Sie sind auf Seite 1von 164

February (2)

GNNON DUNKERLEY & CO.LTD.,


HYDERABAD CIVIL ENGG.DIVN.
Statement of Purchase Orders and Dispatch of materials to various sites for the month of FEB 201
Sl. no

Date of
Indent

01.02.13

30.01.13

31.01.13

01.02.13

Unit

Indent
Qty

No

No

No

No

No

No

No

9-14Amps Elec Starter 3HP to 5HP L&T

Nos

18-32Amps Elec Starter 10HP to 15HP


L&T

Nos

Bearing 6206 (Make: SKF)

Nos

Bearing 6005 (Make: SKF)

Nos

Red Oxide - Berger 20Ltr (Zinc


Cromite)

ltrs

200

Turpentine

ltrs

160

AG7 Grinding Wheel (Bosch)

Nos

40

Cotton Hand Gloves

pair

15

Paint Brush 4"

Nos

Dark Blue Enamel Paint Berger

ltrs

40

Seal Wiper 25/221933


Seal Spool 25/221934
Film Coated Water Proof Plywood 12
mm(8' x 4') 30 kKgs - 250 Nos Hansa

Nos
Nos

4
4

Sft

8000

Description
Vibratory Screen 40 mm dia 1185W x
2100L (Clamp 1185-C)
Vibratory Screen 22 mm dia 1185W x
2200L (Clamp 1185-C)
Vibratory Screen 24 mm dia 1185W x
2000L (Clamp 1185-S)
Vibratory Screen 12 mm dia 1185W x
2100L (Clamp 1185-S)
Vibratory Screen 14 mm dia 1185W x
1900L (Clamp 1185-S)
Vibratory Screen 6 mm dia 1185W x
2000L (Clamp 1185-C)
Vibratory Screen 6 mm dia 1185W x
1800L (Clamp 1185-S)

01.02.13

29.01.13

31.01.13

Exide Battery 12 V-88 Amps

Nos

31.01.13

Solenoid Valve DS5120

Nos

01.02.13

Engine oil filter - 06.436.01.0.00


Fuel filter - 48.117.04.0.00
Fuel filter - 48.117.05.0.00

Nos
Nos
Nos

1
1
1

Page 1

February (2)
10

11

01.02.13

31.01.13

12

01.02.13

13

02.02.13

14

01.02.13

15

01.02.13

Lub Oil Filter (605411880008)

Nos

Fuel Filter Primary (001200240911)

Nos

Fuel Filter Secondary (001200240912)

Nos

Plough Bolt(40/303404)
Nut (1340/0701)
Rear D/F Cutter Kit-side
cutter(550/42065A)
Bucket Tooth(40/303603)
Binding Wire 20 Swg
Wire Nails 3" x 10 Swg
Wire Nails 1" x 12 Swg
K Oil super 13 ltrs can
Lub oil filter element
1.1 liter fuel filter kit
Air cleaner assly with precleaner
Hose for air cleaner (70 ID X 80 L)
Fuel pipe 8.0, 14 B, 1000 WB
Assembly of A.V.MTG (Hard)
Leak off pipe
Leak off pipe M14 X M12, 1700L
Valve(boom)-85812116
Relief Valve-(boom)-85812117
Relief Valve-(bucket)-85812115
Seal Kit-bucket-SSP4218
Seal Kit.boomCyl.-DC7309650
Sender Unit trans Oil-85817672
Kit misc-85824278

Nos
Nos

16
16

Nos

Nos
Kgs
Kgs
Kgs
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos

8
3000
350
100
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

3/8 Bolt&Nut with washer 1 inch

Nos

40

5/16 Bolt&Nut with washer 1inch

Nos

50

5/16 Rivets

Nos

40

Clamp bolts 4inch

Nos

15

Front 2A plates

Nos

Front 2A plates

Nos

Hi-bolts 11 inch

Nos

Page 2

February (2)
Front main bush

Nos

Front shakel pin

Nos

Front jhulla

Nos

Front center bolts

Nos

LF 8 NO clamp

Nos

TATA cater bolts

Nos

15

Leyland Center bolt front

Nos

U clamp sleeves thick

Nos

40

Back plate 2A

Nos

Back plate 3A

Nos

Back centre bolt

Nos

Main bush

Nos

Bell crank bush set

Nos

12

Bell crank

Nos

Bell crank big pin

Nos

Bell crank Medium pin

Nos

Main pin

Nos

Page 3

February (2)
Bed bolts

Nos

30

Bell crank shims 6mm

Nos

20

Bell crank shims 5mm

Nos

20

Bell crank shims 4mm

Nos

20

Main shims 8 mm

Nos

25

Uclamp back 17 inches

Nos

4 mm wire Cable (Deluxe)


(White,red,black)

Nos

5 mm wire Cable (Deluxe) (red,black)

Nos

8 mm wire cable (Deluxe) (Black&red)

Nos

Black tape

Nos

Insulation tape

Nos

Indicators Front assembly

Nos

Back light assembly

Nos

Head light assembly(L&R)

Nos

Air horn set

Nos

24 volt roots horn

Nos

Reverse light assembly

Nos

Page 4

February (2)

16

01.02.13

Reverse horn

Nos

Head light dipper switch

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

ROPE TIE ROD


SPRING
SLEEVE OF RUBBER
RIVET
CHARGE HOPPER
HEX BOLT
SP WASHER
Washer
NUT
HEX BOLT
NUT
SUPPORT ARTICULATION
HEX BOLT
SP WASHER
SELF LOCKING NUT
BRAKE DISC FOR CHUTE
BRAKE SHOE
LEVER
MAN HOLE GASKET
SCREW
PLASTIC TAP FOR BUSHING(911430)
DISCHARGE CHUTE
SCREW CYLINDER - CHUTE LIFTING
Page 5

February (2)
NYLOCKNUT
WASHER
WATER PUMP TP. C1
HYDR. FILTER
RUBBER BUFFER
STRAP
RUBBER PIPE
Steel Pipe
BALL VALVE
Release Coupling
STRAP
RUBBER PIPE
RUBBER PIPE
RUBBER PIPE
ASSY OF MANIFOLD
NIPPLE
BALL VALVE
PIPE FITTING
STRAP
Braided hose
PIPE FITTING
NIPPLE D -1 1/4 X30
BALL VALVE
HOSE COLLER
RUBBER PIPE
1" BALL VALVE
Page 6

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

February (2)
V' BELT

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Screw

Nos

Screw

Nos

Electric Fan

Nos

Ball Valve

Nos

Nozzle

Nos

Hour Counter

Nos

MS Sheet 4' x 4' x 10 ( 1 No)


MS Sheet 8' x 4' x 6 ( 2 No)
MS Sheet 8' x 4' x 4 ( 5 No)
MS Square tube 122 x 61 mm x
6mtr(4.5mm thickness)

Kgs
Kgs
Kgs

125
300
500

mtr

12

SUPPORT ASSY FOR STOP CABLE


STOP CABLE
IGNITION SWITCH
GREEN LENS ASSEMBLY 24V DC
IGNITION SWITCH
COMPLETE DOUBLE COMMAND
SUPPORT FOR CHUTE(LEFT)
SUPPORT FOR CHUTE(RIGHT)
HOOK.
SPRING
HANDLE (RUBBER)
EYE BOLT M8x1.25P
U Shaped Support
WASHER
Tube
WEAR SHEET

17

02.02.13

Page 7

February (2)
18

02.02.13

Stripper - 80200845

Nos

Wearing packing - 60073424

Nos

Double horn showel (SQ) - 80200844

Nos

Bottom plate CP30 - 87300006

set

Hex nut M12 8 Verz DIN 934 60083297

Nos

68

Lock wahser S 12- Zinc C - 60083300

Nos

68

Rubber wahser ID-13, OD-25 80150065

Nos

68

Counter sunk screw M12 X 45 DIN 7991


- 80150065

Nos

68

Internal wear sheet LX - 80200921

Nos

Hex nut M12 8 Verz DIN 934 60083297

Nos

20

Lock wahser S 12- Zinc C - 60083300

Nos

20

Counter sunk screw M12 X 45 DIN 7991


- 80150828

Nos

20

Weairng plate LX - 80200923

Nos

Square socket CSK screw M16X55 80150774

Nos

Square socket CSK screw M16X30 80150775

Nos

12

Hex nut DIN 6915 M16-10-GT500 10001209

Nos

20

Dome nut M16 DIN 1587 M16-6-A2C 10001274

Nos

12

Page 8

February (2)

19

02.02.13

21

15.01.13

Lock wahser 16 - 60083304

Nos

28

Ltrs
Ltrs
Ltrs
Ltrs
Ltrs
Ltrs
Tin

20
40
20
20
2
5
1

Rmt

1818

Rmt

72

Ltrs

400

23

28.01.13

Engine oil valvoline 15 w 40


Gear oil 90 grade
Hydraulic oil
Bearing grease AP3
Brake oil
TQ oil
Coolant (1 Tin = 5 Ltr)
PVC Pipe 160 dia x 4Swg Pressure
(Sudhakar)
PVC Pipe 110 dia x 4Swg Pressure
(Sudhakar)
Hydraulic Oil 68 HLP Grade(Servo)

24

31.01.13

Elbow DN125 90 Degree Bend

Nos

Filter Element (10072694)

Nos

Filter Element (10190588)

Nos

Nos

Nos

Sq.m

297.68

Nos
Nos
Nos

1
1
1

Nos

Kgs

375

Barrel

Nitobond SBR

Ltr

10

22

25

02.02.13

27

02.02.13

26

01.11.12

28

04.02.13

29

31.01.13

Rear Tyre with Tube flap Jet One 100020-16PR


Front Tyre with Tube flap Jet One 100020-16PR
Film Coated with Water Proof Plywood
12 mm (8' x 4') (SEMI-densified - 100
Nos )
Two Lever Box (200664)
Actuation Cable (20903701)
Pump Cable (20118801)
Front Tyre with Tube flap 7.5016PR(MRF)
Conbextra GP2 (Fosroc) 25Kgs (15Bag)
Concure WB 200 Ltr

31

04.02.2013

30

02.02.13

Filter element-10155110

Nos

32
33

04.02.13
02.02.13

Hydraulic Oil 68 HLP Grade(Castrol)


Leaver Key

Ltrs
Nos

300
2

Leaver Spring

Nos

Oil seal

Nos

Page 9

February (2)
1.5 Pinion gear
34

02.02.13

35

03.02.13

Nos

Nos

Nos

15

Coil

Coil

Nos

20

Nos

20

Nos

20

Nos

20

Nos

Nos

Set

Kgs

500

Wire Nails 1" x 12 Swg

Kgs

200

Wire Nails 2" x 12 Swg

Kgs

100

Cube Moulds150x150x150mm

Nos

12

Slump cone with Rod

Nos

Enclo Gear Oil 220 Grade

Ltr

20

Gear Oil 680 Grade

Ltr

20

Nos

24

Nos

Reverse & Forward push button element

Nos

Back stopper
Fastners
On / Off Switch two way
Foot pedal
Plug & Saket 5 pin
Plug & Saket 2 pin
Cable
Auto switch
Oil 220
Servicing & Repairing
Painting

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos

1
1
1
1
1
1
1
1
10
1
1

Needle 60mm with Shaft 5mtr long


Avon
1000wt Halogen fittings complete set
with lamp (Crompton Greaves)
1.5 Sqmm 3Core pvc cable 1.1 kv
grade Super Lite Make
1.5 Sqmm 2Core pvc cable 1.1 kv
grade Super Lite Make
30Amps 3 pole Metal clad plug Top SG Make
30Amps 3 pole Metal clad socket - SG
Make
20Amps 2 pole Metal clad plug Top SG Make
20Amps 2 pole Metal clad socket - SG
Make
40Amps 4 pole 30 ma ELCB

36

37

38

39

04.02.13

05.02.13

05.02.13

05.02.13

40

01.02.13

41

05.02.13

Metal Mercury light with bulb 400 W Complete set with accessories (White
bulb) - (Make: Samsung)
400W MH fitting (Make: Samsung) Complete set
Wire Nails 3" x 10 Swg

Rear Tyre with Tube flap Jet One 100020-16PR


Emergency push button with element

Page 10

February (2)
42

05.02.13

43

05.02.13

44

04.02.13

45

05.02.13

46

31.01.13

Bearing SKF 6208


Inset PB Bush
Body PB Bush
Clutch PB Bush
Cover PB Bush
A 62 Belts
Cuttingh Blades
Fly Wheel Inset
Springs
5.0 Madul Pinion gear
Clutch key
Oil seal
Cable
Fastners
Oil 680 gear oil
Handle Repair
Connecting Rod Repairing
Servicing & Repairing
Painting
Cutting blade

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Ltr
Nos
Nos
Nos
Nos
Nos

2
1
1
1
1
2
2
1
1
1
1
1
1
1
3
1
1
1
1
2

Hand liver spring

Nos

Coupling nib spring

Nos

Coupling nib Plate

Nos

Coupling nib

Nos

Back

Nos

30mm pin

Nos

Ledge pin

Nos

Center pin

Nos

Bending pin

Nos

Hexgouel pin

Nos

Hand lever spring (Cutting Machine)

Nos

Armer cable 70 Sqmm 3.5 core cable

Rmt

70

Armer cable 25 Sqmm 3.5 core cable

Rmt

130

Rock and Pinion Hoist Model SCT-100

Nos

Nos

150

Nos

300

Fullbody Harness "D" Class Double


leyland Push Type Hook 1.8Mtr with
Polyester Sling with TC (Alkoplus)
Helmet Yellow (Male) IS 2925 Guard
Make
Page 11

February (2)
Saftey shoes (Sizes 6-50,7-150,8-50)
Make Alkoplus with Six Month Warranty

Pair

250

Nos

20

Roll

15

Nos

Nos

Nos

150

Nos

20

Kgs

65

Nos

Nos

O ring 29.2 X 3 MAT NBR - 10000469

Nos

Flanged shaft - 10004173

Nos

O Ring 48 X 5 - 10000705

Nos

Sealing cone - 10004928

Nos

Bushing 45 X 45 - 10003717

Nos

MS Flat Patti 50 x 12 mm - 10 Nos


Nitobond SBR (Fosroc)

Kgs
Ltr

285
15

Nitobond EP (Fosroc)

Ltr

Bucket Tooth (40/303603)

Nos

Plough Bolt (40/303404)

Nos

18

Nut (1345/0701)

Nos

18

Safety Net 20mm( 10/5) Space make


Shree arc
Barricating Tape With Logo (Each 300
mtrs)
Fire Extinguisher Co2 (2 kg, Grade "B"
powder)
Fire Extinguisher DCP (2 kg, Grade "B"
powder)
Nose Mask

47

48
49

50

04.02.13

5/2/2013
05.02.13

06.02.13

Helmet White (Male) IS 2925 Guard


Make
16 MM PP Rope ( Each 7.8Kgs/Mtrs)
Maruti
Groove O ring sealing 45/65 X 27.4 10003413
Sealing gland set 45/65 X 27.5 1007414

51

2/2/2013

Exide Battery 12 V-180 Amps

Nos

52

2/2/2013

Formalce Ring (7024206110310)

Nos

24

Grooved Ring Sealing Set


(9942025901205)

Nos

Hyd Sealing Set (9942325938218)

Nos

Page 12

February (2)

53

6/2/2013

54

31/01/13

55

5/2/2013

56

6/2/2013

57

5/2/2013

58

6/2/2013

59

7/2/2013

60

2/2/2013

61

7/2/2013

Bearing Bushing (7024206080314)

Nos

Sealing Cone (9944524338516)


Bushing (7024401030109)
Ram DN 180 (8251030200006)

Nos
Nos
Nos

6
6
3

Rear Tyre with Tube flap 16.9 / 28


(Make : MRF)

Nos

Main Bearing
Connecting Rod bearing
Thrust Washers
Piston
Piston Rings
Cylinder liners
Full Gasket kit
Valves inlet & Exhaust
Valve guide
Valve seats
Air filter
Engine oil filter
Fuel filter
O Rings kit
Benzo Washer
Lub oil pump

Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Main oil seal & gear wheel end oil seal

Set

Fan belt & Hose pipe kit


Spacer (BU0172928)
Stud Cylinder Mounting Head
(BU2770026)
Aluminum Staves (5Mtr)
Leveling Instrument Leica Joggr 24
Aluminum Stand

Set
Nos

1
2

Nos

Nos
Nos
Nos

1
2
1

Nos

Nos

200

Nos

24

Nos

Nos

ltrs

200

ltrs
Nos

160
40

Hand Grinding Machine(Bosch GWS 6100)

Thermocol 200x200x1Mtr Long


(Density-12)
Thermocol 250x250x1Mtr Long
(Density-12)

Drilling Machine (upto 1 inch


capacity,double gear)with motor.KST
make
Rear Tyre with Tube Flap 14/25 (Make
:JK Tyre)

Red Oxide - Berger 20Ltr (Zinc


Cromite)
Turpentine
AG7 Grinding Wheel (Bosch)
Page 13

February (2)

Cotton Hand Gloves


Paint Brush 4"
Dark Blue Enamel Paint Berger

Barrel

15
6
40
1

Kgs

50

Sets

Nos

40

Fullbody Harness "D" Class Double


leyland Push Type Hook 1.8Mtr with
Polyester Sling with TC (Alkoplus)

Nos

50

Safety White helmet (Karam brand)

Nos

Air Filter Set (PP612499/612500)

Nos

Oil Filter (PP 1R0739)


Fuel Filter (PP 1R0753)
Fuel Filter (PP 1R0751)
Cutting Edge (PP 5D9553)
Bolt and Nut (PP 3F5108)

Nos
Nos
Nos
Nos
Nos

1
1
1
1
30

7/2/2013

Mahindra Bolero ZLX AC 7 seater 2WD


BS-4

Nos

6/2/2013

Exide Battery 12 V-150 Amps

Nos

7/2/2013

Emergency push button with


eliment

Nos

Green push button with eliment

Nos

Centre pin

Nos

30 dia pin

Nos

Contactor A9 30 01 ABB

Nos

Relay 6 to 8.5 ABB

Nos

Transformer

Nos

Limit Switch

Nos

M12*35 Alen CSK

Nos

Fly wheel insert

Nos

6208 Bearing SKF

Nos

62

7/2/2013

63

5/2/2013

64

6/2/2013

66
67
68

pair
Nos
ltrs

Superthern 550 (castrol )

16 MM PP Rope ( Each 7.8Kgs/Mtrs)


Maruti
Vertical fall arrestor with poly amide
rope - 200M Karam
Safety Net 20mm( 10/5) Space make
Shree arc

Page 14

February (2)

Pinion gear 5 module

Nos

Handle springs

Nos

Clutch springs

Nos

Ball springs

Nos

Belts A62 Poly F

Nos

Cutting blades

Nos

M16*20 Alen CSK

Nos

69

7/2/2013

Conplast SP430 AA 230 Kgs Barrel

Kgs

3000

70

7/2/2013

Core Cutting Bit 150mm Dia


Core Cutting Bit 100mm Dia

Nos
Nos

1
1

Steel thermometeres, range 0-360C

Nos

71

8/2/2013

HY-Motor B465 BRH (C23813000)

Nos

72

8/2/2013

Hitachi Hard Disk 500 GB

Nos

73

9/2/2013

Engine Oil Filter (9624531001)

Nos

74

10/2/2013

Power Trowel Nice Blade Indigenous

Set

Power Floater Disc Indigenous

Nos

Nos

Nos

Nos

Nos

Nos

Shim (Slide Frame)

Nos

Washer (851) (Alt. No. 11193879)

Nos

Screw TCE M5 x50

Nos

Cap screw ,Hex ,M8x1.25x14

Nos

Screw M10*16 (Altpno 613-10016)

Nos

75

11/2/2013

76

11/2/2013

77

11/2/2013

78

11/2/2013
11/2/2013

79

11/2/2013

Front Tyre With Tube Flap Jet R Plus 1000-20-16PR


Tyre with Tube JEP Radial 215 / 75 R15
MRF
Tyre with Tube JEP Radial 185 / 85 R16
MRF

Cyberoam CR100ia Appliance without


8x5 Support
Total valve subription with 8*5
support for 1 year

Page 15

February (2)

Nut M24*1.5 (Attached with


83961705)

Nos

Guard (851)

Nos

Cap front wheel hub (851)

Nos

Cup M88010

Nos

Cone - M88048

Nos

Nut 7/16" 20 HEX

Nos

Fan

Nos

Bush (851)

Nos

Bush (851) Replaced by 83910548

Nos

Spring washer 7/16" (492-11044)

Nos

Shaft

Nos

Bolt new partno-E3NN1N118AB

Nos

Bolt 5/8"-18*2-3/8"

Nos

Thrust bearing - T158 904A1

Nos

Cone LM104949

Nos

Bushing front wheel spindle pin

Nos

Gasket

Nos

Pin / Shaft

Nos

Cup LM104911A

Nos

Gasket

Nos

Pin

Nos

Lower Pin - Swing post pivot

Nos

spacer

Nos

Nut

Nos

Oil level indicator

Nos

Page 16

February (2)

80

81

11/2/2013

9/2/2013

Cross joint

Nos

RH Rabbet

Nos

Switch assy (Replaced by


85828252)

Nos

Reverser

Nos

Nut-Repl by 81833776

Nos

Clamp - Klipco 130A (ReplBU3690011)

Nos

Bush - swing tower-770

Nos

Bush - swing tower-770

Nos

Ring 65.5 X 2.5

Nos

Grill cover front - new holland

Nos

Tube 16MM

Nos

Throttle cable - Genesis

Nos

Accelator pedal assy

Nos

Bolt M16*2*75

Nos

26

Bolt M16*2.0*65MM

Nos

Nylock nut M16 X 2 PRCL 8

Nos

30

Side cutting tooth LH

Nos

Side cutting tooth RH

Nos

Tooth pint (Casting)

Nos

11

Cutting Edge LDR BKT


(0.9/1.0/1.2M3)

Nos

Washer (Ref. Tab. BU0330023)

Nos

30

Seal kit B/H swing cyl. Wipro

Nos

Nos

Nos

Sq.m

596.23

Rear Tyre with Tube flap 16.9 / 28


(Make : MRF)
Front Tyre With Tube Flap 9.00 / 16
(Make :MRF)
Film Coated with Water Proof Plywood
12 mm (8' x 4') (SEMI-densified - 200
Nos ) 34 Kgs
Page 17

February (2)
82

10/2/2013

83

1/2/2013

Conbextra GP2 (Fosroc) 25Kgs (15Bag)

Bags

80

End Tips (A+B+C) for 60mm

Nos

Oil Seal for 60mm Needle

Nos

60 MM Needle Bearing (2204)

Nos

84

12/2/2013

Aluminium Staves (5 Mtr)

Nos

85

7/2/2013

Hydraulic Oil 68 (Castrol)

Ltr

210

86

12/2/2013

Bearing Grease AP3 Castrol

Kgs

30

87

3/1/2013

Kgs

2100

Kgs

2600

Roll

10

Nos

Nos

Nos

Nos

15

Nos

40

Nos

25

Nos

30

Nos

10

Nos

Nos

Bearing spindle front axle (51108)

Nos

Hub front wheel

Nos

Kit front wheel bolts and nuts set

Nos

Seal front axle hub

Nos

Bearing assembly front wheel inner

Nos

Bearing assembly front wheel outer

Nos

Tube assembly fuel injection cylinder N

Nos

89

90

12/2/2013

12/2/2013

G.I.Sheet 10' Long - 200 Nos (26


Swg) Ispat
G.I.Sheet 12' Long - 200 Nos (26
Swg) Ispat 13Kgs

1.5 Sqmm 2core flexible cable


(Finecab)
1.5 Sqmm 4 Core flexible cable
(Finecab)
MCCB 63Amps 4 pole with Box
ELCB 63 Amps 4 Pole 30MA with
Enclosure (IA)
Metal Socket 20 Amps 2 Pole Make
Electra
Metal Socket 20 Amps 3 Pole Make
Electra
03Pin 20 Amps Plug (Top & Bottom)
(Electro)
02Pin 20 Amps Plug (Top & Bottom)
(Electro)
30Amps 3Pin Metal Plug
Spindle assembly front axle RH
(SQUARE)
Spindle assembly front axle LH
(SQUARE)

Page 18

February (2)
Tube assembly fuel injection cylinder N

Nos

Tube assembly fuel injection cylinder N

Nos

Kit Engine inlet and exhaust valves


(AV)

