10C0541A02
DOCUMENT TITLE:
CTCI
CORPORATION
CERTIFIED 2
1 0 Revised as per PMTs comment Revised as per PMTs comment Issue for approval Hank Hank Hank Hank Karl Karl
PROJ.
10/12/11 MGR 10/08/11 CLIENT
DATE DATE
REV.
DESCRIPTION
BY
CHK.
APPR.
DATE
PAGE 1 OF 11
QA-000-AA-5013
Project No. 10C0541A02 IR-II U&O DBN PROJECT Revision No. Issue No. 3 Rev. 2 Title QA-000-AA-5013 Rev. 2 Inspection and Test Plan for Structure Steel Erection Works Reply Date
Date Received
12 Nov 2011
12 Nov. 2011
Item
1 2
Comments By PMT Mark this activity as Witness (W) scope of inspection for both CTCI and PMT Mark this activity as Witness (W) scope of inspection for PMT
Arrange these activities in the following sequence. Revised as per Page 4 Activity B 03 as B 05 Activity B 04 as B 03
12 Nov. 2011
Activity B 04
Activity B 05 as B 04 Add the following word in the work process activity Main Structure Mark this activity as Witness (W) scope of inspection for PMT
12 Nov. 2011
Activity B 03
12 Nov. 2011
12 Nov. 2011
Activity C 03
8
Remove this activity from this ITP and submit a separate ITP for this activity Remove these QVDs
12 Nov. 2011
Followed
12 Nov. 2011
ARABIAN ARABIANINDUSTRIAL INDUSTRIALFIBERS FIBERSCOMPA COMP YANBU, YANBU,KINGDOM KINGDOMOF OFSAUDI SAUDIARABI ARAB
Activity Work Process Characteristics Quality10C0541A02 Control Acceptance Criteria/ Quality Verifying Document Subcontract CONTRACTOR NAME: CTCI Corporation Contract No/Title: IR-II U&O DBN PROJECT No. Activity to be Verified Verification activity Specification H = (QVD) Mandatory HOLD Point.
Approval
Print Name
Signature
Erection of beams, bracings etc. As per inspection items PROJECT TITLE: with columns in the Checklist of QVD IR-II U&O DBN PROJECT B-03 Plumb & Level check prior to bolt As per inspection items tightening (Main Structure) in the Checklist of QVD B-04 Bolt Tightening As per inspection items WORK AREA/ACTIVITY DESCRIPTION: in the Checklist of QVD
B-02
SES-B02-S02 IFC Drawing SES-B02-S02 SES-B02-S02 SES-B02-S02 SES-B51-S03 Acceptance Criteria/ SES-B02-S02 Specification
B-05
As per inspection items in the Checklist of QVD Characteristics As per inspection items to be Verified in the Checklist of QVD
PMT
Test & Visual Check Quality Control Visual Check Verification activity
Activity Work Process B-06 Inspection of gratings, handrails, No. Activity kick plates, ladders and staircases A Material and Foundation C Paint/Touch-up Paint Release A-01 Material inspection C-01 Surface preparation and application of Paint A-02 Calibration of all the measuring (if Applicable) and Test Equipment D Final Inspection of Structural A-03 WPS/Welder Qualification Steel Erection
A-04 A-05
Conformance to As per inspection items Specification in the Checklist of QVD Calibration Report As per inspection items Record inQualification the Checklist of QVD As per inspection items in the Checklist of QVD As per inspection items in the Checklist of QVD
Test & Visual Check Visual Check Visual Check Visual Check Visual Check Visual Check
AISC303-05 PART7 SES-B02-S02, T01-S01 SES B02-S02, A01-S02 SES B02-S02 SES-B02-S02, T01-S01 AWS D1.1 SES B02-S02, A01-S02 SES A12-S01, A12-S02 SES B02-S02 IFC drawing IFC Drawing SES B02-S02
V V V V V V
Foundation Checked and released Foundation Surface Preparation, Anchor Bolt Check and Pad Installation Erection Dimensional Check: Length, size and bolt condition
Visual Check
AA-5013-1
B B-01
AA-5013-2
EQUIPMENT / MATERIAL INSPECTION RECORD FOUNDATION RELEASE FOR PAD ELEVATION OF COLUMN BASE PLATE
PURCHASE ORDER NO. PROJECT NO.
Project No
Page
REV. REV.
of
Drawing No.
