LIST OF ASSUMPTIONS

CONTRACT NO: 6600029560

Assumptions means: those requirements that are not stated anywhere in the Requisition but are required by Bidder

Job No : JI-2018

JOB No. REQUISITION No. REQUISITION For


Item Paragraph No. No. Document No. A Requisition Original Requirement

JI-2018 J55-U-VE-756357 Thermal Oxidiser Package


Description of Assumptions (See note ** below) Reason

P.O. No. Date Supplier Name


CONTRACTOR Assessment

: : : LAKSEL EPS Technologies Pte. Ltd.


PRINCIPAL Response

Data Sheet/Design Basis/PFD/P&ID 1. On page no. 11, Section-5.1 Inlet Conditions in document J55-U-DAT-VE557384 2. On page no. 11, Section-5.1 Inlet Conditions in document J55-U-DAT-VE557384

Detailed composition of VOCs

Design flow rate of VOCs

Mole or mass fractions of the VOC components has been assumed based on BTEX (Benzene, Toluene, Ethylbenzene, and Xylene and some lighetr hydrocarbons) Design flow rate is considered 8515 m3/hr per datasheet. However, the individual split from the various sources is assumed for the suction manifold sizing.

Project Specification

SDRL