Nos

Valve Guide

Nos

Pump assembly engine lube oil

Nos

Kit engine man and connecting rod bear

Nos

Seal assembly crankshaft rear oil seal

Nos

Seal crankshaft front oil

Nos

Kit piston ring set (FT60/70 AVL)

Nos

Kit gasket for engine overhauling with

Nos

Kit hose pipes

Nos

Filter assembly lube oil (Farmtrac)

Nos

Arm steering spindle front axle


(Square)

Nos

Filter assembly hydraulic lift oil

Nos

Kit fuel filter inserts primary and


secoundary

Nos

Switch assembly heater and starter

Nos

Horn and bracket assembly

Nos

Cleaner assembly engine air

Nos

Wire assembly fuse box

Nos

Kit seal spiindle (FT/PT-445/455)

Nos

Shaft valve rocker

Nos

Kit rocker arm with screw

Nos

Pump assembly water half

Nos

Connection water outlet

Nos

Switch assembly horn blowing

Nos

Wheel assembly front without primer

Nos

Page 19

February (2)
91

11/2/2013

92

11/2/2013

93

5/2/2013

94

13/02/13

G.I.Pipe 150mm dia Medium B Class


(100 Pipes) as per IS: 1239 (Make
Jindal)
Lightrning Arrestor -Porsilean Type
Hydraulic Oil 46 - Castrol Hyspin AWS
46 SC (2 Barrel)

Rmt

600

Nos

Ltr

420

Charging hopper

Nos

Butterfly valve for water

Nos

Butterfly valve Actuator

Nos

Microswitch

Nos

Avcon(3/2)valve for water

Nos

Proximity sensors

Nos

Pneumatic hose(8mm)

Nos

10

Pneumatic hose(10mm)

Nos

20

Pneumatic hose(12mm)

Nos

Elbow (8,10,12)

Nos

Reducer(10-8)

Nos

Connector(10-10)

Nos

10

Elastic intermediate piece(Screw to


weigher)-219 dia

Nos

Elastic intermediate piece(Screw to


weigher)-168 dia

Nos

Elastic intermediate piece(weigher to


mixer)

Nos

Page 20

February (2)
Hosepiece(Screw to weigher)-219
dia(centre large open)

Nos

Hosepiece(Screw to weigher)-168 dia

Nos

Hosepiece( weigherto mixer)

Nos

Hose clamp 178

Nos

Hose Clamp 265

Nos

Hose clamp 400

Nos

Silencer for 5/2 solenoid block

Nos

Sand vibrator motor

Nos

Hooter set

Nos

Aggregate gate pedestral bearing

Nos

Hanger bearing-168 dia screw

Nos

Mixer discharge gate with Bold&nut

Nos

discharge gate hydraulic cylinder seal


kit set

Nos

FORK JOINT ASSEMBLY M12

Nos

FORK JOINT ASSEMBLY M16

Nos

12

THREADED ROD M16x1.5x400

Nos

Threaded rod set withNut&vaucer for


aggregate weigher

Page 21

February (2)
THREADED ROD M12x1.25x360lg

Nos

THREADED ROD M16x1.5x160 lg

Nos

Skip rope tension spring

Nos

Mixer side wear plate

Nos

Bottom tiles for discharge gate with


bolt&nut

Nos

Arms

Nos

Showel

Nos

Stripper

Nos

Wear packing

Nos

12

Rotor cover

Nos

Rotor sealing ledge clamp set

Nos

Loadcell 1 tonne capacity

Nos

THREADED ROD M12x1.25x360lg

Nos

Nut M12

Nos

Nos

Load cell assembly for Aggregate

Load cell assembly for Cem/wat

Loadcell 450 kg

Page 22

February (2)
THREADED ROD M12x1.25x360lg

Nos

Nut M12

Nos

Junction box

Nos

JB connectors (agg,cem/wat,JB1,JB2)

Nos

25

Fork M16

Nos

12

Fork M12

Nos

Threaded rod M12x1.25x360lg

Nos

Threaded rod M16x380

Nos

Threaded rod M16x280

Nos

Threaded rod M16x200

Nos

Sq.m

596.23

Mtr

105

Nos

Oil Seal(0177849)

Nos

Spring

Nos

Side Tiles J" Type

Nos

Side Tiles K" Type

Nos

Side Tiles L" Type

Nos

Exide Battery 12V - 80 Amps

Nos

Fork rod assembly for Cem/wat

95

13/02/13

96

13/02/13

97

6/2/2013

98

99

11/2/2013

8/2/2013

Film Coated Plywood 12 mm (8' x 4')


(SEMI-densified - 200 Nos ) 24 Kgs
Sharp Is 4990 Film Thick 150 GSM
12mm 6/36 Steel Core
Wirerope(Ushamartin)
Hydraulic Cylinder dia 50x295 mm
(80207116)

Page 23

February (2)
100

10/2/2013

101

13/02/13

102

13/02/13

Exide Battery 12V - 100 Amps

Nos

PA Flange 10" - 10042541

Nos

Hub bowex - 10071013

Nos

Pressure spring - 10002363

Nos

Steel ball 6.35MM - 10006001

Nos

Filter element - 10002989

Nos

Lube filter (PP31Z5180443)

Nos

Fuel Filter(PP41Z7181537)

Nos

Exide Battery 12 V-150 Amps

Nos

103

13/02/13

104

11/2/2013

Water pump 21482300

Nos

105
106

11/2/2013
11/2/2013

Centrifugal Water pump (80100299)


Sikament NNSP South 250 Kgs
Sika Viscorete 10 R3,230 Kgs
each(Barrel(09 Barrel)

Nos
Kgs

1
8000

Kgs

2070

Rotter for 40mm Needle make Avon

Nos

Connection Tubes(5705003)
Connection Tubes(3605003)
Rotter Gun 60mm with End Nut
Rotter Gun 40mm with End Nut

Nos
Nos
Nos
Nos

3
3
2
2

Oxygen Regulator

Nos

DA Regulator

Nos

LPG Regulator

Nos

Hose Pipe Red&Black each 30Mtr

Mtr

60

Welding Cable Aluminium

Mtr

50

Cutting Torch

Nos

Welding Holder

Nos

Welding Helmet

Nos

Wlding Cable 400 amps

mtrs

25

Nos

100

Nos

25

107

108

109

14/02/13

14/02/13

14/02/13

Helmet Yellow (Male) IS 2925


Guard Make
Helmet Yellow (Female) IS 2925
Guard Make
Page 24

February (2)

Helmet Green (Male) IS 2925 Guard


Make
Helmet White (Male) IS 2925 Guard
Make
Helmet Red (Male) IS 2925 Guard
Make
Fire Extinguisher Co2 (2 kg, Grade
"B" powder)
Fire Extinguisher DCP (2 kg, Grade
"B" powder)
Nose Mask
Gum Boots (6,7,8&9)
Barricating Tape With Logo (Each
300 mtrs)
110

111

112

11/2/2013

13/02/13

14/02/13

Nos

Nos

30

Nos

Nos

Nos

Nos
Pair

150
10

Roll

10

Nos

Nos

Nos

Nos

Garish Pump Assembly With MS Pipe

Set

Mixer Gear Box Sparket

Nos

Mixer Chain

Nos

Limit Switch LL1

Nos

Skip Bucket Limit Switch Box

Nos

Scrapper Boom Swing Motor Brick


Assembly

Set

Mixer Gear Box Oil Sell

Set

Mixer Gear Box Coupling

Nos

Skip Bucket Rubber Pad

Nos

Rear Tyre with Tube flap Jet One 100020-16PR


Front Tyre with Tube flap Jet One 100020-16PR
Rear Tyre with Tube flap Jet One 100020-16PR
Front Tyre with Tube flap Jet One 100020-16PR

Page 25

February (2)
PU Pipe 8x5

Mtr

100

FRL Unit

Nos

PU Fitting

Set

Siliencer For Solenoid Valve

Nos

10

Cement Butter Fly Valve Assembly

Nos

Water Discharge Bottom Rubber

Nos

Load Cell Square Seating Base With


Bolt

Nos

15

Additive Glass

Nos

Additive Safety Valve

Nos

Additive Discharge Valve

Nos

Additive Feed Valve

Nos

Solenoid Valve Single Coil

Nos

Water Load Cell 300kg With Nut Bolt

Nos

Additive Load Cell 100kg.

Nos

Load Cell Junction Box For Aggregate

Nos

Break Liner For Drum

Set

C4 Amps MCB Single Pole

Nos

Page 26

February (2)
C6 Amps MCB Single Pole

Nos

Glass Relay

Nos

Relay Card Glass Relay

Nos

Snubber Circuit

Nos

Green Colour Push Button

Nos

Red Colour Indicator 240V

Nos

(1) 1/4"BSP 25 65 GIMC PG

Nos

(2) SV ASSY 1/4"BSP 9 KG TS03/07

Nos

(3) ELEMENT AIR FILTER BP03/05

Nos

(4) PSW ASSY PS15 1C WITH UL

Nos

Nos

Mtr

25

Mtr

50

Mtr

300

Mtr

100

Nos

Compressor Details :

ELGI Make, Model - TS03120HN

Fab No- 55940, Max W/P-12KG / CM2

113

114

14/02/13

14/02/13

Auto / Manual Switch With NO / NC


Point (Make: Fine cabe)
6Square mm 3 Core Flexible Cable
(Make: Fine cabe)
4Square mm 3 Core Flexible Cable
(Make: Fine cabe)
1.5Square mm 4 Core Flexible Cable
(Make: Fine cabe)
1.5Square mm 2 Core Flexible Cable
(Make: Fine cabe)
Tyre with Tube Flap 13 / 24(Make:
MRF) Muscle rock
Page 27

February (2)
115

11/2/2013

116

14.02.13

119

15/02/13

End Hose 5" x 4 Meter (Parker)

Nos

Case

3" Suction hose heavy duty

Mtr

3" Foot vale

Nos

3" clamp

Nos

3" Foot valve nipple

Nos

3" Canvas hose heavy duty

Mtr

150

E6013 Welding electrodes sun Arc


3.15X350mm

120
121

13/02/13

122

12/2/2013

123

12/2/2013

124

12/2/2013

125

13/02/13

126

15/02/13

127

15.02.13

128

13/02/13

129

130

15/02/13

16/02/13

Conbextra GP2 (Fosroc) 25Kgs (15Bag) Bags


Red Oxide - Berger 20 Ltr (Zinc Cromite
)
Thinner
G.I.Corrugated sheet 0.8 mm Thick x
10 feet Long 860 mm width(Approx
Weight 16.5 Kgs) per Sheet 50 Nos
Red Oxide - Berger 20 Ltr (Zinc Cromite
)
Turpentine
AG7 Grinding Wheel (Bosch)
Cotton Hand Gloves
Paint Brush 4"
Dark Blue Enamel Paint Berger
Exide Battery 12 V-100 amps
Manual Discharge Gate(Butterfly
Valve)300 dia V22FS 300

80

Ltr

250

Ltr

150

Kgs

825

Ltr

200

Ltr
Nos
Pair
Nos
Ltr
Nos

160
40
15
6
40
1

Nos

No

No

Fuel Filter Primary (001200240911)

No

Fuel Filter Secondary


(001200240912)

No

75KVA RC Gasket - P21108530124

No

125KVA RC Gasket - P21108530124

No

160KVA RC Gasket - 623208530144

No

Binding Wire 20 Swg

Kgs

1000

Greaves Lub Oil 20Ltr Pack


(123200198458) - 20W40
Lub Oil Filter (605411880009)

Page 28

February (2)
131

132
133
134
135
136
137
138

16/02/13

Engine oil 20w/40w (Servo)


AP-3 Bearing Grease (Gastrol)
Gear oil 90 Grade Castrol
Shuttering Oil

Ltrs
Kgs
Ltrs
Ltr

25
20
15
200

16/02/13

Wire Nails 3" x 10 Swg


Wire Nails 1" x 12 Swg
Wire Nails 2" x 12 Swg
Binding Wire 20 Swg
Wire Nails 2" x 10 Swg

Kgs
Kgs
Kgs
Kgs
Kgs

50
50
25
1000
25

16/02/13

Cement silo Air hose (Wire type 5m)

Nos

Flange 4"
Nipple 4"
Clamp 6" (Nut bolt type)
Packing rubber (1m X 1m)

Nos
Nos
Nos
Nos

4
4
10
2

Nos

Sft

6400

Roll

Roll

12

4 Sqmm 4 core flexible cable (Finecab)

Roll

Halogen Set 1000W Make CGL


Film Coated Water Proof Plywood 12
mm(8' x 4') 30 Kgs - 350 Nos Hansa

Nos

24

Sft

11200

Seal Kit for motor (10130089)


Shaft for motor BRFL 470
(80004371)
Drive link (80004303)
12mm 6/36 Steel core Wirerope
(Ushamartin) 3Mtr - 2Nos
12mm 6/36 Steel core Wirerope
(Ushamartin) 4Mtr - 2Nos
D Cycle (2MT)
Spin On filter for Lubrication Oil
(06.423.01.00)

Nos

Nos

Nos

Mtr

Mtr

Nos

Nos

Fuel Fliter Element pre(48.117.04.00)

Nos

Nos

Ltrs
Ltrs
Kgs
Ltrs

50
50
10
10

139

22/01/13

140

16/02/13

141

16/02/13

142

15/02/13

143

16/02/13

144

145

146

16/02/13

14/02/13

8/2/2013

Needle 60mm with Shaft 5mtr long


Avon
Film Coated Plywood 12mm (8' x 4 ')200 Nos 24 Kgs sharp IS 4990
2.5 Sqmm 2core flexible cable
(Finecab)
1.5 Sqmm 2core flexible cable
(Finecab)

Air Cleaner Filter Element


(F6.504.08.0.00)
Engine oil valvoline 15 w 40
Hydralic Oil 68 Grade ( Castrol)
Grease MP3
TQ oil
Page 29

February (2)
147

6/2/2013

148

18/02/13

149

15/02/13

SERVO System 46
SERVO GEAR HP 90
Enclo Gear Oil 220 Grade
Gear Oil 680 Grade
Transformer Oil for Tower Crane
Gear Oil 390 Grade for Bar Cutting
Machine

Barrel
Barrel
Ltr
Ltr
Ltr

1
1
10
5
5

Ltr

10

150

18/02/13

Safety White helmet (Karam brand)

Nos

10

151

13/02/13

Aggregate CPU Card

Nos

Aggregate Signal Codition Card

Nos

BCU Power Card

Nos

BCU Relay Card

Nos

Scraper Break Patti

Nos

Scraper Gearbox Chain (Double


Row)

Nos

152

18/02/13

Discharge gate T500

Nos

153

18/02/13

Carbut tank 1 kg carbot capacity

Nos

Welding torch Milan make

Nos

Gas welding tube red:15 mtrs,blue:15


mtrs

Mtrs

30

cutting pliyer

Nos

Files set

Nos

Pipe wrench 12

Mos

M.s plate 1 x2x2

Nos

Hammer make taparia 100gms

Nos

Hammer make taparia 200 gms

Nos

Hammer make taparia 500 gms

Nos

Hammer make taparia 800gms

Nos

Puti pathi

Nos

Clissel

Nos

Chizel taparia

Nos

Page 30

February (2)
Chizel medium

Nos

Shanan big

Nos

Center punch

Nos

Center punch big

Nos

Gas lighter toruch stainless make

Nos

Hand glowes leather

Pairs

White googles safety

Nos

Welding glass black

Nos

Welding glass white

Nos

Oxygen guage

Nos

G.I wire 14 guage

Kgs

10

Brass rod

Nos

25

M.s plate 12 guage 4x8

Nos

M.s plate 18 guage 4x8

Nos

M .s angle 2x5mm full length

Nos

Gravity meter

Nos

Hand kerosene stove

Nos

Solder 125 watts

Nos

Solder wire 1mm

Roll

Solder paste

Nos

Hydraulic jack 40 tonn capacity

Nos

35 to 50 mm rammer

Nos

Rammer handle

Nos

BSF Tap set

Set

516 BSF Tap set

Set

3/8 BSF Tap set

SET

Page 31

February (2)

154

18/02/13

155

16/02/13

156

18/02/13

BSF Tap set

SET

12MMX1.75 Tap set

SET

10 MMX1.5 Tap set

SET

6MMX1.5 Tap set

SET

8 MM X1.25 Tap set

SET

Drill bit 10.5 mm

Nos

Drill bit 3.5 to 12.5 distance

Set

Nos

Bags

10

Nos

Nos

Nos

Nos

Ltrs

210

Red Oxide - Berger 20Ltr (Zinc


Cromite)

ltrs

200

Turpentine

ltrs

160

AG7 Grinding Wheel (Bosch)

Nos

40

Cotton Hand Gloves

pair

15

Paint Brush 4"

Nos

Dark Blue Enamel Paint Berger

ltrs

40

Female Clevis for Pneumatic Cylinder


for CP 30 Batching Plant
Renderoc S2 (25 Kgs / Bag ) Fosroc
LC1D1156-2305 Contractor Schneider
LC1D09 Contractor Schneider
LC1D32 Contractor Schneider

157

16/02/13

158

18/02/13

159

160
161

162

LC1D12M7 Contractor Schneider


Engine Oil 15 W /40 (CRB
TURBO)Castrol

Tapper Roller Bearing (900603)


Nos
Pillow Block Rod End M12
Nos
(213710530104)
Semi Waterproof Plywood 9mm (8 ' x 4
16/02/2013
Sft
')-175 Nos 17 Kgs Sharp IS 303
16/02/13

19/02/13

19/02/13

2
3
5600

Engine Oil 20 W / 40 w (Servo)

Ltrs

210

AP-3 Bearing Grease (Gastrol)

Kgs

200

Aluminium Straves (5 Mtr)


Levelling Instrument Leica Joggr 24

Nos
Nos

2
1

Page 32

February (2)
163

19/02/13

164

19/02/13

165

19/02/13

166

16/02/13

Aluminium Stand
Needle 60mm with Shaft 5mtr long
Avon
Needle 40mm with Shaft 5 mtr long
Avon
Petrol Vibrator motor 1.5 HP Killicks
3Phase
Electrical Vibrator motor 3HP Avon
3Phase
Cube Moulds150x150x150mm
Filter Element HC 9600 FKN 13 H
(10073397)

Mercury vapor lamp 220V 400W


(fitting with lamp) - Samson
Mercury vapor lamp 220V 250W
(fitting with lamp) - Samson
2.00 Sqmm 3 core copper flexible
cable - Orbit
70 Sqmm 3.5 core Al Armd cable Orbit
40A MCB 4 pole - Legrend
25A MCB 4 pole - Legrend
20A 2 pin metal cold socket with top
- Elemeck
20A 3 pin metal cold socket with top
- Elemeck

Nos

Nos

Nos

Nos

Nos

Nos

18

Nos

Nos

12

Nos

12

Roll

Rmt

200

Nos
Nos

3
3

Nos

12

Nos

12

167

19/02/13

Wheel Brown 16 SWG Double Wheel

168

18/02/13

Dell Optical Mouse


VGA Cable (LCD Monitor)

Nos
Nos

2
1

169

20/02/13

O Ring 92 x 4 - 10001046

Nos

PTFE Back up ring - 10004250

Nos

Film Coated Plywood 12mm (8' x 4 ')350 Nos 24 Kgs sharp IS 4990

Sft

11200

Nos

100

Nos

10

Pair

230

Kgs

2100

Kgs

140

Kgs

2600

170

20/02/13

171

20/02/13

172

18/02/13

Helmet Yellow (Male) IS 2925


Guard Make
Helmet White (Male) IS 2925 Guard
Make
Saftey shoes (Sizes 6-40,7-120,860,9-10) Make Alkoplus with Six
Month Warranty
G.I.Sheet 10' Long - 200 Nos (26
Swg) Ispat 10.5Kgs
G.I.Plain Sheet 3feet Width (90Mtr x
2Roll)
G.I.Sheet 12' Long - 200 Nos (26
Swg) Ispat 13Kgs
Page 33

Nos

February (2)
173

174

20.02.13

15/02/13

175

9/2/2013

176

19/02/13

G.I.Sheet 10' Long - 100 Nos (26


Swg) Ispat 10.5Kgs
G.I.Plain Sheet 3feet Width (90Mtr x
2Roll)

Kgs

1050

Kgs

140

Kgs

16

Kgs

Roll

20

Iron Pan G.I.

Nos

50

Spade with handle

Nos

25

Shovel

Nos

20

Panza

Nos

20

Pica xi with handle

Nos

10

Crober

Nos

Sledge Hammer (1Kgs)

Nos

Sledge Hammer (3Kgs)

Nos

Chisel 10"

Nos

Steel tape 30 mtr

Nos

Steel tape 15 mtr

Nos

Steel tape 5 mtr

Nos

10

Steel tape 3 mtr

Nos

Pressure jack with rod

Nos

Diesel measuring cane - 5 Ltr

Nos

Diesel measuring cane - 10 Ltr

Nos

Mtr

Mtr

Nos

Nos

Ltrs

210

16 MM PP Rope ( Each 7.8Kgs/Mtrs)


Maruti
6mm Nylon Rope
Barricating Tape With Logo (Each 300
mtrs)

178

15/02/13

179

18/02/13

12mm 6/36 Steel core seeling rope


(Ushamartin)3 Mtr -2Nos
12mm 6/36 Steel core seeling rope
(Ushamartin)4 Mtr -2Nos
Recon Engine Model 6BTA 5.9 G
suitable for JS200
Exide Battery 12V-88Amps

180

17/02/13

Hydraulic Oil 68 Castrol

177

16/02/13

Page 34

February (2)
181

18/02/13

182
183

18/02/13
21/02/13

184

21/02/13

Front Tyre with Tube flap Jet One 100020-16PR


Exide Battery 12V-100Amps
20V Circuit Breaker (Siemens)
Carbon bush
Exide Battery 12V-100Amps

185

21/02/13

Bar Bending machine spares

Nos

Nos
Roll
Roll
Nos

1
2
1
1

A9-30-01 ABB Contractor 24 volts

Nos

Emergency push button with


eliment

Nos

Green push button with eliment

Nos

Limit Switch

Nos

Foot switch eliment

Nos

Connectors

Nos

30 dia Centre pin

Nos

22212 Bearing URB

Nos

30206 bearing SKF

Nos

30204 bearing SKF

Nos

6009 bearing FAG

Nos

6002 bearing SKF

Nos

Oil seal 42-55-8/60-80-10

Nos

Fastners

Nos

Page 35

February (2)

Cabels

Nos

Oil 220

Ltrs

1.5 Modul Pinion gear repair

Nos

Bearing SKF 6213 6211

Nos

Cutting blades

Nos

Springs

Set

Oil seal

Nos

Nib

Nos

Nib Plate

Nos

Harm (Nib stopper)

Nos

Blade Guard

Nos

Starter L4T

Nos

Fastners

Nos

Oil 680 Gear oil (4Ltrs)

Nos

Servicing & Repairing


Painting
Bar cutting machine spares

Page 36

February (2)

Servicing & Repairing


Painting
186

19/02/13

187

16/02/13

Hydraulic Oil 68 Grade(Castrol)

Ltrs

280

No

No

Seal set for rod - 024294009

No

Wiper / Scrapper ring - 062814001

No

Support / Scrapper ring 238585009

No.

Leap seal ring - 240421009

No

O ring - 043520000

No.

