SHELL SHIFTING STATUS REPORT

PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchpinda, Chhattisgarh

WORK ORDER No.:

REPORT No.:RKMFY/

PART DESCRIPTION

PART IDENTIFICATION

FINAL STAGE CLEARANCE

REMARKS

1 2 3 4

STEEL TUBE BODY FOR FLUE GAS DUCT

QC CHECK SHEET

CHECKED

NOT APPLICABLE WELDING/SURFACE DEFECT CHECK SPATTER SLAG PHYSICAL COND. REINFORCEMENT LUMPS / HIGHSPOT SURFACE DEFECTS WELDSIZE CLEAT MARK

INSPECTION RESULTS : Inspection passed. The Contractor is allowed to proceed with the works Remedial works listed above to be completed and inspection is required after remedial works Remedial works listed below to be completed but no further inspection required Rejected CONTRACTOR SIGNATORY
NAME SIGN DATE NAME SIGN DATE

AXON PRODUCTION
STATUS ACCEPT

AXON QA/QC
NAME SIGN DATE

TATA/SGS/NWPP

RECTIFY & REOFFER

PAGE NO.:1 OF 1