Subpresupuesto
Fecha
Lugar
001
01/01/2012
021808
Cdigo
Recurso
Unidad
Cantidad
Precio S/.
0147010001
011299001
0147010003
0147000022
0147010002
0147010004
0147000032
CAPATAZ
INSTALACION DE GRASS SINTETICO
OFICIAL
OPERADOR DE EQUIPO LIVIANO
OPERARIO
PEON
TOPOGRAFO
MANO DE OBRA
181.7254
hh
1,196.5700
est
722.4307
hh
95.2639
hh
hh
1,305.4806
hh
1,767.6497
hh
15.0188
15.82
25.90
12.62
12.62
14.39
11.40
14.39
0205010000
0239050000
0202000007
0202000008
0229600007
0204000000
0205010004
0213520041
02300100E1
0221000000
0221000093
0202170002
0202010005
0243510061
0203000032
0238000000
0230900005
0217000026
0230990016
0243000024
0244000016
0245010001
0205030075
0205000003
02050000E1
0205000009
0254010051
0243160052
0230570009
0260000002
0348040003
0348040034
0349040010
0348960005
0337010001
0349100007
0349090000
0348850092
0349030007
03305500E1
0349040033
0349070006
AFIRMADO
AGUA
ALAMBRE NEGRO RECOCIDO # 16
ALAMBRE NEGRO RECOCIDO # 8
ARCO METALICO CON TUBO F G 4"
S/DISEO INC. MALLA NYLON
ARENA FINA
ARENA GRUESA
ASFALTO RC250 PARA JUNTAS I/FLETE
CAL HIDRAULICA (25KG)
CEMENTO PORTLAND TIPO I (42.5KG)
CEMENTO PORTLAND TIPO MS
CLAVOS CON CABEZA DE 2 1/2", 3", 4"
CLAVOS PARA MADERA C/C 3"
ESTACA DE MADERA
FIERRO CORRUGADO PROMEDIO
HORMIGON
IMPRIMANTE SINOLITE
LADRILLO K.K. 18 HUECOS 9x13x24cm
LIJA PARA METAL
MADERA ANDAMIAJE
MADERA TORNILLO CEPILLADA
MADERA TORNILLO INC.CORTE P/ENCOFRADO
MATERIAL GRANULAR SELECCIONADO
PIEDRA CHANCADA DE 1/2"
PIEDRA CHANCADA DE 1/2" Y 3/4"
PIEDRA GRANDE DE 8"
PINTURA LATEX
REGLA DE MADERA
SUM. DE GRASS SINTETICO INC. CAMA ARENA
Y CAUCHO
TEKNOPOR DE 1" x 4' x 8'
MATERIALES
m3
m3
kg
kg
und
m3
m3
gln
BOL
BOL
bls
kg
kg
p2
kg
m3
kg
und
plg
p2
p2
p2
m3
m3
m3
m3
gln
p2
m2
pln
EQUIPOS
hm
hm
hm
hm
%MO
hm
hm
hm
hm
hm
hm
hm
Parcial S/.Presupuestado S
2,874.97
30,991.16
9,117.07
1,202.18
18,785.86
20,151.21
216.14
2,870.42
30,991.16
9,104.38
1,202.16
18,781.06
20,128.44
210.54
83,338.59
83,288.16
316.8407
41.6688
179.7636
44.8628
2.0000
27.20
10.17
4.00
4.00
3,851.92
8,618.05
423.78
719.04
179.44
7,703.84
8,618.62
422.25
719.06
179.46
7,703.84
11.9822
34.8973
0.7208
11.2290
346.6442
435.2418
119.9571
0.3366
35.0909
2,728.5510
31.5996
66.2095
2,635.5000
15.1336
31.3750
370.0475
2,594.6136
394.4225
18.6580
27.7656
17.8896
8.5127
17.6496
1,220.5014
24.00
25.00
9.92
7.50
15.90
16.70
5.10
5.10
3.50
2.98
30.00
1.42
0.68
1.50
4.20
4.70
4.50
25.45
50.00
52.00
30.00
32.50
5.00
80.50
287.52
872.50
7.14
84.23
5,511.58
7,268.51
611.80
1.73
122.82
8,131.08
948.00
94.02
1,792.14
22.70
131.80
1,739.24
11,675.75
10,037.99
933.00
1,444.04
536.70
276.57
88.25
98,250.25
285.62
872.75
7.12
84.21
5,511.01
7,268.43
619.31
1.68
126.33
8,133.68
947.98
94.59
1,792.14
22.70
131.78
1,741.40
11,675.78
10,035.07
932.90
1,443.81
536.69
276.19
91.72
98,250.36
2.7030
16.80
17.5895
48.6489
89.9874
83.1559
90.00
110.00
170.00
3.50
54.4239
22.3758
39.4140
22.3758
15.0188
6.5679
33.9119
20.00
135.00
15.00
114.00
12.50
180.00
9.50
Total
S/.
S/.
45.36
45.41
168,558.87
168,571.89
1,583.10
5,351.50
15,298.30
291.06
1,524.12
1,088.40
3,021.30
591.15
2,551.32
187.75
1,182.60
322.14
1,579.47
5,351.37
15,297.85
285.85
1,524.12
1,088.49
3,015.35
591.25
2,536.72
182.46
1,183.21
322.17
32,992.74
32,958.31
284,890.20
284,818.36
284,818.36
La columna parcial es el producto del precio por la cantidad requerida; y en la ltima columna se muestra el Monto Real que se est utilizando