Sie sind auf Seite 1von 104

Code

1
1.1
1.1.1
1.1.1a
1.1.1b
1.1.1c
1.1.2
1.1.2a
1.1.2b
1.1.2c
1.1.2d
1.1.2e
1.1.2f
1.1.3
1.1.3a
1.1.3b
1.1.3c
1.4
1.4a
2
2.1
AWC0109
3
3.1
3.1a
MCM0029
MCM0066
MCM0007
MCM0015
ALA0024
ALA0040
AHI0003
AHI0006
ALA0026
3.1b
MCM0029
MCM0066
MCM0007
MCM0015
ALA0024
ALA0040
AHI0003
AHI0006
ALA0026
3.2
3.2a
MCM0044
MCM0022
AWC0111
ALA0095
ALA0026
3.3
3.3a
MCM0032
MCM0066
MCM0007
AHI0001
ALA0046
ALA0026
3.3b
MCM0032
MCM0066
MCM0007
AHI0001
ALA0046
ALA0026

Description
ALUMINIUM JOINERY WORKS
ALUMINIUM WINDOWS
Providing, fitting and fixing coloured anodised 20 microns aluminium glazed
W1 of 1800 x 1200mm - Casement openable Windows
W2 of 1200 x 1200mm - Casement openable Windows
W3 of 900 x 1200mm - Casement openable Windows
-do- as above but for Door cum window as per manufacturers specifications
DW1 - 750 x 2100 / 1650 x 2000mm
DW2 - 750 x 2100 / 1500 x 2000mm
DW3 - 750 x 2100 / 1350 x 2000mm
DW4 - 750 x 2100 / 1050 x 2000mm
KW1 - 750 x 2100 / 900 x 1050mm
KW2 - 750 x 2100 / 750 x 1050mm
Providing and fixing in position Aluminium Ventilators of approved size as per
V - 600 x 600 mm - Glazed louvered.
V1 - 2000 x 600 mm - Glazed louvered.
V2 - 1200 x 600 mm - Glazed louvered.
Supply and fixing of approved colour and shade Anodised to 20 micron
Lobby Door : MD1 Double Leaf glass door overall size 1500 x 2100 mm
ANTI-TERMITE TREATMENT WORKS
Providing Anti termite treatment in accordance with stipulations laid down by
Anti Termite treatment
CONCRETE FLOORING
Providng and laying M20 grade Concrete IPS flooring of 50mm thick with
Stilt floor
12mm Blue metal
River sand
Cement - OPC 43 Grade
4mm Glass Strip
Labour for laying - Grano Concrete
Labour for finishing - Grano
Hoist
Scaffolding
Labour for Curing
Fifth floor (LMR)
12mm Blue metal
River sand
Cement - OPC 43 Grade
4mm Glass Strip
Labour for laying - Grano Concrete
Labour for finishing - Grano
Hoist
Scaffolding
Labour for Curing
Providing and laying Vacuum dewatered flooring of specified thickness with
50mm Thk.
RMC M30
Craft Paper
Filling grooves with polysulphide sealent
Labour for VD & Screed vibrator including fixing of channel
Labour for Curing
Providing ad laying Granolitic finish with vaccum dewatered flooring of 50mm
a. In Ground Floor
6mm Blue Metal
River sand
Cement - OPC 43 Grade
Concrete Equipment
Labour for laying & finishing
Labour for Curing
b. In First Floor
6mm Blue Metal
River sand
Cement - OPC 43 Grade
Concrete Equipment
Labour for laying & finishing
Labour for Curing

Unit

Qty

Rate

Nos
Nos
Nos

1
1
1

9516.96
6520.88
5287.2

Nos
Nos
Nos
Nos
Nos
Nos

1
1
1
1
1
1

23010.335
22068.5525
21136.6835
18964.5255
12257.492
11026.015

Nos
Nos
Nos

1
1
1

1013.38
3053.358
1938.64

Nos

17348.625

Sqmt
Sqmt

1
1.00

42
39.00

Sqmt
m3
m3
Bag
Sqmt
m3
Sqmt
Nos
Sqmt
Sqmt
Sqmt
m3
m3
Bag
Sqmt
m3
Sqmt
Nos
Sqmt
Sqmt

1
0.24
0.12
0.45
0.09
0.05
1.00
1.00
1.00
1.00
1
0.24
0.12
0.45
0.09
0.05
1.00
1.00
1.00
1.00

641.36
815.78
1112.42
283.00
484.38
525.00
84.00
100.00
25.00
5.00
641.36
815.78
1112.42
283.00
484.38
525.00
84.00
100.00
25.00
5.00

Sqmt
m3
Sqmt
Rmtr
Sqmt
Sqmt

1
0.05
1.00
0.54
1.00
1.00

475
4,750.00
15.00
140.00
50.00
10.00

Sqmt
m3
m3
Bag
m3
Sqmt
Sqmt
Sqmt
m3
m3
Bag
m3
Sqmt
Sqmt

1
0.05
0.03
0.41
0.05
1.00
1.00
1
0.05
0.03
0.41
0.05
1.00
1.00

299
600.36
932.32
250.00
121.00
136.00
2.81
299
600.36
932.32
250.00
121.00
136.00
2.81

3.3c
MCM0032
MCM0066
MCM0007
AHI0001
ALA0046
ALA0026
3.3d
MCM0032
MCM0066
MCM0007
AHI0001
ALA0046
ALA0026
4
4.1
4.1.1
ALA0075
4.1.2
MCM0030
MCM0066
MCM0007
AHI0004
AHI0007
ALA0023
4.1.3
MCM0030
MCM0066
MCM0007
MCM0004
AHI0004
ALA0037
ALA0025
4.1.4
MCM0026
ALA0077
4.1.5
MCM0026
ALA0077
4.1.6
4.1.7
4.1.8
4.1.9
4.1.10
4.1.11
4.1.12
ALA0078
ALA0079
5
5.1
5.1a
ALA0030
ALA0028
5.2
5.2a
ALA0031
ALA0035
5.3
5.3a
ALA0030
ALA0032
6
6.1
6.1.1
6.1.1a
6.1.1b
6.2

c. In Second Floor
6mm Blue Metal
River sand
Cement - OPC 43 Grade
Concrete Equipment
Labour for laying & finishing
Labour for Curing
In Third Floor
6mm Blue Metal
River sand
Cement - OPC 43 Grade
Concrete Equipment
Labour for laying & finishing
Labour for Curing
DRAIN & PLINTH PROTECTION
FLOOR DRAINS FOR EFFLUENT:
EFFLUENT FLOOR DRAINS :
Labour for Sunken plastering
RCC Cover Slabs for Drains:
20mm Blue Metal
River sand
Cement - OPC 43 Grade
Mixture Machine
Vibrator
Labour for casting of precast slab
PLINTH PROTECTION:
20mm Blue Metal
River sand
Cement - OPC 43 Grade
Dry brick Ballast
Mixture Machine
labour for Brick Ballast
Labour for curing
Providing and fixing in position the PVC coated steps of size 300x150mm for
PVC Step
Labour for Fixing of PVC Steps
Providing and fixing high strenght corrosion resistant foot step groute into
PVC Step
Labour for Fixing of PVC Steps
Supplying and fixing G.I.Puddle Flanges of various dia and size made out of G.I
Between 250 & 500 mm long.
50 mm to 100 mm dia
100 mm to 200 mm dia
50 mm to 100 mm dia
Providing Trap door of size about - 750 x 1200 to access terrace
Constructing floor sump of size about - 200x200 and depth about 200mm
Floor Sump - 200 x 200 x 200
Labour for Fixing of Floor sump
EARTHWORK EXCAVATION
EXCAVATION WORKS:
Upto 2.10 Mts. Depth
Earthwork Excavation
Base dressing
MASS EXCAVATION LIKE BASEMENTS, SUMPS:
Upto 2.10 Mts. Depth
Excavation including dressing & disposal - Upto 2.1m depth
Intercarting
Earth work in Excavation in all types of soil including dense soil, disintegrated/
Upto 3.00 Mts. Depth
Earthwork Excavation
Backfilling
Expansion Joints
Floor (Slab)
Providing and sealing the expansion joints of 25mm thick with joint sealing
Same as above item no. 7.06 (b), of 25mm thick expansion joints with joint
Providing and sealing the 25mm wide expansion joint all levels and locations
On Vertical Surfaces

Sqmt
m3
m3
Bag
m3
Sqmt
Sqmt
Sqmt
m3
m3
Bag
m3
Sqmt
Sqmt

1
0.05
0.03
0.41
0.05
1.00
1.00
1
0.05
0.03
0.41
0.05
1.00
1.00

299
600.36
932.32
250.00
121.00
136.00
2.81
299
600.36
932.32
250.00
121.00
136.00
2.81

Rmtr
Sqmt
Sqmt
m3
m3
Bag
m3
m3
Sqmt
Sqmt
m3
m3
Bag
m3
m3
Sqmt
m3
Nos
Nos
Nos
Nos
Nos
Nos

1
2.85
1
0.09
0.55
0.70
0.10
0.10
1.00
1
0.08
0.06
0.58
0.13
0.08
1.67
0.05
1
1.00
1.00
1
1.00
1.00

6999
404.66
1656
1,184.04
1,160.20
292.33
75.00
50.00
300.00
1631
1,230.24
932.32
327.86
520.00
75.00
550.00
25.00
164
148.57
50.00
199
148.57
50.00

Nos
Nos
Nos
Nos
Nos
Nos
Nos

1
1
1
1
1
1.00
1.00

2700.00
4300.00
3300.00
7500
1231
891.42
250.00

m3
m3
Sqmt

1
1.10
0.50

212
90.00
85.00

m3
m3
m3

1
1.10
1.00

253
140.00
20.00

m3
m3
m3

1
1.10
0.70

133
70.00
80.00

Rmtr
Rmtr

1
1

2200.00
2800.00

6.2.1
6.2.1a
6.2.1b
7
7.1
7.2
7.3
7.4
8
8.1
MCM0066
AHI0002
ALA0036
8.2
ALA0034
AHI0002
8.3
MCM0033
AHI0002
ALA0034
8.4
MCM0037
AHI0002
ALA0036
8.5
MCM0038
AHI0002
ALA0036
8.6
MCM0035
AHI0002
ALA0036
8.7
8.8
9
9.1
9.1.1
9.1.1a
9.1.1b
9.2
9.2.1
9.2.1a
10
10.1
MCM0067
MCM0066
MCM0007
MCM0008
MCM0009
MCM0013
MCM0055
AWC0099
ALA0050
ALA0060
ALA0026
10.2
MCM0067
MCM0066
MCM0007
MCM0008
MCM0009
MCM0013
AWC0099
ALA0049
ALA0060
ALA0026
10.3

Providing and sealing the expansion joints of 25mm thick with joint sealing
Same as above item no. 7.06 (b), of 25mm thick expansion joints with joint
Providing , placing and fixing in position 25mm thick PVC board of supreme
FALSE CEILING WORKS
Providing plaster of Paris cornices upto 3" and fixing the same to the ceiling as
Providing and fixing suspended false ceiling which includes providing and fixing
Supplying and fixng Calicum silicate grid ceiling with required suspended frame
Providing and fixing in position Corner Guards consisting of 125 x 125mm x
FILLING
Supply and fill in Foundation trenches, Basement & Plinth, Open Spaces &
River sand
Earth rammer
Labour for River Sand / Pit sand / Quary dust filling
Supply and fill in Foundation Trenches, Plinth, Open Spaces & Road, excavated
Labour for Earth Filling
Earth rammer
Supply and fill in Basement & Plinth, Open Spaces & Road, with selected
Borowed Earth
Earth rammer
Labour for Earth Filling
Supply and filling of Pit sand in basement of required depth (in layers of every
Pitsand
Earth rammer
Labour for River Sand / Pit sand / Quary dust filling
Supply and filling of Quarry dust in basement of required depth (in layers of
Quarry dust
Earth rammer
Labour for River Sand / Pit sand / Quary dust filling
Supply and filling of Gravel in basement of required depth (in layers of every
Gravel
Earth rammer
Labour for River Sand / Pit sand / Quary dust filling
Carting away excess soil available from excavation earth
Clearing of site from scrub jungle, bushes and tree (if any) etc., complete
FIRE DOORS & STEEL DOOR
FIRE DOORS
Providing and installing in position PROPRIETARY FIRE DOORS of Signum or
FD doors of size 1500 x 2100mm of Powder coated finish shutter with 2 Hour
FD1 doors of size 1100 x 2100mm of Powder coated finish shutter with 2 Hour
STEEL DOOR WITH FRAMES
Supplying and fixing of steel doors frame and shutter with 1.6 thick galvanised
SD Electrical & Cummunication shaft doors of size 750 x 1800mm of Fire rated
FLOORING WORKS
Mirror Polished Vitreous Tile Flooring:
Vitrified tiles
River sand
Cement - OPC 43 Grade
Cement Slurry
White Cement
Colour Pigments
Joint Filler - NITOTILE
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Labour for Tile Flooring
Labour Lift for Tiling
Labour for Curing
SKIRTING WITH VITREOUS TILES:
Vitrified tiles
River sand
Cement - OPC 43 Grade
Cement Slurry
White Cement
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Labour for tile skirting
Labour Lift for Tiling
Labour for Curing
Providing and laying to pattern, homogeneous Vitrified tile flooring of size 600

Rmtr
Sqmt

1
1

2200.00
700.00

Rmtr
Sqmt
Sqmt
Rmtr

1
1
1
1

1028.60
854.10
865.55
629.75

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

1
1.20
1.00
1.00
1
1.00
1.00
1
1.20
1.00
1.00
1
1.20
1.00
1.00
1
1.20
1.00
1.00
1
1.20
1.00
1.00
1
1

1557
938.14
19.00
120.00
128
90.00
19.00
828
407.89
19.00
90.00
1182
893.47
19.00
95.00
669
466.16
19.00
95.00
492
318.93
19.00
95.00
70
120

Nos
Nos

1
1

31237.31249
20277.23882

Nos

9847.843112

Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Kgs
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Kgs
Sqmt
Rmtr
Sqmt
Sqmt

1
1.05
0.02
0.10
2.00
0.18
0.18
0.18
1.00
1.10
3.00
0.50
1
0.11
1125.00
0.01
0.02
0.01
0.01
0.10
1.04
0.30
0.05

1280
484.38
938.14
323.00
6.54
30.00
54.00
80.52
36.73
193.75
42.00
10.00
160
484.38
1,160.20
292.33
6.54
30.00
54.00
36.73
42.00
42.00
10.00

10.3a
MCM0067
MCM0066
MCM0007
MCM0008
MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0050
ALA0060
ALA0026
10.3b
MCM0067
MCM0066
MCM0007
MCM0008
MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0050
ALA0060
ALA0026
10.3c
MCM0067
MCM0066
MCM0007
MCM0008
MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0050
ALA0060
ALA0026
10.3d
MCM0067
MCM0066
MCM0007
MCM0008
MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0050
ALA0060
ALA0026
10.4
10.4a
MCM0067
MCM0066
MCM0007
MCM0008
MCM0013
ALA0049
AWC0099
AHI0003
AHI0006
ALA0050
ALA0060
ALA0026
10.4b

First floor
Vitrified tiles
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Tile Flooring
Labour Lift for Tiling
Labour for Curing
Second floor
Vitrified tiles
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Tile Flooring
Labour Lift for Tiling
Labour for Curing
Third floor
Vitrified tiles
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Tile Flooring
Labour Lift for Tiling
Labour for Curing
Fourth floor
Vitrified tiles
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Tile Flooring
Labour Lift for Tiling
Labour for Curing
Vitrified tile skirting for a height 100mm including necessary chipping,
First floor
Vitrified tiles
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Labour for tile skirting
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Tile Flooring
Labour Lift for Tiling
Labour for Curing
Second floor

Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt

1
1.05
0.02
0.16
2.50
0.10
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1
1.05
0.02
0.16
2.50
0.10
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1
1.05
0.02
0.16
2.50
0.10
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1
1.05
0.02
0.16
2.50
0.10
1.00
1.00
1.00
1.00
1.00
1.00
1.00

870.63
450.00
1112.42
283.00
5.66
62.44
107.64
31.08
100.00
25.00
113.02
22.60
5.00
870.63
450.00
1112.42
283.00
5.66
62.44
107.64
31.08
100.00
25.00
113.02
22.60
5.00
870.63
450.00
1112.42
283.00
5.66
62.44
107.64
31.08
100.00
25.00
113.02
22.60
5.00
870.63
450.00
1112.42
283.00
5.66
62.44
107.64
31.08
100.00
25.00
113.02
22.60
5.00

Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Rmtr

1
0.11
1125.00
0.02
0.25
0.01
1.00
0.10
0.10
0.10
1.00
0.10
0.10
1

95.99
450.00
1112.42
283.00
5.66
62.44
31.00
31.08
100.00
25.00
113.02
22.60
5.00
95.99

MCM0067
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0049
ALA0060
ALA0026
10.4c
MCM0067
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0049
ALA0060
ALA0026
10.4d
MCM0067
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0049
ALA0060
ALA0026
10.5
10.5a
MCM0067
MCM0066
MCM0007
MCM0008
MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0050
ALA0060
ALA0026
10.5b
MCM0067
MCM0066
MCM0007
MCM0008
MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0050
ALA0060
ALA0026
10.5c
MCM0067
MCM0066
MCM0007
MCM0008

Vitrified tiles
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile skirting
Labour Lift for Tiling
Labour for Curing
Third floor
Vitrified tiles
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile skirting
Labour Lift for Tiling
Labour for Curing
Fourth floor
Vitrified tiles
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile skirting
Labour Lift for Tiling
Labour for Curing
Providing and laying to pattern, homogeneous Vitrified tile flooring of size 600
Stilt floor
Vitrified tiles
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Tile Flooring
Labour Lift for Tiling
Labour for Curing
First floor
Vitrified tiles
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Tile Flooring
Labour Lift for Tiling
Labour for Curing
Second floor
Vitrified tiles
River sand
Cement - OPC 43 Grade
Cement Slurry

Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Rmtr
Sqmt
Sqmt
Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Rmtr
Sqmt
Sqmt
Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Rmtr
Sqmt
Sqmt

0.11
1125.00
0.02
0.25
0.01
0.10
0.10
0.10
1.00
0.10
0.10
1
0.11
1125.00
0.02
0.25
0.01
0.10
0.10
0.10
1.00
0.10
0.10
1
0.11
1125.00
0.02
0.25
0.01
0.10
0.10
0.10
1.00
0.10
0.10

450.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
31.00
22.60
5.00
95.99
450.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
31.00
22.60
5.00
95.99
450.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
31.00
22.60
5.00

Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs

1
1.05
0.02
0.16
2.50
0.10
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1
1.05
0.02
0.16
2.50
0.10
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1
1.05
0.02
0.16
2.50

848.03
450.00
1112.42
283.00
5.66
62.44
107.64
31.08
100.00
25.00
113.02
22.60
5.00
870.63
450.00
1112.42
283.00
5.66
62.44
107.64
31.08
100.00
25.00
113.02
22.60
5.00
870.63
450.00
1112.42
283.00
5.66

MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0050
ALA0060
ALA0026
10.5d
MCM0067
MCM0066
MCM0007
MCM0008
MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0050
ALA0060
ALA0026
10.5e
MCM0067
MCM0066
MCM0007
MCM0008
MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0050
ALA0060
ALA0026
10.6
10.6a
MCM0067
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0049
ALA0060
ALA0026
10.6b
MCM0067
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0049
ALA0060
ALA0026
10.6c
MCM0067
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003

Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Tile Flooring
Labour Lift for Tiling
Labour for Curing
Third floor
Vitrified tiles
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Tile Flooring
Labour Lift for Tiling
Labour for Curing
Fourth floor
Vitrified tiles
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Tile Flooring
Labour Lift for Tiling
Labour for Curing
Vitrified tile skirting for a height 100mm including necessary chipping,
Stilt floor
Vitrified tiles
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile skirting
Labour Lift for Tiling
Labour for Curing
First floor
Vitrified tiles
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile skirting
Labour Lift for Tiling
Labour for Curing
Second floor
Vitrified tiles
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist

Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt

0.10
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1
1.05
0.02
0.16
2.50
0.10
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1
1.05
0.02
0.16
2.50
0.10
1.00
1.00
1.00
1.00
1.00
1.00
1.00

62.44
107.64
31.08
100.00
25.00
113.02
22.60
5.00
870.63
450.00
1112.42
283.00
5.66
62.44
107.64
31.08
100.00
25.00
113.02
22.60
5.00
870.63
450.00
1112.42
283.00
5.66
62.44
107.64
31.08
100.00
25.00
113.02
22.60
5.00

Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Rmtr
Sqmt
Sqmt
Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Rmtr
Sqmt
Sqmt
Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos

1
0.11
1125.00
0.02
0.25
0.01
0.10
0.10
0.10
1.00
0.10
0.10
1
0.11
1125.00
0.02
0.25
0.01
0.10
0.10
0.10
1.00
0.10
0.10
1
0.11
1125.00
0.02
0.25
0.01
0.10
0.10

93.73
450.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
31.00
22.60
5.00
95.99
450.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
31.00
22.60
5.00
95.99
450.00
1112.42
283.00
5.66
62.44
31.08
100.00

AHI0006
ALA0049
ALA0060
ALA0026
10.6d
MCM0067
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0049
ALA0060
ALA0026
10.6e
MCM0067
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0049
ALA0060
ALA0026
10.7
10.7a
MCM0051
MCM0066
MCM0007
MCM0008
MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0050
ALA0060
ALA0026
10.7b
MCM0051
MCM0066
MCM0007
MCM0008
MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0050
ALA0060
ALA0026
10.7c
MCM0051
MCM0066
MCM0007
MCM0008
MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0050
ALA0060

Scaffolding
Labour for tile skirting
Labour Lift for Tiling
Labour for Curing
Third floor
Vitrified tiles
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile skirting
Labour Lift for Tiling
Labour for Curing
Fourth floor
Vitrified tiles
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile skirting
Labour Lift for Tiling
Labour for Curing
Providing and laying to pattern, homogeneous Ceramic tile flooring of size 400
First floor
Ceramic tile - 400 x 400mm
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile flooring
Labour Lift for Tiling
Labour for Curing
Second floor
Ceramic tile - 400 x 400mm
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile flooring
Labour Lift for Tiling
Labour for Curing
Third floor
Ceramic tile - 400 x 400mm
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile flooring
Labour Lift for Tiling

Sqmt
Rmtr
Sqmt
Sqmt
Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Rmtr
Sqmt
Sqmt
Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Rmtr
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt

0.10
1.00
0.10
0.10
1
0.11
1125.00
0.02
0.25
0.01
0.10
0.10
0.10
1.00
0.10
0.10
1
0.11
1125.00
0.02
0.25
0.01
0.10
0.10
0.10
1.00
0.10
0.10

25.00
31.00
22.60
5.00
95.99
450.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
31.00
22.60
5.00
95.99
450.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
31.00
22.60
5.00

1
1.05
0.02
0.16
2.50
0.10
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1
1.05
0.02
0.16
2.50
0.10
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1
1.05
0.02
0.16
2.50
0.10
1.00
1.00
1.00
1.00
1.00
1.00

