Bureau of Engineering
(O/01-22e)
Construction Information
Expected Duration: from 7/16/2011 to 7/4/2013 Construction Cost: $8,701,780 Contractor: Los Angeles Engineering
Scope of Work The purpose of this project is to achieve compliance with the Santa Monica Bay Beaches Wet Weather Bacteria Total Maximum Daily Load (TMDL) regulations. The project proposes to divert stormwater from an existing storm drain to the Temescal Canyon Park for treatment through a hydrodynamic separator, underground detention tank and diversion to a sanitary sewer for further treatment at the Hyperion Treatment Plant.
Program Information
Program: Proposition O Project Mgr: Iftekhar Ahmed PM Phone: (213) 485-5875 Lead Division: Proposition O Group Work Order: EW40017A (Active)
Council District(s)
11 - Bill Rosendahl
Neighborhood Council(s)
Pacific Palisades NC
Geographic Information
Thomas Guide: Pg-Grid: 630-J6 Planning Area: West LA Address: 15733 Temescal Canyon Road
Information Resources
Listed below are various resources available for finding more information related to projects. City of Los Angeles Internet Home Page
http://www.lacity.org/