4/16/2008 Project: 3923 Client: Sherwood Copper Corp Location: Kutcho Creek

Equipment Specification Sheet: SAG Mill


Kutcho Creek is a massive sulphide copper and zinc deposit in Northern BC, Canada, which is being engineered to operate at a milling rate of 4000 tonnes/day. The ore contains chalcopyrite, sphalerite, and pyrite. Specific Gravity Ball Mill Work Index Primary Grind 3.6 tonnes/m3 11.1 metric @ P80 88 m P80 43 m

The proposed separation consists of sequential separation of copper followed by zinc. Production Rate Rod Mill Work Index Ball Mill Work Index Feed to SAG Mill Product from SAG Mill SAG Mill Pinion Power SAG Mill Motor Size SAG Mill Size (Diameter) (Length) 181.2 tonnes/hour 8.6 metric 12.2 metric 80% passing 150 mm 80% passing 1000 m 1155 kW 1268 kW (1700 HP) 5.791 m (19 ft) 2.286 m (7.5 ft)

If the milling rate increased from 4000 to 5000 tonnes/day (25% increase) the SAG mill would need to increase to: SAG Mill Pinion Power SAG Mill Motor Size SAG Mill Size (Diameter) (Length) 1444 kW 1604 kW (2150 HP) 6.096 m (20 ft) 2.591 m (8.5 ft)

Page 1 of 1