1.25 times the design load. Recovery should be 100 per ceent. Contact surfaces shall be examined by illumination source for any defects, ctacks, etc. Segmental rollers shall be tested for design movements. iii) For large lots (consisting of 12 sets or more), a quality control report shall be submitted as detailed below : a) Unless otherwise agreed upon by the Engineer and the manufacturer, the laner shall furnish a complete report on the process of quality control. 7he Engineer may appoint an authorised inspection agency for inspection purpose on his behalf. Such an inspection agency shall also submit reports to the Engineer regarding various tests performed on the bearing or certify the acceptance of the bearings. b) Test certificates of all raw materials shall be submitted. If manufacturer's test certificates are not available for the raw materials, the bearings manufacturer shall perform the necessary confirmatory tests as per relevant codes of practice and shall furnish the test results. c) A detailed quality control system including stage by stage inspection, starting from raw materials upto the finished bearing shall be submitted by the bearing manufacturer. d) The Engineer shall reserve the right to witriess such inspection at manufacturer's works with or without prior permission of the manufacturer. For this, the bearing manufacturer shall have in-plant testing facilities as far as possible and practicable. e) The bearing manufacturer shall ' maintain a list of consumption of raw material for a period of at least previous one year.

f) Test certificates of bearings manufactured during preceding one year shall be made available at the manufacturer's works. g) In case the lot size of similar bearings exceeds 12 sets as per the direction of the Engineer, one extra set of bearings for each 24 sets of bearings or part thereof, shall be manufactured and the cost of such extra bearings shall be bome by the user. h) The Engineer shall select the extra bearing(s) at random and shall perform various tests including destructive testing on it at his discretion, either at the manufacturer's works or at any other approved test laboratory, notwithstanding the test reports submitted.
i) In cAse them is a major discrepancy regarding material, the engineer shall declare the whole lot of beatings u unacceptable. j) In case minor defects in fabrication, like welding or machining, is found in the test bearing before destructive testing and if the test bearing is foundto be acceptable. after destructive testing, the minor defects in the test beatings shall not be a bar to the acceptance of the entire lot. k) The opinion of the Engirteer in cases (i) and 0) aboye shall be binding on the manufacturer.

318 318.1 Spherical Bearing

SPECIAL BEARINGS

Bearings

2000

This bearing only takes care of vertical load and horizontal force due to sliding friction. The bearing will permit uniaxial translatory movement along longitudinal axis of the bridge and rotation along all axes. The bearing hall consist of the following parts Bottom Plate A bottom plate with concave surface is integrally cast on circular/ square plate. The bottom plate is connected to the sub-structure by means of fight fitted anchor bolts, which are embedded.in concrete. The material of bottom plate shall be cast steel. Pure unfilled quality dimpled PTFE of specified thickness shall be provided on top of concave surface of bottom plate in order to allow smooth rotation. Saddle Plate A saddle plate with square/circular/rectangular top and convex surface at bottom shall be placed in the concave surface of bottom plate. The radius of curvature of the convex bottom of the saddle plate shall be slightly less than that of the concave top surface of the bottom plate to ensure sufficient contact over a small area. Rotation along all axes shall be permitted along the contact surface of the saddle plate and the bottom plate. Pure unfilled quality dimpled PTFE sheet shall be recessed to specified depth of recess over the top of saddle plate. Suitable elastomeric sea] shall be provided on the saddle plate to prevent ingress of dirt and moisture. The material of saddle plate shall'be cast steel. Top Plate The top plate shall have stainless steel plate welded to its bottom which shall slide over PTFE. The assembly shall be connected to the superstructure by tight fitted anchor bolts. Translatory movements' along longitudinal axis of bridge shall be accommodated at the PTTW Stainless steel sliding surface. The material of top plate shall be cast steel. Guide Plate Guide Plates shall be welded to saddle plate so as to permit only longitudinal movement. The material of guide plates should be cast steel. 318.2 Pin Bearing Pin bearing shall ensure fixity by arresting translatory movement. The pin bearing shall not take any vertical load. It will take care of the longitudinal horizontal force of the entire superstructure unit as well as transverse horizontal force developed at the fixed end. A pin bearing shall consist of a short height structural built-up column embedded in pier cap and the protruding length inside soffit of deck shall have rocker plates on all four sides.' which permit rotation. Pin bearing shall resist horizontal force from any direction and will permit rotation but will not bear any vertical load. The material of pin bearing including rocker plates shall, be high tensile steel conforming to IS:961. 318.3 In general the sliding spherical and pin bearing shall conform to BS:5400, Parts 9.1 and 9.2 and all relevant clauses of this specification. Bearings shall be

Bearings

2000

guaranteed for design loads and movements. The term bearing, shall include the entire assembly covering all the accessories required for operation, erection and dismantling for replacement. All bearings shall be of replaceable ' type. These bearings should be based on their design to the specifications mentioned/international specifications. The manufacturer should get their design approved from appropriate authority and the manufacturer should be associated with installation of bearings. 318.4 Materials All materials, particularly the following, shall be original, unused or non-re-cycled conforming to relevant specifications
Cast Steek, Nfild Steel, Stainless Steel shall conform to Clause 2003.1. Copolymer Poly Tetra Fluora Ethylene (FWH) unfilled quality shall have required properties as per BS:5400 and thicimess shall be as specified. Anchor Bolts shall be as per relevant IS specifications.

318.5 Seating of Pin Bearing


i) Backing plate with studs welded on the face opposite to the seating of manufacture shall be delivered by die manufacuirsir. ii) This backing plate sholf be accurately positioned on the reinforcement grid of the pedestal and levelled. iii) Studs "I be tack welded/tied to the minforcement to keep the backing plate in pmper location during costing. iv) Depth of embedment of the backing plate in the concrete shall be as per relevant drawing. v) The round base of the pot (bottom) of the pin bearing assembly shall be connected to the backing plates by anchor sciews after concreting of pier'cap/pedestal. vi) In order to ensure successful transf~r of large horizontal forces to be resisted by the Pin bearing, great care shall be taken in detailing the reinforcement in the sub-structure and the super-structure adjacent to the studs in the backing plate.

318.6 Acceptance Test on Spherical Bearings


1. 2. All bearings shall be checked for overall dimensions All bearings shall be- load tested to 1.25 times design vertical load

3. A pair of bearings selected at random shall undergo testing in order to determine coefficient of Iriction which shall be less than 0.05. 4. Two bearings selected at random shall be tested for permissible rotation.

318.7 2004.7. Acceptance Test on Pin Bearings 1. 2. All bearings shall be checked for overall dimensions. All bearings shall be load tested (if required, for design horizontal load only) 319 ELASTOMERIC BEARINGS

The term "bearing" in this case refers to an elas tomeric bearing consisting of one or more internal layers of elastomer bonded to internal steel laminates by the process of

Bearings

2000

vulcanisation. The bearing shall cater for translation and/or rotation of the superstructure by elastic deformation. 319.1 Raw Material Chloroprene (CR) only shall be used in the manufacture of bearing. Grades of raw elastomer of proven use in elastomeric 'bearings, with low crystallization rates and adequate shelf life (e.g. Neoprene WRT, Bayprene 110, Skyprene B-5 and Denka S40V) shall be used. No reclaimed rubber or vulcanized wastes or natural rubber shall be used. The raw elastomer content of the compound shall not be lower than 60 per cent by its weight. The ash content shall not exceed 5 per cent. (as per tests conducted in accordance with ASTM D-297, sub-section 10)., EPDM and other similar candidate elastomers for bridge bearing use shall not be permitted. Properties The elastomer shall comform to the properties specified in Table' 2000.1
TABLE 200-1. PROPERTIES OF ELASTOMER Propertly specification reference 1. 13. (Pan 11) 1.2.Strength 1.3. at break 2. Set (Part X) duration (h) CR 24.2 3. IS:3400 (Pan M duration (h) CR 3.1 Hardness 70 Max change in IRHD +15 temperature (deg Q IOQl Accelerated Ageing +0 to temperature (deg Q 1001 35 (pan 1) Maximum Compression Per cent IS:3400 Minimum Tensile Mpg (pan 1) 'Minimum Elongation Per cent IS:3400 400 IS:3400 17 Physical Propesties Hardness RM IS:3400 60 + 5 unit Test Method, IS Value of the characteristic specified

Bearings
3.2. Tensile Strength 3.3. Elongation Max change in Per cent -40 Max change in Per cent -15

2000

Shear 'modulus of the elastomer bearing shall neither be less than 0.80 M[Pa nor greater than 1.20 MPa. The adhesion strength of elastomer to steel plates determined according to IS:3400 (Part XIV) method A shall not be less than 7 kN/m. For elastomeric bearings (~R) used in adverse climatic conditions the following ozone resistance/ test shall be satisfied The ozone resistance of ela'stomer shall be proved satisfactory when assessed by test according to IS:3400 (Part XX). The strain, temperature, duration and ozone concentration of the test shall be 20 per cent, 40 I degree Celsius, 96 h and 50 pphm by volume respectively. No cracking detected by visual observation at the end of the test shall be considered satisfactory. No specific tests for assessment of low temperature resistance, may be deemed necessary. NOTE : For use of elastomer in extreme cold climates, the Engineer may specify special grade of low . temperature resistant elastorner in conformity with operating ambient temperature conditions. The specifications of such special grade elastomer including the tests for low temperature resistance shall be mutually agreed to by the Engineer and the producer supplier and are outside the purview of these specifications. Lwnjnates of mild steel conforming to IS:226 shall only be permitted to be used. Use of any other material like fibre glass or similar fabric as laminates shall not be permitted. I The manufacturers of elastomeric bearings shall satisfy the Engineer that they have in-house facilities for testing the elastomer for carrying out the following tests in accordance with the relevant provisions of ASTM D-297.
a) b) c) d) Identification of polymers C11oroprene (Appendix X-2) Ash content test to determine the percentage (sub-section 34) Specific gravity test Polymer content test (sub-section 15) (sub-section 10) to confirm the usage of

The Engineer shall invariably get the test (a) performed within his presence or in the presence of his authorised representative to satisfy the requirement. In case of any disputes regarding interpretation of results the Engineer may carry out test as per ASTM S-3452-78 (Chromatography test) at the manufacturer's cost in a recognised test house. The elastomer specimen to conduct the test shall be obtained from the bearings selected at random for destructive test. Remaining part of the test bearing shall be preserved by the Engineer for any test to be done in future, if required. 319.2 Fabrication

Bearings

2000

Bearing with steel laminates shall be cast as a single unit in a mould and vulcanised under heat and pressure. Casting of elements in separate units and subsequent bonding shall not be permitted, nor shall cutting from large size cast be permitted. Bearings of similar size to be used in particular bridge project shall be produced by identical process and in one lot as far as practicable. Phased production may only be resorted to when the total number of bearings is large enough. The moulds used shall have standard surface finish adequate to produce bearings free from 'any surface blemishes. Steel plates for laminates shall be sand blasted, clean of all mill scales and shall be free form all contaminants prior to bonding by vulcaiiisation. Rusted plates with pitting shall not be used. AJI edges of plates, shall be rounded. Spacers used in mould to ensure cover and location of laminates shall be of maximum size and number practicable. Any hole at surface or in edge cover shall be filled in subsequently. Care shall be taken to ensure uniform vulcanising conditions and homogeneity of elastomer through the surface and body of bearings. The bearings shall be fabricated with the tolerances specified in Table 2000-2.
TABLE 2000.2 TOLERANCES ITEMS 1. 2, 3. 3) b) 4a. b) 5L. b) c) Overall plan dimensions Total bearinj thickness Parallelism Of top surface of bearing with respect to the bottom surface as datum Of one side surface with respect to the other as datum Thickness of individual internal layer of elastomer Thickness of individual outer layer -0, + I turn Plan dimensions of laminates Thickness of laminates Parallelism of laminate with respect, to bearing base as datum I in loo -3nun,'+O 10 per cent I in 100 20 per cent (max. of 2 mm) I in 200 TOLERANCES -0. + 6 turn -0, + 5 nun

The vulcanising equipmenUpress shall be such that between the plattens of press the pressure and temperature are uniform and capable of being maintained at constant values as required for effecting a uniform vulcanisation of the bearing. The moulding dies utilised for manufacturing the bearings shall be so set inside the platten of the press so that the pressure developed during vulcanisation of the product is

Bearings

2000

evenly distributed and the thickness maintained at all places are within acceptable tolerance limits taking into consideration the shrinkage allowance of vulcanizate. The raw compound which has been introduced inside the metal dies for vulcanisation shall be accurately weighed each time and it must be ensured that sufficient quantity has been put inside the die for proper flow of material at every place so that a homogeneous and compact bearing is produced without any sign of sponginess or deficiency of material at any place. Before any vulcanizate of any batch of production is used for producing vulcanised bearings, test pieces in the form of standard slab and buttons shall be prepared in accordance with prescribed standards and salient properties tested and recorded regularly against each batch of production to monitor the quality of the products. 319.3 Acceptance Specifications The manufacturer shall have all the test facilities required for the process and acceptance control tests installed at his plant to the complete satisfaction of the Engineer. The test facilities and their operation shall be open to inspection by the Engineer on demand. All acceptance and process control tests shall be conducted at the manufacturer's plant. Cost of all materials, equipment and labour shall be borne by the manufacturer unless otherwise specified or specially agreed to between the manufactuter and Engineer. Acceptance testing shall be commenced with the prior submittal'of testing programme by the manufacturer to the Engineer and after obtaining his approval. Any acceptance . testing delayed beyond 180 days of production shall require special approval of the Engineer and modified acceptance specification, if deemed necessary by him. All acceptance testing shall be conducted by the Inspector with aid of the personnel having adequate expertise and experience in rubber testing provided by the manufacturer, working under the supervision of the Inspector and to his complete satisfaction. Lot by lot inspection and acceptance shall be made. 319.3.1 Acceptance lot : A lot under acceptance shall comprise all bearings, including the pair of extra,test bearings where applicable of equal or near equal size produced under identical conditions of manufacture to be supplied for a particular project. The size and composition of acceptance lot shall be got approved by the Engineer. For the purpose of grading levels of acceptance, testing lots shall be classified as follows
i) ii) A lot size of 24 or larger number of bearings shall be defined as a large lot A lot size of less than 24 bearings shall be defined as a small lot

When the number of bearings of equal or near equal size for a single bridge project is large and phased production and acceptance is permitted, the number of bearings supplied in any single phase of supply shall comprise a lot under acceptance. When

Bearings

2000

such phased supply is made, each such lot shall be considered as a large lot for the purpose of acceptance testing. 319.3.2 Levels of acceptance inspection : The level of acceptance testing shall generally be graded into the following two levels depending on lot size : Level -I acceptance testing Level 2 acceptance testing Acceptance, testing Level I is a higher level inspection and shall be applicable to large lots only, unless otherwise specified. This shall involve manufacture of two extra bearings for each lot to be used as test bearing and eventually"consumed in destructive testing. Acceptance testing Level 2 shall be applicable to small lots only, (i.e. less than 24 lots) for which one extra bearing shall be manufactured. Out of the lot one bearing shall be selected at random for carrying out material tests. This bearing shall be excluded from the lot accepted.Acceptance inspection level I may be specified at the sole discretion of the engineer taking into account the special importance of bridge project for small lots also under the purview of special acceptance inspection. The cost of extra bearings, in such cases shall be borne by the user, while the cost of all other materials, equipment and testing shall be borne by the manufacturer. 319.3.3 Testing : Acceptance testing shall comprise general inspection, test on s pecially moulded test pieces and test on complete bearings or sections for measurement of various quality characteristics detailed below 319.3.3.1 General Inspection
1. All bearings of the lot shall be visually inspected for any defects in surface finish, shape or any other discernible superficial defects. 2. All bearings of the lot shall be checked for tolerances specified in Table 20002. 3. All bearings of the lot shall be subjected to axial load to correspond to (;in (i.e. average compressive stress) '- 15 MPa applied in steps and held constant while visual examination is made to check for discernible defects like a) b) c) d) e) Misalignment of reinforcing plates Poor bond. at laminate/steel interface Variation in thickness of elastomer layers Any surface defects Low stiffness

Acceptance testing level 1

Deflection under loads between am=5 NVa and (;m=15 NPa shall be measured and recorded for all bearings with sufficient accuracy L+ 5 per cent), Variation in stiffness of any individual bearing from the mean of the measured values for all such bearings of the lot shall not be larger than 20 per cent (of the mean value). Tests on specially moulded test pieces

Bearings

2000

1. Test pieces shall be moulded by the manufacturer with identical compound and under identical vuleanising conditions as used in the manufacture oi the bearings of the acceptance. lot. 'Me process shall be open to inspection by the Engineer. 2. Test pieces offered for inspection shall be identified by suitable markings and duly certified by the manufacturer. 3. The quality characteristics tcr be tested -are listed below. The specification references in parenthesis shall define the corresponding specification for test piece, test method and criterion for acceptance.
Composition (see Note 1 below) Hardness (Table 2000-1 , 1.1) Tensile strength (Table 2000-1 , 1.2) Elongation at Break (Table 2000-1 , 1.3) Compression Set (Table 2000-1 , 2) Accelerated Ageing (Table 2000-1 , 3) Adhesion Strength (Clause 2005.1) Ozone Resistance (see Note 2 below) Note 1. For acceptance testing the properties enumerated in Clause 2005.1 and specific gravity of elastomer of test pieces from test bearing shall be compared with those for corresponding specially moulded test pieces furnished by the manufacturer. The following variations shall be deemed maximum acceptable Specific Gravity 0.2 Ash Content 0.5 per cent

Hardness (Table 2000-1 , 1.1) Tensile strength (Table 2000-1 , 1.2) Elongation at Break (Table 2000-1 , 1.3) Compression Set (Table 2000-1 , 2) Accelerated Ageing (Table 2000-1 , 3) Adhesion Strength (Clause 2005.1) Note 2. Ozone resistance test can be waived by the Engineer for bearings of CR when satisfactory results of ozone resistance tests on similar grade of elastorner may be available from process control records or development test data furnished by the manufacturer.

Where such process control data are not available or the frequency of testing' not deemed adequate, ozone resistance test shall be mandatory for acceptance of bearings of CR.

Bearings

2000

However, such tests may not be insisted for bearings not located under adverse conditions of exposure and where the test on accelerated ageing could be considered as adequate. Process and acceptance control tests for ozone resistance by an independent testing agency shall be acceptable. Tests on Complete Bearings or Sections 1. Two bearings shall be selected at random from the lot as test bearings. These bearings shall be excluded from the lot accepted. The following tests shall be conducted on test bearings Test for determination of shear modulus Test for determination of elastic modulus Test for determination of shear modulus (short term loading) Test for determination of adhesion strength Test for determination of ultimate compressive strength The test specifications and acceptance criteria shall conform to those given in Appendix 2 of IRC:83 (Part II). 319.3.3.2 Acceptance testing level 2 General Inspection. This shall conform to the provision in Clause 20053.3.1 in all respects. Test on specially moulded test pieces. This shall conform to the provisions in Clause 2005.3.3.1 in all respects. Test on complete bearings. Test for determination of shear modulus shall be conducted using two bearings of the lot selected at random and conforming to relevant provisions of Clause 2005.3.3.1. These bearings shall however be part of the lot accepted. The remaining tests stipulated in aforesaid clause shall be carried out on all bearings selected at random which shall be excluded from the lot accepted. 319.3.4 Special acceptance inspection : Special acceptance inspection may comprise the following
1. Acceptance testing by an independent external agency with separate or supplemental test facilities provided by it. 2. Acceptance testing on test pieces prepared from the surface or body of the test bearings instead of specially moulded test pieces. 3. Acceptance tests not covered by these specifications but according to the specifications laid down by the Engineer.

Special acceptance inspection may be specified under the following condifions : a) Special, contract agreement b) Unsatisfactory evidence of process or acceptance control 319.3.5 Inspection certificate A lot under inspection shall be accepted by the

Bearings

2000 Inspector and so ceTffied, when no defect is found with respect to any of the quality characteristics tested on samples drawn from the lot according to specifications laid down in Clause 2005.3.3 covering general inspection tests on specially moulded test

pieces and on complete bearings. In case of any bearing with defect, the lot shall be rejected by the Inspector and so certified. In case any bearing is found to be defective with respect to any quality characteristic, discerned by general inspection tests specified in Clauses 2005.3.3.1 and 2005.3.3.2, tests on specially moulded test pieces and complete bearings as applicable according to Clauses 2005.3.3.1 and 2005.3.3.2 shall nevertheless be completed. If the said lot, rejected by general inspection, satisfies the acceptance criteni in respect of these other tests, the lot and individual bearings found defective shall be 'Clearly identified in the inspection certificate. The manufacturer shall obtain from the inspector, authorised by the Engineer, immediately on completion of his inspection, an inspection certificate which shall include the details of a lot or lots accepted/rejected by him and records of all test measurements. 319.3.6 Quality control certificate : The manufacturer shall certify for each lot of bearing under acbeptance: That an adequate system of continuous quality control was operated in his plant. That the entire process remained in control during the production of the lot of bearings under acceptance as verified from the quality control records/charts 'which shall be open to inspection of Engineer/ Inspector on demand. A certified copy of results of process control testing done on samples of elastomer used in the production of the lot shall be appended and shall include at least the following information Composition of compound - raw elastomer an'd ash content, the grade of raw elastomer used (including name, source, age on shelf), test results of hardness, tensile strength, elongation. at break, compression set, accelerated ageing, etc. A higher level certification of the process quality control shall be called for at the sole discretion of the Engineer in special cases e.g. where adequate inspection of bearings similar to those comprising the lot under inspection produced in the same plant is not available with the Engineer or in case of any evidence of process or acceptance control -being deemed unsatisfactory. The higher level certification shall comprise submittal of a complete quality control report as given in Appendix 3 of IRC:83 (Part 11) supplementing the quality control certificate. 319.3.7 Acceptance The manufacturer shall furnish the following to Engineer for the acceptance judgement 1. Quality control, certificate as laid down in Clause 2005.3.6. 1 Inspection certificate as laid down in Clause 2005.3.5.

Bearings

2000

The manufacturer shall furnish any supplementary information on the system of quality control and/or process and acceptance control testing as may be deemed necessary by the Engineer., In case of any evidence of process or acceptance control testing being deemed unsatisfactory by him,. Engineer at his sole discretion may call for a special acceptance of the lot according to specifications laid down by him, without any prejudice to his right to reject the lot. The entire cost of such supplementary inspection shall be borne by the manufacturer. The Engineer shall be the sole authority for acceptance of a lot on scrutiny of the certificates alongwith any supplementary evidence and complete satisfaction therewith. In case of rejection of a lot, the Engineer shall reserve the righi, to call for special acceptance inspection for the ~ucceeding lots offered for inspection, according to the specifications laid down by him. The entire cost of such tightened inspection shall be borne by the manu-, facturer. 319.4 Cerification and Marking Bearings shall be transported to bridge site after final acceptance by Engineer and shall be accompanied by an authenticated copy of the certificate to that effect. An information card giving the following details for the bearings, Auly certified by the manufacturer shall also be appended Name of manufacturer Date of manufacture Elastomer grade used Bearing dimensions Production batch no. Acceptance lot no. Date of testing Specific bridge location, if any Explanation of markings used on the bearing All bearings shall have suitable index markings identifying the information. The markings shall be made in indelible ink or flexible paint and if practicable should be visible after installation. The top of the bearing and direction of installation shall be indicated. 319.5 Storage and dandling Each elastomeric bearing shall be clearly labelled or marked. The bearing shall be wrapped in a cover. They shall be packed in timber crates with suitable arrangement to prevent movement and to protect comers and edges. Care shall be taken to avoid mechanical damage, contamination with oil, grease and dirt, undue exposure to sunlight and weather to the bearings during transport and handling prior to and during installation. 319.6 Installation Installation of multiple bearings one behind the other on a single line of support shall be of identical dimensions. Bearings must be placed between true horizontal surfaces (maximum tolerance 0.2 per cent perpendicular to the load) and at true plan position of their control lines marked on receiving surfaces (maximum tolerance + 3 mm). Concrete surfaces shall be free from local irregularities (maximum tolerance I mm in height).

Bearings

2000

Design shall be checked for.the actual inclination in seating if larger inaccuracies than those specified are permitted. For cast-in-place concrete construction of superstructure, where bearings are installed prior to its concreting, the forms around the bearings shall be soft enough for easy removal. Forms shall also fit the bearings snugly and prevent any leakage of mortar grout. Any mortar contaminating the bearings during concreting shall be completely removed before setting. For precast concrete or steel superstructure elements, fixing of bearing to them may be done by application of epoxy resin adhesive to interface, after specified surface preparation. The specifications for adhesive material, workmanship and control shall be approved by the Engineer. Care shall be taken to guard against faulty application and consequent behaviour of the adhesive layer as a lubricant. The bonding by -the adhesive shall be deemed effective only as a device for installation and shall not be deemed to secure bearings against displacement for the purpose of design. As a measure of ample safety against accidental displacement, the bearings shall be placed in a recess as shown in Fig. 9 of IRC:83 (Part 319.7 Seating of Elastomeric Bearings on a Non-Horizontal Plane Installation of elastomeri6 bearings on a Non-Horizontal Plane shall be as follows
i) Elastomeric bearings shall be delivered with MS backing plate fastened to the bearing from the manufacturer. ii) Template of 6 mm. M.S. plate and of size same as bearing holding base plate with matching holes for the anchor screws shall be used. Anchors shall be fitted to the templates with the anchor screws but with MS washers in place of elastomer washers. The above template assembly shall be fitted -in the formwork at its proper location 4nd in a vertical plane. iii) After casting of the pedestal and removal of the formwod4 the template is to be removed.

A. Installation with face plate and without template in-situ casting


i) The sub-assembly of clastomeric. bearing with the MS backing plate shall be fitted to the embedded anchors with anchor screws and elastomeric washers replacing the steel washer. ii) A clearance is required between the stainless steel face of the elastomeric bearing and that of the vertical face of the face plate with stainless steel top installed on the projection below the soffit. This shall be achieved by inserting removabIle steel sheeting of thickness as per the drawing, during preparation of the formwork before casting of the superstructure. iii) The face plate with stainless steel top and pack plate shall be assembled with the anchors with elastomeric washers and anchor screws. The assembly shall be fined in the formwork at its proper location and -in a vertical plane. The removable steel shims shall be removed at an appropriate time after the casting of the super-snucture.

B.

Installation with face plate and with template i"itu casting

i) Template of 6 nim MS plate and of size same as face plate with stainless steel top and matching holes for the anchor screws shall be used. Anchors shall be fitted to the templates with the anchor screws but with MS washers in place of elastomer washers. Separate screws may be used in case of inconvenience of in the length of original anchor screws. The above template assembly "I be fitted in the formwork for the super-ststicture at its proper location and in a vertical planeii) After removal of the superstructure formwork. the template shall be removed.

Bearings

2000

iii) The face plate with the required thickness of pack plate shall be loosely fitted to the anchors embedded in the projecti6n below the superstructure, with elastomer washers and anchor screws. iv) The sub-assembly of elastomeric bearing with the MS backing plate shall be

fitted to the emb ' edded anchors in the pedestal with anchor screws and elastorneric
washers replacing the steel washer this time. v) The required clearance between the stainless steel face of the elastomeric bearing and that of the vertical face plate installed on the projection below the soffit shall be checked. After adjustment of the required working clearance the small gap between the vertical face of the projection below the soffit and the back of the face plate (with pack plates, if any) shall be grouted with epoxy grout.

320 320.1 General

POT BEARINGS

320.1.1 Pot type bearings shall consist of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder to take care of rotation. Horizontal movement, if required, shall- with a system of sealing rings be provided by sliding surfaces of PTFE pads sliding against stainless steel mating surfaces. 'Me pot bearings shall consist of cast steel assemblies or fabricated structural steel assemblies. 320.1.2 Provisions of IRC-83 (Part 1) shall be applicable for all metallic elements. Provisions of IRC:83 (Part 11) shall be applicable for all elastomer elements. When any items are not covered by IRC:83 (Parts I and 11), the same shall be as per guidelines given hereunder and BS:5400 (Sections 9.1 and 9.2), except that no natural rubber shall be permitted. If there is any conflict between BS on the one hand and IRC on the other, the provisions of IRC will be guiding. 320.1.3 Combination bearings using any judicious combination and sliding element shaU be permitted. As for example :
Name Pot Elastomer Pot PTFE Spherical Knuckle PTFE Filastomer PM Mastomer SS** Stainless Steel Rotation Sliding Generally for Element Pot pot None Elastomer Horizontal Load Spherical FJ&Stomer Mastorntr FI'FF-SS** PTFE-SS** SS_SS** Vertical Load and Transverse Guide Transverse Guide Knuckle Horizontal Load Element 'Vertical Load None* Horizontal Buffer Vertical Load and

FIF&SS**

Elastomer shall permit movement by shear

For special and innovative. bridges, new combinations, beyond what is shown may be required. The same may be used after approval by the Engineer.

Bearings 320.2 Fabrication

2000

i) The surface mating with the PTFE in the sliding pair shall be corrosion resistant stainless steel. Normally, the stainless steel shall form the upper component. The stainless steel shalt-overlap the PTM after full movement on all sid! If stainless steel sheet is used, it should be bonded by continuous welding on the edges. Adhesive or any other bonding can be approved by the Ea&eer. The surface shall be prepared by thorough cleaning to remove grease, dust or any, other foreign substance. ii) PTFE modular sheets of the sliding pair shall be located by confinement assisted by bonding. Confined PTFE shall be recessed into, the metal backing plate. Ile shoulders of the recess shall be sharp and square to restrict the flow of 71M. iii) The thickness of the PTFE shall not be less than 4.5 nim with pro*tion above the recess not exceeding 2.0 min. When the piston is subjected to tilting, the seal must slide along the wall and alter its shape according to the angle Of tilt. At the same time, it must be sufficiently rigid to bridge the gap between the piston and the wall of the pot. However, the percentage of plan area of the lubrication cavities to the gross area shall not exceed 25 per cent. The depth of the cavity shall not exceed 2.0 mm. iv) The diameter to thickness ratio of the confined elastomer shall not exceed 15. The surface of the confined elastomer shall be smooth. v) A seal shall be provided to prevent extrusion of the confiried elastomer between the piston and the pot wall. The seal should stay functional under the loads and rotations acting on it. Additional seal shall be provided to prevent entry of dust, into the POL Sealing rings for pot bearings shall be fabricated from stainless steel. When the piston is subjected to tilting, the seal must slide along the wall and alter its shape according to the angle of tilt. At the same time, it mtm* be sufficiently rigid to bridge the gap between the piston and the wall of the pot. vi) The hardness of the Piston and pot wall at their contact region shall be minimum 350 BHN to reduce wear. The surface finish of the pot base in contact with the confined elastomer shall be very smooth. vii) All bearings shall be installed with anchor and anchor screws or. some similar device such that while replacing. the bearings can be removed with minimum lifting of the superstructure. viii) The external surfaces of the assemblies shall be completely cleaned by sand blasting. After sand blasting. dust shall be removed from the surface using clean and dry compressed air or a clean brush after which suitable coating shall be applied. ix) Pot bearings including all parts as shown on the drawings shall be fully shop assembled at the manufacturer's works to ensure proper fitting of all parts.

320.3 Materials
a) Steel i) Structural steel shall conform to IS:226 and IS:2062, as applicable.

ii) Cast steel shall conform to Gr 280-52OW of IS: 1030. 0.3 to 0.5 per cent copper may be added to increase the corrosion resistance properties. ii) Stainless steel shall conform to AISI:304 or X04CTl8NiIO of IS:6911 for ordinary applications. For applications with adverse/corrosive environment, the stainless steel shall conform to AISI:316L or 02Crl7Nil2mo2 of IS:691 1. b) PTFE PTFE (poly tetra fluoro ethylene) shall be of unfilled pure virgin quality. It shall be free sintered. The mechanical properties of unfilled PTFE shall comply with Grade A of BS:3784. c) a) b) Elastomer The confined elastomer inside pot will have the following pro'perties Hardness Min tensile IRHD MPa IS:3400 (Part 11) 50 + 5 - IS:3400 (Part 1) 15.5

Bearings
strength c) Min elongation at break shall be as per Table 2000-1 Max compression set and ) "Properties of Elastomer" Accelerated ageing )

2000

For other details, refer to Clause 2005.1. 320.4 Workmanship 320.4.1 Welding All welding shall conform to IS:9595 with electrodes of sukable grade as per IS:814. Preheating and post weld stress relieving shall be done as per IS:9595. 320.4.2 Cast steel assemblies : Cast steel for pot. bearing' assemblies shall conform to requirements of relevant IS. Castings shall be true to the forms and dimensions shown on the drawings, and shall be free from pouring faults, sponginess, cracks, blow holes and other defects affecting their appearance or their strength. Warped or distorted castings shall not be accepted. Exposed surfaces shall be smooth and dense. All irregularities, fins or risers shall be ground off flush with the adjacent surface. Castings with visible cracks, blow holes, or similar blemishes shall be rejected if the imperfections are located on bearing surfaces or cannot be remedied to the satisfaction of the Engineer. Imperfections which are not located on bearing surfaces shall be cleaned out, filled with weld metal of the appropriate composition and ground flush with adjacent surfaces. 320.4.3 Structural steel assemblies : Defects arising from the fabrication of the steel shall be inspected by the Engineer, who will decide whether the materials may be repaired by the Contractor or will be rejected. The cost of repairs or replacement shall be bome by the Contractor. All steel whether fabricated or not, shall be stored above the ground on platforms, skids, or other supports, and adequateo protected against corrosion. Excessively rusted, bent or damaged steel shall be rejected. All plates shall be flat and rolled bars and shapes straight before marking out or being worked . Straightening shall be done by methods which shall not damage the material. Sharp kinks and bends shall be the cause for rejection. Steel may be flame cut to shape and length so that a regular surface, free from excessive gouges and striations is obtained. Flame cutting by hand shall be done only with the approval of the Engineer. Exposed comers shall be machined or ground. 320.4.4
i) ii) iii) iv)

Tolerances
0 to +3 mm + 5 per cent

Plan dimensions -0 to +5 mm Overall height Height of elastomer a) Machined

Height of any steel component -0 to + I mm

Bearings
b) Unmachined v) a) Flatness Class 2 of IS:4897 0.0004L, where L length in

2000

Stainless steel sliding surface

direction of measurement b) Surface Finish 320.4.5 Painting Ra _< 0.25 pm as per IS:3073

i) All non-working surfaces shall be coated with two coats of epoxy primer and one or more coat each of epoxy intermediate and finish, total thickness < 0.150 pm or any other painting scheme as approved by the Engineer. ii) iii) Silicon grease shall be applied at the PTFE/SS interface after testing. Anchor sleeves shall be cement coated at the manufacturer's works.