713.13
300.00
1112.42
283.00
5.66
62.44
107.64
31.08
100.00
25.00
113.02
22.60
5.00
713.13
300.00
1112.42
283.00
5.66
62.44
107.64
31.08
100.00
25.00
113.02
22.60
5.00
713.13
300.00
1112.42
283.00
5.66
62.44
107.64
31.08
100.00
25.00
113.02
22.60

ALA0026
10.7d
MCM0051
MCM0066
MCM0007
MCM0008
MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0050
ALA0060
ALA0026
10.8
10.8a
MCM0051
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0049
ALA0060
ALA0026
10.8b
MCM0051
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0049
ALA0060
ALA0026
10.8c
MCM0051
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0049
ALA0026
ALA0060
10.8d
MCM0051
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0049
ALA0060
ALA0026
10.9
MCM0050
MCM0066
MCM0007

Labour for Curing


Fourth floor
Ceramic tile - 400 x 400mm
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile flooring
Labour Lift for Tiling
Labour for Curing
Ceramic tile skirting for a height 100mm including necessary chipping,
First floor
Ceramic tile - 400 x 400mm
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile skirting
Labour Lift for Tiling
Labour for Curing
Second floor
Ceramic tile - 400 x 400mm
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile skirting
Labour Lift for Tiling
Labour for Curing
Third floor
Ceramic tile - 400 x 400mm
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile skirting
Labour for Curing
Labour Lift for Tiling
Fourth floor
Ceramic tile - 400 x 400mm
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile skirting
Labour Lift for Tiling
Labour for Curing
Toilet Flooring:- (Anti-Skid Tile Flooring)
Ceramic tile - 300 X 300mm
River sand
Cement - OPC 43 Grade

Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt

1.00
1
1.05
0.02
0.16
2.50
0.10
1.00
1.00
1.00
1.00
1.00
1.00
1.00

5.00
713.13
300.00
1112.42
283.00
5.66
62.44
107.64
31.08
100.00
25.00
113.02
22.60
5.00

Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Rmtr
Sqmt
Sqmt
Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Rmtr
Sqmt
Sqmt
Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Rmtr
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag

1
0.11
1125.00
0.02
0.25
0.01
0.10
0.10
0.10
1.00
0.10
0.10
1
0.11
1125.00
0.02
0.25
0.01
0.10
0.10
0.10
1.00
0.10
0.10
1
0.11
1125.00
0.02
0.25
0.01
0.10
0.10
0.10
1.00
0.10
0.10
1
0.11
1125.00
0.02
0.25
0.01
0.10
0.10
0.10
1.00
0.10
0.10
1
1.05
0.02
0.10

80.24
300.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
31.00
22.60
5.00
80.24
300.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
31.00
22.60
5.00
80.24
300.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
31.00
5.00
22.60
80.24
300.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
31.00
22.60
5.00
1100
322.92
1,160.20
292.33

MCM0008
MCM0009
MCM0013
MCM0055
MCM0012
ALA0048
AWC0099
ALA0050
ALA0060
ALA0026
10.10
10.10a
MCM0049
MCM0066
MCM0007
MCM0008
MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0050
ALA0060
ALA0026
10.10b
MCM0049
MCM0066
MCM0007
MCM0008
MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0050
ALA0060
ALA0026
10.10c
MCM0049
MCM0066
MCM0007
MCM0008
MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0050
ALA0060
ALA0026
10.10d
MCM0049
MCM0066
MCM0007
MCM0008
MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0050
ALA0060
ALA0026
10.10e
MCM0049
MCM0066
MCM0007

Cement Slurry
White Cement
Colour Pigments
Joint Filler - NITOTILE
POP
Labour for POP spreading & cleaning
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Labour for tile flooring
Labour Lift for Tiling
Labour for Curing
Providing and laying to pattern, Anti- skid ceramic tile flooring of size 300 x
Stilt floor
Anti skid Ceramic tile - 300 x 300mm
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile flooring
Labour Lift for Tiling
Labour for Curing
First floor
Anti skid Ceramic tile - 300 x 300mm
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile flooring
Labour Lift for Tiling
Labour for Curing
Second floor
Anti skid Ceramic tile - 300 x 300mm
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile flooring
Labour Lift for Tiling
Labour for Curing
Third floor
Anti skid Ceramic tile - 300 x 300mm
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile flooring
Labour Lift for Tiling
Labour for Curing
Fourth floor
Anti skid Ceramic tile - 300 x 300mm
River sand
Cement - OPC 43 Grade

Kgs
Kgs
Kgs
Kgs
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt

2.00
0.20
0.20
0.20
1.00
1.00
1.00
1.00
3.00
1.00

6.54
30.00
54.00
80.52
6.90
28.26
36.73
113.02
42.00
10.00

Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag

1
1.05
0.02
0.16
3.30
0.10
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1
1.05
0.02
0.16
3.30
0.10
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1
1.05
0.02
0.16
3.30
0.10
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1
1.05
0.02
0.16
3.30
0.10
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1
1.05
0.02
0.16

695.06
300.00
1112.42
283.00
5.66
62.44
107.64
31.08
100.00
25.00
113.02
22.60
5.00
717.66
300.00
1112.42
283.00
5.66
62.44
107.64
31.08
100.00
25.00
113.02
22.60
5.00
717.66
300.00
1112.42
283.00
5.66
62.44
107.64
31.08
100.00
25.00
113.02
22.60
5.00
717.66
300.00
1112.42
283.00
5.66
62.44
107.64
31.08
100.00
25.00
113.02
22.60
5.00
717.66
300.00
1112.42
283.00

MCM0008
MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0050
ALA0060
ALA0026
10.11
10.11a
MCM0049
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0049
ALA0060
ALA0026
10.11b
MCM0049
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0049
ALA0060
ALA0026
10.11c
MCM0049
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0049
ALA0060
ALA0026
10.11d
MCM0049
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0049
ALA0060
ALA0026
10.12
MCM0054
MCM0066
MCM0007
MCM0008
MCM0009
MCM0013
MCM0055
AWC0099

Cement Slurry
Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile flooring
Labour Lift for Tiling
Labour for Curing
Anti- skid ceramic tile skirting for a height 100mm including necessary
First floor
Anti skid Ceramic tile - 300 x 300mm
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile skirting
Labour Lift for Tiling
Labour for Curing
Second floor
Anti skid Ceramic tile - 300 x 300mm
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile skirting
Labour Lift for Tiling
Labour for Curing
Third floor
Anti skid Ceramic tile - 300 x 300mm
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile skirting
Labour Lift for Tiling
Labour for Curing
Fourth floor
Anti skid Ceramic tile - 300 x 300mm
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for tile skirting
Labour Lift for Tiling
Labour for Curing
Glazed Wall Tiles:
Glazed Ceramic Wall Tiles
River sand
Cement - OPC 43 Grade
Cement Slurry
White Cement
Colour Pigments
Joint Filler - NITOTILE
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area

Kgs
Kgs
Sqmt
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt

3.30
0.10
1.00
1.00
1.00
1.00
1.00
1.00
1.00

5.66
62.44
107.64
31.08
100.00
25.00
113.02
22.60
5.00

Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Rmtr
Sqmt
Sqmt
Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Rmtr
Sqmt
Sqmt
Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Rmtr
Sqmt
Sqmt
Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Rmtr
Sqmt
Sqmt

1
0.11
1125.00
0.02
0.33
0.01
0.10
0.10
0.10
1.00
0.10
0.10
1
0.11
1125.00
0.02
0.33
0.01
0.10
0.10
0.10
1.00
0.10
0.10
1
0.11
1125.00
0.02
0.33
0.01
0.10
0.10
0.10
1.00
0.10
0.10
1
0.11
1125.00
0.02
0.33
0.01
0.10
0.10
0.10
1.00
0.10
0.10

80.70
300.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
31.00
22.60
5.00
80.70
300.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
31.00
22.60
5.00
80.70
300.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
31.00
22.60
5.00
80.70
300.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
31.00
22.60
5.00

Sqmt
m3
Bag
Kgs
Kgs
Kgs
Kgs
Sqmt

1.05
0.02
0.11
2.00
0.15
0.15
0.15
1.00

322.92
1,160.20
292.33
6.54
30.00
54.00
80.52
36.73

ALA0051
ALA0060
ALA0026
10.12.1
10.12.1a
MCM0053
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0051
ALA0060
ALA0026
10.12.1b
MCM0053
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0051
ALA0060
ALA0026
10.12.1c
MCM0053
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0051
ALA0060
ALA0026
10.12.1d
MCM0053
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0051
ALA0060
ALA0026
10.12.2
10.12.2a
MCM0053
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0051
ALA0060
ALA0026
10.12.2b
MCM0053

Labour for wall tiles for toilets & kitchen


Labour Lift for Tiling
Labour for Curing
Providing and fixing Glazed tile for dado using tiles of size 200 x 300mm,
First floor
Coloured glazed designer tile
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for wall tiles for toilets & kitchen
Labour Lift for Tiling
Labour for Curing
Second floor
Coloured glazed designer tile
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for wall tiles for toilets & kitchen
Labour Lift for Tiling
Labour for Curing
Third floor
Coloured glazed designer tile
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for wall tiles for toilets & kitchen
Labour Lift for Tiling
Labour for Curing
Fourth floor
Coloured glazed designer tile
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for wall tiles for toilets & kitchen
Labour Lift for Tiling
Labour for Curing
Providing and fixing Glazed tile for dado using tiles of size 200 x 300mm,
First floor
Coloured glazed designer tile
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for wall tiles for toilets & kitchen
Labour Lift for Tiling
Labour for Curing
Second floor
Coloured glazed designer tile

Sqmt
Sqmt
Sqmt

1.13
3.00
1.00

160.00
42.00
10.00

Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt

1
1.08
0.02
0.12
2.50
0.10
1.00
1.00
1.00
1.13
1.00
1.00
1
1.08
0.02
0.12
2.50
0.10
1.00
1.00
1.00
1.13
1.00
1.00
1
1.08
0.02
0.12
2.50
0.10
1.00
1.00
1.00
1.13
1.00
1.00
1
1.08
0.02
0.12
2.50
0.10
1.00
1.00
1.00
1.13
1.00
1.00

628.98
300.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
160.00
21.53
5.00
628.98
300.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
160.00
21.53
5.00
628.98
300.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
160.00
21.53
5.00
628.98
300.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
160.00
21.53
5.00

Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt

1
1.08
0.02
0.12
2.50
0.10
1.00
1.00
1.00
1.13
1.00
1.00
1
1.08

628.98
300.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
160.00
21.53
5.00
628.98
300.00

MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0051
ALA0060
ALA0026
10.12.2c
MCM0053
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0051
ALA0060
ALA0026
10.12.2d
MCM0053
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0051
ALA0060
ALA0026
10.12.3
10.12.3a
MCM0053
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0051
ALA0060
ALA0026
10.12.3b
MCM0053
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0051
ALA0060
ALA0026
10.12.3c
MCM0053
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003

River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for wall tiles for toilets & kitchen
Labour Lift for Tiling
Labour for Curing
Third floor
Coloured glazed designer tile
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for wall tiles for toilets & kitchen
Labour Lift for Tiling
Labour for Curing
Fourth floor
Coloured glazed designer tile
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for wall tiles for toilets & kitchen
Labour Lift for Tiling
Labour for Curing
Providing and fixing Coloured glazed designer tile for dado using tiles of size
Stilt floor
Coloured glazed designer tile
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for wall tiles for toilets & kitchen
Labour Lift for Tiling
Labour for Curing
First floor
Coloured glazed designer tile
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for wall tiles for toilets & kitchen
Labour Lift for Tiling
Labour for Curing
Second floor
Coloured glazed designer tile
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist

m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt

0.02
0.12
2.50
0.10
1.00
1.00
1.00
1.13
1.00
1.00
1
1.08
0.02
0.12
2.50
0.10
1.00
1.00
1.00
1.13
1.00
1.00
1
1.08
0.02
0.12
2.50
0.10
1.00
1.00
1.00
1.13
1.00
1.00

1112.42
283.00
5.66
62.44
31.08
100.00
25.00
160.00
21.53
5.00
628.98
300.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
160.00
21.53
5.00
628.98
300.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
160.00
21.53
5.00

Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos

1
1.08
0.02
0.12
2.50
0.10
1.00
1.00
1.00
1.13
1.00
1.00
1
1.08
0.02
0.12
2.50
0.10
1.00
1.00
1.00
1.13
1.00
1.00
1
1.08
0.02
0.12
2.50
0.10
1.00
1.00

628.98
300.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
160.00
21.53
5.00
650.51
300.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
160.00
21.53
5.00
650.51
300.00
1112.42
283.00
5.66
62.44
31.08
100.00

AHI0006
ALA0051
ALA0060
ALA0026
10.12.3d
MCM0053
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0051
ALA0060
ALA0026
10.12.3e
MCM0053
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0051
ALA0060
ALA0026
10.13
MCM0068
MCM0066
MCM0007
MCM0008
MCM0009
MCM0013
MCM0055
MCM0012
ALA0048
AWC0099
ALA0050
ALA0060
ALA0026
10.14
10.14a
MCM0020
MCM0066
MCM0007
MCM0008
MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0041
ALA0026
10.15
10.15a
MCM0020
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0042
ALA0026

Scaffolding
Labour for wall tiles for toilets & kitchen
Labour Lift for Tiling
Labour for Curing
Third floor
Coloured glazed designer tile
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for wall tiles for toilets & kitchen
Labour Lift for Tiling
Labour for Curing
Fourth floor
Coloured glazed designer tile
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for wall tiles for toilets & kitchen
Labour Lift for Tiling
Labour for Curing
Concrete Step Tiles for External Staircase:
Concrete Step Tile
River sand
Cement - OPC 43 Grade
Cement Slurry
White Cement
Colour Pigments
Joint Filler - NITOTILE
POP
Labour for POP spreading & cleaning
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Labour for tile flooring
Labour Lift for Tiling
Labour for Curing
Providing and laying in position to pattern called for 20mm thick Pre-polished
Stilt floor
Granite stone 20 mm thk
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Granite flooring
Labour for Curing
20mm thick Pre-polished Granite skirting for a height 100mm including
Stilt floor
Granite stone 20 mm thk
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Granite skirting
Labour for Curing

Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Kgs
Kgs
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt

1.00
1.13
1.00
1.00
1
1.08
0.02
0.12
2.50
0.10
1.00
1.00
1.00
1.13
1.00
1.00
1
1.08
0.02
0.12
2.50
0.10
1.00
1.00
1.00
1.13
1.00
1.00
1
1.08
0.02
0.18
2.00
0.10
0.10
0.10
1.00
1.00
1.00
1.10
1.00
1.00

25.00
160.00
21.53
5.00
650.51
300.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
160.00
21.53
5.00
650.51
300.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
160.00
21.53
5.00
1340
300.00
1,160.20
292.33
6.54
30.00
54.00
80.52
6.90
28.26
36.73
193.75
42.00
10.00

Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Nos
Sqmt
Sqmt
Sqmt

1
1.05
0.02
0.16
3.30
0.10
1.00
1.00
1.00
1.00
1.00
1.00

2819.12
2000.00
1112.42
283.00
5.66
62.44
107.64
31.08
100.00
25.00
452.09
5.00

Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Rmtr
Sqmt

1
0.11
1125.00
0.02
0.33
0.01
0.10
0.10
0.10
1.00
0.10

363.70
2000.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
137.76
5.00

10.16
10.16.1
ALA0044
MCM0066
MCM0007
MCM0008
MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0044
ALA0039
AWC0112
ALA0065
ALA0026
10.16.2
ALA0044
MCM0066
MCM0007
MCM0008
MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0044
ALA0039
ALA0112
ALA0065
ALA0026
10.16.3
ALA0044
MCM0066
MCM0007
MCM0008
MCM0013
AWC0098
AWC0099
AHI0003
AHI0006
ALA0044
ALA0039
ALA0112
ALA0065
ALA0026
10.16.4
MCM0019
MCM0066
MCM0007
MCM0008
MCM0013
AWC0099
AHI0003
AHI0006
ALA0042
ALA0026
10.17
10.17a
MCM0018
MCM0066
MCM0007
MCM0008
MCM0013
ALA0039
AWC0099
AHI0003

Providing and laying in position 20mm thick Pre-polished Granite slab for
For Treads with edges bull nosed with grooves 3 nos of size 5mm x 3mm with
Labour for Granite stone in Staircase steps
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Granite stone in Staircase steps
Labour for half round nosing
Labour for 3mm Groove
Labour Lift for Granite stone
Labour for Curing
For Risers
Labour for Granite stone in Staircase steps
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Granite stone in Staircase steps
Labour for half round nosing
Labour for 3mm Groove
Labour Lift for Granite stone
Labour for Curing
For Landing with one side bull nosed
Labour for Granite stone in Staircase steps
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and apply of POP with LDPE Sheet
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Granite stone in Staircase steps
Labour for half round nosing
Labour for 3mm Groove
Labour Lift for Granite stone
Labour for Curing
20mm thick Pre-polished Granite skirting for a height 100mm including
Granite stone 12 mm thk
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Granite skirting
Labour for Curing
Providing and laying 20mm thick Pre-polished Granite counters for Kitchen set
First floor
Granite stone
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Labour for half round nosing
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist

Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Nos
Sqmt
Sqmt
Rmtr
Rmtr
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Nos
Sqmt
Sqmt
Rmtr
Rmtr
Sqmt
Sqmt
Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Nos
Sqmt
Sqmt
Rmtr
Rmtr
Sqmt
Sqmt
Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Nos
Sqmt
Rmtr
Sqmt

1
1.05
0.02
0.16
3.30
0.10
1.00
1.00
1.00
1.00
1.00
2.22
6.66
1.00
1.00
1
1.05
0.02
0.16
3.30
0.10
1.00
1.00
1.00
1.00
1.00
2.22
6.66
1.00
1.00
1
1.05
0.02
0.16
3.30
0.10
1.00
1.00
1.00
1.00
1.00
2.22
6.66
1.00
1.00
1
0.11
1125.00
0.02
0.33
0.01
0.10
0.10
0.10
1.00
0.10

3871.47
2000.00
1112.42
283.00
5.66
62.44
107.64
31.08
100.00
25.00
565.11
275.52
49.20
37.67
5.00
3871.47
2000.00
1112.42
283.00
5.66
62.44
107.64
31.08
100.00
25.00
565.11
275.52
49.20
37.67
5.00
3871.47
2000.00
1112.42
283.00
5.66
62.44
107.64
31.08
100.00
25.00
565.11
275.52
49.20
37.67
5.00
398.14
2000.00
1112.42
283.00
5.66
62.44
31.08
100.00
25.00
172.20
5.00

Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Rmtr
Sqmt
Nos

1
1.05
0.02
0.15
3.30
0.10
1.50
1.00
1.00

3151.35
2000.00
1112.42
283.00
5.66
62.44
275.52
31.08
100.00

AHI0006
ALA0041
ALA0065
ALA0026
10.17b
MCM0018
MCM0066
MCM0007
MCM0008
MCM0013
ALA0039
AWC0099
AHI0003
AHI0006
ALA0041
ALA0065
ALA0026
10.17c
MCM0018
MCM0066
MCM0007
MCM0008
MCM0013
ALA0039
AWC0099
AHI0003
AHI0006
ALA0041
ALA0065
ALA0026
10.17d
MCM0018
MCM0066
MCM0007
MCM0008
MCM0013
ALA0039
AWC0099
AHI0003
AHI0006
ALA0041
ALA0065
ALA0026
10.18
10.18a
MCM0018
MMM0002
AWC0099
AHI0003
AHI0006
ALA0043
ALA0039
ALA0065
ALA0026
10.18b
MCM0018
MMM0002
ALA0039
AWC0099
AHI0003
AHI0006
ALA0043
ALA0065
ALA0026
10.18c
MCM0018
MMM0002

Scaffolding
Labour for Granite flooring
Labour Lift for Granite stone
Labour for Curing
Second floor
Granite stone
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Labour for half round nosing
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Granite flooring
Labour Lift for Granite stone
Labour for Curing
Third floor
Granite stone
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Labour for half round nosing
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Granite flooring
Labour Lift for Granite stone
Labour for Curing
Fourth floor
Granite stone
River sand
Cement - OPC 43 Grade
Cement Slurry
Colour Pigments
Labour for half round nosing
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Granite flooring
Labour Lift for Granite stone
Labour for Curing
Providing and laying 20mm thick Pre-polished Granite counters for wash
First floor
Granite stone
MS Bracket
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Granite stone cladding
Labour for half round nosing
Labour Lift for Granite stone
Labour for Curing

Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Nos
Sqmt
Nos
Sqmt
Sqmt
Rmtr
Sqmt
Sqmt

1.00
1.00
1.00
1.00
1
1.05
0.02
0.15
3.30
0.10
1.50
1.00
1.00
1.00
1.00
1.00
1.00
1
1.05
0.02
0.15
3.30
0.10
1.50
1.00
1.00
1.00
1.00
1.00
1.00
1
1.05
0.02
0.15
3.30
0.10
1.50
1.00
1.00
1.00
1.00
1.00
1.00

25.00
442.30
37.67
5.00
3151.35
2000.00
1112.42
283.00
5.66
62.44
275.52
31.08
100.00
25.00
442.30
37.67
5.00
3151.35
2000.00
1112.42
283.00
5.66
62.44
275.52
31.08
100.00
25.00
442.30
37.67
5.00
3151.35
2000.00
1112.42
283.00
5.66
62.44
275.52
31.08
100.00
25.00
442.30
37.67
5.00

1
1.05
2.00
1.00
1.00
1.00
1.00
2.10
1.00
1.00

3550.72
2000.00
150.00
31.08
100.00
25.00
442.30
275.52
37.67
5.00

Second floor
Granite stone
MS Bracket
Labour for half round nosing
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Granite stone cladding
Labour Lift for Granite stone
Labour for Curing
Third floor
Granite stone
MS Bracket

Sqmt
Sqmt
Nos
Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Nos

1
1.05
2.00
2.10
1.00
1.00
1.00
1.00
1.00
1.00
1
1.05
2.00

3550.72
2000.00
150.00
275.52
31.08
100.00
25.00
442.30
37.67
5.00
3550.72
2000.00
150.00

ALA0039
AWC0099
AHI0003
AHI0006
ALA0043
ALA0065
ALA0026
10.18d
MCM0018
MMM0002
ALA0039
AWC0099
AHI0003
AHI0006
ALA0043
ALA0065
ALA0026
10.19
10.19a
MCM0021
MCM0066
MCM0007
MCM0013
AWC0099
AHI0003
AHI0006
ALA0043
ALA0039
ALA0065
ALA0026
10.19b
MCM0021
MCM0066
MCM0007
MCM0013
AWC0099
AHI0003
AHI0006
ALA0043
ALA0039
ALA0065
ALA0026
10.19c
MCM0021
MCM0066
MCM0007
MCM0013
AWC0099
AHI0003
AHI0006
ALA0043
ALA0039
ALA0065
ALA0026
10.19d
MCM0021
MCM0066
MCM0007
MCM0013
AWC0099
AHI0003
AHI0006
ALA0043
ALA0039
ALA0065
ALA0026
10.19e

