Sie sind auf Seite 1von 16

Building Material Prices for Pahang No Cement 1 Ordinary Portland Cement, 50kg bag 2 Ordinary Portland Cement in bulk

3 White Cement 40kg per bag, collection in MT Description Credit Term (Days) Del or Ex Unit bag MT MT 60 60 60 Delivered Delivered Delivered Dec-11 (RM) Dec-12 Dec-13 (RM) (RM) Pahang 16.70 17.60 18.50 317.1 769 333.00 807.50 349.70 847.90

No. Granite

Description

Credit Term (Days) Del or Ex Unit MT 60 ExFactory

Dec-11 (RM) 24.5

4 Granite Aggregate 3/4"

Dec-12 Dec-13 (RM) (RM) Pahang 25.80 27.10

No. Sand

Description Unit MT MT MT MT

Credit Term (Days) Del or Ex 30 30 30 30 ExFactory ExFactory ExFactory ExFactory

Dec-11 (RM) 15.8 25.2 16.1 23.1

5 Normal River Sand- Ex 6 Fine River Sand for Plastering- Ex 7 Normal Mining Sand 8 Fine Mining Sand for Plastering

Dec-12 Dec-13 (RM) (RM) Pahang 16.60 17.50 26.50 17.00 24.30 27.90 17.90 25.60

No.

Description Mild Steel Round Bar

Credit Term (Days) Del or Ex Unit MT MT MT MT MT 60 60 60 60 60

9 Mild Steel Round Bar R10, MS146 10 Mild Steel Round Bar R12, MS146 11 Mild Steel Round Bar R16, MS146 12 Mild Steel Round Bar R20, MS146 13 Mild Steel Round Bar R22, MS146

Dec-12 Dec-13 (RM) (RM) Pahang Delivered 2362.5 2480.70 2604.80 Dec-11 (RM) Delivered 2362.5 2480.70 2604.80 Delivered 2264.5 2377.80 2496.70 Delivered 2334.5 2451.30 2573.90 Delivered 2334.5 2451.30 2573.90

Building Material Prices for Pahang No. Description Mild Steel Round Bar Credit Term (Days) Del or Ex 60 60 Dec-12 Dec-13 (RM) (RM) Pahang Delivered 2334.5 2451.30 2573.90 Dec-11 (RM) Delivered 2334.5 2451.30 2573.90

Unit MT MT

14 Mild Steel Round Bar R25, MS146 15 Mild Steel Round Bar R32, MS146

No.

Description High Tensile Deformed Bar

Unit MT MT MT MT MT MT

Credit Term (Days) Del or Ex 60 60 60 60 60 60

16 High Tensile Deformed Bar-Y10, MS146 17 High Tensile Deformed Bar-Y12, MS146 18 High Tensile Deformed Bar-Y16, MS146 19 High Tensile Deformed Bar-Y20, MS146 20 High Tensile Deformed Bar-Y25, MS146 21 High Tensile Deformed Bar-Y32, MS146

Dec-12 Dec-13 (RM) (RM) Pahang Delivered 2369.5 2488.00 2612.40 Dec-11 (RM) Delivered 2369.5 2488.00 2612.40 Delivered 2264.5 2377.80 2496.70 Delivered 2264.5 2377.80 2496.70 Delivered 2264.5 2377.80 2496.70 Delivered 2264.5 2377.80 2496.70

No. BRC Fabric

Description Unit m2 m2 m2 m2 m2

Credit Term (Days) Del or Ex 30 30 30 30 30 Delivered Delivered Delivered Delivered Delivered

Dec-11 (RM) 6.8 9.24 12.6 15.5 18.8

22 BRC A6, MS145 23 BRC A7, MS145 24 BRC A8, MS145 25 BRC A9, MS145 26 BRC A6, MS145

Dec-12 Dec-13 (RM) (RM) Pahang 7.20 7.60 9.80 13.30 16.30 19.80 10.30 14.00 17.20 20.80

No

Description Ready Mix Concrete - Granite

Unit

Credit Term (Days) Del or Ex

Dec-11 (RM)

Dec-12 Dec-13 (RM) (RM) Pahang

27 Ready Mix Concrete - Normal Mix Grade10, Granite

m3

30

Delivered

183.4

192.60

202.30

Building Material Prices for Pahang No Description Ready Mix Concrete - Granite 28 Ready Mix Concrete - Normal Mix Grade15, Granite 29 Ready Mix Concrete - Normal Mix Grade20, Granite 30 Ready Mix Concrete - Normal Mix Grade25, Granite 31 Ready Mix Concrete - Normal Mix Grade30, Granite 32 Ready Mix Concrete - Normal Mix Grade35, Granite 33 Ready Mix Concrete - Normal Mix Grade40, Granite Unit m3 Credit Term (Days) 30 Del or Ex Delivered Dec-11 (RM) Dec-12 Dec-13 (RM) 202.30