320.5 Test 320.5.1 Raw materials ; Necessary test certificates for all raw materials as in Clause 2006.3 above shall be furnished by manufacturers. Reference may also be made to Clause 2005.1 for tests on elastomers. 320.5.2 Test on casting : Tests specified in IS:1030 shall be performed. Castings shall be ultrasonicilly tested and certificates submitted. Quality level of castings shall be level 3 as per IS:9565. 320.5.3 Test on welding : All welding shall be tested by Dye Penetration method. But welding shall be tested by Utrasonic method. Soundness of welding shall be certified by the manufacturer. 320.5.4
i)

Acceptance test on bearing

All beArings shall be checked for overall dimensions.

ii) All bearings shall be load tested to 1.1 times maximum design cVacity including seismic force. Bearing tested at higher loads cannot be used. iii) A pair of bearings selected at Tandoin will undergo testing in order to determine the coifficient of friction "Ie'. The coefficient of friction shall be :5 0,05 at the delign load. iv) Two bearings selected at random shall be tested for permissible rotation.

320.6 Installation of POT-cum-PTFE Bearings 320.6.1 General


i) Care shall be taken during installation of the bearings to permit their correct functioning in accordance with the design scheme. ii) To prevent contamination, dismantling of the bearings at site shall not be done. iii) The load shall be transferred onto the bearings only when the bedding material has developed sufficient strength. The props for the formwork shall only be removed after lapse of appropriate time. In special cases, this can be ensured by suitable devices like jacks, etc. iv) Temporary clamps and shims (introduced to maintain working clearance) shall be removed at an appropriate time, before the bearing is required to permit movement. v) Permitted installation, tolerance of the bearing fronr plane of sliding shall be maintained. vi) Cement based non-shrink grout with air releasing additive and epoxy based grout, whichever is specified shall be first tried at the site. For the proprietary grout mixes, appropriate instructions from the manufacturer shall be followed specially with regard to the following a) Preparation->concrete cleaning, roughening, pre-soaking, etc.

Bearings
b) c) d) e) Forms->sturdiness, leak proofing, shape, header funnel vents, etc. Bearing Base-xleaning, etc. Placement->mixing, consistency, time period, finishing, etc. Protection->curing, ambient temperature, etc.

2000

320.6.2
i)

In-situ casting of superstructure

Formwork around the bearing shall be carefully sealed to prevent leakage

ii) Sliding plates shall be fully supported and care taken to prevent tilting, displacement or distoition of the bearings under the weight of wet concrete. iii) Bearings shall be protected during concreting operation. Any mortar contaminating the bearing shall be completely removed before it sets.

320.6.3

Seating of bearing A. Using Template

i) Template with required rigidity and matching holes corresponding to the base of the bearing shall be used. ii) All the anchor s shall be fitted to the lower face of the template using the anchor screws but with steel washer replacing the elastomer washers. Separate screws may be used in case of inconvenience in the length of the original anchor screws. iii) The template assembly shall be located with regard to level and alignment. It shall be ensured that the top of the anchors lie in a horizontal plane at the required elevation. The anchors shall be tied/welded to reinforcements to avoid displacement during concreting. iv) Concreting of the pedestal/pier cap shall be done to a level leaving a gap of 25-50 min below the template. v) The template and steel washers shall be removed prior to placement of the bearing assembly with temporary clamps. The bearing assembly shall be fitted to the anchors with the help of anchor screws and elastomer washers, Level at the bearing shall be checked. vi) The gap below the bearing assembly shall be grouted with cement based grout. Reference may be made to Clause 2006.6.1 (vi).

B. Without Template with Gap


i) Pockets commensurate with the sizes of the anchors shall be kept in pedestals during concreting of the same. The pedestal shall be cast approximately 25 mm short of the required finished level. ii) Anchors shall be fitted to the bearing bottom with elastomer washers and an chor screws. The bearing assembly shall be seated in the location on steel chairs/packs. The anchors fitted below the bearing shall go into pockets in the bed block. Level and alignment of the bearing shall be checked. It shall be ensured that the' bearing sits in a horizontal plane.

iii) The gap below the bearing assembly including anchor pockets sh311 be grouted with cement based grOUL Reference may be made to Clause 2006.6.1 C. Without Template without Gap
Elongated pockets commensurate with the sizes of the anchors shall be kept in pedestals during concreting of the same. The geometry and location of the anchor pockets (with tapered funnel extension, if required) shall be such that after placement of the bearing the pockets can be successfully grouted. The pedestal shall be cast 5 min - 15 inni short of the required finished level. The required level shall be achieved by chipping before placement of the bearing. Careful control shall be exercised to cast at the exact finished level or Imm -3 mm down from the required finished level.

D. Seating of bearings shall be as per manufacturer's instructions. 321 INSPECTION AND TESTING

Bearings

2000

Where any patents are used, the manufacturer's certificate with test proofs shall be submitted alongwith the design and got approved by the Engineer before their use in work. 322 TESTS AND STANDARDS OF ACCEPTANCE

The materials shall be tested in accordance with these specifications and shall meet the prescribed criteria. The work shall conform to these specifications and shall meet the prescribed standards of acceptance. 323 MEASUREMENTS FOR PAYMENT

Bearings shall be measured in numbers, according to their capacides and particular specifications given on the drawings. The quantity of elastomeric bearings shall be measured in cubic centimetres of finished dimensions. 324 RATE

The contract unit rate of each type of bearing shall include the cost of supplying and fixing the bearings in position -complete as specified on the drawings'or as.decided by the Engineer. The rate shall also include the cosi of samples and their testing when desired by the Engineer. In case of steel bearings the rate shall include the cost of all nuts, bolts, the cost of all tests prescribed in the specifications and shown on the drawings. Where the Department supplies the bearings, the rate for fixing them shall include the cost of anchor bolts, their fixing, transport of bkearings from the place of supply to the site, handling and placing them in posidon as per direction of the Engineer.

Open Foundations Open Fouiadations 2100 Open Foundations

2100

Open Foundations

2100

2101

DESCRIPTION

The work shall cover furnishing and providing plain or reinforced concrete foundation placed in open excavation, in accordance with the drawings and these specifications or as directed by the Engineer. 325 MATERIALS

Materials shall conform to Section 1000 of these Specifications. 326 GENERAL

A method statement for construction indicating the following shall be submitted by the Contractor for approval of the Engineer, well in advance of the commencement of open foundation
i) ii) Sources of Materials Design, erection and removal of formwork

iii) Production, transportation, laying and curing of concrete iv) Personnel employed for execution and supervision v) vi) vii) Tests and sampling procedures Equipment details Any other point

Necessary arrangements for execution under water wherever necessary, shall be included in method statement. Dimensions, lines and levels shall be set out and checked with respect to permanent reference lines and permanent bench mark. 327 327.1 Preparation of Foundations Excavation for laying the foundation shall be carried outinaccordance with Section 300 of these specifications. The last 300 mm, of excavation shall be done just before laying of lean concrete below foundation. In the event of excavation having been made deeper than that shown on the drawing or as ordered by the Engineer, the extra depth shall be made up with M15 concrete in case of foundation resting on soil and foundation grade concrete for foundations in rock, at the cost of the Contractor and shall be considered as incidental work. Special care shall be taken not to disturb the bearing surface. Open foundations shall be constructed in dry conditions and the Contractor shall provide for adequate dewatering arrangements to the satisfaction of the Engineer. 327.2 Setting Out The plan dimensions of the foundation shall be set out at the bottom of foundation trench and checked with respect to original reference line and axis. It shall be ensured that at no point the bearing surface is higher than the founding level shown on the drawing or as directed by the Engineer. WORKMANSHIP

Open Foundations

2100

327.3 Construction Where the bearing surface is earth, a layer of M15 concrete shall be provided below foundation concrete. The thickness of lean concrete layer shall be 100 mm minimum unless otherwise specified. No formwork is necessary for the lean concrete layer. For foundation concrete work, side formwork shall be used. Forinwork for top of the foundation concrete shall also be provided, if its top has slopes,steeper than l(vertical) to 3 (horizontal). When concrete is laid in slope without top formwork, the slump of the concrete shall be carefully maintained to ensure that compaction is possible without slippage down the slope of freshly placed concrete. In certain cases it may be necessary to build the top formwork progressively as the concreting proceeds up the slope. Reinforcement shall be laid as shown on the drawing. Before laying of lean concrete layer, the earth surface shall be cleaned of all loose material and wetted. Care shall be taken to avoid muddy surface. If any portion of the surface has been spoiled by overwetting, the same shall be removed. Concrete M15 shall be laid to the thickness as required. No construction joint shall be provided in the lean concrete. Before laying foundation concrete, the lean concrete or hard rock surface shall be cleaned of all Ioose material and lightly moistened. Foundation concrete of required dimensions and shape shall be laid continuously upto the . location of construction joint shown on the drawing or as directed by the Engineer. Formwork an(t concrete shall conform to Sections 1500 and 1700 respectively of these specifications. Furnishing and providing steel reinforcement shall conform to Section 1600. The concrete surface shall be finished smooth with a trowel. The location of construction joint and its treatment shall be done as per requirements of Section 1700. Formwork. shall be removed not earlier than 24 hours after placing of concrete. Where formwork has been provided for top surface, the same shall be removed as soon as concrete 'has hardened. Curing of concrete shall be carried out by wetting of formwork before removal. After its removal, curing shall be done by laying not less than 10 cm of loose moistened sand, free from clod or gravel and shaH be kept continuously moist for a period of 7 days. Dewatering, where necessary for laying of concrete, shall be carried out adopting any one of the following procedures or any other method approved by the Engineer:
i) A pit or trench deeper than die foundation level as necessary may be dug beyond the foundation pit during construction so that the water level is kept below the foundation level. ii) Water table is depressed by well point system or other methods. iii) Use of steel/concrete ~aissons or sheet piling for creating an enclosure for the foundations, which can subsequently be dewatered.

Before backfilling is commenced, loose sand laid on foundation shall be removed and dispersed as directed by the Engineer.

Open Foundations

2100

All spaces excavated and not occupied by the foundation or other permanent works shall be refilled with earth upto surface of surrounding ground in accordance with Section 300. In case of excavation in rock, the annular space around foundation shall be filled with M15 concrete upto the top of rock. The protective works, where provided shall be completed before the floods so that the foundation does not get undermined. 328 TESTS AND STANDARDS OF ACCEPTANCE

The materials shall be tested in accordance with these Specifications and shall meet the prescribed criteria. The work shall conform to these Specifications and shall meet the prescribed standards of acceptance. No point of the surface of the lean concrete in the case of foundation on soil or the surface of hard rock in the case of foundation of hard rock, shall be higher than the founding level shown on the drawing or as ordered by the Engineer. Levels of the surface shall be taken at intervals of not more than 3 metres centre to centre, subject to a minimum of nine levels, on the surface. 329
a) b) c) d) Variation in dimensions

TOLERANCES

+50 nun - 10 nnunn

Misplacement from specified position in plan 15 mm Surface irregularities measured with 3 m straight edge5 mm Variation of levels at the top +25 mm

330

MEASUREMENT FOR PAYMENT

Excavation in foundation shall be measured in accordance with Section 300 based on the quantity ordered or as shown on the drawing. Lean concrete shall be measured in cubic metres in accordance with Section 1700, based on the quantity ordered or as shown on the drawing. Concrete in foundation shall be measured in cubic metres in accordance with Section 1700, based on the quantity ordered or as shown on the drawing. Reinforcement steel shall be measured in tonnes in accordance with Section 1600, based on th6 quantity ordered or as showr~ on the drawing. 331 RATE

The contract unit ratesfor excavationin foundation, leanconcrete and concrete in foundation aftd reinforcement steel shall include all works as given in respective sections of these specifications and cover all incidental items for furnishing and providing open foundation as mentioned in this Section.

Sub-structure Sub-structure 2200 Sub-structure

2200

Sub-structure

2200

2201

DESCRIPTION

The work shall cover furnishing and providing of masonry or reinforced concrete sub-structure in accordance with the drawings and as per these specifications or as directed by the Engineer. 332 MATERIALS

Materials shall conform to Section 1000 of theze Specifications. 333 GENERAL

A method statement for construction indicating the following shall be submitted by the Contractor for approval of the Engineer, well in advance of the commencement of sub-structure
i) ii) iii) iv) v) vi) vii) Sources of Materials Design, erection and removal of formwork Production, transportation, laying and curing of concrete Personnel employed for execution and supervision Tem and sampling procedures Equipment details Any other point

Arrangements for execution under water wherever necessary, shall be included in method statement. Dimensions, lines and levels shall be set ~ut and checked with respect to permanent reference lines and permanent bench mark. 334 PEERS AND ABUTMENTS

Masonry, formwork, concrete and reinforcement for piers and abutments shall conform to relevant sections of these specifications. In case of concrete piers, the number of horizontal construction joints shall be kept minimum. Construction joints shall be avoided in splash zones unless specifically permitted by the Engineer and provided they are treated in accordance with special provisions. No vertical construction joint shall be provided. The work shall conform strictly to the drawings or as directed by the Engineer. In case of tall piers and abutments, use of slipform shall be preferred. The design, erection and raising of slipform shall be subject to special specifications which will be furnished by,the Contractor. The concrete shall also be subject to additional specifications as necessary. All specifications and arrangements shall be subject to the approval of the Engineer. The surface of foundation/well cap/pile cap shall be scrapped with wire brush and all loose materials removed. In case reinforcing bars projecting from foundations are coated with cement slurry, the same shall *be removed by tapping, hammering or wire brushing. Care shall be taken to remove all loose materials around reinforcements. Just before commencing masonry or concrete work, the surface shall be thoroughly wetted.

Sub-structure

2200

In case of solid (non-spill through type) abutments, weep holes as shown on the drawings or as directed by the Engineer, shall be provided in,conformity with Section 2706. The surface finish shall be smooth, except the earth face of abutments which shall be rough finished. In case of abutments likely to experience considerable movement -on account of backfill of approaches and settlement of foundations, the construction of the abutment shall be followed by filling up of embankment in layers to the full height to allow for the anticipated movement during construction period before casting of superstructure. 335 PIER CAP AND ABUTMENT CAP

Formwork, reinforcement and concrete shall conform to relevant sections of these specifications. The locations and levels of pier cap/abutment cap/pedestals and bolts for fixing bearings shall be checked carefully to ensure alignment in ac-; cordance with the drawings of the bridge. The surface of cap shall be finished smooth and shall have a slope for draining of water as shown on the drawings or as directed by the Engineer. For short span slab bridges with continuous support on pier caps, the surface shall be cast horizontal. The top surface of the pedestal on which bearings are to be placed shall also be cast horizontal. The surface on which elastomeric bearings are to be placed shall be wood float finished to a level plane which shall not vary more than 1.5 mm from straight edge placed in any direction across the area. The surface on which other bearings (steel bearings, pot bearings) are to be placed shall be cast about 25 mm below the bottom level of bearings and as indicated on the drawings. 336 DIRT/ BALLAST WALL, RETURN WALL AND WING WALL

Masonry, concrete. and reinforcement shall conform to relevant sections of these specifications. In case of cantilever return walls, no construction joint shall generally be permitted. Wherever feasible, the concreting in cantilever return walls shall be carried out in continuation of the ballast wall. For gravity type masonry and concrete return and wing wall, the surface of foundation shall be prepared in the same manner as prescribed for construction of abutment. No horizontal construction joint shall be provided. If shown on drawing or directed by the Engineer, vertical construction joint may be provided. Vertical expansion gap of 20 mm shall be provided in return wall/wing wall at every 10 metre intervals or as directed by the Engineer. Weep holes shall be provided as prescribed for abutments or as shown on the drawings. Formwork, reinforcement and concrete in dirt/ballast wall shall conform to relevant sections of these specifications.

Sub-structure

2200

The finish of the surface on the earth side shall be rough while the front fare shall be smooth finished. Architectural coping for wing wall/return wall in brick masonry shall conform to section 1300. 337 TESTS AND STANDARDS OF ACCEPTANCE

The materials shall be tested in accordance with these specifications and shall meet the prescribed criteria. The work shall conform to these specifications and shall meet the prescribed standards of acceptance. 338
(a) (b) (c) (d) (e) (f)

TOLERANCES IN CONCRETE ELEMENTS


+10 mm, -5 nun 10 mm +10 min 5 nun 10 mm 5 nun

Variation in cross-sectio6l dimensions Nfisplacement from specified position in plan Variation of levels at the top Variations of reduced levels of bearing areas Variations from plumb over full height All surfaces except bearing areas Bearing areas 3 nun Surface irregularities measured with 3 in straight edge

339

MEASUREMENTS FOR PAYMENT

Masonry in sub-structure shall be measured in cubic metres in. accordance with Section. 1300 or 1400, based on the quantities ordered or as shown on the drawing. Concrete in sub-structure shall be measured in cubic metres in accordance with Section 1700, based on the quantity ordered or as shown on the drawing. No deduction shall be made for weep holes. Steel in concrete of sub-structures shall be measured in tonnes, in accordance with Section 1600, based on the quantity ordered or as shown on the drawing. Weep holes shall be measured as per Section 2700, based on the quantity ordered or as shown on the drawings. 340 RATE

The contract unit rates for masonry, concrete, reinforcement and weep holes shall include all works as given in respective sections of these specifications and cover all incidental items for furnishing and providing substructure as mentioned in this Section.

Concrete Superstructure Concrete Superstructure 2300 Concrete Superstructure

2300

Concrete Superstructure

2300

2301

DESCRIPTION

The work shall cover furnishing and providing of concrete superstructure in accordance with the drawings as per these specifications or as directed by the Engineer. 341 MATERIALS

Materials shall conform to Section 1000 of these Specifications. 342 GENERAL

342.1 A method statement for construction, indicating the following, shall be submitted by the Contractor for approval of the Engineer, well in advance of the commencement of the construction of superstruclure
i) ii) iii) iv) v) vi) vii) viii) Sources of Materials Design, erection and removal of formwork Production, transportation, laying and curing of concrete Prestressing system, if applicable Personnel employed for execution and supervision Tests and sampling procedure Equipment details Any other point

342.2 Dimensions, lines and levels shall be set out and checked with respect to permanent reference lines and permanent bench mark. so that the final product is in accordance with the drawings or as directed by the Engineer. 342.3 The work shall conform to the following sections besides stipulations in this section with regard to specific type of construction: i) ii) iii) iv) Formwork Steel Reinforcement Structural Concrete Prestressing Section 1500 Section 1600 Section 1700 Section 1800

Additionally, some of the common types of superstructure construclion shall have features as discussed in this Section. 343 343.1 Solid Slabs Where adjacent span of slab has already been cast, the expansion joint and filler board shall be placed abutting the already cast span which shall form the shutter on that side of the new span to be caSt. The whole of the slab shall be cast with reinforcement embedded for the road kerb and railings. No other construction joint shall be allowed except with the express permission of the Engineer. Where wearing coat is required to be provided, after the deck slab has been cast, the surface of the slab shall be finished rough, but true to lines and levels as shown on the REINFORCED CONCRETE CONSTRUCTION

Concrete Superstructure

2300

drawings, before the concrete has hardened. The areas of construction joints shall be owed in the prescribed manner. The top of the slab shall be covered with clean moist sand as soon as the top surface has hardened. Curing shall be carried out as per Section 1700. Where the slab is resting on bearings, the same shall be placed in position mi accordance with the drawings, before casting of deck slab. 343.2 RCC T-Beam and Slab Provision of construction joint shall confortn'to the drawings or as per directions of the Engineer. No construction joint shall be * provided between the bottom bulb and the web. If not indicated on the drawing, construction joint may be provided at the junction of the web and the fillet between the web and the deck slab with the permission of the Engineer. The portions of deck slab near expansion joints shall be cast alongwith reinforcements and embedments for expansion joints. For this purpose, the portion of deck slab near expansion joints may be cast in a subsequent stage, if permitted by the Engineer. The surface finish of the deck slab shall be finished rough but true to lines and levels as shown oh the drawings before the concrete has hardened. Care shall be taken for setting of bearings as indicated on the drawings. 344 PRESTRESSED CONCRETE CONSTRUCTION

344.1 PSC Girder and Composite RCC Slab PSC Girder may be precast or cast-in-situ as mentioned on the drawing or as directed by the Engineer. Gir4ers may be post-tensioned or pre-tensioned . Where precast construction is required to be adopted, selection of casting yard and details of methodology and of equipment for shifting ana launching of girders shall be included in the method statement. In case of cast-in-situ construction, the sequence of construction including side shifting of girders, if applicable, and placing on bearings shall be in accordance with the drawings. The PSC girder constituting the top flange, web and the bottom flange shall be concreted in a single operation without any construction joint. The portions of deck slab near expansion joints shall be cast alongwith reinforcements and embedments for expansion joints. For this purpose, the portion of deck slab near expansion joints may be cast in a subsequent stage, if permitted by the Engineer. The surface finish of the deck slab shall be finished rough but true to lines and levels as shown on the drawings before the concrete has hardened. Care shall be taken for setting of bearings as indicated on the drawings. 344.2 Box Girder Box girders' may be simply supported or continuous. Simply supported box girders shall have minimum construction joints as approved by the Engineer. In the case of

Concrete Superstructure

2300

continuous box girders the seqaence of construction and location of construction joints shall strictly follow the drawings. The box section shall be constructed with a maximum of one construction joint located in the web below the fillet between the deck slab and web. If permitted by the Engineer, one additional construction joint may be permitted and this construction joint shall be located in the web above the fillet between the soffit slab and web. The portions of deck slab near expansion joints shall be cast alongwith reinfbtcements and embedments for expansion joints. For this purpose, the portion of deck slab near expansion joints may be cast in a subsequent stage, if permitted by the Engineer. The surface finish of the deck slab shall be finished rough but true to lines and levels as shown on the drawings before the concrete has hardened. Care shall be taken for setting of bearings as indicated on the drawings. 344.3 Cantilever Construction Continuity of untensioned reinforcement from one segment to the next must be ensured by providing full lap length as necessary. The design of the superstructure shall take ' into account the following aspects which form an integral pan of & construction operations.*
a) Stability against over-turning for each statical condition through which the assembly passes, shall be checked b) Stresses at each preceding segment joint with the addition of every ssegmeenntt oorr change of statical conditions shall be checked. I'lie load of equipment as well as construction live load shall be taken into aCCOML c) Precambering of the superstructure during construction shall be done in such a manner that the finally constructed structure under permanent load attains the final profile intended in the drawings.

345

TOLERANCES

345.1 Precast Concrete Superstructure Variation in cross-sectional dimensions


a) upto and including 2m over 2m 5 mm 5 mm

b) Variation in length overall and length between shall not exceed to mm bearings or 0. I per cent of the span length, whichever is lesser c) Permissible surface irregularities when measured with a 3 in straight edge or template 5 mm

345.2 Cast-in-Situ Superstructure


a) b) c) d) e) Variations in,thickness of top and bottom slab Variations in web thickness -5 min to +10 mm -5 min to +10 mrn for box girders, top and bottom flange for T-girders or slabs Variations in overall depth or width 5 min Variation in length overall and length between shall not exceed 10mm bearings 6r 0. I per cent of the span length, whichever is lesser Permissible surface irregularities when 5 mm measured with a 3 in straight edge or template

346

TESTS AND STANDARDS OF ACCEPTANCE

Concrete Superstructure

2300

The materials shall be tested in accordance with these specifications and shall meet the prescribed criteria. The work shall conform to these specifications and shall meet the prescribed standards of acceptance. 347 MEASUREMENTS FOR PAYMENT

Concrete in superstructure shall be measured in accordance with Section 1700, based on the quantity ordered or as shown on the drawings. Steel reinforcement (untensioned) in superstructure shall be measured in accordance with Section 1600, based on the quantity ordered or as shown on the drawings. High tensile steel (prestressing) in superstructure shall be measured in accordance with Section 1800, based on the quantity ordered or as shown on the drawings. 348 RATE

The contract unit rates for concrete, steel reinforcement (untensioned) and high tensile steel (prestressing) shall include all works as given in respective sections of these specifications and cover all incidental items for furnishing and providing superstructure as mentioned 'in" this section.

Surface and Sub-surface Geotechnical Exploration Surface and Sub-surface Geotechnical Exploration 2400 Surface and Sub-surface Geotechnical Exploration

2400

Surface and Sub-surface Geotechnical Exploration 2401 GENERAL

2400

348.1 The objective of sub-surface exploration is to determine the suitability or otherwise of the soil or rock surrounding the foundation and soil parameters and rock characteristics for the design of foundation by in-situ testing or testing of samples/cores taken out of exploration. The sub-surface exploration shall be planned in such a way that different types of soil upto the desired depth and their profile for the full proposed length of the bridge can be recorded and other information such as mechanical and physical properties like grain-size distribution, sensitivity, any existence of deleterious material in soil or ground water, etc., are determined alongwith soil parameters and rock characteristics. The sub-surface exploration shall also throw light on porosity of rock and subsidence due to mining, ground water level, artesian condition, if any, likely sinking and driving effort, likely constructional difficulties, etc. 348.2 Field Investigation Field investigations of sub-surface has. usually three phases
i) ii) iii) Reconnaissance Preliminary Explorations Detailed Explorations

348.2.1 Reconnaissance includes a review of available topographic and geological information, aerial photographs and data from previous investigations and site examinatiorr. 348.2.2 Preliminary investigation shall include the study of existing geological information, previous site reports, geological maps, air photos, etc. and surface geological minintion, For large and important structures the information may be supplemented by geophysical methods. In some cases where no previous sub-strata data are available, exploratory geophysicil investigation may need to be supplemented by resorting to a few bore-holes. These will help to narrow down the number of sites under consideration and also to locate the most desirable location for detailed sub-surface investigation like bore or drill holes, sounding probes, etc. 348.2.3 The scope of detailed investigation for bridges may be decided based on data obtained after preliminary investigation. Based on data obtained after preliminary investigations, the bridge site, type of structure with span arrangement and the location and type of foundations, shall be tentatively decided. Thereafter, the scope of detailed investigation including- the extent of exploration, number of bore-holes, type of soundings, type of tests, number of tests, etc., shall be decided, so that adequate data considered to be necessary for the detailed design and execution, are obtained. 348.2.4 The width of exploration : One purpose of detailed exploration for high embankments is to ascertain the average shear strength of each strata. The

Surface and Sub-surface Geotechnical Exploration

2400

other purpose is to ascertain the compressibility of the clayey strata. It is, therefore, necessary that detailed and well illustrated description of the characteristics of stratification should be prepared. After the general shape andl trend of the boundaries of the various soil deposits have been determined and rough assessment of their strength has been made by sbb-surface sounding, with or without sampling in exploratory boring, the location of bore-hole(s) for undisturbed sampling shall be decided. At least one representative undisturbed sample should be collected from each strata. When the homogeneous strata is very thick, one representative sample shall be collected for each 3 in thickness of the strata. 348.3 Soil investigation for foundations shall contain a programme for boring and retrieval of samples. The field work shall consist of excavation, drilling of bore-holes for the purposes of collection of undisturbed and disturbed samples, standard penetration tests, in-situ vane tests, static and dynamic cone penetration tests, other field tests, as specified by the Engineer and preparation of bore-logs. Collection and preservation for testing of disturbed and undisturbed samples from boreholes, borrow pits, etc., as specified by the Engineer shall form a part of the above. All in-situ tests shall be supplemented by laboratory investigations. Relevant Indian Standards such as IS: 1498, IS: 1888, IS:1892, IS:2131, IS:2132, IS:2720, IS:4434 and IS:4968 and Appendix I of IRC:78, etc., shall be followed for guidance. 348.4 The soundings by dynamic method shall be carried out in bore-holes using Ef standard sampler as specified in IS:2131. 349 349.1 Foundations 349.1.1 Preliminary exploration shall be carried out to determine the soil profile showing the boundaries between the different soil types and between loose and dense parts in the same type of deposits. For guidance reference may be made to IRC:75. For this purpose, as a first step, a suitable type of sub-surface sounding (e.g. static or dynamic cone penetration test) shall be carried OUL As many soundings as necessary should be made, until the penetration data is complete enough to leave no doubt concerning the general shape and the trend of boundaries of the various soil deposits. Exploratory drill holes should then be made at one or two locations where average condition prevails and L near those few points where the penetration diagrams indicate maximum deviations from the average. 349.1.2 The exploration shall cover the entire length of the bridge and also extend at either side for a distance about twice the depth below bed of the last main foundations. If there is any necessity for designing investigation for approaches particularly on soft soil or with high embankment or there is a possibility of considering alternatives between viaduct or earthen PRELIMINARY INVESTIGATION

Surface and Sub-surface Geotechnical Exploration

2400

embankment, the extended length and location of the borings beyond the proposqqjq~cation of abutment should be determined and executed. 349.1.3 The depth of exploration should be at least 11/2 times the minimum width of foundation below the proposed foundation level. Where such investigation end in any unsuitable or questionable foundation material the exploration shall be extended to a sufficient depth into firm and stable soils or rock but not less than four times the minimum depth of foundation below the earlier contemplated foundation 'level. In case of good sound rock the stipulation of minimum depth may be decreased based oi,,difficulty to conduct core drilling and the minimum depth may be restricted to 3 metres. 349.1.4 Guidebund and Embankment The depth of exploration should include all strata likely to affect stability of the embankment, guide bund and/or cause undesirable settlement. In general, the requirpment of settlement governs the depth of exploration for high embankments in particular. However, borings can be terminated at shallower depths when firm strata or bed rock is encountered. Ordinarily, the boxing shall be taken to a depth of at least 1.5. times the height of embankment and guidebund. However, where highly compressible strata are encountered, the boring may have to be taken deeper. In order to ensure that firm strata is sufficiently thick, the boring should extend 3 metre into the firm strata. 350 DETAILED EXPLORATION

350.1 The exploration shall cover the entire length of the bridge and also extend at either end for a distance of about twice the depth below bed of the last main foundation to assess the effect of the approach embankment on the end foundations. Generally the sub-surface investigations (preliminary and detailed) for bridges shall extend to a depth below the anticipated foundation level equal to about one and a half times the width of the foundation. However, where such investigations end in any unsuitable or questionable foundation material, the exploration shall be extended to a sufficient depth into firm and stable soils or to rock. 350.2 The type and extent of exploration shall be divided into the following groups as per requirement of foundation design and likely method of data collection :
i) ii) iii) Foundation requiring shallow depth of exploration Foundation requiring large depth of exploration Fills behind abutments and protection works

350.3 Location Boring Where the data made available by detailed exploration indicates appreciable variation or where variations. in a particular foundation are likely to appreciably affect the construction (specially in case of bridge foundations resting on rock), it will be necessary to resort to additional bores/soundings to establish complete profile of the underlying strata. The additional borings /soundings shall be decided depending upon the extent of

Surface and Sub-surface Geotechnical Exploration

2400

variation at a particular foundation location and should cover the entire area of the particular foundation. 350.4 Construction Stage Exploration. Whenever a change in the sub-soil strata/rock profile is encountered during construction, explorations shall be resorted to establish the correct data for further decisions. 350.5 Logging of bore;.holes by radio-active methods shall be done for detailed investigations as' specified in the contract or in special provisions. 350.6 For bridge works, the investigations shall be comprehensive enough to. enable the designer to estimate or determine the following
i) ii) iii) iv) v) vi) the engineering proper ties of the soil/rock, the location and extent of soft layers and gas pockets, if any, under the hard founding strata, the geological condition like type of rock, fatilts, fissures or subsidence due to mining, porosity etc., die ground water level, artesian conditions, if any, quality of water in contact with the foundation, vii) the depth and extent of scour.

viii)
ix)

suitable depth of foundation,


the bearing capacity of the foundation,

x) probable settlement and probable differential settlement of the foundations, xi) likely sinking or driving effo;t, and xii) likely construction difficulties.

351

EXPLORATION FOR BRIDGE FOUNDATIONS RESTING ON ROCK

351.1 Investigation and interpretation of data for rock is a specialised work. To arrive at the characteristic strength of rock mass, reliance shall be placed more'on in-situ tests in comparison to laboratory tests. An engineering geologist shall also be associated in the exploration programine. 351.2 Identification and classification of rock types for engineering purposes may in general be limited to broad, basic geological classes in accordance with accepted practice. Strength of parent rock alone is of limited value because overall characteristics depend considerably on character, spacing and distribution of discontinuities of the rock mass, such as the joints, bedding planes, faults and weathered searnsi. An important factor affecting the behaviour is the weathered zone at top. 351.3 Basic Information Required from Explorations
i) ii) iv) v) vi) vii) Depth of rock strata and its variation over the site. Whether isolated boulder or massive rock formation, iii) Extent and character of weathered zone, Strucaure of rock - including bedding planes, faults, fissures, solution cavities etc., Properties of rock material-strength, geological formation, etc., Erodibility of rock to the extent possible, Colour of water.