Labour for half round nosing


Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Granite stone cladding
Labour Lift for Granite stone
Labour for Curing
Fourth floor
Granite stone
MS Bracket
Labour for half round nosing
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Granite stone cladding
Labour Lift for Granite stone
Labour for Curing
Providing and Laying in position 20mm thick Pre-polished Granite stone slab
Stilt floor
Granite Stone for clading
River sand
Cement - OPC 43 Grade
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Granite stone cladding
Labour for half round nosing
Labour Lift for Granite stone
Labour for Curing
First floor
Granite Stone for clading
River sand
Cement - OPC 43 Grade
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Granite stone cladding
Labour for half round nosing
Labour Lift for Granite stone
Labour for Curing
Second floor
Granite Stone for clading
River sand
Cement - OPC 43 Grade
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Granite stone cladding
Labour for half round nosing
Labour Lift for Granite stone
Labour for Curing
Third floor
Granite Stone for clading
River sand
Cement - OPC 43 Grade
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Granite stone cladding
Labour for half round nosing
Labour Lift for Granite stone
Labour for Curing
Fourth floor

Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Nos
Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt
Sqmt

2.10
1.00
1.00
1.00
1.00
1.00
1.00
1
1.05
2.00
2.10
1.00
1.00
1.00
1.00
1.00
1.00

275.52
31.08
100.00
25.00
442.30
37.67
5.00
3550.72
2000.00
150.00
275.52
31.08
100.00
25.00
442.30
37.67
5.00

Sqmt
Sqmt
m3
Bag
Kgs
Sqmt
Nos
Sqmt
Sqmt
Rmtr
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Sqmt
Nos
Sqmt
Sqmt
Rmtr
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Sqmt
Nos
Sqmt
Sqmt
Rmtr
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Sqmt
Nos
Sqmt
Sqmt
Rmtr
Sqmt
Sqmt
Sqmt

1
1.05
0.02
0.20
0.10
1.00
1.00
1.00
1.00
0.33
1.00
1.00
1
1.05
0.02
0.20
0.10
1.00
1.00
1.00
1.00
0.33
1.00
1.00
1
1.05
0.02
0.20
0.10
1.00
1.00
1.00
1.00
0.33
1.00
1.00
1
1.05
0.02
0.20
0.10
1.00
1.00
1.00
1.00
0.33
1.00
1.00
1

2852.01
2000.00
1112.42
283.00
62.44
31.08
100.00
25.00
508.60
275.52
37.67
5.00
2889.68
2000.00
1112.42
283.00
62.44
31.08
100.00
25.00
508.60
275.52
37.67
5.00
2889.68
2000.00
1112.42
283.00
62.44
31.08
100.00
25.00
508.60
275.52
37.67
5.00
2889.68
2000.00
1112.42
283.00
62.44
31.08
100.00
25.00
508.60
275.52
37.67
5.00
2889.68

MCM0021
MCM0066
MCM0007
MCM0013
AWC0099
AHI0003
AHI0006
ALA0043
ALA0039
ALA0065
ALA0026
10.20
10.20a
MCM0017
MCM0066
MCM0007
MCM0009
MCM0052
ALA0052
ALA0047
ALA0026
10.20b
MCM0017
MCM0066
MCM0007
MCM0009
MCM0052
ALA0052
ALA0047
ALA0026
10.20c
MCM0017
MCM0066
MCM0007
MCM0009
MCM0052
ALA0047
ALA0052
ALA0026
10.20d
MCM0017
MCM0066
MCM0007
MCM0009
MCM0052
ALA0047
ALA0052
ALA0026
10.21
10.21a
MCM0017
MCM0066
MCM0007
MCM0009
MCM0052
ALA0047
ALA0052
ALA0026
10.21b
MCM0017
MCM0066
MCM0007
MCM0009
MCM0052
ALA0047
ALA0052
ALA0026

Granite Stone for clading


River sand
Cement - OPC 43 Grade
Colour Pigments
Supply and Cleaning with Cleansing agents like cleaning acid over Tiling Area
Hoist
Scaffolding
Labour for Granite stone cladding
Labour for half round nosing
Labour Lift for Granite stone
Labour for Curing
Providing, laying and polishing natural Kota stone material 20mm thick of size
a. In Ground Floor (below portico, Staircase midlanding areas)
25mm Thk Kota Stone - 550 x 550mm
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Soap wash & cleaning
Labour for laying of Kotastone Flooring
Labour for Curing
b. In First Floor (Staircase landing and midlanding area)
25mm Thk Kota Stone - 550 x 550mm
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Soap wash & cleaning
Labour for laying of Kotastone Flooring
Labour for Curing
c. In Second Floor (Staircase landing area)
25mm Thk Kota Stone - 550 x 550mm
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Labour for laying of Kotastone Flooring
Soap wash & cleaning
Labour for Curing
In Third Floor
25mm Thk Kota Stone - 550 x 550mm
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Labour for laying of Kotastone Flooring
Soap wash & cleaning
Labour for Curing
Kota Stone 100mm high skirting
a. In Ground Floor
25mm Thk Kota Stone - 550 x 550mm
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Labour for laying of Kotastone Flooring
Soap wash & cleaning
Labour for Curing
b. In First Floor
25mm Thk Kota Stone - 550 x 550mm
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Labour for laying of Kotastone Flooring
Soap wash & cleaning
Labour for Curing

Sqmt
m3
Bag
Kgs
Sqmt
Nos
Sqmt
Sqmt
Rmtr
Sqmt
Sqmt

1.05
0.02
0.20
0.10
1.00
1.00
1.00
1.00
0.33
1.00
1.00

2000.00
1112.42
283.00
62.44
31.08
100.00
25.00
508.60
275.52
37.67
5.00

Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Sqmt

1
1.08
0.02
0.20
0.10
0.05
1.00
1.00
1.00
1
1.08
0.02
0.20
0.10
0.05
1.00
1.00
1.00
1
1.08
0.02
0.20
0.10
0.05
1.00
1.00
1.00
1
1.08
0.02
0.20
0.10
0.05
1.00
1.00
1.00

1210
596.46
932.32
250.00
25.00
40.00
36.00
453.00
2.81
1210
596.46
932.32
250.00
25.00
40.00
36.00
453.00
2.81
1210
596.46
932.32
250.00
25.00
40.00
453.00
36.00
2.81
1210
596.46
932.32
250.00
25.00
40.00
453.00
36.00
2.81

Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Rmtr
Sqmt
Sqmt
Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Rmtr
Sqmt
Sqmt

1
0.11
1125.00
0.02
0.01
0.01
1.00
0.10
0.10
1
0.11
1125.00
0.02
0.01
0.01
1.00
0.10
0.10

214
596.46
932.32
250.00
25.00
40.00
138.00
36.00
2.81
214
596.46
932.32
250.00
25.00
40.00
138.00
36.00
2.81

10.21c
MCM0017
MCM0066
MCM0007
MCM0009
MCM0052
ALA0047
ALA0052
ALA0026
10.21d
10.22
10.22.1
10.22.1a
MCM0017
MCM0066
MCM0007
MCM0009
MCM0052
ALA0044
ALA0038
ALA0052
ALA0026
10.22.1b
MCM0017
MCM0066
MCM0007
MCM0009
MCM0052
ALA0044
ALA0038
ALA0052
ALA0026
10.22.1c
MCM0017
MCM0066
MCM0007
MCM0009
MCM0052
ALA0044
ALA0038
ALA0052
ALA0026
10.22.2
10.22.2a
MCM0017
MCM0066
MCM0007
MCM0009
MCM0052
ALA0044
ALA0038
ALA0052
ALA0026
10.22.2b
MCM0017
MCM0066
MCM0007
MCM0009
MCM0052
ALA0044
ALA0038
ALA0052
ALA0026
10.23
10.23.1
10.23.1a
MCM0017

c. In Second Floor
25mm Thk Kota Stone - 550 x 550mm
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Labour for laying of Kotastone Flooring
Soap wash & cleaning
Labour for Curing
In Third Floor
Providing, laying and polishing natural Kota stone material 20mm thick of size
Tread of size about - 1200 x 250mm
a. In Ground Floor
25mm Thk Kota Stone - 550 x 550mm
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Labour for Granite stone in Staircase steps
Labour for Full Round Nosing
Soap wash & cleaning
Labour for Curing
b. In First Floor
25mm Thk Kota Stone - 550 x 550mm
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Labour for Granite stone in Staircase steps
Labour for Full Round Nosing
Soap wash & cleaning
Labour for Curing
c. In Second Floor
25mm Thk Kota Stone - 550 x 550mm
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Labour for Granite stone in Staircase steps
Labour for Full Round Nosing
Soap wash & cleaning
Labour for Curing
Tread of size about - 7240 x 300mm
a. In Ground Floor
25mm Thk Kota Stone - 550 x 550mm
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Labour for Granite stone in Staircase steps
Labour for Full Round Nosing
Soap wash & cleaning
Labour for Curing
b. In First Floor
25mm Thk Kota Stone - 550 x 550mm
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Labour for Granite stone in Staircase steps
Labour for Full Round Nosing
Soap wash & cleaning
Labour for Curing
Providing, laying and polishing natural Kota stone material 20mm thick of size
Riser of size about - 1200 x 175mm
a. In Ground Floor
25mm Thk Kota Stone - 550 x 550mm

Rmtr
Sqmt
m3
Bag
Kgs
Kgs
Rmtr
Sqmt
Sqmt
Rmtr

1
0.11
1125.00
0.02
0.01
0.01
1.00
0.10
0.10
1

214
596.46
932.32
250.00
25.00
40.00
138.00
36.00
2.81
214

Nos
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Rmtr
Sqmt
Sqmt
Nos
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Rmtr
Sqmt
Sqmt
Nos
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Rmtr
Sqmt
Sqmt

1
0.32
0.01
0.06
0.03
0.02
0.30
50.00
0.30
0.30
1
0.32
0.01
0.06
0.03
0.02
0.30
50.00
0.30
0.30
1
0.32
0.01
0.06
0.03
0.02
0.30
50.00
0.30
0.30

397
596.46
932.32
250.00
25.00
40.00
566.00
310.00
36.00
2.81
397
596.46
932.32
250.00
25.00
40.00
566.00
310.00
36.00
2.81
397
596.46
932.32
250.00
25.00
40.00
566.00
310.00
36.00
2.81

Nos
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Rmtr
Sqmt
Sqmt
Nos
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Rmtr
Sqmt
Sqmt

1
2.33
0.05
0.43
0.22
0.11
2.17
50.00
2.17
2.17
1
2.33
0.05
0.43
0.22
0.11
2.17
50.00
2.17
2.17

2873
596.46
932.32
250.00
25.00
40.00
566.00
310.00
36.00
2.81
2873
596.46
932.32
250.00
25.00
40.00
566.00
310.00
36.00
2.81

Nos
Sqmt

1
0.23

278
596.46

MCM0066
MCM0007
MCM0009
MCM0052
ALA0044
ALA0052
ALA0026
10.23.1b
MCM0017
MCM0066
MCM0007
MCM0009
MCM0052
ALA0044
ALA0052
ALA0026
10.23.1c
MCM0017
MCM0066
MCM0007
MCM0009
MCM0052
ALA0044
ALA0052
ALA0026
10.23.2
10.23.2a
MCM0017
MCM0066
MCM0007
MCM0009
MCM0052
ALA0044
ALA0052
ALA0026
10.23.2b
MCM0017
MCM0066
MCM0007
MCM0009
MCM0052
ALA0044
ALA0052
ALA0026
10.24
10.24a
ALA0053
MCM0066
MCM0007
MCM0009
MCM0052
ALA0053
ALA0052
ALA0026
10.24b
ALA0053
MCM0066
MCM0007
MCM0009
MCM0052
ALA0053
ALA0052
ALA0026
10.24c
ALA0053
MCM0066
MCM0007

River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Labour for Granite stone in Staircase steps
Soap wash & cleaning
Labour for Curing
b. In First Floor
25mm Thk Kota Stone - 550 x 550mm
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Labour for Granite stone in Staircase steps
Soap wash & cleaning
Labour for Curing
c. In Second Floor
25mm Thk Kota Stone - 550 x 550mm
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Labour for Granite stone in Staircase steps
Soap wash & cleaning
Labour for Curing
Riser of size about - 7240 x 175mm
a. In Ground Floor
25mm Thk Kota Stone - 550 x 550mm
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Labour for Granite stone in Staircase steps
Soap wash & cleaning
Labour for Curing
b. In First Floor
25mm Thk Kota Stone - 550 x 550mm
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Labour for Granite stone in Staircase steps
Soap wash & cleaning
Labour for Curing
Providing and fixing Interior wall cladding tiles over one layer of cement
In Basement
Labour for Wall Cladding tile
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Labour for Wall Cladding tile
Soap wash & cleaning
Labour for Curing
In Ground floor
Labour for Wall Cladding tile
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Labour for Wall Cladding tile
Soap wash & cleaning
Labour for Curing
In First floor
Labour for Wall Cladding tile
River sand
Cement - OPC 43 Grade

m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Sqmt
Nos
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Sqmt
Nos
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Sqmt

0.01
0.04
0.02
0.01
0.21
0.21
0.21
1
0.23
0.01
0.04
0.02
0.01
0.21
0.21
0.21
1
0.23
0.01
0.04
0.02
0.01
0.21
0.21
0.21

932.32
250.00
25.00
40.00
566.00
36.00
2.81
278
596.46
932.32
250.00
25.00
40.00
566.00
36.00
2.81
278
596.46
932.32
250.00
25.00
40.00
566.00
36.00
2.81

Nos
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Sqmt
Nos
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Sqmt

1
1.36
0.03
0.25
0.13
0.06
1.27
1.27
1.27
1
1.36
0.03
0.25
0.13
0.06
1.27
1.27
1.27

1676
596.46
932.32
250.00
25.00
40.00
566.00
36.00
2.81
1676
596.46
932.32
250.00
25.00
40.00
566.00
36.00
2.81

Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag

1
1.08
0.02
0.20
0.10
0.05
1.00
1.00
1.00
1
1.08
0.02
0.20
0.10
0.05
1.00
1.00
1.00
1
1.08
0.02
0.20

884
503.75
932.32
250.00
25.00
40.00
227.00
36.00
2.81
884
503.75
932.32
250.00
25.00
40.00
227.00
36.00
2.81
884
503.75
932.32
250.00

MCM0009
MCM0052
ALA0053
ALA0052
ALA0026
10.24d
ALA0053
MCM0066
MCM0007
MCM0009
MCM0052
ALA0053
ALA0052
ALA0026
10.24e
ALA0053
MCM0066
MCM0007
MCM0009
MCM0052
ALA0053
ALA0052
ALA0026
10.24f
ALA0053
MCM0066
MCM0007
MCM0009
MCM0052
ALA0053
ALA0052
ALA0026
10.25
10.25a
ALA0053
MCM0066
MCM0007
MCM0009
MCM0052
AHI0006
ALA0053
ALA0052
ALA0026
10.25b
ALA0053
MCM0066
MCM0007
MCM0009
MCM0052
AHI0006
ALA0053
ALA0052
ALA0026
10.25c
ALA0053
MCM0066
MCM0007
MCM0009
MCM0052
AHI0006
ALA0053
ALA0052
ALA0026
10.25d
ALA0053
MCM0066
MCM0007

White Cement
Colour Oxides
Labour for Wall Cladding tile
Soap wash & cleaning
Labour for Curing
In Second floor
Labour for Wall Cladding tile
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Labour for Wall Cladding tile
Soap wash & cleaning
Labour for Curing
In Third Floor
Labour for Wall Cladding tile
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Labour for Wall Cladding tile
Soap wash & cleaning
Labour for Curing
In Terrace Floor
Labour for Wall Cladding tile
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Labour for Wall Cladding tile
Soap wash & cleaning
Labour for Curing
Providing and fixing Exterior wall cladding tiles over one layer of cement
In Basement
Labour for Wall Cladding tile
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Scaffolding
Labour for Wall Cladding tile
Soap wash & cleaning
Labour for Curing
In Ground floor
Labour for Wall Cladding tile
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Scaffolding
Labour for Wall Cladding tile
Soap wash & cleaning
Labour for Curing
In First floor
Labour for Wall Cladding tile
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Scaffolding
Labour for Wall Cladding tile
Soap wash & cleaning
Labour for Curing
In Second floor
Labour for Wall Cladding tile
River sand
Cement - OPC 43 Grade

Kgs
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Sqmt

0.10
0.05
1.00
1.00
1.00
1
1.08
0.02
0.20
0.10
0.05
1.00
1.00
1.00
1
1.08
0.02
0.20
0.10
0.05
1.00
1.00
1.00
1
1.08
0.02
0.20
0.10
0.05
1.00
1.00
1.00

25.00
40.00
227.00
36.00
2.81
884
503.75
932.32
250.00
25.00
40.00
227.00
36.00
2.81
884
503.75
932.32
250.00
25.00
40.00
227.00
36.00
2.81
884
503.75
932.32
250.00
25.00
40.00
227.00
36.00
2.81

Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag

1
1.08
0.02
0.20
0.10
0.05
1.00
1.00
1.00
1.00
1
1.08
0.02
0.20
0.10
0.05
1.00
1.00
1.00
1.00
1
1.08
0.02
0.20
0.10
0.05
1.00
1.00
1.00
1.00
1
1.08
0.02
0.20

916
503.75
932.32
250.00
25.00
40.00
25.00
249.00
36.00
2.81
916
503.75
932.32
250.00
25.00
40.00
25.00
249.00
36.00
2.81
916
503.75
932.32
250.00
25.00
40.00
25.00
249.00
36.00
2.81
916
503.75
932.32
250.00

MCM0009
MCM0052
AHI0006
ALA0053
ALA0052
ALA0026
10.25e
ALA0053
MCM0066
MCM0007
MCM0009
MCM0052
AHI0006
ALA0053
ALA0052
ALA0026
10.25f
ALA0053
MCM0066
MCM0007
MCM0009
MCM0052
AHI0006
ALA0053
ALA0052
ALA0026
10.26
10.27
ALA0038
11
11.1
11.2
11.2.1
11.2.1a
11.2.1b
11.2.1c
11.2.1d
11.2.1e
11.2.1f
11.2.2
11.2.2a
11.2.2b
11.2.2c
11.2.2d
11.2.2e
11.2.2f
11.2.3
11.2.3a
11.2.3b
11.2.3c
11.2.3d
11.2.3e
11.2.3f
11.2.4
11.2.5
11.2.6
11.2.7
11.2.7a
11.2.7b
11.2.7c
11.2.8
11.2.8a
11.2.8b
11.2.8c
11.2.9
11.2.9
11.2.9

White Cement
Colour Oxides
Scaffolding
Labour for Wall Cladding tile
Soap wash & cleaning
Labour for Curing
In Third floor
Labour for Wall Cladding tile
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Scaffolding
Labour for Wall Cladding tile
Soap wash & cleaning
Labour for Curing
In Terrace Floor
Labour for Wall Cladding tile
River sand
Cement - OPC 43 Grade
White Cement
Colour Oxides
Scaffolding
Labour for Wall Cladding tile
Soap wash & cleaning
Labour for Curing
Providing and laying to pattern, Wooden flooring fixed over grano flooring as
EDGE ROUNDING & POLISHING:
Labour for Full Round Nosing
FORM WORK
Providing, fabricating and erecting form work at all levels and places and
1) plywood shuttering shall be considered for all vertical elements,beam
Columns
Stilt Floor
First Floor
Second Floor
Third Floor
Fourth Floor
Terrace
Slab
First Floor
Second Floor
Third Floor
Fourth Floor
Terrace
Above Terrace
Beams
First Floor
Second Floor
Third Floor
Fourth Floor
Terrace
Above Terrace
Footings / Raft slab for columns,Core walls,Retaining walls
RCC Parapet at all levels of specified thickness
Grade slab
Domestic Sump tanks.
Bottom slab
Walls
Top slab
Domestic Overhead tanks.
Bottom slab
Walls
Top slab
Staircase at all floors & heights.
Lintels
Chejjas/Lofts

Kgs
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Rmtr
Rmtr

0.10
0.05
1.00
1.00
1.00
1.00
1
1.08
0.02
0.20
0.10
0.05
1.00
1.00
1.00
1.00
1
1.08
0.02
0.20
0.10
0.05
1.00
1.00
1.00
1.00
1
1
1.00

25.00
40.00
25.00
249.00
36.00
2.81
916
503.75
932.32
250.00
25.00
40.00
25.00
249.00
36.00
2.81
916
503.75
932.32
250.00
25.00
40.00
25.00
249.00
36.00
2.81
1542.70
340
263.00

Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt

1
1
1
1
1
1

359.43
359.43
359.43
359.43
359.43
359.43

Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt

1
1
1
1
1
1

310.43
310.43
310.43
310.43
310.43
310.43

Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt

1
1
1
1
1
1
1
1
1

410.43
410.43
410.43
410.43
410.43
410.43
264.43
329.43
310.43

Sqmt
Sqmt
Sqmt

1
1
1

310.43
329.43
310.43

Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt

1
1
1
1
1
1

310.43
330.43
310.43
310.43
379.43
379.43

11.2.9
11.2.9
MCM0048
ALA0090
12
12.1
AWC0100
12.2
AWC0100
12.3
AWC0100
12.4
12.4a
12.4b
12.4c
12.4d
12.4e
12.4f
12.5
12.5a
12.5b
12.5c
12.5d
12.5e
12.5f
13
13.1
13.1.1
MCM0001
MCM0066
MCM0007
AHI0006
ALA0012
ALA0063
ALA0025
13.1.2
MCM0001
MCM0066
MCM0007
MCM0041
AHI0006
ALA0011
ALA0062
ALA0025
13.1.3
MCM0001
MCM0066
MCM0007
MCM0041
ALA0087
ALA0011
ALA0062
ALA0025
AWC0101
13.2
13.2.1
13.2.1a
MCM0005
MCM0066
MCM0007
AHI0006
ALA0015
ALA00114
ALA0025
13.2.1b
MCM0005
MCM0066

RCC DG, Chillers, Pump & Transfo Foundations


Providing Staging for the Centering of Slabs and Beams above 5.50Mts. with
Formwork Materials - Staging
Labour for formwork for Staging
HAND RAIL WORKS
Fabricating, supplying, and fixing in position 900 mm high railing to balcony, as
Staircase MS Rails
Fabricating, supplying, and fixing in position 900 mm high railing to balcony, as
Staircase MS Rails
Fabricating, supplying and installing in position railing to stairs, consisting of
Staircase MS Rails
Providing and fixing 50MM dia polished MS handrail of approved quality.
In Foundation and Basement
In Ground Floor
In First Floor
In Second Floor
In Third Floor
In Terrace Floor
Providing and fixing 50MM dia polished SS handrail of approved quality.
In Foundation and Basement
In Ground Floor
In First Floor
In Second Floor
In Third Floor
In Terrace Floor
MASONRY WORKS
BRICK WORKS
Providing and constructing Brick Masonry in Basement & in Super Structure
Brick
River sand
Cement - OPC 43 Grade
Scaffolding
Labour for 230mm Brick work
Labour Lift for Brick work
Labour for curing
Providing and constructing half brick (4") Masonry in Basement & in Super
Brick
River sand
Cement - OPC 43 Grade
Torsteel
Scaffolding
Labour For Half Brick Work
Labour Lift Half brick works
Labour for curing
Providing 3" Thk. Staircase Side Parapet & Handrail of 2'-6" (750mm) High in
Brick
River sand
Cement - OPC 43 Grade
Torsteel
Labour for scaffolding
Labour For Half Brick Work
Labour Lift Half brick works
Labour for curing
Staricase SS Hand rail
SOLID BLOCK WORKS:
Providing 200mm thick block work using Solid concrete block of size
In Basement
Solid block - 400 x 200 x 200
River sand
Cement - OPC 43 Grade
Scaffolding
Labour for Solid Block Masonry 200mm thk
Labour Lift Solid block work 200mm thk
Labour for curing
In Ground Floor
Solid block - 400 x 200 x 200
River sand

