Sie sind auf Seite 1von 18

COAL MINING IN ZIMBABWE

by Mabasa Temba HAWADI, Director, ZIMBABWE GEOLOGICAL SURVEY Ministry of Mines and Mining Development 30 March, 2012
COAL MINING IN ZIMBABWE AN OVERVIEW
FFF & IEA ZIMBABWE COAL INDABA: ROSEMANK HOTEL, RSA

CONTENTS
1. INTRODUCTION 2. OUTLINE OF GEOLOGY 3. COAL RESOURCES 4. COAL EXPLORATION
COAL MINING IN ZIMBABWE AN OVERVIEW
FFF & IEA ZIMBABWE COAL INDABA: ROSEMANK HOTEL, RSA

COAL MINING IN ZIMBABWE AN OVERVIEW


FFF & IEA ZIMBABWE COAL INDABA: ROSEMANK HOTEL, RSA

COUNTRY PROFILE
TOTAL AREA
LAND SIZE WATER AREA CAPITAL CITY COMMERCIAL LANGUAGE OTHER LANGUAGES CURRENCY CLIMATE POPULATION

390 757 square kilometers


386 670 square kilometers 4 087 square kilometers HARARE English Shona, Ndebele Multi currency system (USD, Rand, Pula, Euro) Subtropical climate. Rain season from November to March. +12 million

COAL MINING IN ZIMBABWE AN OVERVIEW


FFF & IEA ZIMBABWE COAL INDABA: ROSEMANK HOTEL, RSA

ECONOMY
Zimbabwe is well endowed with significant quantities of
MINERAL AGRICULTURAL and HUMAN resources. MINING IS A LEADER IN THE ECONOMIC DRIVERS THAT INCLUDE AGRICULTURE AND MANUFACTURING .
COAL MINING IN ZIMBABWE AN OVERVIEW
FFF & IEA ZIMBABWE COAL INDABA: ROSEMANK HOTEL, RSA

OUTLINE OF GEOLOGY
INDEX of detailed geological mapping About 60 - 65% of the country has been mapped in detail.
Each block has a 1:100 000 map & a descriptive text called Bulletin or Short Report all available at the Geological Survey Department
COAL MINING IN ZIMBABWE AN OVERVIEW
FFF & IEA ZIMBABWE COAL INDABA: ROSEMANK HOTEL, RSA

OUTLINE OF GEOLOGY

COAL MINING IN ZIMBABWE AN OVERVIEW


FFF & IEA ZIMBABWE COAL INDABA: ROSEMANK HOTEL, RSA

OUTLINE OF GEOLOGY

COAL MINING IN ZIMBABWE AN OVERVIEW


FFF & IEA ZIMBABWE COAL INDABA: ROSEMANK HOTEL, RSA

OUTLINE OF GEOLOGY Archaean Craton


60% is Archaean basement 2.5 3.8 Ga old Granite-gneisses enclosing volcano-sedimentary piles known as greenstone belts Greenstone belts rich in economic minerals

COAL MINING IN ZIMBABWE AN OVERVIEW


FFF & IEA ZIMBABWE COAL INDABA: ROSEMANK HOTEL, RSA

OUTLINE OF GEOLOGY Metamorphic belts surrounding craton


the Archaean Limpopo Mobile Belt to the south the Proterozoic Magondi to the northwest the Proterozoic Zambezi Mobile Belt to the north and northeast All rich in economic including metamorphic minerals
COAL MINING IN ZIMBABWE AN OVERVIEW
FFF & IEA ZIMBABWE COAL INDABA: ROSEMANK HOTEL, RSA

OUTLINE OF GEOLOGY Sedimentary Basins


the Proterozoic Magondi, Gairezi and Sijarira basins the Permian-TriassicJurassic Karoo Supergroup Cretaceous sediments Tertiary to Recent sands of the Kalahari.

COAL MINING IN ZIMBABWE AN OVERVIEW


FFF & IEA ZIMBABWE COAL INDABA: ROSEMANK HOTEL, RSA

COAL RESOURCES
Large reserves in Lower Karoo of the mid Zambezi Basin the Save-Limpopo basin. Estimated resources of >12 billion tonnes (20 billion tonnes) (26.65 billion tonnes) The Hwange area hosts large reserves of both coking and thermal coal. Despite the widespread occurrence, development and production has been around Hwange area. (Hwange, Makomo & Galpex) There has been limited coal production from the Sengwa, Tuli and Mkwasine coalfields

COAL MINING IN ZIMBABWE AN OVERVIEW


FFF & IEA ZIMBABWE COAL INDABA: ROSEMANK HOTEL, RSA

COAL RESOURCES
Known coal areas of Zimbabwe. 1

Sinamatella; 2 Western areas; 3 Hwange Colliery; 4 Entuba 5 Dahlia; 6 Hankano; 7 Lubimbi; 8 Sebungu; 9 Lubu; 10 Lusulu; 11 Sessami; 12 Kaonga; 13 Bari; 14 Sengwa South; 15 Sengwa North; 16 Nebiri; 17 Marowa; 18 Msambansovu; 19 Stranges Coal; 20 Sabi Valley; 21 Mkwasine; 22 Malilongwe; 23 Bendezi; 24 Chivumburu; 25 Bubye East; 26 Bubye West; 27 Singwezi; 28 Umzingwane; 29 Massabi. (now 34 locations)
COAL MINING IN ZIMBABWE AN OVERVIEW
FFF & IEA ZIMBABWE COAL INDABA: ROSEMANK HOTEL, RSA

COAL EXPLORATION
1. Geological Mapping/ Prospecting Licences/ Special Grants 2. Introduction of Exclusive Prospecting Order (EPO) on 1st July 1947 to facilitate prospecting over large areas. 1 in 1947. 1661 by October 2004.
Some discoveries through EPOs include: Lubimbi coalfield - EPO 13 Tuli coalfield - EPO 19 Bubye coalfield - EPOs 50 & 112 Sengwa coal deposit - EPO 446

COAL MINING IN ZIMBABWE AN OVERVIEW


FFF & IEA ZIMBABWE COAL INDABA: ROSEMANK HOTEL, RSA

COAL EXPLORATION
CURRENT GRANTED SPECIAL GRANTS and APPLICATIONS

COAL MINING IN ZIMBABWE AN OVERVIEW


FFF & IEA ZIMBABWE COAL INDABA: ROSEMANK HOTEL, RSA

STAGES FOR 27 COMPANIES Literature review, desktop studies and reconnaissance

Geological mapping and geophysical surveys to delineate drill targets Phase 1 drilling and borehole logging Phase 2 (follow up/ closer spaced grid) drilling Geological modeling & Feasibility studies Mining & Production
COAL MINING IN ZIMBABWE AN OVERVIEW
FFF & IEA ZIMBABWE COAL INDABA: ROSEMANK HOTEL, RSA

21%

21%

Mining & Production 3% 10% Feasibility & Modelling Phase 2 Drilling Phase 1 Drilling Mapping & Surveys Desktop & Reconnaissance

7%

38%

COAL MINING IN ZIMBABWE AN OVERVIEW


FFF & IEA ZIMBABWE COAL INDABA: ROSEMANK HOTEL, RSA

THANK YOU TATENDA SIYABONGA


COAL MINING IN ZIMBABWE AN OVERVIEW
FFF & IEA ZIMBABWE COAL INDABA: ROSEMANK HOTEL, RSA

Das könnte Ihnen auch gefallen