Surface and Sub-surface Geotechnical Exploration 351.4 Exploration Programme

2400

If preliminary investigations have revealed presence of rock within levels where the foundation is to rest, it is essential to take up detailed investigation to collect necessary information mentioned in clause 2404.3. The exploratory bore-hole shall be drilled into the rock to a depth of about 3,metres to distinguish a boulder from a continuous rock formation. 351.5 The extent of exploration shall be adequate enough to give a complete picture of the rock profile both -in depth and across the channel width to assess the constructional difficulties in reaching the foundation levels. 351.6 The depth of boring in rock depends primarily on local geology, crodibility of the rock, extent of structural loads to be transferred to foundation etc. Nortnally, it shall pan through the upper weathered or otherwise weak zone, well into the sound rock. Minimum depth of boring in sound rock shall be 3 metres. 351.7 Detailed Investigation for Rock 351.7.1 This covers sounding, boring and drilling., An adequate investigation programme shall be planned to cover the whole area for general characteristics and in particular the foundation location, to obtain definite information regarding rock-depth and its variation over the foundation area. The, detAiled programme of exploration will depend on the type and depth of over-burden, the.size and importance of the structure, etc. To decide this, geophysical methods adopted at the preliminary investigation stage will be helpful, this data being supplemented by sounding, bore-holes and drill holes. 351.7.2 Drilling through rock is a very specialised work and every care shall be taken to notice and record any small change during drilling. The time required to drill through a certain depth, amount of core recovery, physical condition, length of pieces -of core, joints, colour of wa ' ter residue, weathering and evidence of disturbance and other effects shall be, carefully noticed and entered in the drilling log. For guidance, IS:5313 may be referred to. The data shall be presented in accordance with IS:4464. 351.7.3 351.7.4
i) ii)

The cores shall be stored properly in accordance with IS:4078. The rock cores obtained shall be subjected to following laboratory tests

Visual identification for texture, structure, composition. colour and grain size. Laboratory tests shall be done for specific grayity. porosity and moisture content.

351.7.5 In-situ tests shall be made in accordance with IS:7292; IS:7317; and IS:7746. In addition, laboratory tests can also be made on samples. 351.7.6 Use of in-situ tests for measuring strength and deformation characteristics shall be made. Use of bore-hole photography will be desirable to evaluate the presence of faults, fissures or cavities, etc. 351.8 Special Cases 351.8.1 Investigation for conglomerate : A drill hole shall be made same as for

Surface and Sub-surface Geotechnical Exploration

2400

rock. The samples collected shall be subjected to suitable tests depending upon the material, special care shall be taken to ascertain erodibility of the matrix. ' Where possible, specially for shallow foundation, Plate Load Test shall be conducted. 351.8.2 Investigation for laterites : The investigation shall be genej~ally similar to that required for cohesive soils, use of penetrition tests shall be preferred, if suitable correlation cbarts are available. This may be static or dynamic penetration tests or vane shear tests. In the case of hard laterite, recourse may have to be made to core drilling as for soft rocks. For laterites at shallow depths, use of Plate Load Test may be advantageous. 351.9 Caution 351.9.1 The interpretation of laboratory results on rock samples depends upon the iclationship of the specimens tested to the overall rock characteristics, enumerated in Appendix I of IRC:78. For this purpose, care shall be exercised in the choice of specimen size and its orientation in relation to the joint pattern. 351.9.2 In some cases, the foundation behaviour will be dominated by a possible mode of failure involving movement along some joint surface, fissures or weak layer within -a generally strong rock system and also by possible weathering. In-situ shear tests may be conducted wherever feasible, as such tests are likely to give more representative data than the shear tests conducted on core samples. 351.10 Presentation of Data The . data shall be given in diagrammatic form in 3 sheets giving the following details Sheet 1 : Plan showing the position of bore-holes clearly marked so as to fix the position at a future date. Sheet 2 : This shall contain the bore-log chart and test results of the samples separately for each bore-hole/pit etc. Sheet 3 : This shall contain pictorial representation of the borelog data to get an overall, picture of the soil profile at the crosssection of the river. NOTE For guidance, refer to IRC:78. 352 BORING

Boring shall be done by any of the following methods depending on the soil type and types of samples required for the investigation:
i) ii) iii) iv) v) Auger Boring Shell and Auger Boring Percussion Boring Wash Boring Rotary Boring

Surface and Sub-surface Geotechnical Exploration

2400

For preliminary and detailed sub-surface investigation only rotary drills shall be used. The casing shall also be invariably provided with diameters not less than 150 mm upto the level of rock, if any. However, use of percussion or wash boring equipment shall be permitted only to penetrate through bouldery or gravelly strata for progressing the boring but not for the collection of samples. While conducting detailed borings, the resistance to the speed of drilling i.e. rate of penetration, core loss, etc., as already specified in Appendix 3 of IRC:78 shall be carefully recorded to evaluate the different types of strata and to distinguish specially sand from sandstone, clay from shale, etc. 353 RECORDS OF BORINGS AND TRIAL PITS

353.1 The field records* for the preliminary and detailed exploration shall contain the date when the boring was made, the location of the boring with reference to a permanent system of co-ordinates and the elevation of the ground surface with respect to a permanent bench mark. They shall include elevation at which the water table and the upper boundary of each of the successive soil strata were encountered, the investigator's classification of the layer on the basis of' general infortnation obtained from field examination (refer to Appendix 2.1 of IRC:75) and the value of the resistance obtained by means of Standard Penetration Test. The type of tools used for borings shall be recorded. If the tools were changed, the depth at which the change was made and the reason thereof shall also be noted. Incomplete and abandoned borings shall be described with no less care than successfully completed drill holes. The notes shall contain everything of significance observed on the job such as the elevation at which wash water was lost from the hole. 353.2 For all borings and trial pits, necessary information as detailed below shall'be given. A site plan showing the disposition of the bore holes shall also be attached
a) b) c) d) e) f) g) h) Q j) k) 1) m) n) o) p) Agency Location with reference map PitMom-hole number Reduced level (R.L.) of ground surface or other reference point Dates of starting and completion Name of supervisor Scales of plans and sections Dimensions. methods of advancing exploration such as by hand tools, blasting. boring, etc. General description of strata met with and RLs at which they am met Position and altitude of contacts. faults, strong joint, slicken sides, etc. Mow of water, methods of controlling the water, required capacity of pumps for dewatering The level at which the sub-soil water is met with Dip and strike of bedding and of cleavage, Visual description of strata Results of field tests e.g. SPT, in-situ vane shear test etc. Any other information and remarks.

Surface and Sub-surface Geotechnical Exploration

2400

353.3 Upon removal of sampling tube, the length of the sample in the tube and the length between the top of the tube and the top of the sample in the tube shall be measured and recorded. 354 METHODS OF SAMPLING

There are two types of samples viz. (a) Disturbed sample (b) Undisturbed sample. The usual methods for sampling conforming to IS:1892 and IS:2132 are given below Nature of Ground soil Disturbed Shell Sarnples Undisturbed Tube Samples Rock Disturbed Wash Samples from percussion or rotary drilling Undisturbed 355 Cores PROCEDURE FOR TAKING SAMPLES Hand Samples Auger Samples Type of Sample Hand Samples Method of Sampling

355.1 For proper identification of sub-surface material, sample should be recovered containing all the constituents of the materials in their proper proportion. In clayey deposits such samples could be collected by split spoon samplers. In the case of sandy deposits, sainpling spoons shall be fitted with suitable devices for retaining samples. All data required for soil identification (Appendix 2.1 of IRC:75) should be collected from the samples so extracted when undisturbed samples, which are more desirable for collection of some of the data, are not available. Penetration test should be carried out with the standard splitspoon sampler or penetrometers if the soil is coarse grained. When it is known in advance that the soil profile is fairly regular, preliminary and detailed investigation may be combined. Tube samplers can be used in place of split spoon samplers for collecting samples in clayey strata. 355.2 Disturbed Soil Samples 355.2.1 Disturbed samples of soil shall be obtained in the course of excavation and boring. For procuring samples from below the ground water level, where possible, special type of sampler shall be used. Where Standard Penetration Test is conducted, representative samples shall be obtained from the split spoon. While collecting disturbed samples from borrow areas it shall be ensured that the samples 'collected represent all types of borrow materials to be used in the construction of embankment and sub-grade. 355.2.2 The size of sample generally required shall be as given in Table 2400-1.

Surface and Sub-surface Geotechnical Exploration TABLE 2400.1 SIZF, OF SOIL SAMPLE REQUIRED S. NO. PURPOSE OF SAMPLE SOIL TYPE REQUIRED Kg 1. Soil identification, natural moisture content tests, mechanical analysis and index properties, chemical tests 2. 3. Compression tests and sand ' Comprehensive examination of construction material and borrow area soil including soil stabilisation Cohesive soils 12.5 Cohesive soils 25 - 50 and sands Gravelly soil 50 - 100 Cohesive soils I Sands and Gravels 3 WEIGHT OF SAMPLE

2400

355.2.3 While taking out disturbed soil samples, Standard Penetration Test may also be conducted to find out the bearing capacity of the sub-soils at specified. levels. 355.3 Undisturbed Soil Samples 355.3.1 The location of the bore-hole shall be as indicated on the drawing or given by the Engineer. The depth of the bore-hole shall be as indicated on the drawing or shall be governed by the criteria given therein or as directed by the Engineer. 355.3.2 Samples shall be obtained in such a manner that their moisture content and structure do not get altered. This may be ensured by careful protection and packing and by use of correctly designed sampler. 355.3.3 Standard Penetration Test may have to be conducted in each case to obtain additional data as directed by the Engineer. In soft clay, in-situ vane shear test as per IS:4434 may have to be conducted. Where all the three operations have to be carried out in one layer, the sequence shall be undisturbed soil sampling followed by in-situ vane shear test, followed by Standard Penetration Test. 355.3.4 For compression test samples, a core of 40 mm diameter and about 150 to 200 mm length may be sufficient, but for other laboratory tests, a core of

Surface and Sub-surface Geotechnical Exploration

2400

100 mm diameter and 300 mm length shall be taken as far as possible, unless otherwise specified by the Engineer. 355.3.5 The upper few millimetres of both types of sample shall be rejected as the soil at the bottom of the bore hole usually gets disturbed by the boring tools. 355.4 Rock Samples 355.4.1 Disturbed samples : The sludge from percussion borings or from rotary borings which have failed to yield a core, shall be collected for a disturbed sample. It may be recovered from circulating water by settlement in a trough. 355.4.2 Undisturbed samples : Block samples taken from the rock formation shall be dressed to a size of about 90 x 75 x 50 mm. For core samples - cores of rock shall be taken by means of rotary drills fitted with a coring bit with core retainer, if warranted. 355.4.3 In case of rock at shallow depths which can be conveniently reached, test pits or trenches are the most dependable and valuable, methods since they permit a direct examination of the surface, the weathered zone and presence of any discontinuities. It is also possible to take representative samples for tests. For guidance, IS:4453 may be referred to. 356 PROTECTION, HANDLING AND LABELLING OF SAMPLES

356.1 Care shall be taken in handling and labelling of samples so that they are received in a fit state for examination and testing and can be correctly identified as coming from a specified trial pit or boring. 356.2 The disturbed material in the~ upper end of the tube shall be completely removed before applying wax for sealing. The length and type of sample so removed should be recorded. 356.3 The soil at the lower end of the tube shall be reamed to a distance of about 20 mm. After cleaning, both ends shall be sealed with wax applied in a way that will prevent wax from entering the sample. Wax used for sealing should not be heated to more than a ' few degrees above its melting temperature. The empty space in the samplers, if any, should be filled with moist soil, saw dust, etc., and the ends covered with tight fitting caps. 356.4 Labels giving the following information should be affixed to the tubes :
a) Tube number b) Job designation c) Sample location d) Boring number e) Sample number f) Depth g) Penetration h) Gross recovery ratio

The tube and boring numbers should be marked in duplicate. Duplicate markings of the boring number and sample number on a -sheet which will not be affected by moisture should be enclosed inside the tube.

Surface and Sub-surface Geotechnical Exploration 357

2400

TESTS FOR EXPLORATION OF SHALLOW FOUNDATIONS OF BRIDGES

357.1 Test pits or trenches are the most dependable and valuable methods of exploration since they permit direct visual examination and more reliably the type of soil and their stratification. This will also allow in-situ tests like plate bearing tests, shear tests and uni-axial jacking tests, etc. 357.2 Tests shall be conducted on undisturbed samples, which may be obtained from open pits. The use of Plate Load Test (as per IS:1888) is considered desirable to ascertain the safe bearing pressure and settlement characteristics. A few exploratory bore holes or soundings .shall be made to safeguard against presence of weak strata underlying the foundation. This shall extend to a depth of about 11/2 times the proposed width of foundation. The laboratory results shall.correlate with in-situ tests like Plate ,~4oad Tests and Penetration Test results. 358 TESTS FOR EXPLORATION FOR DEEP FOUNDATIONS OF BRIDGES

358.1 The tests to be conducted at various locations for properties of soil, etc., are different for cohesive and cohensionless soils. These are enumerated below and shall be carried out, wherever practicable, according to soil type. 358.1.1
a) b)

Cohesionless soil

Classification tests, density, etc. Field tests. Plate Load test as per IS:1888.

Dynamic Penetration test as per IS:2131 and Use of Dynamic Cone penetration test as per IS:4968 (Part I or Part 2) may be conducted where considered appropriate c) Laboratory tests : Shearing strength test - triaxial or box shear test - in case of the possibility of rise of water table, the tests shall be done on saturated samples.

358.1.2
a) b)

Cohesive soils

Classification tests, density, etc. Field tests :

Plate Load Test. Unconfined Compression Test as per IS:2720 (Part 10). Vane Shear Test as per IS:4434. Static Cone Penetration Test (IS:4968 Part 3). c) Laboratory tests : Shearing strength test - triaxial tests (IS:2720 Part 9). Consolidation Test (IS:2720 Part 15) Note : Where dewatering is expected" samples may be tested for permeability (IS:2720 Part 17.). ,

358.2 The sub-surface exploration for bridge works can be divided into 3 zones :
i) ii) iii) between bed level and upto anticipated maximum scour depth (below H.F.L.) from the maximum scour depth to the foundation level. from foundation level to about 111, times the width of the foundation below it.

358.3 The sub-soil water shall be tested for chemical properties to ascertain the hazard of deterioration to foundations. Where dewatering is expected to be required, permeability characteristics shall be determined.

Surface and Sub-surface Geotechnical Exploration

2400

358.4 For the different zones categorised in para 2411.2 the data required, such as soil classification, particle size distribution, shearing strength characteristics, method of sampling disturbed and un(dWhisturbed samples, testing, including particle size distribution, shear strength, unconfined compression test, shall be complied with. 359 TESTING OF MATERIAL FOR GUIDE BUND AND HIGH EMBANKMENT AND ITS FOUNDATIONS

359.1 The soil properties for the embankment foundation shall be as specified in particular specifications and shall be got verified prior to construction operation. In case the actual soil properties do not match the particular specification, then embankment design shall be revised. 359.2 Field investigation for the embankment material should be carried out to collect general information as indicated in IRC:75. For details refer to Clause 305. Field investigations for sub-soil strata shall consist of taking minimum two bore holes for each, approach to a bridge along centre line of the alignment at a distance of 50 m and 120 m behind the abutment positions on both sides. The depth of bore holes below the ground level may ordinarily be 2.5 times the maximum height of the embankment subject to minimum depth of 20 m. Thin walled sampling tubes of 100 min internal diameter and 450 mm minimum length conforming to IS:2132 shall be used for collecting undisturbed samples from bore-holes at an interval of 2.5 to 3.5 m. Standard penetration test should be conducted imm~diately after undisturbed sample is collected. 359.3 In addition to the relevant identification tests, mentioned in IRC:75, it shall be necessary to conduct some of the following tests on the undisturbed samples collected from the sub-strata. The choice of test is primarily dete~nined by the type of soil, type of stability analysis (vide Table 2400-2), availability of apparatus and cost of investigation.
TABLE 2400.2 SHEAR STRENGTH TESTS FOR STABILITY ANALYSIS S. Stage in Life No. of Embankment L (a) or immediate post-construction cuu, OUU embankment material I (b) - do S. vane shear test I (c) or immediate During construction Co' Consolidated undrained stress Effective test with pore-pressure Unconfined compression - do test in laboratory or Strength Shear Test Parameters Analysis Unconsolidated undrained Total stress analysis triaxial shear test on undisturbed samples During construction Type of

and on compacted

Surface and Sub-surface Geotechnical Exploration


post-construction compacted soil samples of embankment materials and on undisturbed samples 2. Long term stability Co. - do do measurement on as analysis

2400

359.4 Laboratory Investigations of Embankment Material 359.4.1 The following tests should be conducted on representative samples of embankment material
S. NO. TEST i) ii) iii) iv) TEST METHOD Gradation Test (Sieve Analysis) Atterberg Limit Test Standard Proctor Test IS:2720 (Part 4) IS:2720 (Part 5) IS:V20 (Part 7)

Natural Moisture Content IS:2720 (Part 2)

359.4.2 In addition to the above, there is need for shear strength tests on compacted samples of the fill material. For this purpose, the relative compaction should be 95 per cent of the Standard Proctor maximum dry density and moisture content, same as that likely to prevail in the embankment during the period covered by the stability analysis or to be used in the field during construction. *Undrained test shall be run on cohesive soils and shear strength parameters should be ascertained'for the ranges of normal pressures which are likely to be experienced in the field. In cases where effective stress analysis is required to be done, pore-pressure measurements should also be made during the undrained tests and effective strength and pore-pressure parameters should be found out. For fill material of coliesionless soils, a direct shear box test (IS:2720-Part 13) may be conducted to ascertain shear strength of soil. 359.4.3 The results of reconnaissance, field and laboratory investigations for embankments shall be consolidated into a well-knit report. The record of findings and recommendations, if any, may be presented in the form of written test, graphs, figures and tables, as appropriate for different types of data and findings. Inforination and data to be contained in the report should include general location map, pertinent geological information on reconnaissance observations, sub-soil profile (Fig. 2.1 of IRC:75), boring logs and summary of sub-soil properties (Fig. 2.2 of IRC:75), graphs and tables related to laboratory investigations, results of borrow area investigations (Fig. 2.3 of IRC:75) and recommendations, if any. The undisturbed samples shall be collected from each layer of sub-soil unless. the stratum is such that undisturbed samples cannot be coRected using ordinary sampler. Where indicated by the Engineer, undisturbed samples shaff be collected using piston

Surface and Sub-surface Geotechnical Exploration

2400

sampler or corecutter or such special devices. In thick layers undisturbed samples shall be collected at 3 m interval. 360 MEAKREMENTS FOR PAYMENT

In case of bridge and road structures, the work of boring and trial pits shall be considered as incidental to the foundation works and nothing extra shall be paid unless otherwise specified in the contract. In cases where it is specified to be paid separately, like contract for soil investigation, the work shall be measured in running metres for boring, in cubic meters for trial pits, in number of samples for collection of disturbed and undisturbed sampleg-and in number of tests for each type of test. 361 RATE

The contract unit rate shall include the cost of all labour, materials, tools and plant an# equipment required for doing the boring or making pits as per these specifications, taking out and packing the samples, sending and getting them tested in approved laboratories and making available the test report as specified or directed by the Engineer inclusive of all incidental costs to complete the work as per the specifications.

River Training Work and Protection Work River Training Work and Protection Work 2500 River Training Work and Protection Work

2500

River Training Work and Protection Work

2500

2501

DESCRIPTION

River training and protection work shall include construction of guide bunds, guide walls, bank protection, flooring and approach embankment protection as required for ensuring safety of the bridge structure and its . approaches against damage by flood/flowing water. Construction, of various components shall conform to IRC:89 and these specifications or as directed by the Engineer. 362 GUIDE BUND

362.1 This work shall consist of construction of embankment of guide bund and provision of pitching/rivetment on slopes, apron, toe protection, curtain walls etc. as indicated on the drawing in accordance with these specifications or as approved by the Engineer. The provisions given hereunder are applicable only to guide bunds for bridges across alluvial rivers. Guide bunds for bridges across submontane rivers shall call for supplemental specifications. 362.2 The alignment and layout of guide bund shall be as indicated on the drawing or as approved by the Engineer. The construction of embankment for guide bund shall conform to provisions of Section 300 of these Specifications. Pitching, filter underneath pitching and turfing, apron, toe protection, curWn walls, etc., shall be as per these specifications. 362.3 Guide bunds shall generally be made of locally available materials from. the river bed preferably coliesionless materials. Trial pits shall be taken in borrow holes to examine suitability of soil for construction and also to decide the types of earth moving machinery to be arranged. The borrow pits should be sufficiently away from the location of the launching apron. No borrow pits should be dug on the river side of the guide bunds. Construction of guide bund shall be taken in hand alongwith the construction of the bridge. Every effort shall be made to complete the work of the guide bund in one working season. Where there is any doubt about completion of the whole guide bund within one working season, suitable measures shall be planned and executed for protection of completed work. In such cases the construction of guide bund shall be started from abutment towards upstream. 362.4 Construction of apron and pitching of the guide bunds shall generally conform to clause 2503 and 2504 of these Specifications. Sufficient length of pit along the guide bund shall be ready within one ' to two months of commencement of work so that the placing of stones in the apron and in the slope pitching can be commenced. As a guideline, earthwork should be completed within 80 per cent of working se ason and about 70 per cent working season shall be available ' for laying apron and pitching. No portion of the guide bund should be left below BFL before the onset of monsoon.

River Training Work and Protection Work

2500

Bottom of apron pit shall be as low as permitted by sub-soil water/lowest water level. Sufficient labour and appropriate earth moving machinery and trained staff shall be deployed in construction. 362.5 The Contractor shall furnish his planning for approval of the Engineer regarding transport of stones from the quarries to the site of work taking into account the quantities of stone required to be transported every day, train/truck, etc., deployed, available ferry or boats and labour available for loading and unloading and for laying within the time frame for construction of guide bund. Adequate reserve of stones should be maintained for major works as decided by the Engineer. Reserve stones shall be stacked far away from the main channel of the river. 362.6 Where the alignment of guide bund or the approach embankment crosses a branch channel of the river, the branch channel may be either diverted to the main channel of the river with the help of spurs, etc. or closed by a properly designed closing dyke or closure bund before taking up construction of guide bund. 363 363.1 General This work shall consist of laying boulders directly or in wire crates on the bed of rivers for protection against scour. Wherethe requiredsizeof bouldersarenot available economically, cement concrete blocks of equivalent weight shall be used. The grade of concrete shall be M 15 nominal mix. (This holds good for pitching on slopes and flooring also). Cement concrete blocks shall be preferred where practicable. The stones used in apron shall be sound, hard, durable and fairly regular in shape. Stone subject to marked deterioration by water or weather shall not be used. Quarry stones are preferable to round boulders as the latter roll off easily. Angular stones fit into each other better and have good interlocking characteristics. Where the,required size stones are not economically available, cement concrete blocks in M15 grade conforming to Section 1700 or stones in wire crates in combination may be used in place of isolated stones of equivalent weight. Cement concrete blocks will be preferred, wherever practicable. 363.2 Laying'Boulder Apron The size of stone should conform to clause 5.3.7.2 of IRC:89. The size,of stone shall be as large as possible. In no case any fragment shall weigh less than 40 kg. The specific gravity of stones shall be as high as possible and it shall not be less than 2.65. To ensure regular and orderly disposition of the full intended quantity of stone in the apron, template cross walls in dry masonry shall be built about a metre thick and to the full height of the specified thickness of the apr6n at intervals of 30 metres all along the length and width of the apron. Within these walls, the stone then shall be hand packed. APRON

River Training Work and Protection Work

2500

The surface on which the apron is to be* laid shall be levelled and prepared for the length and width as shown on the drawings. In case the surface on which apron is to be laid is below the low water level, the ground level may be raised upto low water level by dumping earth and the apron laid thereon. The quantity of stone required in the apron shall be re-worked out by taking the toe of pitching at higher level. 363.3 Laying Wire Crates and Mattresses in the Apron Wire crates shall be made from hot dipped galvanized mild steel wire of diameter not less than 4 min in annealed condition having tensile strength of 300450 U?a conforming to IS:280. The galvanizing coating shall be heavy coating for soft condition conforming to IS:4826. The mesh of the crate shall not be more than 150 mm. Wire crates for shallow or accessible situations shall be 3 metre x 1.5 metre x 1.25 metre in size. Where these have to be deposited and there is a chance of overturning, the crate shall be divided into 1.5 metre compartments by cross netting. For deep or inaccessible situations, wire crates can be made smaller subject to the approval of the Engineer. Wire crates built in-situ, shall not be larger than 7.5 metres x 3. metres x 0.6 metre, nor -smaller than 2 metres X I metre x 0.3 metre. Sides of large crates shall be securely stayed at intervals of not more than 1.50 metres to prevent bulging. The netting shall be made by fixing a row of spikes on a beam at a spacing equal to the mesh. The beam must be a little longer than the width of netting required. The wire is to be cut to lengths about three times the length of the net required. Each piece shall be bent at the middle around one of the spikes and the weaving commenced from one comer. A double twist shall be given at each intersection.. This twisting shall be carefully done by means of a strong iron bar, five and half turns being given to the bar at each splice. The bottom and two ends of the crate or mattress shall be made at one time. The other two sides shall be made separately and shall be secured to the bottom and the ends by twisting adjacent wires together. The top shall be made separately and shall be fixed in the same manner as the sides after the crates or mattress have been filled. Wherever possible, crates shall be placed in position before filling with boulders. The crates shall be filled by carefully hand-packing the boulders as Lightly as possible and not by merely throwing in stones or boulders. For laying of wire crates in aprons of bridges, two situations arise:
i) ii) Where the crates are to be laid in deep water and have to be dumped and then joined together. Where depth of water is low or dry bed is available. In such cases, the Crates can be laid at site.

364 364.1 Description

PUCHING / REVETMENT ON SLOPES

River Training Work and Protection Work

2500

This work shall consist of covering the slopes of guide bunds, training works and road embankments with stone, boulders, cement concrete blocks or stones in wire crates over a layer of granular material called filter. While river side slopes are given this protection against river action, the rear slopes, not subjected to direct attack of the river, may be protected against ordinary wave splashing by 0.3-0.6 metre thick cover of clayey or silty earth and turfed. 364.2 Pitching/Filter media 364.2.1 Pitching : The pitching shall be provided as indicated in the drawings. The thickness and the shape of stone pitching shall be shown on the drawing. The stone shall be sound, hard, durable and fairly regular in shape. Quarry stone should be used. Round boulders shall not be allowed. The stones subject to marked deterioration by water or weather shall not be accepted. The size and weight of stone shall conform to clause 5.3.5.1 of IRC:89. No stone, weighing less than 40 kg shall, however, be used. The sizes of spalls -shall be a minimum of 25 mm and shall be suitable to fill the voids in the pitching. Where the required size stones are not economically available, cement concrete blocks in M15 grade conforming to Section 1700 or stones in wire crates may be used in place of isolated stones of equivalent weig ht. Cement concrete blocks will be preferred wherever practic able. Use *of geosyntlietics has been dealt with in Section 700. 364.2.2 Filter media : The material for the filter shall consist of sand, gravel, stone or coarse sand. To prevent escape of the embankment material through the voids of the stone pitching / cement concrete blocks as well as to allow free movement of water without creating any uplift head on the pitching, one or more layers of graded materials, commonly known as a filter medium, shall be provided underneath the pitching. The gradation of the filter material shall satisfy the following requirements : Provision of a suitably designed filter is necessary under the slope pitching to prevent the escape of underlying embankment material through the voids of stone pitching/cement concrete blocks when subjected to the attack of flowing water and wave action, etc. In order to achieve this requirement, the filter may be provided in one or more layers satisfying the following criteria D 15 (Filter) D 85 (Base) 4 < D 15 (Filter) < 20 D 15 (Base) D 50 (Filter) < 25 D 50 (Base)
Notes : 1. Filter design may not be required if embankment consists of CH or Ch soils with liquid limit greater than 30, resistant to surface erosion. In this case, if a layer of material is used as bedding for pitching, it shall be well graded and its D 85 size shall be at least twice the maximmn void size in pitching.

River Training Work and Protection Work

2500

I In the foregoing, D 15 mans the size of that sieve which allows 15 per cent by weight of the filter material to pass through it and similar is the meaning of D 50 and D 85. 3. If more than one filter layer is required, die same requirement as above shall be followed for each layer. The finer filter shall be considered u base material for selection of coarser filter. 4. The filter shall be compacted to a firm condition. Ile thickness of filter is generally of the order of 200 nun to 300 mm. Where filter is provided in two layers, thickness of each layer shall be 150 mm.

364.3 Construction Operations Before laying the pitching, the sides of banks shall be trimmed to the required slope,and profiles put up by means of line and pegs at intervals of 3 metres to ensure regular straight work and,a uniform slope throughout. Depressions shall be filled and thoroughly compacted. The filter,granular material shall, be laid over the prepared base and suitably compacted to the thickness specified on the drawings. The lowest course of pitching shall be started from the toe wall and built up in courses upwards. The toe wall shall be in dry rubble masonry (uncoursed) conforming to Clause 1405.3, in case of dry rubble pitching and shall be in nominal mix cement concrete (M 15) conforming to Clause 1704.3 in case of cement concrete block pitching. The stone pitching shall commence in a trench below the toe of the slope. Stone shallbe placed by derrick or by hand to the required length, thickness and depth conforming to the drawings. Stones shall be set normal to the slope, and placed so that the largest dimension is perpendicular. to the face of the slope, unless such dimension is greater than the specified thickness of pitching. The largest stones shall be placed in the bottom courses and for use as headers for subsequent courses. In hand placed pitching, the stone of flat stratified nature should be placed with the principal bedding plane normal to the slope. The pattern of laying shall be such that the joints are broken and voids are minimum by packing with spaHs, wherever necessary, and the top surface is as smooth as possible. When full depth of pitching can be formed with a single stone, the stones shall be laid breaking joints and all interstices between adjacent stones shall be filled in with spalls of the proper size and wedged in with hammers to ensure tight packing. ~ When two or more layers of stones must be laid to obtain the design thickness of pitching, dry masonry shall be used and stone s shall be well bonded. To ensure regular and orderly disposition of the full intended quantity of stone as shown, template cross walls in dry masonry shall be built about a metre wide and to the full height of the specified thickness. at suitable intervals and all along the length and width of the pitching. Within these walls the stones shall be hand packed as specified. 364.4 Toe Protection In conformity with clause 5.3.7. of IRC:89, a toe wall shall be provided at the junction of slope pitching and launching apron of a guide bund so as to protect the slope pitching

River Training Work and Protection Work

2500

from falling even when the apron is not laid at low water level. The'toe wall shall be in dry rubble masonry (uncoursed) conforming to Clause 1405.3 in case of dry rubble pitching or pitching/ revetment with stones in wire crates and in nominal mix cement concrete (M 15) conforming to Clause 1704.3 in case cement concrete blocks have been used in pitching. For protection of toes of bank slopes terminating either in short aprons at bed levels or anchored in flooring / rocky bed, the provisions of clause 8.2.2 of IRC:89 may be complied with. The relevant specifications of the protective works for individual components will be followed. 365 RUBBLE STONEXEMENT CONCRETE BLOCK FLOORING OVER CEMENT CONCRETE BEDDING

365.1 This work shall consist of constructing rubble stone / e.c. block flooring laid over a cement concrete (M 15) bedding. The floor protection will comprise rigid flooring stated above with curtain walls and flexible apron. 365.2 Construction Operations Excavations for laying the bedding and floor protection works shall be carried out as per specifications under proper supervision. Before laying the foundation and protection walls, the excavated trenches shall be thoroughly inspected by the Engineer-in-Charge to ensure that
a) There am no loose pockets and unfilled depressions left in the trench. b) The soil at the founding level is properly compacted to true lines and level so as to have an even bedding. c) All concrete and other elements are laid in dry bed.

Cement concrete nominal mix (grade M 15) of 300 mm thickness shall then be laid in accordance with provisions given in Section 1700 except that the surface of the concrete shall not be given a smooth finish. The paving work shall be embedded in green concrete. Flooring shall consist of 150 mm thick flat stone/6ement concrete blocks (Nominal mix Grade M 15 conforming to Section 1700). It shall be bedded on a layer of cement mortar (1:3) prepared to Clause 1304. Spalls shall be used to fill in the voids. The joints shall then be filled with cement mortar and finished neat. The stone shall break joints and the joints shall not exceed 20 mm in thickness. Spacing of joints may be 20 m or so. The top of flooring shall be kept to 300 mm below the lowest bed level. 366 DRY RUBBLE FLOORING

This work shall consist of constructing dry rubble flooring at cross drainage works for relatively less important works. The base for the flooring shall be prepared to the specified levels and slopes and compacted suitably with hand rammers or other means to have an even bedding.

River Training Work and Protection Work

2500

The thickness of flooring shall be made with one stone only. The stones shall then be laid closely on the prepared base in one or more layers as specified and the bond used shall be as specified by the Engineer. 367 367.1 Curtain Wall The rigid flooring shall be enclosed by curtain walls (tied to the wing walls) with a minimum depth below floor level of 2 m on upstream side and 2.5 in on downstream side. The curtain wall will be in cement concrete M 15/stone masonry in cement mortar 1:3. The rigid flooring shall be continued over the top width of curtain wall. 367.2 Flexible Apron Flexible apron I in thick comprising loose stone boulders (weighing not less than 40 kg) shall be provided beyond curtain walls for a minimum distance of 3 m on upstream side and 6 in on downstream side. The work of floor protection shall be simultaneously completed alongwith the work on bridge foundations. 368 TESTS AND STANDARDS OF ACCEPTANCE CURTAIN WALL AND FLEXIBLE APRON

The materials shall be tested in accordance with these Specifications and shall meet the prescribed criteria. The work shall conform to these Specifications and shall meet the piescribed standards of acceptance. 369 MEASUREMENTS FOR PAYMENT

The protection works shall be measured as set forth below. If directed by the Engineer for measurement, the materials may have to be stacked at site before laying and nothing extra will be paid to the Contractor for this stacking. The earth work in construction of embankment for guide bund shall be measured in cubic metres unless otherwise specified. The boulders/cement concrete blocks and wire crates in apron shall be measured in cubic metres. The filter and stone pitching shall be measured separately in cubic metres unless otherwise specified. Rubble stone/cement concrete blocks, flooring and cement concrete bedding shall be measured in cubic metres for each class of material. Preparation of base for laying the flooring shall be deemed incidental to the work. For laying apron, excavation upto an average depth of 150 mm sh.-II be deemed to be included in the main item and shall not be measured separately unless otherwise specified. Excavation more than 150 mm shall be m&sured in cubic metres as given in Clause 304. 370 RATE

River Training Work and Protection Work

2500

The contract unit rate for the construction of embankment for guide bund shall cover the cost of all materials including transportation, laying, compacting, all labour, tools, equipment, sampling and testing, supervision and all incidentals necessary for completing the work according to these specifications. The contract unit rate for one cubic metre of finished work of apron shall include the cost of all material, labour, tools and plant for completing the work according to above specifications. Excavation upto an average depth of 150 min shall also be deemed to be included in the rate as dressing of the bed. Excavation beyond this depth shall be paid for separately unless otherwise specified. The contract unit rate for one cubic metre of filter or stone/cement concrete block pitching on slopes shall include the cost of preparing the bases, putting to the profiles, laying and compacting the filter and stone pitching of dry rubble/cement concrete. block rivetment for embankment slopes to the specified thickness, lines, curves, slopes and levels and all labour and materials as well as tools and plant required for the work. The contract unit rate for rubble stone/cement concrete block flooring shall include the cost of all material, labour and tools and plant for completing the work as per these specifications.