Bushing - 222484006

No

O ring - 043909003

No

Rubber disc - 242574006

No

No

No

Set of seals 445763

No

Wear sleeve - 228383004

No

O Ring - 042762005

No

Red Oxide - Berger 20Ltr (Zinc


Cromite)

ltrs

400

Turpentine

ltrs

320

AG7 Grinding Wheel (Bosch)

Nos

50

Cotton Hand Gloves

pair

30

Paint Brush 4"

Nos

Dark Blue Enamel Paint Berger

ltrs

100

Forward control valve (24v) 240888008


Throttle valve / Flow control 245745007

Agitator paddle LHS -Mixing pedal 441540


Agitator paddle RHS -Mixing pedal 441541

188

21/02/13

Page 37

February (2)

Nos

40

No

Grouting Pipe 12mm Dia

Rmt

Cup wheel brush (AG-7 Heavy Duty )


189

21/02/13

140PSI Grouting Pump

190

21/02/13

Rendroc Plug(5 Kgs/Bag) Fosroc


Rendroc S2(25 Kgs/bags) Fosroc

Bags
Bags

5
2

191

21/02/13

Dell USB Optical Mouse

Nos

192

21/02/13

250 Metal halide fitting - CG

Nos

10

ELCB 63 amps with box - Legrand

Nos

Igniter - Bajaj

Nos

15

1000 W Halogen Lamp - Samson

Nos

100

6 Sqmm copper Flexible - Spike

Nos

RCCB 636 Amps with box - Legrand

Nos

32 amps Metal socket - Elmek


20 amps metal socket - Elmek
Capacitor - Capco
PVC tapes - Miracle

Nos
Nos
Nos
Nos

30
30
15
100

Nos

Barrel
Ltr
Ltr
Nos

2
65
25
4

Rubber Mat 4.0 x 4.0 Mtr

Kgs

114

First Aid Kit

Nos

125A SF unit with enclosure & with


Fuses

Nos

125A MCCB with enclosure & with Fuses

Nos

193

22/02/13

194
195

22/02/13
16/02/13

196

22/02/13

197

12/2/2013

198

23/02/13

199
200

25/02/13
23/02/13

201

25/02/13

Wood Planner Machine wit Cutter 3


Phase without Motor Sarla Make
Superthern 550 (Castrol)
Gear Oil 320 Grade
Gear Oil 220 Grade
Digital Thermometers,range 0-300 C

Superthern 550 (Castrol)

Barrel

"O" Ring (80236535)


"O" Ring (80271233)
Gasket (81875252)
Gasket (81875253)
Gasket (81834073)
Ring Snap (81803542)
Bearing (82958961)
Bearing (81845711)
Bearing (81824478)

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos

4
2
2
2
1
1
1
1
1

Conplast SP430AA 230 Kgs Barrel

Kgs

10000

Page 38

February (2)
202
203
204

23/02/13
23/02/13
23/02/13

Binding Wire 20 Swg


Hydraulic Oil 68 Grade (Castrol)
Wire Nails 3" x 10 Swg
Wire Nails 1" x 12 Swg

Kgs
Ltrs
Kgs
Kgs

4000
20
100
100

205

22/02/13

Chain Wheel ( 60014430 )

Nos

206

20/02/13

12mm 6/36 Steel core Wirerope


(Ushamartin)

Mtr

35

No

207

25/02/13

Product Description (cannon IR


2520 MFD)Black & White Network
Print, B/W Digital Copy and Colour
Scan & B/W Scanning,Multiple copies
1-999, Magnification 25% - 400%
Speed:
20
ppm,1x250
sheet
Cassettes, Auto Duplex,100 Sheet
Stack by pass Tray, Trolley and
Stabilizer.

208

25/02/13

Conplast SP430 KR(M) 6 (250 Kgs)

Kgs

10000

209

25/02/13

210

28/02/13

Kgs
Kgs
Kgs
Kgs
Kgs

500
200
2000
4000
2000

211

17/02/13

Wire Nails 3" x 10 Swg


Wire Nails 1" x 12 Swg
Binding Wire 20 Swg
Binding Wire 20 Swg
Wire Nails 3" x 10 Swg
Tyre with TubeJEP Radial 185/70 R14
MRF

Nos

212

26/02/13

Nos

Nos

Nos

Nos

Nos

Sft

448

CFT

67

Agitator shaft (10167220)

PC

Hydraulic motor (10039180

PC

PC

PC

Sealing set 180 (10029138)

PC

Hexagon bolt 12X30 (10001517)

PC

213

214

26/02/13

10/1/2013

Rod sealing 56 X 71 X 11.4 10113950


Rod sealing 56 X 71 X 8.5 10197313
Rod seal - 10209466
Guide band 15 X 2.5 X 180 10197314
Scraper 56 X 66 X 7

Semi Waterproof Plywood 9mm (8' x 4')


- 14Nos 17Kgs Sharp IS303
Wood Runner (2"x4")8' Pinewood
150Nos

Agitator support drive side


(10061072)
Agitator support gland assy
(10061073)

Page 39

February (2)
215

22/02/13

216

22/02/13

217

26/02/13

218

25/02/13

219

26/02/13

220

26/02/13

221

26/02/13

222

26/02/13

223

25/02/13

224

22/02/13

Bucket Tooth (40/303603)


Plough Bolt (40/303404)
Nut (1345/0701)
Primary element
Safety element
LOP Filter
Service Kit Fuse 5A - 716/05703
7.5A - 716/05704
Fuse 10A - 716/05705
Fuse 15A - 716/05706
Relay (430Z) - 696/01480
Relay 696/01479
Flasher indicator - 696/01477

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos

9
18
18
1
1
2
1
10
10
10
10
8
2
2

Needle 60mm with Shaft 5mtr long


Avon

Nos

Rmt

300

Rmt

120

Nos

120 Sqmm 3.5core all armd cable Orbit


25 Sqmm 3.5core all armd cable Orbit
250Amps 4Pole DN3 400D MCCB
with Speader links - L & T

1.5 Sq.m 4 Core PVC Cable 1.1 KV


Grade "super lite make"
Tube -CWM103090H24

Coil

Nos

Bush - CWM02909387

Nos

Red Oxide - Berger 20Ltr (Zinc


Cromite)

ltrs

400

Turpentine

ltrs

320

AG7 Grinding Wheel (Bosch)

Nos

50

Cotton Hand Gloves

pair

30

Paint Brush 4"

Nos

Dark Blue Enamel Paint Berger

ltrs

100

Cup wheel brush (AG-7 Heavy Duty )

Nos

40

Binding Wire 20 Swg

Kgs

2000

Rmt

30

Rmt

250

Nos
Nos

1
1

G.I.Pipe 50mm Dia B Class (Make


Jindal)
G.I.Pipe 100mm Dia B Class (Make
Jindal)
Dell USB Key Board
Intel CPU Fan
Page 40

February (2)
225

28/02/13

20mm Steel core Wirerope 6/36


(Ushamartin)

Mtr

30

226

28/02/13

Hydraulic filter - PP H50120AA

Nos

Pilot Filter - PP H50140AA

Nos

Orbit air Sander 6"

Kgs

Kgs

60

Nos

228

28/02/13

229

27/02/13

230

28/02/13

G.I.Plain Sheet 8 x 4 Feet Width 18


SWG 2 Sheets 30 Kgs Approx
Platform Weigh Balance 100 Kg
Capacity

Page 41

February (2)

sites for the month of FEB 2013


Total value
of PO (In
Rs)

PO .
Qty

Rate

2605 / 01.02.2013

4750.00

2605 / 01.02.2013

4950.00

2605 / 01.02.2013

4500.00

2605 / 01.02.2013

5200.00

2605 / 01.02.2013

4700.00

2605 / 01.02.2013

4250.00

2605 / 01.02.2013

3850.00

M/s. Industrial Power Control

2606 / 01.02.2013

1480.00

M/s. Industrial Power Control

2606 / 01.02.2013

4800.00

M/s. Beekay Bearing Associates

2607 / 01.02.2013

350.00

M/s. Beekay Bearing Associates

2607 / 01.02.2013

180.00

M/s. Industrial Sales Corporation 2608 / 01.02.2013

200

94.50

M/s. Industrial Sales Corporation 2608 / 01.02.2013

160

53.00

M/s. Industrial Sales Corporation 2608 / 01.02.2013

40

85.00

M/s. Industrial Sales Corporation 2608 / 01.02.2013

15

14.50

M/s. Industrial Sales Corporation 2608 / 01.02.2013

66.00

M/s. Industrial Sales Corporation 2608 / 01.02.2013

40

148.00

47647.5

2610 / 01.02.2013
2610 / 01.02.2013

4
4

83.41
297.63

1688

2612 / 01.02.2013

8000

50.00

458000

2613 / 01.02.2013

6600.00

5500

2614 / 01.02.2013

10800.00

31065

2615 / 01.02.2013
2615 / 01.02.2013
2615 / 01.02.2013

1
1
1

487.00
135.00
165.00

901

Supplier Name
M/s. Kamala Screens
Metalperforators
M/s. Kamala Screens
Metalperforators
M/s. Kamala Screens
Metalperforators
M/s. Kamala Screens
Metalperforators
M/s. Kamala Screens
Metalperforators
M/s. Kamala Screens
Metalperforators
M/s. Kamala Screens
Metalperforators

&
&
&
&
&
&
&

M/s. Asian Earthmovers


M/s. Asian Earthmovers
M/s. Paam Commercial Private
Limited
M/s. Sri Krishna Battery Sales &
Service
M/s. Basci Engineering
Equipments P Ltd
M/s. Pace Engineering Services
M/s. Pace Engineering Services
M/s. Pace Engineering Services

P.O.No & Date

Page 42

32120

20958

2247

February (2)
M/s.
Ltd
M/s.
Ltd
M/s.
Ltd
M/s.
M/s.

Trans Diesel Engineers Pvt

2616 / 01.02.2013

588.00

2616 / 01.02.2013

166.00

2616 / 01.02.2013

148.00

TRR Automotive
TRR Automotive

2617 / 01.02.2013
2617 / 01.02.2013

16
16

62.88
42.79

M/s. TRR Automotive

2617 / 01.02.2013

3531.87

M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.

2617
2619
2619
2619
2620
2620
2620
2620
2620
2620
2620
2620
2620
2621
2621
2621
2621
2621
2621
2621

8
3000
350
100
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

506.55
58.5
58.5
59.5
2611.35
89.08
222.71
3821.83
137.12
185.15
735.37
51.53
144.10
14935
17575
15965
3863
6438
2524
13576

Trans Diesel Engineers Pvt


Trans Diesel Engineers Pvt

TRR Automotive
JPR Marketing
JPR Marketing
JPR Marketing
Veetech diesels
Veetech diesels
Veetech diesels
Veetech diesels
Veetech diesels
Veetech diesels
Veetech diesels
Veetech diesels
Veetech diesels
Pace Engineering
Pace Engineering
Pace Engineering
Pace Engineering
Pace Engineering
Pace Engineering
Pace Engineering

Services
Services
Services
Services
Services
Services
Services

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

01.02.2013
02.02.2013
02.02.2013
02.02.2013
02.02.2013
02.02.2013
02.02.2013
02.02.2013
02.02.2013
02.02.2013
02.02.2013
02.02.2013
02.02.2013
02.02.2013
02.02.2013
02.02.2013
02.02.2013
02.02.2013
02.02.2013
02.02.2013

M/s. shree balaji motors stores

2622 / 02.02.2013

40

11

M/s. shree balaji motors stores

2622 / 02.02.2013

50

M/s. shree balaji motors stores

2622 / 02.02.2013

40

M/s. shree balaji motors stores

2622 / 02.02.2013

15

18

M/s. shree balaji motors stores

2622 / 02.02.2013

1787

M/s. shree balaji motors stores

2622 / 02.02.2013

1787

M/s. shree balaji motors stores

2622 / 02.02.2013

85

Page 43

2738.84

10620

212021

9158

78994

February (2)
M/s. shree balaji motors stores

2622 / 02.02.2013

60

M/s. shree balaji motors stores

2622 / 02.02.2013

65

M/s. shree balaji motors stores

2622 / 02.02.2013

520

M/s. shree balaji motors stores

2622 / 02.02.2013

50

M/s. shree balaji motors stores

2622 / 02.02.2013

109

M/s. shree balaji motors stores

2622 / 02.02.2013

15

18

M/s. shree balaji motors stores

2622 / 02.02.2013

18

M/s. shree balaji motors stores

2622 / 02.02.2013

40

M/s. shree balaji motors stores

2622 / 02.02.2013

1692

M/s. shree balaji motors stores

2622 / 02.02.2013

1534

M/s. shree balaji motors stores

2622 / 02.02.2013

75

M/s. shree balaji motors stores

2622 / 02.02.2013

110

M/s. shree balaji motors stores

2622 / 02.02.2013

12

93.33

M/s. shree balaji motors stores

2622 / 02.02.2013

2235

M/s. shree balaji motors stores

2622 / 02.02.2013

195

M/s. shree balaji motors stores

2622 / 02.02.2013

185

M/s. shree balaji motors stores

2622 / 02.02.2013

170

Page 44

February (2)
M/s. shree balaji motors stores

2622 / 02.02.2013

30

36

M/s. shree balaji motors stores

2622 / 02.02.2013

20

17

M/s. shree balaji motors stores

2622 / 02.02.2013

20

16

M/s. shree balaji motors stores

2622 / 02.02.2013

20

15

M/s. shree balaji motors stores

2622 / 02.02.2013

25

19

M/s. shree balaji motors stores

2622 / 02.02.2013

437

M/s. shree balaji motors stores

2622 / 02.02.2013

245

M/s. shree balaji motors stores

2622 / 02.02.2013

350

M/s. shree balaji motors stores

2622 / 02.02.2013

945

M/s. shree balaji motors stores

2622 / 02.02.2013

10

M/s. shree balaji motors stores

2622 / 02.02.2013

10

M/s. shree balaji motors stores

2622 / 02.02.2013

89

M/s. shree balaji motors stores

2622 / 02.02.2013

210

M/s. shree balaji motors stores

2622 / 02.02.2013

135

M/s. shree balaji motors stores

2622 / 02.02.2013

280

M/s. shree balaji motors stores

2622 / 02.02.2013

290

M/s. shree balaji motors stores

2622 / 02.02.2013

120

Page 45

February (2)
M/s. shree balaji motors stores

2622 / 02.02.2013

85

M/s. shree balaji motors stores

2622 / 02.02.2013

420

M/s. infra automotive serivces

2623 / 02.02.2013

178.00

M/s. infra automotive serivces

2623 / 02.02.2013

46.00

M/s. infra automotive serivces

2623 / 02.02.2013

5,749.00

M/s. infra automotive serivces

2623 / 02.02.2013

22.00

M/s. infra automotive serivces

2623 / 02.02.2013

11,361.00

M/s. infra automotive serivces

2623 / 02.02.2013

35.00

M/s. infra automotive serivces

2623 / 02.02.2013

22.00

M/s. infra automotive serivces

2623 / 02.02.2013

22.00

M/s. infra automotive serivces

2623 / 02.02.2013

32.00

M/s. infra automotive serivces

2623 / 02.02.2013

51.00

M/s. infra automotive serivces

2623 / 02.02.2013

32.00

M/s. infra automotive serivces

2623 / 02.02.2013

2,756.00

M/s. infra automotive serivces

2623 / 02.02.2013

222.00

M/s. infra automotive serivces

2623 / 02.02.2013

25.00

M/s. infra automotive serivces

2623 / 02.02.2013

62.00

M/s. infra automotive serivces

2623 / 02.02.2013

952.00

M/s. infra automotive serivces

2623 / 02.02.2013

1,681.00

M/s. infra automotive serivces

2623 / 02.02.2013

105.00

M/s. infra automotive serivces

2623 / 02.02.2013

343.00

M/s. infra automotive serivces

2623 / 02.02.2013

83.00

M/s. infra automotive serivces

2623 / 02.02.2013

23.00

M/s. infra automotive serivces

2623 / 02.02.2013

11,474.00

M/s. infra automotive serivces

2623 / 02.02.2013

4,179.00

Page 46

44977

February (2)
M/s. infra automotive serivces

2623 / 02.02.2013

32.00

M/s. infra automotive serivces

2623 / 02.02.2013

23.00

M/s. infra automotive serivces

2623 / 02.02.2013

12,175.00

M/s. infra automotive serivces

2623 / 02.02.2013

10,113.00

M/s. infra automotive serivces

2623 / 02.02.2013

424.00

M/s. infra automotive serivces

2623 / 02.02.2013

43.00

M/s. infra automotive serivces

2623 / 02.02.2013

643.00

M/s. infra automotive serivces

2623 / 02.02.2013

742.00

M/s. infra automotive serivces

2623 / 02.02.2013

1,010.00

M/s. infra automotive serivces

2623 / 02.02.2013

1,458.00

M/s. infra automotive serivces

2623 / 02.02.2013

46.00

M/s. infra automotive serivces

2623 / 02.02.2013

505.00

M/s. infra automotive serivces

2623 / 02.02.2013

553.00

M/s. infra automotive serivces

2623 / 02.02.2013

721.00

M/s. infra automotive serivces

2623 / 02.02.2013

646.00

M/s. infra automotive serivces

2623 / 02.02.2013

72.00

M/s. infra automotive serivces

2623 / 02.02.2013

266.00

M/s. infra automotive serivces

2623 / 02.02.2013

87.00

M/s. infra automotive serivces

2623 / 02.02.2013

41.00

M/s. infra automotive serivces

2623 / 02.02.2013

2,496.00

M/s. infra automotive serivces

2623 / 02.02.2013

92.00

M/s. infra automotive serivces

2623 / 02.02.2013

247.00

M/s. infra automotive serivces

2623 / 02.02.2013

827.00

M/s. infra automotive serivces

2623 / 02.02.2013

346.00

M/s. infra automotive serivces

2623 / 02.02.2013

1,195.00

M/s. infra automotive serivces

2623 / 02.02.2013

505.00

Page 47

February (2)
M/s. infra automotive serivces

2623 / 02.02.2013

333.00

M/s. infra automotive serivces

2623 / 02.02.2013

194.00

M/s. infra automotive serivces

2623 / 02.02.2013

294.00

M/s. infra automotive serivces

2623 / 02.02.2013

296.00

M/s. infra automotive serivces

2623 / 02.02.2013

187.00

M/s. infra automotive serivces

2623 / 02.02.2013

296.00

M/s. infra automotive serivces

2623 / 02.02.2013

20,457.00

M/s. infra automotive serivces

2623 / 02.02.2013

263.00

M/s. infra automotive serivces

2623 / 02.02.2013

263.00

M/s. infra automotive serivces

2623 / 02.02.2013

423.00

M/s. infra automotive serivces

2623 / 02.02.2013

46.00

M/s. infra automotive serivces

2623 / 02.02.2013

58.00

M/s. infra automotive serivces

2623 / 02.02.2013

53.00

M/s. infra automotive serivces

2623 / 02.02.2013

53.00

M/s. infra automotive serivces

2623 / 02.02.2013

23.00

M/s. infra automotive serivces

2623 / 02.02.2013

238.00

M/s. infra automotive serivces

2623 / 02.02.2013

2,887.00

M/s. infra automotive serivces

2623 / 02.02.2013

84.00

M/s. infra automotive serivces

2623 / 02.02.2013

24.00

M/s. infra automotive serivces

2623 / 02.02.2013

11,895.00

M/s. infra automotive serivces

2623 / 02.02.2013

228.00

M/s. infra automotive serivces

2623 / 02.02.2013

237.00

M/s. infra automotive serivces

2623 / 02.02.2013

7,987.00

M/s. Bhagwati Steel Tubes


M/s. Bhagwati Steel Tubes
M/s. Bhagwati Steel Tubes

2624 / 02.02.2013
2624 / 02.02.2013
2624 / 02.02.2013

125
300
500

46
45
45

M/s. Bhagwati Steel Tubes

2624 / 02.02.2013

12

670

Page 48

125803

52280

February (2)
M/s. schwing stetter (I) Pvt Ltd

2625 / 02.02.2013

1391.00

M/s. schwing stetter (I) Pvt Ltd

2625 / 02.02.2013

1983.00

M/s. schwing stetter (I) Pvt Ltd

2625 / 02.02.2013

1723.00

M/s. schwing stetter (I) Pvt Ltd

2625 / 02.02.2013

93960.00

M/s. schwing stetter (I) Pvt Ltd

2625 / 02.02.2013

68

5.00

M/s. schwing stetter (I) Pvt Ltd

2625 / 02.02.2013

68

16.00

M/s. schwing stetter (I) Pvt Ltd

2625 / 02.02.2013

68

14.00

M/s. schwing stetter (I) Pvt Ltd

2625 / 02.02.2013

68

70.00

M/s. schwing stetter (I) Pvt Ltd

2625 / 02.02.2013

11968.00

M/s. schwing stetter (I) Pvt Ltd

2625 / 02.02.2013

20

5.00

M/s. schwing stetter (I) Pvt Ltd

2625 / 02.02.2013

20

16.00

M/s. schwing stetter (I) Pvt Ltd

2625 / 02.02.2013

20

70.00

M/s. schwing stetter (I) Pvt Ltd

2625 / 02.02.2013

16742.00

M/s. schwing stetter (I) Pvt Ltd

2625 / 02.02.2013

179.00

M/s. schwing stetter (I) Pvt Ltd

2625 / 02.02.2013

12

182.00

M/s. schwing stetter (I) Pvt Ltd

2625 / 02.02.2013

20

31.00

M/s. schwing stetter (I) Pvt Ltd

2625 / 02.02.2013

12

23.00

Page 49

February (2)
M/s. schwing stetter (I) Pvt Ltd

2625 / 02.02.2013

28

43.00

212198

M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.

2626
2626
2626
2626
2626
2626
2626

20
40
20
20
2
5
1

205.00
230.00
160.00
210.00
360.00
280.00
755.00

23575

Balaji
Balaji
Balaji
Balaji
Balaji
Balaji
Balaji

supppliers
supppliers
supppliers
supppliers
supppliers
supppliers
supppliers

/
/
/
/
/
/
/

02.02.2013
02.02.2013
02.02.2013
02.02.2013
02.02.2013
02.02.2013
02.02.2013

M/s. Sudhakar polymers limited

2631 / 02.02.2013

1818

432829

M/s. Sudhakar polymers limited

2631 / 02.02.2013

72

7811

464875.2

M/s. Balaji supppliers

2632 / 02.02.2013

400

160

64000

M/s. schwing stetter (I) Pvt Ltd

2633 / 02.02.2013

60507

M/s. schwing stetter (I) Pvt Ltd

2633 / 02.02.2013

6314

M/s. schwing stetter (I) Pvt Ltd

2633 / 02.02.2013

4278

M/s. JK Tyre & industries Ltd

2635 / 02.02.2013

63316

M/s. JK Tyre & industries Ltd

2635 / 02.02.2013

29424

101939

M/s. Sharp Ply (India) Pvt Ltd

2636 / 02.02.2013

297.68

538.2

183442.03

M/s. Trans construction eqpt


M/s. Trans construction eqpt
M/s. Trans construction eqpt

2636-A/ 02.02.2013
2636-A/ 02.02.2013
2636-A/ 02.02.2013

1
1
1

5352
8195
10536.00

26196

M/s. Tyre Bank

2637 / 04.02.2013

7950

15900

M/s. S.V. Enterprises

2638 / 04.02.2013

375

26.00

M/s. S.V. Enterprises

2638 / 04.02.2013

16500.00

M/s. S.V. Enterprises

2638 / 04.02.2013

10

380.00

46550

M/s. Schwing stetter (I) Pvt Ltd

2639 / 04.02.2013

M/s. Schwing stetter (I) Pvt Ltd

2640 / 04.02.2013

8926

8994

M/s. Balaji suppliers


M/s. Sri sai engineering works

2641 / 04.02.2013
2642 / 04.02.2013

300
2

205
1200.00

61500

M/s. Sri sai engineering works

2642 / 04.02.2013

50.00

M/s. Sri sai engineering works

2642 / 04.02.2013

50.00

Page 50

71639

February (2)
M/s. Sri sai engineering works

2642 / 04.02.2013

1600.00

4500

M/s. M S Traders

2643 / 04.02.2013

10879

11423

M/s. Anand Enterprises

2644 / 04.02.2013

15

1,049.00

M/s. Anand Enterprises

2644 / 04.02.2013

3,480.00

M/s. Anand Enterprises

2644 / 04.02.2013

2,250.00

M/s. Anand Enterprises

2644 / 04.02.2013

20

197.00

M/s. Anand Enterprises

2644 / 04.02.2013

20

206.00

M/s. Anand Enterprises

2644 / 04.02.2013

20

71.00

M/s. Anand Enterprises

2644 / 04.02.2013

20

82.00

M/s. Anand Enterprises

2644 / 04.02.2013

2,109.00

M/s. U K Enterprises

2646 / 04.02.2013

3,450.00

M/s. U K Enterprises

2646 / 04.02.2013

3,100.00

M/s. JPR Marketing

2648 / 05.02.2013

500

58.50

M/s. JPR Marketing

2648 / 05.02.2013

200

59.50

M/s. JPR Marketing

2648 / 05.02.2013

100

59.50

M/s. Apt Engineering Company

2649 / 05.02.2013

12

850.00

M/s. Apt Engineering Company

2649 / 05.02.2013

1450.00

M/s. Balaji Supplies

2651 / 05.02.2013

20

185.00

M/s. Balaji Supplies

2651 / 05.02.2013

20

185.00

7400

M/s. JK Tyre & industries Ltd

2652 / 05.02.2013

24

15829

417582

M/s. Sri sai engineering works

2653 / 05.02.2013

150.00

M/s. Sri sai engineering works

2653 / 05.02.2013

200.00

M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.

