GENERAL FRAMEWORK: 1.

Health and Safety documents should show Adequate arrangement of audits Effective safety management systems Hazards with potential to cause major accident that has been identified

2. Escape plan for leaving workplace safely in the event of danger and an associated rescue plan 3. Testing and maintenance of all the equipments should be done prior to the use of the same. 4. In case of emergency, and any type of acoustic system should be provided for transmitting of sound to every part of the site. (Remote Control System) 5. Training should be given for every Act, to the workers 6. Wherever necessary, in accordance with the level of risk, should have suitable signs and should be readily identified by the workers 7. No sharp or similar objects to be allowed to remain in the workplace as it may be a source of danger 8. The arrangements for carrying out demolition or dismantling shall be recorded in writing before the demolition or dismantling work begins 9. During excavation, care should be taken that Any of the excavation part does not collapse No material from the side or roof falls or is dislodged No person is buried in the excavation of any of the roof or part is dislodged or falls

10. Energy distribution installations should be suitably located, checked and clearly indicated 11. There should be proper diversion of traffic and segregation of pedestrian and vehicular flow of traffic for smooth functioning of the traffic and for the safety of the workers 12. Changing rooms and lockers to be provided. Changing room with seating to be provided. 13. Precautions to be taken while loading and unloading of the goods and materials

Das könnte Ihnen auch gefallen