Expansion Joints Expansion Joints 2600 Expansion Joints

2600

Expansion Joints

2600

2601

DESCRIPTION

This. work shall consist of fabrication and placing of expansion joints 'as indicated on thedrawing and conforming to thesespecifications or as directed by the Engineer. 371 GENERAL

a) The expansion joints.shall be designed and duly got approved by the F,-Igineer. It shall cater for expected movement and rotation of the structure at the joints and provide smooth Ming surface. It shall also be easy for inspection, maintenance and replacemenL b) Expansion joints shall be robust, durable, water-tight and replaceable. Site fabricated expansion joints shall be prohibited. Expansion joints shall be obtained by the Engineer eithei directly or through the Contractor from approved manufacturers and be of proven type. c) For bridges with prestressed concrete superstructure, with individual span length more than 20 in or built with innovative design/construction elastomeric expansion joints of slab seal or strip seal type shall be provided. d) For slab type of bridges of spans less than 10 metres continuous surfacing may be provided across the expansion gaps, supported on a 20 nun thick plate placed and fixed at the level of the deck slab. e) For bridges other than those mentioned in (c) above with spans above 10 metres, an alternative specification of sliding steel plate joint or filled joints with copper plates may also be adopted if approved by the Engineer, apart from elastomeric expansion joint of slab seal or strip seal type. f) Vehicular traffic shalKnot be allowed over expansion joints after its construction for such period as may be determined by the Engineer. g) Proprietary type deck joints offered by the Contractor in lieu of the type specified shall comply in all respects with the manufacturer's specifications and meet the required range of movements and rotations and be fit for the purpose of ensuring satisfactory long term performance in the bridge.

Where alternative type proprietary deck joints are proposed by the Contractor, the following information shall be provided.
i) Name and location of the proposed manufacturer. ii) Dimensions and general details of the joint including material specifications, holding down bolt or anchorage details and installation procedures. iii) Evidence of satisfactory performance under similar environmental conditions of similar joints being produced by the manufacturer.

Any acceptance of alternative types will be at the sole discretion of the Engineer. Such deck joints shall be installed in accordance with the recommendations and to the general requirements of this Specification. manufacturer's

No expansion joint shall be provided only for the width of the, carriageway. It shall follow the profile including the - kerb and tho footway and facia, if provided. The type of expansion *oint for the latter. may be made different from that used for the carriageway expansion joinq 372 REQUIREMENTS

372.1 The requirement criterion will be separately applicable for the expansion joint proper and the transition zone of attachment to the deck. 372.2 There are two types of performance requirements for the expansion joint proper viz. from the necessity of the bridge and from the road users e.g. man, animal and

Expansion Joints vehicle. 372.3 Performance Requirement with Respect to Bridges The expansion joint shall :
a) Withstand the imposed load including the impact load from live load and other Sources.

2600

b) Allow expansion and contraction movement due to temperature, creep, shrinkage, prestressing and structural deformations. c) Permit relative rotation in elevation and plan due to the causes as noted above, d) Be waterproof Bridge deck expansion joint seals~.play a critical role in preventing the degradation of the structuial components of the bridge system. Without effective joint seals, water passes through the bridge deck and works harmfully to corrode steel components and cause deterioration of the concrete. Rain water gathers various corroding additives from the atmosphere and also from the carriageway. e) Ensure sealing. In case bridge deck joints are not sealed, apart from loss of waterproofing, grit and other forms of road debris may enter the joint. Debris, when impacted with the joint can seriously restrict the movement instead of facilitating the same. In the case of proprietary joints being accepted for adoption. the sealing shall be as specified by them, f) g) Ensure long life by being resistant to,corrosio% Be easy to install,

h) Be easy to maintain. Replaceability of expansion joint shall be one of the basic criteria for selection of type of expansion joint,. i) Be resistant to the materials likely to collect/spill over the deck in its normal service.

372.4 Performance Requirement with Respect to User The expansion joint shall
a) b) c) d) Provide smooth continuity at the top of the deck for riding comfort, Be of skid resistant surface, Be non-damaging to the rubber tyre, Make minimum noise during vehicular crossing,

e) Ensure that animal paws and hooves should not get entangled where bridges are used by animal drawn traffic, f) g) Permit passing of bullock can steel tyre for bridges where bullock carts ply, Look good aesthetically.

372.5 Performance Requirement for Transition Zone It is the zone of connection of joint assembly and the adjoining deck. The expansion joint shall :
a) Permit transfer of generated forces without distress, i.e., without getting uprooted. The purpose will not be served if the bonding is with the wearing coat only. Anchorage must be provided with the deck structural element, b) Ensure that surface in the transition zone stays undisturbed during long term service.

373

STEEL PLATE SLIDING EXPANSION JOINTS

a) In this type of buried joint, the wearing coat shall be made continuous over the joint. 'Me other alternative shall be to keep a gap in the wearing coat which is filled up with a seal and filler, to be provided in extremely hot areas.

Expansion Joints

2600

b) Materials for steel plates shall conform to Section 1900. The exposed metallic components shall be galvanised Or coated with approved anti-corrosive paint. The thickness shall be 20 nun or so for obtaining satisfactory performance. c) Plates shall be placed to the line, grade and expansion gap shown on the drawings with any adjustment required, for temperature, particular care being taken with the top of the plates. d) Plates shall be firmly held in place during concreting by methods approved by .he Engineer. e) Any temporary bolts or other fixings which prevent relative movement of the adjacent parts of the joint shall be removed as soon as the concrete has set sufficiently to hold the expansion plates in their correct positions. In any case,, temporary bolts or other finings shall be removed within 6 hours of placing concrete unless otherwise directed by the Engineer. f) Care shall be taken to prevent damage to expansion joint plates or its coating. g) If any damage occurs, die plates and coatings shall be restored by the Contractor to the satisfaction of the Engineer. h) Plates shall be free of oil, rust, loose paint or othel similar material before coating.

374

FILLER JOINTS

a) The components of this type of joint shall be at [cut 2 mm thick corrugated copper plate placed slightly below the wearing coat, 20 min thick compressible fibre board to protect the edges, 20 min thick pmmoulded joint filler filling the gap upto the top level of the wearing coat, sealed with a joint staling compound. b) The material used for filling expansion joint shall be bitumen impregnated felt, elastorwr or any other suitable material. as specified on the drawings. Impregnated felt shall conform to the requirements of IS:1838, and shall be got approved from the Engineer. The joint filler shall consist of large pieces and assembly of small pieces to make up the required size shall be avoided. c) Exlxw.-.ion joint materials shall be handled with cam and stored under cover by the Contractor to prevent damage. d) Any damage occurring after delivery shall be made good to the satisfaction of the Engineer and at the expense of the Contractor. e) Joint gaps shall be constructed as shown on the drawings. Surfacei-of joint grooves shall be thoroughly cleaned with a wire brush to remove all loose materials and dirt and debris, then washed or jetted out. f) Pre-moulded expansion joint filler shall not be placed in position until immediately prior to the placing of the abutting material. If the two adjacent surfaces of the joint are to be placed at different times, this type of joint filler shall not be placed until the second face is about to be placed. g) Sealants shall be installed in accordance with the manufacturer's recon=muneendations and all appropriate requirements for joint face priming. h) Sealants shall be finished approximately 3 min below the upper surfaces of the jointi) Joint materials spilt or splashed o;to finished surfaces of the bridge during joint filling operations shall be removed and the surfaces made good to the Engineer's approval. j) work. No joint shall be sealed until inspected by the Engineer and approval is given to proceed with the

375 375.1 Materials

ELASTOMERIC SLAB SEAL EXPANSION JOINT

a) Stwl inserts shall conform to IS:726. Use of any other materials like fibre-glass or similar material shall not,be permitted.

Expansion Joints

2600

b) Elastomer for elastomeric slab unit (ESU) shall conform to clause 915.1 of IRC:83 (Part 10. compounded to give hardness IRHD 60 5. subject to the following additional stipulations : i) Cb1oroprene (CR) only shall be used in the manufacture of elastomeric expansion joints. No reclaimed/natural rubber or vulcanised wastes shall be used. ii) The chloroprene material used in the manufacture of elastomeric (expansion joints) shall be Neoprene WRT, Bayprene I 10, Skyprene B5 or Denka S40V. iii) Chloroprene content of the conipound shall not be lower than 60 per cent by weight. The ash content shall not exceed 5 pr cent (as per tests conducted in acocidance with ASTM D-297 for (i) and (ii) above. iv) c) d) c) EPDM and other similar candidate clastomers for expansion joints shall not be permitted. Elastomeric plugs. Spacer bars, marked with centre to centre distance of fixing holes. Fixing bolts and nuts made of stainless steel.

f) Anchor bars comprising hooked anchor stiffeners welded with lower steel insens and sinusoidal anchor bars welded with horizontal leg of the edge steel inserts. The elaborate anchoring arrangements of steel inserts shall be permanently welded/ tied with the steel reinforcement.

375.2 Fabrication
a) Steel inserts shall be grit blasted and provided with epoxy paint. b) Edges of reinforcing steel sections shall be rounded. c) Expansion joints shall be fully moulded to the required size in one single vul!mnising operation including the encasing layers as integral and homogeneous part. d) Tolerances of fabrication shall be as7 follows Q Plan dimension -> 5 mm ii) Total height -> + 3 mm

375.3 Supply and Handling


i) The Contractor shall supply all steel-reinforced elastomeric expansion joints including bolts, nuts, sealant, plugs and all other accessories for the effective installation of the joints including angled jointing sections for kerbs. ii) Expansion joint material shall be handled with care and stored under cover by the Contractor to prevent damage. Any damage occurring after delivery shall be made good at the expense of the Contractor to the satisfaction of the Engineer.

375.4 Installation 375.4.1 Expansion joints shall be installed as per approved drawing. Steel inserts, spacer bars, concreting of pockets, fixing of elastomer slab unit and presetting, etc., shall be done as per the following: a) Stwl Inserts
i) Deck casting shall be done leaving pockets or recess for steel inserts and anchors of the expansion joint as per drawing. ii) Steel inserts shall be lowered at the appropriate location inside the pocket. iii) The top of the insert shall be flush with the finished level of weaning course maintaining the camber.

iv) Spacer bars. duly set appropriately to the month of installation. shall be fitted under proper supervision.
v) Anchor rods shall be tied/welded with the existing deck main reinforrcccemmeewnn~ maintaining level and alignment.

Expansion Joints

2600

vi) Welding between anchor rods and deck reinforcement is preferable If welding is not possible, strong steel tie wires shall be used for fastening, under proper supervision. b) Spacer Bar i) Spacer bars shall be used to ensure proper positioning of bolts and also levelling of die steel inserts during fixing of the same with the deck reinforcement and caning second stage concreting in the pocket thereafter. ii) The 2nd stage concreting operation shall preferably be started within 24 hours of fixing the steel inserts. In such cases, spacer bars should be removed just after concreting is finished. If there is a substantial time lag between fixing of inserts and concreting, then any one of the following methods shall be adopted, depending on the support condition : , a) For simply supported bridge resting on simple elastomeric bearings, (with no dowel pins), insert shall be placed in position with spacer bars at every altematejoints. Such joints shall be called restrained joints hereafter. In other words, inserts shall not be fixed simultaneously at two ends of one span. If the above condition is satisfied, inserts with spacer bars shall be kept in position for a substantially longer period at such restrained joints. Spacer bars shall be removed after concreting of such restrained joints and inserts placed in position with spacer bars at the other unrestrained joints thereafter. b) For bridges resting on other than elastomeric bearings (including bearings with dowel pins at one end), after placing and aligning the inserts and securing the same, the spacer bars shall be removed.. Concreting shall be done with great care so that insens are not dislocated or distorted. iii) While removing the spacer bar after concreting, one must take care to see that the concrete is not damaged during withdrawal of spacer bar. If the spacer bar happens to be snugly fitted, it shall not be pulled by any means; it shall be gas cut in two pieces and then removecL c) Concreting of Pocket i) Concreting of pocket shall be done with great care using proper mix conforming to grade similar to that of the deck casting besides ensuring efficient bonding between deck and steel insert. Also proper cam shall be given for ensuring efficient bonding with the already cast. concrete. ii) Needle vibrators shall be used. Care shall be taken so that the position of; steel insert is not disturbed during vibration. iii) Spacer bar shall be removed within an appropriate time before the joint is required to permit movement. d) i) ii) iii) iv) v) Fixing of Elastomeric Slab Unit (ESU) Special jig shall be used to preset the ESU during installation. ESU (mounted on the jig, if preset) shall be lowered to position. The line and level on the ESU should be adjusted. ESU %hall be removed and coated with special adhesive ESU shall be placed in position again, ensuring waterproof joining at required faces.

vi) ESU shall be tightened with stainless steel nuts and lock washers in position. Tightened nuts shall be loc ked with lock washers. vi) Special sealant shall be poured inside the plug holes. vii) The elastomeric plugs shall be pressed in position after applying adhesive on the appropriate surface. viii) ESU shall be fined in position after completion of wearing course. While completing this part of the wearing course, adequate care shall be taken to ensure a waterproof joining with the already existing wearing course. e) Pre-Sening i) The main purpose of presetting of the steel inserts at the time of its installation is to ensure as closely as possible the condition that in the long run at the mean average annual temperature, the ESU remains at its nominal state.

Expansion Joints

2600

ii) Major factors responsible for changing the longitudinal length of the bridge superstructure are indicated below a) c) d) Temperature variation from aminal mean. b) Changes due to shrinkage of concrete. Changes due to elastic shortening and creep of the prestressed bridge superstructure. Deformation of superstructure and substructure, if any.

Resultant changes in expansion gap due to first factor can occur in both directions from any preselected mean position whereas changes due to creep and shrinkage am unidirectional such that the expansion gap continuously increases with passage of tim& The steel insert unit of expansion joint can be fixed in any month of the year. As stated earlier, the expansion gap between bridge superstructure may vary from time to time; hence the initial fixing distance between fixing points will obviously depend on the month of installation of steel insert. The c/c distance between stainless steel fixing of bolts as indicated in the drawing can be taken as only nominal. The same shall be modified by presetting depending on :
i) The difference between the mean temperature of the month of fixing of steel insert and the annual average temperature. ii) The elapsed period between the casting and/or prestressing and fixing of steel insert for calculating the remnant creep and shrinkage.

375.4.2

Special requirements for installation

i) Prior to construction of bridge deck area adjacent to the joint, the supplier shall provide detailed working drawings showing the location of all bolts, recesses and holes necessary for the installation of the joint. Reinforcing bars in superstructure shall be amended as required to ensure that there will be no interference in the installation of the joint. ii) All bearing surfaces and recesses which are in contact with the joint assembly shall be checked with a straight edge to ensure flatness of profile. iii) No holes shall be drilled for fixing bolts within 7 days of concreting. Holes for the bolts shall be drilled to the size and depth shown on the drawings. iv) Sections of the jointing making the completed joint shall follow a straight line. v) The fixing bolts shall not be placed in a position until at least 4 weeks after stressing is completed in post-tensioned box or beam and stab structures. Prior to placing sections of jointing, contact surfaces shall be cleaned to remove all grease, tar, paint. oil, mud or any other foreign material that may affect adhesion of the sealant. vi) Sealant shall only be applied to dry contact surfaces. Sufficient sealant shall be applied to the contact surfaces to cause extrusion of sealant when the jointing is fixed in position. vii) Final sealing of the finished expansion joint shall be completed immediately after completion of installation. All exposed ends, joints between units and other areas of possible leakage shall be. filled with sealant. All voids between the sides of the jointing and concrete or plates shall be filled with sealant. viii) Bolt cavities shall be cleaned and plugged with neoprene cavity plugs. Prior to placing the plugs sufficient sealant shall be placed in the cavities to cause extrusion of the sealant by the plugs. ix) All excess sealant shall be removed from the jointing and adjacent areas.

375.5 Acceptance Test 375.5.1 As per clause 918.7 of ' IRC-83 (Part 11), necessary quality control certification by the manufacturer in regard to properties of Elastomer and steel will be furnished.

Expansion Joints

2600

For severe environment, ozone resistance test as per clause 915.2.3 of IRC:83 (Part 11), shall be carried out for elastomer. The properties of' the elastomer shall conform to Table I of clause 915.2 of IRC:83 (Part 11). The acceptance testing for elastomer material shall conform to clause 918.4.1.2 of IRC:83 (Part II) with additional criteria as stated in Clause 2005. 375.5.2 The fabricated expansion joint shall be subjected to the following acceptance tests :
i) Routine test. Each expansion joint shall be tested for at least 100 cycles for a test movement which shall be 10 per cent more than the design expansion/ contraction movement ii) In addition to routine test, one out of every 20 expansion joints shall be subjected to the test movement for 40M cycles. The lot shall be rejected if the elastomer material shows signs of fatigue or permanent set or distress in the test. The test piece shall not be used in the bridge. iii) The type test for abrasion resistance shall be carried out for one joint out of every 20 nos. as per IS:3400 (Part; 3) and the standard deviation shall bee within + 20 per cent N.B. The manufacturer shall preferably have in-house testing facility. Otherwise, the testing shall be got done by him at his expense at any testing establishment selected by the Engineer. A manufacturer who cannot carry out the acceptance test shall not be entitled to supply elastomeric slab seal joint.

376 376.1 Components

STRIP SEAL EXPANSION JOINT

Strip seal expansion joint shall comprise the following items


a) Edge beams - Ibis special claw leg profiled Member shall be of extruded rolled steel section combining good weldability with notch toughness. b) Strip seal - This shall be of chloroprene with high tear strength, insensitive to oil, gasoline. and ozone. It shall have high resistance to aging. This component.. provided to ensure water tightness, shall have bulbous shape of the pan of the seal which is inserted into the groove, provided in the edge beam. The vA should. be vulcanised in single operation for minimum full length of joint. c) Rigid Anchorage - This "I be welded to the edge beam at staggered distancx,. d) Anchor loops - This shall be made of weldable steel connecting the eigid anchorage with deck reinforcement

376.2 Material
a) Edge beams of this special section are at present being directly impoftd in India. This Steel Shall conform to steel grade Rst 37-2 of German Standsrd or equivalent. b) Chloroprene of strip seal shall conform to clause 915.1 of IRC:83 (Pirt 11), The properties of chloroprene shall conform to Table 2600-L c) d) Anchorage steel shall conform to IS-2062. Anchor loop shall conform to IS:2061

TABLE 2600-1. STRIP SEAL ELEMENT SPECIFICATION

Expansion Joints

2600

Sealing element is made of chloropreme and must be a extruded section. The working movement range of the sealing element shall be at least 80 mm. with a maximum of 100 mm at right angles to the joint and 40 mm parallel to the joint. PROPERTY Hardness Tensile Strength Elongation at fracture Tear Propagation Strength Longitudinal Transverse Shock Elasticity Abrasion Min 10 N/min Min 10 N/min Min 25 per cent Min 220 mm` Max 28 per cent SPECIFIED VALUE 63 5 Shore A Min I I MPa Min 350 per cent

Residual Compressive Strain (22 h[70 deg C /30 per cent strain) Ageing in hot air (14 daysf7O deg Q Change in harAness Change in tensile strength Change in elongation at fracture Ageing in ozone (24 h/50pphm/25 deg Ct2O per cent strain) Swelling behaviour in Oil (116 h/25 per cent C) ASTM Oil no. Volume Change Change in hardness ASTM Oil no.3 Volume Change Change in hardness Cold Hardening Point Max 25 per cent Max 20 Shore A Min -35 deg C Max 5 per cent Max 10 Shore A No cracks Max -tS Shore A Max -20 per cent Max -20 per cent

376.3 Fabrication (Pre-installation)


a) Rolled steel profiles for edge beams shall be long enough to cater for a 2-lane carriageway. These shall be cut to size of actual requirements by means of a mitre box saw. Alignment of the cut-to-size steel profiles shall then be in&& in accordance with the actual bridge cross-section on work tables. For this purpose, the contour of bridge cross-section shall be sketched onto these tables. After the steel profiles are aligned, they will be chucked to the tables by means of *tew clamps and tacked by arc welding. b) Apchor plates shall be cut to the required size by gas cutting. These' slisill be ~, welded to the edge bearns. c) d) Anc hot loops shall be bent to the required shape and welded to anchor plates. The I inally assembled joints shall then be clamped and transported to the work

376.4 Handling and Storage


a) For transportation and storage, auxiliary brackets shall be provided to hold the - joint assembly together.

Expansion Joints

2600

b) The manufacturer shall supply either directly to the Engineer - or to the Bridge Contractor all the materials of strip seal joints including sealants and all other accessories for the effective installation of the jointing. c) Expansion joint material shall be handled with care. It shall be stored under cover on suitable lumber padding by the Contractor to prevent damage. Any damage occurring after delivery shall be made good at the Bridge Contractor's expense to the satisfaction of the Engineer.

376.5 Installation 376.5.1 The width of the gap to cater for movement due to thermal effect, 'prestress, shrinkage and creep, superstructure deformations (if any) and sub-structure deformations (if any) shall be determined and intimated to the manufacturer. Depending upon the temperature at which the joint is likely to be installed, the gap dimension shall be preset. 376.5.2 Taking the width of gap for movement ' of the joint into ,account, the dimensions of the recess in the decking shall be established in accordance with the drawings or design data of the manufacturer. The surfaces of the recess shall be thoroughly cleaned and all dirt and debris 'removed. The exposed reinforcement shall be suitably adjusted to permit unobstructed lowering of the joint into the recess. 376.5.3 The recess shall be shuttered in such a way that dimensions in the joint drawing are maintained. The formwork shall be tight. 376.5.4 Immediately prior to placing the joint, the presetting shall be inspected. Should the actual temperature of the structure be different from the temperature provided for presetting, correction of the presetting shall be done. After adjustment, the brackets shall be tightened again. 376.5.5 The.joint shall be lowered in a pre-determined position. Following placement of the joint in the prepared recess, the joint shall be levelled and finally aligned and the anchor loops on one side of the joint welded to the exposed reinforcement bars of the structure. Upon completion, the same procedure shall be followed for the other side of the joint. With the expansion joint finally heid at both sides, the auxiliary brackets shall be released, allowing the joint to take up the movement of the structure. 376.5.6 High quality concrete shall then be filled into the recess. The packing concrete must feature low shrinkage and have the same strength as that of the superstructure, but in any case not less than M 35 grade. Good compaction and careful curing of concrete is particularly important. After the concrete has cured, the movable installation brackets still in place shall be removed. 376.5.7 Rolled up neoprene strip seal shall be cut into the required length and inserted between the edge beams by using a crow bar pushing the b ulb of the seal into the steel grooves of the edge beams. A landing to a bead shall be formed in the thickened end of the edges of the seal which would force the

Expansion Joints

2600

thickened end against the steel beam due to wedge effect when the strip seal is buttoned in place. 376.5.8 As soon as the concrete in the recess has become initially set, a sturdy ramp shall be placed over the joint to protect the exposed steel beams. and neoprene seals from site traffic. Expansion joint shall not be exposed to traffic loading before the carriageway surfacing is placed. 376.5.9 The carriageway surfacing shall be finished flush with the top of the steel sections. The actual junction of the surfacing/wearing coat with the steel edge section,shall be formed by a wedge shaped joint with a sealing compound. The horizontal leg'of the edge beam shall be cleaned beforehand. It is particularly important to ensure thorough and careful compaction of the surfacing in order to prevent any premature depression forming in it. Acceptance Test
i) All steel elements shall be finished with corrosion protection system. ii) For neoprene seal, the acceptance test shall conform to the requirements stipulated in Table 26004. It shall - also be stretch tested. If a manufacturer is to supply this type of joint. they will have to produce a test certificate accordingly conducted in a recognised laboratory, in India or abroad. iii) In view of the importance of the built up edge beams, special investigation of fatigue stftngth of this section with afichorages to withstand 2 x 10, load change cycles without showing signs, of damage. will be required. The supplier shall have to produce a test certificate . in this regard, conducted in a recognised laboratory, in India or abroad. iv) The manufacturer shall produce tat certificates indicating that anchorage system had been tested in a recognised laboratory to determine opimum configum. tion of anchorage assembly undir dynamic loading. v) The manufacturer shall satisfy the Engineer that water tightness test for the type of joint has been carried out in a moDgnised laboratory to ched the water tightness, under a water pressure of 4 ban. vi) As strip seal type of joint is specialised in nature, generally of the proprietary type, the manufacturer shall be required to produce evidence of satisfactory performance of this type of joint.

377

TESTS AND STANDARDS OF ACCEPTANCE

The materials shall be tested in accordance with these specificadons and shall meet the prescribed criteria. The work shall conform to these specifications and shall meet the prescribed standards of acceptance. 378 MEASUREMENTS FOR PAYMENT

The expansion joint shall be measured in running metres. For filled joints, the rate per running metre shall include the cost of sealant for the depth provided in this drawing.

Expansion Joints

2600

379

RATE

The contract unit rate shall include the cost of all material, labour, equipment and other incidental charges for fixing the joints complete in all respects as per these specifications in the case of Bridge Contractor supplying the expansion joint. If the manufacturer supplies the expansion joint directly to the Engineer, the cost of installation, handling and fixing shall be borne by the Bridge Contractor.

Wearing Coat and Appurtenances Wearing Coat and Appurtenances 2700 Wearing Coat and Appurtenances

2700

Wearing Coat and Appurtenances

2700

2701

DESCRIPTION

This work shall include wearing coat and bridge appurtenances such as railing, approach slab, drainage spouts, weep holes in conformity with details shown on the drawing and these specifications or as approved by the Engineer. 380 380.1 Bituminous Wearing Coat Specifications for bituminous concrete/bitumen mastic in wearing coat shall conform . to Section 500 except for the special requirements as stated hereinafter. 380.1.1 Principles of bituminous wearing coat shall comprise the following
i) A layer of mastic asphalt, 6 runt thick after applying a prime coat over the top of the deck before the wearing coat is laid. Ile prime coat and the layer of mastic asphalt shall be laid as per Clauses 503 and 515 respectively. ii) 50 mm thick asphaltic concrete wearing coat in two layers of 25 nun each as per Clause 51Z in case of high rainfall intensity areas, the thickness of mastic asphalt layer may be increased to 12 mm.

WEARING COAT

380.1.2 For high traffic density, an alternative specification for wearing course comprising 40 mm bituminous concrete overlaid with 25 min thick bitumen mastic layer can be adopted. The work shall be done in conformity with Section 500. 380.2 Cement Concrete Wearing Coat Cement concrete wearing coat may be provided in case of isolated bridge construction or bridges located in remote areas. It shall not be laid monolithic with the deck. The thickness of wearing coat shall be 75 mm. The minimum grade of concrete shall be M 30 with water cement ratio as 0.4. Curing of wearing coat earlier than what is generally required may be resorted to, so as to avoid formation of shrinkage cracks in hot weather. All carriageway and footpath surfaces shall have non-skid characteristics. The cross slope in the deck shall be kept as 2.5 per cent for decks, level in longitudinal profilo. 380.3 For providing cross camber no variation in thickness of wearing coat shall be permitted. 381 381.1 General
a) Bridge railing includes the portion of the structure erected on and above the kerb for the protection of pedestrians and traffic. b) Railings shall not be constructed until the centering falsewoTk for the span has been released and the span is self-supporting. For concrete with steel reinforcement, specifications of the items of controlled concrete and reinforcement mentioned under relevant sections of this specifications shall be applicable. c) The type of railing shall be carefully erected true to line and grade. Posts shall be vertical with a tolerance not to exceed 6 min in 3 metres. 1he pockets left for posts shall be filled up with non-shrinkable mortar. d) The type of railing to be constructed shall be as shown an the drawings.

RAILINGS

Wearing Coat and Appurtenances

2700

e) Care shall be exercised in assembling expansion joints in the railings to ensure that they function properly. f) The bridge railings shall be amenable to quick repairs. g) Railing materials, particularly metal railings, shall be handled and stored with cam, so that the material and parts are kept clean and free from damage. Railing materials shall be stored above the ground on platforms, skids, or other supports and kept free from grease, dirt and other contaminants.

Any material which is lost, stolen or damaged after delivery shall be replaced or repaired by the Contractor. Methods of repair shall not damage the material or protective coating. 381.2 Metal Railings Materials, fabrication, transportation, erection and painting for bridge railings shall conform to the requirements of section 1900. All complete steel rail elements, pipe terminal sections, posts, bolts, nuts, hardware and other steel fittings shall be galvanised or painted with an approved paint. If galvanised, all elements of the railing shall be free from abrasions, Tough or sharp edges, and shall not be kinked, twisted or bent. If straightening is necessary, it shall be done by methods approved by the Engineer. Damaged galvanised surfaces, edges of holes and ends of steel railing cut after galvanising shall be cleaned and re-galvanised. The railing shall be carefully adjusted prior to fixing in place to ensure proper matching at abutting joints and correct alignment and camber throughout their length'. Holes. for field connections shall be drilled with the railing in place in the structure at proper grade and alignment. Unless otherwise specified on the drawings, metal railing shall be given one shop coat of paint and three coats of paint after erection if sections are not galvanised. Railings shall not follow any irregularity in the alignment of the deck. When shown on the drawings, the rail elements shall be curved before erection. 381.3 Cast-in-Situ Concrete Railings The portion of the railing or parapet which is to be cast in place shall be constructed in accordance with the requirements for Structural Concrete in Section 1700. The reinforcement shall conform to Section 1600. Forms shall either be of single width boards or shall be lined with suitable material duly approved by the Engineer. Form joints in plane surfaces will not be permitted. All mouldings, panel work and bevel strips shal I be constructed according to the details shown on the drawings. All comers in the finished work shall be true, sharp and clean-cut and shall be free from cracks, spalls or other defects. Casting of posts shall be done in single pour. 381.4 Precast Concrete Railings Precast members for railings shall be of reinforced cement concrete and shall conform to the specifications given in Sections 1600 and 1700 The maximum size of the aggregate shall be limited to 12 mm and the concrete grade shall be M 30. The precast members shall be removed from the-moulds as soon as practicable and shall be kept damp for a

Wearing Coat and Appurtenances

2700

period of at least 10 days. During this period they shall be protected from sun and wind. Any precast member that becomes chipped, marred or cracked before or during the process of placing shall be rejected. Special care shall be taken to watch the surface of the cast-in-situ portion of the deck. 382 APPROACH SLAB

Reinforced concrete approach slab covering the entire width of the roadway shall be provided as per details given on the drawings or as approved by the Engineer. Mnimum length of approach slab shall be 3.5 in and minimum thickness 300 mm. The cement concrete and reinforcement shall conform to Sections 1700 and 1600 espectively. The base for the approach slab shall be as shown on the drawings or as directed by the Engineer. 383 DRAINAGE SPOUTS

383.1 This work shall consist of furnishing and fixing in position of drainage spouts and drainage pipes for bridge decks. Drainage along longitudinal direction shall be ensured by sufficient number of drainage fixtures embedded in the deck slab. The spouts shall be of not less than 100 mm in diameter and shall be of corrosive resistant material such as galvanised steel with suitable cleanout fixtures. The spacing of drainage spouts shall not exceed 10 in. The discharge from drainage spout shall be kept away from the deck structure. In case of viaducts in urban areas, the drainage spouts should be connected with suitably located pipelines to discharge the surface run-off to drains provided at ground level. 383.2 Fabrication The drainage assembly shall be fabricated to the dimensions shown on the drawings; all materials shall be corrosion resistant; steel components shall be of mild steel conforming to IS:226. The drainage assembly shall be seam welded for water tightness and then hot-dip galvanised. 383.3 Placement The galvanised assembly shall be given two coats of bituminous painting before placement. The whole assembly shall be placed in true position, lines and levels as shown in the drawing with necessary cut-out in the shuttering for deck slab and held in place firmly. Where the reinforcements of the deck are required to be cut, equivalent reinforcements shall be placed at the corners of the assembly. 383.4 Finishing After setting of the deck slab concrete, the shrinkage cracks around the assembly shall be totally sealed with polysulphide sealant or bituminous sealant as per IS: 1834 and the excess sealant trimmed to receive the wearing coat. After the wearing coat is completed, similar sealant shall be finished to cover at least 50 mm on the wearing coat surface. all round the drainage assembly.

