Sie sind auf Seite 1von 1

PROJECT INFORMATION REPORT

City of Los Angeles

Bureau of Engineering

Department of Public Works

Temescal Canyon Stormwater BMP Phase I


Current Phase
Construction

(O/01-22e)

Construction Information
Expected Duration: from 7/16/2011 to 7/4/2013 Construction Cost: $8,701,780 Contractor: Los Angeles Engineering

Scope of Work The purpose of this project is to achieve compliance with the Santa Monica Bay Beaches Wet Weather Bacteria Total Maximum Daily Load (TMDL) regulations. The project proposes to divert stormwater from an existing storm drain to the Temescal Canyon Park for treatment through a hydrodynamic separator, underground detention tank and diversion to a sanitary sewer for further treatment at the Hyperion Treatment Plant.

Program Information
Program: Proposition O Project Mgr: Iftekhar Ahmed PM Phone: (213) 485-5875 Lead Division: Proposition O Group Work Order: EW40017A (Active)

Council District(s)
11 - Bill Rosendahl

Project Status Project is the construction phase.

Neighborhood Council(s)
Pacific Palisades NC

Geographic Information
Thomas Guide: Pg-Grid: 630-J6 Planning Area: West LA Address: 15733 Temescal Canyon Road

Information Resources
Listed below are various resources available for finding more information related to projects. City of Los Angeles Internet Home Page
http://www.lacity.org/

Bureau of Engineering Internet Home Page


http://eng.lacity.org/

BOE Mapping Application (Navigate LA)


http://navigatela.lacity.org/

BOE Public Right of Way Reservation System


http://navigatela.lacity.org/pwrsview/

Bureau of Engineering Project Information Reports


http://eng.lacity.org/iuprs/

Bureau of Engineering Projects Out to Bid


http://eng.lacity.org/docs/dpw/bids/consbids.pdf