Sqmt
Sqmt
Sqmt
Sqmt

1
1
1.00
1.00

339.43
303
186.00
60.00

Rmtr
Rmtr
Rmtr
Rmtr
Rmtr
Rmtr

1
1.00
1
1.00
1
1.00

1642.90
1603.00
1642.90
1603.00
1757.40
1717.50

Rmtr
Rmtr
Rmtr
Rmtr
Rmtr
Rmtr

1
1
1
1
1
1

1869
1869
1869
1869
1869
1869

Rmtr
Rmtr
Rmtr
Rmtr
Rmtr
Rmtr

1
1
1
1
1
1

4566
4566
4566
4566
4566
4566

m3
Nos
m3
Bag
Sqmt
m3
m3
m3
Sqmt
Nos
m3
Bag
MT
Sqmt
Sqmt
Sqmt
m3
Sqmt
Nos
m3
Bag
MT
Sqmt
Sqmt
Sqmt
m3
Rmtr

1
497.00
0.28
1.07
10.00
1.00
1.00
1.00
1
60.00
0.03
0.21
0.01
1.00
1.00
1.00
0.12
1
60.00
0.03
0.18
0.01
1.00
1.00
0.50
0.12
1.33

5154
4.73
938.14
323.00
25.00
725.00
174.00
25.00
872
4.73
938.14
323.00
60,150.00
25.00
125.00
15.00
25.00
4139
4.96
932.32
327.86
60,150.00
10.00
125.00
15.00
25.00
1,905.00

m3
Nos
m3
Bag
Sqmt
m3
m3
m3
m3
Nos
m3

1
62.50
0.13
0.62
1.00
1.00
1.00
1.00
1
62.50
0.13

3494
37.80
932.32
250.00
25.00
790.00
105.00
14.06
3494
37.80
932.32

MCM0007
AHI0006
ALA0015
ALA00114
ALA0025
13.2.1c
MCM0005
MCM0066
MCM0007
AHI0006
ALA0015
ALA00114
ALA0025
13.2.1d
MCM0005
MCM0066
MCM0007
AHI0006
ALA0015
ALA00114
ALA0025
13.2.1e
MCM0005
MCM0066
MCM0007
AHI0006
ALA0015
ALA00114
ALA0025
13.2.1f
MCM0005
MCM0066
MCM0007
AHI0006
ALA0015
ALA00114
ALA0025
13.2.2
13.2.2a
MCM0005
MCM0066
MCM0007
MMM0003
AHI0003
AHI0006
ALA0014
ALA0026
13.2.2b
MCM0005
MCM0066
MCM0007
MMM0003
AHI0003
AHI0006
ALA0014
ALA0026
13.2.2c
MCM0005
MCM0066
MCM0007
MMM0003
AHI0003
AHI0006
ALA0014
ALA0026
13.2.2d
MCM0005

Cement - OPC 43 Grade


Scaffolding
Labour for Solid Block Masonry 200mm thk
Labour Lift Solid block work 200mm thk
Labour for curing
In First Floor
Solid block - 400 x 200 x 200
River sand
Cement - OPC 43 Grade
Scaffolding
Labour for Solid Block Masonry 200mm thk
Labour Lift Solid block work 200mm thk
Labour for curing
In Second Floor
Solid block - 400 x 200 x 200
River sand
Cement - OPC 43 Grade
Scaffolding
Labour for Solid Block Masonry 200mm thk
Labour Lift Solid block work 200mm thk
Labour for curing
In Third floor
Solid block - 400 x 200 x 200
River sand
Cement - OPC 43 Grade
Scaffolding
Labour for Solid Block Masonry 200mm thk
Labour Lift Solid block work 200mm thk
Labour for curing
In Terrace floor
Solid block - 400 x 200 x 200
River sand
Cement - OPC 43 Grade
Scaffolding
Labour for Solid Block Masonry 200mm thk
Labour Lift Solid block work 200mm thk
Labour for curing
Providing and constructing 200mm thick Solid concrete block work in walls,
Stilt floor
Solid block - 400 x 200 x 200
River sand
Cement - OPC 43 Grade
MS Flat
Hoist
Scaffolding
Labour for Solid block masonary 100mm thk
Labour for Curing
First floor
Solid block - 400 x 200 x 200
River sand
Cement - OPC 43 Grade
MS Flat
Hoist
Scaffolding
Labour for Solid block masonary 100mm thk
Labour for Curing
Second floor
Solid block - 400 x 200 x 200
River sand
Cement - OPC 43 Grade
MS Flat
Hoist
Scaffolding
Labour for Solid block masonary 100mm thk
Labour for Curing
Third floor
Solid block - 400 x 200 x 200

Bag
Sqmt
m3
m3
m3
m3
Nos
m3
Bag
Sqmt
m3
m3
m3
m3
Nos
m3
Bag
Sqmt
m3
m3
m3
m3
Nos
m3
Bag
Sqmt
m3
m3
m3
m3
Nos
m3
Bag
Sqmt
m3
m3
m3

0.62
1.00
1.00
1.00
1.00
1
62.50
0.13
0.62
1.00
1.00
1.00
1.00
1
62.50
0.13
0.62
1.00
1.00
2.00
1.00
1
62.50
0.13
0.62
1.00
1.00
3.00
1.00
1
62.50
0.13
0.62
1.00
1.00
4.00
1.00

250.00
25.00
790.00
105.00
14.06
3515
37.80
932.32
250.00
25.00
790.00
105.00
14.06
3536
37.80
932.32
250.00
25.00
790.00
105.00
14.06
3557
37.80
932.32
250.00
25.00
790.00
105.00
14.06
3578
37.80
932.32
250.00
25.00
790.00
105.00
14.06

Sqmt
Nos
m3
Bag
Kgs
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Nos
m3
Bag
Kgs
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Nos
m3
Bag
Kgs
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Nos

1
11.55
0.03
0.12
0.18
1.00
1.00
1.00
1.00
1
11.55
0.03
0.12
0.18
1.00
1.00
1.00
1.00
1
11.55
0.03
0.12
0.18
1.00
1.00
1.00
1.00
1
11.55

757.47
41.90
1,112.42
283.00
48.50
100.00
25.00
167.21
5.00
778.47
41.90
1,112.42
283.00
48.50
100.00
25.00
167.21
5.00
799.47
41.90
1,112.42
283.00
48.50
100.00
25.00
167.21
5.00
820.47
41.90

MCM0066
MCM0007
MMM0003
AHI0003
AHI0006
ALA0014
ALA0026
13.2.2e
MCM0005
MCM0066
MCM0007
MMM0003
AHI0003
AHI0006
ALA0014
ALA0026
13.2.2f
MCM0005
MCM0066
MCM0007
MMM0003
AHI0003
AHI0006
ALA0014
ALA0026
13.2.3
13.2.3a
MCM0006
MCM0066
MCM0007
MCM0041
AHI0006
ALA0014
ALA0026
13.2.3b
MCM0006
MCM0066
MCM0007
MMM0003
MCM0040
AHI0003
AHI0006
ALA0015
ALA0026
13.2.3c
MCM0006
MCM0066
MCM0007
MMM0003
MCM0040
AHI0003
AHI0006
ALA0015
ALA0026
13.2.3d
MCM0006
MCM0066
MCM0007
MMM0003
MCM0040
AHI0003
AHI0006
ALA0015
ALA0026
13.2.3e
MCM0006
MCM0066

River sand
Cement - OPC 43 Grade
MS Flat
Hoist
Scaffolding
Labour for Solid block masonary 100mm thk
Labour for Curing
Fourth floor
Solid block - 400 x 200 x 200
River sand
Cement - OPC 43 Grade
MS Flat
Hoist
Scaffolding
Labour for Solid block masonary 100mm thk
Labour for Curing
Fifth floor (Parapet wall, LMR & Staricase Head room)
Solid block - 400 x 200 x 200
River sand
Cement - OPC 43 Grade
MS Flat
Hoist
Scaffolding
Labour for Solid block masonary 100mm thk
Labour for Curing
Providing and constructing 100mm thick Solid block work at all levels in walls,
In Basement
Solid block 400 X 200 X 100
River sand
Cement - OPC 43 Grade
Torsteel
Scaffolding
Labour for Solid block masonary 100mm thk
Labour for Curing
Stilt floor / Ground Floor
Solid block 400 X 200 X 100
River sand
Cement - OPC 43 Grade
MS Flat
Reinforcement steel - TMT FE 500
Hoist
Scaffolding
Labour for Solid Block Masonry 200mm thk
Labour for Curing
First floor
Solid block 400 X 200 X 100
River sand
Cement - OPC 43 Grade
MS Flat
Reinforcement steel - TMT FE 500
Hoist
Scaffolding
Labour for Solid Block Masonry 200mm thk
Labour for Curing
Second floor
Solid block 400 X 200 X 100
River sand
Cement - OPC 43 Grade
MS Flat
Reinforcement steel - TMT FE 500
Hoist
Scaffolding
Labour for Solid Block Masonry 200mm thk
Labour for Curing
Third floor
Solid block 400 X 200 X 100
River sand

m3
Bag
Kgs
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Nos
m3
Bag
Kgs
Nos
Sqmt
Sqmt
Sqmt
Sqmt
Nos
m3
Bag
Kgs
Nos
Sqmt
Sqmt
Sqmt

0.03
0.12
0.18
1.00
1.00
1.00
1.00
1
11.55
0.03
0.12
0.18
1.00
1.00
1.00
1.00
1
11.55
0.03
0.12
0.18
1.00
1.00
1.00
1.00

1,112.42
283.00
48.50
100.00
25.00
167.21
5.00
841.47
41.90
1,112.42
283.00
48.50
100.00
25.00
167.21
5.00
862.47
41.90
1,112.42
283.00
48.50
100.00
25.00
167.21
5.00

Sqmt
Nos
m3
Bag
MT
Sqmt
Sqmt
Sqmt
Sqmt
Nos
m3
Bag
Kgs
MT
Nos
Sqmt
m3
Sqmt
Sqmt
Nos
m3
Bag
Kgs
MT
Nos
Sqmt
m3
Sqmt
Sqmt
Nos
m3
Bag
Kgs
MT
Nos
Sqmt
m3
Sqmt
Sqmt
Nos
m3

1
12.50
0.01
0.10
0.01
1.00
1.00
1.00
1
11.55
0.01
0.10
0.18
0.15
1.00
1.00
1.00
1.00
1
11.55
0.01
0.10
0.18
0.15
1.00
1.00
1.00
1.00
1
11.55
0.01
0.10
0.18
0.15
1.00
1.00
1.00
1.00
1
11.55
0.01

469
18.90
932.32
250.00
42000.00
25.00
147.00
14.06
609.23
26.46
1112.42
283.00
48.50
46350.00
100.00
25.00
140.96
5.00
630.23
26.46
1112.42
283.00
48.50
46350.00
100.00
25.00
140.96
5.00
651.23
26.46
1112.42
283.00
48.50
46350.00
100.00
25.00
140.96
5.00
672.23
26.46
1112.42

MCM0007
MMM0003
MCM0040
AHI0003
AHI0006
ALA0015
ALA0026
13.2.3f
MCM0006
MCM0066
MCM0007
MMM0003
MCM0040
AHI0003
AHI0006
ALA0015
ALA0026
13.2.3g
MCM0006
MCM0066
MCM0007
MMM0003
MCM0040
AHI0003
AHI0006
ALA0015
ALA0026
13.3
13.3.1
13.3.1a
MCM0001
MCM0066
MCM0007
ALA0013
ALA0025
13.3.1b
MCM0001
MCM0066
MCM0007
ALA0013
ALA0025
13.3.1c
MCM0001
MCM0066
MCM0007
ALA0013
ALA0025
13.3.1d
MCM0001
MCM0066
MCM0007
ALA0013
ALA0025
13.3.2
13.3.2a
MCM0001
MCM0066
MCM0007
ALA0013
ALA0025
13.3.2b
MCM0001
MCM0066
MCM0007
ALA0013
ALA0025
14

Cement - OPC 43 Grade


MS Flat
Reinforcement steel - TMT FE 500
Hoist
Scaffolding
Labour for Solid Block Masonry 200mm thk
Labour for Curing
Fourth floor
Solid block 400 X 200 X 100
River sand
Cement - OPC 43 Grade
MS Flat
Reinforcement steel - TMT FE 500
Hoist
Scaffolding
Labour for Solid Block Masonry 200mm thk
Labour for Curing
Fifth floor (LMR & Staricase Head room)
Solid block 400 X 200 X 100
River sand
Cement - OPC 43 Grade
MS Flat
Reinforcement steel - TMT FE 500
Hoist
Scaffolding
Labour for Solid Block Masonry 200mm thk
Labour for Curing
Providing and constructing brick steps using 230mm thick first class bricks in
a. Step size about - 1200 x 250 x 170mm
a. In Ground Floor
Brick
River sand
Cement - OPC 43 Grade
Labour for brick work in Step
Labour for Curing
b. In First Floor
Brick
River sand
Cement - OPC 43 Grade
Labour for brick work in Step
Labour for Curing
c. In Second Floor
Brick
River sand
Cement - OPC 43 Grade
Labour for brick work in Step
Labour for Curing
c. In Third Floor
Brick
River sand
Cement - OPC 43 Grade
Labour for brick work in Step
Labour for Curing
b. Step size at entry of size about
a. 7240 x 300 x 175 mm
Brick
River sand
Cement - OPC 43 Grade
Labour for brick work in Step
Labour for Curing
b. 7240 x 600 x 175 mm
Brick
River sand
Cement - OPC 43 Grade
Labour for brick work in Step
Labour for Curing
MISCELLANEOUS

Bag
Kgs
MT
Nos
Sqmt
m3
Sqmt
Sqmt
Nos
m3
Bag
Kgs
MT
Nos
Sqmt
m3
Sqmt
Sqmt
Nos
m3
Bag
Kgs
MT
Nos
Sqmt
m3
Sqmt

0.10
0.18
0.15
1.00
1.00
1.00
1.00
1
11.55
0.01
0.10
0.18
0.15
1.00
1.00
1.00
1.00
1
11.55
0.01
0.10
0.18
0.15
1.00
1.00
1.00
1.00

283.00
48.50
46350.00
100.00
25.00
140.96
5.00
693.23
26.46
1112.42
283.00
48.50
46350.00
100.00
25.00
140.96
5.00
714.23
26.46
1112.42
283.00
48.50
46350.00
100.00
25.00
140.96
5.00

Nos
Nos
m3
Bag
Nos
m3
Nos
Nos
m3
Bag
Nos
m3
Nos
Nos
m3
Bag
Nos
m3
Nos
Nos
m3
Bag
Nos
m3

1
32.57
1125.00
0.08
1.00
0.05
1
32.57
1125.00
0.08
1.00
0.05
1
32.57
1125.00
0.08
1.00
0.05
1
32.57
1125.00
0.08
1.00
0.05

354
6.60
932.32
250.00
116.00
28.12
370
6.60
932.32
250.00
116.00
28.12
386
6.60
932.32
250.00
116.00
28.12
402
6.60
932.32
250.00
116.00
28.12

Nos
Nos
m3
Bag
Nos
m3
Nos
Nos
m3
Bag
Nos
m3

1
242.71
0.01
0.60
1.00
0.38
1
485.43
0.02
1.20
1.00
0.76

2633
6.60
932.32
250.00
116.00
28.12
5278
6.60
932.32
250.00
166.00
28.12

14.1
14.2
MCM0007
MCM0066
ALA0010
14.3
14.3.1
14.3.1a
ALA0001
14.3.1b
ALA0002
14.3.1c
ALA0003
14.40
14.4.1
14.4.1a
ALA0007
14.4.1b
ALA0005
14.4.1c
ALA0008
14.4.1d
ALA0006
14.5
14.5.1a
ALA0004
15
15.1
AWC0106
15.2
15.2a
AWC0105
15.2b
AWC0105
15.2c
AWC0105
15.2d
AWC0105
15.2e
AWC0105
15.3
15.3a
AWC0105
15.3b
AWC0105
15.3c
AWC0105
15.3d
AWC0105
15.3e
AWC0105
15.3f
AWC0105
15.4
AWC0103
15.5
15.5a
AWC0103
15.5b
AWC0103
15.5c
AWC0103
15.5d
AWC0103
15.5e
AWC0103
15.5f

ARCHITECTURAL DECORATIVE WORKS:


SUNKEN GROOVES :
Cement - OPC 43 Grade
River sand
Labour for making grooves
MISCELLANEOUS & SPECIAL WORKS
Chasing the R.C.C.Columns for Exposing Reinforcement and Welding the insert
Size : Upto 230mm x 230mm ( 9"x9")
Chasing the R.C.C.Columns for Exposing Reinforcement and Welding the
Size : Above (a) Upto 230mm x 300mm ( 9"x12")
Chasing the R.C.C.Columns for Exposing Reinforcement and Welding the
Size : Above (b) Upto 300mm x 600mm ( 12"x24")
Chasing the R.C.C.Columns for Exposing Reinforcement and Welding the
SPECIAL WORKS FOR CLEAN ROOMS:
Providing Square & Rectangular Cut-outs with alround kerbs of with required
Upto 0.60 SqM ( 6.5 SFt)
Cut-outs with alround kerbs - Upto 0.60 SqM (6.50 Sft)
Above 0.60 SqM & upto 1.00 SqM ( 6.5 - 11 SFt)
Cut-outs with alround kerbs Above 0.60 SqM & upto 1.00 SqM ( 6.50 - 11
Above 1.0 SqM & upto 1.50 SqM ( 11- 16 SFt)
Cut-outs with alround kerbs Upto 1.0 SqM & Upto 1.50 Sqm (11 - 16 SFt)
Above 1.50 SqM & upto 2.50 SqM (16 - 25 SFt)
Cut-outs with alround kerbs Above 1.50 SqM & upto 2.00 SqM ( 16 - 25
Providing Circular Cut-outs with alround kerbs of with required Plywood
Upto 1000mm in dia.
Circular Cutouts - Upto 1000mm iin dia
PAINTING WORKS
Preparing the surface and applying 3 coats of cement paint of approved make
Cement paint
Prepare the Ceiling surfaces and applying one coat of primer and two coats of
In Basement
Plastic Emulsion paint
In Ground Floor
Plastic Emulsion paint
In First Floor
Plastic Emulsion paint
In Second Floor
Plastic Emulsion paint
In Third Floor
Plastic Emulsion paint
Scraping and cleaning the surface, application of one coat of primer
In Basement
Plastic Emulsion paint
In Ground Floor
Plastic Emulsion paint
In First Floor
Plastic Emulsion paint
In Second Floor
Plastic Emulsion paint
In Third Floor
Plastic Emulsion paint
In Terrace Floor
Plastic Emulsion paint
Supply and painting 3 Coats of Berger/ICI/Asian Exterior Emulsion( Weather
Exterior Emulsion
Prepare the surfaces of External walls and provide 2coats of exterior emulsion
In Basement
Exterior Emulsion
In Ground Floor
Exterior Emulsion
In First Floor
Exterior Emulsion
In Second Floor
Exterior Emulsion
In Third Floor
Exterior Emulsion
In Terrace Floor

Rmtr
Bag
m3
Rmtr

1
0.01
0.0010
1.00

170
327.86
932.32
116.00

Nos
Nos
Nos
Nos
Nos
Nos

1
1.00
1
1.00
1
1.00

679
550.00
802
650.00
925
750.00

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos

1
1.00
1
1.00
1
1.00
1
1.00

680
550.00
799
650.00
1101
900.00
1122
900.00

Nos
Nos

1
1.00

3075
2,500.00

Sqmt
Sqmt

1
1.00

71
56.70

Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt

1
1.00
1
1.00
1
1.00
1
1.00
1
1.00

91
94.50
91
94.50
91
94.50
91
94.50
91
94.50

Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt

1
1.00
1
1.00
1
1.00
1
1.00
1
1.00
1
1.00
1
1.00

146
94.50
146
94.50
146
94.50
146
94.50
146
94.50
146
94.50
136
110.25

Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt

1
1.00
1
1.00
1
1.00
1
1.00
1
1.00
1

128
110.25
128
110.25
128
110.25
128
110.25
128
110.25
128

AWC0103
15.6
15.6.1
15.6.1a
15.6.1b
15.6.1c
15.6.1d
15.6.1e
15.6.1f
15.6.2
15.6.2a
15.6.2b
15.6.2c
15.6.2d
15.6.2e
15.6.2f
15.6.3
15.6.4
16
16.10
16.1a
MCM0024
ALA0081
16.2
ALA0080
ALA0080
16.3
16.4
16.5
MCM0023
ALA0066
16.6
MCM0032
MCM0066
MCM0007
AHI0001
ALA0022
ALA0025
16.7
MCM0025
ALA0076
17
17.1
17.1a
MCM0031
MCM0066
MCM0007
MCM0046
ALA0089
AHI0001
ALA0022
ALA0025
17.1b
MCM0031
MCM0066
MCM0007
MCM0046
ALA0089
AHI0001
ALA0022
ALA0025
17.1c
MCM0031
MCM0066
MCM0007
MCM0046
ALA0089

Exterior Emulsion
Prepare the surface of internal walls, beams, column, fins etc., and apply two
for wall & other vertical surfaces
Stilt floor
First floor
Second floor
Third floor
Fourth floor
Fifth floor (LMR & Staricase Head room)
for ceiling & other horizontal surfaces
Stilt floor
First floor
Second floor
Third floor
Fourth floor
Fifth floor (LMR & Staricase Head room)
Providing and applying synthetic textured finish (RENOVO or other approved
Providing and applying external grade emulsion in approved colour and brand
PHE - PIPING WORKS
Providing and fixing PVC rain water down take pipes as per IS : 4985-2000 class
160 mm dia.
PVC Down take pipe - 160mm dia
Labour for PVC down take pipe - 160mm dia
Providing and fixing uPVC gratings in Terrace to rain water pipes on terrace
UPVC Grating
Labour for Gratings
Locating and fixing anchor bolts for steel base plates into RCC column
Providing ladder
Supply fixing and testing 110mm dia SWR-PVC B Class pipe confirming to IS
PVC SWR Pipe - 110mm Dia
Labour for Laying of SWR pipes - 110mm dia
Providing PCC encasing for internal pipes running in ground floor with laying
6mm Blue Metal
River sand
Cement - OPC 43 Grade
Concrete Equipment
Labour for PCC
Labour for Curing
Providing and fixing heavy duty Manhole cover of size about - 600 x 600mm
C.I. Man Hole cover of 24 x 24 size
Labour for Fixing of MH Covers
PLAIN CEMENT CONCRETE
Providing and laying plain cement concrete 1:4:8 (1 cement : 4 coarse sand : 8
a. In foundation and plinth beam
40mm Blue Metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Formwork - Labour
Concrete Equipment
Labour for PCC
Labour for Curing
b. In basement flooring
40mm Blue Metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Formwork - Labour
Concrete Equipment
Labour for PCC
Labour for Curing
c. In ramp
40mm Blue Metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Formwork - Labour