2653
2653
2653
2653
2653
2653
2653
2653
2653
2653
2653

1
1
1
1
1
1
1
1
10
1
1

4500.00
300.00
450.00
1600.00
500.00
400.00
300.00
150.00
220.00
2000.00
1000.00

Sri
Sri
Sri
Sri
Sri
Sri
Sri
Sri
Sri
Sri
Sri

sai
sai
sai
sai
sai
sai
sai
sai
sai
sai
sai

engineering
engineering
engineering
engineering
engineering
engineering
engineering
engineering
engineering
engineering
engineering

works
works
works
works
works
works
works
works
works
works
works

/
/
/
/
/
/
/
/
/
/
/

05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
Page 51

80780

33949

49455

13755

13750

February (2)
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.

Sri
Sri
Sri
Sri
Sri
Sri
Sri
Sri
Sri
Sri
Sri
Sri
Sri
Sri
Sri
Sri
Sri
Sri
Sri
Sri

sai
sai
sai
sai
sai
sai
sai
sai
sai
sai
sai
sai
sai
sai
sai
sai
sai
sai
sai
sai

engineering
engineering
engineering
engineering
engineering
engineering
engineering
engineering
engineering
engineering
engineering
engineering
engineering
engineering
engineering
engineering
engineering
engineering
engineering
engineering

works
works
works
works
works
works
works
works
works
works
works
works
works
works
works
works
works
works
works
works

2654
2654
2654
2654
2654
2654
2654
2654
2654
2654
2654
2654
2654
2654
2654
2654
2654
2654
2654
2655

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013

2
1
1
1
1
2
2
1
1
1
1
1
1
1
3
1
1
1
1
2

450.00
3000.00
2300.00
3000.00
1800.00
325.00
2000.00
3500.00
130.00
5000.00
1200.00
50.00
100.00
700.00
250.00
400.00
300.00
3000.00
500.00
2,000.00

M/s. Sri sai engineering works

2655 / 05.02.2013

50.00

M/s. Sri sai engineering works

2655 / 05.02.2013

25.00

M/s. Sri sai engineering works

2655 / 05.02.2013

400.00

M/s. Sri sai engineering works

2655 / 05.02.2013

700.00

M/s. Sri sai engineering works

2655 / 05.02.2013

4,500.00

M/s. Sri sai engineering works

2655 / 05.02.2013

700.00

M/s. Sri sai engineering works

2655 / 05.02.2013

1,200.00

M/s. Sri sai engineering works

2655 / 05.02.2013

1,200.00

M/s. Sri sai engineering works

2655 / 05.02.2013

1,200.00

M/s. Sri sai engineering works

2655 / 05.02.2013

800.00

M/s. Sri sai engineering works

2655 / 05.02.2013

50.00

M/s. U K Enterprises

2656 / 05.02.2013

70

216.00

M/s. U K Enterprises

2656 / 05.02.2013

130

101.00

29663

M/s. Spratan Engineering


Industries Pvt Ltd

2657 / 05.02.2013

2400000

2448000

M/s. Emrald Enterprises

2658 / 05.02.2013

150

960.00

M/s. Emrald Enterprises

2658 / 05.02.2013

300

55.00

Page 52

31280

15100

February (2)
M/s. Emrald Enterprises

2658 / 05.02.2013

250

235.00

M/s. Emrald Enterprises

2658 / 05.02.2013

20

3500.00

M/s. Emrald Enterprises

2658 / 05.02.2013

15

450.00

M/s. Emrald Enterprises

2658 / 05.02.2013

4000.00

M/s. Emrald Enterprises

2658 / 05.02.2013

1950.00

M/s. Emrald Enterprises

2658 / 05.02.2013

150

3.00

M/s. Emrald Enterprises

2658 / 05.02.2013

20

53.00

M/s. Emrald Enterprises

2658 / 05.02.2013

65

162.00

M/s. Schwing Stetter (I) Pvt Ltd

2659/05.02.13

301.00

M/s. Schwing Stetter (I) Pvt Ltd

2659/05.02.13

384.00

M/s. Schwing Stetter (I) Pvt Ltd

2659/05.02.13

11.00

M/s. Schwing Stetter (I) Pvt Ltd

2659/05.02.13

4,710.00

M/s. Schwing Stetter (I) Pvt Ltd

2659/05.02.13

84.00

M/s. Schwing Stetter (I) Pvt Ltd

2659/05.02.13

236.00

M/s. Schwing Stetter (I) Pvt Ltd

2659/05.02.13

619.00

9987.84

Bhagwati Steel Tubes


S.V. Enterprises

2661 / 05.02.2013
2669/06.02.13

285
15

50
380

14963

S.V. Enterprises

2669/06.02.13

1400

12700

M/s.Asian Earthmovers

2670 / 06.02.2013

580

M/s.Asian Earthmovers

2670 / 06.02.2013

18

72

M/s.Asian Earthmovers

2670 / 06.02.2013

18

52

1688

Sri Krishna Battery Sales

2671/06.02.13

10500

9900

Trans Construction Equipment

2672/06.02.13

24

53.00

Trans Construction Equipment

2672/06.02.13

211.00

Trans Construction Equipment

2672/06.02.13

341.00

Page 53

323940

February (2)
Trans Construction Equipment

2672/06.02.13

457.00

Trans Construction Equipment


Trans Construction Equipment
Trans Construction Equipment

2672/06.02.13
2672/06.02.13
2672/06.02.13

6
6
3

225.00
1224.00
2893.00

28280

M/s. Tyre Bank

2673/06.02.13

33000

66000

Venkat
Venkat
Venkat
Venkat
Venkat
Venkat
Venkat
Venkat
Venkat
Venkat
Venkat
Venkat
Venkat
Venkat
Venkat
Venkat

Agencies
Agencies
Agencies
Agencies
Agencies
Agencies
Agencies
Agencies
Agencies
Agencies
Agencies
Agencies
Agencies
Agencies
Agencies
Agencies

2675/06.02.13
2675/06.02.13
2675/06.02.13
2675/06.02.13
2675/06.02.13
2675/06.02.13
2675/06.02.13
2675/06.02.13
2675/06.02.13
2675/06.02.13
2675/06.02.13
2675/06.02.13
2675/06.02.13
2675/06.02.13
2675/06.02.13
2675/06.02.13

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1,250.00
750.00
200.00
10,500.00
8,080.00
2,800.00
4,800.00
2,200.00
480.00
800.00
2,200.00
400.00
240.00
400.00
100.00
3,500.00

Venkat Auto Agencies

2675/06.02.13

800.00

Venkat Auto Agencies


Pace Engineering Services

2675/06.02.13
2676/06.02.13

1
2

1,600.00
12.00

Pace Engineering Services

2676/06.02.13

72.00

192

Nikki Engineering
Nikki Engineering
Nikki Engineering

2677/06.02.13
2677/06.02.13
2677/06.02.13

1
2
1

1100.00
9200.00
1200.00

21735

Industrial Sales Corporation

2678/06.02.13

2600

5486

Vesura EPS

2680 / 07.02.2013

200

137.00

Vesura EPS

2680 / 07.02.2013

24

213.00

34138

Sidhpurwala Engineering
Company

2681 / 07.02.2013

18500

19425

JK Tyre & industries Ltd

2682 / 07.02.2013

34965

80069.85

Industrial Sales Corporation

2684 / 07.02.2013

200

99

Industrial Sales Corporation


Industrial Sales Corporation

2684 / 07.02.2013
2684 / 07.02.2013

160
40

56.5
85

Auto
Auto
Auto
Auto
Auto
Auto
Auto
Auto
Auto
Auto
Auto
Auto
Auto
Auto
Auto
Auto

Page 54

47060

February (2)
Industrial Sales Corporation
Industrial Sales Corporation
Industrial Sales Corporation
Alpha Lubricants

2684
2684
2684
2685

07.02.2013
07.02.2013
07.02.2013
07.02.2013

15
6
40
1

14.5
66
154
35105

Emerald Enterprises

2688 / 07.02.2013

50

162.00

Emerald Enterprises

2688 / 07.02.2013

27,552.00

Emerald Enterprises

2688 / 07.02.2013

40

3500.00

Emerald Enterprises

2688 / 07.02.2013

50

960.00

Emerald Enterprises

2688 / 07.02.2013

125.00

pioneer machinery

2689 / 07.02.2013

5627.00

pioneer
pioneer
pioneer
pioneer
pioneer

2689
2689
2689
2689
2689

1
1
1
1
30

850.00
1290.00
950.00
4250.00
125.00

19332

machinery
machinery
machinery
machinery
machinery

/
/
/
/

/
/
/
/
/

07.02.2013
07.02.2013
07.02.2013
07.02.2013
07.02.2013

39013.5
30436

224527

Karnataka Agencies

2691 / 07.02.2013

635357

654736

M/s. Sri Krishna Battery Sales &


Service

2692 / 08.02.2013

12000

9300

M/s. Sri sai engineering works

2693 / 08.02.2013

150.00

M/s. Sri sai engineering works

2693 / 08.02.2013

100.00

M/s. Sri sai engineering works

2693 / 08.02.2013

1,200.00

M/s. Sri sai engineering works

2693 / 08.02.2013

700.00

M/s. Sri sai engineering works

2693 / 08.02.2013

950.00

M/s. Sri sai engineering works

2693 / 08.02.2013

1,400.00

M/s. Sri sai engineering works

2693 / 08.02.2013

950.00

M/s. Sri sai engineering works

2693 / 08.02.2013

600.00

M/s. Sri sai engineering works

2693 / 08.02.2013

35.00

M/s. Sri sai engineering works

2693 / 08.02.2013

3,500.00

M/s. Sri sai engineering works

2693 / 08.02.2013

450.00

Page 55

February (2)
M/s. Sri sai engineering works

2693 / 08.02.2013

5,000.00

M/s. Sri sai engineering works

2693 / 08.02.2013

50.00

M/s. Sri sai engineering works

2693 / 08.02.2013

50.00

M/s. Sri sai engineering works

2693 / 08.02.2013

20.00

M/s. Sri sai engineering works

2693 / 08.02.2013

300.00

M/s. Sri sai engineering works

2693 / 08.02.2013

2,000.00

M/s. Sri sai engineering works

2693 / 08.02.2013

15.00

30950

3000

39.19

117570

M/s. Fosroc chemicals (I) Pvt Ltd 2694 / 08.02.2013


M/s. Apt Engineering Company
M/s. Apt Engineering Company

2695 / 08.02.2013
2695 / 08.02.2013

1
1

M/s. Apt Engineering Company

2695 / 08.02.2013

450.00

28665

2696 / 08.02.2013

28968

28616

2698 / 08.02.2013

3500

3500

M/s. Pioneer Machinery & Spares 2699 / 11.02.2013

9995

11559

2700 / 11.02.2013

5145

2700 / 11.02.2013

5750

12475

M/s.Jk Tyre & industries ltd,

2701 / 11.02.2013

14712

32343

M/s.Tyre bank

2702 / 11.02.2013

5050

35350

M/s.Tyre bank

2703 / 11.02.2013

5600

11200

M/s Data System

2706 / 11.02.2013

105,000.00

M/s Data System

2706 / 11.02.2013

35,000.00

2707 / 11.02.2013

45.00

2707 / 11.02.2013

12.00

2707 / 11.02.2013

13.00

2707 / 11.02.2013

4.00

2707 / 11.02.2013

12.00

M/s. Putzmeister concrete


machines pvt ltd
M/s. Visam computer services
M/s. Kem construction
Equipments
M/s. Kem construction
Equipments

M/s. Case New holand


construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt

ltd
ltd
ltd
ltd
ltd

Page 56

15000.00
10500.00

151542

February (2)
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt

ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd

2707 / 11.02.2013

75.00

2707 / 11.02.2013

155.00

2707 / 11.02.2013

55.00

2707 / 11.02.2013

325.00

2707 / 11.02.2013

675.00

2707 / 11.02.2013

8.00

2707 / 11.02.2013

1,950.00

2707 / 11.02.2013

235.00

2707 / 11.02.2013

357.00

2707 / 11.02.2013

3.00

2707 / 11.02.2013

125.00

2707 / 11.02.2013

145.00

2707 / 11.02.2013

55.00

2707 / 11.02.2013

1,200.00

2707 / 11.02.2013

875.00

2707 / 11.02.2013

325.00

2707 / 11.02.2013

85.00

2707 / 11.02.2013

575.00

2707 / 11.02.2013

675.00

2707 / 11.02.2013

155.00

2707 / 11.02.2013

1,225.00

2707 / 11.02.2013

1,325.00

2707 / 11.02.2013

385.00

2707 / 11.02.2013

16.00

2707 / 11.02.2013

105.00

Page 57

February (2)
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt
M/s. Case New holand
construction (india)pvt

2707 / 11.02.2013

1,550.00

2707 / 11.02.2013

146.00

2707 / 11.02.2013

9,250.00

2707 / 11.02.2013

7,450.00

2707 / 11.02.2013

204.00

2707 / 11.02.2013

24.00

2707 / 11.02.2013

275.00

2707 / 11.02.2013

330.00

2707 / 11.02.2013

36.00

2707 / 11.02.2013

1,550.00

2707 / 11.02.2013

925.00

2707 / 11.02.2013

1,175.00

2707 / 11.02.2013

1,775.00

2707 / 11.02.2013

26

42.00

2707 / 11.02.2013

32.00

2707 / 11.02.2013

30

15.00

2707 / 11.02.2013

1,425.00

2707 / 11.02.2013

1,425.00

2707 / 11.02.2013

11

475.00

2707 / 11.02.2013

16,545.00

2707 / 11.02.2013

30

14.00

2707 / 11.02.2013

5,750.00

M/s. Tyre Bank

2708 / 11.02.2013

33000

M/s. Tyre Bank

2708 / 11.02.2013

11400

44400

M/s.Sharp ply (india) Pvt Ltd

2709 / 12.02.2013

596.23

538.2

367420.18

ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd
ltd

Page 58

91086

February (2)
Shuban Enterprises

2714 / 12.02.2013

80

630

M/s.M.S. Traders

2715 / 12.02.2013

205.00

M/s.M.S. Traders

2715 / 12.02.2013

71.00

M/s.M.S. Traders

2715 / 12.02.2013

650.00

5834

M/s.Nikki Engineering

2716 / 12.02.2013

1100

1155

M/s .Alpha Lubricants

2717 / 12.02.2013

210

164.96

30035

M/s. Balagi Suppliers

2718 / 12.02.2013

30

210

6300

M.B Trading Corporation

2719 / 12.02.2013

2100

58.00

2719 / 12.02.2013

2600

58.00

M/s Industrial power Control

2724 / 12.02.2013

10

2,310.00

M/s Industrial power Control

2724 / 12.02.2013

4,550.00

M/s Industrial power Control

2724 / 12.02.2013

1,235.00

M/s Industrial power Control

2724 / 12.02.2013

1,890.00

M/s Industrial power Control

2724 / 12.02.2013

15

95.00

M/s Industrial power Control

2724 / 12.02.2013

40

130.00

M/s Industrial power Control

2724 / 12.02.2013

25

182.00

M/s Industrial power Control

2724 / 12.02.2013

30

168.00

M/s Industrial power Control


M/s Venkateshware Auto tractor
Agencies
M/s Venkateshware Auto tractor
Agencies
M/s Venkateshware Auto tractor
Agencies
M/s Venkateshware Auto tractor
Agencies
M/s Venkateshware Auto tractor
Agencies
M/s Venkateshware Auto tractor
Agencies
M/s Venkateshware Auto tractor
Agencies
M/s Venkateshware Auto tractor
Agencies
M/s Venkateshware Auto tractor
Agencies

2724 / 12.02.2013

10

186.00

2725 / 12.02.2013

2,750.00

2725 / 12.02.2013

2,750.00

2725 / 12.02.2013

315.00

2725 / 12.02.2013

928.00

2725 / 12.02.2013

186.00

2725 / 12.02.2013

51.00

2725 / 12.02.2013

284.00

2725 / 12.02.2013

290.00

2725 / 12.02.2013

152.00

Page 59

50400

286230

67135

February (2)
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies
M/s Venkateshware
Agencies

Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor
Auto tractor

2725 / 12.02.2013

169.00

2725 / 12.02.2013

159.00

2725 / 12.02.2013

2,699.00

2725 / 12.02.2013

105.00

2725 / 12.02.2013

2,500.00

2725 / 12.02.2013

3,500.00

2725 / 12.02.2013

1,750.00

2725 / 12.02.2013

1,528.00

2725 / 12.02.2013

2,450.00

2725 / 12.02.2013

2,432.00

2725 / 12.02.2013

336.00

2725 / 12.02.2013

146.00

2725 / 12.02.2013

750.00

2725 / 12.02.2013

354.00

2725 / 12.02.2013

171.00

2725 / 12.02.2013

264.00

2725 / 12.02.2013

255.00

2725 / 12.02.2013

1,607.00

2725 / 12.02.2013

901.00

2725 / 12.02.2013

250.00

2725 / 12.02.2013

763.00

2725 / 12.02.2013

250.00

2725 / 12.02.2013

1,679.00

2725 / 12.02.2013

141.00

2725 / 12.02.2013

70.00

2725 / 12.02.2013

4,162.00

Page 60

43224

February (2)
M/s. Bharat tube corporation

2726 / 12.02.2013

600

1060

654444

M/s. Anand Enterprises

2727 / 12.02.2013

6500

14587

M/s.Alpha Lubricants

2728 / 12.02.2013

420

144

61949

M/s. Universal engineers

2729 / 13.02.2013

85000.00

M/s. Universal engineers

2729 / 13.02.2013

12500.00

M/s. Universal engineers

2729 / 13.02.2013

14500.00

M/s. Universal engineers

2729 / 13.02.2013

5500.00

M/s. Universal engineers

2729 / 13.02.2013

19500.00

M/s. Universal engineers

2729 / 13.02.2013

4500.00

M/s. Universal engineers

2729 / 13.02.2013

10

65.00

M/s. Universal engineers

2729 / 13.02.2013

20

75.00

M/s. Universal engineers

2729 / 13.02.2013

85.00

M/s. Universal engineers

2729 / 13.02.2013

75.00

M/s. Universal engineers

2729 / 13.02.2013

85.00

M/s. Universal engineers

2729 / 13.02.2013

10

95.00

M/s. Universal engineers

2729 / 13.02.2013

2500.00

M/s. Universal engineers

2729 / 13.02.2013

2500.00

M/s. Universal engineers

2729 / 13.02.2013

1500.00

Page 61

February (2)
M/s. Universal engineers

2729 / 13.02.2013

6500.00

M/s. Universal engineers

2729 / 13.02.2013

5500.00

M/s. Universal engineers

2729 / 13.02.2013

2500.00

M/s. Universal engineers

2729 / 13.02.2013

450.00

M/s. Universal engineers

2729 / 13.02.2013

500.00

M/s. Universal engineers

2729 / 13.02.2013

750.00

M/s. Universal engineers

2729 / 13.02.2013

175.00

M/s. Universal engineers

2729 / 13.02.2013

12500.00

M/s. Universal engineers

2729 / 13.02.2013

16500.00

M/s. Universal engineers

2729 / 13.02.2013

1450.00

M/s. Universal engineers

2729 / 13.02.2013

5500.00

M/s. Universal engineers

2729 / 13.02.2013

45000.00

M/s. Universal engineers

2729 / 13.02.2013

3000.00

M/s. Universal engineers

2729 / 13.02.2013

M/s. Universal engineers

2729 / 13.02.2013

500.00

M/s. Universal engineers

2729 / 13.02.2013

12

750.00

M/s. Universal engineers

2729 / 13.02.2013

400.00

Page 62

February (2)
M/s. Universal engineers

2729 / 13.02.2013

360.00

M/s. Universal engineers

2729 / 13.02.2013

160.00

M/s. Universal engineers

2729 / 13.02.2013

950.00

M/s. Universal engineers

2729 / 13.02.2013

68000.00

M/s. Universal engineers

2729 / 13.02.2013

68500.00

M/s. Universal engineers

2729 / 13.02.2013

9500.00

M/s. Universal engineers

2729 / 13.02.2013

1250.00

M/s. Universal engineers

2729 / 13.02.2013

1250.00

M/s. Universal engineers

2729 / 13.02.2013

12

950.00

M/s. Universal engineers

2729 / 13.02.2013

8500.00

M/s. Universal engineers

2729 / 13.02.2013

6500.00

M/s. Universal engineers

2729 / 13.02.2013

M/s. Universal engineers

2729 / 13.02.2013

14500.00

M/s. Universal engineers

2729 / 13.02.2013

360.00

M/s. Universal engineers

2729 / 13.02.2013

20.00

M/s. Universal engineers

2729 / 13.02.2013

M/s. Universal engineers

2729 / 13.02.2013

12500.00

Page 63

February (2)
M/s. Universal engineers

2729 / 13.02.2013

360.00

M/s. Universal engineers

2729 / 13.02.2013

20.00

M/s. Universal engineers

2729 / 13.02.2013

4000.00

M/s. Universal engineers

2729 / 13.02.2013

25

300.00

M/s. Universal engineers

2729 / 13.02.2013

M/s. Universal engineers

2729 / 13.02.2013

12

750.00

M/s. Universal engineers

2729 / 13.02.2013

500.00

M/s. Universal engineers

2729 / 13.02.2013

360.00

M/s. Universal engineers

2729 / 13.02.2013

380.00

M/s. Universal engineers

2729 / 13.02.2013

280.00

M/s. Universal engineers

2729 / 13.02.2013

200.00

539649

M/s.Sharp ply (india)Pvt ltd

2730 / 13.02.2013

596.23

509.86

348072.93

M/s. Chains&Spares Coropration

2731 / 13.02.2013

105

106

11687

M/s.Schwing Stetter (I) Pvt Ltd

2732 / 13.02.2013

10415

M/s.Schwing Stetter (I) Pvt Ltd

2732 / 13.02.2013

1929

M/s.Gaytri Engineering Works

2733 / 13.02.2013

800.00

M/s.Gaytri Engineering Works

2733 / 13.02.2013

1800.00

M/s.Gaytri Engineering Works

2733 / 13.02.2013

2500.00

M/s.Gaytri Engineering Works

2733 / 13.02.2013

1200.00

7993

M/s. Sri Krishna Battery Sales &


Service

2734 / 13.02.2013

6500

5200

Page 64

12438

February (2)
M/s. Sri Krishna Battery Sales &
Service

2735 / 13.02.2013

8250

M/s.Schwing Stetter (I) Pvt Ltd

2738 / 13.02.2013

9,183.00

M/s.Schwing Stetter (I) Pvt Ltd

2738 / 13.02.2013

13,376.00

M/s.Schwing Stetter (I) Pvt Ltd

2738 / 13.02.2013

11.00

M/s.Schwing Stetter (I) Pvt Ltd

2738 / 13.02.2013

11.00

M/s.Schwing Stetter (I) Pvt Ltd

2738 / 13.02.2013

502.00

M/s.Pioneer Machinery &Spares

2740 / 13.02.2013

1931

M/s.Pioneer Machinery &Spares

2740 / 13.02.2013

1550

4026

M/s.Sri Krishna Battery Sales


m/s.Trans Cunstruction
Equiment
M/s.Schwing Stetter (i)pvt Ltd
M/s.Sika india Pvt Ltd

2741 / 13.02.2013

12000

18600

2742 / 13.02.2013

12418

13508

2743 / 13.02.2013
2746 / 14.02.2013

1
8000

7389
30

7614

M/s.Sika india Pvt Ltd

2746 / 14.02.2013

2070

96

564423

M.S. Traders,

2748 / 14.02.2013

1320.00

M.S. Traders,
M.S. Traders,
M.S. Traders,
M.S. Traders,
M/s. Sidhpurwala
Company
M/s. Sidhpurwala
Company
M/s. Sidhpurwala
Company
M/s. Sidhpurwala
Company
M/s. Sidhpurwala
Company
M/s. Sidhpurwala
Company
M/s. Sidhpurwala
Company
M/s. Sidhpurwala
Company
M/s. Sidhpurwala
Company

