Beruflich Dokumente
Kultur Dokumente
Sheet No. 1 of 1
Calc by: SCS Date 11/7/2008
Check by: Date
De Minimus Calculations
80% TSS removal must be achieved on an average weighted basis from the site as a whole using the
"Weighted Average Method".
(from Vol. 3, Ch. 1, Page 35, Massachusetts Stormwater Handbook)
Drainage Areas
Area Size (ac) TSS Removal (%) (AreaXTSS)
Re2 0.34 97% 0.3298
Re3 0.07 97% 0.0679
P33 0.21 78% 0.1638
SUM= 0.62 SUM= 0.5615
= 0.5615
0.62