INDIABULLS POWER LIMITED

Amravati,Maharastra

Unit

PTW No.

Date.

B.F.P NORMALISATION PROCEDURE


FIELD
STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 ACTIVITIES Required Done Remarks

Close main pump casing drain Close booster pump casing drain Close booster pump suction strainer drain Close main pump suction strainer drain Close drain valve after NRV Close drain valve after minimum recirculation valve Open minimum flow recirculation valve at deaerator Open suction valve Close vent valve in BFP discharge line after priming. Close booster pump vent after priming. Open BP DE/NDE seal CW(S) valve Open BP DE/NDE seal CW(R) valve Open main pump DE/NDE seal coolers CW (S) valve Open main pump DE/NDE seal coolers CW (R) valve Open W.O.Cooler-1 CW (S) valve Open W.O cooler -1 CW ( R ) valve Open W.O cooler-2 CW (S) valve Open W.O cooler -2 CW ( R ) valve Open BFP motor cooler CW(S) valve Open BFP motor CW (R) valve Open lub. Oil cooler-1 CW(S) valve Open lub. Oil cooler-1 CW(R) valve Open lub. Oil cooler-2 CW(S) valve Open lub. Oil cooler-2 CW(R) valve CONTROL ROOM

STEPS 1 2 3 4 5 6

ACTIVITIES

Required

Done

Normalise Lub. Oil pump module Normalise discharge valve module. Normalise IBV module. Normalise W.O coolers inlet CW valve module. Rack in the breaker Rack in both breakers i.e SA and SB in case of pump-C Name
Signature

INDIABULLS POWER LIMITED


Amravati,Maharastra

Unit

PTW No.

Date.

B.F.P ISOLATION PROCEDURE


FIELD
STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 ACTIVITIES Required Done Remarks

Close suction valve Close discharge valve IBV Close minimum flow recirculation valve at deaerator Open vent valve in BFP discharge line. Open drain valve after NRV Open main pump casing drain Open booster pump vent Open booster pump casing drain Open suction strainer drain Close BP DE/NDE seal CW(S) valve Close BP DE/NDE seal CW(R) valve Close main pump DE/NDE seal coolers CW (S) valve Close main pump DE/NDE seal coolers CW (R) valve Open drain valve after minimum recirculation valve Close W.O .cooler-1 CW (S) valve Close W.O cooler -1 CW ( R ) valve Close W.O cooler-2 CW (S) valve Close W.O cooler -2 CW ( R ) valve Close BFP motor cooler CW(S) valve Close BFP motor CW (R) valve Close lub. Oil cooler-1 CW(S) valve Close lub. Oil cooler-1 CW(R) valve Close lub. Oil cooler-2 CW(S) valve Close lub. Oil cooler-2 CW(R) valve Open main pump suction strainer vent Open main pump suction strainer drain CONTROL ROOM

STEPS 1 2 3 4 5 6

ACTIVITIES

Required

Done

Rackout the breaker Rack out both breakers i.e SA and SB in case of pump-C Close discharge valve and isolate module Close IBV and isolate module Isolate Lub. Oil pump module Close W.O cooler I/L valve. Isolate module Name
Signature