2748
2748
2748
2748

14.02.2013
14.02.2013
14.02.2013
14.02.2013

3
3
2
2

847.00
710.00
2125.00
1895.00

2749 / 14.02.2013

3200.00

2749 / 14.02.2013

3200.00

2749 / 14.02.2013

2350.00

2749 / 14.02.2013

60

50.00

2749 / 14.02.2013

50

135.00

2749 / 14.02.2013

4450.00

2749 / 14.02.2013

150.00

2749 / 14.02.2013

120.00

2749 / 14.02.2013

25

450.00

M/s.Emerald Enterprises

2750 / 14.02.2013

100

55.00

M/s.Emerald Enterprises

2750 / 14.02.2013

25

55.00

Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering

/
/
/
/

Page 65

6500

24501

16119

41150

February (2)
M/s.Emerald Enterprises

2750 / 14.02.2013

55.00

M/s.Emerald Enterprises

2750 / 14.02.2013

30

55.00

M/s.Emerald Enterprises

2750 / 14.02.2013

55.00

M/s.Emerald Enterprises

2750 / 14.02.2013

4000.00

M/s.Emerald Enterprises

2750 / 14.02.2013

1950.00

M/s.Emerald Enterprises
M/s.Emerald Enterprises

2750 / 14.02.2013
2750 / 14.02.2013

150
10

3.00
103.00

M/s.Emerald Enterprises

2750 / 14.02.2013

10

450.00

m/s. JK Tyre & Industries

2751 / 14.02.2013

15829

m/s. JK Tyre & Industries

2751 / 14.02.2013

14712

M/s.JK Tyre & Industries

2752 / 14.02.2013

15829

M/s.JK Tyre & Industries

2752 / 14.02.2013

14712

M/s.Gayatri Engineering Works

2753 / 14.02.2013

34,500.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

6,800.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

8,200.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

2,000.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

14,500.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

4,800.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

2,500.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

6,500.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

1,800.00

Page 66

20675

136141

67142

February (2)
M/s.Gayatri Engineering Works

2753 / 14.02.2013

100

58.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

8,500.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

3,500.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

10

120.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

22,500.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

800.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

15

2,200.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

3,600.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

400.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

8,500.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

8,500.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

3,800.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

8,500.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

8,500.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

4,500.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

4,800.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

800.00

Page 67

February (2)
M/s.Gayatri Engineering Works

2753 / 14.02.2013

950.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

850.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

2,150.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

125.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

450.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

150.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

M/s.Gayatri Engineering Works

2753 / 14.02.2013

M/s.Gayatri Engineering Works

2753 / 14.02.2013

M/s.Gayatri Engineering Works

2753 / 14.02.2013

800.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

750.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

350.00

M/s.Gayatri Engineering Works

2753 / 14.02.2013

3,500.00

M/s.Industrial power control

2754 / 14.02.2013

398.00

M/s.Industrial power control

2754 / 14.02.2013

25

128.00

M/s.Industrial power control

2754 / 14.02.2013

50

79.00

M/s.Industrial power control

2754 / 14.02.2013

300

49.00

M/s.Industrial power control

2754 / 14.02.2013

100

28.00

27250

M/s.Tyre bank

2755 / 14.02.2013

28000

56000

Page 68

236536

February (2)
M/s.I.R.international

2756 / 14.02.2013

35000

M/s.Schwing Stetter (i)Pvt.ltd

2757 / 14.02.2013

Pradeep Engineering Store

2765 / 15.02.2013

2,480.00

Pradeep Engineering Store

2765 / 15.02.2013

250.00

Pradeep Engineering Store

2765 / 15.02.2013

240.00

Pradeep Engineering Store

2765 / 15.02.2013

65.00

Pradeep Engineering Store

2765 / 15.02.2013

90.00

Pradeep Engineering Store

2765 / 15.02.2013

150

150.00

M.B. trading corporation

2766 / 15.02.2013

Shuban interpises

2767 / 15.02.2013

80

630

Industrial sales Corporation

2768 / 15.02.2013

250

99

Industrial sales Corporation

2768 / 15.02.2013

150

56.5

37803

Industrial sales Corporation

2769 / 15.02.2013

825

56.5

48943.5

Industrial sales Corporation

2770 / 15.02.2013

200

99

Industrial sales Corporation


Industrial sales Corporation
Industrial sales Corporation
Industrial sales Corporation
Industrial sales Corporation
sri krishna Baittery & sles

2770
2770
2770
2770
2770
2771

160
40
15
6
40
1

56.5
85
14.5
66
154
8250

49347.5
6500

M/s. Conveytech system

2772 / 15.02.2013

21500

21930

M/s. Balaji suppliers

2773 / 15.02.2013

Trans diesel Engineeers

2776 / 15.02.2013

4,104.00

Trans diesel Engineeers

2776 / 15.02.2013

460.00

Trans diesel Engineeers

2776 / 15.02.2013

166.00

Trans diesel Engineeers

2776 / 15.02.2013

148.00

Trans diesel Engineeers

2777 / 15.02.2013

72.00

Trans diesel Engineeers

2777 / 15.02.2013

72.00

Trans diesel Engineeers

2777 / 15.02.2013

46.00

JPR Marketing

2781 / 16.02.2013

1000

/
/
/
/
/
/

15.02.2013
15.02.2013
15.02.2013
15.02.2013
15.02.2013
15.02.2013

Page 69

58.5

34178

50400

5781

976
61425

February (2)
Balaji suppliers
Balaji suppliers
Balaji suppliers
Balaji suppliers
Emerald enterprises
JPR Marketing
JPR Marketing
JPR Marketing
JPR Marketing
JPR Marketing

2782
2782
2782
2782
2783
2784
2784
2784
2784
2784

Conveytech system

2785 / 16.02.2013

Conveytech
Conveytech
Conveytech
Conveytech

2785
2785
2785
2785

system
system
system
system

/
/
/
/
/
/
/
/
/
/

/
/
/
/

16.02.2013
16.02.2013
16.02.2013
16.02.2013
16.02.2013
16.02.2013
16.02.2013
16.02.2013
16.02.2013
16.02.2013

16.02.2013
16.02.2013
16.02.2013
16.02.2013

25
20
15
200

205.00
210.00
230.00
45.00

21775

50
50
25
1000
25

58.50
59.50
59.50
58.50
58.50

70718

18,000.00

4
4
10
2

195.00
298.00
110.00
2,350.00

56961

M.S. Traders,

2786 / 16.02.2013

16000

33600

Sharp ply(india)Pvt ltd

2787 / 16.02.2013

6400

44.5

326096

Industrial power control

2788 / 16.02.2013

3,458.00

Industrial power control

2788 / 16.02.2013

12

2,310.00

Industrial power control

2788 / 16.02.2013

9,526.00

Industrial power control

2788 / 16.02.2013

24

995.00

155472

PAMM Commercial Pvt ltd

2789 / 16.02.2013

11200

50

641200

schwing stetter (india) pvt Ltd

2790 / 16.02.2013

4,900.00

schwing stetter (india) pvt Ltd

2790 / 16.02.2013

11,121.00

schwing stetter (india) pvt Ltd

2790 / 16.02.2013

3,958.00

Pradeep engineering

2793 / 16.02.2013

100.00

Pradeep engineering

2793 / 16.02.2013

100.00

Pradeep engineering

2793 / 16.02.2013

450.00

Balaji service,Bellary

2794 / 16.02.2013

427.00

Balaji service,Bellary

2794 / 16.02.2013

121.00

Balaji service,Bellary

2794 / 16.02.2013

1497.00

2593

Balaji
Balaji
Balaji
Balaji

2795
2795
2795
2795

50
50
10
10

205.00
205.00
210.00
280.00

25400

suppliers,Secunderabad
suppliers,Secunderabad
suppliers,Secunderabad
suppliers,Secunderabad

/
/
/
/

16.02.2013
16.02.2013
16.02.2013
16.02.2013
Page 70

20131

5439

February (2)
Sri ram agencies
Sri ram agencies
Balaji suppliers
Balaji suppliers
Balaji suppliers

2796
2796
2797
2797
2798

/
/
/
/
/

16.02.2013
16.02.2013
18.02.2013
18.02.2013
18.02.2013

1
1
10
5
5

32942.72
38735.68
185
185
140

Balaji suppliers

2798 / 18.02.2013

10

185

2550

Emerald
enterprises,secunderabad

2799 / 18.02.2013

10

125

1250

Gayatri engineering works

2800 / 18.02.2013

15635.00

Gayatri engineering works

2800 / 18.02.2013

8600.00

Gayatri engineering works

2800 / 18.02.2013

12540.00

Gayatri engineering works

2800 / 18.02.2013

11600.00

Gayatri engineering works

2800 / 18.02.2013

2400.00

Gayatri engineering works

2800 / 18.02.2013

3800.00

54867

Schwing stetter (1) Pvt ltd


Sidhpurwala Engineering
Company
Sidhpurwala Engineering
Company
Sidhpurwala Engineering
Company
Sidhpurwala Engineering
Company
Sidhpurwala Engineering
Company
Sidhpurwala Engineering
Company
Sidhpurwala Engineering
Company
Sidhpurwala Engineering
Company
Sidhpurwala Engineering
Company
Sidhpurwala Engineering
Company
Sidhpurwala Engineering
Company
Sidhpurwala Engineering
Company
Sidhpurwala Engineering
Company
Sidhpurwala Engineering
Company

2801 / 18.02.2013

96518

91209.2

2802 / 18.02.2013

4,800.00

2802 / 18.02.2013

1,800.00

2802 / 18.02.2013

30

65.00

2802 / 18.02.2013

190.00

2802 / 18.02.2013

650.00

2802 / 18.02.2013

293.00

2802 / 18.02.2013

2,340.00

2802 / 18.02.2013

125.00

2802 / 18.02.2013

165.00

2802 / 18.02.2013

246.00

2802 / 18.02.2013

330.00

2802 / 18.02.2013

45.00

2802 / 18.02.2013

80.00

2802 / 18.02.2013

137.00

Page 71

71678
2775

February (2)
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company

Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering
Engineering

2802 / 18.02.2013

160.00

2802 / 18.02.2013

230.00

2802 / 18.02.2013

40.00

2802 / 18.02.2013

60.00

2802 / 18.02.2013

30.00

2802 / 18.02.2013

65.00

2802 / 18.02.2013

55.00

2802 / 18.02.2013

40.00

2802 / 18.02.2013

10.00

2802 / 18.02.2013

1,500.00

2802 / 18.02.2013

10

65.00

2802 / 18.02.2013

25

40.00

2802 / 18.02.2013

4,100.00

2802 / 18.02.2013

4,300.00

2802 / 18.02.2013

1,300.00

2802 / 18.02.2013

150.00

2802 / 18.02.2013

1,050.00

2802 / 18.02.2013

350.00

2802 / 18.02.2013

290.00

2802 / 18.02.2013

50.00

2802 / 18.02.2013

6,500.00

2802 / 18.02.2013

5,520.00

2802 / 18.02.2013

3,600.00

2802 / 18.02.2013

750.00

2802 / 18.02.2013

796.00

2802 / 18.02.2013

972.00

Page 72

February (2)
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company
Sidhpurwala
Company

Engineering

2802 / 18.02.2013

1,584.00

2802 / 18.02.2013

1,572.00

2802 / 18.02.2013

1,012.00

2802 / 18.02.2013

463.00

2802 / 18.02.2013

558.00

2802 / 18.02.2013

350.00

2802 / 18.02.2013

2,990.00

66589

Universal engineers ,Chennai

2807 / 18.02.2013

1150

1208

S.V. Enterprises

2808 / 18.02.2013

10

1000

10000

Industrial Power control

2809 / 18.02.2013

975.00

Industrial Power control

2809 / 18.02.2013

3195.00

Industrial Power control

2809 / 18.02.2013

1085.00

Industrial Power control

2809 / 18.02.2013

11053.00

22331

M/s.Alpha Lubricants

2810 / 18.02.2013

210

237.57

43254

M/s Industrial Sales Corporation

2811 / 18.02.2013

200

99

M/s Industrial Sales Corporation

2811 / 18.02.2013

160

56.5

M/s Industrial Sales Corporation

2811 / 18.02.2013

40

85

M/s Industrial Sales Corporation

2811 / 18.02.2013

15

14.5

M/s Industrial Sales Corporation

2811 / 18.02.2013

66

M/s Industrial Sales Corporation

2811 / 18.02.2013

40

154

Trans Construction Equipment

2812 / 18.02.2013

1627

Trans Construction Equipment

2812 / 18.02.2013

1711

M/s Sharp Ply (India ) Pvt Ltd

2823 / 19.02.2013

5600

M/s Balaji Suppliors

2824 / 19.02.2013

210

205

M/s Balaji Suppliors

2824 / 19.02.2013

200

210

M/s. Nikki engineering


M/s. Nikki engineering

2833 / 19.02.2013
2833 / 19.02.2013

2
1

1100
9200

Engineering
Engineering
Engineering
Engineering
Engineering
Engineering

Page 73

49347.5

9123
34.5

221214

85050

February (2)
M/s. Nikki engineering

2833 / 19.02.2013

1200

M/s. M.S. Traders

2834 / 19.02.2013

10879

M/s. M.S. Traders

2834 / 19.02.2013

9074

M/s. M.S. Traders

2834 / 19.02.2013

10200

M/s. M.S. Traders

2834 / 19.02.2013

10950

64109

M/s.APT Engineering Company


M/s.Schwing Stetter (i) Pvt
Ltd,Bangalore

2835 / 19.02.2013

18

850

16065

2836 / 19.02.2013

7489

7546

M/s. U K Enterprises

2837 / 19.02.2013

12

3,100.00

M/s. U K Enterprises

2837 / 19.02.2013

12

3,050.00

M/s. U K Enterprises

2837 / 19.02.2013

6,552.00

M/s. U K Enterprises

2837 / 19.02.2013

200

215.00

M/s. U K Enterprises
M/s. U K Enterprises

2837 / 19.02.2013
2837 / 19.02.2013

3
3

1,150.00
770.00

M/s. U K Enterprises

2837 / 19.02.2013

12

195.00

M/s. U K Enterprises

2837 / 19.02.2013

12

175.00

188948

M/s. industrial Equipment Center 2838 / 19.02.2013

4400

5038

M/s.Viswam Computer Service


M/s.Viswam Computer Service

2839 / 19.02.2013
2839 / 19.02.2013

2
1

270
100

640

M/s.I.R. international

2840 / 20.02.2013

38

M/s.I.R. international

2840 / 20.02.2013

150

587

M/s Sharp Ply

2841 / 20.02.2013

11200

47

602728

M/s.Emerald Enterprises

2845 / 20.02.2013

100

55.00

M/s.Emerald Enterprises

2845 / 20.02.2013

10

55.00

M/s.Emerald Enterprises

2845 / 20.02.2013

230

235.00

M/s.Industrial sales Corporation

2846 / 20.02.2013

2100

58.00

M/s.Industrial sales Corporation

2846 / 20.02.2013

140

70.00

M/s.Industrial sales Corporation

2846 / 20.02.2013

2600

58.00

Page 74

13230

60100

296520

February (2)
M/s Industrial Sales Corporation

2848 / 20.02.2013

1050

58.00

M/s Industrial Sales Corporation

2848 / 20.02.2013

140

70.00

M/s.Emerald Enterprises

2849 / 20.02.2013

16

162

M/s.Emerald Enterprises

2849 / 20.02.2013

110

3142

M/s.Emerald Enterprises

2850 / 20.02.2013

20

450

9000

M/s Pradeep engineering store

2851 / 20.02.2013

50

165.00

M/s Pradeep engineering store

2851 / 20.02.2013

25

150.00

M/s Pradeep engineering store

2851 / 20.02.2013

20

295.00

M/s Pradeep engineering store

2851 / 20.02.2013

20

190.00

M/s Pradeep engineering store

2851 / 20.02.2013

10

250.00

M/s Pradeep engineering store

2851 / 20.02.2013

590.00

M/s Pradeep engineering store

2851 / 20.02.2013

45.00

M/s Pradeep engineering store

2851 / 20.02.2013

135.00

M/s Pradeep engineering store

2851 / 20.02.2013

160.00

M/s Pradeep engineering store

2851 / 20.02.2013

450.00

M/s Pradeep engineering store

2851 / 20.02.2013

365.00

M/s Pradeep engineering store

2851 / 20.02.2013

10

120.00

M/s Pradeep engineering store

2851 / 20.02.2013

75.00

M/s Pradeep engineering store

2851 / 20.02.2013

2750.00

M/s Pradeep engineering store

2851 / 20.02.2013

475.00

M/s Pradeep engineering store

2851 / 20.02.2013

950.00

M/s Pradeep engineering store

2852 / 20.02.2013

1650

M/s Pradeep engineering store

2852 / 20.02.2013

2150

29478

M/s.Powerica Limited

2853 / 20.02.2013

166202

190301

M/s. Sri Krishna Battery Sales

2854 / 20.02.2013

6600

5500

M/s.Alpha Lubricants

2855 / 20.02.2013

210

164.96

30035

Page 75

74235

35895

February (2)
M/s.JK Tyre & Industries

2856 / 20.02.2013

14712

32343

M/s Sri Krishna Battery Sales


M/s.Industrial Power Control
M/s.Industrial Power Control
M/s.Sri Krishna Battery

2857
2858
2858
2859

1
2
1
1

8250
1850
2250
8250

6500

M/s.sri Sai Engineering works

2860 / 21.02.2013

M/s.sri Sai Engineering works

2860 / 21.02.2013

950

M/s.sri Sai Engineering works

2860 / 21.02.2013

150.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

100.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

600.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

300.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

75.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

800.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

1,700.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

450.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

350.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

400.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

150.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

65.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

900.00

/
/
/
/

20.02.2013
21.02.2013
21.02.2013
21.02.2013

Page 76

5950
6500

February (2)
M/s.sri Sai Engineering works

2860 / 21.02.2013

500.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

220.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

200.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

4,000.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

700.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

M/s.sri Sai Engineering works

2860 / 21.02.2013

600.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

2,000.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

130.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

70.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

700.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

400.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

300.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

200.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

1,600.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

700.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

Page 77

1000

February (2)
M/s.sri Sai Engineering works

2860 / 21.02.2013

3,500.00

M/s.sri Sai Engineering works

2860 / 21.02.2013

700.00

28700

M/s. Balaji Suppliors


M/s. Putzmeister concrete
machines pvt ltd
M/s. Putzmeister concrete
machines pvt ltd
M/s. Putzmeister concrete
machines pvt ltd
M/s. Putzmeister concrete
machines pvt ltd
M/s. Putzmeister concrete
machines pvt ltd
M/s. Putzmeister concrete
machines pvt ltd
M/s. Putzmeister concrete
machines pvt ltd
M/s. Putzmeister concrete
machines pvt ltd
M/s. Putzmeister concrete
machines pvt ltd
M/s. Putzmeister concrete
machines pvt ltd
M/s. Putzmeister concrete
machines pvt ltd
M/s. Putzmeister concrete
machines pvt ltd
M/s. Putzmeister concrete
machines pvt ltd
M/s. Putzmeister concrete
machines pvt ltd
M/s. Putzmeister concrete
machines pvt ltd

2862 / 21.02.2013

280

205

57400

2865 / 21.02.2013

67197.00

2865 / 21.02.2013

6891.00

2865 / 21.02.2013

3548.00

2865 / 21.02.2013

230.00

2865 / 21.02.2013

274.00

2865 / 21.02.2013

403.00

2865 / 21.02.2013

357.00

2865 / 21.02.2013

1201.00

2865 / 21.02.2013

56.00

2865 / 21.02.2013

281.00

2865 / 21.02.2013

2468.00

2865 / 21.02.2013

2468.00

2865 / 21.02.2013

21475.00

2865 / 21.02.2013

24306.00

2865 / 21.02.2013

92.00

M/s. Industrial Sales Corporation 2866 / 21.02.2013

400

99.00

M/s. Industrial Sales Corporation 2866 / 21.02.2013

320

56.50

M/s. Industrial Sales Corporation 2866 / 21.02.2013

50

85.00

M/s. Industrial Sales Corporation 2866 / 21.02.2013

30

14.50

M/s. Industrial Sales Corporation 2866 / 21.02.2013

66.00

M/s. Industrial Sales Corporation 2866 / 21.02.2013

100

154.00

Page 78

122568.6

February (2)

40

370.00

2869 / 21.02.2013

6000

2869 / 21.02.2013

220

6993

2870 / 21.02.2013
2870 / 21.02.2013

5
2

300
1000

3500

M/s.Viswam Computer Service

2873 / 22.02.2013

270

270

M/s UK Enterprises

2874 / 22.02.2013

10

3,050.00

M/s UK Enterprises

2874 / 22.02.2013

5,161.00

M/s UK Enterprises

2874 / 22.02.2013

15

250.00

M/s UK Enterprises

2874 / 22.02.2013

100

100.00

M/s UK Enterprises

2874 / 22.02.2013

3,075.00

M/s UK Enterprises

2874 / 22.02.2013

5,161.00

M/s UK Enterprises
M/s UK Enterprises
M/s UK Enterprises
M/s UK Enterprises
M/s.Andhra machine &
tollsCorporation
M/s. Alpha Lubricants
M/s.Balaji Suppliers
M/s.Balaji Suppliers
M/s. Apt Engineering Company
M/s. Sidhpurwala Engineering
company
M/s. Sidhpurwala Engineering
company

2874
2874
2874
2874

30
30
15
100

375.00
250.00
200.00
9.00

147389

24800

25792

2
65
25
4

35105
185
185
950

60872

2882 / 22.02.2013

114

150

2882 / 22.02.2013

2100

M/s. Industrial Power Control

2883 / 23.02.2013

6850

M/s. Industrial Power Control

2883 / 23.02.2013

5800

14484
62329

M/s. Industrial Sales Corporation 2866 / 21.02.2013


M/s. Sidhpurwala Engineering
company
M/s. Sidhpurwala Engineering
company
M/s. S.V. Enterprises
M/s. S.V. Enterprises

/
/
/
/

22.02.2013
22.02.2013
22.02.2013
22.02.2013

2875 / 22.02.2013
2876
2880
2880
2881

M/s. Alpha Lubricants


2884
M/s.pace Enginering Service
2887
M/s.pace Enginering Service
2887
M/s.pace Enginering Service
2887
M/s.pace Enginering Service
2887
M/s.pace Enginering Service
2887
M/s.pace Enginering Service
2887
M/s.pace Enginering Service
2887
M/s.pace Enginering Service
2887
M/s.pace Enginering Service
2887
M/s.Fosroc Chemicals (India) Pvt
2888
Ltd

/
/
/
/

/
/
/
/
/
/
/
/
/
/

22.02.2013
22.02.2013
22.02.2013
22.02.2013

25.02.2013
25.02.2013
25.02.2013
25.02.2013
25.02.2013
25.02.2013
25.02.2013
25.02.2013
25.02.2013
25.02.2013

/ 25.02.2013
Page 79

35945.7

4
2
2
2
1
1
1
1
1

57.00
178.00
464.00
386.00
901.00
76.00
2524.00
2642.00
1774.00

10000

39.19

88495

16650
3990

20160

10762
391900

February (2)
M/s.JPR Marketing
M/s.Balaji Suppliers
M/s.JPR Marketing
M/s.JPR Marketing

2889
2890
2891
2891

M/s. Schwing Stetter (I) Pvt.Ltd

/
/
/
/

25.02.2013
25.02.2013
25.02.2013
25.02.2013

4000
20
100
100

58.5
205
58.5
59.5

245700
4100

2895 / 25.02.2013

20507

20663

M/s.chains And Spares


Corporation

2896 / 25.02.2013

35

106

3896

M/s. Canon India Pvt Ltd

2897 / 25.02.2013

82971

79250

10000

35

450283

500
200
2000
4000
2000

58.5
59.5
58.5
58.5
58.5

166058

17200

M/s.Fosroc Chemicals (India) Pvt


2899 / 26.02.2013
Ltd
M/s.JPR Marketing
2900 / 26.02.2013
M/s.JPR Marketing
2900 / 26.02.2013
M/s.JPR Marketing
2900 / 26.02.2013
M/s.JPR Marketing
2901 / 26.02.2013
M/s.JPR Marketing
2901 / 26.02.2013
M/s.Tyre Bank

2902 / 26.02.2013

4300

M/s.Schwing Stetter

2903 / 26.02.2013

726.00

M/s.Schwing Stetter

2903 / 26.02.2013

2030.00

M/s.Schwing Stetter

2903 / 26.02.2013

1156.00

M/s.Schwing Stetter

2903 / 26.02.2013

406.00

M/s.Schwing Stetter

2903 / 26.02.2013

297.00

M/s. Sharp Ply (India) Pvt Ltd

2904 / 26.02.2013

448

34.50

M/s. Sharp Ply (India) Pvt Ltd

2904 / 26.02.2013

67

435.00

M/s.Schwing Stetter

2905 / 26.02.2013

12,280.00

M/s.Schwing Stetter

2905 / 26.02.2013

39,478.00

M/s.Schwing Stetter

2905 / 26.02.2013

20,555.00

M/s.Schwing Stetter

2905 / 26.02.2013

23,562.00

M/s.Schwing Stetter

2905 / 26.02.2013

4,634.00

M/s.Schwing Stetter

2905 / 26.02.2013

42.00

Page 80

12390

368550

6286

51068

101611.6

February (2)
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.
M/s.

