SITE TEST REPORT

Replacement of 132/11kV Transformer, Transformer Protection Panels and 110V DC Batteries at W13 Substation CONTRACT No. N-6399

Consultant Main Contractor

ENERGO

Equipment : Circuit:

11kV Neutral Grounding ByPass Switchgear & 11kV Neutral Grounding Reactor 11 KV NGBS-1 Page 1 of 2

1. Bus Bar Contact Resistance: AIM : To check the contact resistance of the NGBS joints

H Tranformer Neutral

Q7
I

Q6

A 100 A DUCTOR

Solid Earthing

NGR Earthing

Tested by
ABB Transmission & Distribution

Witnessed by ENERGO

Approved by TRANSCO

Signature Name Date

SITE TEST REPORT


Replacement of 132/11kV Transformer, Transformer Protection Panels and 110V DC Batteries at W13 Substation CONTRACT No. N-6399

Consultant Main Contractor

ENERGO

Equipment : Circuit:

11kV Neutral Grounding ByPass Switchgear & 11kV Neutral Grounding Reactor 11 KV NGBS-1 Page 2 of 2

CURRENT INEJECTED: 100 A

Sl.No 1 2 3 4 5 6 7 8 9 10 11 12

Measured Point A B C D E* F G H I NGR Earthing Transformer Neutral Solid Earthing Transformer Neutral Total NGBS ( A - I )

Measured Resistance in ( ohms ) 4 2 9 4 3 5 11 4 1 60 63 93

* E measured with condition of 10 & 11


TEST EQUIPMENT DETAILS : MAKE PROGRAMMA TYPE 600 A Sl.No. CAL. DUE

Tested by
ABB Transmission & Distribution

Witnessed by ENERGO

Approved by TRANSCO

Signature Name Date