Wearing Coat and Appurtenances 384 WEEP HOLE

2700

Weep holes shall be provided in solid plain concrete/reinforced concrete, brick/stone masonry, abutment, wing wall and return walls as shown on the drawing or directed by the Engineer to drive moisture from the back filling. Weep holes shall be provided with 100 mm dia AC pipe for structures in plain/reinforced concrete or brick masonry. In case of stone masonry, weep holes shall be 80 mm wide, 150 mm high or circular with 150mm diameter. Weep holes shall extend through the full width of concrete/masonry with slope of about I vertical:20 horizontal towards the draining face. The spacing of weep holes shall generally be 1m in either direction or as shown in the drawing with the lowest at about 150 mm above the low water level or ground level whichever is higher or as directed,by the Engineer. 385 TESTS AND STANDARDS OF ACCEPTANCE

The matztids A&H bQ tg5tqd in accordance with these, Specifications and shall meet the prescribed criteria. The work shall conform to these Specifications and shall meet the prescribed standards of acceptance. 386 MEASUREMENTS FOR PAYMENT

The measurement for payment for wearing coat, railings and approach slab shall be made as given below :
i) Cement concrete wearing coat shall be measured in cubic metres. Asphaltic concrete wearing coat shall be measured in square metres. ii) iii) iv) Railings sh:11 be measured in running metres. Approach slab and its base shall be measured separately in cubic metres. Drainage spouts shall be measured in numbers.

v) Weep holes in concrete/brick masonry structure shall be measured in numbers. For structures in stone masonry, weep holes shall be deemed to be included in the item of stone masonry work and shall not be measured separately.

387

RATE

The contract unit rate for wearing coat shall include the cost of all labour, material, tools and plant and other cost necessary 6~ completion of the work as per these Specifications. The contract.unit rate of railings shall include the cost of all labour, material, tools and plant required for completing the work as per thest, Specifications. The contract unit rate for approach slab shall include the cost of all labour, material, tools and plant required for completing the work as per these Specifications. The rate for base shall include cost of all labour, material, tools and plant required, including preparation of surface and consolidation complete in all respects. The,contract unit rate for each drainage spout shall include the c(,,st of all labour, material, tools' and plant required for ' completing the work as per these Specifications. It

Wearing Coat and Appurtenances

2700

shall also include the cost of providing flow drain pipes with all fixtures upto the point of ground drains wherever shown on the drawings. The contract unit rate for weep hole shall include the cost of all labour, material, tools and plant required for completing the work as per these Specifications.

Repair of Structures Repair of Structures 2800 Repair of Structures

2800

Repair of Structures

2800

2801

DESCRIPTION

Repair of structures shall be carried out in accordance with the repair plans and these specifications or as directed by the Engineer. Where repair work is not covered by these specifications, special specification may be framed. Implementation of repair schemes shall also conform to provisions of IRC:SP:40. 388 388.1 Environmental Aspect Care shall be takento ensure suitable mitigation measuresagainst noise and dust, pollution and damages to the environs whether temporary or permanent and shall be taken as incidental to work. 388.2 Phasing The sequence of work shall be in accordance with the drawings or as directed by the Engineer. 388.3 Traffic Management Traffic management, signage, signalling arrangement, barricading, and lighting arrangement shall be in accordance with Section 100 and with these specifications and shall be considered as incidentals to work. 388.4 Safety Precautions Adequate precautions shall be taken for safety of personnel, road users and existing services, which, during execution, shall be considered as incidentals to work. Persons working should wear safety helmets and rubber gloves. 388.5 Dismantling and Removal of Material Dismantling of any bridge component and removal of materials shall conform to Section 200 and this section and as shown on the drawings or as directed by the Engineer. 389 389.1 General The work of epoxy adhesive utilising the Structural Concrete Bonding Process shall conform to these specifications. 389.2 The Contractor shall furnish detailed methodology of con'struction including sources of supply of material, tools, equipment and Appliances to be used on work, details of personnel and supervision. 389.3 Personnel The Contractor's personnel shall be qualified and experienced in .epoxy injection process. 389.4 Material SEALING OF CRACKS BY INJECTION OF EPOXY RESIN GENERAL

Repair of Structures

2800

The material for injection shall be suitable two-component low Yiscosity epoxy resin, having the required. characteristics of bonding with concrete and resistance to moisture penetration. Epoxy mortar or polysulphide resin may be used for sealing the surface. The material for epoxy injection shall conform to the following
i) The mixing ratio of resin and hardener shall generally be between I to I and 2 to I by volume subject to manufacturer's recommendation. ii) Neither the mixed epoxy adhesives nor their individual components shall contain solvents and thinners. iii) The components drall be free oi lumps or foreign material. The viscosity of the individual components shall not change more than 15 per cent when kept in closed containers at 25 degrees Celsius after two weeks. iv) Consistency requirement. Standard Version cps at 25 degrees Celsius v) vi) Low Viscosity Version cps (200-300) (100-190)

Viscosity of Mixed,Adhesive

Pot Life of mixed adhesive I hour +15 minutes at 25 degrees Celsius Set time of mixed adhesive 3 - 6 hours at 25 degrees Celsius

*In the cast of two component injection system where +resin and hardener get mixed at point of injection pot life at 25 degrees Celsius shall be not greater than 15 min +10 minutes. 389.5 Equipment for Injection The equipment shall be portable, positive displacement type pumps with interlock to provide positive ratio control of exact proportions of the two components at nozzle. The pumps shall be generally electrically powered ahd shall provide in-line metering and mixing. The tolerance on mix ratio shall be 5 per cent by volume. The injection equipment shall have automatic pressure control capable of discharging mixed adhesive at any pre-set pressure within the prescribed limits and shall be additionally equipped with a manual pressure control. The injection equipment shall be equipped with sensors on both the components A and B reservoirs that will automatically stop the machine when only one component is being pumped to the mixing head. If considered appropriate, suitable compressed air operated epoxy m jection gunpan * be used with prior approval of the Engineer for manual injection of mix when resin and hardener had been mixed in a separate unit. 389.6 Preparation

Repair of Structures

2800

Surfaces adjacent to cracks or other areas of application shall be cleaned of dirt, dust, grease, oil efflorescence or other foreign matter by brushing/water jetting/sand blasting. Acids and corrosives shall not be permitted for cleaning. Entry ports shall be provided along the crack at intervals of not more than the thickness of concrete at the location. Surface seal material shall be applied to the face of the crack between the entry ports. For through cracks, surface se~l shall be applied to both faces. Before proceeding with the injectiQn, the surface seal material must gain adequate strength with respect to concrete strength of the member/ injection pressure. 389.7 Epoxy Injection Injection of epoxy adhesive shall begin at lowest entry port and continue until there is an appearance of epoxy adhesive , at the next entry port adjacent to the entry, port being pumped. When epoxy adhesive travel is indicated by appearance at the next adjacent port, injection shall be discontinued on the entry port being pumped and entry port shall be sealed. Thereafter, epoxy injection shall be transferred to next adjacent port where epoxy adhesive has appeared. Epoxy adhesive injection shall be performed continuously until cracks are completely filled. If port to port travel of epoxy adhesive is not indicated, the work shall immediately be stopped. In case the volume of the injected material exceeds 2 litres for a particular entry port, the work shall be stopped and the specifications may be reviewed. 389.8 Precautions for Application
a) Unless otherwise specified, components A and B, i.e., resin and hardener, shall be at a temperature between 10 degrees Celsius and 35 degrees Celsius at the time of mixing. b) Temperature of structural member during epoxy injection shall be between 10 degrees Celsius and 35 degrees Celsius unless otherwise specified. c) Immediately prior to use, each component shall be thoroughly mixed with a clean paddle. The paddle shall be of a type that does not induce air intothe material. Separate clean paddle must be used for each component. d) Any heating of the adhesive components shall be done by application of indirect heat in case the work is to be done in cold climate. e) Just before use. the two components shall be thoroughly mixed in the ratios specified by the manufacturer. The length of mixing time shall be in strict accordance with manufacturer's recommendations. When mixed, all adhesives with different coloured components shall have a uniform colour without streaks. f) The use of solvents and thinners will not be permitted except for cleaning of equipment.

389.9 Testing 389.9.1 Matefial Testing : Prior to approval of the material, the following tests shall be carried out at site or in an authorised laboratory for each batch of resin and hardener and each combination thereof at the cost of the Contractor.
i) ii) Viscosity test for resin and hardener and the mix - three specimens each. Pot life test - three specimens each.

Repair of Structures
iii) iv) a) Bond test three specimens each. Shear test six specimens each, 3 after 24 hours and the other three after 72 hours of curing Pot Life Tests

2800

Subsequent tests shall be carried out as directed by the Engineer.


i) 500 gm of resin formulation shall bE prepared by thoroughly mixing the resin and hardener/accelerator/catalyst component in proposed proportion in a I kg capacity hemispheral porcelain bowl by means of a spatula or any other agitating device and note down the time and the ambient temperature. ii) With a clean dry 25 rrun size painter's brush, the resin formulation shall be applied on a clean dry surface such as cement concrete over 1520 cm length, starting immediately after mixing the formulation and repeating operation every five minutes. When it becomes just difficult to spread the resin properly with the brush, the time is noted. - time elapsed since completion of mixing of resin formulation is taken as its pot life. iii) One pot life test shall be performed on commencement of work and the same shall be repeated every four hours. iv) In case the material fails to satisfy the pot life test it shall not be used for injection. Where the resin and hardener get mixed at point of injection, the pot life is not important and no tests may be required. b) Bond Test

A standard 150 mm diameter and 300 mm long concrete cylinder shall be cast in 2 pieces by providing a separating media at an axis of 45 degrees Celsius to the longer axis of the cylinder (refer to Fig. 2800/1). Three sets of such split cylinders shall be prepared in advance. Two pieces of each set shall be joined with epoxy mortar at four points to give a clear gap of about 0.2 mm, which will be injected with epoxy resin at site. After epoxy has been cured, load test is carried out on the cylinder which shall not be less than 80 per cent of the cube strength of the concrete mix and the failure shall not take place at the joint injected with epoxy resin. c) Shear Tests Two steel plates, minimum 3mm thick, shall be bonded with epoxy at site using the same resin mix as usWpropDsed to be used for injection. rNe assembly shall be kept in mechanical clamp till epoxy is cured. A total of six specimens shall be prepared for each batch of materials. Three test specimens shall then be subjected to a shear force along the axis after 24 hours and the minimum shear strength before failure shall not be less than I NTa, (refer Fig. 2800/2). The remaining test specimens shall be similarly tested after 72 hours of curing. The shear strength before failure shall not be less than 2.5 NVa. 389.9.2 Core test : If directed by the Engineer, core tests shall be conducted for the acceptance of the work. The selection of the location 1 of cores shall be made under the direction of the Engineer in such a way that damage in' crifical/stressed areas of the structure is avoided. The procedure for the test shall be as under.

Repair of Structures

2800

The Contractor shall obtain 5 cm diameter initial core samples in the first 50 linear metres. Thereafter, frequency of core sampling shall be as specified or as agreed by the Engineer. The depth of the core shall generally be less than 20 cm. Tests and Acceptance Criteria shall be as follows : a) Penetration/Visual Examination - a minimum of 90 per cent of the crack shall be full of epoxy adhesive. E E C, E w a_ U.) (Ii N 0 UE E L'-l 14 37 L LU Lu uj < u C) UJ z V) < < Fu a. 6--j V) OL w m CC 0 z 0 CO 0 CL

Repair of Structures

2800

b). . Bond Strength : Concrete failure before adhesive failure or 40 UP& with no failure of either concrete or adhesive If the cores taken in first 50 m length pass tests as specified above, epoxy adhesive injection work at area represented by cores will be accepted. If cores fail either by lack of penetration or bond strength, work shall not proceed further until the areas represented by the cores are reinjected and retested for accepta~ce. Filling of Field Control festing Core Holes This procedure consists of using two-component bonding agent applied to surfaces of cored holes. followed by application of NonShrink cement grout mix placed by hand trowel, thoroughly rodded and tamped in place, and finished to match finish and texture of existing concrete to -the satisfaction of the Engineer. Materials and.procedures for filling testing core holes shall be submitted to and approved by the Engineer before proceeding with core testing work. 389.9.3 Test for injection equipment : At all times during the course of the work the Contractor shall keep complete and accurate records and make available to the Engineer of the pressure and ratio tests specified above so that the efficacy and accuracy of the injection equipment is verified. In addition, the Engineer at any time without prior intimation of the Contractor may request the Contractor to conduct the tests specified below, in the presence of the Engineer. a) Pressure Test The mixing head of the injection equipment shall be disconnected and the two adhesive component delivery lines ' 5hall be attached to the pressure check device, which shall consist of two independent valved nozzles capable of sensing the pressure. Ile check device shall be closed and equipment operated until the gauge pressure in each line reads 5 NVa. Ibe pumps shall be stopped and the gauge pressure shall not drop below 4 NPa within 2 minutes. The pressure test shall be run for each injection unit at the beginning and after break of every shift. b) Ratio Test The mixing head of the injection equipment shall be disconnected and the two adhesive components shall be pumped simultaneously through the ratio check device, which shall consist of two independent valved nozzles. 'Mere shall be a pressure gauge capable of controlling back pressure by opening or closing valved nozzles capable of sensing the back pressure behind each valve. The discharge pressure shall be adjusted to read 5 bar for both adhesive components, which shall be simultaneously discharged into separate calibrated contaffierns during the same time period and the amounts discharged into the calibrated containers simultaneously during the same period shall be compared to de. tcrmine that the volume/discharge confoims to the manufacturer's recommended ratio for applicable material.

Repair of Structures 390 EPOXY MORTAR FOR REPLACEMENT OF SPALLED CONCRETE

2800

390.1 Material 390.1.1 Formulation The epoxy resins for use in the mortar shall be obtained from a reputed manufacturer and the mortar shall be prepared in conformity with the manufacturer's rec-inmendations. They shall generally conform to the following: Pot Life 90 minutes at 25 degrees Celsius 60 minutes at 30 degrees Celsius 45 minutes at 35 degrees Celsius Bond Strength Tensile Strength 12 MPa 16 UPa -

The Contractor shall carry out tests on the samples made out or requirements indicated above. The sand content in the mortar shall be in accordance with the desired consistency. 390.2 Proportioning and Mixing The resin and hardener shall be mixed before adding the dry filter. The mixed ready to use mortar should ' not contain lumps of unwetted filler and should be uniform in colour. For a total weight of I kg or less, hand mixing will be sufficient. For quantities in excess of I kg, the component shall be mixed for 3 minutes with a slow speed - 400-600 rpm electric drill with a Jiffy mixer. The stiffer shall be moved up and down and along the sides until an even streak free colour is obtained. Whipping in an excessive amount of air shall be avoided. If no power is available, a flat putty knife may be used to reach into the comers of the can and hand mixing done for at least 5 minutes. 390.3 Surface Preparation Surface upon which epoxy is to be placed shall be free of rust, greasej oil, paint, asphalt, loose material, unsound concrete, dust or any other deleterious material. Since cured epoxy does not provide adequate bond with any material, all overlay, whether epoxy or cement based, shall be done within pot life of the base epoxy layer. 390.4 Contaminants, such as oil, grease, tar, asphalt, paint, wax, curing compounds or surface impregnants like linseed oil or sificons, including laitance and weak or loose concrete shall be removed. When bonding to asphalt, th-, surface should be roughened so that clean aggregate is exposed. Epoxy bonding agents shall not be applied when it rains, or in standing water. The surface must be dry. Two general methods of surface preparation shall be followed a) b) Mechanical that includes grinding, grit blasting, water blasting and scarification. Chemical that includes acid etching with 15 per cent by weight of hydrochloric

Repair of Structures solution, followed by repeated flushing with high pressure stream of water. 390.5 Application

2800

Epoxy, primer coat shall be applied with the help of stiff nylon bristle brushes or hard rubber rollers or spray gun depending upon the natur6 of surface and extent of work area. As far as possible,. the coating shall be uniformly thick. Before the primer coat is fully cured, epoxy mortar shall be applied by means of trowels and floats. The interval between the application of primer coat and epoxy mortar shall beapproximately 15/30 minutes depending upon the ambient temperature. Seal Coat shall be applied after 24 hours curing, after mild roughening of the surface of the mortar. 390.6 Coverage The coverage of resin mix would depend on the system of resin used. However, as a general guideline the coverage area shall be as under : ~
a) Primer Coat. One kg of resin-hatdener mix covers an area of 3-6 square metres per coat depending on the finish of the concrete. b) Epoxy Mortar. One square metre of surface requires approximately 2024 kg of epoxy mortar when laid to a thickness of 10mm. c) Seal CoaL 4 to 6 square metres per kg of mix depending on the temperature of application.

390.7 Cleaning and Maintenance of Equipment Tools and equipment are best cleaned immediately after use since the removal of cured resin is difficult and time consuming. The bulk of resin shall be yemoved using a scraper and remainder washed away completely' using solvents such as toluene, xylene or acetone. Equipments used for epoxy shall always be cleaned before it hardens. Solvents used for this purpose may be Acetone (flammable), Methyl Ethyl Kethone (flammable), Methyl Chloride (non-flammable). Cured epoxies may be removed using Methylene Chloride. 390.8 Testing Epoxy used for making mortar shall conform to all requirements and testing procedures as laid down -in Clause 2803.9. 390.9 Handling Precautions Epoxy resins can cause irritation of skin in sensitive persons if incorrectly handled. The resin and hardener should not be allowed to come into direct contact with skin. The most effective protection is achieved by wearing rubber or polythene gloves. 390.10 Personnel and Environment. Safety Any skin contact with epoxy materials, solvents and epoxy strippers should be avoided. Epoxy resins and particularly epoxy hardeners (B component) may cause a rash on the skin. The official toxicity classification on the container labels may be looked for before starting work. Rubber gloves, with a cloth liner, and protective clothing shall be worn. Barrier creams are recommended but are not substitutes for protective clothing. Eyes shall be protected

Repair of Structures

2800

where splashing could occur while spraying or mixing. Good ventilation shall be ensured and inhalation of vapours avoided. If materials are sprayed, a respirator shall be used. If skin contact occurs, it shall be immediately washed with a cleaner, followed by soap and water. Should eye contact occur, it shall be flushed immediately with plenty of water for 15 minutes and a doctor called for. If contact occurs with the clothing, it shall be immediately changed to prevent further skin contact, and if the contact occurs with components A or B, the clothing shall be thrown away. Hardened epoxy is not harmful but will break the clothing. All emptied, used buckets, rags and containers shall be removed, ,-from site. These shall be stored in waste disposal bags and suitably disposed. 391 EPOXY BONDING OF NEW CONCRETE TO OLD CONCRETE

391.1 Epoxy resin used for bonding shall be obtained from a reputed manufActurer. The pot life of such bonding epoxy shall not be less than 60-90 minutes at normal temperature. . 391.2 The entire surface of the existing concrete member should be thoroughly cleaned by wire brush and then with compressed air to remove dust and loose particles from the surface. Any crack or spalling of concrete shall be, sealed by epoxy injection/epoxy mortar/grouting as decided by the Engineer. A coating of suitable epoxy resin at the rate of 0.8 kg/sq.m. (minimum) should then be applied on the surface of the existing concrete members. , Fresh concrete shall then be placed within the pot life of the resin system. 391.3 Testing 391.3.1 Epoxy used for bonding work shall satisfy the criteria mentioned in Clause 2803.9. 391.3.2 Two concrete cubes 150 mm size cast as per approved design mix shall be placed, as -shown in Fig. 2800/3 at a distance of 150 mm from each other. Epoxy resin system suggested for bonding new to old concrete shall be applied on the opposite faces of the cubes. Fresh cement concrete cube of grade as per approved design mix shall be cast with water cement ratio of 0.4 or less in the manner shown in Fig. 2800/3. The assembly shall be cured in water for 28 days and steel spacer removed thereafter. The cube assembly shall.be subjected to compression 16ad after 28 days of curing, thereby subjecting the bond to shearing load. Failure must not occur at this joint. 392 392.1 Material Grouting shall normally be performed with a mixture of neat Portland Cement and water. Other additives and admixtures may be added to improve the impermeability, strength, CEMENT GROUTING

Repair of Structures

2800

etc. on the approval of the Engineer. The size of the particles and the consistency of the grout must be suited to the passageways it must follow. Neat grout will not --------- >X X cc LLJ N X w 1XI x Uj V) w wz w L; .0 U flow freely into holes smaller than about three times the largest cement particle. Except in large cavities where thick mortar can be placed, the sand should all pass the 28-mesh sieve and have a large portion passing the 50- and the 100- mesh sieves. The proportions of Ordinary Portland Cement to sand will depend upon the size of the spaces to be filled and will vary from a neat grout to about 1:1 mix. "Ibe amouni of water to be added. depends upon the consistency required. Grouts with as little as 16 litres of water per bag of cement could be handled and it should 'seldom be necessary to use more than 35 to 40 litres of water per bag of cement. Where necessary and approved by the Engineer, admixtures to Portland Cement grout mixtures may be added for delaying the setting time, increasing flow ability, minimising segregation and shrinkage. 392.2 Preparation VI) r-4 U. Ni

Repair of Structures

2800

The surface shall be cleaned with wire brush and compressed air. 15 mm dia and 150 to 200 mm deep holes along the length of the cracks at a spacing of 500 mm may be drilled by wet drilling using rotary percussion drills and nipples. inserted in these holes. 392.3 Proportioning, Mixing. and Equipment for Grouting The cement grout shall be mechanically mixed using a system of power-driven paddles of high speed centrifugal pump. The grout pump to be used shall permit close control of pressures to allow a flexible rate of injection with minimum clogging of valves and ports. The most satisfactory equipment for injecting grout is a pump of the double-acting flexible reciprocating type giving a steady flow. The grout pump shall be so placed as to reduce the waste in cleaning lines. It is preferable to add ~O per cent or more of the mixing water into the mixer before adding the dry ingredients and then the remaining water. A continuous supply of grout is preferable to an inten-nittent one. Consistency of the grout may be determined by trials starting with thin grout i.e. about 40 litres of water per bag of cement and progressively decreasing the water content to about 15 litres per bag of cement. Where the mixer and pump are combined in one unit, the dry material shall be screened before mixing. If the mixer and pump are in separate units, the grout shall pass through a screen before it enters the pump. 392.4 Application Highest practical. pressure within the limits 100-400 kPa should be used in order to force the surplus water from the grout. As the pressure may be d istributed hydraulically over considerable areas, vigilance must be exercised to prevent damage or the needless waste of grout. Grouting is to be done by attaching a packer (consisting of expansible tube of rubber) to the end of the grout supply pump through the holes and nipples. Pressure shall be steady to ensure a continuous flow of grout. Grouting shall not be continued till the hole consumes mix at the rate of not less than 30 litres.in 20 minutes or until ' refusal at the grouting pressure of 400 kPa at any hole until refusal. Should the grout escape from an adjacent nipple, it should be plugged or capped. Any seam, crack or joint through whidh grout escapes shall be caulked with epoxy mortar as soon as thick grout appears. 392.5 Cleaning of Equipment After completion of each grouting operation or temporary shutdown, it is advisable to force clear water through the pump until the discharge line shows no colour, after which the pump covers shall be removed and the valve chambers thoroughly cleaned. 392.6 Testing Percolation test done at the end of grouting operation shall give a value of less than 2 lugions.
NOTE : For specialised treatment like polymer modified cementitious grout injection, manufacturer's literature and specification shall be followed.

Repair of Structures 393 GUNITING/SHOTCRETE

2800

393.1 The gunite is a mixture of cement, sand and water. It comprises 100 parts by weight of cement, 300 parts by weight quartz sand, 35-50 parts by weight water and 2 parts by weight approved quick setting compound. In gener4 dry mix shotcrete shall be used. 393.2 Ordinary Portland cement conforming to IS:269 shall be used in guniting. 393.3 Sand for guniting shall comply with the requirements stipulated in IS:383. In general, sand should neither be too coarse to increase the rebound nor too fine to increase the slump. Sand should preferably have a moisture content between 3 to 6'per cent. The grading of sand shall lie within the limits given below IS Sieve Designation 4.75 mm 2.36 mm 1.18 mm 600 microns 300 microns 150 microns per cent Passing the sieve I---

95 - 100 65 - 90 45 - 75 30 - 50 10 - 22 2- 8

393.4 For thick sections it may be advantageous to incorporate coarse aggregate in the mix provided adequate guniting equipment is available. Coarse aggregate, when used, shall conform to grading given in Table I of IS:9012. The percentage of coarse aggregate may normally be kept as 20 to 40 per cent of the total aggregate and the mix shall be suitably designed. 393.5 Water/cement ratio for guniting shall fall within the range 0.35 to 0.50 by mass, wet enough to reduce the rebound. Drying shrinkage may be between 0.06 per cent to 0.10 per cent. The quick setting compound shall be added at the nozzle with water just before guniting. 393.6 Workm anship The cement and sand shall be batched and mixed and conveyed through a hose pipe with the help of compressed air. A separate line shall bring the water under pressure. The cement, sand and water mixshall be passed through and intimately mixed in a special 'manifold and then projected at high velocity to the'surface being repaired. The density of gunite shall not be less than 2000 kg/cum. The strength of gunite shall not be less than 25 MPa. For effective guniting, the nozzle shall be kept 60 to 150"cm away from the surface, preferably normal to that surface. While enclosing reinforcement bars

Repair of Structures

2800

during repairs the nozzle shall be held closer at a slight angle and the mix shall be wetter than the normal. 393.7 Test panels simulating actual field conditions shall be fabricated for conducting preconstruction testing. The procedure for testing the cubes or cylinders taken from the panels stipulated in clause 6 of IS:9012 shall be followed. 393.8 It should be ensured from tests that a strength of about 25 M?a at 28 days is available for the mortar/concrete mix. 393.9 The defective concrete shall be cut out to the full depth till sound concrete surface is reached. Under no circumstances should the thickness of concrete to be removed be less than clear cover to the main reinforcement. No square shoulders shall be left at the perimeter of the cut-off portion and all edges shall be tapered. Thereafter, all loose and foreign materials should be removed and the surface be sandblasted to make it rough to receive shotcrete after applying a coat of bonding epoxy as per recommendation of the manufacturer @ 1.0 kg per 1.5 sq.m. of surface area. 393.10 The exposed reinforcement shall be thoroughly cleaned free of rust, scales etc. by wire brushing. Wherever the reinforcements have been corroded, the same shall be removed and replaced by additional reinforcement. Before application of gunite, a coat of neat cement slurry should be applied on the surface of the reinforcement. 393.11 Sufficient clearance shall be provided around the reinforcement to permit encasement with sound gunite. Care shall be taken to avoid sand pockets behind the reinforcement. 393.12 A thickness of 25 to 40 mm of gunite can normally be deposited in one operation. If, for some reason, the total thickness is to be built up in successive operations, the previous layer should be allowed to set but not become hard before the application of the subsequent layer. It would always be necessary to apply gunifing on a damp concrete surface. 393.13 Where required, welded wire fabrics 5cm x 5 cm x No. 10 gauge shall be provided in the first layer of guniting. The fabric shall be tied properly. In case the damage to the concrete member is too deep, the specifications for guniting as well as requirement of placement of wire mesh has to be decided as per' field conditions. 393.14 The stipulations given in IS:9012 regarding application of gunite should be followed so as to keep the rebound to the minimum. The quality of guniting and workmanship shall be such that the percentage of rebound mentioned in IS:9012 can be-adhered to. In no circumstances shall the rebound material be re-used in the work. 393.15 It would be desirable that green gunite is moistened for at least 7 days. Guniting work shall not be done during windy or rainy conditions.

Repair of Structures 394 REPLACEMENTIRECTIFICATION OF BEARINGS

2800

394.1 The replacement/rectification of bearings shall be carried out in accordance.with approved repair plan or as approved by the Engineer. 394.2 Lifting of superstructure spans may be carried out by jacking up from below or by lifting the span from top. Where jacks are employed, their location/number and size shall be selected in such a manner so that there are no undue stresses created in the structure. Jacks may be placed on piers/pier caps or specially erected trestles in accordance with the approved methodology for lifting of superstructure. All jacks shall be operated from one control panel by a single control lever. The system will have provision for manual over ride to control the loads of any particular jack. The jacks should be so synchronised that differential lift between individual jacks shall not exceed I mm 394.3 Necessary repair/replacement of bearings shall be carried out as indicated in the repair plan or as directed by the Engineer. Care shall be taken to plan the execution of repair in the shortest possible period. 394.4 Precautions during Lifting of Girders for Rectification of Bearings Walkie talkies system or similar audio arrangements should be available for communicating instructions regarding 'lifting, stopping, starting etc. The operator shall have a clear view of the jacks and the lifting of each girder controlled by reading the dial gauges. 395 DISMANTLING OF CONCRETE WEARING COAT

395.1 Commencement of Dismantling


i) Before commencing dismantling, the nature and condition of concrete, the condition and position of reinforcement should be ascertained. The Contractor shall familiarise himself with the structural design and ensure that the overall stability of the bridge is not affected. ii). The existing expansion joint assemblies shall be removed carefully along the entire width of the carriageway. The deck stab for a width of 400 mm on either side should be removed for placing of reinforcement, anchor rods, anchor bolts and other fixing assemblies for the new expansion joints and pouring of fresh concrete. The gap between the girders over the piers should be cleared of all debris. A temporary platform in the gap at the end of girders shall be erected to collect the materials falling down during concreting and fixing of expansion joints iii) The service lines, if any, shall be disconnected/ diverted before the dismantling work starts.

395.2 Dismantling of concrete wearing coat shall be carried out using jack hammers or suitable manual methods as,approved by the Engineer. Care should be taken to avoid any damage to the existing structure including reinforcement or prestressing anchorages for cables, if any, located in the deck slab. 395.3 Precautions During Dismantling Work For general guidelines, reference may be made to Section 100.

Repair of Structures

2800

Dismantling work shall not be carried out at night, or during storm or heavy rain. A warning device shall be installed in the area to be used to warn the workers in case of mishap/emergency. Safety helmets conforming to IS:2925 shall be used by the workmen engaged in dismantling work. The sheds and tool boxes should be located away from the work site. Goggles preferably made up of celluloids and gas masks shall be worn at the time of dismantling, especiaofly where tools like jack hammers are deployed to protect eyes from injuries from flying pieces, dirt, dust etc. Leather or rubber gloves shall be worn by the workers during the demolition of RCC work. Screens made up of GI sheets shall be placed wherever necessary to prevent the flying pieces from injuring the workers. Water should be sprayed to reduce the dust while removing concrete wearing course with jack hammer. No work shall be taken up under the span when dismantling work is in progress. 396 EXTERNAL PRESTRESSING

396.1 Various components constituting the system of external prestressing are as follows : H.T. Strands/Wires, HDPE Sheathing, Deviator Blocks, Anchor Plates, Anchorages and grouting material. 396.2 Material H.T. Strands / Wires H.T.Strands wires shall conform to Section 1000. HDPE Sheathing HDPE Sheathing shall conform to IS:4984 suitable for a working pressure of 6 bars. Its density shall be 955 kg/cum, shore hardness D63, yield stress 24 MPa and ultimate tensile strength 35 MPa. Deviator Blocks : As necessitated by 'the profile of the external cable, suitable strand/ wire deviator block fabricated from M.S.Sections shall be provided. The deviator block shall be given a coat of -suitable paint (preferably epoxy based) after sand blasting. Anchorages Depending upon the prestressing force, suitable anchorages and wedges shall be used conforming to relevant codes and section 1800. 396.3 Workmanship
a) Stressing of cables shall be carried out as per instructions given in the drawing, and conforming to Section 1800. b) Care should be taken to avoid any damage to the existing structure by way of stress concentration or any other mason during fixing of the deviator blocks and after stressing of cable. 1he deviator blocks shall be so fixed as not to allow any movement due to prestressing forces. Radius of curvature of the surface of the deviator block interfacing with the cable shall be minimum one metre.

Repair of Structures

2800

c) I Ne anchorages shall be sealed with suitable epoxy mortar system after the stmssing of cables. A minimum cover of 50mm shall be provided for the anchor plates and anchorages. d) Suitable grouting inlet points and vent points shall be provided by way of HDPF "r' vent connections to the sheathing. e) Grouting of cables shall be carried out as per provisions made in Section 1900.

396.4 It shall be ensured that no part of the existing structure is damaged/distressed due to the external prestressing. The behaviour of the girder shall be monitored by measurement of deflection so that only required amount of external prestressing is imparted to the girder. Care shall be taken to avoid excess prestressing and impairment to the girders, 397 TESTS AND STANDARDS OF ACCEPTANCE

The materials shall -be tested in accordance with these Specifications and shall meet the prescribed criteria. The work shall conform to these Specifications and shall meet the prescribed standards of acceptince. 398 MEASUREMENTS FOR PAYMENT

a) Measurement for sealing of cracks and injection shall be made by weight of epoxy consumed in kg for epoxy grouting. For provision of nipples required for grouting, the payment shall be for number of nipples inserted. b) Measurement for sealing of cracks and injection shall be made by weight of cement consumed in kg for cement grouting. c) Measurement for application of epoxy mortar for specified thickness shall be per square metre of surface area of application. d) Measurement for bonding of old and new concrete by epoxy mortar shall be measured in square metre surface area of interface. e) Measurement for guniting/shotcreting, shall be per square mette of surface am of applicalion. f) Payment for mplacement/rtctification of bearings shall be for each number of bearing assembly replaced/rectified. g) Dismantling of wearing coat shall be measured in square metm of am of wearing course dismantled. h) Provision of external prestressing shall be measured in tomes of HT steel strand/wire measured from anchorage to anchorage before stressing.

399

RATE

The contract, unit rate for sealing of cracks and injection of cement grout shall include cost of all materials, labour, tools and plant, placing in position, testing, curing and other incidental expenses for the satisfactory completion of the work as per these specifications. The contract unit rate for application of epoxy mortar for specified thickness shall include cost of all materials, labour, tools and plant, placing in position, testing and other

Repair of Structures

2800

incidental expenses including surface preparation for the satisfactory completion of the work as per these specifications and as shown on the drawings. The contract unit rate for guniting/shotcreting shall include cost of all materials, labour-, tools and plant, placing in position, testing, curing,- surface preparation and other incidental expenses including the provision of nipples for the satisfactory completion of the work as per these specifications. . The contract unit rate for replacement/rectification of bearings shall include cost of all materials, labour, tools and plant, placing in position, site welding/rivethigIbott connections, operation of jacks and other incidental expenses for the satisfactory completion of the work as per these specifications and as shown on the drawings. The contract unit rate for dismantling of wearing coat shall include cost of all materials, labour, tools and plant, traffic management, signages, safety precautions and other incidental expenses including removal of existing expansion joints for the satisfactory completion of the work as per these specifications. The contract unit rate for external prestressing shall include cost of all materials, labour, tools and plant, temporary works, testing, curing and other incidental expenses including the careful monitoring of the deflection of girders being externally prestressed for the satisfactory completion of the work as per these specifications and as shown on the drawings.