Asian
Asian
Asian
Asian
Asian
Asian
Asian
Asian
Asian
Asian
Asian
Asian
Asian
Asian

Earthmovers
Earthmovers
Earthmovers
Earthmovers
Earthmovers
Earthmovers
Earthmovers
Earthmovers
Earthmovers
Earthmovers
Earthmovers
Earthmovers
Earthmovers
Earthmovers

2906
2906
2906
2906
2906
2906
2906
2907
2907
2907
2907
2907
2907
2907

/
/
/
/
/
/
/
/
/
/
/
/
/
/

26.02.2013
26.02.2013
26.02.2013
26.02.2013
26.02.2013
26.02.2013
26.02.2013
26.02.2013
26.02.2013
26.02.2013
26.02.2013
26.02.2013
26.02.2013
26.02.2013

9
18
18
1
1
2
1
10
10
10
10
8
2
2

549.76
49.29
68.25
980.10
484.36
405.69
409.48
37.91
19.91
23.70
29.38
459.72
127.96
188.63

9771

5432

M.S. Traders,

2908 / 26.02.2013

10879

M/s. U K Enterprises

2909 / 26.02.2013

300

350.00

M/s. U K Enterprises

2909 / 26.02.2013

120

111.00

M/s. U K Enterprises

2909 / 26.02.2013

16,627.00

143274

M/s. Anand Enterprises

2911 / 26.02.13

4550

18727.8

M/s.pace Enginering Service

2912 / 26.02.13

20343

M/s.pace Enginering Service

2912 / 26.02.13

592

M/s. Industrial Sales Corporation 2915 / 26.02.13

400

99.00

M/s. Industrial Sales Corporation 2915 / 26.02.13

320

56.50

M/s. Industrial Sales Corporation 2915 / 26.02.13

50

85.00

M/s. Industrial Sales Corporation 2915 / 26.02.13

30

14.50

M/s. Industrial Sales Corporation 2915 / 26.02.13

66.00

M/s. Industrial Sales Corporation 2915 / 26.02.13

100

154.00

M/s. Industrial Sales Corporation 2915 / 26.02.13

40

370.00

88495
122850

JPR Marketing

2916 / 26.02.13

2000

58.5

M/s. Bharat Tubes Corporation

2917 / 26.02.13

30

284.00

M/s. Bharat Tubes Corporation

2917 / 26.02.13

250

660.00

M/s.Viswam Computer Service


M/s.Viswam Computer Service

2920 / 28.02.13
2920 / 28.02.13

1
1

350
600

Page 81

22846

22711

950

February (2)
M/s. Chains&Spares Coropration

2922 / 28.02.13

30

276

M/s. Pioneer Machinery & Spares 2924 / 28.02.13

2565

M/s. Pioneer Machinery & Spares 2924 / 28.02.13

2094

11552

M/s. Sidhpurwala Engineering


company

6500

6825

60

58

3654

11500

13168

2927 / 28.02.13

M/s. Industrial Sales Corporation 2930 / 28.02.13


M/s.APT Engineering Company

2931 / 28.02.13

Page 82

8694

February (2)

Date of
Dispatch

Mode of Transport

L.R.No /
Truck No

16.02.2013

Through Godwon

16.02.2013

194

16.02.2013

Through Godwon

16.02.2013

194

16.02.2013

Through Godwon

16.02.2013

194

16.02.2013

Through Godwon

16.02.2013

194

16.02.2013

Through Godwon

16.02.2013

194

16.02.2013

Through Godwon

16.02.2013

194

16.02.2013

Through Godwon

16.02.2013

194

01.02.2013

collected by uday

01.02.2013

31685

01.02.2013

collected by uday

01.02.2013

31685

01.02.2013

collected by uday

01.02.2013

601

01.02.2013

collected by uday

01.02.2013

601

02.02.2013

collected by uday

02.02.2013

356

02.02.2013

collected by uday

02.02.2013

356

02.02.2013

collected by uday

02.02.2013

356

02.02.2013

collected by uday

02.02.2013

356

02.02.2013

collected by uday

02.02.2013

356

02.02.2013

collected by uday

02.02.2013

356

D.C.NO.

Invoice No

120231170
120231170
11120655
1139
99
1411
1411
1411
Page 83

February (2)
1448
1448
1448
129210310
129210310
129210310

18.02.2013
18.02.2013
18.02.2013
18.02.2013
18.02.2013
18.02.2013
18.02.2013
18.02.2013
18.02.2013

Through
Through
Through
Through
Through
Through
Through
Through
Through

Godwon
Godwon
Godwon
Godwon
Godwon
Godwon
Godwon
Godwon
Godwon

18.02.2013
18.02.2013
18.02.2013
18.02.2013
18.02.2013
18.02.2013
18.02.2013
18.02.2013
18.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

Page 84

129210310
1253
1253
1253
6403
6403
6403
6403
6403
6403
6403
6403
6403
1407
1407
1407
1407
1407
1407
1407
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935

February (2)
19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

Page 85

4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935

February (2)
19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

Page 86

4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935

February (2)
4930 / 4931 /
4932 / 4933 /
4934 / 4935
4930 / 4931 /
4932 / 4933 /
4934 / 4935

19.02.2013

Collected by uday

19.02.2013

19.02.2013

Collected by uday

19.02.2013

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

Page 87

February (2)
20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

Page 88

February (2)
20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

20.03.2013

Collected by uday

20.03.2013

96 / 132

02.02.2013
02.02.2013
02.02.2013

Collected by uday
Collected by uday
Collected by uday

02.02.2013
02.02.2013
02.02.2013

611
611
611

02.02.2013

Collected by uday

02.02.2013

611

Page 89

February (2)
87117928 /
87118011
87117928 /
87118011
87117928 /
87118011
87117928 /
87118011
87117928 /
87118011
87117928 /
87118011
87117928 /
87118011
87117928 /
87118011
87117928 /
87118011
87117928 /
87118011
87117928 /
87118011
87117928 /
87118011
87117928 /
87118011
87117928 /
87118011
87117928 /
87118011
87117928 /
87118011
87117928 /
87118011

Page 90

February (2)
87117928 /
87118011
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013

Collected
Collected
Collected
Collected
Collected
Collected
Collected

by
by
by
by
by
by
by

uday
uday
uday
uday
uday
uday
uday

05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013

22.02.2013

Thrugh godwon

22.02.2013

22.02.2013

Thrugh godwon

22.02.2013

18.02.2013

Thrugh godwon

18.02.2013

5073
5073
5073
5073
5073
5073
5073
4519015685 /
4519015691 /
4519015685 /
4519015691 /
5112
87117931 /
87117930
87117931 /
87117930
87117931 /
87117930
1750051155
1750051155
4610
1064
1064
1064
110413
8777
8777
8777
87117927 /
87118010
87117932
5072
220
220
220

Page 91

February (2)
220
2822
1576
1576
1576
1576
1576
1576
1576
1576
191
191
1252
1252
1252
1178
1178
5074
5074
2070040577
20.03.2013

Collected By uday

20.03.2013

248

20.03.2013

Collected By uday

20.03.2013

248

20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013

Collected
Collected
Collected
Collected
Collected
Collected
Collected
Collected
Collected
Collected
Collected

20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013

248
248
248
248
248
248
248
248
248
248
248

By
By
By
By
By
By
By
By
By
By
By

uday
uday
uday
uday
uday
uday
uday
uday
uday
uday
uday

Page 92

February (2)
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
15.02.2013

Collected By uday
Collected By uday
Collected By uday
Collected By uday
Collected By uday
Collected By uday
Collected By uday
Collected By uday
Collected By uday
Collected By uday
Collected By uday
Collected By uday
Collected By uday
Collected By uday
Collected By uday
Collected By uday
Collected By uday
Collected By uday
Collected By uday
Collected by Paul

20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
15.02.2013

249
249
249
249
249
249
249
249
249
249
249
249
249
249
249
249
249
249
249
221

15.02.2013

Collected by Paul

15.02.2013

221

15.02.2013

Collected by Paul

15.02.2013

221

15.02.2013

Collected by Paul

15.02.2013

221

15.02.2013

Collected by Paul

15.02.2013

221

15.02.2013

Collected by Paul

15.02.2013

221

15.02.2013

Collected by Paul

15.02.2013

221

15.02.2013

Collected by Paul

15.02.2013

221

15.02.2013

Collected by Paul

15.02.2013

221

15.02.2013

Collected by Paul

15.02.2013

221

15.02.2013

Collected by Paul

15.02.2013

221

15.02.2013

Collected by Paul

15.02.2013

221

06.02.2013

Thrugh godwon

06.02.2013

192

06.02.2013

Thrugh godwon

06.02.2013

192

09.02.2013

recived by jagdish

09.02.2013

196

11.02.2013

Thrugh godwon

11.02.2013

786

11.02.2013

Thrugh godwon

11.02.2013

786

Page 93

February (2)
11.02.2013

Thrugh godwon

11.02.2013

786

11.02.2013

Thrugh godwon

11.02.2013

786

11.02.2013

Thrugh godwon

11.02.2013

786

11.02.2013

Thrugh godwon

11.02.2013

786

11.02.2013

Thrugh godwon

11.02.2013

786

11.02.2013

Thrugh godwon

11.02.2013

786

11.02.2013

Thrugh godwon

11.02.2013

786

11.02.2013

Thrugh godwon

11.02.2013

786

05.02.13

Collected by gopal das

05.02.13

85151758

05.02.13

Collected by gopal das

05.02.13

85151758

05.02.13

Collected by gopal das

05.02.13

85151758

05.02.13

Collected by gopal das

05.02.13

85151758

05.02.13

Collected by gopal das

05.02.13

85151758

05.02.13

Collected by gopal das

05.02.13

85151758

05.02.13

Collected by gopal das

05.02.13

85151758

06.02.2013

Collected by uday

06.02.2013

624
8780
8780
120231181 /
120231328
120231181 /
120231328
120231181 /
120231328
1140
1076
1076
1076

Page 94

February (2)
1076
1076
1076
1076
07.02.2013

Collected by das
by
by
by
by
by
by
by
by
by
by
by
by
by
by
by
by

07.02.2013

110414

23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013

recived
recived
recived
recived
recived
recived
recived
recived
recived
recived
recived
recived
recived
recived
recived
recived

yougendar
yougendar
yougendar
yougendar
yougendar
yougendar
yougendar
yougendar
yougendar
yougendar
yougendar
yougendar
yougendar
yougendar
yougendar
yougendar

23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013

26734
26734
26734
26734
26734
26734
26734
26734
26734
26734
26734
26734
26734
26734
26734
26734

23.02.2013

recived by yougendar

23.02.2013

26734

23.02.2013
12.02.2013

recived by yougendar
recived by panni

23.02.2013
12.02.2013

26734
1412

12.02.2013

recived by panni

12.02.2013

1412
158
158
158

09.02.2013

recived by jagdish

09.02.2013

370
310
310
50
2070040209

09.02.2013

recived by uday

09.02.2013

369

09.02.2013
09.02.2013

recived by uday
recived by uday

09.02.2013
09.02.2013

369
369

Page 95

February (2)
09.02.2013
09.02.2013
09.02.2013
20.02.2013

recived by uday
recived by uday
recived by uday
recived by shekawat

09.02.2013
09.02.2013
09.02.2013
20.02.2013

369
369
369
467

09.02.2013

recived by uday

09.02.2013

780

09.02.2013

recived by uday

09.02.2013

780

09.02.2013

recived by uday

09.02.2013

780

09.02.2013

recived by uday

09.02.2013

780

09.02.2013

recived by uday

09.02.2013

780

11.02.2013

recived by ramesh

11.02.2013

627

11.02.2013
11.02.2013
11.02.2013
11.02.2013
11.02.2013

recived
recived
recived
recived
recived

ramesh
ramesh
ramesh
ramesh
ramesh

11.02.2013
11.02.2013
11.02.2013
11.02.2013
11.02.2013

627
627
627
627
627

11.02.2013

recived by saithya

11.02.2013

1141

9/2/2013

VRL

620691395

231 / 232

9/2/2013

VRL

620691395

231 / 232

9/2/2013

VRL

620691395

231 / 232

9/2/2013

VRL

620691395

231 / 232

9/2/2013

VRL

620691395

231 / 232

9/2/2013

VRL

620691395

231 / 232

9/2/2013

VRL

620691395

231 / 232

9/2/2013

VRL

620691395

231 / 232

9/2/2013

VRL

620691395

231 / 232

9/2/2013

VRL

620691395

231 / 232

9/2/2013

VRL

620691395

231 / 232

by
by
by
by
by

Page 96

February (2)
9/2/2013

VRL

620691395

231 / 232

9/2/2013

VRL

620691395

231 / 232

9/2/2013

VRL

620691395

231 / 232

9/2/2013

VRL

620691395

231 / 232

9/2/2013

VRL

620691395

231 / 232

9/2/2013

VRL

620691395

231 / 232

9/2/2013

VRL

620691395

231 / 232

22.02.2013

recived by shekhwat

09.02.2013
09.02.2013

Diwakar Cargo
Diwakar Cargo

12313
12313

1188
1188

09.02.2013

Diwakar Cargo

12313

1188

09.02.2013

Collected By uday

22.02.2013

09.02.2013

7714

90310545
226

14.02.2013

srs travels

14.02.2013

Collected by sanjay

14.02.2013

108

14.02.2013

Collected by sanjay

14.02.2013

108

Cancellation
order-2921

Cancellation order-2921

Cancellation
order-2921

Cancellation
order-2921

14.02.2013

,diwakar transport ,

LR 12616

110583

15.02.2013

Bellary hyd Roadways

l.R. 21171

110599

19.02.2013

recived BY HRO IT

36581 / 36675

19.02.2013

recived BY HRO IT

36581 / 36675

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

6559575

L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442

Page 97

635

2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564

February (2)
15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
Page 98

2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564

February (2)
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442
L.R.
179693442

2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564
2012024563 /
2012024564

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

15.2.13

Gatti travels)

14.02.2013

Collected By KTR

14.02.2013

110585 / 110584

14.02.2013

Collected By KTR

14.02.2013

110585 / 110584

14.02.2013

Cancelled order

14.02.2013

Cancellation
order-2863

Page 99

February (2)
02.03.2013

Collected by balkrishna

18.02.2013

VRL

18.02.2013

VRL

18.02.2013

VRL

02.03.2013
L.R.227362689
L.R.227362689
L.R.227362689

Collected by KTR
Collected by Site
person(Shekhawat)

1422
2834
2834
2834
164
463

6300

5106

16.02.2013

239

16.02.2013

239

14.02.2013

31828

14.02.2013

31828

14.02.2013

31828

14.02.2013

31828

14.02.2013

31828

14.02.2013

31828

14.02.2013

31828

14.02.2013

31828

14.02.2013

31828

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

Page 100

February (2)
21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

21.02.2013

Collected by Uday

21.02.2013

723

Page 101

February (2)
25.02.2013

Collected by Uday

25.02.2013

6888

13.02.2013

Recived by Site

13.02.2013

1590

22.02.2013

Recived by Site

22.02.2013

472
613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

Page 102

February (2)
613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

Page 103

February (2)
613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

Page 104

February (2)
613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

613 / 630 /

4654 / 4645
19.02.2013

diwakar transport

15.02.2013

Professinol Couriers

15.02.2013

Professinol Couriers

14.02.2013

DTDC Transport

14.02.2013

DTDC Transport

14.02.2013

DTDC Transport

14.02.2013

DTDC Transport

13-02-13

Keseneni -Travels

lR-12685
LR. BPY
31152185
LR. BPY
31152185
,Doket
no.00287462
,Doket
no.00287462
,Doket
no.00287462
,Doket
no.00287462
13000699
Page 105

7503
87118009
87118009
137
137
137
137
1144

February (2)
13.02.2013

Diwakar

LR-13000699

1143

13.02.2013

Vrl Logistic

504771511

85151904

13.02.2013

Vrl Logistic

504771511

85151904

13.02.2013

Vrl Logistic

504771511

85151904

13.02.2013

Vrl Logistic

504771511

85151904

13.02.2013

Vrl Logistic

504771511

85151904

14.02.2013

By-ARK Travel

B834766

634

14.02.2013

By-ARK Travel

B834766

634

14.02.2013

kessineni trav

14.02.2013

sharma trans port ,,

13000727,

1145

SBC4278513

1100
85151947
12000001039

recived by Site-Sanjay

12000001039

18.02.2013

VRL Transport

227362688

2833

18.02.2013
18.02.2013
18.02.2013
18.02.2013

VRL
VRL
VRL
VRL

227362688
227362688
227362688
227362688

2833
2833
2833
2833

Transport
Transport
Transport
Transport

14.02.2013

Collected by site ,Dipu

51

14.02.2013

Collected by site ,Dipu

51

14.02.2013

Collected by site ,Dipu

51

14.02.2013

Collected by site ,Dipu

51

14.02.2013

Collected by site ,Dipu

51

14.02.2013

Collected by site ,Dipu

51

14.02.2013

Collected by site ,Dipu

51

14.02.2013

Collected by site ,Dipu

51

14.02.2013

Collected by site ,Dipu

51

14.02.2013

Collected by site ,Dipu

807

14.02.2013

Collected by site ,Dipu

807
Page 106

February (2)
14.02.2013

Collected by site ,Dipu

807

14.02.2013

Collected by site ,Dipu

807

14.02.2013

Collected by site ,Dipu

807

14.02.2013

Collected by site ,Dipu

807

14.02.2013

Collected by site ,Dipu

807

14.02.2013
14.02.2013

Collected by site ,Dipu


Collected by site ,Dipu

807
807

14.02.2013

Collected by site ,Dipu

807

01.02.2013

recived by N.K.Paul

2070040578

01.02.2013

recived by N.K.Paul

2070040578

recived by site(
yougendar)
recived by site(
yougendar)

1830040379
1830040379

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

Page 107

February (2)
19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

Page 108

February (2)
19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

19.02.2013

VRL Logistic

Do-620708577

139 / 146 / 150

15.02.2013
15.02.2013
15.02.2013
15.02.2013
15.02.2013
15.02.2013

recived by site
(omprakash)
recived by site
(omprakash)
recived by site
(omprakash)
recived by site
(omprakash)
recived by site
(omprakash)
Bellary Hyd roadways

31830
31830
31830
31830
31830
LR. Number
21171
Page 109

110596

February (2)
NJPT
13000842
Cancellation
Cancellation order-2770A
order-2770A
kesineni travell

Cancellation
order-2770A

3169
Cancellation
order-2770A

14.02.2013

recived by site (dipu)

1962 / 1964

14.02.2013

recived by site (dipu)

1962 / 1964

14.02.2013

recived by site (dipu)

1962 / 1964

14.02.2013

recived by site (dipu)

1962 / 1964

14.02.2013

recived by site (dipu)

1962 / 1964

14.02.2013

recived by site (dipu)

1962 / 1964

23.02.2013

recived by site(niraj)
recived by
site(Balkrishna)

243
1348

16.02.2013

Collected by KTR

373

16.02.2013

Collected by KTR

373

19.02.2013

Collected by KTR

379

16.02.2013

Collected by KTR

374

16.02.2013
16.02.2013
16.02.2013
16.02.2013

Collected
Collected
Collected
Collected

13.02.2013

by
by
by
by

KTR
KTR
KTR
KTR

Diwakar Transport,

L R-12809

374
374
374
374
374
1142
16
5176

16.02.2013

manjunath Road lines

LR-37320

1505

16.02.2013

manjunath Road lines

LR-37320

1505

16.02.2013

manjunath Road lines

LR-37320

1505

16.02.2013

manjunath Road lines

LR-37320

1505

16.02.2013

Indra Travels

LR-15044

1506

16.02.2013

Indra Travels

LR-15044

1506

16.02.2013

Indra Travels

LR-15044

1506
1278

Page 110

February (2)
5110
5110
5110
5110
823
1279
1279
1279
1279
1279
16
16
16
16
16
2845
1482
31872
31872
31872
31872
Chandra Road Line

Bill 11120682

Ka-23a-5194

11120682
87118160
87118160
87118160
1980
1980
1980

5111
5111
5111
5111
Page 111

February (2)
1449
1449
5116
5116
5115
5115
824
143 / 145
143 / 145
143 / 145
143 / 145
143 / 145
143 / 145
85152048
19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

Page 112

February (2)
19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

Page 113

February (2)
19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52

19.02.2013

Collected by uday

19.02.2013

52
619

22.02.2013

Through KTR

3041

18.02.2013

Diwakar transport

L.R. 12107-

31885

18.02.2013

Diwakar transport

L.R. 12107-

31885

18.02.2013

Diwakar transport

L.R. 12107-

31885

18.02.2013

Diwakar transport

L.R. 12107-

31885

18.02.2013

Collected by site person

464

19.02.2013

Collected By uday(KTR)

378

19.02.2013

Collected By uday(KTR)

378

19.02.2013

Collected By uday(KTR)

378

19.02.2013

Collected By uday(KTR)

378

19.02.2013

Collected By uday(KTR)

378

19.02.2013

Collected By uday(KTR)

378

21.02.2013

Collected by site

1487

21.02.2013

Collected by ktr

5127 / 5155

21.02.2013

Collected by ktr

5127 / 5155

21.02.2013
21.02.2013

Collected by ktr
Collected by ktr

165
165
Page 114

8805

February (2)
21.02.2013

Collected by ktr

165

21.02.2013

Collected by ktr

2835

21.02.2013

Collected by ktr

2835

21.02.2013

Collected by ktr

2835

21.02.2013

Collected by ktr

2835

21.02.2013

Collected by site person

1246

21.02.2013

VRL Logistic

21.02.2013

Collected by ktr

202

21.02.2013

Collected by ktr

202

21.02.2013

Collected by ktr

202

21.02.2013

Collected by ktr

202

21.02.2013
21.02.2013

Collected by ktr
Collected by ktr

202
202

21.02.2013

Collected by ktr

202

21.02.2013

Collected by ktr

202

Recived by HRO (IT)


Recived by HRO (IT)

cancellation
order-3000
240
240

21.02.2013

Recived by Site (N K Paul)

3179

21.02.2013

Recived by Site (N K Paul)

3179

21.02.2013

recived by site person

1490 / 1492

21.02.2013

Collected By Site

843 / 882

21.02.2013

Collected By Site

843 / 882

21.02.2013

Collected By Site

843 / 882

21.02.2013

Collected By Site

383

21.02.2013

Collected By Site

383

21.02.2013

Collected By Site

383

VT89010714

Page 115

87118050

February (2)
22.02.2013

Through KTR

DC - 3042

382

22.02.2013

Through KTR

DC - 3042

382

22.03.2013

Collected by site

822

22.03.2013

Collected by site

822
859

recived by site

2001 / 2002

22.03.2013

recived by site

2001 / 2002

22.03.2013

recived by site

2001 / 2002

22.03.2013

recived by site

2001 / 2002

22.03.2013

recived by site

2001 / 2002

22.03.2013

recived by site

2001 / 2002

22.03.2013

recived by site

2001 / 2002

22.03.2013

recived by site

2001 / 2002

22.03.2013

recived by site

2001 / 2002

22.03.2013

recived by site

2001 / 2002

22.03.2013

recived by site

2001 / 2002

22.03.2013

recived by site

2001 / 2002

22.03.2013

recived by site

2001 / 2002

22.03.2013

recived by site

2001 / 2002

22.03.2013

recived by site

2001 / 2002

22.03.2013

recived by site

2001 / 2002

23.03.2013

collected by ktr

2005

23.03.2013

collected by ktr

2005

22.02.2013

recived by site
Dispatched by party
vechicle

1146

21.02.2013

469

Page 116

February (2)
1750051154
22.02.2013
21.02.2013
21.02.2013
22.03.2013

Diwakar
Diwakar
Diwakar
Diwakar

3865
41135
41135
3865

1148
31909
31909
1147

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

Page 117

February (2)
28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

Page 118

February (2)
28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.2.13

Collected by uday

28.2.13

235 / 236 / 237

28.02.2013

Through KTR

DC-3050

5130

23.02.2013

collected by uday

23.02.2013

386

23.02.2013

collected by uday

23.02.2013

386

23.02.2013

collected by uday

23.02.2013

386

23.02.2013

collected by uday

23.02.2013

386

23.02.2013

collected by uday

23.02.2013

386

23.02.2013

collected by uday

23.02.2013

386

Page 119

February (2)
23.02.2013

collected by uday

23.02.2013

386
54
54
5507
5507

26.02.2013

recived by IT
HRO,Mr.umakant
Through KTR

DC-3052

210

26.02.2013

Through KTR

DC-3052

210

26.02.2013

Through KTR

DC-3052

210

26.02.2013

Through KTR

DC-3052

210

26.02.2013

Through KTR

DC-3052

210

26.02.2013

Through KTR

DC-3052

210

26.02.2013
26.02.2013
26.02.2013
26.02.2013

Through
Through
Through
Through

DC-3052
DC-3052
DC-3052
DC-3052

210
210
210
210

KTR
KTR
KTR
KTR

310

7376
23.02.2013
23.02.2013
22.02.2013

Jaypee Daily Parcel


Jaypee Daily Parcel
Diwakar Transport,

L.R.-47718
3900

473
5131
5131
1255
53
53

Diwakar

LR-4414

31928

Diwakar

LR-4414

31928
1468
1468
1468
1468
1468
1468
1468
1468
1468
8075

Page 120

February (2)
26.02.2013

Through KTR

27.02.2013

Professinol Couriers

3051BLR415004712
9

1308
5153
1310
1310
87118103
7570

8064
1307
1307
1307
1304
1304
110798
87021791
87021791
87021791
87021791
87021791
Professonal Corurier
cancellation
order-2996

cancellation order-2996
Professonal Corurier
Professonal Corurier
Professonal Corurier
Professonal Corurier
Professonal Corurier
Professonal Corurier

