Beruflich Dokumente
Kultur Dokumente
NO
1
2
3
4
TGL
3/9/2013
3/16/2013
3/23/2013
3/30/2013
Rp
Rp
Rp
Rp
JUMLAH
Rp
TUKANG
MATERIAL
915,000.00 Rp
706,000.00
1,860,000.00 Rp 1,148,000.00
2,320,000.00 Rp 1,619,000.00
1,260,000.00 Rp
299,500.00
Rp
900,000.00
+
+
6,355,000.00 Rp 4,672,500.00
JUMLAH TOTAL
Rp 11,027,500.00