Beruflich Dokumente
Kultur Dokumente
Incident Mgmt
*2 shift 7/16 *shift region = each Jabo 1 and Jabo 2 **using existing
Management Process
Netcool
External Alarms
RFM Existing
JABO BO
Escalation Level
FOP
Incident MGM
Management Process
RFM Existing : Handling Environment/External RBS Alarm Handling Site OOS due to power/transmission Dispatch to FOP JABO FO :
Handling Internal RBS Alarm First level troubleshooting, analysis the problem before dispatch to FOP JABO BO : Indicate first level analysis for repetitive and intermittent alarm 2nd level escalation Monitor MOS5200 for VIP Area Monitor FOP do the right action on field based dispatch from FO Analysis problem appears on Jabo Network and give preventive actions Handling VIP Complaint on Jabo Network and give root cause analysis ( correlation with TT/WO) Escalate or TR for 3rd party (BTS Hotel, BTS Repeater, etc) Shift leader Incident Management : 3rd level escalation Analysis for Repetitive problem and give preventive solutions Summary Report for Jabo Network then give improvement plan Lead meeting to all stake holder
Tools Overview
Tools Overview NetCool Alarm Monitoring System MOS 7100 for Trouble Ticket (TT) MOS 5200 for Performance Monitoring System WinFiol for 2G Ericsson Troubleshooting Amos for 3G Ericsson Troubleshooting
BO
RFM Existing
JABO EXCELLENT FO
FOP
Compliances : Zero miss alarm Reduce impacted service alarm to 70% Improved BTS availability to 98% No performance degradation caused by transmission link Reduce VIP complain on strategic area No sleeping cell (CS-PS)