Transmission and Distribution Line And Substation Infrastructures

SETBACKS & WAYLEAVE CORRIDORS - EXISTING & FUTURE INSTALLATION CONCEPTS

SABAH ELECTRICITY SDN BHD

Sabah Power Grid Network System

Concepts of Electrical Grid System


GENERATION

TRANSMISSION

DISTRIBUTION

CONSUMERS

Regulatory Requirements & Prudent Utility Practices


1. Meet Regulatory Requirements & Prudent Utility Practices
i. ii. iii. iv. v. Electricity Supply Act 1990 Electricity Regulation 1994 EC Malaysia Way-leave Guidelines SESB Electricity Supply Application Handbook (2008) SESB Safety Rules and Design Specifications

2. Design & develop electrical system infrastructures in an


economical way considering safety, security, efficiency and reliability of power supply.

Requirement Under The Act/Regulations


Ensure safety of person and security of the supply lines, the Electricity Supply Act 1990 and the Electricity Regulations 1994 stipulate the following provisions: 1. No person shall without lawful authority of the supply authority of the licensee, undertake any work or engage in any activity in the vicinity of any electrical installation or part of thereof in a manner likely to interfere with any electrical installation or to cause danger to any person or property. 2. The minimum clearances from ground for supply lines shall be as shown in following tables. 3. The minimum clearance of any building or structures from high voltage supply lines, apart from a substation building, must not be less than 4.57 metres.

Minimum Ground Clearance for Transmission Lines


Operating Voltage of the Lines Clearance from Ground (As provided for in the Electricity Regulations 1994) In positions inaccessible Over roads Other than over roads to vehicular traffic (metres) (metres) (metres) 6.1 6.1 5.18 6.7 6.7 5.79 7.0 7.0 7.0 7.3 7.3 7.3

66kV 132kV 275kV 500kV

* Ensure that trees or plants grown under or in the vicinity of the high voltage electricity supply lines are less than 2.4 metres in height

Minimum clearance of any building or structures from high voltage supply lines, apart from a substation building, must not be less than 4.57 metres.

Minimum Ground Clearance for Distribution Line Up to 33kV


Clearance from Ground (As provided for in the Electricity Regulations 1994) In positions inaccessible Over roads Other than over roads to vehicular traffic (metres) (metres) (metres) 5.49 5.79 5.18 5.49 4.57 4.88

Operating Voltage of the Lines

415V 11kV 33kV

* Ensure that trees or plants grown under or in the vicinity of the high voltage electricity supply lines are less than 2.4 metres in height

Minimum clearance of any building or structures from high voltage supply lines, apart from a substation building, must not be less than 4.57 metres.

REASONS FOR SETBACKS/BUFFER ZONES


a) Reduce the potential for future incompatible land use conflicts b) Restrict the future development of sensitive land uses in close proximity to existing or proposed distribution & transmission infrastructures c) Meet Regulatory Requirements

FUTURE KOTA KINABALU ELECTRICAL TRANSMISSION SYSTEM

Typical Transmission Overhead Line Structures

Typical Right of Way For Overhead Line Structures

20m

20m

Pole Structure for Transmission Line

Close-up of the Base of an Angle Structure

Typical Future Transmission Overhead Steel / Concrete Pole Structure

Typical Right of Way For Overhead Steel / Concrete Pole Structure

20m

20m

Future Typical Right of Way For Transmission Overhead Line Structures


Tower or Pole

Red Zone measured 12m either side of transmission line + distance around structure and conductor swing Orange Zone measured 20m either of the red zone Green Zone beyond the orange zone

Typical Transmission Underground Cable System Infrastructure

Wayleave Corridors for Transmission Underground Cable System


Corridor for underground Cable

Road

Road Shoulder / Perimeter Drain

No

Voltage System

Corridor for Underground Cable from Road Shoulder / Perimeter Drain (A) 5m 3m

1 2

275 kV System 132/66 kV System Ground Surface

2m
Gas/Water/Telco. pipe

SESB Cable

3m

Typical GIS Building

Indoor Gas Insulated Switchgear Building

Future Underground GIS substation

Use of gas-insulated switchgear allowed the 132-kV transformer substation in the center of Kota Kinabalu to be constructed underground and a park built over it which harmonizes with the surroundings. The sound of the waterfall, which acts as a heat-exchanger, hides the noise made by the fans.

Wayleave Requirement for SESB Distribution Overhead Line

Road Shoulder / Perimeter Drain No 1 2 3 4 5

Building Structure / Plants Wayleave Distance A 2m 2m 3m 3m 8m Wayleave Distance B 5m 2m 6m 3m 8m

Type of conductor Aerial Bundled Cable (ABC) 33 kV Aerial Bundled Cable (ABC) 11 kV Overhead Line (Bare) 33 kV Overhead Line (Bare) 11 kV Overhead Line (Lattice Tower) 33 kV

Wayleave Corridors for Distribution Underground Cable System


Corridor for underground Cable

Road

Road Shoulder / Perimeter Drain

No

Voltage System

Corridor for Underground Cable from Road Shoulder / Perimeter Drain (A) 2m 1.5 m

1 2

33 kV System 11 kV System Ground Surface

1.2m
Gas/Water/Telco. pipe

SESB Cable

2m

Wayleave Requirement for Distribution Substation

Building / Structure Building / Structure PPU PE Sewerage Pump House 50m 30m

Distance
Sewerage Pond

PPU/PE SESB Garbage Collection Center 50m 50m Waste Disposal Center 500m 100m

250m 100m

Building / Structure PPU PE

Slope Upward (with retaining wall) 10m 10m

Slope Downward (with retaining wall) 30m 30m

River

Ocean

50m 50m

250m 100m

Typical Setback for Distribution Substation

Typical Substation Land and Building Sizes Requirements


Substation Category Type Gas Insulated Switchgear (GIS) without outdoor switchyard a) 132/33/11kV b) 275/132/33kV Conventional Outdoor AIS a) 132/33/11kV b) 275/132/33kV Indoor Type Outdoor Switchyard (a) Conventional (33kV) (b) Conventional (11kV) (a) Single transformer substation (b) Double transformer substation Distribution Substation (PE) 11/0.400kV (c) Compact Substation (d) Outdoor Substation Land Size (Building Size) Building Design Customized design subject to SESB approval 1.5 acres 2 acres 8 acres 20 acres 45 m x 45 m (23 m x 29 m) Subject to SESB approval 33 mx 22 m (21 m x 10 m) 20 m x 14 m (8 m x 6 m) 14 m x 18 m (8 m x 6 m) 17 m x 18 m (11 m x 6 m) Subject to SESB approval 6mx6m For special case application Limited to those located in the rural areas. According to SESB design Customized design subject to SESB approval (with inclusion of meter room) Customized design subject to SESB approval

Pencawang Masuk Utama (PMU)

Pencawang Penurun Utama (PPU) 33/11kV Main Switching Substation (SSU) 33kV & 11kV

Future Challenges & Moving Forward


A long-term planning, strategic line route and line corridor selection and setbacks :
With a changed and more focused approach With clearer governmental strategy/plan for SESB Projects

The issue of incompatible land uses between high voltage transmission and distribution lines, substations and sensitive land uses could be addressed by creating buffer zones that apply to future development areas to be implemented in the next update of the Kota Kinabalu Local Plan 2020 and Structural Plan 2030 and Land Use Bylaw review.

THANK YOU FOR YOUR ATTENTION

Das könnte Ihnen auch gefallen