BUNKER PRE-LOADING PLAN


Date: To Bunker: Sulphur: GUAYAQUIL Port: Name of Supplier: Name of Barge: MT Grade: mm2/s kg/m3 400.0 IFO-380 Viscosity @ 50 C: 380 Density @ 15 C: %m/m %V/V Flash Point: Deg. C Pumping Temper.: 30 Deg. C Correct S.G.: Water: Time / Hose Connected: Time / Bunker Comenced: Time / Bunker Completed: Time / Hose Disconnected: Time / Barge Away: Draft Before: MTR MTR Trim: Fwd: Aft: Draft After: Fwd: MTR Aft: MTR Trim: MTR Expected After Bunker: 400 MT Actual After Bunker: 400.0 MT CBM
85% Full Capacity Full Capacity Ullage in Quantity in CBM MTR in CBM

Before Bunker
Ullage in MTR Quantity in CBM

Expected After Bunker


Quantity in CBM

Actual After Bunker


Quantity in CBM Quantity Vol. in in MT %

Tank Name No.1 F.O. Tank (Port) No.1 F.O. Tank ( Stbd) No.2 F.O. Tank (Centr) No.3 F.O. Tank (Centr) No.4 F.O. Tank (Port) No.4 F.O. Tank (Stbd) No.5 F.O.Tank (Stbd)

Quantity Vol. in Ullage in in MT % MTR

Quantity Vol. in Ullage in in MT % MTR

459.15 459.15 153.14 201.79 162.33 162.33 103.81

12.00 12.00 12.34 12.38 3.05 3.08 1.62

390.28 390.28 130.17 171.52 137.98 137.98 88.24

12.78 12.81 13.21 0.00 0.00 0 3.93

349.13 345.93 72.40 0.00 0.00 0.00 36.98


Total:

337.90 340.20 71.00 0.00 0.00 0.00 31.40


613.62

76 75 47 0 0 0 36

12.78 12.81 13.21 12.33 2.8 2.8 1.63

349.13 345.93 72.40 171.00 118.30 118.30 88.20


Total:

337.90 340.20 71.00 168.00 116.00 116.00 85.00


650.00

76 75 47 85 73 73 85

13.93 12.61 13.21 12.38 2.98 3.02 1.55

276.90 348.40 72.40 171.00 118.30 118.30 89.97


Total:

271.40 341.50 71.00 168.00 116.00 116.00 85.43


1169.33

60 76 47 85 73 73 87

Note: 1) While topping-up the tanks the flow of oil shall be slowed when tanking being filled 70% full and stopped when 85% full. Maximum bunker fill must not exceed 85% capacity. 2) Do not allow air blow into the tanks if the last tank is above 85% full capacity. 3) Take the sample of fuel oil by continuous drip method, drip to be adjusted so that a true representative sample is obtained throughout bunkering time. Master of the M.V. Crown Garnet Chief Engineer
Prepared by : C/E Yuriy Volkovich Checked by : T. V. R. Kumar Approved by: K.K. Devanandan Date : 1 July 2005