(RM) Pahang 183.4 192.60

m3

30

Delivered

191.1

200.70

210.80

m3

30

Delivered

206.1

216.50

227.40

m3

30

Delivered

207.9

218.30

229.30

m3

30

Delivered

221.6

232.70

244.40

m3

30

Delivered

234.5

246.30

258.70

No Brick

Description

Credit Term (Days) Del or Ex Unit piece piece piece 30 30 30 Delivered Delivered Delivered

Dec-11 (RM) 0.4 0.23 1.1

34 Common Clay Bricks - Pallet 35 Cement Sand Brick - Pallet 36 Smooth Face Facing Brick, Red

Dec-12 Dec-13 (RM) (RM) Pahang 0.50 0.60 0.30 1.20 0.40 1.30

No

Description Concrete Roof Tiles

Unit piece

Credit Term (Days) Del or Ex 60 Delivered

Dec-11 (RM) 1.8

37 Interlock concrete Tiles - Standard Duotone Colour (Monier Elabana)

Dec-12 Dec-13 (RM) (RM) Pahang 1.90 2.00

No

Description Metal Sheet Decking

Credit Term (Days) Del or Ex Unit m2 30 Delivered

Dec-11 (RM) 55.3

38 MS Decking - Lysaght Colourbond Spandek Hi - Ten 0.47mm TCT

Dec-12 Dec-13 (RM) (RM) Pahang 58.10 61.10

Building Material Prices for Pahang No Description Metal Sheet Decking Credit Term (Days) Del or Ex Unit m2 30 Delivered Dec-11 (RM) 60.5 Dec-12 Dec-13 (RM) (RM) Pahang 63.60 66.80

39 MS Decking - Lysaght Colourbond Kliplok Hi - Ten 0.53mm TCT

No

Description Roofing Sheet

Unit sheet

Credit Term (Days) Del or Ex 60 Delivered

Dec-11 (RM) 29.1

40 Corrugated Roofing Sheet - 76mm Double Width, 1065 x 2440mm x 4mm (Hume/Malex/UAC)

Dec-12 Dec-13 (RM) (RM) Pahang 30.60 32.20

No Floor Tiles

Description

Credit Term (Days) Del or Ex Unit Piece 60 Delivered

Dec-11 (RM) 1

41 Glazed Ceramic Floor Tiles, Standard Light Colour 200mm x 200mm x 8mm Grade 1 42 Glazed Ceramic Floor Tiles, Standard Light Colour 300mm x 300mm x 8mm Grade 1 43 Plain Homogeous Floor Tiles, Standard Light Colour 200mm x 200mm x 8mm Grade 1 44 Plain Homogeous Floor Tiles, Standard Light Colour 300mm x 300mm x 8mm Grade 1

Dec-12 Dec-13 (RM) (RM) Pahang 1.10 1.20

Piece

60

Delivered

1.9

2.00

2.10

Piece

60

Delivered

1.5

1.60

1.70

Piece

60

Delivered

2.4

2.60

2.80

No Paver

Description

Credit Term (Days) Del or Ex Unit Piece Piece 60 60 Delivered Delivered

Dec-11 (RM) 0.9 0.9

45 Uni-Espave - 200mm x 190mm 46 Uni-Pave/ Sunpave, 225mm x 112.5mm

Dec-12 Dec-13 (RM) (RM) Pahang 1.00 1.10 1.00 1.10

Building Material Prices for Pahang No Description Plain Cellulose Fibre Credit Term (Days) Del or Ex Unit Sheet 60 Delivered Dec-11 (RM) 4.5 Dec-12 Dec-13 (RM) (RM) Pahang 4.80 5.10

47 Plain Cellulose Fibre Ceiling Sheet 610mm x 1220mm x 3.2mm (UAC/HUME/MALEX) 48 Plain Cellulose Fibre Ceiling Sheet 610mm x 1220mm x 4.5mm (UAC/HUME/MALEX)

Sheet

60

Delivered

7.2

7.60

8.00

No

Description Gypsum Ceiling Board

Credit Term (Days) Del or Ex Unit Sheet 60 Delivered

Dec-11 (RM) 5.3

49 Plain Gypsum Ceiling Board 610mm x 1220mm x 9.5mm Boral/Amrstrong

Dec-12 Dec-13 (RM) (RM) Pahang 5.60 5.90

No Timber Door

Description

Credit Term (Days) Del or Ex Unit Piece 60 Delivered

Dec-11 (RM)