CHECK RESULT SAT UNSAT RECORD NO. REMARK Remarks
01 Foundation inspections and tests complete. QUANTITY 02 Leveling plate or billet plate grouting complete and checked as per survey report below PACKING &APPEARANCE VISUAL 03 Check Surface preparation and Pad installation completed INSPECTION 04 Anchor Bolts condition MARKING SIZE & DIMENSION Pad Elevation of Column Base Plate (mm) EN E ES MATERIAL TEST REPORT S WS W WN N
NOT COMPLETION
NOT AVAILABLE
CERTIFICATION
Approved By
Series No.
Manufacturer
Calibrated Date
CTCI
JUDGEMENT PMT
ACCEPTABLE REJECT
This material receiving inspection record should be completed and signed by the receiving person while materials are delivered.
JN-540 84.11
22 Jan.2013
Area No
Car Parking
Page
Calibration date
2 of 2
Location
Item 01 02 03 04 05
Structural Steel Column @ G/L S & R axis 27-50 @ Car Parking Area Phase 1 Description of Check
Drawing No BSI-STR-ER-12-258-SH
Inspection Result Yes No N/A Result
Correct dimension and size Match of member Correct grade & length of bolts Correct size & bolts condition Correct Installed the Beam and bracing alignment, diagonal to meet the required elevation
Column No
Length (mm)
Actual Reading Actual Reading Difference (N/S-Direction) (E/W-Direction) Tolerance (mm) (mm) (mm) 1 3 2 1 3 1 3 2 1 2 3 2 1 2 2 2 2 2 2 2 2 1 2 3
Result Accept
Reject
Result
Col.@ G/L S axis 39 Col.@ G/L S axis 40 Col.@ G/L S axis 41 Col.@ G/L S axis 42 Col.@ G/L S axis 43 Col.@ G/L S axis 44 Col.@ G/L S axis 45 Col.@ G/L S axis 46 Col.@ G/L S axis 47 Col.@ G/L S axis 48 Col.@ G/L S axis 49 Col.@ G/L S axis 50
2110 2110 2110 2110 2110 2110 2110 2110 2110 2110 2110 2110
CTCI
MD. ABDUL MAJEED
PMT
SIRAJ UL HASSAN
AA-5013-3 KC-Q-CV-2557
07 Feb.2013
Project No.
Area No
Car Parking
Page
1 of 1
Car parking Shed Anchor Bolts @ G/L S, R,P,Q & T axis 27-53 @ Car Parking Area Phase 1 BSI-STR-ER-12-258-SH Bolt Type
HSB HSB HSB HSB HSB HSB HSB HSB HSB
Size
M20 M20 M20 M20 M20 M20 M20 M20 M20
Accept
Reject
Manufacturer KD
CTCI
DANNY T. BUGAY
SIRAJ UL HASSAN
GROUT/POUR CARD
Project No. 10C0541A02 IR-II U&O DBN PROJECT Area No
113
Page
1 of 1
Location
XF37A-0113-001
GROUTING PARTS
CONBEXTRA EP150
INSPECTION RESULTS
REMARKS
Yes 1. Pre-grouting Inspection 1.1 Chipped 1.2 Soaked in water 1.3 Drain location/Vent holes in Base plate 1.4 Blow out 2. Grout Inspection
No
N/A
2.1 Specified material did not exceed self life/expired date 2.2 The mix procedure used was in accordance with the manufacturers recommendations.
2.3 Curing according to manufacturers recommendation
DANNY T. BUGAY
SIRAJ UL HASSAN
AA-5013-5 Record No
Drawing No
Item 1
Description of Check
Ensure that the area has been prepared, clean and it was dry/free from condensation prior to the application of paint/coating
Remarks
Verify that the coating/painting has been mixed and applied in accordance with the relevant specification and/or manufacturers recommendation
Verify that the color of the paint applied was in accordance with the requirements of relevant project specification.
Verify that the correct number of coat has been applied in accordance with the requirements of relevant paint code.
Verify that the paint application has not fouled any moving parts (i.e. valve spindle)
Verify that all defects have been repaired & touch-up in accordance with the approved manufacturers instruction.
NOTES :
Sub Contractor
CTCI
PMT
Area No
Drawing No.
Location
Car Parking Shed Structural Steel @ Car Parking Area Phase 1 Description of Check
Inspection Results Yes No N/A Remarks
Item
01 Structural elements (main structure, handrails, grating, kick plates, ladders or staircases)- installed and checked against drawings
02 03 04 05 06
Structural elements - plumb, level, aligned All structural supports installed as per design Anchor bolts nuts tight Column base grouted Bolted connections checked
07 Welded connections checked Corre 08 Anchor bolt holes for equipment located on steel structures meet the manufacturers requirement Coatings applied, touch-up complete
09
REMARKS :
CTCI
PMT
DANNY T. BUGAY
SIRAJ UL HASSAN