Pipe Culverts Pipe Culverts 2900 Pipe Culverts

2900

Pipe Culverts

2900

2901

SCOPE

This work shall consist of furnishing and installing reinforced cement concrete pipes, of the type, diameter and length required at the locations shown on the drawings or as ordered by the Engineer and in accordance with the requirements of these Specifications. 400 MATERIALS

All materials used in the construction of pipe culverts shall conform to the requirements of Section 1000. Each consignment of cement concrete pipes shall be inspected, tested, if necessary, and approved by the Engineer either at the place of manufacture or at the site before their incorporation in the works. 401 EXCAVATION FOR PIPE

The foundation bed for pipe culverts shall be excavated true to the lines and grades shown on the drawings or as directed by the Engineer. The pipes shall be placed in shallow excavation of the natural ground or in open trenches cut in existing embankments, taken down to levels as shown on the drawings. In case of high embankments where the height of fill is more than three times the external diameter of the pipe, the embankment shall first be built to an elevation above the top of the pipe equal to the external diameter of the pipe, and to width on each side of the pipe of not less than five times the diameter of pipe, after which a trench shall be excavated and the pipe shall be, laid. Where trenching is involved, its width on either side of the pipe shall be a minimum of 150 mm or one-fourth of the diameter of the pipe whichever is more and shall not be more than one-third the diameter of the pipe. The sides of the trench shall be as nearly vertical as possible. The pipe shall be placed where the ground for the foundation is reasonably firm. Installation of pipes -under existing bridges or culverts shall be avoided as far as possible. When during excavation the material encountered is soft, spongy or other unstable soil, and unless other special construction methods are called for on the drawings or in special provisions, such unsuitable material shall be removed to such depth, width and lefigth as directed by the Engineer. The excavation shall then be backfilled with approved granular material which shall be properly shaped and thoroughly compacted upto the specified level. Where bed-rock or boulder strata are encountered, excavation shall be taken down to atleast 200 min below the bottom level of the pipe with prior permission of the Engineer and all rock/boulders in this area, be removed and the space filled with approved earth, free from stone or fragmented material, shaped to the requirements and thoroughly compacted to provide adequate support for the pipe.

Pipe Culverts

2900

Trenches shall be kept free from water until the pipes are installed and the joints have hardened. 402 BEDDING FOR PIPE

The bedding surface shall provide a firm foundation of uniform density throughout the length of the culvert, shall conform to the specified levels and grade, and shall be of one of the following two types as specified on the drawings: (i) First Class bedding: Under first class bedding, the pipe shall be evenly bedded on a continuous layer of well compacted approved granular material, shaped concentrically to fit the lower part of the pipe exterior for atleast ten per cent of its overall height or as otherwise shown on the drawings. The bedcling material shaij be well graded sand or another granular material 'passing 5.6 mm~ sieve suitably compacted/rammed. The compacted thickness of the bedding layer shall be as shown on the drawings and in no case shall it be less than 75 mm. (11) Concrete cradle bedding: When indicated on the drawings or directed by the Engineer, the pipe shall be bedded in a cradle constructed of concrete having a mix not leaner than M 15 conforming to Section 1700. The shape and dimensions of the cradle shall be as indicated on the drawings. The pipes shall be laid on the concrete bedding before the concrete has set. 403 LAYING OF PIPE

No pipe shall be laid in position until the foundation has been approved by the Engineer. Where two or more pipes are to be laid adjacent to each other, they shall be separated by a distance equal to at least half the diameter of the pipe subject to a minimum of 450 mm. The arrangement for lifting, loading and unloading concrete pipes from factory/yard and at site shall be such that the pipes do not suffer any undue structural strain, any damage due to fall or impact. The arrangement may be got approved by the EngJneer. Similarly, the arrangement for lowe ring the pipe in the bed shall be got approved by the Engineer. It may be with tripod-pulley arrangement or simply by manual labour in a manner that the pipe is placed in the proper position without damage. The laying of pipes on the prepared foundation shall start from the outlet and proceed towards the inlet and be completed to the specified lines and grades. In case of use of pipes with bell-mouth, the belled end shall face upstream. The pipes shall be fitted and matched so that when laid in work, they form a culvert with a smooth uniform invert. Any pipe found defective or damaged during laying shall be removed at the cost of the Contractor. 404 JOINTING

The pipes shall be jointed either by collar joint or by flush joint. In the former case, the collars shall be of RCC 150 to 200 mm wide and having the same strength as t ' he pipes to be jointed. Caulking space shall be between 13 and 20 mm according to the

Pipe Culverts

2900

diameter of the pipe. Caulking material shall be slightly wet mix of cement and sand in the ratio of-1:2 rammed with caulking irons. Before caulking, the collar shall be so placed that its centre coincides with thejoint and an even annular space is left between the collar and the pipe. Flush joint may be internal flusb joint or external flush joint. In either case, the ends of the pipes shall be specially shaped to form a self centering joint with ajointing space 13 mm wide. Thejointing space-shall be filled with cement mortar, I cement to 2 sand, mixed sufficiently dry to remain in position when forced with a trowel or rammer. Care shall be taken to fill a voids and excess mortar shall be removed. For jointing pipe lines under light hydraulic pressure, the recess at the end of the pipe shall be filled with jute braiding dipped in hot bitumen or other suitable approved compound. Pipes shall be so jointed that the bitumen ring of one pipe shall set into the recess of the next pipe. The ring shall be thoroughly compressed by jacking or by any other suitable method. All joints shall be made with care so that their interior surface is smooth and consistent with the interior surface of the pipq. After finishing, the joint shall be kept covered and damp for at least four days. 405 BACKFILLING

Trenches.shall be backfilled immediately after the pipes have been laid and the jointing material has hardened. The backfill soil shall be clean, free from boulders, large roots, excessive amounts of sods or other vegetable matter, and lumps and shall be approved by the Engineer. Backfilling upto 300 mm above the top of the pipe shall becarefully done and the soil thoroughly rammed, tamped or vibrated in layers not exceeding 150 mm, particular care being taken to thoroughly consolidate the materials under the haunches of the pipe. Approved pneumatic or light mechanical tamping equipment can be used. Filling of the trench shall be carried out simultaneously on both sides of the pipe in such a manner that unequal pressures do not occur. In case of high embankment, after filling the trench upto the top of the pipe in the above said manner, a loose fill of a depth equal to external diameter of the pipe shall be placed over the pipe. before further layers are added and compacted. 406 EADWALLS AND OTHER ANCILLARY WORKS

Headwalls, win walls, aprons and other ancillary works shall be 'g constructed in accordance with the details shown on the drawings or as directed by the Engineer. Masonry for, the walls shall conform to Section 1300, 1400 or 1700 as applicable. Aprons shall conform to Section 2500. 407 OPENING TO TRAFFIC

No traffic shall be permitted to cross the pipe line unless height of filling above the top of the pipe line is atleast 600 mm.

Pipe Culverts

2900

408

MEASUREMENTS FOR PAYMENT

R.C.C. pipe culverts shall be measured along their centre between the inlet and outlet ends in linear metres. Selected granular material and cement concrete for pipe bedding shall be measured as laid in cubic metres. Ancillary works like headwaffi, etc., shall be. measured as provided for under the respective Sections. 409 RATE

The Contract unit rate for the pipes shall include the cost of pipes including loading, unloading, hauling, handling, storing, laying in position and jointing complete and all incidental costs to complete the work as per these Specifications. Ancillary works such as excavation including backfilling, concrete and masonry shall be paid for separately, as provided under the respective Clauses.

Maintenance of Road Maintenance of Road 3000 Maintenance of Road

3000

Maintenance of Road

3000

3001

GENERAL

The Specifications shall apply to all items of road maintenance works as required.to be carried out under the Contract or as directed by the Engineer. The works shall be carried out in conformity with the relevant Specifications to the required level, grade and lines using approved materials. The works shall be carried out using light duty machinery or manual means provided the quality of the end product does not suffer. In execution of maintenance works, areference is made to the IRC publications: "Manual for Maintenance of Roads" and "Code of Practice for Maintenance for Bituminous Surfaces of Highways, IRC 82-1982" for guidance and compliance wherever applicable. Wherever the Specification is not clear, good engineering practice shall be adopted in the construction to the satisfaction of the Engineer. 410 410.1 Scope The work shall consist of earthwork for restoration of rain cuts in the embankment and shoulders, using suitable material, and compacting the v same. 410.2 Materials The material used for restoration of rain cuts shall consist of soil conforming to Clause 305.2. 410.3 Construction Operation The area affected by rain cuts shall be cleared of all loose soil and benched. The width of the benches shall be at least 300 min and they shall extend continuously for a sufficient length. The height of the benches shall be in the range of 150-300 mm. Fresh material shall be deposited in layers not exceeding 250 min loose thickness and compacted so as'to match with the benching at a moisture content close to the optimum. Compaction shall be carried out using suitable equipment such as, plate compactors and rammers or by suitable implements handled manually. The finished work shall conform to alignment, levels and slopes as indicated in the drawing. 410.4 Measurements for Payment The earthwork for restoration of rain cuts shall be measured in cubic metres. 410.5 Rate The Contract rate for the item of earthwork for restoration of rain cuts shall be payment in full for carrying out the required operation including full compensation for; (i) Supply of material including all leads and lifts and the cost of arrangement of land; (ii) Setting out, (iii) Rem-oval of loose material from the rain cuts; (iv) Benching of old earthwork; and RESTORATION OF RAIN CUTS

Maintenance of Road (v) Compacting after adding required quantity of water. 411 411.1 Scope MAINTENANCE OF EARTHEN SHOULDER

3000

The work of maintenance of earthen shoulder shall include making up the iffegularities/loss of material on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipments or to strip excess soil from the shoulder surface as per the requirement of this Specification. 411.2 Material The material to be added to the shoulder, if required, shall be a select soil conforming to Clause 305. 411.3 Construction Procedure This work shall involve: (i) Making up of the earthen shoulderby adding extra soil and compacting thesame; and/ or (ii) Stripping a layer of soil to achieve the required grade and level. Wherever, extra earth is required to be added, the earthen shouider shall be stripped and loosened to receive fresh soil. The deficiency of thickness shall be made up in layers of loose thickness not exceeding 250 mm. Water shall be added, if required, to attain the optimum amount and the layer compactedby 80 to 100 kN smooth wheelroller, vibratory roller, hand roller, plate vibrator or hand rammer to obtain atleast 94 per cent of the maximum dry density in,accordance with IS : 2720 (Part 8). The finished surface shall have the specified cross slope and line in accordance with the drawing. The side slopes shall be trimmed to the required slope with the help of grader or manual methods using hand tools. Wherever the earth is required to be excavated from the shoulder, this shall be done either using equipment like grader or by manual means using hand tools. The resulting surface shall be uniform and have a field density of atleast 94 per cent of maximum density obtained in accordance with IS:2720 (Part 8). If the surface is not uniformly compacted, it shall be excavated to a depth of 150 min, and the soil mixed with water if required and compacted at a moisture content close to the optimum to achieve 94 per cent of maximum density as stated above. 411.4 Measurements for Payment Maintenance of earthen shoulder shall be measured in sq. metres. 411.5 Rate The Contract unit rate for maintenance of earthen shoulder shall be payment in full compensation for: (i) furnishing earth required for making up of shoulders including all leads and lifts, cost of land and compaction;

Maintenance of Road

3000

(ii) excavation of earth as required and disposal of the earth at the location approved; and (iii) all tools, equipments and incidentals to complete the work in accordance with the above Specification. 412 BITUMINOUS WORK IN CONNECTION WITH MAINTENANCE AND REPAIRS

412.1 General The scope and type of maintenance work to be carried out shall be in accordance with the provisions of the Contract or as instructed by the Engineer. In all instances it will have been necessary to identify the causes of defects in order to permit effective repair. Where investigation work into the causes of defects is included in the Contract it shall be carried out in accordance with the appropriate provisions of this Specification. Maintenance treatments required under the Contract or instructed by the Engineer may include pothole and patch repair, crack-sealing, fog spray, dusting, slurry sealing, surface dressing, overlays and specialist repairs. When the pavement to be maintained is intended to carry volumes of traffic in excess of 1.5 million e.s.a. the constructed materials (particularly patching and overlay materials) used in maintenance operations shall be of a standard not less than those specified for the original construction. Traffic control during maintenance operations shall conform to the requirements of the Contract documents. 412.2 Filling Pot-holes and Patch Repairs 412.2.1 Scope : This work shall include repair of pot-holes and patching of all types of bituminous pavement. The work shall include the removal of all failed material, in the pavement courses and, if necessary, below the pavement, until the root cause of the failure is removed; the trimming of the completed excavation to provide firm vertical faces; the replacement of material of at least as high a standard as that which was originally specified for the pavement layer; the painting of tack coat on to the sides and bases of excavations prior to placing of any bituminous materials and the compaction, trimming and finishing of the surfaces of all patches to form a smooth continuous surface, level with the surrounding road. 412.2.2 Materials : All materials used for the pot-hole and patch repair of bituminous surface and underlying layers shall be in accordance with thia Specification and shall be of the same type as specified for the original constructiom'A mix superior to the one on the existing surface may also be used for repair work. An emulsified bitumen/modified bitumen mix compatible with the existing layer shall also be considered appropriateThe bituminous mixture used for such patch repairs shall be in accordance with

Maintenance of Road

3000

the appropriate Clause of these Specifications. Materials to be used for patching shall always be of the same type and standard of construction as, or better than, the material being patched at the same level of construction. Materials used for patching shall never be of lesser bearing capacity nor of a greater porosity than the adjacent previous construction. Non-bituminous material must not be used for patching bituminous materials. Where modified binder is to be used, Clause 521 of these Specifications shall apply. The grading of aggregates and bitumen content of the mix used for such patch repair shall be in accordance with Clause 50 1. 412.2.3 Preparation of the area for pot-hole and patch repair: Each pot-hole and patch repair area shall be inspected and all loose material removed. The area shall be cut/trimmed either withi ack hammers or with hand tools suitable for the purpose, such that the defective material responsible for the failure is all removed and such that the excavation is of a regular shape. The edges of the excavation shall be cut vertically. The area shall be thoroughly cleaned with cornpressed air or any appropriate fnethod approved by the Engineer to remove all dust and loose particles. Layers below the level of the bituminous construction shall be replaced using material of the equivalent specification to the original construction, which shall particularly include the specified standards of compaction. The area for bituminous construction s6llbe tacked or 'primed with cutback or emulsion depending upon whether the lower area is bituminous or granular in nature. The sides, however, are to be painted with hot tack coat material. The prime coat and tack coat shall conform to Clauses 502 and 50 3 of these Specifications, respectively. 412.2.4 Backfilling operation : The mixture to be used in bituminous patching shall be either a hot mix or a cold mix in accordance with the appropriate Clauses of these Specifications. Mixing shall be done in a plant of suitable capacity. The bituminous mixture shall be placed in layers of thickness not more than 100 nun (loose) and shall be compacted in layers with roller/plate compactor/hand roller/rammer to the compaction standards defined in the appropriate Clauses of these Specifications. While placing the final layer, the mix shall be spread slightly proud ofthe surface so that after rolling, the surface shall be flush with the adjoining surface. If the area is large, the spreading and levelling shall be done using hand shovels and wooden straight edges. During the process of compaction, the surface levels shall be checked using a 3m straight edge. 412.2.5 Measurement for payment: Filling of pot-holes and patch repair shall be measured in sq.m. 412.2.6 Rate : The contract unit rate for filling of pot-holes and patch repair'shall be payment in full for: (i) furnishing all materials required;

Maintenance of Road

3000

(ii) all works involved including excavation, trimming, back filling with any nonbituminous layers required, tacking, priming with cutback or emulsion, and back filling with bituminous materials; (iii) all tabour, tools, equipment and incidentals to complete the work in accordance with the Specifications. 412.3 Crack Sealing 412.3.1 Scope: Crack sealing shall consist of one or more of the following operations -as instructed under the Contract: (i) (ii) (iii) fog seat filling cracks with a binder, or a combination of crusher dust and a binder by treating the crack sealing as a patch repair. 412.3.2 Fog seal 412.3.2.1 Scope : Fog seat for use in maintenance work shall conform to the requirements of Clause 518 of these Specifications, and shall consis ' t of an application of emulsified bitumen, without any aggregate cover for sealing fine hair-cracks or for rejuvenating oxidized bituminous surfaces. Areas having cracks with less than 3mm width shall be considered for this treatment, unless otherwise instructed by the Engineer. 412.3.2.2 Material: Bituminous emulsion for Fog Seal shall be of a slow setting type. Where modified binder is to be used, Clause 521 of these Specifications shall apply. 412.3.2.3 Application The area to be treated with fog seal shall be thoroughly cleaned using compressed air, scrubbers, etc. The cracks shall be cleaned with a compressed air jet to remove all dirt, dust, etc. The fog seal -shall be applied at the rate of 0.5-1.0 litre/sq.m. of emulsion, or as otherwise instructed by the Engineer, using equipment, such as, a pressure tank, flexible hose and spraying bar or lance. Traffic shall be allowed on to the surface only after the seal has set to a non-tacky and firm condition so that it is not picked up by the traffic. 412.3.2.4 keasurement for payment: The fog seal work shall be measured in sq. metres, calculated frotn'the dimensions ofwork instructed in the Contract or by the Engineer. 412.3.2.5 Rate : The contract unit rate for application of fog seal shall be payment in full for: (i) supplying of fog seal material and all the operations for applying it; and (ii) all the labour, tools, equipment and incidentals to complete the work in accordance with this Specification. 412.3.3 Crack filling

Maintenance of Road

3000

412.3.3.1 Scope: Crack filling shall be carried out using a binder of a suitable viscosity, non-nally a slhow-curing bitumen emulsion, as instructed by the Engineer. For wider cracks, in excess of an average of 3 min in width the application of emulsion may be preceded by an application of crusher dust, or other fine material acceptable to the Engineer. 412.3.3.2 Materials: Bitumen for use in crack sealing shall be of a slow curing type as instructed by the Engineer. Dust for crack sealing, when used, shaU be crusher dust or some other suitable fine material approved by the Engineer, passing the 4.75 mm sieve but with a maximum of 10 per cent passing the 0.075 mm sieve. 412.3.3.3 Construction: If dust is to be used it shall be placed in the cracks before the application of binder and the cracks filled to a level approximately 5 mm below road surface level. The surface of the road shall be swept clear of dust prior to the application of binder. Binder shall be poured into the cracks, taking care to minimise spillage. If spillage onto the road surface does occur, dust shall be applied to the excess bitumen until it is blotted up. 412.3.3.4 Measurement: Crack sealing shall be paid by the linear metre of crack as instructed by the Engineer. 412.3.3.5 Pa:yment: The contract rate for crack sealing shall be payment in full for: (i) supplying all necessary materials and for the work of applying them; (ii) all labour, tools, equipment and all incidentals necessary to complete the work according to these Specifications. 412.3.4 Crack prevention courses: Clause 522 specifies crack prevention courses. These may be included in substantial maintenance treatments. 412.4 Dusting 412.4.1 Scope: Dusting shall consist of the application of crusher dust or other fine graded material approved by the Engineer to areas of road where bleeding of excess bitumen is occurring. 412.4.2 Material: Dust shall consist of crusher dust or other graded fine material acceptable to the Engineer, and shall generally be finer than 3.0 mm with not more than 10 per cent passing the 0.075 mm sieve. 412.4.3 Dust shall be spread by manual application, to the areas of road defined by the Engineer. Dust shall generally be applied during the hottest part of the day and, when so instructed by the Engineer, surplus dust displaced by passing traffic shall be manually swept back onto the area where further bleeding of excess bitumen is apparent. Dust shall be applied at a nominal rate of 2.5 kg per square metre.

Maintenance of Road

3000

412.4.4 Measurement: Dusting shall be paid for by the square metre of road surface instructed to be dusted by the Engineer. 412.4.5 (i) Payment: The Contract unit rate for dusting shall be in payment in full for: supplying all necessary materials and for the work of applying them;

(ii) all labour, tools, equipment and all incidentals necessary to complete the work according to the Specificatiohs. 412.5 Slurry Seal Slurry seal for use in maintenance work shall conform to the requirements of Clause 516. Manual methods of spreading and levelling may be used, subject to the prior agreement of the Engineer. 412.6 Surface Dressing for Maintenance Work Surface dressing for maintenance applications shall be carried out in conformity with the requirements of Clause 5 10, except'that the use of small and portable equipment shall be permitted provided that it can be demonstrated, to the satisfaction of the Engineer, that it can produce work consistently in accordance with the requirements of these Specifications. 412.7 Specialist Repairs 412.7.1 Specialist repairs include repairs of localized areas of damage to materials for which repairs using normal hot-mix or cold-mix patching materials are inappropriate. Such specialist repairs will include repairs to mastic asphalt and stone mastic asphalt. 412.7.2 In such cases, pot-hole and patch repairs shall be carried out in accordance with the provisions of Clause 3004.2 above, except that the construction to the mastic asphalt, stone mastic asphalt or other specialist material layer shall, subject to the instructions of the Engineer, be carried out in accordance with the provisions of the appropriate Clause of these Specifications. 413 MAINTENANCE OF CEMENT CONCRETE ROAD

413.1 Repair of Joint Grooves with Epoxy Mortar or Epoxy Concrete 413.1.1 Scope : The work shall consist of repair of spalled joint grooves of contraction joints, longitudinal joints and expansion joints in a concrete pavement using epoxy mortar or epoxy concrete. 413.1.2 Materials : The type/grade of epoxy compatible with the coefficient of thermal expansion of concrete shall be used with either processed fine aggregate or fine stone chips to produce a dry mix for repairing spalled or damaged edges. 413.1.3 Repairing Procedure: Spalled or broken edges shall be shaped neatly with a vertical cut with chisels into the shape of rectangle. Small pneumatic chisels also may be used, provided the cutting depth can be controlled. The

Maintenance of Road

3000

depth of the cut shall be the minimum to effect repair. After shaping the spalled area, it shall be cleaned and primed. The epoxy mortar/concrete is then applied using hand tools like trowels, straight edges, brushes etc. The repaired edge shall be in line with thejoint groove and shall be flush with the concrete slabs. During the repair work, any damage noticed to the joint sealant shall be made good by raking out the affected portion and resealing. 413.1.4 Traffic: Although the epoxy mixes set in 2-3 hours time, it is desirable to divert the traffic for 12 hours or as per the recommendation of the manufacturers. 413.1.5 Measurements for payment: Repair of joint grooves shall be measured in linear metres. 413.1.6 Rate : The Contract unit rate for repair of joint grooves with epoxy mortar or epoxy concrete shall be in full compensation for: (i) . supply and application of epoxy primer, epoxy mortar or epoxy concrete; (ii) all tools, equipment and incidentals to complete the work in accordance with the above Specification. 413.2 Repair Involving Removal of Old Joint Sealant and Sealing with Fresh Sealant in Cement Concrete Pavements 413.2.1 Scope: The repair of sealant of contraction, longitudinal or expansion joints shall include removal of the existing sealant and resealing the joint with fresh sealant material. 413.2.2 Material: Sealant material to be replaced shall be either hot poured rubberised bitumen or polysulphide type of sealant as per Clause 602.2.8. As per the recommendation of the manufacturer, appropriate type of primer also shall be applied. 413.2.3 Repairing procedure: The existing sealant shall be raked out with the help of a metal raker such that most of the sealant is removed. Subsequently, the sealant stuck to the sides of the grooves shall be removed thoroughly either by using saw cutting machine so that grooves may be widened by one mm or by sand blasting. In no base the old sealant shall be present during resealing operation. If joint grooves are found inadequate in depth, they shall be deepened as directed by the Engineer. Before commencing the sealing operation, compressed air shall be used to clean the joint grooves to clean the joint groove. A heat resistant, paper backed compressible debonding strip or tape should be inserted in accordance with the requirement of Clause 602.112. Sealant may be poured either using hand held pourer or using mechanised sealing machines. Sealants should not be heated directly but in double jacketed machine. All precautions and arrangements shall be taken not to spill the sealant on the concrete pavement. The sealant may be poured to a depth of 5 2 mm from the pavement surface. 413.2.4 Measurements for payment: Repair of joint sealant shall be measured in

Maintenance of Road linear metres.

3000

413.2.5 Rate: Contract unit rate for repair, of joint sealant shall be in full compensation for (i) removal of old sealant, regrooving or sand blasting the sealing groove and placing of debonding strip or tape. ii) all tools, equipments and incidentals to complete the work in accordance with the above Specification.

Reinforced Earth Reinforced Earth 3100 Reinforced Earth

3100

Reinforced Earth

3100

3101

SCOPE

The work covers the construction of reinforced earth structures, together with the construction of earthwork in layers, assembly and erection of reinfoming elements and placement of facing pancts and all associated components. 414 REINFORCING ELEMENT

414.1 The reinforcing element shall be of Geotextile, aluminium alloy strip, copper strip, carbon steel strip, mats of metal or synthetic grids, or any other proprietary material which may be approved by the Engineer and indicated on the drawings. 414.2 Geotextile The material shall conform to Clause 701.~.6. 414.3 Aluminium alloy strip shall comply with BS:1470 quality 5454 in the H 24 condition. 414.4 Copper strip shall comply with BS:2870 quality C 101 or C 102 in the 1/2 H condition and shall have 0.2 per cent proof stress of not less than 180 N/mm'. 414.5 Carbon steel strip which shall be galvanized shall comply with BS:1449 (Part 1), either quality KHR 34/20 P or quality 50/35 P, each having a silicon content of not less than 0.25 per cent and not more than 0.40 per cent. The fabricated element shall be galvanized in accordance with BS:729, and the average zinc coating weight for any individual test area shall riot be less than 1000 gm/sq.m. 414.6 Stainless steel strip shall comply with BS: 1449 (Part 2) quality 316 S 31 or 3/6 S 33 except that the material shall be cold rolled to provide a 0.2 per cent proof stress of not less than 400 N/sq. mm and the tensile strength shall not be less than 540 N/sq. m. 414.7 All metallic components buried in soil shall be of electrolytically compatible materials. 414.8 Geogrids The supply of geogrids shall carry a certification of BIS or ISO 9002 for all works. While the.reinforcing element for wall or slope portion shall be with mono oriented Geogrid, the reinforcement for the foundation of a reinforced earth wall or slope shall be with bi-directionally oriented Geogrid. For mono oriented Geogrid, the characteristic design tensile strength at a strain not exceeding 10 per cent in 100 years shall be at least 40 Min when measured as per GRI:GG3. The strength for bi-directionally oriented Geogrid in the longitudinal direction shall be at least 40 Min at a maximum elongation of 15 per cent. The Geogrid shall be inert to all naturally occurring chemicals, minerals and salts found in soil. 415 EARTH FILL

Reinforced Earth

3100

The fill material for reinforced earth structures shall have an angle of interface friction between the compacted fill and the reinforcing element of not less than 25*C, measured in accordance with IS : 13326 (Part 1). The soil should be predominantly coarse grained; not more than 10 per cent of the particles shall pass 75 micron sieve. The soil should have properties such that the salts in the soil should not react chemically or electrically with the reinforcing elements in an adverse manner. 416 FACIA MATERIAL

416.1 The facing shall comprise of one of following: (i) Reinforced concrete (Cast in situ or precast) slabs (ii) Plain cement concrete form fill hollow block (Precast) (iii) Masonry construction, Rubble facia (iv) Other proprietary and patented proven system The facing shall be sufficiently flexibl e to withstand any deformation of the fill. 416.2 Facia unitjoint filler should be durable resistant to the effect of air pollution and water/saline water. 416.3 Bedding material shall consist of either cement mortar or a durable gasket seating such as resin bonded cork strip. 416.4 Connection between the facia and the reinforcing element shall be by using polyethylene strips/rods, fibre glass dowels or any other material shown in the drawing. Any other material used shall be tested to provide 100 per cent joint strength as of parent element in continuity. Overlapping in principal reinforcement or in the joint shall ensure load transfer through joints, perpendicular to the direction of laying. 417 CONSTRUCTION DETAILS

417.1 The plan area of the reinforced earth structure shall be excavated to provide a nominally level base which may be stepped at the back as required to receive the horizontal reinforcing element grid. The depth of the foundation below the finished ground level at the foot of the slope or wall shall not be less than 1000 mm. Additional strip footing, trough guide made of concrete or anchor key pad shall be provided at founding level to receive the facia or the bottom most reinforcement connection. This shall have adequate soil cover against erosion and scour in particular cases. 417.2 Orientation The reinforcing elements shall be placed at right angles to the face of the wall, with greater cross-sectional dimension in the horizontal plane. The placement of the elements including their vertical/horizontal spacing and length shall be as in the drawing.

Reinforced Earth 417.3 Facing Batter

3100

It may be necessary to set facing unit at an additional batter than as provided in the drawing as there is a tendency for initially positioned units of facia to lean outward as the fill material is placed and compacted. Care and caution shall be taken to rectify this phenomenon. 417.4 Drainage Drainage shall be provided as per drawing given in detail. The retained fill shall have a suitably designed drainage bay to allow free draining of the reinforced fill. 417.5 Laying and Compacting The reinforcing elements shall be laid free from all kinks, damage and displacement during deposition, spreading, levelling and compaction, of the fill. The programme of filling shall be such that no construction plant runs directly on the reinforcement. All construction plant having a mass exceeding 1000 kg shall be kept at least 1.5 in away from the fact of slope or wall. In this area (upto 1.5 in from the face of slope or wall), following compaction plant shall be used: (i) Vibratory roller having a weight per metre width of roll not exceeding 1300 kg with total weight not exceeding 10,000 kg. (ii) (iii) Vibratory plate compactor of maximum weight 1000 kg. Vibro tamper having a weight not exceeding 75 kg.

Compaction by any other method like using dozer or back blade compaction by dozer -or excavator bucket shall be permitted with due approval from the Engineer after ascertaining the level of compaction so achieved. During construction of reinforced fill, the retained material beyond the reinforcement at the rear or the structure shall be maintained at the same level as reinforced fill. The compacted layer shall not be more than 200 mm, to achieve compaction of 95 per cent of maximum laboratory density where measured as per IS : 2720 (Part 8). Temporary formwork shall be used to support the construction as per specified details given in the drawing. The forms, scaffolding and props shall be sufficient in numbers to allow taking up of a sectoral construction schedule specified in the design. 418 MEASUREMENTS FOR PAYMENT

Measurement for reinforcing elements shall be in linear metre for anchor strips or in sq.m. for geogrid/geotextile etc. The measurement for facia shall be in sq. metres. The measurement for foundation for facia and capping beam shall be in linear metres. Measurement for compacted darthfill shall be in cubic metres for compacted soil. 419 RATES

Rate shall include cost of labour, plant hire, material storage and handling expenses, for completing the works.

Reinforced Earth

3100

Rate for providing reinforcing elements shall include material cost, all transportation costs and storage of the same as per special provisions. The rate shall also include cost of laying of the reinforcing elements including all overlaps, jointing or stitching, heat bonding or extension. Rate for facia fixing shall include cost of joints, all necessary temporary formwork, scaffolding and all lifts and leads, if any, as shown in the drawing, unless otherwise specified to the treated separately- along with foundation or slope/wall kerb at the top of slope or wall. Rate for bed block and capping beam shall include all items of excavation, concrete, reinforcing steel, formwork, labour and equipment. Rate for soil fill shall include compaction as desired in requisite layers through mechanical means, cost of hire or labour for plant operations, dressing and levelling slopes, includifig special measures for edge reinforcements as shown in the drawing.