50 Solid decorative Timber Door 3' x 7' (Branded), Certificated by SIRIM

Dec-12 Dec-13 (RM) (RM) Pahang 205.1 215.40 226.20

No Pipes

Description

Credit Term (Days) Del or Ex Unit 6m run 60 Delivered

Dec-11 (RM) 38.1

51 Galvanised Iron Class A- 20mm Diameter (Maruici) , MS863

Dec-12 Dec-13 (RM) (RM) Pahang 40.10 42.20

52 PVC Pressure Pipes Class D, Grey Colour, 50mm Diameter (Paling), MS628 53 HDPE Pipe PN 10 - 50mm Diameter, MS1058 54 ABS Pipe PN 15 Class E - 20mm, MS1419

4m run 100m roll 5.8m run

60

Delivered

26.4

27.80

29.20

60

Delivered

408.5

429.00

450.50

60

Delivered

25

26.30

27.70

Building Material Prices for Pahang No Polytank 55 Polyethelene Water Tank (Polytank), circular, 100 Gallons, MS1225 Weida Equivelant Description Credit Term (Days) Del or Ex Unit No. 60 Delivered Dec-11 (RM) Dec-12 Dec-13 (RM) (RM) Pahang 120.1 126.20 132.60

No

Description Hand Wash Basin

Credit Term (Days) Del or Ex Unit Set 60 Delivered

Dec-11 (RM) 77.4

56 Wash Hand Basin - 560mm x 406mm, White Colour, Jacqueline WB 142, Claytan

Dec-12 Dec-13 (RM) (RM) Pahang 81.30 85.40

No

Description Water Closets

Credit Term (Days) Del or Ex Unit Item 60 Delivered

Dec-11 (RM)

57 Water Closet Western Type - WC 644 White Colour Without Cistern Claytan 58 Water Closet Eastern Type Bengal ACBL-000, Without Cistern White Colour, Johnson-Suisse

Dec-12 Dec-13 (RM) (RM) Pahang 120.4 126.50 132.90

Item

60

Delivered

58.3

61.30

64.40

No

Description

Credit Term

Dec-11

Dec-12 Dec-13

Stainless Steel Sink 59 Single Bowl Single Drainer Lay On Type, 42" x 18"

Unit Item

(Days) 60

Del or Ex Delivered

(RM) 88.9

(RM) Pahang 93.40

(RM) 98.10

No Nippon

Description Unit 5 Liters

Credit Term (Days) Del or Ex 60 Delivered

Dec-11 (RM)

60 Paint - Nippon Standard Colour Gloss Oilbase, 9000 Gloss Finish

Dec-12 Dec-13 (RM) (RM) Pahang 103.2 108.40 113.90

Building Material Prices for Pahang No Nippon 61 Paint - Nippon Standard Colour Internal Emulsion, Luxury, Waterbase, Satin Glo 62 Paint - Nippon - Internal Emulsion Waterbase, Finish, Standard Colour, Super Matex 63 Paint - Nippon Standard Colour External Acrylic Emulsion, Weatherbond Description Credit Term (Days) Del or Ex Unit 5 Liters 60 Delivered Dec-11 (RM) 95.6 Dec-12 Dec-13 (RM) (RM) Pahang 100.40 105.50

7 Liters

60

Delivered

33

34.70

36.50

5 Liters

60

Delivered 102.34

107.50

112.90

No

Description Hollow Sections

Credit Term (Days) Del or Ex Unit MT 60

64 Square Hollow Section 50mm x 50mm x 3.0mm (4.38kg/m) 65 Rectangular Hollow Section 150mm x 100mm x 4.5mm (16.9kg/m)

Dec-12 Dec-13 (RM) (RM) Pahang Delivered 3328.5 3495.00 3669.80 Dec-11 (RM)

MT

60

Delivered 3391.5 3561.10 3739.20

No Beams

Description

Credit Term (Days) Del or Ex Unit MT 60

66 Universal Beams 356mm x 368mm x 13.33mm (162.2kg/m) 67 Structural Sections and Beams

Dec-12 Dec-13 (RM) (RM) Pahang Delivered 3280.9 3445.00 3617.30 Dec-11 (RM)

MT

60

Delivered

2384.2 2503.50

No Equal Angles

Description Unit MT

Credit Term (Days) Del or Ex 60

67 Equal Angles 50mm x 50mm x 4mm (3.06kg/m)

Dec-12 Dec-13 (RM) (RM) Pahang Delivered 2717.1 2853.00 2995.70 Dec-11 (RM)

Building Material Prices for Pahang No Plywood 68 Plywood - Shuttering Board 4' x 8' x 12mm 69 Plywood - Shuttering Board 4' x 8' x 25mm 1st Grade Description Credit Term (Days) Del or Ex Unit Piece 60 Delivered Dec-11 (RM) Dec-12 Dec-13 (RM) (RM) Pahang 53 55.70 58.50

Piece

60

Delivered

137 143.90

151.10

54

Oil & Gas Price 405

422

455

459

489

517

84.4

58.4

901

55.4

Oil & Gas Price

7235