BLR415004714
9
cancellation
order-2996
BLR415004714
9
BLR415004714
9
BLR415004714
9
BLR415004714
9
BLR415004714
9
BLR415004714
9
Page 121

1507
cancellation
order-2996
87118115 /
87118158
87118115 /
87118158
87118115 /
87118158
87118115 /
87118158
87118115 /
87118158
87118115 /
87118158

February (2)
Collected
Collected
Collected
Collected
Collected
Collected
Collected

by
by
by
by
by
by
by

Om
Om
Om
Om
Om
Om
Om

Prakash
Prakash
Prakash
Prakash
Prakash
Prakash
Prakash

120231329
120231329
120231329
120231329
120231329
120231329
120231329

2842
211 / 212
211 / 212
211 / 212
1607
1474
Collected by site
,MrShukla

1474
391 / 401
391 / 401
391 / 401
391 / 401
391 / 401
391 / 401
391 / 401
1316

,06.03.2013

,AP29T-6567 ,

,L.R.4798

7138

,06.03.2013

,AP29T-6567 ,

,L.R.4798

7138
401
401

Page 122

February (2)
01.03.2013
1/3/13
1/3/13

Diwakar Transport
SRE Travel
SRE Travel

L.R.4392

7608

911/10525

659

911/10525

659
55

Collected by kTR ,Uday


06.03.2013

399

Through
KTR,AP26U/8444,

DC/3078

Page 123

1302

February (2)

Invoice Date

Invoice
Amount

MRP No

Name of the
Site

16.02.2013

32,120

1732 / 19.02.13

GMR

16.02.2013

32,120

1732 / 19.02.13

GMR

16.02.2013

32,120

1732 / 19.02.13

GMR

16.02.2013

32,120

1732 / 19.02.13

GMR

16.02.2013

32,120

1732 / 19.02.13

GMR

16.02.2013

32,120

1732 / 19.02.13

GMR

16.02.2013

32,120

1732 / 19.02.13

GMR

01.02.2013

20,958

1436/06.02.13

KTR

01.02.2013

20,958

1436/06.02.13

KTR

01.02.2013

2,247

1431/01.02.13

KTR

01.02.2013

2,247

1431/01.02.13

KTR

02.02.2013

42724

1431/ 01.02.13

KTR

02.02.2013

42724

1431/ 01.02.13

KTR

02.02.2013

42724

1431/ 01.02.13

KTR

02.02.2013

42724

1431/ 01.02.13

KTR

02.02.2013

42724

1431/ 01.02.13

KTR

02.02.2013

42724

1431/ 01.02.13

KTR

05.02.13
05.02.13

1528
1528

1592 / 11.02.13
1592 / 11.02.13

JSWSL
JSWSL

04.02.13

458,000

1052 / 07.02.13

Dalmia

04.02.2013

5,500

401 / 11.02.2013

Alliance

05.02.2013

31065

1723 / 13.02.2013

GMR

12.02.2013
12.02.2013
12.02.2013

901
901
901

1707 / 01.02.13
1707 / 01.02.13
1707 / 01.02.13

GMR
GMR
GMR

Page 124

Remarks

February (2)
02.02.2013

2,774

1742 / 25.02.13

GMR

02.02.2013

2,774

1742 / 25.02.13

GMR

02.02.2013

2,774

1742 / 25.02.13

GMR

28.02.2013
28.02.2013

10,620
10,620

440 / 02.03.2013
440 / 02.03.2013

Alliance
Alliance

28.02.2013

10,620

440 / 02.03.2013

Alliance

28.02.2013
07.02.2013
07.02.2013
07.02.2013
18.02.2013
18.02.2013
18.02.2013
18.02.2013
18.02.2013
18.02.2013
18.02.2013
18.02.2013
18.02.2013
12.02.2013
12.02.2013
12.02.2013
12.02.2013
12.02.2013
12.02.2013
12.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013

10,620
212,359
212,359
212,359
4,405
4,405
4,405
4,405
4,405
4,405
4,405
4,405
4,405
78,994
78,994
78,994
78,994
78,994
78,994
78,994

440 / 02.03.2013
2832 / 13.02.2013
2832 / 13.02.2013
2832 / 13.02.2013
1449 / 19.02.2013
1449 / 19.02.2013
1449 / 19.02.2013
1449 / 19.02.2013
1449 / 19.02.2013
1449 / 19.02.2013
1449 / 19.02.2013
1449 / 19.02.2013
1449 / 19.02.2013
57 / 13.02.2013
57 / 13.02.2013
57 / 13.02.2013
57 / 13.02.2013
57 / 13.02.2013
57 / 13.02.2013
57 / 13.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013

Alliance
OMPL
OMPL
OMPL
KTR
KTR
KTR
KTR
KTR
KTR
KTR
KTR
KTR
Sathavana
Sathavana
Sathavana
Sathavana
Sathavana
Sathavana
Sathavana

109,719

109,719

109,719

109,719

109,719

109,719

109,719

Page 125

KTR

KTR

KTR

KTR

KTR

KTR

KTR

February (2)
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013

109,719

109,719

109,719

109,719

109,719

109,719

109,719

109,719

109,719

109,719

109,719

109,719

109,719

109,719

109,719

109,719

109,719

1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
Page 126

KTR

KTR

KTR

KTR

KTR

KTR

KTR

KTR

KTR

KTR

KTR

KTR

KTR

KTR

KTR

KTR

KTR

February (2)
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013

109,719

109,719

109,719

109,719

109,719

109,719

109,719

109,719

109,719

109,719

109,719

109,719

109,719

109,719

109,719

109,719

109,719

1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013
Page 127

KTR

KTR

KTR

KTR

KTR

KTR

KTR

KTR

KTR

KTR

KTR

KTR

KTR

KTR

KTR

KTR

KTR

February (2)
19.02.2013 /
19.02.2013 /
19.02.2013
19.02.2013 /
19.02.2013 /
19.02.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013

109,719

109,719

1449,1450,1451,
1452,1453 /
19.02.2013
1449,1450,1451,
1452,1453 /
19.02.2013

KTR

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

Page 128

February (2)
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

Page 129

February (2)
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.03.2013 /
20.03.2013
02.02.2013
02.02.2013
02.02.2013
02.02.2013

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

134,709

1478 / 02.03.2013

KTR

54,809
54,809
54,809

1432/02.02.13
1432/02.02.13
1432/02.02.13

KTR
KTR
KTR

54,809

1432/02.02.13

KTR

Page 130

February (2)
05.02.2013 /
15.02.2013

212198

96,97 / 07.02.2013,
127 / 22.02.2013

BMMI

05.02.2013 /
15.02.2013

212198

96,97 / 07.02.2013,
127 / 22.02.2013

BMMI

05.02.2013 /
15.02.2013

212198

96,97 / 07.02.2013,
127 / 22.02.2013

BMMI

05.02.2013 /
15.02.2013

212198

96,97 / 07.02.2013,
127 / 22.02.2013

BMMI

05.02.2013 /
15.02.2013

212198

96,97 / 07.02.2013,
127 / 22.02.2013

BMMI

05.02.2013 /
15.02.2013

212198

96,97 / 07.02.2013,
127 / 22.02.2013

BMMI

05.02.2013 /
15.02.2013

212198

96,97 / 07.02.2013,
127 / 22.02.2013

BMMI

05.02.2013 /
15.02.2013

212198

96,97 / 07.02.2013,
127 / 22.02.2013

BMMI

05.02.2013 /
15.02.2013

212198

96,97 / 07.02.2013,
127 / 22.02.2013

BMMI

05.02.2013 /
15.02.2013

212198

96,97 / 07.02.2013,
127 / 22.02.2013

BMMI

05.02.2013 /
15.02.2013

212198

96,97 / 07.02.2013,
127 / 22.02.2013

BMMI

05.02.2013 /
15.02.2013

212198

96,97 / 07.02.2013,
127 / 22.02.2013

BMMI

05.02.2013 /
15.02.2013

212198

96,97 / 07.02.2013,
127 / 22.02.2013

BMMI

05.02.2013 /
15.02.2013

212198

96,97 / 07.02.2013,
127 / 22.02.2013

BMMI

05.02.2013 /
15.02.2013

212198

96,97 / 07.02.2013,
127 / 22.02.2013

BMMI

05.02.2013 /
15.02.2013

212198

96,97 / 07.02.2013,
127 / 22.02.2013

BMMI

05.02.2013 /
15.02.2013

212198

96,97 / 07.02.2013,
127 / 22.02.2013

BMMI

Page 131

February (2)
05.02.2013 /
15.02.2013

212198

96,97 / 07.02.2013,
127 / 22.02.2013

05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
22.02.2013 /
22.02.2013
22.02.2013 /
22.02.2013
18.02.2013
05.02.13 /
05.02.13
05.02.13 /
05.02.13
05.02.13 /
05.02.13

23,575
1437/07.02.13
1437/07.02.13
1437/07.02.13
1437/07.02.13
1437/07.02.13
1437/07.02.13

27.02.2013

101,954

1151 / 01.03.2013

Dalmia

27.02.2013

101,954

1151 / 01.03.2013

Dalmia

05.02.2013

183,442

384 / 05.02.2013

Alliance

04.02.2013
04.02.2013
04.02.2013

26,654

1220 / 15.03.2013
26,654
26,654

Dalmia
Dalmia
Dalmia

07.02.2013

15,900

1616 / 16.02.2013

JSWSL

04.02.2013

46550

1052 / 07.02.13

Dalmia

46550

Dalmia

46550

Dalmia

274066

BMMI

04.02.2013
04.02.2013
05.02.2013 /
15.02.2013

464,875
464,875
67,200
66848
66848
66848

1052 /
07.02.13
1052 /
07.02.13
98 /
07.02.2013,
127 /
22.02.2013

1437/07.02.13
23,575
23,575
23,575
23,575
23,575
23,575
2895 / 26.02.2013,
2898 / 27.02.2013
2895 / 26.02.2013,
2898 / 27.02.2013
1632 / 23.02.2013
1585 / 08.02.13,
1584 / 08.02.13
1585 / 08.02.13,
1584 / 08.02.13
1585 / 08.02.13,
1584 / 08.02.13

BMMI
KTR
KTR
KTR
KTR
KTR
KTR
KTR
OMPL
OMPL
JSWSL
JSWSL
JSWSL
JSWSL

05.02.13

8,994

1636 / 24.02.2013

JSWSL

05.02.2013
15.02.2013

62250
4580
1586 /
08.02.13
1586 /
08.02.13

109 / 12.02.2013
1586 / 08.02.13

BMMI
JSWSL

4580

JSWSL

4580

JSWSL

15.02.2013
15.02.2013

Page 132

February (2)
15.02.2013

1586 /
08.02.13

4580

JSWSL

04.02.2013

11,423

1586 / 08.02.2013

JSWSL

05.02.2013

77560

384 / 05.02.2013

Alliance

77560

Alliance

77560

Alliance

77560

Alliance

77560

Alliance

77560

Alliance

77560

Alliance

77560

Alliance

395 / 09.02.2013

Alliance

33949

Alliance

395 / 09.02.2013

Alliance

49,455

Alliance

49,455

Alliance

1060 / 08.02.13

Dalmia

13,755

Dalmia

109 / 12.02.2013

BMMI

7,400

BMMI

05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
05.02.2013
06.02.2013
06.02.2013
07.02.2013
07.02.2013
07.02.2013
07.02.2013
07.02.2013
05.02.2013
05.02.2013

384 /
05.02.2013
384 /
05.02.2013
384 /
05.02.2013
384 /
05.02.2013
384 /
05.02.2013
384 /
05.02.2013
384 /
05.02.2013
33949
395 /
09.02.2013
49,455
395 /
09.02.2013
395 /
09.02.2013
13,755
1060 /
08.02.13
7,400
109 /
12.02.2013

28.02.2013

208,819

1758 / 01.03.13

GMR

20.03.2013

13,750

1512 / 18.03.2013

KTR

20.03.2013

13,750

1512 / 18.03.2013

KTR

20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013

13,750
13,750
13,750
13,750
13,750
13,750
13,750
13,750
13,750
13,750
13,750

1512
1512
1512
1512
1512
1512
1512
1512
1512
1512
1512

KTR
KTR
KTR
KTR
KTR
KTR
KTR
KTR
KTR
KTR
KTR

/
/
/
/
/
/
/
/
/
/
/

18.03.2013
18.03.2013
18.03.2013
18.03.2013
18.03.2013
18.03.2013
18.03.2013
18.03.2013
18.03.2013
18.03.2013
18.03.2013

Page 133

February (2)
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
20.03.2013
15.02.2013

31,280
31,280
31,280
31,280
31,280
31,280
31,280
31,280
31,280
31,280
31,280
31,280
31,280
31,280
31,280
31,280
31,280
31,280
31,280
15200
101 /
08.02.2013
101 /
08.02.2013
101 /
08.02.2013
101 /
08.02.2013
101 /
08.02.2013
101 /
08.02.2013
101 /
08.02.2013
101 /
08.02.2013
101 /
08.02.2013
101 /
08.02.2013
101 /
08.02.2013
29663
110 /
12.02.2013

1512 / 18.03.2013
1512 / 18.03.2013
1512 / 18.03.2013
1512 / 18.03.2013
1512 / 18.03.2013
1512 / 18.03.2013
1512 / 18.03.2013
1512 / 18.03.2013
1512 / 18.03.2013
1512 / 18.03.2013
1512 / 18.03.2013
1512 / 18.03.2013
1512 / 18.03.2013
1512 / 18.03.2013
1512 / 18.03.2013
1512 / 18.03.2013
1512 / 18.03.2013
1512 / 18.03.2013
1512 / 18.03.2013
101 / 08.02.2013

KTR
KTR
KTR
KTR
KTR
KTR
KTR
KTR
KTR
KTR
KTR
KTR
KTR
KTR
KTR
KTR
KTR
KTR
KTR
BMMI

15200

BMMI

15200

BMMI

15200

BMMI

15200

BMMI

15200

BMMI

15200

BMMI

15200

BMMI

15200

BMMI

15200

BMMI

15200

BMMI

15200

BMMI

110 / 12.02.2013

BMMI

29663

BMMI

09.02.2013

2,448,000

1073 / 11.02.2013

Dalmia

11.02.2013

372951

1053 / 07.02.13

Dalmia

11.02.2013

1053 /
07.02.13

372951

Dalmia

15.02.2013
15.02.2013
15.02.2013
15.02.2013
15.02.2013
15.02.2013
15.02.2013
15.02.2013
15.02.2013
15.02.2013
15.02.2013
06.02.2013
06.02.2013

Page 134

Asset

February (2)
11.02.2013
11.02.2013
11.02.2013
11.02.2013
11.02.2013
11.02.2013
11.02.2013
11.02.2013
05.02.13
05.02.13
05.02.13
05.02.13
05.02.13
05.02.13
05.02.13
06.02.2013
06.02.2013
06.02.2013

1053 /
07.02.13
1053 /
07.02.13
1053 /
07.02.13
1053 /
07.02.13
1053 /
07.02.13
1053 /
07.02.13
1053 /
07.02.13
1053 /
07.02.13
9988
385 /
05.02.2013
385 /
05.02.2013
385 /
05.02.2013
385 /
05.02.2013
385 /
05.02.2013
385 /
05.02.2013
14,438
12,700
1052 /
07.02.13

372951

Dalmia

372951

Dalmia

372951

Dalmia

372951

Dalmia

372951

Dalmia

372951

Dalmia

372951

Dalmia

372951

Dalmia

385 / 05.02.2013

Alliance

9988

Alliance

9988

Alliance

9988

Alliance

9988

Alliance

9988

Alliance

9988

Alliance

1437 / 07.02.2013
1052 / 07.02.13

KTR
Dalmia

12,700

Dalmia

11.03.2013 /
07.02.2013

6,642

1585 / 08.02.2013,
1601 / 130.02.2013

JSWSL

11.03.2013 /
07.02.2013

6,642

1585 / 08.02.2013,
1601 / 130.02.2013

JSWSL

11.03.2013 /
07.02.2013

6,642

1585 / 08.02.2013,
1601 / 130.02.2013

JSWSL

07.02.2013

9,900

1586 / 08.02.2013

JSWSL

06.02.2013

27382

1582 / 08 .02.13

JSWSL

06.02.2013

27382

1582 / 08 .02.13

JSWSL

06.02.2013

27382

1582 / 08 .02.13

JSWSL

Page 135

February (2)
06.02.2013

27382

1582 / 08 .02.13

JSWSL

06.02.2013
06.02.2013
06.02.2013

27382
27382
27382

1582 / 08 .02.13
1582 / 08 .02.13
1582 / 08 .02.13

JSWSL
JSWSL
JSWSL

07.02.2013

66,000

103 / 09.02.2013

BMMI

23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013
23.02.2013

47,060
47,060
47,060
47,060
47,060
47,060
47,060
47,060
47,060
47,060
47,060
47,060
47,060
47,060
47,060
47,060

1784
1784
1784
1784
1784
1784
1784
1784
1784
1784
1784
1784
1784
1784
1784
1784

13.02.2013
13.02.2013
13.02.2013
13.02.2013
13.02.2013
13.02.2013
13.02.2013
13.02.2013
13.02.2013
13.02.2013
13.02.2013
13.02.2013
13.02.2013
13.02.2013
13.02.2013
13.02.2013

VSP
VSP
VSP
VSP
VSP
VSP
VSP
VSP
VSP
VSP
VSP
VSP
VSP
VSP
VSP
VSP

23.02.2013

47,060

1784 / 13.02.2013

VSP

23.02.2013
12.02.2013

47,060
192

1784 / 13.02.2013
1724 / 13.02.2013

VSP
GMR

12.02.2013

192

1724 / 13.02.2013

GMR

07.02.2013
07.02.2013
07.02.2013

21,735
21,735
21,735

1060 / 08.02.13
1060 / 08.02.13
1060 / 08.02.13

Dalmia
Dalmia
Dalmia

09.02.2013

5460

993 / 31.01.13

Dalmia

09.02.2013

34,938

528 / 20.02.2013

KHEL

09.02.2013

34,938

528 / 20.02.2013

KHEL

08.02.2013

19795

1060 / 08.02.2013

Dalmia

15.02.2013

80,070

1603 / 15.02.2013

JSWSL

09.02.2013

45644

1438/ 09.02.13

KTR

09.02.2013
09.02.2013

45644
45644

1438/ 09.02.13
1438/ 09.02.13

KTR
KTR

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

Page 136

February (2)
09.02.2013
09.02.2013
09.02.2013
20.02.2013

45644
45644
45644
30,437

1438/ 09.02.13
1438/ 09.02.13
1438/ 09.02.13
1741 / 23.02.13

KTR
KTR
KTR
GMR

09.02.2013

257083

414 /

Alliance

09.02.2013

257083

414 /

Alliance

09.02.2013

257083

414 /

Alliance

09.02.2013

257083

414 /

Alliance

09.02.2013

257083

414 /

Alliance

11.02.2013

19,332

1749 / 15.02.2013

TN-06

11.02.2013
11.02.2013
11.02.2013
11.02.2013
11.02.2013

19,332
19,332
19,332
19,332
19,332

1749
1749
1749
1749
1749

15.02.2013
15.02.2013
15.02.2013
15.02.2013
15.02.2013

TN-06
TN-06
TN-06
TN-06
TN-06

2955 / 11.03.2013

MRPL

9300

1334 / 15.02.2013

sarda

30,250

43/ 14.02.13

suryadev

30,250

43/ 14.02.13

suryadev

30,250

43/ 14.02.13

suryadev

30,250

43/ 14.02.13

suryadev

30,250

43/ 14.02.13

suryadev

30,250

43/ 14.02.13

suryadev

30,250

43/ 14.02.13

suryadev

30,250

43/ 14.02.13

suryadev

30,250

43/ 14.02.13

suryadev

30,250

43/ 14.02.13

suryadev

30,250

43/ 14.02.13

suryadev

11.02.2013
27.02.2013 /
27.02.2013
27.02.2013 /
27.02.2013
27.02.2013 /
27.02.2013
27.02.2013 /
27.02.2013
27.02.2013 /
27.02.2013
27.02.2013 /
27.02.2013
27.02.2013 /
27.02.2013
27.02.2013 /
27.02.2013
27.02.2013 /
27.02.2013
27.02.2013 /
27.02.2013
27.02.2013 /
27.02.2013

/
/
/
/
/

Page 137

Asset

February (2)
27.02.2013 /
27.02.2013
27.02.2013 /
27.02.2013
27.02.2013 /
27.02.2013
27.02.2013 /
27.02.2013
27.02.2013 /
27.02.2013
27.02.2013 /
27.02.2013
27.02.2013 /
27.02.2013

30,250

43/ 14.02.13

suryadev

30,250

43/ 14.02.13

suryadev

30,250

43/ 14.02.13

suryadev

30,250

43/ 14.02.13

suryadev

30,250

43/ 14.02.13

suryadev

30,250

43/ 14.02.13

suryadev

30,250

43/ 14.02.13

suryadev

22.02.2013

117,178

1742 / 23.02.13

GMR

09.02.2013
09.02.2013

28665
28665

1725 / 15.02.2013
1725 / 15.02.2013

GMR
GMR

09.02.2013

28665

1725 / 15.02.2013

GMR

09.02.13

28193

2852 / 19.02.2013

OMPL

08.02.2013

4,500

--

HRO

14.02.2013

11,559

--

GMR

14.02.2013

12,475

411 / 15.02.2013

Alliance

14.02.2013

12,475

411 / 15.02.2013

Alliance

Cancellation order2921

Cancellation
order-2921

Cancellation order2921

KHEL

14.02.2013

43,750

1757 / 28.02.13

GMR

15.02.2013

11,200

1730 / 18.02.2013

GMR

151542

--

HRO

151542

--

HRO

13.02.2013 /
19.02.2013
13.02.2013 /
19.02.2013
15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13

Page 138

/
/
/
/
/

suryadev
suryadev
suryadev
suryadev
suryadev

February (2)
15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
47,48,49,50
16.02.13
Page 139