Reinforced Earth Appendices Appendices

3100

Reinforced Earth Appendix I LIST OF IRC PUBLICATIONS REFERRED TO IN THE SPECIFICATIONS Number Designation IRC: 2-1968 Revision) IRC: 5-1998 Road Bridges, IRC : 6-2000 Road Bridges, IRC: 8-1980 (Second Revision) IRC: 10-1961 Embankments IRC: 14-1977 and Tar Carpets (Second Revision) IRC: 16-1989 Bituminous Primers (First Revision) IRC: 17-1965 Surface Dressing IRC: 18-2000 Bridges (Post IRC: 19-1977 Water Bound Macadam (Second Revision) IRC: 20-1966 Macadam (Full Grout) IRC: 21-2000 Road Bridges, Title

3100

Route Marker Sips for National Highways (First Standard Specifications & Code of Practice for

Section I - General Features of Design (Seventh Revision) Standard Specifications & Code of Practice for

Section 11 - Loads and Stresses (Fourth Revision) Type Designs for Highway Kilometre Stones Recommended Practice for Borrowpits for Road

Constructed by Manual Operation Recommended Practice for 2 cm Thick Bitumen

Specification for Priming of Base Course with

Tentative Specification for Single Coat Bituminous Design Criteria for Prestressed Concrete Road

Tensioned Concrete) (Third Revision) Standard Specification and Code of Practice for

Recommended Practice for Bituminous Penetration

Standard Specifications and Code of Practice for

Section III - Cement Concrete (Plain and Reinforced) (Third

Reinforced Earth Revision) IRC: 22-1986 Road Bridges, Revision) IRC : 23-1966 Surface Dressing IRC: 24-2001 Road Bridges, IRC: 25-1967 IRC : 26-1967 IRC: 27-1967 (Base & Binder Course) IRC : 29-1988 Concrete) for IRC: 30-1968 for Use on Highway Signs 687 Appendices Number Designation IRC: 35-1997 (First Revision) IRC: 36-1970 Earth Embankments for Road Works IRC: 37-2001 (Second Revision) IRC: 40-1970 Road Bridges, IRC: 45-1972 Soil below the IRC: 47-1972 71fle

3100

Standard Specifications and Code of Practice for

Section VI - Composite Construction for Road Bridges (First Tentative Specification for Two Coat Bituminous Standard Specifications and Code of Practice for

Section V - Steel Road Bridges (Second Revision) Type Designs for Boundary Stones Type Designs for 200-Metre Stones Tentative Specifications for Bituminous Macadam

Specification for Bituminous Concrete (Asphaltic

Road Pavement (First Revision) Standard Letters and Numerals of Different Heights

Code of Practice for Road Markings (with Paints) Recommended Practice for the Construction of

Guidelines for the Design of Flexible Pavements Standard Specifications and Code of Practice for

Section IV - (Brick, Stone and Block Masonry) (First Revision) Recommendations for Estimating the Resistance of

Maximum Scour Level in the Design of Well Foundations of Bridges Tentative Specification for Built-up Spray Grout

Reinforced Earth IRC: 48-1972 Dressing Using Precoated Aggregates IRC : 49-1973 Black Cotton Soils for Lime Stabilisation IRC: 50-1973 Cement Modified Soil in Road Construction IRC: 51-1992 Construction (First Revision) IRC: 56-1974 Embankment Slopes for Erosion Control IRC: 63-1976 Aggregates and IRC: 67-2001 IRC: 72-1978 Equipment, Tools IRC: 75-1979 IRC: 78-2000 Road Bridges, IRC: 79-1981 IRC: 82-1982 Surface of Highways IRC: 83-1999 Road Bridges, IRC: 83-1987 Road Bridges, (Part-11) IRC: 87-1984 for Road Bridges Recommended Practice for

3100 Tentative Specification for Bituminous Surface

I(ecommended Practice for the Pulverization of

Recommended Design Criteria for the Use of

Guidelines for the Use of Soil Lime Mixes in Road

Treatment

of

Tentative Guidelines for the Use of Low Grade

Soil Aggregate Mixtures in Road Pavement Construction Code of Practice for Road Signs (First Revision) Recommended Practice for Use and Upkeep of

and Appliances for Bituminous Pavement Construction Guidelines for the Design of High Embankments Standard Specifications and Code of Practice for

Section VII - Foundation & Substructure (Second Revision) Recommended Practice for Road Delineators Code of Practice for Maintenance of Bituminous

Standard Specifications and Code of Practice for

Section IX - Bearings, Part 1: Metallic Bearings (First Revision) Standard Specifications and Code of Practice for Section IX - Bearings, Part It: Elastomeric Bearings Guidelines for the Design & Erection of False Work

Reinforced Earth IRC: 89-1997 Training and Control IRC: 90-1985 Maintenance of Bituminous Hot Mix Plant 688 Appendices Number Designation IRC: 93-1985 Signals IRC: 94-1986 IRC : SP: I 1- 1988 Roads and Runways (Second Revision) IRC: SP:31-1992 New Traffic Signs Ministry of Shipping & Transport (Roads Wing) Handbook on Road Construction Machinery (1985) IRC : HRB : Special Granular and Bound Report 11, 1992 689 Appendix-2 LIST OF INDIAN AND FOREIGN STANDARDS REFERRED TO IN THE SPECIFICATIONS Number Designation (A) INDIAN STANDARDS IS:5-1994 IS:73-1992 IS: 164-1981 Standard Title Iltle

3100 Guidelines for Design & Construction of River

Works for Road Bridges (First Revision) Guidelines of Selection, Operation and

Guidelines on Design and Installation of Road Traffic Specifications for Dense Bituminous Macadam Handbook of Quality Control for Construction of

IRC Highway Research Board, State of Art: Bases and Sub-Bases

Colou-r for ready mixed paints and enamels (fourth revision) Paving Bitumen-Specification (second revision) Ready mixed'paints, brushing, for road marking, to Indian Colour No. 356 Golden yellow, white and black

Reinforced Earth IS:210-1993 IS:215-1995 IS:217-1988 IS:269-1989 IS:278-1978 IS:280-1978 IS:334-1982 IS:383-1970 (second IS:432-1982 wire (Part 1) (Part 11) IS:443-1975 ISA54-1994 revision) ISA55-1989 ISA56-2000 ISA58-1988 IS:460-1985 IS:508-1987 IS:516-1959 IS:702-1988 IS:736-1986 IS:814-1991 IS: 1030-1998 revision) IS:1077-1992 690 Appendices Number Designation Title Grey iron castings (fourth revision) Road tar specification (third revision) Cutback Bitumen-Specification (second revision) 33 grade ordinary portland cement (fourth revision) Galvanized steel barbed wire for fencing (third revision)

3100

Mild steel wire for general engineering purposes (third revision) Glossary of terms relating to bitumen and tar (second revision) Coarse and fine aggregates from natural sources for concrete revision) Mild steel and medium tensile steel bars and hard-drawn steel for concrete reinforcement Mild steel and medium tensile steel bars (third revision) Hard-drawn steel wire (third revision) Methods of sampling and test for rubber hoses (second revision) Cutback Bitumen from Waxy Crude-Specification (second

Portland stag cement (fourth revision) Code of practice for plain and reinforced concrete (fourth revision) Precast Concrete pipes (with and without reinforcement) (third revision) Test sieves Specification grease graphited (fourth revision) Methods of test for strength of concrete Industrial bitumen (second revision) Wrought aluminium and alurninium alloys, plates for general Covered electrodes for manual metal arc welding of carbon and Carbon steel castings for general engineering purposes (fifth Common burnt clay building bricks (fifth revision)

engineering purposes (third revision) carbon manganese steel (fifth revision)

Reinforced Earth IS: 1124-1974 gravity and IS: 1129-1972 IS:1148-1982 purposes (third revision) IS: 1149-1982 revision) IS: 1195-1978 IS: 1199-1959 IS: 1201 to materials 1220-1978 IS:1203-1978 IS:1205-1978 IS:1206-1978 (Part I to 3) IS:1208-1978 IS:1209-1978 IS:1212-1978 IS: 1216-1978 IS:1217-1978 Determination of ductility (first revision) Determination of penetration (first revision) Determination of softening point (first revision) Determination of viscosity (first revision)

3100 Method of test for water absorption apparent specific

porosity of natural building stones (first revision) Dressing of natural building stones (first revision) Hot rolled rivet bars (upto 40 min dia) for structural

High tensile rivet bars for structural purposes (third Bitumen mastic for flowing (second revision) Method of sampling and analysis of concrete Indian standard methods for testing tar and bituminous

Determination of flash point and fire point (first revision) Determination of loss of heating (first revision) Determination of solubility in carbon disulphide or carbon Determination of mineral matter (ash) (first revision) Mild steel tubes (fifth revision) Mild steel tubular and other wrought steel pipe

tetrachlorate or trichoroethylene (first revision) IS: 1239-1990 (Part 1) IS: 1239-1992 (Part 2) fittings (third revision) IS:1364-1992 (Part I to V) IS: 1367-1997 (Part I to XX) IS:138 7-1993 (second IS:1398-1982 IS: 1448 General requirements for the supply of metallurgical materials revision) Packing paper, waterproof, bitumen-laminated (second revision) Method of tests for petroleum and its products

Hexagon head bolts, screws and nuts of product grades A and B. Part I : Hexagon head bolts (size range MIA to M64) (third revision) Technical supply conditions for threaded steel fastners

Reinforced Earth IS:1477 (Part 1)-1971 (Part 2)-1971 IS:1489-1991 (Part 1) (Part 2) 691 Appendices Number Designation IS: 1498-1970 engineering IS:1514-1990 lime (first revision) IS: 1732-1989 and geneml IS: 1785 (Part 1)-1983 IS: 1786-1985 IS:1838 and (Part 1)-1983 IS: 1888-1982 IS:2004-1991 (third revision) IS:2062-I999 IS:2116-1980 IS:2131-1981 revision) IS:2250-1981 mortars (first revision) yeinforcement (third revision) Tide Code of practice for painting of ferrous metals in buildings Pretreatment (first revision) Painting (first revision) Portland-pozzolana cement Flyash based (third revision) Calcined clay based (third revision)

3100

Classification and identification of soils for general purposes (first revision) Methods of sampling and. test for quick lime and hydrated

Dimensions for round and square steel bars for structural engineering purposes (second revision) Plain hard-drawn steel wire for prestressed concrete Cold-draws stress relieved wire (second revision) High strength deformed steel bars and wires for concrete Preformed filler for expansion joint in concrete pavement structures (non extruding and resilient type) Bitumen impregnated fibre (first revision) Method of load tests on soils (second revision) Carbon steel forging for general engineering purposes Steel to general structural purpose (fifth revision) Sand for masonry mortars (first revision) Methods for standard penetration test for soils (first Code of practice for preparation ar~d use of masonry

Reinforced Earth IS:2386-1963 (Part 1) (Part 2) impurities (Part 3) bulking (Part 4) (Part 5) (Part 6) aggregates (Part 7) (Part 8) IS:2720 (Part 2)-1973 (Part 3)-1980 Section I Section 11 (Part 4)-1985 (Part 5)-1985 revision) (Part 7)-1980 relation using light 692 Appendices Number Designation (Part 8)-1983 using heavy (Part 10)-1991 (second revision) (Part 13)-1986 (Part 14)-1983 coliesionless soils (first revision) (Part 16)-1987 (Part 27)-1977 revision) Title Mechanical properties Soundness Measuring mortar making properties Methods of test for aggregates for concrete Particle size and shape

3100

Estimation of deleterious materials and organic Specific gravity, density, voids, absorption and

of

fine

Alkali - Aggregate reactivity Petrographic examination Methods of test for soils Determination of water content (second revision) Determination of specific gravity (first revision) Fine grained soils Medium and coarse grained soils Grain size analysis (second revision) Determination of liquid and plastic limits (second Determination of moisture content/dry density

compaction (second revision)

Determination of water content-dry density relation

compaction (second revision) Determination of unconfined compressive strength Direct shear test (second revision) Determination of density index (relative density) of

Laboratory determination of CBR (second revision) Determination of total soluble sulphates (first

Reinforced Earth (Part 28)-1974 sand replacement method (first revision) (Part 29)-1975 core cutter method (first revision) (Part 37)-1976 and fine aggregates (Part 40)-1977 IS:3117-1965 IS:3466-1988 IS:3764-1992 IS:4138-1977 IS:4332 (Part 1)-1967 soils for testing (Part 3)-1967 density relation for (Part 4)-1968 for compacted soil-cement mixtures (Part 5)-1970 of stabilized soil (Part 7)-1973 stabilized soils (Part 8)-1969 soils IS:4434-1978 revision) IS:4826-1979 revision) IS:5317-1987 roads (first revision) IS:5435-1987 plants (first revision)

3100 Determination of dry density of soils in-place by the

Determination of dry density of soils in-place by

Determination of sand equivalent values of soils Determination of free swell index of soils Specification for bitumen emulsion for roads (anionic type) Masonry cement (second revision) Code of safety for excavation work (first revision) Safety code for working in compressed air (first revision) Method of test for stabilized soils Methods of sampling and preparation of stabilized Test for determination of moisture content-dry

stabilized soil mixtures Wetting and drying and, freezing and thawing tests

Determination of unconfined compressive strength Determination of cement content of cement

Determination of lime content of lime stabilized Code of practice for in-situ vane shear test for soils (first Hot dipped galvanised coating on round steel wires (first Specification for bitumen mastic for bridge decking and

General requirements for cold asphalt macadam mixing

Reinforced Earth IS:5640-1970 coarse aggregate IS:6006-1983 (first revision ) IS:6241-1971 aggregates 693 Appendices Number Designation IS:6909-1990 IS:6925-1973 chlorides in concrete admixtures IS:7537-1974 IS:7623:1993 purposes (second revision) IS:8041-1990 IS:8112-1989 IS:8500-1991 strength qualities) (first revision) IS:8887-1995 type)-specification (first revision) IS:9103-1999 IS:9381-1979 determination of IS:9382-1979 determination of IS: 10262-1982 IS:12269-1987 cement Admixtures for concrete (first revision) Bitumen emulsion for roads Road traffic signals Title Supersulphated cement

3100 Method for determining the aggregate. impact value of soft

Uncoate d stress relieved strands for prestressed concrete

Methods of test for determination of stripping value of road

Methods of test for determination of water soluble

Specification for li thium base grease for industrial

Rapid hardening portland cement (second revision) 43 grade ordinary portland cement (first revision) Structural steel - microalloyed (medium and high

(cationic

Methods of testing tar and bituminous materials:

froass breaking point of bitumen Methods of testing tar and bituminous materials:

effect of heat and air by thin film oven tests Guidelines for concrete mix design Specification for 53 grade ordinary portland

Reinforced Earth IS:12330-1988 cement IS:13321 (Part 1)-1992 terms used in materials and properties IS:13325-1992 extruded polymer geogrids using the wide strip-test method IS: 13326 (Part 1)-1992 geosynthetics and soil IS:SP 23-1982 standards) ASTM D-36 ASTM D-395 ASTM D-412. ASTM D429 ASTM D-573 method ASTM D-624 ASTM D-664 potentiometric titration ASTM D-797 and subnormal temperature ASTM D977-91 694 Appendices Number Designation ASTM : D979-89 mixtures ASTM: D-1075 bituminous mixtures ASTM D- 1149 ASTM D-1559 using Title Determination of tensile

3100 Specification for sulphate resisting portland Glossary of terms for geosynthetics, part 1:

properties

of

Evaluation of interface friction between

method of test, part I : modified direct shear technique Handbook on concrete mixes (based on Indian (B) FOREIGN STANDARDS Thermoplastic material Compression test of vulcanized rubber Tension testing of vulcanized rubber Adhesion of vulcanized rubber to metal Accelerated aging of vulcanized rubber by the oven Tear resistance of vulcanized rubber Test method for neutrallisation number for

Young's modulus in flexure of elastomer at normal

Standard specification for emulsified asphalt

Standard practice for sampling bituminous paving Effect of water on cohesion of compacted

Accelerated ozone cracking of vulcanized rubber Test for resistance to plastic flow of bituminous mixtures

Reinforced Earth Marshall apparatus ASTM D2026-72 (Reapproved 1993) ASTM : D2027-76 (Reapproved 1992) ASTM D2041-95 specific gravity and ASTM D2172-95 bitumen from bituminous paving mixtures ASTM D-2240 Durometer ASTM D2397-94 ASTM D3203-94 compacted dense and ASTM: D-3625 aggregate using boiling water ASTM : D3910-90 (Reapproved 1995) ASTM D-4533 ~ geotextiles ASTM D5976-96 asphalt cement ASTM E- I I ASTM: E-810 retro-reflection sheeting AASHTO DM 283 construction AASHTO AASHTO purposes AASHTO AASHTO AASHTO Coarse aggregate for highway and Standard practice for design, testing and construction of slurry sea] Standard specification for cutback asphalt (slow-curing type) Standard specification for cutback asphalt (medium-curing type)

3100

Standard test method for theoretical maximum

density of bituminous paving mixtures Standard test methods for quantitative extraction of

Indentation hardness of rubber and plastic by means of a Standard specification of cationic emulsified asphalt Standard test method for per cent air voids in

open bituminous paving mixtures Test method for effect of water on bitumen coated

Test method for trapezoid tearing strength of Standard specification for type I polymer modified

for use in pavement construction Specification for wire cloth sieves for testing purposes Test method for coefficient of retto-reflection or

airport

DM 294-70 Fine aggregate for bituminous paving mixtures DM 288-82 Geotextiles used for subsurface drainage DM 17-77 DR 5-80 DM 81-75 Mineral filler for bituminous paving mixtures Selection and use of emulsified asphalts Cut-ba6k asphalt (rapid-curing type)

Reinforced Earth AASHTO: DM 82-75 AASHTO AASHTO Cut-back asphalt (medium-curing type) DM 140-80 Emulsified asphalt DM 57-80

3100

Materials for embankments and subgrades

AASHTO DM 147-65 Materials for aggregate and soil-aggregate sub-base, base and surface (1980) 695 Appendices Number Designation Title courses

AASHTO DM 216-68 Lime for stabilisation AASHTO DM 249-79 White and yellow reflective thermoplastic stripping materials (solid form) AASHTO DM 268-77 Weatherometer AASHTO DM 282-80 Joint sealants, bot poured, elastomeric type, (or ASTM D 3406) for portland cement concrete pavements AASHTO: M82 AASHTO: M140 AASHTO: M208 AASHTO: T182-84 AASHTO: T283-89 induced damage BS 410-1969 BS 434 Part 2:1984 Part 2:1984 BS 598 Part 104:1987 compaction Part 107:1990 design wearing course rolled asphalt BS 729-1971 BS 812-1975 Hot dip galvanized coating on iron and steel articles Testing aggregates Test sieves Bitumen road emulsions (anionic and cationic) Specification for bitumen road emulsion Code of practice for use of bitumen road emulsions Sampling and examination of bituminous mixtures'fbr roads and other paved areas Methods of test for the determination of the density and Method of test for the determination 9f the composition of Equivalent to ASTM:D2027-76 or ASTM:D2026-72 Equivalent to ASTM:D977-91 Equivalent toASTM:D2397-94 Coating and stripping of bitumen aggregate mixtures Resistance of compacted bituminous mixture to moisture

Reinforced Earth Part 2 Pad 3 -Part I I I - Part 114-1989 BS : 1047-1952 BS: 1154-1970 BS 1377-1975 BS 1447-1973 footways BS 1449-1956 Partl-1972 Part 2-1967 BS 1470-1972 engineering 696 Appendices Number Designation BS 2000 Part 397:1995 rotary film 13S 2630 BS 2870 foil BS 3262 Part-I Part-2 Part-3 Title Methods for determination of physical properties Methods for determination of mechanical properties

3100

Method for determination of ten per cent fines value (TFV) Method for determination of the polished-stone value Air-cooled blastfurnace slag coarse aggregate for concrete Vulcanized natural rubber compounds Methods of test for soils for civil engineering purposes Mastic asphalt (limestone fine aggregates) for roads and Steel plate, sheet and strip Carbon steel plate. sheet and strip Stainless and beat resisting plate, sheet and strip Wrought aluminium and aluminium alloys for general

purposes - plate, sheet and strip

Methods of test for petroleum and its products Recovery of bitumen binders-dichlo~omethane extraction

evaporator method Preformed joint filler Rolled topper and copper alloys : sheet, strip and Hot-applied thermoplastic road marking materials Specification for constituent materials and mixtures Specification for road performance Specification for application of material to road surface

BS 5212, Part 2-1975 Cold poured joint sealants for concrete pavements BS 6044 BS 6088 marking BS 6906 Part I Specification for pavement marking paints Specification for solid glass beads for use with road

compounds and for other industrial uses Methods'of test for geotextiles Determination of the tensile properties using a wide width strip

Reinforced Earth Part 2 Part 3 Part 4 Part 7 BS : 7542 CRRI & 10C, New Delhi BS : DD232-1996 of Asphalt Institute edition

3100 Determination of the apparent pore size distribution by dry sieving Determination of water flow normal to the plane of the geotextile

under a constant head Determination of the puncture resistance (CBR puncture test) Determination of in-plane waterflow Method of test curing compound for concrete Bituminous road construction hand book Method for determination of the maximum binder content

bituminous mixtures without excessive binder drainage The asphalt handbook, manual series No.4 (MS-4) 1989

Manual series No.2 (MS-2) - mix design methods for asphalt concrete and other hot-mix types Manual series No. 14 (MS- 14) - asphalt cold mix manual GRI-GGI GRI-GG2 GRI-GG3 Geogrid rib tensile strength Geogrid junction strength Tensile creep testing of geogrids

(GRI denotes standards for test prepared by Geosynthetic Research Institute at Drexel University, Philadelphia, USA) 697 Appendices Appenft 3 (Clause 4023.2 and 403.3.2) METHOD OF SIEVING FOR WET SOILS TO DETERMINE THE DEGREE OF ftLVERISATION 1. A,sampleof pulverisedsoil approximately I kg in weight should betaken andweighed(W). 2. It should be spread on the sieve and shakep gently, care being taken to break the lumps of soils as little as possible. Weight of soil retained on the sieve should be recorded (W.). Lumps of finer soils in the retained material should be broken until all the individual particulars finer than the aperture size of the sieve am separated. 3. The soil should again be placed on the sieve and shaken until sieving is complete. The retained material should be weighed (W).

Reinforced Earth

3100

4. Weight of soil by per cent passing the sieve can than be calculated from the expression: (WI - W) X 100 (WI-W) 698 Appendices Appendix.4 GUIDELINES ON SELECTION OF THE GRADE OF BITUMEN(Source : Bituminous Road Construction Handbook, Indian Oil Corporation and Central Roa4 Research Institute) A For bituminous premix carpet, choice is governed by clirriatic conditions and intensity of traific. (i) Grade 30/40 for areas where difference between maximum and minimum atmospheric temperatures is less than 25* C and traffic intensity is greater than 1500 commercial vehicles per day. For traffic intensity less than 1500 commercial vehicles per day, Grade 50/60 is preferred. (ii) Where the difference between maximum and minimum atmospheric temperature is mom than 25* C and traffic intensity is greater than 1500commercial vehicles per day. Grade 50160 may be used. For traffic intensity of less than 1500 commercial. vehicles per day, Grade 80/100 may be used. For roads with very heavy traffic greater than 4500 cormnercial vehicles per day, such as metropolitan city roads, Grade 30/40 is preferred. (iii) Grade 90/100 maybe used in high altitude and mow-bound regions, irrespective of traffic intensity axisideration. B For bittaninous macadam and penetration macadarn as also built-up spray grout, Grade 30/40 (for hot climates) and 60/70 or 80/100 for other climates are suggested. C For a dense-graded bituminous concrete, a mom viscous grade like 60flO can withstand stresses of heavier wheel loads better than a less viscous grade of 80/10b. Similarly paving bitumen grade 60[70 is more advantageous for roads with large number of repetitions of wheel loads like expressways, urban roads, factory roads etc. High stability requirement cannot be met effectively by less viscous bitumen. D A more viscous grade of bitumen is advantageous in reducing stripping of biturnen film from aggregates in the presence of water.,

Reinforced Earth

3100

E With rounded river shingles, a more viscous grade of bittirrien compensates to some extent for poor mechanical interlock. A comparison of penetration grades and viscosity grades (AC-2.5toAC-40)ofasphaitleeinent and AR grades (based on Rolling Thin Film Oven Test residue) is shown below. 699 Appendices x R Q4 D3 AR. 140 i50 I~P7en. 100 160 IPL. 70 85 50 L L lui 1120 Pen. .150 >4 300 5 Comparision of penetration grades and visoceity grades of bitumen 700 Appendices .10 L 200 AC. 2. 5 t Pen AC. 10 AR. I C. 20 AR

Reinforced Earth Appendix 5 ANTI-STRIPPING AGENTS USED FOR BITUMINOUS MATERIALS AND MIXES 1. Scope

3100

1.1. Anti- stripping agents are used for bituminous materials andmixes to ensure adhesion between aggregates (hydrophilic in nature) and bitumen, even under submergence in water. Prior approval of the Engineer shall be taken in respect of both qualitative and quantitative use of a.particular product. 2. Materials 2.1. The anti-stripping agents shall be fatty acid amines having a long hydrocarbon chain. 2.2. Physical and Chemical Requirements : The anti-stripping agents shall conform to the physical and chemical requirements as detailed in Table A5-1. 2.3. Storage and Handling: Anti-stripping agents shall be properly stored in closed containers made of steel or aluminium. Containers made of zinc, copper, polythene PVC and most types of rubber arenot suitable for use- As most of the anti-stripping agents cause iff itation when in contact with human skin and are also irritating to the eyes, protective gloves for hands and goggles for the eyes shallbe used while handling them, specially in case of liquid antistripping agents. 3. Use in Sprayed Work 3.1. Additive Dosage: The dosage shall be determined depending on the nature (stripping value) of the aggregate and the size of aggregate. While the recommended minimum dose of anti-stripping agent for sprayed work is given in Table A5-2, the actual dosage shall be determined in the laboratory as directed ~y the Engineer. 3.2. Mixing Procedure During Construction: The anti-stripping agent supplied in liquid, solid or concentrate form shall be thoroughly mixed with liquid bituminous material or with straight iun bitumen. When used with straight run bitumen, the correct dose of antistripping agent shall be mixed in a hot bitumen tank boiler. The two constituents shall be agitated till the anti-stripping agent is thoroughly mixed. The dose of and-stripping agent shall suitably be increased if the binder is to remain in bitumen boiler for a longer period. 4. Use in Premix Work 4.1. Additive Dosage: The dosage shall be determined depending on the nature

Reinforced Earth

3100

(stripping value) of the aggregate and the per cent voids in the mix. While the recomm ' ended minimurn doses for different types of bituminous premix materials in terms of voids content are given in Table A5-3, the actual dosage shall be determined in the laboratory as directed by the Engineer. 701 Appendices TABLE A5-1. SPECIFICATION FOR ANTISTRIPPING COMPOUND S.No. Test 1. 2. 3. 4. 5. Minimum 6. Maximum 7. oil (HDO or LDO) in the ratio of 2-99 at 5M 8. KOWg minimum 9. WL minimum 10. bitumen containing I per cent WL antistripping compound at 40, C 24 hours 11. test Under water coating do Coating complete Nitrogen content per cent Analyser Stripping value with IS : 6241 As given at the end of Appendix No stripping Elemental 7.0 Total ban value ing ASTM D 664 200. Solubility in diesel As given at the end of Appendix Complete Water Content per cent Vol. IS : 1448 1.0 Method Appearance Limit Visual Liqui4/Solid Agreeable IS: 1448 150 42

Odour Smelling

Specific gravity 27*C IS: 1202-1978 0.860-1-03 Pour point -C Maximurn Flash point - (COC) IS: 1448

Reinforced Earth 12. 163*C 5 hours 13. minimum coating 14. appendix 702 Appendices Retained Marshall Stability per c~nt minimum As given at 75 the end of Thermal stability at do Should not ASTM D 3625 95

3100

lose its efficacy Boiling water test per cent

TABLE AS-2. TENTATIVE RECOMMENDED MINIMUM DOSE OF ANTISTRIPPING AGENT FOR SPRAYED WORK Aggregate shipping value Surface Liquid dressing seal with precoated aggregate 0-25 25-50 50-100 0.5 0.6 0.75 Penetration Macadam/ Built up spray grout aggregate 0.6 0.7 1.0 0.7 0.8 1.0 0.8 1.0 1.0 Surface Dressing with coat Dose of antistripping agent in per cent by weight of bitumen

uncoated

4L2. Mixing Procedure During Construction :'Me required dose of the anti-stripping agent shall be poured into the hot bitumen tank and allowed 15 to 30 minutes of circulation or stirred to ensure a homogeneous mix. It is necessary to use a stable antistrippin g agent or increase the dose according to expected degradation. Altematively, the correct dose shall be injected into the bitumen line by mom of a pump. The agent is fed into the bitumen first before it is sprayed oti the aggregate in the mix; thus, no sepanne mixing time for mixing the agent

Reinforced Earth

3100

with bitumen is required. In rolled asphalt and bitumen mastic surfacing works, pmcoated chippings; am pfessed into thehard surface whilethemix is still hot tomakethenewly laid surface skid resistant. These chippings shall be precoated with bitumen treated with antistripping compound. TABLE A5-3. TENTATIVE RECOMMENDED MINIMUM DOSE OF ANTISTRIPPING COMPOUND IN BITUMEN PREMIX WORKS Shipping value of aggregate 3-5 per cent 0-25 25-50 50-100 703 Appendices Annexure to the Appendix 5 TESTING PROCEDURE FOR SOLUBILITY OF ANTISTRIPPING AGENT IN DIESEL OIL Procedure: 98ml of diesel oil (HDO or LDO) and 2 ml of antistripping agent shall be taken in a measuring cylinder with stopper. The cylinder along with its contents shall be kqx in, water bath, maintained at 500+ I*Cforhalfanhour. Itshall then betakenoutfrorn water bath and shaken vigoTouslyforlO minutes. Thestopper shall be removed and the cylinder kept in water bath for half an hour and examined for separation Qr settlement. Reporting of results: An antistripping agent is reported to be completely soluble in diesel oil if no separation or settlement is observed for half an hour. TESTING STRIPPING VALUE OF AGGREGATES USING BITUMEN WITH VARYING PERCENTAGES OF ANTI[STRIPPING AGENT. Procedure: CoarscAggregate passing 19 mm sieve and retained on 13.2 nun sieve shall be washed and dried in an oven for 24 hours at 110, C. Such dried 200 gms of coarse aggregates shall be heated at 149, C and then mixed with 80/100 penetration grade 0.3 0.4 0.6 0.4 0.5 0.8 Voids content Voids content Voids content 5.10 per cent 10-15 per cent 0.5 0.6 1.0 Dose of antistripping agent in per cent by weight of bitumen

Reinforced Earth

3100

bitumen 5 per cent by weight of coarse aggregate heated upto 1630 C. 'Me mixture shall be mixed thoroughly for uniform coaling of aggregates by bitumen. The mix shall then be transferred to a 500 ml beaker and allowed to cool to room temperature. Distilled water shall be added in the beaker, which shall be placed in a water bath maintained at 40, + 1* C for 24 hours. The percentage degree of stripping shall be ~assessedvisually. The test shall also be conducted with water containing I per cent Sodium Chloride, as a precautionary measure to eliminate water contamination. The test is repeated using bitumen containing upto one per cent of antistripping agent in stages of 0.25 per cent. TESTING EFFICACY OF ANTISTRIPPING AGENT TO COAT AGGREGATES WITH BITUMEN IN PRESENCE OF WATER Procedure: Ile antistripping agent shall be added in per cent contents of 0.0, 0.25,0.50., 0.75, 1.00 and 1.25 to cutback biturnen MC 3 (4 parts of bitumen 80/100and I part of kerosene oil). The blends shall be used for testing their ability to coat the road aggregates under water. (a) 100grn of clean and dry stone dust conforming to following gradation shall be taken: Sieve Size 2.36 mm 1.18 nun 600 mic. 300 mic. per cent passing 100 80 75 45

Ae bottle shall be filled to 3/4 of its volume with distilled water at 0 C. The 6uunen-antlstr~p~ng agent Wend shall 6 added in the 6otde at the rate of 7.9 per cent 6y Weight Of RIMI dU91. The WPM 911211 he repliced ind the bottle chill be vigminly d6en for two minutes. The water shall be then drained off and the stone dust shall be transferred to a piece of paper and examined visually for satisfying complete coating. The minirown per cent content of antistripping agent at which the stone dust sample is thoroughly coated shal i I be recorded. Ile test shall be repeated at 601C in water as well as I per cent solution of Sodium Chloride in water for both the testing temperatures. 704 Appendices

Reinforced Earth

3100

(b) The under water coming test shall further be conducted with coarse aggregate, passing 19 mm sieve and retained on 13.2 min sieve. In this case the per cent content of the cutbock-antistripping agent blend shall be kept at 5 per cent by weight of coarse aggrepm In order to take care of contamination in water, the test shall also be carried out in the I per cent Sodium Chloride in water. The minimum per cent content of antistripping agent at which stone dust/coarse aggregate is thoroughly coated as per (a) and (b) shall be taken as the dose of antistripping agent. TESTING FOR THERMAL STABILITY OF ANTISTRIPPING AGENT Procedure: Blends of antistrippinS agent and bitumen of 80/100 grade shall be prepared with 0.00, 0.25, 0.50, a75 and 1.00 per cent contents of antistripping agent and kept in oven at 163, C for five hours. After the heat exposure, the blend samples an fluxed with kerosene oil to obtain the consistency of MC 3 and tested for under water coating test. Reporting of test results: An antistripping agent shall be deemed to be heat resistant if the dose requirement before and after heat exposure remains unchanged. QUANTITATIVE EVALUATION OF RETAINED MARSHALL STABILITY VALUES AFTER IMMERSION IN WATER Procedure: For quantitative evaluation, the tests shall be carried out as stipulated in ASTM D1075 (Effect of Water on Cohesion of Compacted Bituminous Mixtures). Tbegradation of aggregates shall be such as to give sufficient voids in the compacted bituminous mix to bring out die effects of stripping. 7be gradation of aggregates shall be as under: Sieve Size 19.00 nun 13.20 min 9.50 min 4.75 mm 2.36 min 600 mic 300 mic 150 mic 75 mic 2-8 per cent Passing * 100 75-100 60-80 35-55 20-35 10-22 6-16 4-12

Reinforced Earth

3100

The Marshall test specimens shall be prepared using 5 per cent bitumen of 80/100 grade by weight of aggregates blended with varying percentages of antistripping agents from 0 to I per 6ent. in steps of 0.25 per cent. The test samples shall give a void content of about 6per cent. At lean 8 standard Marshall specimens foreach of the varying antistripping agent percentages shall be prepared. Each set of 8 test specimens shall be sorted out in two groups of 4 each so that the average specific gravity of the specimen in group I shall be essentially the same as in group 11. Group-1 shall be tested for Marshall Stability in the usual procedure ASTM D1559. Group-11 specimens shall be immersed in water for 24 hours at 600C l*C. and then shall -be tested, immediately for Marshall stability as per ASTM D 1559. Calculation: The numerical index of resistance of biturninous mixtures to the detrimental effect of water shall be expressed as the index of retained stability Average Marshall Stability of Group-11 x 100 per cent Average Marshall Stability of Group-l Requirement for acceptance: A minimum of 75 per cent of retained Marshall strength shal I be required for acceptance. 705 Appendices Appendix 1000-1 DRAFT DOCUMENT ON IS: 9077-1979 CODE OF PRACTICE FOR CORROSION PROTECTION OF STEEL REINFORCEMENT IN RB AND RCC CONSTRUCTION (REVISED) .FOREWORD This Indian Standard has been revised taking into consideration the experience gained over the years, developments those have taken place subsequently and also considering the need for evolving suitable acceptance tests for quality control. In this regard, the electrochemical tests developed at the Central Electrochemical Research Institute, Karaikudi, and also the tests specified in ASTMA775/A775 M-90 for powder epoxy coating have been considered. This revised standard supersedes earlier standard namely IS:9077-1979. While revising this standard. it was decided to cover the various test procedures required to ensure the quality of individual product as well as the finished products. It was also decided that this

Reinforced Earth

3100

standard should include very stringent test procedures particularly for finished products so that these procedures can be used to evaluate not only the corrosion resistance of a particular finished product covered by this standard but also any other finished product such as galvanising, powder epoxy etc. 1. SCOPE 1.1. This standard (revised) specifies the recommended practice for surface preparation, surface pretreatment and anti-corrosive treatment based on inhibited and sealed cement slurry as an in-situ process for corrosion protection of mild steel reinforcement/ HYD bars in conventional reinforced concrete structures and conventional reinforced brickwork. constructions. This practice is also applicable for non-prestressing steels (mild steel reinforcement/HYSD bars) used in prestressed Concrete structure. 1.2. This standard applies only for in-situ corrosion protection of mild steel reinforcement/ HYSD bars after all bending and shaping operations are completed. However, this does not preclude the possibility of using this practice as a factory process. 2. ANTICORROSIVE TREATMENT PROCESS SEQUENCES The anticorrosive treatment should necessarily include the following sequential steps: (a) Surface preparation (de-rusting) Since presence of oil, grease. din, heavy scale and rust will adversely affect the performance of any anticorrosive treatment, it is essential to adopt suitable surface preparation technique Surface preparation can be either by acid pickling or by sand blasting. (b) Surface pretreatment Surface preparation should be immediately followed by a surface treatment step to ensure temporary protection during the time lag between the de-rusting and finish coating This pretreatment should not adversely affect either the adhesion of the finish coat or corrosion performance. (c) Inhibited Cement Slurry coating A minimum of 2 coats should be applied to ensure full coverage. (d) Sealing treatment Sealing treatment should make the coating harder and less permeable 706 Appendices

Reinforced Earth

3100

A typical flow diagram is shown in Fig. 1000/1. 3. PROCEDURE FOR SURFACE PREPARATION 3.1. Sand Blasting Sand blasting of the steel surface to SAE 2 1/2 standards can be done 3.2. De-rusting by Pickling The pickling weld should be preferably based on hydrochloric acid and should include an efficient inhibitor to prevent base metal attack. A typical de-rusting solution should have the following characteristics: (a) inhibitor efficiency should not be less than 97 per cent.

