Sie sind auf Seite 1von 1

TCOT Emergency Response Plan Appendix 2 Pre Incident Plan (PIP)

MY PMO S 07 022 Rev. 1 March 2013

Pre Incident Plan (PIP) Type of Emergency/Scenario: VESSEL BREAKOUT (MARINE OPERATION EMERGENCIES) Location of Emergency/Scenario: Terengganu Crude Oil Terminal (TCOT) Vessel Breakout near to SALM at TCOT RESPONSE OBJECTIVE(S): 1 To assist mooring master on board when vessel breakout 2 To notify Kerteh Marine Control 3 To activate the Oil Spill Response action if found that hose string part during breakout which may caused oil spill 4 To activate additional assistance from PETRONAS Refinery support craft IMMEDIATE RESPONSE ACTION
1. Mooring vessel Master 1.1 Notify TCOT Control Room 1.2 Stop all ongoing operations e.g. deblasting, loading 1.3 Notify Kerteh Marine Control 2.1 Notify PMO Incident Commander (PMO IC) 1.1.1 Radio 1.3.1 Radio 2.1.1 Telephone

RESOURCES REQUIRED

REMARKS

2. On Scene Commander (OSC)

1stRESPONSE
1. Mooring vessel Master

ACTION
1.1 Maintain the vessel close to SALM with engine and the tug assistance in order to disconnect the cargo hose and lower the hose to the sea 1.2 Maneuver the tanker clear of the berth

RESOURCES REQUIRED

REMARKS

2ND RESPONSE
1. On Scene Commander (OSC)

ACTION
1.1 Prepare to call out PIMMAG if the potential of oil spill at the SALM is likely. 1.1.1 Telephone

RESOURCES REQUIRED

REMARKS

OTHER ACTIONS,CONCERNS:
1 Sudden bad weather 2 Multiple emergencies at TCOT

1 Major oil spill which may escalate to sensitive area

ONGOING POTENTIAL HAZARDS:

*This Pre Incident Plan (PIP) shall be reviewed and updated once the actual kind of emergency take place at TCOT