Sqmt

1.00

110.25

Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt

1
1
1
1
1
1

113.40
113.40
113.40
113.40
113.40
113.40

Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt

1
1
1
1
1
1
1
1

115.50
115.50
115.50
115.50
115.50
115.50
393.75
136.50

Rmtr
Rmtr
Rmtr
Nos
Nos
Nos
Nos
Nos
Rmtr
Rmtr
Rmtr
Rmtr
m3
m3
bag
m3
m3
m3
Nos
Nos
Nos

1
1.22
1.00
1
1.00
1.00
1
1
1
1.00
1.00
1
0.03
0.01
0.12
0.03
0.03
0.03
1
1.00
1.00

583
328.00
72.00
587
350.93
125.00
450
15000
349
216.31
79.00
76
600.36
932.32
250.00
121.00
315.00
2.81
10453
10102.71
350.00

m3
m3
m3
bag
Sqmt
Sqmt
m3
m3
m3
m3
m3
m3
bag
Sqmt
Sqmt
m3
m3
m3
m3
m3
m3
bag
Sqmt
Sqmt

1
0.90
0.45
3.24
1.00
1.00
1.00
1.00
1.00
1
0.90
0.45
3.24
1.00
1.00
1.00
1.00
1.00
1
0.90
0.45
3.24
1.00
1.00

3576
741.62
932.32
250.00
118.57
107.00
121.00
315.00
28.12
2702
741.62
932.32
250.00
118.57
107.00
121.00
315.00
28.12
2702
741.62
932.32
250.00
118.57
107.00

AHI0001
ALA0022
ALA0025
17.2
MCM0031
MCM0039
MCM0066
MCM0065
ALA0022
AHI0001
ALA0025
17.3
MCM0030
MCM0066
MCM0065
MCM0046
ALA0088
ALA0022
AHI0001
ALA0025
17.4
MCM0034
MCM0066
MCM0007
MCM0046
ALA0089
AHI0001
ALA0022
ALA0025
18
18.1
MCM0066
MCM0007
ALA0074
ALA0069
ALA0070
ALA0064
AHI0006
ALA0026
18.2
18.2a
MCM0066
MCM0007
ALA0074
ALA0068
AHI0006
ALA0070
ALA0026
18.2b
MCM0066
MCM0007
ALA0074
ALA0068
AHI0006
ALA0070
ALA0026
18.2c
MCM0066
MCM0007
ALA0074
ALA0068
AHI0006
ALA0070
ALA0059
ALA0026
18.2d
MCM0066

Concrete Equipment
Labour for PCC
Labour for Curing
Providing and laying Plum concrete1: 5: 10. wherever specified using river
40mm Blue Metal
Stone Boulders
River sand
Cement - OPC 53 Grade
Labour for PCC
Concrete Equipment
Labour for Curing
Providing and laying P.C.C. 1:2:4 of specified thickness wherever specified
20mm Blue Metal
River sand
Cement - OPC 53 Grade
Form work material - PCC. RCC FOOTING, ETC
Labour for Form work - PCC
Labour for PCC
Concrete Equipment
Labour for Curing
Providing and placing brick jelly cement concrete 1:3:6 in Toilets sunken areas
Brick jelly
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Formwork - Labour
Concrete Equipment
Labour for PCC
Labour for Curing
PLASTERING WORKS
CEILING PLASTERING: 12 mm thick plastering in cement mortar 1:4 (1 cement:
River sand
Cement - OPC 43 Grade
Labour for Hacking
Labour for Button marking
Labour For Ceiling Plastering
Labour Lift For Ceiling Plastering
Scaffolding
Labour for Curing
Prepare the surfaces of all Ceiling and plaster in CM 1:4, including button
In Basement
River sand
Cement - OPC 43 Grade
Labour for Hacking
Labour for Button Fixing
Scaffolding
Labour For Ceiling Plastering
Labour for Curing
In Ground Floor
River sand
Cement - OPC 43 Grade
Labour for Hacking
Labour for Button Fixing
Scaffolding
Labour For Ceiling Plastering
Labour for Curing
In First Floor
River sand
Cement - OPC 43 Grade
Labour for Hacking
Labour for Button Fixing
Scaffolding
Labour For Ceiling Plastering
Labour Lift for Internal & External Plastering
Labour for Curing
In Second Floor
River sand

m3
m3
m3
m3
m3
m3
m3
Bag
m3
m3
m3
m3
m3
m3
Bag
Sqmt
Sqmt
m3
m3
m3
m3
m3
m3
bag
Sqmt
Sqmt
m3
m3
m3

1.00
1.00
1.00
1
0.57
0.38
0.45
2.70
1.00
1.00
1.00
1
0.88
0.45
6.18
1.50
1.50
1.00
1.00
1.00
1
0.90
0.45
4.05
1.00
1.00
1.00
1.00
1.00

121.00
315.00
28.12
2753
1,075.34
741.62
1,112.42
283.00
315.00
121.00
50.00
4365
1,112.42
1,112.42
283.00
150.00
128.00
315.00
121.00
50.00
3000
847.56
932.32
250.00
118.57
107.00
121.00
315.00
28.12

Sqmt
m3
Bag
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt

1
0.01
0.10
1.00
1.00
1.00
1.00
1.00
1.00

360
938.14
323.00
35.00
29.00
125.00
26.00
25.00
10.00

Sqmt
m3
Bag
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3

1
0.02
0.12
1.00
1.00
1.00
1.00
1.00
1
0.02
0.12
1.00
1.00
1.00
1.00
1.00
1
0.02
0.12
1.00
1.00
1.00
1.00
1.00
1.00
1
0.02

220
932.32
250.00
29.00
15.00
25.00
116.00
2.81
220
932.32
250.00
29.00
15.00
25.00
116.00
2.81
229
932.32
250.00
29.00
15.00
25.00
116.00
9.00
2.81
238
932.32

MCM0007
AHI0006
ALA0070
ALA0074
ALA0068
ALA0026
ALA0059
18.2e
MCM0066
MCM0007
AHI0006
ALA0070
ALA0074
ALA0068
ALA0026
ALA0059
18.2f
MCM0066
MCM0007
AHI0006
ALA0070
ALA0074
ALA0068
ALA0026
ALA0059
18.3
18.3a
MCM0066
MCM0007
ALA0070
ALA0026
ALA0074
AHI0003
AHI0006
18.3b
MCM0066
MCM0007
ALA0070
ALA0026
ALA0074
AHI0003
AHI0006
18.3c
MCM0066
MCM0007
ALA0070
ALA0026
ALA0074
AHI0003
AHI0006
18.3d
MCM0066
MCM0007
ALA0070
ALA0026
ALA0074
AHI0003
AHI0006
18.3e
MCM0066
MCM0007
ALA0070
ALA0026
ALA0074
AHI0003
AHI0006
18.3f

Cement - OPC 43 Grade


Scaffolding
Labour For Ceiling Plastering
Labour for Hacking
Labour for Button Fixing
Labour for Curing
Labour Lift for Internal & External Plastering
In Third Floor
River sand
Cement - OPC 43 Grade
Scaffolding
Labour For Ceiling Plastering
Labour for Hacking
Labour for Button Fixing
Labour for Curing
Labour Lift for Internal & External Plastering
In Terrace Floor
River sand
Cement - OPC 43 Grade
Scaffolding
Labour For Ceiling Plastering
Labour for Hacking
Labour for Button Fixing
Labour for Curing
Labour Lift for Internal & External Plastering
Prepare the surface and Plaster the Ceilings, soffit of staircase and Concrete
Stilt floor
River sand
Cement - OPC 43 Grade
Labour For Ceiling Plastering
Labour for Curing
Labour for Hacking
Hoist
Scaffolding
First floor
River sand
Cement - OPC 43 Grade
Labour For Ceiling Plastering
Labour for Curing
Labour for Hacking
Hoist
Scaffolding
Second floor
River sand
Cement - OPC 43 Grade
Labour For Ceiling Plastering
Labour for Curing
Labour for Hacking
Hoist
Scaffolding
Third floor
River sand
Cement - OPC 43 Grade
Labour For Ceiling Plastering
Labour for Curing
Labour for Hacking
Hoist
Scaffolding
Fourth floor
River sand
Cement - OPC 43 Grade
Labour For Ceiling Plastering
Labour for Curing
Labour for Hacking
Hoist
Scaffolding
Fifth floor (LMR & Staricase Head room)

Bag
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt

0.12
1.00
1.00
1.00
1.00
1.00
2.00
1
0.02
0.12
1.00
1.00
1.00
1.00
1.00
3.00
1
0.02
0.12
1.00
1.00
1.00
1.00
1.00
4.00

250.00
25.00
116.00
29.00
15.00
2.81
9.00
247
932.32
250.00
25.00
116.00
29.00
15.00
2.81
9.00
256
932.32
250.00
25.00
116.00
29.00
15.00
2.81
9.00

Sqmt
m3
Bag
Sqmt
Sqmt
Sqmt
Nos
Sqmt
Sqmt
m3
Bag
Sqmt
Sqmt
Sqmt
Nos
Sqmt
Sqmt
m3
Bag
Sqmt
Sqmt
Sqmt
Nos
Sqmt
Sqmt
m3
Bag
Sqmt
Sqmt
Sqmt
Nos
Sqmt
Sqmt
m3
Bag
Sqmt
Sqmt
Sqmt
Nos
Sqmt
Sqmt

1
0.02
0.13
1.00
1.00
1.00
1.00
1.00
1
0.02
0.13
1.00
1.00
1.00
1.00
1.00
1
0.02
0.13
1.00
1.00
1.00
1.00
1.00
1
0.02
0.13
1.00
1.00
1.00
1.00
1.00
1
0.02
0.13
1.00
1.00
1.00
1.00
1.00
1

255.35
1112.42
283.00
131.25
5.00
36.75
100.00
25.00
264.85
1112.42
283.00
131.25
5.00
36.75
100.00
25.00
274.35
1112.42
283.00
131.25
5.00
36.75
100.00
25.00
283.85
1112.42
283.00
131.25
5.00
36.75
100.00
25.00
293.35
1112.42
283.00
131.25
5.00
36.75
100.00
25.00
302.85

MCM0066
MCM0007
ALA0070
ALA0026
ALA0074
AHI0003
AHI0006
18.4
MCM0066
MCM0007
ALA0073
ALA0059
ALA0069
ALA0074
AHI0006
ALA0026
18.5
18.5a
MCM0066
MCM0007
MCM0058
AHI0006
ALA0067
ALA0072
ALA0068
ALA0026
18.5b
MCM0066
MCM0007
MCM0058
AHI0003
ALA0067
ALA0072
ALA0068
AHI0006
ALA0026
18.5c
MCM0066
MCM0007
MCM0058
ALA0067
ALA0072
ALA0068
AHI0003
AHI0006
ALA0026
18.5d
MCM0066
MCM0007
MCM0058
ALA0067
ALA0072
ALA0068
AHI0003
AHI0006
ALA0026
18.5e
MCM0066
MCM0007
MCM0058
ALA0067
ALA0072
ALA0068
AHI0003
AHI0006
ALA0026
18.5f

River sand
Cement - OPC 43 Grade
Labour For Ceiling Plastering
Labour for Curing
Labour for Hacking
Hoist
Scaffolding
PLASTERING INDEPENDENT COLUMNS & BEAMS:
River sand
Cement - OPC 43 Grade
Labour For External Plastering
Labour Lift for Internal & External Plastering
Labour for Button marking
Labour for Hacking
Scaffolding
Labour for Curing
INTERNAL PLASTERING: Prepare the surface and plaster all internal RCC /
In Basement
River sand
Cement - OPC 43 Grade
Chicken mesh
Scaffolding
Labour for Internal Plastering
Labour for Fixing of Chicken mesh
Labour for Button Fixing
Labour for Curing
Stilt floor / Ground Floor
River sand
Cement - OPC 43 Grade
Chicken Mesh
Hoist
Labour For Internal Plastering
Labour for Fixing of Chicken mesh
Labour for Button Fixing
Scaffolding
Labour for Curing
First floor
River sand
Cement - OPC 43 Grade
Chicken Mesh
Labour For Internal Plastering
Labour for Fixing of Chicken mesh
Labour for Button Fixing
Hoist
Scaffolding
Labour for Curing
Second floor
River sand
Cement - OPC 43 Grade
Chicken Mesh
Labour For Internal Plastering
Labour for Fixing of Chicken mesh
Labour for Button Fixing
Hoist
Scaffolding
Labour for Curing
Third floor
River sand
Cement - OPC 43 Grade
Chicken Mesh
Labour For Internal Plastering
Labour for Fixing of Chicken mesh
Labour for Button Fixing
Hoist
Scaffolding
Labour for Curing
Fourth floor

m3
Bag
Sqmt
Sqmt
Sqmt
Nos
Sqmt
Sqmt
m3
Bag
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt

0.02
0.13
1.00
1.00
1.00
1.00
1.00
1
0.01
0.13
1.00
1.00
1.00
1.00
1.00
1.00

1112.42
283.00
131.25
5.00
36.75
100.00
25.00
377
938.14
323.00
140.00
14.00
29.00
35.00
25.00
10.00

Sqmt
m3
Bag
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Sqmt
Nos
Sqmt
Rmtr
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Sqmt
Sqmt
Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt
m3
Bag
Sqmt
Sqmt
Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt
m3
Bag
Sqmt
Sqmt
Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt

1
0.02
0.10
0.20
1.00
1.00
0.20
1.00
1.00
1
0.02
0.10
0.20
1.00
1.00
1.00
1.00
1.00
1.00
1
0.02
0.10
0.20
1.00
1.00
1.00
1.00
1.00
1.00
1
0.02
0.10
0.20
1.00
1.00
1.00
1.00
1.00
1.00
1
0.02
0.10
0.20
1.00
1.00
1.00
1.00
1.00
1.00
1

203
932.32
250.00
14.56
25.00
116.00
72.00
15.00
2.81
267.83
1112.42
283.00
14.17
100.00
130.20
17.22
28.26
25.00
5.00
277.33
1112.42
283.00
14.17
130.20
17.22
28.26
100.00
25.00
5.00
286.83
1112.42
283.00
14.17
130.20
17.22
28.26
100.00
25.00
5.00
296.33
1112.42
283.00
14.17
130.20
17.22
28.26
100.00
25.00
5.00
305.83

MCM0066
MCM0007
MCM0058
ALA0067
ALA0072
ALA0068
AHI0003
AHI0006
ALA0026
18.5g
MCM0066
MCM0007
MCM0058
ALA0067
ALA0072
ALA0068
AHI0003
AHI0006
ALA0026
18.6
MCM0066
MCM0007
MCM0014
ALA0073
ALA0059
ALA0069
AHI0006
ALA0026
18.7
18.7a
MCM0066
MCM0007
MCM0058
AHI0006
ALA0073
ALA0072
ALA0068
ALA0026
18.7b
MCM0066
MCM0058
MCM0007
MCM0014
ALA0073
ALA0045
ALA0072
ALA0068
AHI0003
AHI0006
ALA0026
18.7c
MCM0066
MCM0058
MCM0007
MCM0014
ALA0073
ALA0045
ALA0072
ALA0068
AHI0003
AHI0006
ALA0026
18.7d
MCM0066
MCM0058
MCM0007
MCM0014

River sand
Cement - OPC 43 Grade
Chicken Mesh
Labour For Internal Plastering
Labour for Fixing of Chicken mesh
Labour for Button Fixing
Hoist
Scaffolding
Labour for Curing
Fifth floor (LMR & Staricase Head room)
River sand
Cement - OPC 43 Grade
Chicken Mesh
Labour For Internal Plastering
Labour for Fixing of Chicken mesh
Labour for Button Fixing
Hoist
Scaffolding
Labour for Curing
EXTERNAL PLASTERING:
River sand
Cement - OPC 43 Grade
Water proofing compound
Labour For External Plastering
Labour Lift for Internal & External Plastering
Labour for Button marking
Scaffolding
Labour for Curing
Providing waterproof plaster to external walls, columns, etc. in waterproof
In Basement
River sand
Cement - OPC 43 Grade
Chicken mesh
Scaffolding
Labour For External Plastering
Labour for Fixing of Chicken mesh
Labour for Button Fixing
Labour for Curing
Stilt floor / Ground Floor
River sand
Chicken Mesh
Cement - OPC 43 Grade
Water proofing compound
Labour For External Plastering
Labour for Grooves
Labour for Fixing of Chicken mesh
Labour for Button Fixing
Hoist
Scaffolding
Labour for Curing
First floor
River sand
Chicken Mesh
Cement - OPC 43 Grade
Water proofing compound
Labour For External Plastering
Labour for Grooves
Labour for Fixing of Chicken mesh
Labour for Button Fixing
Hoist
Scaffolding
Labour for Curing
Second floor
River sand
Chicken Mesh
Cement - OPC 43 Grade
Water proofing compound

m3
Bag
Sqmt
Sqmt
Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt
m3
Bag
Sqmt
Sqmt
Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt

0.02
0.10
0.20
1.00
1.00
1.00
1.00
1.00
1.00
1
0.02
0.10
0.20
1.00
1.00
1.00
1.00
1.00
1.00
1
0.02
0.13
0.01
1.00
1.00
1.00
1.00
1.00

1112.42
283.00
14.17
130.20
17.22
28.26
100.00
25.00
5.00
315.33
1112.42
283.00
14.17
130.20
17.22
28.26
100.00
25.00
5.00
417
938.14
323.00
72.66
140.00
14.00
29.00
25.00
10.00

Sqmt
m3
Bag
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Sqmt
Bag
Kgs
Sqmt
Rmtr
Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt
m3
Sqmt
Bag
Kgs
Sqmt
Rmtr
Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt
m3
Sqmt
Bag
Kgs

1
0.02
0.10
0.20
1.00
1.00
0.20
1.00
1.00
1
0.03
0.20
0.16
0.24
1.00
0.10
1.00
1.00
1.00
1.00
1.00
1
0.03
0.20
0.16
0.24
1.00
0.10
1.00
1.00
1.00
1.00
1.00
1
0.03
0.20
0.16
0.24

219
932.32
250.00
14.56
25.00
132.00
72.00
15.00
2.81
332.95
1112.42
14.17
283.00
74.43
147.00
116.00
17.22
28.26
100.00
25.00
5.00
342.45
1112.42
14.17
283.00
74.43
147.00
116.00
17.22
28.26
100.00
25.00
5.00
351.95
1112.42
14.17
283.00
74.43

ALA0073
ALA0045
ALA0072
ALA0068
AHI0003
AHI0006
ALA0026
18.7e
MCM0066
MCM0058
MCM0007
MCM0014
ALA0073
ALA0045
ALA0072
ALA0068
AHI0003
AHI0006
ALA0026
18.7f
MCM0066
MCM0058
MCM0007
MCM0014
ALA0073
ALA0045
ALA0072
ALA0068
AHI0003
AHI0006
ALA0026
18.7g
MCM0066
MCM0058
MCM0007
MCM0014
ALA0073
ALA0045
ALA0072
ALA0068
AHI0003
AHI0006
ALA0026
18.8
18.8a
MCM0066
MCM0007
MCM0058
ALA0067
ALA0072
ALA0068
AHI0003
AHI0006
ALA0026
18.8b
MCM0066
MCM0007
MCM0058
ALA0067
ALA0072
ALA0068
AHI0003
AHI0006
ALA0026
18.8c
MCM0066
MCM0007

Labour For External Plastering


Labour for Grooves
Labour for Fixing of Chicken mesh
Labour for Button Fixing
Hoist
Scaffolding
Labour for Curing
Third floor
River sand
Chicken Mesh
Cement - OPC 43 Grade
Water proofing compound
Labour For External Plastering
Labour for Grooves
Labour for Fixing of Chicken mesh
Labour for Button Fixing
Hoist
Scaffolding
Labour for Curing
Fourth floor
River sand
Chicken Mesh
Cement - OPC 43 Grade
Water proofing compound
Labour For External Plastering
Labour for Grooves
Labour for Fixing of Chicken mesh
Labour for Button Fixing
Hoist
Scaffolding
Labour for Curing
Fifth floor ( Parapet wall , LMR & Staricase Head room)
River sand
Chicken Mesh
Cement - OPC 43 Grade
Water proofing compound
Labour For External Plastering
Labour for Grooves
Labour for Fixing of Chicken mesh
Labour for Button Fixing
Hoist
Scaffolding
Labour for Curing
Providing rough plastering in CM 1:5 with course sand, 12mm thick for fixing
Stilt floor
River sand
Cement - OPC 43 Grade
Chicken Mesh
Labour for Internal Plastering
Labour for Fixing of Chicken mesh
Labour for Button Fixing
Hoist
Scaffolding
Labour for Curing
First floor
River sand
Cement - OPC 43 Grade
Chicken Mesh
Labour for Internal Plastering
Labour for Fixing of Chicken mesh
Labour for Button Fixing
Hoist
Scaffolding
Labour for Curing
Second floor
River sand
Cement - OPC 43 Grade

Sqmt
Rmtr
Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt
m3
Sqmt
Bag
Kgs
Sqmt
Rmtr
Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt
m3
Sqmt
Bag
Kgs
Sqmt
Rmtr
Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt
m3
Sqmt
Bag
Kgs
Sqmt
Rmtr
Rmtr
Sqmt
Nos
Sqmt
Sqmt

1.00
0.10
1.00
1.00
1.00
1.00
1.00
1
0.03
0.20
0.16
0.24
1.00
0.10
1.00
1.00
1.00
1.00
1.00
1
0.03
0.20
0.16
0.24
1.00
0.10
1.00
1.00
1.00
1.00
1.00
1
0.03
0.20
0.16
0.24
1.00
0.10
1.00
1.00
1.00
1.00
1.00

147.00
116.00
17.22
28.26
100.00
25.00
5.00
361.45
1112.42
14.17
283.00
74.43
147.00
116.00
17.22
28.26
100.00
25.00
5.00
370.95
1112.42
14.17
283.00
74.43
147.00
116.00
17.22
28.26
100.00
25.00
5.00
380.45
1112.42
14.17
283.00
74.43
147.00
116.00
17.22
28.26
100.00
25.00
5.00

Sqmt
m3
Bag
Sqmt
Sqmt
Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt
m3
Bag
Sqmt
Sqmt
Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt
m3
Bag

1
0.02
0.13
0.20
1.00
1.00
1.00
1.00
1.00
1.00
1
0.02
0.13
0.20
1.00
1.00
1.00
1.00
1.00
1.00
1
0.02
0.13

268.53
1112.42
283.00
14.17
130.20
17.22
28.26
100.00
25.00
5.00
278.03
1112.42
283.00
14.17
130.20
17.22
28.26
100.00
25.00
5.00
287.53
1112.42
283.00

MCM0058
ALA0067
ALA0072
ALA0068
AHI0003
AHI0006
ALA0026
18.8d
MCM0066
MCM0007
MCM0058
ALA0067
ALA0072
ALA0068
AHI0003
AHI0006
ALA0026
18.8e
MCM0066
MCM0007
MCM0058
ALA0067
ALA0072
ALA0068
AHI0003
AHI0006
ALA0026
18.9
MCM0066
MCM0007
MCM0058
ALA0067
ALA0072
ALA0068
AHI0003
AHI0006
ALA0026
18.10
18.10a
MCM0066
MCM0007
MCM0014
AHI0006
ALA0067
ALA0074
ALA0068
ALA0026
18.10b
MCM0066
MCM0007
MCM0014
AHI0006
ALA0067
ALA0074
ALA0068
ALA0059
ALA0026
18.10c
MCM0066
MCM0007
MCM0014
AHI0006
ALA0067
ALA0074
ALA0068
ALA0026
ALA0059