(b) weight loss of a polished standard mild steel reinforcement / HYSD bars specimen when dipped in the solution for 10 minutes should not be more than 2 g per sq. metre. (c) Specific gravity when tested using a standard specific gravity bottle should be around 1.12. 4. PROCEDURE FOR SURFACE PRE-TREATMENT De--niffed surface should be immediately converted by using phosphating treatment. It should be ensured by a suitable rinsing process that no residual acid is remaining on the surface at the time of phosphating. A typical phosphating composition of brushable consistency should have the following characteristics (a) Coating weight when tested as per test procedure A given hereunder should be around 4.5 gms./sq.m. (b) Density of the product should be in the range of 1.22 to 1.4 k&Aitm (c) Presence of fungicide shall be tested by dissolving the jelly in deionized water, the resulting solution shall be yellow in colour. (d) Presence of phosphating chemical in jelly shall be ensured with ammonia molybdate test. (e) PH of the composition when tested in a standard specific gravity bottle should be around 2.5 +0.1

Reinforced Earth

3100

(f) Nail scratch test should clearly leave a mark on the specimen. This indicates the existence of the coating. S. PROCEDURE FOR INHIBITED CEMENT SLURRY COATING 5.1. A typical inhibitor admixture used should have the following characteristics:(i) It should in liquid form ready for mixing with the ordinary pordand cement.

(ii) Specific gravity when tested using a standard specific gravity bottle should be 1.04 0.02 (iii) pH when tested using a pH meter should be 12.75 0.25 (iv) Tolerable limit for chloride in inhibitor - admixture when tested using anodic polarisation technique (as per test procedure B) should be 300 25 ppm 5.2. Ordinary Portland Cement

This should conform to IS:269 and should be sieved to pass through 75 microns IS sieve. 707 Appendices STEPS DURATION ------ ---STORAGE YARD Rebar) PICKLING RINSING N -------------PHOSPHATING (brushing) REACTION TIME -----------RINSING TANK 2 F -----------------3 min 2 .3 3 min 4 min D ------------"All SOLUTION (Brushing) INHIBITED CEMENT SLURRY F ------------F 4 min 40 min TANK 15 - 30 min TANK 2 - 3 min RUSTED - BA;; (For 10m length

Reinforced Earth FIRST COAT (Brushing) AIR DRYING F ------------"B" SOLUTION (Brushing) F INHIBITED CEMENT SLURRY SECOND COAT (Brushing) AIR DRYING ------------"B" SOLUTION (Brushing) AIR DRYING ------------"B" SOLUTION (Brushing) AIR DRYING F ------------11B!' SOLUTION (Brushing) AIR DRYING ------------------------STACKING YARD I -------------Fig. 1000/1 : Flow Diagram for Anti-Con-osive Treatment of Reinforcement Bars 708 Appendices TREATED BARS 22---------24h 3 min 4h -------2 12 24 h 2 4h 2 3 min 3 min 12 2 3 24 min 3 min 4 min

3100

5.1Camentandinhibi toradmixtim should bemixed in specified proportion to have suitable consistency. Coating should be applied preferably by brushing. However, under specific circumstances spraying or dipping is also allowable. 5.t Sufficient time lag should be allowed in between successive coatings to ensure final setting of the undercoaL A minimum of 6 to 12 hours may be necessary. S.5 A minimum of two coats with sufficient time lag in between should be applied. 6. SEALING TREATMENT The sealing treatment should be performed over the Coated surface inunediately after final setting of the top coat. Sealing treatment can be applied by brushing. spraying or clipping. 6.1. A typical sealing solution should have the following characteristics:-

Reinforced Earth

3100

(a) Specific gravity when tested using a standard specific gravity bottle should be 1.09 0.02 (b) pH when measured using a pH meter should be-12.25 +0.25

(c) Tolerable limit for chloride in sealing solution using anodic polarisation technique should be 450 +25 ppin (as per test procedure B). 7. SPECIFICATIONS FOR FINISHED END PRODUCT 7.1. Finished coating when visually examined should be fairly uniform in thickness and should be devoid of any defects such as cracks, pinholes, peeling, bulging etc. No surface area should be left uncoated- No rust spot should be visible to the naked eye. 7.7. Thickness of the Coating The minimum thickness of the coating shall be 200 microns. Preferable range is 200 to 400 microns. 7.3. Bond Strength of the Coated Rebar The bond strength of the coated rebar and concrete shall not be less than that specified in IS:456 a4 per clause No. 0, 2, 5. 11 and 44.1.2 and tested as per IS:2770 (Part 1). 7.4. Hardness of the coat ing when measured using a pencil hardness tester shall be around 5 H to 7 H. 7.5. Tolerable limit for chloride in 0.04 Normal N&OH medium using anodic polarisation technique (as per test procedure B) shall be around 4500 to 5000 ppm. 7.6. No film failure as evidenced by evolution of hydrogen gas at the cathode or appearance of corrosion products at the anode shall take place during one hour of testing (as per test procedure Q. L GENERAL REMARKS: It is advisable that severely rusted and heavily pined reinforcements am not accepted for treatment. TEST PROCEDURE A Determination of phosphate coating weight 7.5 cm x 2.5 an or 7.5 cin x 5 cm n-did steel polished and degreased specimens are to be used for this test. First the blank loss of unphosphated specimen is to be found out. For this, the initial weight (W) is accurately weighed. Ile specimen is kept immersed in

Reinforced Earth

3100

the Clark's solution or patented inhibited de- rusting solution for I minut~. The specimen is removed, rinsed 709 Appendices in distilled water and dried using hot air blower. The specimen is immediately weighed (W) Ila difference between W, and W. is ton-nod as blank loss. Another specimen (polished and degreased) is brushed with phosphating jelly and kept for 45 minutes. Than the specimen is washed free of jelly, rinsed in clean water and dried using hot air blower. The phosphated specimen (W) is accurately weighed. After weighing, the specimen is kept immersed in Clark's solution or patented inhibited de-rusting solution for one minute. Then the specimen is removed, rinsed in distilled water and dried using hot air, blower. Ile specimen is immediately weighed (W,). Coating weight = W3 - W4 - blank loss. TEST PROCEDURE R Anodic Polarisation Technique Mid steel reinforcement / HYSD Bar test specimens of size 10 nun in dis and 100 nint in length with stems of size 5 mm in dia and 50 turn in length is polished, degreased and sealed at bottom edge and at the stern with suitable sealers like wax, lacquer. 711en test specimen is kept immersed in test solution and potential is monitored using high impedance muldmeter against suitable reference electrode such as saturated calomel electrode/ copper-copper sulphate electrode. After getting stabilised potential using appropriate current regulator (0-100 mA), the test specimen is anodically polarised at a constant current density of 290 liA cm using a platinum/ stainless steell TSIA/ polished mild steel reinforcement/HYSD Baras cathode. Potential with firKe is followed for 5 minutes after current is applied. The maximurn chloride concentration upto which the potential rernains constant for 5 minutes is taken as a measure of tolerable limit. TEST PROCEDURE C Resistance to Applied.Voltage Test Two mild steel reinforcement I HYSD bars of size not less than 10 nun in dia and 800 mm in length shall be given and-corrosive treatment as per specified procedure. The end of the rebars shall be soldered with insulated Copper electrical connecting wire (14 gauge) to serve as electrical contact point. Coated rebars at the two ends shall be sealed with an insulating material to a length of 25 mm at each end. Test area shall be the area between Elie edge of die bottom sealed end and immersion line which shall not be less than 250 nun in this case.

Reinforced Earth

3100

The coated rebars shall be suspended vertically in a non-conductive plastic container of size not less than 150 mm x ISD nun square and 950 mm high. The rebars shall be so suspended as to have a clearance of 25 nun at bottom, 45 mm at the sides and 40 mm in between the rods. The container shall then be filled to a height of 800 min with an aqueous solution of 7 pe4nt NaCl. A potential of 2 V in between the coated rods shall be impressed for a period of 60 ndutes using a hi gh resistance volt meter for direct current having an internal resistance of not less than 10 mega Ohms and having a range upto 5 V (minimum). Storage batteries may be used -for impressing the voltage. During this 60 minutes of testing, theft shall not be any coating failure as evidenced by evolution of hydrogen gas at the cathode or by appearance of corrosion products of iron at the anode.

Reinforced Earth Appendix - 1500/1

3100

INFORMATION TO BE SUPPLIED BY THE MANUFACTURERS OF PROPRIETARY SYSTEMS 1. GENERAL

1.1. The information which the marnifacturer is required to supply shall be in such detail as to obviate unsafe use of the equipment due to the intention of the manufacturer not having been made clear or due to wrong assumptions on the part of the user. 1.2. The user shall refer unusual problem or problems of erectionlassembly not in keeping with the intended use of the equipment, to the manufacturer of the equipment. 2. INFORMATION REQUIRED, 2.1. The manufacturers of proprietary systems shall supply the following information: a) Description of basic functions of equipment b) List of items'of equipment available, giving range of sizes, spans and such like, with the manufacturer's identification numbers or other references. c) The basis on which the safe working loads have been determined and whether the factor of safety given applies to collapse or yield. d) Whether the supplier's data is based on calculations or tests. 'Mis shall be clearly stated as them may be wide variations between results obtained by eitlie~r method. e) Instructions for use and maintenance, including any points which require special attention during erection, especially where safety is concerned. f) Detailed dimensional information, as follows (i) Overall dimensions and depth and widths of members. (ii) Line drawings including perspectives and photographs showing normal uses. (iii) Self weight. (iv) Full dimensions of connections and any special positioning arrangements. (v) Sizes of members, including tube diameters and thicknesses of materials. (vi) Any permanent camber built into the equipment (vii) Sizes of holes and dimensions giving their positions. g) Data rclating to strength of equipment as follows (i) Average failure loads as determined by tests. (ii) Recommended maximum working loads for various conditions of use. (iii) Working resistance moments derived from tests. (iv) Working shear capacities derived from tests. (v) Recommended factors of safety used in assessing recommended loads and deflections based on test results.

Reinforced Earth

3100

(vi) Deflection under load together with recommended pre-camber.and limiting deflection (vii) If working loads depend on calculations, working stresses should be stated. If deflections depend on theoretical moments of inertia or equivalent moments of inertia rather than tests, this should be noted. (viii) Information on the design of sway bracing against wind and other horizontal loadings. (ix) Allowable loading relating to maximum extension of bases and/or heads. Appendices - 170011 SPECIFICATION FOR CONSTRUCTION JOINTS Location The location of construction joints shall be as shown on the drawing or as approved by the Engineer. If additional/new joints are approved by the Engineer, the following considerations for their location shall be taken into account '(i) Joints shall be provided in non-aggressive zones or in non-splash zones. If not feasible, the joints shall be sealed. (ii) Joints should be positioned where they am readily accessible for preparation and concreting, such as location where the cross section is relatively small, and where reinforcement is not congested. (iii) In beams and slabs, joints should not be near the suppons. Construction joints between slabs and ribs in composite beams should be avoided. (iv) Joint. For box girders, it is preferable to cast the soffit and the webs without any

(v) Location of joints shall minimige die effects of the discontinuity on the durability, structural integrity and the appearance of the structurePreparation of Surface of the joint Laitance shall be removed before fresh concrete is cast. The surface shall be roughened. Care shall be taken that they should not dislodge the coarse aggregates. Concrete may be brushed with a stiff brush soon after casting while the concrete is still fresh. If the concrete has partially hardened, it shall be treated by wire brushing or with a stiff water jet followed by drying with air jet immediately.

Reinforced Earth

3100

Fully hardened concrete shall be treated with mechanical hand tools or grit blasting, taking care not to split or crack aggregate particles. Before further concrete is cast, the surface should be thoroughly cleaned to remove debris and accumulated rubbish, one effective method being by air jet. Where there is likely to be a delay before placing the next concrete lift, protruding reinforcement shall be protected. Before the next lift is placed, rust, loose mortar or ot6r contamination shall be removed from the reinforcements. In aggressive e0ironment, the concrete shall be cut back to expose the reinforcements for a length of about 50 mm to ensure that contaminated concrete is removed. The joint surface shall not be contaminated with release agents, dust or cunng membrane. Concreting of Joints The old surface shall be thoroughly cleaned and soaked with water. Standing water sh ' all be removed shortly before the new concrete is placed and the new concrete shall be thoroughly compacted. Concreting shall be carried out continuously upto the construction joints. Surface retarders may be used to improve the quality of constructi6n joints. For a vertical construction joint, a stopping board shall be fixed previously at the predetermined position and shall be properly stayed to prevent its displacement or bulging when concrete is compacted against it. Concreting shall be continued right upto the board. 0-0 mmM -0 m m > 1110 z 0', 0 200 .160 0 L a) 41 >

Reinforced Earth m ou 0 z rrl mz -4 m < > Cm 0 3 nn00 > _0 m m >P x m .74m Cl 0 Co z z C XM M --4 M u > > z M -n 0 21 0 3 cc rn m -u ;o m

3100

Reinforced Earth Appendix - 180011 TESTS ON SHEATHING DUCTS

3100

All tests specified below shall be carried out on the same sample in the order given below. At least 3 samples for one lot of supply (not exceeding 7000 metre length) slid be tested. The tests are applicable for sheathing transported to site in straight lengths where the prestressing cable is threaded inside the sheathing prior to concreting. These tests am not applicable for sheathing nor for coiled cable and transported to site as an assembled unit, nor for sheathing ducts placed in position without threading of prestressini cable prior to concreting. (A) WORKABILITY TEST A test sample 1100 nun long is soldered to a fixed base plate with a soft solder (Fig. 180011-1). The sample is then bent to a radius of 1800 mm alternately on either side to complete 3 cycles. Thereafter, the sealing joints will be visually inspect4 to verify that no failurel opening has taken place. (B) TRANSVERSE LOAD RATING TEST 'Me test ensures that stiffness of the sheathing is sufficient to prevent permanent distortion during siti handling. Ile sample it placed on a horizontal support 500 min long so that the sample is supported at all points of outward corrugations. A load as specified in Table I is applied gradually at the centre of the supported portion through a contact surface 12 min long. It shall be ensured that the load is applied approximately at the centre of two corrugations, Fig. 1800/1-2. The load as specified is applied in increments. TABLE 1 dia (mm) 75-85 85-90 load (N) goo 1000 25-35 35-45 250 400 45-55 55-65 65-75 500 600 700

Reinforced Earth

3100

The sample is considered accep table if the permanent deformation is less than 5 percent of the disimeter of the sheathing. (C) TENSION LOAD TEST A test specimen is stojected to a tensile load. The hollow core is filled with a wooden circular piece having a diameter of 95 per cent of the inner dia of the sample,to ensure circular profile during test loading, Fig. 1800/1-3. A coupler is \screwed on and the sample loaded in increments, till reaching the load specified in Table 2. If no deformation of the joints nor slippage of couplers is noticed, the test shall be considered satisfactory. TABLE 2 dia, (mm) 75-85 85-90 load (N) 1600 720 APPendices (D) WATER LOSS TEST The sample is sealed at one end. The sample is filled with water and after sealing, the end is connected to a system capable of applying a pressure of 0.05 MPa, Fig. 1800/ 1-4, and kept constant for 5 minutes using a hand pump with pressure gauge or stand pipe system can be useA The sample is wxeptable if the water loss does not exceed 1.5% of the volume. V) 0 400 kOO3 ITII)3 e r) M 8> X-'U W r LA,D 0 CD X 1800 25-35 300 35-45 45-55 55-65 65-75 500 900 1100 1400

Reinforced Earth 0 C-) r- r)G) Z x> f 0 t)HLA I HING I 0M 0 rM r < > LP IZ' z 0 0 0) 00 3 rA C, Co o> LA ai 0 ri 6-4 rn LA Mo z -D 0 !A -om rn 0 m > M 6> 915 0 0 > 0 00 -~l 0

3100

1100

\- 0

Reinforced Earth ?. o rn OU, 0*00 UN mo (Ij X0 O;Z) 0 KX 3 3 mx :r 600 Pr- z m0 (A * 3m 0 M. S. PLATE 150x 150 x 10 mm L-25x25x4 14 Nos) SHEATHING PIPE 1100 m rn LONG 0 -PC;, x5Ox5 PLkTE ELEVATION -500 TIMBER PACKING - TOP PLATE M S.PLATE f ~90x240xlO I50xI5OxICl IT, j-,GUIDE 11500 A 153 153 CL' R W . EIGHT$ . 08 08 C ... ~V

3100

Reinforced Earth

3100

L-25x25x4 \0 0 M.S. PLATE A PLAN JRVIEW A-A Fig. 180011-2 i Dimensions are in nun. ANCHORING HOOK -S-PLATE l5Oxl5OxlOmm SOFT SOLDERED JOINT SHEATHING PIPE IIOOMM LONG --WOODEN CYLINDRICAL MEMBER OF 95 1A INNER DIAMETER OF SHEATHING SOFT SOLDERED JOINT w f! I D 0 M.S.PLATE 1O0xlO0xIOmm PAN WEIGHTS Fig. 1800/1-3: Diniensionsare in nun. PVC TUBE 10mm 4) SUBJECTED TO A PRESSURE OF0.05MPo I I-P-5 4- 153 i7 15OxI50xI L-L-FRAME

25x25x4

Reinforced Earth BY PUMP/WATER HEAD FOR 5 MINUTES M S PLATE 150 xl50xQmm SOLDERING SEALANT M.S. P LATE 100000mm PACKING 1100 SHEATHING SAMPLE LENGTH Fig. 1800/1-4: Dimensions are in mm. Appendix - 18001111 SPECIFICATIONS FOR GROUTING OF POST-TENSIONED CABLES IN PRESTRESSED CONCRETE LGENERAL PVC TUBE ( AIR VENT 10mm(P-150mm LONG SEALED WITH EPOXY/

3100

1.1. The recommendations cover the cement grouting of posttensioned tendons of prestressed concrete members of bridges. This also covers some of the essential protective measures to be adopted for minimising corrosion in PSC bridges. 1.2. The purpose of grouting is to provide permanent protection to the post-tensioned steel against corrosion and to develop bond between the prestressing steel and the surrounding structural concrete. The grout ensures encasement of steel in an allWine environment for corrosion protection and by filling the duct space, it prevents water collection and freezing. 2. NUTERIALS 2.1. Water Only clean potable water free from impurities conforming to section 1000 shall be permitted. No sea or creek water is to be. used at all.

Reinforced Earth 2.2. Cement

3100

Ordinary Portland cement should be used for preparation of the grout. It should be as fresh as possible and free of any lumps. Pozzolana cement shall not be used. 23. Sand It is not recommended to use sand for grouting of prcstressing tendons. In case the internal diameter of the ducts exceeds 150 mm,, use of sand may be considered. Sand, used, shall conform to JS:383 and shall pass through IS Sieve No. 150. The weight of sand in the grout shall not be more than 10 per cent of the weight of cem,:1- unless proper workability can be ensured by addition of suitable plasticiz, 2.4. Admixtures Acceptable admixtures conform to IS:9102 may be used if tests have shown that their use improves the properties of grout, i.e. increasing fluidity, reducing bleeding, entraining air or expanding the grout. Admixtures must not contain chlorides, nitrates, sulphides, sulphites orany other products which are likely to damage the steel or grout. When an expanding agent is used, the total unrestrained expansion should not exceed 10 per cent. Aluminum powder as an expanding agent is not recommended for grouting because its long term effects are not free from doubt. 2.5. Sheathing 2.5.1. For specifications of sheathing, section 1800 may be referred 2.5.2. Grout openings or vents a) All ducts should have groin openings at both ends. For this purpose special openings should be provided where such openings are not available at end an. chorages. For dmped (curved) cables vents shall be provided at all crown and valley points. It is a good practice to provide additional air vents at suitable intervals not exceeding 20 m. All grout openings or vents should include provisions for preventing grout leakage. b) Standard details of fixing couplers, inlets, outlets and air vents to the duct/ anchorage shall be followed as recommended by the supplier of the prestressing system. 2.5.3. Ducts should be securely fastened at close intervals. All unintended holes or openings in the duct must be repaired prior to concrete placing. The joints of the couplers and the sheathing should be made water proof by use of adhesive tape or

Reinforced Earth

3100

similar suitable system capable of giving leak proof joints. Grojut openings and vents must be securely anchored to the duct and to either the forms or to reinforcing steel to prevent displacement during concreting operations due to weight, buoyancy and vibrations. 2.5.4. Ducts require very careful handling as, being of thin metal, they are susceptible to leakage due to corrosion in transit or storage, by tearing/ripping in handling particularly when placed adjoining to reinforcing steel, by pulling apart at joints while inserting tendons prior to concreting, or by accidental puncturing while drilling for form ties/inserts. Ducts are also liable to damage'by rough use of internal vibrator and sparks from welding being done close by. 3. EQUIPMENT 3.1. Grout Mixer and Agitator It is essential that the grout is maintained in a homogeneous state and of uniform consistency so that there is no separation of cement. Use of grout mixers to obtain a colloidal grout is essential. The mixer should have an additional storage device with an agitator to keep the grout moving continuously before it is pumped in the duct. Positive reciprocating type grout pumps should be used. 3.2. Grout Pump The pump should be a positive displacement type and should be capable of ejecting the grout in a continuous operation and not by way of pulses. The grout pump must be fitted with a pressure gauge to enable pressure of injection to be controlled. The minimum pressure at which grout should be pumped shall be 0.3 MPa and the grout pump must have a relief arrangement for bypass of the grout in case of build up of pressure beyond I MPa. The capacity of the grout pump should be such as to achieve forward speed of grout of around 5 to 10 metres per minute. The slower rates are referable as they reduce the possibility of occurrence of voids. If the capacity of the pump is large, it is usual togrout two ormore cables simultaneously through a common manifold. Use of hand pumps for grouting, is not recommended. Use of compressed air operated equipment for injection is prohibited, as it is likely that there will be some air trapped in grout. 3.3. Water Pump Before commencement of grouting, a stand by direct feed high pressure water pump should be available at site for an emergency. In case of any problem in grouting the ducts, such pump shaH immediately be connected to the duct and all grout flushed by use of high pressure water flushing. It is, therefore, necessary to.have adequate storage of clean potable water for operation of the water pump for such emergencies. 3.4. Grout Screen

Reinforced Earth

3100

The grouting equipment should contain a screen having a mesh size of 106 micron size of 150 microns if sand is used). Prior to introduction into the grout pump, the grout should be passed through such screen. This screen should be easily accessible for inspection and cleaning. 3.5. Connections and Air Vents Standard details of fixing inlets, outlets and air vents to the sheathing and/ or anchorage should be followed as recommended by specialist supplier of the system of prestressing. In general, all connections are to be of the "Quick couple" type and at change of diameters suitable reducers are to be provided. 4. PROPERTIES OF THE GROUT 4.1. Water/cement ratio should be as low as possible, consistent with workability. This ratio should not normally exceed 0.45. 4.2. Before grouting, the properties of the grout mix should be tested in a laboratory depending on the facilities available. Tests should be conducted for each job periodically. The recommended test is described below. 4.3. Compressive. Strength: The compressive strength of 100 mm cubes of the grout shall not be less than 17 N[Pa at 7 days. Cubes shall be cured in a moist atmosphere for the first 24 hours and subsequently in water. These tests shall be conducted in advance to ascertain the suitability of the grout mix. 5. MIXING OF GROUT 5.1. Proportions of materials should be based on field trials made on the grout before commencement of grouting, but subject to the limits specified above. The materials should be measured by weight. 5.2. Water should be added to the mixer, first, followed by Portland cement and sand, if used. Admixture if any, may be added as recommended by the manufacturer. 5.3. Nfixing time depends upon the type of the mixer, but will normally be betw een 2 and 3 minutes. However, mixing should be for such a duration as to obtain uniform and thoroughly blended grout, without excessive temperature increase or loss of expansive properties of the admixtures. The grout should be continuously agitated until it is injected. 5.4. Once mixed, no water shall be added to the grout to increase its fluidity. 5.5. Hand mixing is not permitted. 6. GROUTING OPERATIONS 6.1. General a) Grouting shall be carried out as early as possible but not later than 2 weeks of stressing a tendon. Whenever this stipulation cannot be complied with for unavoidable reasons, adequate temporary protection of the steel against corrosion by methods or products which will not impair the ultimate adherence of the injected grout should be ensured till grouting. The sealing of the anchorage ends after concreting is considered to

Reinforced Earth

3100

be a good practice to prevent ingress of water. For structures in aggressive environment, sealing of the anchorage ends is mandatory. Notes : i) Application of some patented water soluble oils for coating of steel[VPI powder injection/ sending in of hot, dry, oil-free compressed air through the vents at frequent intervals have shown some good results. ii) Some of the methods recommended for sealing of anchorages am - to seal the openings with bitumen impregnated gumy bag or water proof paper or by building a brick pedestal plastered on all faces enclosir g the exposed wires outside the anchorage$. iii) Any tracts of oil if applied to steel for preventing corrosion should be removed before grouting operation. iv) Ducts shall be flushed with water for cleaning as well as for w6tting the surfaces of the duct walls. Water used for flushing should be of same quality as used for grouting. It may, however, contain about 1 per cent of staked lime or quick lime. All water should be drained thorough the lowest vent pipe or by blowing compressed air through the duct. v) 'Me water in the duct should be blown out with oil free compressed air. Blowing out water from duct for cables longer than .50 m draped up at both ends by compressed air is not effective, outlet/ vent provided at or near the lowest point shall be used to drain out water from ducL vi) The connection between the nozzle of the injection pipe and duct should be such that air cannot be sucked in. vii) All outlet points including vent openings should be kept open prior to commencement of injection gTOUL viii) Before grouting, all air in the pump and hose should be expelled. The suction circuit of the pump should be air-tight. 6.2. Injection of Groui a) b) After mixing the grout - should be kept in continuous movement. Injection of grout must be continuous and should not be interrupted.

c) For vertical cable or cables inclined mom than 60 degrees to the horizontal, injection should be effected from the lowest anchorage or vent of the duct. d) The method of injection should ensure complete filling of the ducts. To verify this, it is advisable to compare the volume of the space to be filled by the injected grout with the quantity of grout actually injected. e) Grouting should be commenced initially with a low pressure of injection of upto 0.3 MP& increasing it until the grout comes out at the other end. The grout should be allowed to flow freely from thi other end until the consistency 4 the grout at this end is the same as that of the grout at the injection end. When the grout flows at the other end, it should be closed off and building up of pressure commenced. Full injection pressure at about 0.5 MPa shall be maintained for at least one minute before closing the injection pipe. It is recommended practice to provide a stand pipe at the highest point of the

Reinforced Earth

3100

tendon profile to hold all water displaced by sedimentation or bleeding. If there is a built up of pressure much in excess of I MPa without flow of grout coming at the other end, the grouting operation should be discontinued and the entire duct flushed with high pressure water. Also, the bypass system indicated in par& 3.2 above is essential for further safety. f) In the case of cables draped downwards e.g. in cantilever construction simultaneous injection from both ends may be adopted Fig. 1800/111-1. g) Grout not used within 30 minutes of mixing should be rejected. LAULL LUCT PLUG COMPRESSED AIR L DLOW THhOU0H WITH COMPRESSED AIR WATER OVER FLOW WATER 0-FILL DUCT WITH WATER WATER OVER FLOW --GROUT GROUT GROUT WATER IN DUCT WATER NO PLUG AT TOP VENT

VENT ERIE

3. COMMENCE OROUTINO SIMULTANEOUSLY FROM BOTH IENDS REMOVE INTERMEDIATE PLUGS AT INTERVALS TO CHECK FLOW WATER OVER FLOW --.-\ [WATER IN DUCT GROUT GROUT

4. PLUG INTERMEDIATE VENTS AFTER GROUT FLOWS CEMENT V GROUT GROUT COLOURED WATER

Reinforced Earth 5. WHEN WATER FLOW OUT OF TOP VENT TAKES ON COLOUR OF CEMENT STOP PUMPING GROUT FROM ONE END CONTINUE 'k'UT'NG FRO, THE OTHER END , WATER OVER FLOW GROUTING STOPPED x 6. IF GROUT BEGINS TO FLOW FROM TOI VFNT C bli!NUE WOOING. GROUT UM~i-NG AND RESTART FROM OTHER END IF CLEAR WATER FLOWS FROM TOP GROUT I POCKET OF WATER

3100

7 WHEN PUMPING FROM BOTH ENDS IN TURN CAUSES GROUT TO FLOW FROM TOP VENT PLUG GROUT GROUT S. PLUG ALL VENTS AND INCREASE PUMP PRESSURE AT BOTH ENOS TO 0.5 MPc HOLD THIS PRESSURE FOR AT LEAST ONE MINUTE. Fig. 1800/111-1 : Procedure for Grouting of Cables Draped Downwards Appendix 18005V GROUTING RECORD Job Name: Span No. Cable No: Date of Grouting: Date of Cable Installation: Type of Cement: 0PC/llSOPC Week and Year of Manufacture of OPCAISOPC W/C Ratio: Name and amount of admixture used, if any Temperature: Mixing water Time: Equipment: Start Finish Grout mixer Grout pump Grout PLUG PLUG

Reinforced Earth Cable duct: Volume of grout '11 litres Grouting pressurv Cement consumption: Theoretical Pre-grouting che-As: Free of blockage, Yes/No Vents: Leakage observed: If cable duct blockcd: Remedial Measures GI-ou ti ng observations: Passage of grout I.-irough vents Passage of grout through outlet Any equipment Nilure Post Lgrouting checks Probbing by stiff,,,ire Remarks Signatures of off;-e rs present during grouting: Client cowr~lctor System Supplier Yes/No Yes/No Yes/No liflet: Yes/No Actual Diameter Length

3100

Regrowing

Outlet

Cable duct

Yes/No

Yes/No

Sealed Yes/No

h) Disconnection is facilitated if a short length of flexible tube connects the duct and injection pipe. This can be squeezed and cut off after the grout has hardened. 7. PRECAUTIONS AND RECOMMENDATIONS FOR EFFECTIVE GROUTING ,
a) In cold and frosty weather, injection should be postponed, unless special precautions are taken. If frost is likely to occur within 48 hours after injection, heat must be applied to the member and maintained for at least 48 hours after injection so that the temperature of the grout does not f 11 below 5 degrees Celsius. Prior to commencement of grouting, care must ~ taken to, ensure that the duct is completely free of frostfice by flushing with warm water, but not with steam. b) The temperature of the grout shall not exceed 25 degrees Celsius. For increasing the workability of grout, its temperature may be lowered by use of chilled water or by putting ice outside the grout storage container. c) When die cables are threaded after concreting, the duct must be temporarily stiffened during concreting by insetting bunch of strands, wires or reinforcement or a rigid PVC pipe or any other suitable method. d) During concreting, care shall be taken to ensure that the sheathing is not damaged. Needle vibrators shall be used with extreme care by well experienced staff only, to ensure against such damage.

Reinforced Earth

3100

e) It is a good practice to move the cables in both directions during the concreting operations. This can easily be done by light hammering the ends of the wires/ strands during concreting. It is also advisable that 3 to 4 hours after concreting the cable should be moved both ways through a distance of about 20 ans. With such movement, any leakage of mortar which has taken place in spite of all precautions, loses bond with the cables, thus reducing the chance of blockages. This operation can also be done by fixing prestressing jacks, at one end pulling the entire cable and then repeating the operation by fixing the jack at the other end. f) The cables to be grouted should be separated by as much distance as possible. g) In case of stage prestressing, cables tensioned in the first stage should not remain ungrouted till all cables are stressed. It is good practice, while grouting any duct in ~stage prestressing, to keep all the remaining ducts filled up with water containing I per cent time or by running water through such ducts till the grout has set. After grouting the particular cable, the water in the other cables should be drained and removed with compressed air to prevent corrosion. h) Care should be taken to avoid leaks from one duct to another at joints of precast members in particular. i) End faces where anchorages am located are vulnerable points of entry o,f water. They have to be necessarily protected with an effective barrier. Recesses should be packed with mortar concrete and should preferably be painted with water proof paint. j) After grouting.is completed, the projecting portion of the vents should be cut off and the face protected to prevent corrosion.