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev

February (2)
15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

15.2.13 / 15.2.13

102,514

14.02.2013 /
14.02.2013
14.02.2013 /
14.02.2013
Cancellation order2863

44400
44400
Cancellation
order-2863

47,48,49,50 /
16.02.13
47,48,49,50 /
16.02.13
47,48,49,50 /
16.02.13
47,48,49,50 /
16.02.13
47,48,49,50 /
16.02.13
47,48,49,50 /
16.02.13
47,48,49,50 /
16.02.13
47,48,49,50 /
16.02.13
47,48,49,50 /
16.02.13
47,48,49,50 /
16.02.13
47,48,49,50 /
16.02.13
47,48,49,50 /
16.02.13
47,48,49,50 /
16.02.13
47,48,49,50 /
16.02.13
47,48,49,50 /
16.02.13
47,48,49,50 /
16.02.13
47,48,49,50 /
16.02.13
47,48,49,50 /
16.02.13
47,48,49,50 /
16.02.13
47,48,49,50 /
16.02.13
47,48,49,50 /
16.02.13
47,48,49,50 /
16.02.13
42/ 14.2.13, 42/
14.2.13
42/ 14.2.13, 42/
14.2.13
Cancellation order2863
Page 140

suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
alliance

February (2)
02.03.2013

50,402

1330 / 04.03.2013

Ambuja

18.02.2013

5,834

431 / 26.02.2013

alliance

18.02.2013

5,834

431 / 26.02.2013

alliance

18.02.2013

5,834

431 / 26.02.2013

alliance

19.02.2013

1,155

62 / 19.02.2013

Sathavana

18.02.2013

30,034

1741 / 23.02.13

GMR

18.02.2013

6,300

62 / 19.02.2013

Sathavana

16.02.2013

322,791

50/18.2.13

suryadev

16.02.2013

322,791

50/18.2.13

suryadev

14.02.2013

73,811

62 / 19.02.2013

Sathavana

14.02.2013

73,811

62 / 19.02.2013

Sathavana

14.02.2013

73,811

62 / 19.02.2013

Sathavana

14.02.2013

73,811

62 / 19.02.2013

Sathavana

14.02.2013

73,811

62 / 19.02.2013

Sathavana

14.02.2013

73,811

62 / 19.02.2013

Sathavana

14.02.2013

73,811

62 / 19.02.2013

Sathavana

14.02.2013

73,811

62 / 19.02.2013

Sathavana

14.02.2013

73,811

62 / 19.02.2013

Sathavana

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

Page 141

February (2)
21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

21.02.2013

30,558

1466 / 21.02.2013

KTR

Page 142

February (2)
25.02.2013

666,775

1799 / 21.02.2013

STM

13.02.2013

14,883

406 / 13.02.2013

Alliance

22.02.2013

61,951

1741 / 23.02.13

GMR

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
Page 143

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

February (2)
14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
Page 144

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

February (2)
14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
Page 145

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

February (2)
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013
39,40,41,42/
14.2.13, 54 /
22.02.2013

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

14.02.2013 /
14.02.2013

336,294

15.02.2013 /
13.02.2013

348,053

406 / 13.02.2013

Alliance

19.02.2013

11,687

1640 / 27.02.2013

JSWSL

15.02.2013

1,944

15.02.2013

1,944

14.02.2013

8,000

431 / 26.02.2013

Alliance

14.02.2013

8,000

431 / 26.02.2013

Alliance

14.02.2013

8,000

431 / 26.02.2013

Alliance

14.02.2013

8,000

431 / 26.02.2013

Alliance

13.02.2013

5,200

417 /

Alliance

1632 / 23.02.2013,
1624 / 22.02.2013
1632 / 23.02.2013,
1624 / 22.02.2013

Page 146

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

suryadev

JSWSL
JSWSL

February (2)
13.02.2013

6,500

1724 / 14.02.2013

GMR

13.02.2013

24,501

405 / 13.02.2013

Alliance

13.02.2013

24,501

405 / 13.02.2013

Alliance

13.02.2013

24,501

405 / 13.02.2013

Alliance

13.02.2013

24,501

405 / 13.02.2013

Alliance

13.02.2013

24,501

405 / 13.02.2013

Alliance

14.02.2013

4,026

1769 / 14.03.2013

TN-06

14.02.2013

4,026

1769 / 14.03.2013

TN-06

14.02.2013

18,600

417 /

Alliance

14.02.2013

13,966

414 /

Alliance

15.02.2013
28.02.2013

7,614
316,002

413 / 16.02.2013
439 / 01.03.2013

Alliance
Alliance

28.02.2013

316,002

439 / 01.03.2013

Alliance

18.02.2013

16,119

1154 / 02.03.2013

Dalmia

18.02.2013
18.02.2013
18.02.2013
18.02.2013

16,119
16,119
16,119
16,119

1154
1154
1154
1154

Dalmia
Dalmia
Dalmia
Dalmia

14.02.2013

41,150

51/ 18.2.13

suryadev

14.02.2013

41,150

51/ 18.2.13

suryadev

14.02.2013

41,150

51/ 18.2.13

suryadev

14.02.2013

41,150

51/ 18.2.13

suryadev

14.02.2013

41,150

51/ 18.2.13

suryadev

14.02.2013

41,150

51/ 18.2.13

suryadev

14.02.2013

41,150

51/ 18.2.13

suryadev

14.02.2013

41,150

51/ 18.2.13

suryadev

14.02.2013

41,150

51/ 18.2.13

suryadev

18.02.2013

23,105

52/ 18.2.13

suryadev

18.02.2013

23,105

52/ 18.2.13

suryadev

/
/
/
/

02.03.2013
02.03.2013
02.03.2013
02.03.2013

Page 147

February (2)
18.02.2013

23,105

52/ 18.2.13

suryadev

18.02.2013

23,105

52/ 18.2.13

suryadev

18.02.2013

23,105

52/ 18.2.13

suryadev

18.02.2013

23,105

52/ 18.2.13

suryadev

18.02.2013

23,105

52/ 18.2.13

suryadev

18.02.2013
18.02.2013

23,105
23,105

52/ 18.2.13
52/ 18.2.13

suryadev
suryadev

18.02.2013

23,105

52/ 18.2.13

suryadev

28.02.2013

136,757

145 / 01.03.2013

BMMI

28.02.2013

136,757

145 / 01.03.2013

27.02.2013

67,151

1815 / 01.03.2013

VSP

27.02.2013

67,151

1815 / 01.03.2013

VSP

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013

Page 148

BMMI

February (2)
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

Page 149

February (2)
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013
19.02.2013 /
07.03.2013 /
12.03.2013

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

235,985

1656, 1657 /
01.03.2013

JSWSL

15.02.2013

27,250

1659 / 01.03.2013

JSWSL

15.02.2013

27,250

1659 / 01.03.2013

JSWSL

15.02.2013

27,250

1659 / 01.03.2013

JSWSL

15.02.2013

27,250

1659 / 01.03.2013

JSWSL

15.02.2013

27,250

1659 / 01.03.2013

JSWSL

15.02.2013

56,500

1730 / 18.02.2013

GMR

Page 150

February (2)
18.02.2013

34,178

426 / 23.02.2013

Alliance

Cancellation order2770A
14.02.2013 /
14.02.2013
14.02.2013 /
14.02.2013
14.02.2013 /
14.02.2013
14.02.2013 /
14.02.2013
14.02.2013 /
14.02.2013
14.02.2013 /
14.02.2013
23.02.2013

Cancellation
order-2770A

Cancellation order2770A

Alliance

42,915

37,38/15.2.13

suryadev

42,915

37,38/15.2.13

suryadev

42,915

37,38/15.2.13

suryadev

42,915

37,38/15.2.13

suryadev

42,915

37,38/15.2.13

suryadev

42,915

37,38/15.2.13

suryadev

172,977

1135 / 26.02.2013

Dalmia

15.02.2013

50,402

1087 / 18.02.2013

MRpl-PP

16.02.2013

36,262

1102 / 21.02.2013

Dalmia

16.02.2013

36,262

1102 / 21.02.2013

Dalmia

19.02.2013

49,358

24 / 20.02.2013

RPCL

16.02.2013

44,671

1447 / 16.02.2013

KTR

16.02.2013
16.02.2013
16.02.2013
16.02.2013
16.02.2013
13.02.2013

44,671
44,671
44,671
44,671
44,671
6,500

1447 / 16.02.2013
1447 / 16.02.2013
1447 / 16.02.2013
1447 / 16.02.2013
1447 / 16.02.2013
138 / 27.02.2013

KTR
KTR
KTR
KTR
KTR
BMMI

44/16.2.13

suryadev

16.02.2013
28.02.2013

9,350

527 / 18.02.2013

KHEL

16.02.2013

6,093

2864 / 21.02.2013

OMPL

16.02.2013

6,093

2864 / 21.02.2013

OMPL

16.02.2013

6,093

2864 / 21.02.2013

OMPL

16.02.2013

6,093

2864 / 21.02.2013

OMPL

16.02.2013

1,090

1743 / 25.02.13

GMR

16.02.2013

1,090

1743 / 25.02.13

GMR

16.02.2013

1,090

1743 / 25.02.13

GMR

19.02.2013

61,302

24 / 20.02.2013

RPCL

Page 151

February (2)
18.02.2013
18.02.2013
18.02.2013
18.02.2013
22.02.2013
19.02.2013
19.02.2013
19.02.2013
19.02.2013
19.02.2013

21,775
21,775
21,775
21,775
473
70,564
70,564
70,564
70,564
70,564

61 / 23.02.2013
61 / 23.02.2013
61 / 23.02.2013
61 / 23.02.2013
44/ 14.2.13
62 / 23.02.2013
62 / 23.02.2013
62 / 23.02.2013
62 / 23.02.2013
62 / 23.02.2013

suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev
suryadev

16.02.2013

44/16.2.13

suryadev

16.02.2013
16.02.2013
16.02.2013
16.02.2013

44/16.2.13
44/16.2.13
44/16.2.13
44/16.2.13

suryadev
suryadev
suryadev
suryadev

05.03.2013

33,600

1150 / 01.03.2013

Dalmia

18.02.2013

347,872

119 / 19.02.2013

BMMI

18.02.2013

165,514

1103 / 21.02.2013

Dalmia

18.02.2013

165,514

1103 / 21.02.2013

Dalmia

18.02.2013

165,514

1103 / 21.02.2013

Dalmia

18.02.2013

165,514

1103 / 21.02.2013

Dalmia

27.02.2013

641,200

1152 / 01.03.2013

Dalmia

05.03.2013

8,925

1663 / 06.03.2013

JSWSL

05.03.2013

8,925

1663 / 06.03.2013

JSWSL

05.03.2013

8,925

1663 / 06.03.2013

JSWSL

18.02.2013

4,988

425 / 23.02.2013

Alliance

18.02.2013

4,988

425 / 23.02.2013

Alliance

18.02.2013

4,988

425 / 23.02.2013

Alliance
GMR
GMR
GMR

18.02.2013
18.02.2013
18.02.2013
18.02.2013

25,400
25,400
25,400
25,400

421
421
421
421

/
/
/
/

21.02.2013
21.02.2013
21.02.2013
21.02.2013
Page 152

Alliance
Alliance
Alliance
Alliance

February (2)
22.02.2013
22.02.2013
20.02.2013
20.02.2013
20.02.2013

71,678
71,678
2,775
2,775
2,550

1754 / 20.02.2013
1754 / 20.02.2013
61 / 23.02.2013
61 / 23.02.2013
270 / 22.02.2013

TN-06
TN-06
suryadev
suryadev
yashoda

20.02.2013

2,550

270 / 22.02.2013

yashoda

22.02.2013

1,431

52/ 18.2.13

suryadev

54,917

281 / 01.03.2013

RPCL

54,917

281 / 01.03.2013

RPCL

54,917

281 / 01.03.2013

RPCL

54,917

281 / 01.03.2013

RPCL

54,917

281 / 01.03.2013

RPCL

54,917

281 / 01.03.2013

RPCL

91,210

59 / 21.02.2013

suryadev

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

26.02.2013 /
27.02.2013
26.02.2013 /
27.02.2013
26.02.2013 /
27.02.2013
26.02.2013 /
27.02.2013
26.02.2013 /
27.02.2013
26.02.2013 /
27.02.2013
21.02.2013

Page 153

February (2)
19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

Page 154

February (2)
19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

19.02.2013

67,849

1457 / 19.02.2013

KTR

18.02.2013

1,208

51/ 18.2.13

suryadev

21.02.2013

11,200

1115 / 23.02.2013

Dalmia

18.02.2013

22,331

1767 / 12.03.2013

GMR

18.02.2013

22,331

1767 / 12.03.2013

GMR

18.02.2013

22,331

1767 / 12.03.2013

GMR

18.02.2013

22,331

1767 / 12.03.2013

GMR

18.02.2013

43,254

1742 / 23.02.13

GMR

19.02.2013

44,671

1454 / 19.02.2013

KTR

19.02.2013

44,671

1454 / 19.02.2013

KTR

19.02.2013

44,671

1454 / 19.02.2013

KTR

19.02.2013

44,671

1454 / 19.02.2013

KTR

19.02.2013

44,671

1454 / 19.02.2013

KTR

19.02.2013

44,671

1454 / 19.02.2013

KTR
OMPL
OMPL

21.02.2013
21.02.2013 /
28.02.2013
21.02.2013 /
28.02.2013
20.02.2013
20.02.2013

90,103

1115 / 23.02.2013

Dalmia

85,050

130 / 23.02.2013

BMMI

85,050

130 / 23.02.2013

BMMI

13,230
13,230

62 / 23.02.2013
62 / 23.02.2013

suryadev
suryadev

Page 155

February (2)
20.02.2013

13,230

62 / 23.02.2013

suryadev

20.02.2013

64,109

62 / 23.02.2013

suryadev

20.02.2013

64,109

62 / 23.02.2013

suryadev

20.02.2013

64,109

62 / 23.02.2013

suryadev

20.02.2013

64,109

62 / 23.02.2013

suryadev

21.02.2013

16,065

130 / 23.02.2013

BMMI

21.02.2013

7,546

1636 / 24.02.2013

JSWSL

21.02.2013

186,342

130 / 23.02.2013

BMMI

21.02.2013

186,342

130 / 23.02.2013

BMMI

21.02.2013

186,342

130 / 23.02.2013

BMMI

21.02.2013

186,342

130 / 23.02.2013

BMMI

21.02.2013
21.02.2013

186,342
186,342

130 / 23.02.2013
130 / 23.02.2013

BMMI
BMMI

21.02.2013

186,342

130 / 23.02.2013

BMMI

21.02.2013

186,342

130 / 23.02.2013

BMMI

cancellation order3000
19.02.2013
19.02.2013

cancellation
order-3000
640
640

cancellation order3000
---

21.02.2013

588

152 / 04.03.2013

BMMI

21.02.2013

588

152 / 04.03.2013

BMMI

647,462

1115 / 23.02.2013

Dalmia

21.02.2013 /
21.02.2013
28.02.2013 /
07.03.2013
28.02.2013 /
07.03.2013

68,814
68,814

264 / 26.02.2013,
337 / 09.03.2013
264 / 26.02.2013,
337 / 09.03.2013
264 / 26.02.2013,
337 / 09.03.2013

BMMI
HRO
HRO

RPCL
RPCL

28.02.2013 /
07.03.2013

68,814

21.02.2013

333,669

Orchid wood

21.02.2013

333,669

Orchid wood

21.02.2013

333,669

Orchid wood
Page 156

RPCL

February (2)
ACC,Perundur
ai
ACC,Perundur
ai

21.02.2013

89,460

21.02.2013

89,460

22.02.2013

3,409

270 / 22.02.2013

yashoda

22.02.2013

3,409

270 / 22.02.2013

yashoda

02.03.2013

10,305

1674 / 08.03.2013

JSWSL

33,153

60 / 22.02.2013

suryadev

33,153

60 / 22.02.2013

suryadev

33,153

60 / 22.02.2013

suryadev

33,153

60 / 22.02.2013

suryadev

33,153

60 / 22.02.2013

suryadev

33,153

60 / 22.02.2013

suryadev

33,153

60 / 22.02.2013

suryadev

33,153

60 / 22.02.2013

suryadev

33,153

60 / 22.02.2013

suryadev

33,153

60 / 22.02.2013

suryadev

33,153

60 / 22.02.2013

suryadev

33,153

60 / 22.02.2013

suryadev

33,153

60 / 22.02.2013

suryadev

33,153

60 / 22.02.2013

suryadev

33,153

60 / 22.02.2013

suryadev

33,153

60 / 22.02.2013

suryadev

22.02.2013

29,478

424 / 22.02.2013

alliance

22.02.2013

29,478

424 / 22.02.2013

alliance

22.02.2013 /
22.02.2013
22.02.2013 /
22.02.2013
22.02.2013 /
22.02.2013
22.02.2013 /
22.02.2013
22.02.2013 /
22.02.2013
22.02.2013 /
22.02.2013
22.02.2013 /
22.02.2013
22.02.2013 /
22.02.2013
22.02.2013 /
22.02.2013
22.02.2013 /
22.02.2013
22.02.2013 /
22.02.2013
22.02.2013 /
22.02.2013
22.02.2013 /
22.02.2013
22.02.2013 /
22.02.2013
22.02.2013 /
22.02.2013
22.02.2013 /
22.02.2013

Dalmia
22.02.2013

5,500

127 / 22.02.2013

BMMI

21.02.2013

30,034

1741 / 23.02.13

GMR

Page 157

February (2)
27.02.2013

34,803

337 / 09.03.2013

Surana

22.02.2013
21.02.2013
21.02.2013
22.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013

6,500
6,813
6,813
6,500

127 / 22.02.2013
1090 / 22.02.2013
1090 / 22.02.2013
127 / 22.02.2013

BMMI
Ambuja
Ambuja
BMMI

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

Page 158

February (2)
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

Page 159

February (2)
28.02.2013 /
28.02.2013 /
28.02.2013
28.02.2013 /
28.02.2013 /
28.02.2013
23.02.2013

28,700

1471 / 26.02.2013

KTR

28,700

1471 / 26.02.2013

KTR

57,400

436 / 28.02.2013

alliance

2934 / 06.03.2013

OMPL

2934 / 06.03.2013

OMPL

2934 / 06.03.2013

OMPL

2934 / 06.03.2013

OMPL

2934 / 06.03.2013

OMPL

2934 / 06.03.2013

OMPL

2934 / 06.03.2013

OMPL

2934 / 06.03.2013

OMPL

2934 / 06.03.2013

OMPL

2934 / 06.03.2013

OMPL

2934 / 06.03.2013

OMPL

2934 / 06.03.2013

OMPL

2934 / 06.03.2013

OMPL

2934 / 06.03.2013

OMPL

2934 / 06.03.2013

OMPL

23.02.2013

85,968

1467 / 23.02.2013

KTR

23.02.2013

85,968

1467 / 23.02.2013

KTR

23.02.2013

85,968

1467 / 23.02.2013

KTR

23.02.2013

85,968

1467 / 23.02.2013

KTR

23.02.2013

85,968

1467 / 23.02.2013

KTR

23.02.2013

85,968

1467 / 23.02.2013

KTR

Page 160

February (2)
23.02.2013

85,968

1467 / 23.02.2013

KTR

25.02.2013

7,128

1135 / 26.02.2013

Dalmia

25.02.2013

7,128

1135 / 26.02.2013

Dalmia

23.02.2013
23.02.2013

3,500
3,500

1135 / 26.02.2013
1135 / 26.02.2013

Dalmia
Dalmia

22.02.2013

270

--

HRO

02.03.2013

147,389

Dalmia

02.03.2013

147,389

Dalmia

02.03.2013

147,389

Dalmia

02.03.2013

147,389

Dalmia

02.03.2013

147,389

Dalmia

02.03.2013

147,389

Dalmia

02.03.2013
02.03.2013
02.03.2013
02.03.2013

147,389
147,389
147,389
147,389

Dalmia
Dalmia
Dalmia
Dalmia

22.02.2013

26,040

134 / 25.02.2013

BMMI

22.02.2013
23.02.2013
23.02.2013
22.02.2013

62,330
15,725
15,725
3,780

1740 / 23.02.13
1660 / 01.03.2013
1660 / 01.03.2013
1725 / 15.02.13

GMR
JSWSL
JSWSL
GMR

20.02.2013

20,545

1459 / 20.02.2013

KTR

20.02.2013

20,545

1459 / 20.02.2013

KTR

23.02.2013

14,484

1640 / 27.02.2013

JSWSL

23.02.2013

14,484

1640 / 27.02.2013

JSWSL

26.02.2013
26.02.2013
26.02.2013
26.02.2013
26.02.2013
26.02.2013
26.02.2013
26.02.2013
26.02.2013

3,360
3,360
3,360
3,360
3,360
3,360
3,360
3,360
3,360

1745 / 26.02.2013
1744 / 26.02.2013
1744 / 26.02.2013
1744 / 26.02.2013
1744 / 26.02.2013
1744 / 26.02.2013
1744 / 26.02.2013
1744 / 26.02.2013
1744 / 26.02.2013
1744 / 26.02.2013

GMR
GMR
GMR
GMR
GMR
GMR
GMR
GMR
GMR
GMR

06.03.2013

387,589

156 / 07.03.2013

BMMI

Page 161

February (2)
28.02.2013
26.02.2013
01.03.2013
01.03.2013

244,472
4,100
12,390
12,390

1151 / 01.03.2013
72 / 28.02.2013
274 / 02.03.2013
274 / 02.03.2013

Dalmia
suryadev
yashoda
yashoda

26.02.2013

20,663

1640 / 27.02.2013

JSWSL

28.02.2013

3,896

532 / 28.02.2013

KHEL

1256 / 22.03.2013

Dalmia

06.03.2013

450,283

1176 / 07.03.2013

Dalmia

28.02.2013
28.02.2013
28.02.2013
27.02.2013
27.02.2013

166,672
166,672
166,672
369,779
369,779

441 / 03.03.2013
441 / 03.03.2013
441 / 03.03.2013
1151 / 01.03.2013
1151 / 01.03.2013

Alliance
Alliance
Alliance
Dalmia
Dalmia

26.02.2013

17,200

72 / 28.02.2013

suryadev

26.02.2013

6,286

142 / 28.02.2013

BMMI

26.02.2013

6,286

142 / 28.02.2013

BMMI

26.02.2013

6,286

142 / 28.02.2013

BMMI

26.02.2013

6,286

142 / 28.02.2013

BMMI

26.02.2013

6,286

142 / 28.02.2013

BMMI

27.02.2013

18,221

534 / 07.03.2013

KHEL

cancellation order2996
28.02.2013 /
05.03.2013
28.02.2013 /
05.03.2013
28.02.2013 /
05.03.2013
28.02.2013 /
05.03.2013
28.02.2013 /
05.03.2013
28.02.2013 /
05.03.2013

cancellation
order-2996

cancellation order2996

KHEL

101,611

1186 / 09.03.2013

Dalmia

101,611

1186 / 09.03.2013

Dalmia

101,611

1186 / 09.03.2013

Dalmia

101,611

1186 / 09.03.2013

Dalmia

101,611

1186 / 09.03.2013

Dalmia

101,611

1186 / 09.03.2013

Dalmia

Page 162

February (2)
11.03.2013
11.03.2013
11.03.2013
11.03.2013
11.03.2013
11.03.2013
11.03.2013

9,608
9,608
9,608
9,608
9,608
9,608
9,608
1766
1766
1766
1766
1766
1766
1766

26.02.2013

/
/
/
/
/
/
/

08.03.2013
08.03.2013
08.03.2013
08.03.2013
08.03.2013
08.03.2013
08.03.2013

JSWSL
JSWSL
JSWSL
JSWSL
JSWSL
JSWSL
JSWSL
GMR
GMR
GMR
GMR
GMR
GMR
GMR

22,846

1150 / 01.03.2013

Dalmia

157224

147 / 02.03.2013

BMMI

157224

147 / 02.03.2013

BMMI

157224

147 / 02.03.2013

BMMI

27.02.2013

18,728

73 / 28.02.2013

suryadev

26.02.2013

21,462

67 / 27.02.2013

Sathavana

26.02.2013

21,462

67 / 27.02.2013

Sathavana

89,918

1467 / 27.02.2013

Sathavana

89,918

1467 / 27.02.2013

Sathavana

89,918

1467 / 27.02.2013

Sathavana

89,918

1467 / 27.02.2013

Sathavana

89,918

1467 / 27.02.2013

Sathavana

89,918

1467 / 27.02.2013

Sathavana

02.03.2013 /
02.03.2013
02.03.2013 /
02.03.2013
02.03.2013 /
02.03.2013

27.02.2013 /
05.03.2013
27.02.2013 /
05.03.2013
27.02.2013 /
05.03.2013
27.02.2013 /
05.03.2013
27.02.2013 /
05.03.2013
27.02.2013 /
05.03.2013
27.02.2013 /
05.03.2013
01.03.2013

89,918

1467 / 27.02.2013

Sathavana

121,990

71 / 03.03.2013

Sathavana

06.03.2013

178,766

1827 / 08.03.2013

Sathavana

06.03.2013

178,766

1827 / 08.03.2013

Sathavana

27.02.2013
27.02.2013

950
950

---

HRO
HRO

Page 163

February (2)
06.03.2013

8,694

1686 / 15.03.2013

JSWSL

01.03.2013

11,552

1768 / 12.03.2013

GMR

01.03.2013

11,552

1768 / 12.03.2013

GMR

28.02.2013

6955

1474 / 01.03.2013

KTR

05.03.2013

3,532

1488 / 05.03.2013

KTR

04.03.2013

13168

132 / 07.03.2013

suryadev

Page 164

Das könnte Ihnen auch gefallen