Chicken Mesh
Labour for Internal Plastering
Labour for Fixing of Chicken mesh
Labour for Button Fixing
Hoist
Scaffolding
Labour for Curing
Third floor
River sand
Cement - OPC 43 Grade
Chicken Mesh
Labour for Internal Plastering
Labour for Fixing of Chicken mesh
Labour for Button Fixing
Hoist
Scaffolding
Labour for Curing
Fourth floor
River sand
Cement - OPC 43 Grade
Chicken Mesh
Labour for Internal Plastering
Labour for Fixing of Chicken mesh
Labour for Button Fixing
Hoist
Scaffolding
Labour for Curing
Providing rough plastering 12mm thick in CM 1:6 with course sand, on walls
River sand
Cement - OPC 43 Grade
Chicken Mesh
Labour for Internal Plastering
Labour for Fixing of Chicken mesh
Labour for Button Fixing
Hoist
Scaffolding
Labour for Curing
Prepare the surfaces and plaster in c:m 1:3 mixed with water proofing
In Ground Floor
River sand
Cement - OPC 43 Grade
Water proofing compound
Scaffolding
Labour for Internal Plastering
Labour for Hacking
Labour for Button Fixing
Labour for Curing
In First Floor
River sand
Cement - OPC 43 Grade
Water proofing compound
Scaffolding
Labour for Internal Plastering
Labour for Hacking
Labour for Button Fixing
Labour Lift for Internal & External Plastering
Labour for Curing
In Second floor
River sand
Cement - OPC 43 Grade
Water proofing compound
Scaffolding
Labour for Internal Plastering
Labour for Hacking
Labour for Button Fixing
Labour for Curing
Labour Lift for Internal & External Plastering

Sqmt
Sqmt
Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt
m3
Bag
Sqmt
Sqmt
Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt
m3
Bag
Sqmt
Sqmt
Rmtr
Sqmt
Nos
Sqmt
Sqmt
Sqmt
m3
Bag
Sqmt
Sqmt
Rmtr
Sqmt
Nos
Sqmt
Sqmt

0.20
1.00
1.00
1.00
1.00
1.00
1.00
1
0.02
0.13
0.20
1.00
1.00
1.00
1.00
1.00
1.00
1
0.02
0.13
0.20
1.00
1.00
1.00
1.00
1.00
1.00
1
0.02
0.07
0.20
1.00
1.00
1.00
1.00
1.00
1.00

14.17
130.20
17.22
28.26
100.00
25.00
5.00
297.03
1112.42
283.00
14.17
130.20
17.22
28.26
100.00
25.00
5.00
306.53
1112.42
283.00
14.17
130.20
17.22
28.26
100.00
25.00
5.00
294.31
1112.42
283.00
14.17
130.20
17.22
28.26
100.00
25.00
5.00

Sqmt
m3
Bag
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt

1
0.05
0.35
0.30
1.00
1.00
1.00
1.00
1.00
1
0.05
0.35
0.30
1.00
1.00
1.00
1.00
1.00
1.00
1
0.05
0.35
0.30
1.00
1.00
1.00
1.00
1.00
2.00

328
932.32
250.00
23.31
25.00
132.00
29.00
15.00
2.81
337
932.32
250.00
23.31
25.00
132.00
29.00
15.00
9.00
2.81
346
932.32
250.00
23.31
25.00
132.00
29.00
15.00
2.81
9.00

18.10d
MCM0066
MCM0007
MCM0014
AHI0006
ALA0067
ALA0074
ALA0068
ALA0026
ALA0059
18.10e
MCM0066
MCM0007
MCM0014
AHI0006
ALA0067
ALA0074
ALA0068
ALA0059
ALA0026
18.11
18.11a
MCM0066
MCM0007
AHI0006
ALA0075
ALA0074
ALA0068
MCM0014
ALA0026
18.11b
MCM0066
MCM0007
MCM0014
AHI0006
ALA0075
ALA0074
ALA0068
ALA0059
ALA0026
18.11c
MCM0066
MCM0007
MCM0014
AHI0006
ALA0075
ALA0059
ALA0074
ALA0068
ALA0026
18.11d
MCM0066
MCM0007
MCM0014
AHI0006
ALA0075
ALA0059
ALA0074
ALA0068
ALA0026
18.11e
MCM0066
MCM0007
MCM0014
AHI0006
ALA0075
ALA0074

In Third floor
River sand
Cement - OPC 43 Grade
Water proofing compound
Scaffolding
Labour for Internal Plastering
Labour for Hacking
Labour for Button Fixing
Labour for Curing
Labour Lift for Internal & External Plastering
In Terrace floor
River sand
Cement - OPC 43 Grade
Water proofing compound
Scaffolding
Labour for Internal Plastering
Labour for Hacking
Labour for Button Fixing
Labour Lift for Internal & External Plastering
Labour for Curing
Waterproof cement plaster in sunken areas using cement mortor 1:4 mixed
In Ground Floor
River sand
Cement - OPC 43 Grade
Scaffolding
Labour for Sunken plastering
Labour for Hacking
Labour for Button Fixing
Water proofing compound
Labour for Curing
In First Floor
River sand
Cement - OPC 43 Grade
Water proofing compound
Scaffolding
Labour for Sunken plastering
Labour for Hacking
Labour for Button Fixing
Labour Lift for Internal & External Plastering
Labour for Curing
In Second floor
River sand
Cement - OPC 43 Grade
Water proofing compound
Scaffolding
Labour for Sunken plastering
Labour Lift for Internal & External Plastering
Labour for Hacking
Labour for Button Fixing
Labour for Curing
In Third floor
River sand
Cement - OPC 43 Grade
Water proofing compound
Scaffolding
Labour for Sunken plastering
Labour Lift for Internal & External Plastering
Labour for Hacking
Labour for Button Fixing
Labour for Curing
In Terrace floor
River sand
Cement - OPC 43 Grade
Water proofing compound
Scaffolding
Labour for Sunken plastering
Labour for Hacking

Sqmt
m3
Bag
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt

1
0.05
0.35
0.30
1.00
1.00
1.00
1.00
1.00
3.00
1
0.05
0.35
0.30
1.00
1.00
1.00
1.00
3.00
1.00

355
932.32
250.00
23.31
25.00
132.00
29.00
15.00
2.81
9.00
364
932.32
250.00
23.31
25.00
132.00
29.00
15.00
9.00
2.81

Sqmt
m3
Bag
Sqmt
Sqmt
Sqmt
Sqmt
Kgs
Sqmt
Sqmt
m3
Bag
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
Sqmt
m3
Bag
Kgs
Sqmt
Sqmt
Sqmt

1
0.02
0.12
1.00
1.00
1.00
1.00
0.12
1.00
1
0.02
0.12
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1
0.02
0.12
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1
0.02
0.12
1.00
1.00
1.00
3.00
1.00
1.00
1.00
1
0.02
0.12
1.00
1.00
1.00
1.00

767
932.32
250.00
25.00
116.00
29.00
15.00
72.66
2.81
776
932.32
250.00
72.66
25.00
116.00
29.00
15.00
9.00
2.81
785
932.32
250.00
72.66
25.00
116.00
9.00
29.00
15.00
2.81
794
932.32
250.00
72.66
25.00
116.00
9.00
29.00
15.00
2.81
803
932.32
250.00
72.66
25.00
116.00
29.00

ALA0068
ALA0059
ALA0026
18.12
MCM0029
MCM0066
MCM0007
ALA0071
ALA0026
18.13
MCM0007
MCM0066
ALA0009
19
19.1
19.1a
MCM0028
MCM0007
MCM0066
ALA0082
19.1b
MCM0028
MCM0007
MCM0066
ALA0082
19.1c
MCM0028
MCM0007
MCM0066
ALA0082
19.2
19.2a
MCM0027
MCM0007
MCM0066
ALA0082
19.2b
MCM0027
MCM0007
MCM0066
ALA0082
ALA0058
19.2c
MCM0027
MCM0007
MCM0066
ALA0082
ALA0058
ALA0058
19.2d
MCM0027
MCM0007
MCM0066
ALA0082
ALA0058
19.2e
MCM0027
MCM0007
MCM0066
ALA0082
ALA0058
20
20.1
20.1a
MCM0030
MCM0066
MCM0007

Labour for Button Fixing


Labour Lift for Internal & External Plastering
Labour for Curing
Providing Tapered Cement Plastering & internal Drip Mould for the parapet
12mm Blue metal
River sand
Cement - OPC 43 Grade
Labour for Cement Plastering
Labour for Curing
PLASTER BANDS :
Cement - OPC 43 Grade
River sand
Labour for making band
PRECAST WORKS
Supply and fixing Teracotta jali of size about - 200x200
In Ground floor
Terra cotta Jali
Cement - OPC 43 Grade
River sand
Labour for fixing of Terracota Jali
In First floor
Terra cotta Jali
Cement - OPC 43 Grade
River sand
Labour for fixing of Terracota Jali
In Second floor
Terra cotta Jali
Cement - OPC 43 Grade
River sand
Labour for fixing of Terracota Jali
Supply and fixing RC jali of size about - 600x600
In Ground floor
RCC Jali - 600 x 600
Cement - OPC 43 Grade
River sand
Labour for fixing of Terracota Jali
In First floor
RCC Jali - 600 x 600
Cement - OPC 43 Grade
River sand
Labour for fixing of Terracota Jali
Labour Lift for RCC Jali
In Second floor
RCC Jali - 600 x 600
Cement - OPC 43 Grade
River sand
Labour for fixing of Terracota Jali
Labour Lift for RCC Jali
Labour Lift for RCC Jali
In Third floor
RCC Jali - 600 x 600
Cement - OPC 43 Grade
River sand
Labour for fixing of Terracota Jali
Labour Lift for RCC Jali
In Terrace floor
RCC Jali - 600 x 600
Cement - OPC 43 Grade
River sand
Labour for fixing of Terracota Jali
Labour Lift for RCC Jali
REINFORCED CEMENT CONCRETE
Providing and laying in position machine batched, machine mixed and machine
RCC M15 - Column Footings & Lift Raft Base Slabs
20mm Blue Metal
River sand
Cement - OPC 43 Grade

Sqmt
Sqmt
Sqmt
Rmtr
m3
m3
Bag
Rmtr
Sqmt
Rmtr
Bag
m3
Rmtr

1.00
4.00
1.00
1
0.01
0.01
0.07
1.00
1.00
1
0.01
1,125.00
1.00

15.00
9.00
2.81
192
889.94
932.32
327.86
110.00
10.00
170
292.33
1,160.20
125.00

Sqmt
Nos
Bag
m3
Sqmt
Sqmt
Nos
Bag
m3
Sqmt
Sqmt
Nos
Bag
m3
Sqmt

1
26.25
0.25
0.03
1.00
1
26.25
0.25
0.03
1.00
1
26.25
0.25
0.03
1.00

1112
25.30
250.00
932.32
362.00
1112
25.30
250.00
932.32
362.00
1112
25.30
250.00
932.32
362.00

Sqmt
Nos
Bag
m3
Sqmt
Sqmt
Nos
Bag
m3
Sqmt
Sqmt
Sqmt
Nos
Bag
m3
Sqmt
Sqmt
Sqmt
Sqmt
Nos
Bag
m3
Sqmt
Sqmt
Sqmt
Nos
Bag
m3
Sqmt
Sqmt

1
2.92
0.06
0.01
1.00
1
2.92
0.06
0.01
1.00
1.00
1
2.92
0.06
0.01
1.00
1.00
1.00
1
2.92
0.06
0.01
1.00
1.00
1
2.92
0.06
0.01
1.00
1.00

1237
292.78
250.00
932.32
362.00
1252
292.78
250.00
932.32
362.00
15.00
1267
292.78
250.00
932.32
362.00
15.00
15.00
1282
292.78
250.00
932.32
362.00
15.00
1297
292.78
250.00
932.32
362.00
15.00

m3
m3
m3
Bag

1
0.90
0.45
6.40

6262
1,177.31
938.14
323.00

MCM0046
ALA0089
AHI0004
AHI0007
ALA0018
ALA0025
20.1b
MCM0030
MCM0066
MCM0007
MCM0046
AHI0004
AHI0007
ALA0019
ALA0089
ALA0025
20.1c
MCM0030
MCM0066
MCM0007
MCM0046
ALA0019
AHI0004
AHI0007
ALA0089
ALA0025
20.1d
MCM0030
MCM0066
MCM0007
MCM0046
ALA0019
ALA0056
AHI0007
AHI0004
AHI0006
ALA0089
AHI0003
ALA0025
20.1e
MCM0030
MCM0066
MCM0007
MCM0046
ALA0018
ALA0056
AHI0007
AHI0004
AHI0006
ALA0089
AHI0003
ALA0025
20.1f
MCM0030
MCM0066
MCM0007
MCM0046
ALA0019
ALA0056
AHI0007
AHI0004
AHI0006
ALA0089
AHI0003
ALA0025
20.1g
MCM0030

Form work material - PCC. RCC FOOTING, ETC


Formwork - Labour
Mixture Machine
Vibrator
Labour for Concrete using Mixture machine - Footing, Raft etc
Labour for curing
RCC M15 - Columns upto Plinth Beams
20mm Blue Metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Mixture Machine
Vibrator
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Formwork - Labour
Labour for curing
RCC M15 - Plinth Beams / Grade Beams/ Floor beams
20mm Blue Metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Mixture Machine
Vibrator
Formwork - Labour
Labour for curing
RCC M15 - Columns in Super Structure (At all levels)
20mm Blue Metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Labour Lift For Concrete
Vibrator
Mixture Machine
Scaffolding
Formwork - Labour
Hoist
Labour for curing
RCC M15 - Lift Pit side walls
20mm Blue Metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Labour for Concrete using Mixture machine - Footing, Raft etc
Labour Lift For Concrete
Vibrator
Mixture Machine
Scaffolding
Formwork - Labour
Hoist
Labour for curing
RCC M15 - Lintels in Super Structure (At all levels)
20mm Blue Metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Labour Lift For Concrete
Vibrator
Mixture Machine
Scaffolding
Formwork - Labour
Hoist
Labour for curing
RCC M15 - Sunshades/Lofts in Super Structure (At all levels)
20mm Blue Metal

Sqmt
Sqmt
m3
m3
m3
m3
m3
m3
m3
Bag
Sqmt
m3
m3
m3
Sqmt
m3
m3
m3
m3
Bag
Sqmt
m3
m3
m3
Sqmt
m3
m3
m3
m3
Bag
Sqmt
m3
m3
m3
m3
Sqmt
Sqmt
Nos
m3
m3
m3
m3
Bag
Sqmt
m3
m3
m3
m3
Sqmt
Sqmt
Nos
m3
m3
m3
m3
Bag
Sqmt
m3
m3
m3
m3
Sqmt
Sqmt
Nos
m3
Sqmt
m3

1.79
1.79
1.00
1.00
1.00
1.00
1
0.90
0.45
6.40
10.00
1.00
1.00
1.00
10.00
1.00
1
0.90
0.45
6.40
8.75
1.00
1.00
1.00
8.75
1.00
1
0.90
0.45
6.40
9.80
1.00
1.00
1.00
1.00
10.00
9.80
1.00
1.00
1
0.90
0.45
6.40
9.80
1.00
1.00
1.00
1.00
10.00
9.80
1.00
1.00
1
0.90
0.45
6.40
13.00
1.00
1.00
1.00
1.00
10.00
13.00
1.00
1.00
1
0.07

250.00
110.00
75.00
25.00
500.00
25.00
9979
1,177.31
938.14
323.00
250.00
75.00
25.00
500.00
110.00
25.00
9595
1,177.31
938.14
323.00
250.00
700.00
75.00
25.00
110.00
25.00
10625
1,177.31
938.14
323.00
250.00
700.00
260.00
25.00
75.00
25.00
110.00
100.00
25.00
13200
1,177.31
938.14
323.00
250.00
500.00
260.00
25.00
75.00
25.00
110.00
100.00
25.00
12335
1,177.31
938.14
323.00
250.00
700.00
260.00
25.00
75.00
25.00
110.00
100.00
25.00
931
1,177.31

MCM0066
MCM0007
MCM0046
ALA0019
ALA0056
AHI0007
AHI0004
AHI0006
ALA0089
AHI0003
ALA0025
20.1h
MCM0030
MCM0066
MCM0007
MCM0046
ALA0019
ALA0056
AHI0004
AHI0007
AHI0006
ALA0089
AHI0003
ALA0025
20.2
MCM0029
MCM0066
MCM0007
MCM0014
ALA0040
ALA0026
20.3
20.3a
MCM0029
MCM0066
MCM0007
MCM0014
ALA0018
ALA0025
20.3b
MCM0029
MCM0066
MCM0007
MCM0014
ALA0018
ALA0025
20.4
20.4.1
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
ALA0018
ALA0089
ALA0025
20.4.2
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
ALA0018
ALA0089
ALA0025

River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Labour Lift For Concrete
Vibrator
Mixture Machine
Scaffolding
Formwork - Labour
Hoist
Labour for curing
RCC M15 - Staircase Waist Slab in Super Structure (At all levels)
20mm Blue Metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Labour Lift For Concrete
Mixture Machine
Vibrator
Scaffolding
Formwork - Labour
Hoist
Labour for curing
Providing and laying concrete screed in M15 concrete to slope of average
12mm Blue metal
River sand
Cement - OPC 43 Grade
Water proofing compound
Labour for finishing - Grano
Labour for Curing
Providing water proof cement concrete flashing of about 150x 150mm at
In Ground floor
12mm Blue metal
River sand
Cement - OPC 43 Grade
Water proofing compound
Labour for Concrete using Mixture machine - Footing, Raft etc
Labour for Curing
In Terrace floor
12mm Blue metal
River sand
Cement - OPC 43 Grade
Water proofing compound
Labour for Concrete using Mixture machine - Footing, Raft etc
Labour for Curing
Providing and laying in position machine batched, machine mixed and machine
RCC M20 - Footing
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Labour for Concrete using Mixture machine - Footing, Raft etc
Formwork - Labour
Labour for Curing
RCC M20 - Pedestal
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Labour for Concrete using Mixture machine - Footing, Raft etc
Formwork - Labour
Labour for Curing

m3
Bag
Sqmt
m3
m3
m3
m3
Sqmt
Sqmt
Nos
m3
m3
m3
m3
Bag
Sqmt
m3
m3
m3
m3
Sqmt
Sqmt
Nos
m3
Sqmt
m3
m3
Bag
Kgs
m2
m2

0.03
0.48
1.00
0.09
0.08
0.08
0.08
1.00
1.00
0.08
0.08
1
0.90
0.45
6.40
6.75
1.00
1.00
1.00
1.00
10.00
6.75
1.00
1.00
1
0.09
0.05
0.65
0.19
1.00
1.00

938.14
323.00
250.00
700.00
260.00
25.00
75.00
25.00
110.00
100.00
25.00
9558
1,177.31
938.14
323.00
250.00
700.00
260.00
75.00
25.00
25.00
110.00
100.00
25.00
401
600.36
932.32
250.00
23.31
136.00
2.81

Rmtr
m3
m3
Bag
Kgs
m3
m3
Rmtr
m3
m3
Bag
Kgs
m3
m3

1
0.02
0.01
0.15
0.04
0.02
0.02
1
0.02
0.01
0.15
0.04
0.02
0.02

157
600.36
932.32
250.00
82.74
500.00
28.12
157
600.36
932.32
250.00
82.74
500.00
28.12

m3
m3
m3
m3
bag
Sqmt
m3
m3
Sqmt
m3
m3
m3
m3
m3
bag
Sqmt
m3
m3
Sqmt
m3

1
0.49
0.33
0.49
6.40
1.50
1.00
1.00
1.50
1.00
1
0.49
0.33
0.49
6.40
7.11
1.00
1.00
7.11
1.00

3897
988.82
600.36
932.32
250.00
175.00
121.00
500.00
105.00
28.12
6106
988.82
600.36
932.32
250.00
250.00
121.00
500.00
105.00
28.12

20.4.3
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
ALA0018
ALA0089
ALA0025
20.4.4
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
ALA0018
ALA0089
ALA0025
20.4.5
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
ALA0019
ALA0089
ALA0025
20.4.6
MCM0030
MCM0029
MCM0066
MCM0007
MMM0001
AHI0001
ALA0024
AWC0113
ALA0025
20.4.7
20.4.7a
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0089
ALA0025
20.4.7b
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0056
ALA0089
ALA0057
ALA0025
20.4.7c
MCM0030

RCC M20 - Plinth Beam


20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Labour for Concrete using Mixture machine - Footing, Raft etc
Formwork - Labour
Labour for Curing
RCC M20 - Plinth Protection
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Labour for Concrete using Mixture machine - Footing, Raft etc
Formwork - Labour
Labour for Curing
RCC M20 - Retaining Wall
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Formwork - Labour
Labour for Curing
RCC M20 - Flooring (VDF)
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Channel ISMC 150
Concrete Equipment
Labour for laying - Grano Concrete
Vaccum dewatering
Labour for Curing
RCC M20 - RC Column / floating column
In Ground floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Formwork - Labour
Labour for Curing
In First floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Labour Lift For Concrete
Formwork - Labour
Labour Lift for Formwork
Labour for Curing
In Second floor
20mm Blue Metal

m3
m3
m3
m3
bag
Sqmt
m3
m3
Sqmt
m3
m3
m3
m3
m3
bag
Sqmt
m3
m3
Sqmt
m3
m3
m3
m3
m3
bag
Sqmt
m3
m3
Sqmt
m3
m3
m3
m3
m3
bag
Kgs
m3
m3
Sqmt
m3

1
0.49
0.33
0.49
6.40
8.64
1.00
1.00
8.64
1.00
1
0.49
0.33
0.49
6.40
8.64
1.00
1.00
8.64
1.00
1
0.49
0.33
0.49
6.40
8.64
1.00
1.00
8.64
1.00
1
0.49
0.33
0.49
6.40
5.77
1.00
1.00
5.00
1.00

6433
988.82
600.36
932.32
250.00
225.00
121.00
500.00
105.00
28.12
6433
988.82
600.36
932.32
250.00
225.00
121.00
500.00
105.00
28.12
6433
988.82
600.36
932.32
250.00
225.00
121.00
578.00
105.00
28.12
4056
4160.00
275.00
236.42
99.89
28.00
121.00
578.00
73.92
28.12

m3
m3
m3
m3
bag
Sqmt
m3
Sqmt
m3
Sqmt
m3
m3
m3
m3
m3
bag
Sqmt
m3
Sqmt
m3
m3
Sqmt
Sqmt
m3
m3
m3

1
0.49
0.33
0.49
6.40
10.00
1.00
1.00
1.00
10.00
1.00
1
0.49
0.33
0.49
6.40
10.00
1.00
1.00
1.00
1.00
10.00
10.00
1.00
1
0.49

7342
988.82
600.36
932.32
250.00
250.00
121.00
25.00
578.00
116.00
28.12
7610
988.82
600.36
932.32
250.00
250.00
121.00
25.00
578.00
158.00
116.00
11.00
28.12
7878
988.82

MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0056
ALA0089
ALA0057
ALA0025
20.4.7d
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0056
ALA0089
ALA0057
ALA0025
20.4.7e
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0056
ALA0089
ALA0057
ALA0025
20.4.8
20.4.8a
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0089
ALA0025
20.4.8b
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0056
ALA0089
ALA0057
ALA0025
20.4.8c
MCM0030
MCM0029
MCM0066
MCM0007

12mm Blue metal


River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Labour Lift For Concrete
Formwork - Labour
Labour Lift for Formwork
Labour for Curing
In Third floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Labour Lift For Concrete
Formwork - Labour
Labour Lift for Formwork
Labour for Curing
In Terrace floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Labour Lift For Concrete
Formwork - Labour
Labour Lift for Formwork
Labour for Curing
RCC M20 - Lintels
In Ground floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Formwork - Labour
Labour for Curing
In First floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Labour Lift For Concrete
Formwork - Labour
Labour Lift for Formwork
Labour for Curing
In Second floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade

m3
m3
bag
Sqmt
m3
Sqmt
m3
m3
Sqmt
Sqmt
m3
m3
m3
m3
m3
bag
Sqmt
m3
Sqmt
m3
m3
Sqmt
Sqmt
m3
m3
m3
m3
m3
bag
Sqmt
m3
Sqmt
m3
m3
Sqmt
Sqmt
m3

0.33
0.49
6.40
10.00
1.00
1.00
1.00
2.00
10.00
20.00
1.00
1
0.49
0.33
0.49
6.40
10.00
1.00
1.00
1.00
3.00
10.00
30.00
1.00
1
0.49
0.33
0.49
6.40
10.00
1.00
1.00
1.00
4.00
10.00
40.00
1.00

600.36
932.32
250.00
250.00
121.00
25.00
578.00
158.00
116.00
11.00
28.12
8146
988.82
600.36
932.32
250.00
250.00
121.00
25.00
578.00
158.00
116.00
11.00
28.12
8414
988.82
600.36
932.32
250.00
250.00
121.00
25.00
578.00
158.00
116.00
11.00
28.12

m3
m3
m3
m3
bag
Sqmt
m3
Sqmt
m3
Sqmt
m3
m3
m3
m3
m3
bag
Sqmt
m3
Sqmt
m3
m3
Sqmt
Sqmt
m3
m3
m3
m3
m3
bag

1
0.49
0.33
0.49
6.40
14.00
1.00
1.00
1.00
14.00
1.00
1
0.49
0.33
0.49
6.40
14.00
1.00
1.00
1.00
1.00
14.00
14.00
1.00
1
0.49
0.33
0.49
6.40

9226
988.82
600.36
932.32
250.00
275.00
121.00
25.00
578.00
121.00
28.12
9538
988.82
600.36
932.32
250.00
275.00
121.00
25.00
578.00
158.00
121.00
11.00
28.12
9850
988.82
600.36
932.32
250.00

MCM0046
AHI0001
AHI0006
ALA0019
ALA0056
ALA0089
ALA0057
ALA0025
20.4.8d
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0089
ALA0056
ALA0057
ALA0025
20.4.8e
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0056
ALA0089
ALA0057
ALA0025
20.4.9
20.4.9a
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0089
ALA0025
20.4.9b
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0056
ALA0089
ALA0057
ALA0025
20.4.9c
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006

Form work material - PCC. RCC FOOTING, ETC


Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Labour Lift For Concrete
Formwork - Labour
Labour Lift for Formwork
Labour for Curing
In Third floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Formwork - Labour
Labour Lift For Concrete
Labour Lift for Formwork
Labour for Curing
In Terrace floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Labour Lift For Concrete
Formwork - Labour
Labour Lift for Formwork
Labour for Curing
RCC M20 - Fascia Drop of 60mm thick
In Ground floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Formwork - Labour
Labour for Curing
In First floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Labour Lift For Concrete
Formwork - Labour
Labour Lift for Formwork
Labour for Curing
In Second floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding

Sqmt
m3
Sqmt
m3
m3
Sqmt
Sqmt
m3
m3
m3
m3
m3
bag
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
m3
m3
m3
m3
bag
Sqmt
m3
Sqmt
m3
m3
Sqmt
Sqmt
m3

14.00
1.00
1.00
1.00
2.00
14.00
28.00
1.00
1
0.49
0.33
0.49
6.40
14.00
1.00
1.00
1.00
14.00
3.00
42.00
1.00
1
0.49
0.33
0.49
6.40
14.00
1.00
1.00
1.00
4.00
14.00
56.00
1.00

275.00
121.00
25.00
578.00
158.00
121.00
11.00
28.12
10162
988.82
600.36
932.32
250.00
275.00
121.00
25.00
578.00
121.00
158.00
11.00
28.12
10474
988.82
600.36
932.32
250.00
275.00
121.00
25.00
578.00
158.00
121.00
11.00
28.12

Sqmt
m3
m3
m3
bag
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
m3
m3
bag
Sqmt
m3
Sqmt
m3
m3
Sqmt
Sqmt
m3
Sqmt
m3
m3
m3
bag
Sqmt
m3
Sqmt

1
0.03
0.02
0.03
0.38
1.00
0.06
0.06
0.06
1.00
0.06
1
0.03
0.02
0.03
0.38
1.00
0.06
0.06
0.06
0.06
1.00
1.00
0.06
1
0.03
0.02
0.03
0.38
1.00
0.06
0.06

617
988.82
600.36
932.32
250.00
275.00
121.00
25.00
578.00
121.00
28.12
637
988.82
600.36
932.32
250.00
275.00
121.00
25.00
578.00
158.00
121.00
11.00
28.12
658
988.82
600.36
932.32
250.00
275.00
121.00
25.00

ALA0019
ALA0089
ALA0056
ALA0057
ALA0025
20.4.9d
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0056
ALA0089
ALA0057
ALA0025
20.4.10
20.4.10a
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0089
ALA0025
20.4.10b
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0089
ALA0056
ALA0057
ALA0025
20.4.10c
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0089
ALA0056
ALA0057
ALA0025
20.4.10d
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0089
ALA0056

Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Formwork - Labour
Labour Lift For Concrete
Labour Lift for Formwork
Labour for Curing
In Third floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Labour Lift For Concrete
Formwork - Labour
Labour Lift for Formwork
Labour for Curing
RCC M20 - Sunshade of 50mm thick
In Ground floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Formwork - Labour
Labour for Curing
In First floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Formwork - Labour
Labour Lift For Concrete
Labour Lift for Formwork
Labour for Curing
In Second floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Formwork - Labour
Labour Lift For Concrete
Labour Lift for Formwork
Labour for Curing
In Third floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Formwork - Labour
Labour Lift For Concrete

m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
m3
m3
bag
Sqmt
m3
Sqmt
m3
m3
Sqmt
Sqmt
m3

0.06
1.00
0.12
2.00
0.06
1
0.03
0.02
0.03
0.38
1.00
0.06
0.06
0.06
0.18
1.00
3.00
0.06

578.00
121.00
158.00
11.00
28.12
678
988.82
600.36
932.32
250.00
275.00
121.00
25.00
578.00
158.00
121.00
11.00
28.12

Sqmt
m3
m3
m3
bag
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
m3
m3
bag
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
m3
m3
bag
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
m3
m3
bag
Sqmt
m3
Sqmt
m3
Sqmt
m3

1
0.02
0.02
0.02
0.32
1.00
0.05
0.05
0.05
1.00
0.05
1
0.02
0.02
0.02
0.32
1.00
0.05
0.05
0.05
1.00
0.05
1.00
0.05
1
0.02
0.02
0.02
0.32
1.00
0.05
0.05
0.05
1.00
0.10
2.00
0.05
1
0.02
0.02
0.02
0.32
1.00
0.05
0.05
0.05
1.00
0.15

580
988.82
600.36
932.32
250.00
275.00
121.00
25.00
578.00
121.00
28.12
599
988.82
600.36
932.32
250.00
275.00
121.00
25.00
578.00
121.00
158.00
11.00
28.12
618
988.82
600.36
932.32
250.00
275.00
121.00
25.00
578.00
121.00
158.00
11.00
28.12
637
988.82
600.36
932.32
250.00
275.00
121.00
25.00
578.00
121.00
158.00

ALA0057
ALA0025
20.4.10e
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0089
ALA0056
ALA0057
ALA0025
20.4.11
20.4.11a
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0089
ALA0025
20.4.11b
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0089
ALA0056
ALA0057
ALA0025
20.4.11c
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0089
ALA0056
ALA0057
ALA0025
20.4.11d
MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0089
ALA0056
ALA0057
ALA0025
20.4.11e

Labour Lift for Formwork


Labour for Curing
In Terrace floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Formwork - Labour
Labour Lift For Concrete
Labour Lift for Formwork
Labour for Curing
RCC - M20 Wall - 60mm thk.
In Ground floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Formwork - Labour
Labour for Curing
In First floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Formwork - Labour
Labour Lift For Concrete
Labour Lift for Formwork
Labour for Curing
In Second floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Formwork - Labour
Labour Lift For Concrete
Labour Lift for Formwork
Labour for Curing
In Third floor
20mm Blue Metal
12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Formwork - Labour
Labour Lift For Concrete
Labour Lift for Formwork
Labour for Curing
In Terrace floor

Sqmt
m3
Sqmt
m3
m3
m3
bag
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3

3.00
0.05
1
0.02
0.02
0.02
0.32
1.00
0.05
0.05
0.05
1.00
0.20
4.00
0.05

11.00
28.12
656
988.82
600.36
932.32
250.00
275.00
121.00
25.00
578.00
121.00
158.00
11.00
28.12

Sqmt
m3
m3
m3
bag
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
m3
m3
bag
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
m3
m3
bag
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
m3
m3
bag
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt

1
0.03
0.02
0.03
0.38
1.00
0.06
0.06
0.06
1.00
0.06
1
0.03
0.02
0.03
0.38
1.00
0.06
0.06
0.06
1.00
0.06
1.00
0.06
1
0.03
0.02
0.03
0.38
1.00
0.06
0.06
0.06
1.00
0.12
2.00
0.06
1
0.03
0.02
0.03
0.38
1.00
0.06
0.06
0.06
1.00
0.18
3.00
0.06
1

617
988.82
600.36
932.32
250.00
275.00
121.00
25.00
578.00
121.00
28.12
637
988.82
600.36
932.32
250.00
275.00
121.00
25.00
578.00
121.00
158.00
11.00
28.12
658
988.82
600.36
932.32
250.00
275.00
121.00
25.00
578.00
121.00
158.00
11.00
28.12
678
988.82
600.36
932.32
250.00
275.00
121.00
25.00
578.00
121.00
158.00
11.00
28.12
678

MCM0030
MCM0029
MCM0066
MCM0007
MCM0046
AHI0001
AHI0006
ALA0019
ALA0089
ALA0056
ALA0057
ALA0025
20.5
MCM0030
MCM0066
MCM0007
MCM0046
ALA0019
AHI0007
AHI0004
ALA0089
ALA0025
20.6
MCM0030
MCM0066
MCM0007
ALA0019
AHI0007
AHI0004
AHI0006
MCM0046
ALA0089
ALA0025
20.7
20.7.1
20.7.1a
MCM0042
MCM0046
AHI0007
AHI0006
AHI0003
ALA0020
ALA0089
ALA0025
20.7.1b
MCM0042
MCM0047
AHI0007
AHI0006
AHI0003
ALA0020
ALA0089
ALA0025
20.7.1c
MCM0042
MCM0046
AHI0007
AHI0006
AHI0003
ALA0020
ALA0089
ALA0025
20.7.1d
MCM0042
MCM0047
AHI0007
AHI0006

20mm Blue Metal


12mm Blue metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Formwork - Labour
Labour Lift For Concrete
Labour Lift for Formwork
Labour for Curing
RCC M20 - Raft Slabs , Base slabs & Cover Slabs for Under Ground & Over Head
20mm Blue Metal
River sand
Cement - OPC 43 Grade
Form work material - PCC. RCC FOOTING, ETC
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Vibrator
Mixture Machine
Formwork - Labour
Labour for Curing
RCC M20 - Side Walls, Dividing walls for Under Ground & Over Head Water
20mm Blue Metal
River sand
Cement - OPC 43 Grade
Labour for Concrete using Mixture machine - Plinth beam, Grade beam,
Vibrator
Mixture Machine
Scaffolding
Form work material - PCC. RCC FOOTING, ETC
Formwork - Labour
Labour for curing
Providing and laying in position machine batched, machine mixed and machine
RMC - M15
Roof Beams in Super Structure with a normal beam bottom height upto
RMC M15
Form work material - PCC. RCC FOOTING, ETC
Vibrator
Scaffolding
Hoist
Labour For Concrete ( RMC )
Formwork - Labour
Labour for curing
Roof Slabs in Super Structure with a normal Slab bottom height upto 3.60Mts.
RMC M15
Formwork - Material - Roof slab & Roof beam
Vibrator
Scaffolding
Hoist
Labour For Concrete ( RMC )
Form Work Labour for Roof Slab
Labour for curing
Roof Beams in Super Structure with a normal beam bottom height above
RMC M15
Form work material - PCC. RCC FOOTING, ETC
Vibrator
Scaffolding
Hoist
Labour For Concrete ( RMC )
Formwork - Labour
Labour for curing
Roof Slabs in Super Structure with a normal Slab bottom height above 3.60Mts.
RMC M15
Formwork - Material - Roof slab & Roof beam
Vibrator
Scaffolding

m3
m3
m3
bag
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
m3
m3
m3
Bag
Sqmt
m3
m3
m3
Sqmt
m3
m3
m3
m3
Bag
m3
m3
m3
Sqmt
Sqmt
Sqmt
m3

0.03
0.02
0.03
0.38
1.00
0.06
0.06
0.06
1.00
0.24
4.00
0.06
1
0.90
0.45
8.64
5.00
1.00
1.00
1.00
5.00
1.00
1
0.90
0.45
8.64
1.00
1.00
1.00
10.00
8.00
8.00
1.00

988.82
600.36
932.32
250.00
275.00
121.00
25.00
578.00
121.00
158.00
11.00
28.12
8564
1177.31
938.14
323.00
250.00
700.00
25.00
75.00
110.00
10.00
10265
1177.31
938.14
323.00
700.00
25.00
75.00
25.00
250.00
110.00
25.00

m3
m3
Sqmt
m3
Sqmt
Nos
m3
Sqmt
m3
m3
m3
Sqmt
m3
Sqmt
Nos
m3
Sqmt
m3
m3
m3
Sqmt
m3
Sqmt
Nos
m3
Sqmt
m3
m3
m3
Sqmt
m3
Sqmt

1
1.01
10.40
1.00
10.00
1.00
1.00
10.40
1.00
1
1.01
6.75
1.00
10.00
1.00
1.00
6.75
1.00
1
1.01
10.00
1.00
10.00
1.00
1.00
10.00
1.00
1
1.01
6.50
1.00
10.00

10978
4,200.00
250.00
25.00
25.00
100.00
190.00
120.00
25.00
9009
4,200.00
250.00
25.00
25.00
100.00
190.00
120.00
25.00
14130
4,200.00
440.00
25.00
25.00
100.00
190.00
220.00
25.00
11058
4,200.00
440.00
25.00
25.00

AHI0003
ALA0020
ALA0089
ALA0025
20.7.2
20.7.2.1
20.7.2.1a
MCM0043
MCM0046
AHI0001
AHI0006
ALA0020
ALA0089
ALA0025
20.7.2.1b
MCM0043
MCM0046
AHI0001
AHI0006
ALA0020
ALA0089
ALA0057
ALA0025
20.7.2.1c
MCM0043
MCM0046
AHI0001
AHI0006
ALA0020
ALA0089
ALA0025
ALA0057
20.7.2.1d
MCM0043
MCM0046
AHI0001
AHI0006
ALA0020
ALA0089
ALA0025
ALA0057
20.7.2.1e
MCM0043
MCM0046
AHI0001
AHI0006
ALA0020
ALA0089
ALA0025
ALA0057
20.7.2.2
20.7.2.2a
MCM0043
MCM0046
AHI0001
AHI0006
ALA0020
ALA0089
ALA0025
20.7.2.2b
MCM0043
MCM0046
AHI0001
AHI0006
ALA0020
ALA0089
ALA0025

Hoist
Labour For Concrete ( RMC )
Form Work Labour for Roof Slab
Labour for curing
RMC - M20
RCC M20 - Tie beam
In Ground floor
RMC M20
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour For Concrete ( RMC )
Formwork - Labour
Labour for Curing
In First floor
RMC M20
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour For Concrete ( RMC )
Formwork - Labour
Labour Lift for Formwork
Labour for Curing
In Second floor
RMC M20
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour For Concrete ( RMC )
Formwork - Labour
Labour for Curing
Labour Lift for Formwork
In Third floor
RMC M20
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour For Concrete ( RMC )
Formwork - Labour
Labour for Curing
Labour Lift for Formwork
In Terrace floor
RMC M20
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour For Concrete ( RMC )
Formwork - Labour
Labour for Curing
Labour Lift for Formwork
RCC M20 - Roof slab
In Ground floor
RMC M20
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour For Concrete ( RMC )
Formwork - Labour
Labour for Curing
In First floor
RMC M20
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour For Concrete ( RMC )
Formwork - Labour
Labour for Curing

Nos
m3
Sqmt
m3

1.00
1.00
6.50
1.00

100.00
190.00
220.00
25.00

m3
m3
m3
m3
Sqmt
m3
Sqmt
m3
m3
m3
m3
m3
Sqmt
m3
Sqmt
Sqmt
m3
m3
m3
m3
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
m3
m3
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
m3
m3
m3
Sqmt
m3
Sqmt
m3
Sqmt

1
1.03
12.00
1.00
1.00
1.00
12.00
1.00
1
1.03
12.00
1.00
1.00
1.00
12.00
12.00
1.00
1
1.03
12.00
1.00
1.00
1.00
12.00
1.00
24.00
1
1.03
12.00
1.00
1.00
1.00
12.00
1.00
36.00
1
1.03
12.00
1.00
1.00
1.00
12.00
1.00
48.00

9585
4160.00
275.00
121.00
25.00
190.00
121.00
28.12
9717
4160.00
275.00
121.00
25.00
190.00
121.00
11.00
28.12
9849
4160.00
275.00
121.00
25.00
190.00
121.00
28.12
11.00
9981
4160.00
275.00
121.00
25.00
190.00
121.00
28.12
11.00
10113
4160.00
275.00
121.00
25.00
190.00
121.00
28.12
11.00

m3
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
m3
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3

1
1.03
6.67
1.00
1.00
1.00
6.67
1.00
1
1.03
6.67
1.00
1.00
1.00
6.67
1.00

7119
4160.00
250.00
121.00
25.00
190.00
121.00
28.12
7193
4160.00
250.00
121.00
25.00
190.00
121.00
28.12

ALA0057
20.7.2.2c
MCM0043
MCM0046
AHI0001
AHI0006
ALA0020
ALA0089
ALA0025
ALA0057
20.7.2.2d
MCM0043
MCM0046
AHI0001
AHI0006
ALA0020
ALA0089
ALA0025
ALA0057
20.7.2.2e
MCM0043
MCM0046
AHI0001
AHI0006
ALA0020
ALA0089
ALA0025
ALA0057
20.7.2.3
20.7.2.3a
MCM0043
MCM0046
AHI0001
AHI0006
ALA0020
ALA0089
ALA0025
20.7.2.3b
MCM0043
MCM0046
AHI0001
AHI0006
ALA0020
ALA0089
ALA0025
ALA0057
20.7.2.3c
MCM0043
MCM0046
AHI0001
AHI0006
ALA0020
ALA0089
ALA0025
ALA0057
20.7.2.3d
MCM0043
MCM0046
AHI0001
AHI0006
ALA0020
ALA0089
ALA0025
ALA0057
20.7.2.4
20.7.2.4a
MCM0043

Labour Lift for Formwork


In Second floor
RMC M20
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour For Concrete ( RMC )
Formwork - Labour
Labour for Curing
Labour Lift for Formwork
In Third floor
RMC M20
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour For Concrete ( RMC )
Formwork - Labour
Labour for Curing
Labour Lift for Formwork
In Terrace floor
RMC M20
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour For Concrete ( RMC )
Formwork - Labour
Labour for Curing
Labour Lift for Formwork
RCC M20 - Waist slab
In Ground floor
RMC M20
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour For Concrete ( RMC )
Formwork - Labour
Labour for Curing
In First floor
RMC M20
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour For Concrete ( RMC )
Formwork - Labour
Labour for Curing
Labour Lift for Formwork
In Second floor
RMC M20
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour For Concrete ( RMC )
Formwork - Labour
Labour for Curing
Labour Lift for Formwork
In Third floor
RMC M20
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour For Concrete ( RMC )
Formwork - Labour
Labour for Curing
Labour Lift for Formwork
RCC M20 - Sill slab
In Ground floor
RMC M20

Sqmt
m3
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt

6.67
1
1.03
6.67
1.00
1.00
1.00
6.67
1.00
13.33
1
1.03
6.67
1.00
1.00
1.00
6.67
1.00
20.00
1
1.03
6.67
1.00
1.00
1.00
6.67
1.00
26.67

11.00
7266
4160.00
250.00
121.00
25.00
190.00
121.00
28.12
11.00
7339
4160.00
250.00
121.00
25.00
190.00
121.00
28.12
11.00
7413
4160.00
250.00
121.00
25.00
190.00
121.00
28.12
11.00

m3
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
m3
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
m3
Sqmt
m3
Sqmt
m3
Sqmt
m3
Sqmt

1
1.03
6.67
1.00
1.00
1.00
6.67
1.00
1
1.03
6.67
1.00
1.00
1.00
6.67
1.00
6.67
1
1.03
6.67
1.00
1.00
1.00
6.67
1.00
13.33
1
1.03
6.67
1.00
1.00
1.00
6.67
1.00
20.00

7119
4160.00
250.00
121.00
25.00
190.00
121.00
28.12
7193
4160.00
250.00
121.00
25.00
190.00
121.00
28.12
11.00
7266
4160.00
250.00
121.00
25.00
190.00
121.00
28.12
11.00
7339
4160.00
250.00
121.00
25.00
190.00
121.00
28.12
11.00

m3
m3

1
1.03

7119
4160.00

MCM0046
AHI0001
AHI0006
ALA0020
ALA0089
ALA0025
20.7.2.4b
MCM0043
MCM0046
AHI0001
AHI0006
ALA0020
ALA0089
ALA0057
ALA0025
20.7.2.4c
MCM0043
MCM0046
AHI0001
AHI0006
ALA0020
ALA0089
ALA0057
ALA0025
20.7.2.4d
MCM0043
MCM0046
AHI0001
AHI0006
ALA0020
ALA0089
ALA0057
ALA0025
20.7.2.4e
MCM0043
MCM0046
AHI0001
AHI0006
ALA0020
ALA0089
ALA0057
ALA0025
20.7.3
20.7.3.1
20.7.3.1a
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.1b
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.1c
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.1d
MCM0045

Form work material - PCC. RCC FOOTING, ETC


Concrete Equipment
Scaffolding
Labour For Concrete ( RMC )
Formwork - Labour
Labour for Curing
In First floor
RMC M20
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour For Concrete ( RMC )
Formwork - Labour
Labour Lift for Formwork
Labour for Curing
In Second floor
RMC M20
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour For Concrete ( RMC )
Formwork - Labour
Labour Lift for Formwork
Labour for Curing
In Third floor
RMC M20
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour For Concrete ( RMC )
Formwork - Labour
Labour Lift for Formwork
Labour for Curing
In Terrace floor
RMC M20
Form work material - PCC. RCC FOOTING, ETC
Concrete Equipment
Scaffolding
Labour For Concrete ( RMC )
Formwork - Labour
Labour Lift for Formwork
Labour for Curing
RMC - M30
RCC M30 - Columns
Stilt Floor
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
First Floor
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
Second Floor
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
Third Floor
RMC M30 with pump

Sqmt
m3
Sqmt
m3
Sqmt
m3
m3
m3
Sqmt
m3
Sqmt
m3
Sqmt
Sqmt
m3
m3
m3
Sqmt
m3
Sqmt
m3
Sqmt
Sqmt
m3
m3
m3
Sqmt
m3
Sqmt
m3
Sqmt
Sqmt
m3
m3
m3
Sqmt
m3
Sqmt
m3
Sqmt
Sqmt
m3

6.67
1.00
1.00
1.00
6.67
1.00
1
1.03
6.67
1.00
1.00
1.00
6.67
6.67
1.00
1
1.03
6.67
1.00
1.00
1.00
6.67
13.33
1.00
1
1.03
6.67
1.00
1.00
1.00
6.67
20.00
1.00
1
1.03
6.67
1.00
1.00
1.00
6.67
26.67
1.00

250.00
121.00
25.00
190.00
121.00
28.12
7193
4160.00
250.00
121.00
25.00
190.00
121.00
11.00
28.12
7266
4160.00
250.00
121.00
25.00
190.00
121.00
11.00
28.12
7339
4160.00
250.00
121.00
25.00
190.00
121.00
11.00
28.12
7413
4160.00
250.00
121.00
25.00
190.00
121.00
11.00
28.12

m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3

1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01

5371.77
4600.00
190.00
26.78
163.46
25.00
50.00
5371.77
4600.00
190.00
26.78
163.46
25.00
50.00
5371.77
4600.00
190.00
26.78
163.46
25.00
50.00
5371.77
4600.00

ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.1e
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.1f
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.2
20.7.3.2a
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.2b
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.2c
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.2d
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.2e
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.2f
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.3
20.7.3.3a
MCM0045
ALA0020
AHI0007

Labour For Concrete ( RMC )


Vibrator
Hoist
Scaffolding
Labour for Curing
Fourth Floor
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
Terrace
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
RCC M30 - Slab
First Floor
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
Second Floor
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
Third Floor
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
Fourth Floor
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
Terrace
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
Above Terrace
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
RCC M30 - Beams
First Floor
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator

m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3

1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00

190.00
26.78
163.46
25.00
50.00
5371.77
4600.00
190.00
26.78
163.46
25.00
50.00
5371.77
4600.00
190.00
26.78
163.46
25.00
50.00

m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3

1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00

5193.27
4600.00
190.00
26.78
163.46
25.00
50.00
5193.27
4600.00
190.00
26.78
163.46
25.00
50.00
5193.27
4600.00
190.00
26.78
163.46
25.00
50.00
5193.27
4600.00
190.00
26.78
163.46
25.00
50.00
5193.27
4600.00
190.00
26.78
163.46
25.00
50.00
5193.27
4600.00
190.00
26.78
163.46
25.00
50.00

m3
m3
m3
m3

1
1.01
1.00
1.00

5193.27
4600.00
190.00
26.78

AHI0003
AHI0006
ALA0025
20.7.3.3b
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.3c
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.3d
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.3e
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.3f
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.4
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.5
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.6
20.7.3.6a
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.6b
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025

Hoist
Scaffolding
Labour for Curing
Second Floor
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
Third Floor
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
Fourth Floor
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
Terrace
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
Above Terrace
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
RCC M30 - Footings / Raft slab for columns,Core walls,Retaining walls
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
RCC M30 - RCC Parapet at all levels of specified thickness
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
Domestic Sump tanks.
RCC M30 - SUMP - Bottom slab
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
RCC M30 - SUMP - Walls
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing

Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3

1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00

163.46
25.00
50.00
5193.27
4600.00
190.00
26.78
163.46
25.00
50.00
5193.27
4600.00
190.00
26.78
163.46
25.00
50.00
5193.27
4600.00
190.00
26.78
163.46
25.00
50.00
5193.27
4600.00
190.00
26.78
163.46
25.00
50.00
5193.27
4600.00
190.00
26.78
163.46
25.00
50.00
5193.27
4600.00
190.00
26.78
163.46
25.00
50.00
5371.77
4600.00
190.00
26.78
163.46
25.00
50.00

m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3

1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00

5193.27
4600.00
190.00
26.78
163.46
25.00
50.00
5371.77
4600.00
190.00
26.78
163.46
25.00
50.00

20.7.3.6c
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.7
20.7.3.7a
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.7b
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.7c
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.8
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.9
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.10
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
20.7.3.11
MCM0045
ALA0020
AHI0007
AHI0003
AHI0006
ALA0025
21
21.1
21.1a
MCM0041
MCM0059
MCM0003
AHI0005
ALA0086
ALA0061
ALA0084

RCC M30 - SUMP - Top slab


RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
Domestic Overhead tanks.
RCC M30 - OH - Bottom slab
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
RCC M30 - Walls
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
RCC M30 - Top slab
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
RCC M30 - Staircase at all floors & heights
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
RCC M30 - Lintels
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
RCC M30 - Chejjas/Lofts
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
RCC M30 - DG Chillers, Pump & Transformer Foundations
RMC M30 with pump
Labour For Concrete ( RMC )
Vibrator
Hoist
Scaffolding
Labour for Curing
REINFORCEMENT STEEL WORKS
Fabricating & fixing in position reinforcement for RCC work with high yield
Tor or Mild Steel Reinforcement (TMT - Thermo Mechanically Treated)
Torsteel
GI Binding wire - 18 SWG
Cover Block
Rod cutting & bending Machine
Labour for reinforcement Steel
Labour Lift for Reinforcment Steel
Labour for fixing of Cover Block

m3
m3
m3
m3
Nos
Sqmt
m3

1
1.01
1.00
1.00
1.00
1.00
1.00

5193.27
4600.00
190.00
26.78
163.46
25.00
50.00

m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3
m3
m3
m3
m3
Nos
Sqmt
m3

1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00
1
1.01
1.00
1.00
1.00
1.00
1.00

5193.27
4600.00
190.00
26.78
163.46
25.00
50.00
5371.77
4600.00
190.00
26.78
163.46
25.00
50.00
5193.27
4600.00
190.00
26.78
163.46
25.00
50.00
4845.50
4600.00
190.00
26.78
163.46
25.00
50.00
5024.00
4600.00
190.00
26.78
163.46
25.00
50.00
5024.00
4600.00
190.00
26.78
163.46
25.00
50.00
5193.27
4600.00
190.00
26.78
163.46
25.00
50.00

MT
MT
Kgs
Nos
MT
MT
MT
MT

1
1.03
10.00
75.00
1.00
1.00
1.00
1.00

77593
60,150.00
61.43
2.39
250.00
5,500.00
300.00
50.00

21.1b
MCM0040
MCM0059
MCM0003
AHI0005
ALA0086
ALA0084
AHI0003
AHI0006
21.2
21.2a
MCM0041
MCM0059
ALA0086
ALA0085
ALA0084
AHI0005
21.2b
MCM0041
MCM0059
ALA0086
ALA0085
ALA0084
AHI0005
21.2c
MCM0041
MCM0059
ALA0086
ALA0085
ALA0084
AHI0005
ALA0061
21.2d
MCM0041
MCM0059
ALA0086
ALA0085
ALA0084
AHI0005
ALA0061
21.2e
MCM0041
MCM0059
ALA0086
ALA0085
ALA0084
AHI0005
ALA0061
21.2f
MCM0041
MCM0059
ALA0086
ALA0085
ALA0084
AHI0005
ALA0061
22
22.1
AWC0108
MCM0035
ALA0029
22.2
AWC0107
23
23.1
MMM0005
ALA0091

Fe 500
Reinforcement steel - TMT FE 500
G.I binding wire - 18SWG
Cover block
Rod cutting & bending Machine
Labour for reinforcement Steel
Labour for fixing of Cover Block
Hoist
Scaffolding
Supply, Fabricating and placing in position using TMT / ISI steel reinforcement
In Foundation and Basement
Torsteel
G.I binding wire - 18SWG
Labour for reinforcement Steel
Labour for Casting of Cover block
Labour for fixing of Cover Block
Rod cutting & bending Machine
In Ground Floor
Torsteel
G.I binding wire - 18SWG
Labour for reinforcement Steel
Labour for Casting of Cover block
Labour for fixing of Cover Block
Rod cutting & bending Machine
In First Floor
Torsteel
G.I binding wire - 18SWG
Labour for reinforcement Steel
Labour for Casting of Cover block
Labour for fixing of Cover Block
Rod cutting & bending Machine
Labour Lift for Reinforcment Steel
In Second Floor
Torsteel
G.I binding wire - 18SWG
Labour for reinforcement Steel
Labour for Casting of Cover block
Labour for fixing of Cover Block
Rod cutting & bending Machine
Labour Lift for Reinforcment Steel
In Third Floor
Torsteel
G.I binding wire - 18SWG
Labour for reinforcement Steel
Labour for Casting of Cover block
Labour for fixing of Cover Block
Rod cutting & bending Machine
Labour Lift for Reinforcment Steel
In Terrace Floor
Torsteel
G.I binding wire - 18SWG
Labour for reinforcement Steel
Labour for Casting of Cover block
Labour for fixing of Cover Block
Rod cutting & bending Machine
Labour Lift for Reinforcment Steel
ROAD WORK
Providing & Laying Boulder Soling consisting of 230 Thk. hardcore of well
Boulder Soling
Gravel
Earthwork Cutting
WBM LAYER WITH 40mm BGM:
Bituminous Macadam Road
STRUCTURAL STEEL WORKS
For Trusses & Equipment Supports & Insert Plates
Structural steel
Fabrication with Consumables & mc

MT
MT
Kgs
Nos
MT
MT
MT
Nos
Sqmt

1
1.03
10.00
100.00
1.00
1.00
1.00
1.00
1.00

52954.25
46,350.00
68.00
1.75
250.00
4,515.00
105.00
163.46
25.00

MT
MT
Kgs
MT
Nos
MT
MT
MT
MT
Kgs
MT
Nos
MT
MT
MT
MT
Kgs
MT
Nos
MT
MT
MT
MT
MT
Kgs
MT
Nos
MT
MT
MT
MT
MT
Kgs
MT
Nos
MT
MT
MT
MT
MT
Kgs
MT
Nos
MT
MT
MT

1
1.03
10.00
1.00
100.00
1.00
1.00
1
1.03
10.00
1.00
100.00
1.00
1.00
1
1.03
10.00
1.00
100.00
1.00
1.00
0.22
1
1.03
10.00
1.00
100.00
1.00
1.00
0.44
1
1.03
10.00
1.00
100.00
1.00
1.00
0.67
1
1.03
10.00
1.00
100.00
1.00
1.00
0.89

50
60,150.00
61.53
5,500.00
2.50
150.00
250.00
50
0.00
0.00
0.00
2.50
150.00
250.00
51
0.00
0.00
0.00
2.50
150.00
250.00
3,500.00
51
0.00
0.00
0.00
2.50
150.00
250.00
350.00
51
0.00
0.00
0.00
2.50
150.00
250.00
350.00
52
0.00
0.00
0.00
2.50
150.00
250.00
350.00

Sqmt
Sqmt
m3
m3
Sqmt
Sqmt

1
925.00
100.00
216.45
1
1.00

710
460.00
606.10
100.00
640
490.00

MT
MT
MT

1
1.03
1.00

98374
62,600.00
12,000.00

ALA0092
23.2
23.2.1a
23.2.1b
23.2.1c
23.2.1d
23.2.1e
23.2.1f
23.3
MMM0004
ALA0054
24
24.1
AWC0110
24.2
24.2a
MCM0002
ALA0083
ALA0094
MCM0057
MCM0056
MCM0007
MCM0014
MCM0013
MCM0066
ALA0093
ALA0025
24.2b
MCM0002
ALA0083
ALA0094
MCM0057
MCM0056
MCM0007
MCM0014
MCM0013
MCM0066
ALA0093
ALA0025
24.3
24.3.1
24.3.2
24.3.2a
24.3.2b
24.4
24.4.1
24.4.1a
24.5
24.5.1
24.5.1a
24.5.1b
24.5.2
24.5.2a
24.5.3
25
25.1
25.1.1
25.1.1a
MCM0063
MCM0011
MCM0064
AWC0104
AHI0003
AHI0006
ALA0097
ALA0055
25.1.2

Labour for erection of structural steel


Providing and fixing of metal works for grills for staircase / handrail balusters
In Foundation and Basement
In Ground Floor
In First Floor
In Second Floor
In Third Floor
In Terrace Floor
Providing and fixing GRILL of required pattern with M.S. flats, square / round
MS Grills
Labor charges for fixing of Grill
WATER PROOF ROOFING WORKS
WATER PROOFER: FOR OPEN TERRACE:
Brick Bat cobba with false square finish
Laying brick jelli lime cement concrete for weathering course using one part of
In Ground floor
Brick bat
Lime
Vellam
Kaddukai
Pressed tiles
Cement - OPC 43 Grade
Water proofing compound
Colour Pigments
River sand
Labour for laying weather proof course
Labour for curing
In Terrace floor
Brick bat
Lime
Vellam
Kaddukai
Pressed tiles
Cement - OPC 43 Grade
Water proofing compound
Colour Pigments
River sand
Labour for laying weather proof course
Labour for curing
BASEMENT AND RETAINING WALLS, DRAINS, SUMPS, RAMPS & TRENCHES,
Providing and laying 2mm thick, self adhesive, self protected and self healing
Providing waterproofing to the roof by the following method with min. 10
The first part consists of application of first layer of micro fibre reinforced
The second part consisting of water proofing the terrace by surface method of
TOILETS/BALCONIES
Providing waterproofing for the Toilets/Balconies,in two parts, by Surface
The first part consists of application of first layer of micro fibre reinforced
UG SUMP, Lift pits, OHT & Swimming pools.
Providing waterproofing by Surface method INTERNALLY by following methods
Floors
Walls
Providing and fixing in position single component, self sealing water swelling
(a) Syncoflex make - 25 mm X25mm
Providing brick coba filling at all levels and wherever specified with CM 1:8
WOODEN JOINERY
DOORS
Providing and fixing in position doors with frame of First class teak wood
Door D of size 1050x2100mm of solid core panelled shutter of 40mm thick
Teak wood frame
Anchor Fastner
Teak wood Shutter
Melamine polish
Hoist
Scaffolding
Labour for fixing of Frame & Shutter
Labour for fixing of Door Lock
Providing and fixing in position doors with frame of Padauk wood wrought and

MT

1.00

7,500.00

MT
MT
MT
MT
MT
MT
Sqmt
Kgs
Sqmt

1
1
1
1
1
1
1
13.46
1.00

130000
130000
130000
130000
130000
130000
1455.54
78.75
282.56

Sqmt
Sqmt

1
1.00

899
700.00

Sqmt
m3
MT
Kgs
Kgs
Nos
Bag
Kgs
Kgs
m3
m3
Sqmt
Sqmt
m3
MT
Kgs
Kgs
Nos
Bag
Kgs
Kgs
m3
m3
Sqmt

1
0.09
0.05
0.20
0.10
18.90
0.23
75.00
0.10
0.02
0.10
1.00
1
0.09
0.05
0.20
0.10
18.90
0.23
75.00
0.10
0.02
0.10
1.00

909
847.56
2800.00
40.00
35.00
15.96
250.00
23.31
125.00
932.32
420.00
2.81
909
847.56
2800.00
40.00
35.00
15.96
250.00
23.31
125.00
932.32
420.00
2.81

Sqmt

700.00

Sqmt
Sqmt

1
1

285.00
535.00

Sqmt

285.00

Sqmt
Sqmt

1
1

350.00
350.00

Rmtr
m3

1
1

200.00
3500.00

Nos
Nos
Nos
Nos
Sqmt
Nos
Sqmt
Nos
Nos

1
1.00
6.00
1.00
4.63
1.00
1.00
1.00
1.00

18933.56
6096.10
42.15
5359.18
800.00
163.46
25.00
900.00
150.00

25.1.2a
MCM0062
MCM0011
MCM0061
AWC0102
AHI0003
AHI0006
ALA0097
ALA0055
25.1.2b
MCM0062
MCM0011
MCM0060
AWC0102
AHI0003
AHI0006
ALA0097
25.1.3
25.1.3a
25.20
25.2.1
25.2.1a
ALA0096
MCM0010
25.2.1b
ALA0096
MCM0010
25.2.1c
ALA0096
MCM0010
25.2.1d
ALA0096
MCM0010
25.2.1e
ALA0096
MCM0010
25.2.2
25.2.2a
ALA0096
MCM0010
25.2.2b
ALA0096
MCM0010
25.2.2c
ALA0096
MCM0010
25.2.2d
ALA0096
MCM0010
25.2.2e
ALA0096
MCM0010

Door D1 of size 900x2100mm of solid core flush shutter of 35mm thick single
Padauk Wood door Frames
Anchor Fastner
35mm BSC Flush shutter - 900 x 2100
Enamel Painting
Hoist
Scaffolding
Labour for fixing of Frame & Shutter
Labour for fixing of Door Lock
Door D2, of size 750x2100mm of solid core flush shutter of 30mm thick single
Padauk Wood door Frames
Anchor Fastner
30mm BSPC Flush shutter - 750 x 2100
Enamel Painting
Hoist
Scaffolding
Labour for fixing of Frame & Shutter
Providing and fixing Double leaf door made of 12mm toughened glass of
Lobby Door : ED1 Double Leaf glass door overall size 1500 x 2100 mm
JOINERIES:
Fixing Only of Flush doors of size about given below. (Doors supplied by client)
a. 1200 x 2150 (D5)
Labour for Door Frame Fixing
Anchor Fastner
b. 1000 x 2150 (D4)
Labour for Door Frame Fixing
Anchor Fastner
c. 750 x 2100 (D2)
Labour for Door Frame Fixing
Anchor Fastner
d. 750 x 1800 (D2A)
Labour for Door Frame Fixing
Anchor Fastner
e. 750 x 2150 (D2B)
Labour for Door Frame Fixing
Anchor Fastner
Fixing Only of Windows / Ventilators of size about given below. (Material
a. 1200 x 1200
(W1)
Labour for Door Frame Fixing
Anchor Fastner
b. 1200 x 1050 (W2)
Labour for Door Frame Fixing
Anchor Fastner
b. 2400 x 1200 (W4)
Labour for Door Frame Fixing
Anchor Fastner
c. 500 x 1200
(V)
Labour for Door Frame Fixing
Anchor Fastner
d. 450 x 1200 (V1)
Labour for Door Frame Fixing
Anchor Fastner

Nos
Nos
Nos
Nos
Sqmt
Nos
Sqmt
Nos
Nos
Nos
Nos
Nos
Nos
Sqmt
Nos
Sqmt
Nos

1
1.00
6.00
1.00
3.97
1.00
1.00
1.00
1.00
1
1.00
6.00
1.00
3.97
1.00
1.00
1.00

11930.92
4623.52
42.15
3436.62
100.00
163.46
25.00
900.00
150.00
10062.07
4435.55
42.15
2305.74
100.00
163.46
25.00
900.00

Nos

33045

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos

1
1.00
6.00
1
1.00
6.00
1
1.00
6.00
1
1.00
6.00
1
1.00
6.00

520
237.00
37.05
520
237.00
37.05
520
237.00
37.05
520
237.00
37.05
520
237.00
37.05

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos

1
1.00
6.00
1
1.00
6.00
1
1.00
6.00
1
1.00
6.00
1
1.00
6.00

520
237.00
37.05
520
237.00
37.05
520
237.00
37.05
520
237.00
37.05
520
237.00
37.05

Amount

9516.96
6520.88
5287.2
23010.335
22068.5525
21136.6835
18964.5255
12257.492
11026.015
1013.38
3053.358
1938.64
17348.625
42
39.00

641.36
195.79
133.49
127.35
42.38
26.25
84.00
16.35
10.75
5.00
641.36
195.79
133.49
127.35
42.38
26.25
84.00
16.35
10.75
5.00
475
237.50
15.00
75.60
50.00
10.00
299
27.02
25.64
101.25
6.05
136.00
2.81
299
27.02
25.64
101.25
6.05
136.00
2.81

Type
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
R
I
I
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
I
I
R
R
R
R
R
R
I
R
R
R
R
R
R

299
27.02
25.64
101.25
6.05
136.00
2.81
299
27.02
25.64
101.25
6.05
136.00
2.81

6999
1,153.28
1656
106.56
638.11
204.63
12.50
5.00
300.00
1631
92.27
55.01
188.52
65.00
6.23
916.85
1.25
164
148.57
50.00
199
148.57
50.00

2700.00
4300.00
3300.00
7500
1231
891.42
250.00

212
99.00
42.50
253
154.00
20.00
133
77.00
56.00

2200.00
2800.00

I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
I
I
R
I
R
R
R
R
R
R
I
R
R
R
R
R
R
R
I
R
R
I
R
R
I
I
I
I
I
I
I
R
R
I
I
I
R
R
I
I
R
R
I
I
R
R
I
I
I
I
I
I

2200.00
700.00
1028.60
854.10
865.55
629.75
1557
1,125.77
19.00
120.00
128
90.00
19.00
828
489.47
19.00
90.00
1182
1072.16
14.38
95.00
669
559.39
14.38
95.00
492
382.72
14.38
95.00
70
120

31237.31249
20277.23882

9847.843112
1280
508.60
20.64
31.01
13.08
5.40
9.72
14.49
36.73
213.13
126.00
5.00
160
50.86
1.16
3.80
0.13
0.36
0.65
3.67
43.68
12.60
0.50

I
I
I
I
I
I
I
I
I
I
R
R
R
I
R
R
I
R
R
R
I
R
R
R
I
R
R
R
I
R
R
R
I
I
I
I
I
I
I
I
I
I
I
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
I

870.63
472.50
26.70
44.60
14.15
6.24
107.64
31.08
16.35
10.75
113.02
22.60
5.00
870.63
472.50
26.70
44.60
14.15
6.24
107.64
31.08
16.35
10.75
113.02
22.60
5.00
870.63
472.50
26.70
44.60
14.15
6.24
107.64
31.08
16.35
10.75
113.02
22.60
5.00
870.63
472.50
26.70
44.60
14.15
6.24
107.64
31.08
16.35
10.75
113.02
22.60
5.00
95.99
47.25
2.67
4.46
1.42
0.62
31.00
3.11
1.63
1.08
113.02
2.26
0.50
95.99

I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R
R
R
R
I

47.25
2.67
4.46
1.42
0.62
3.11
1.63
1.08
31.00
2.26
0.50
95.99
47.25
2.67
4.46
1.42
0.62
3.11
1.63
1.08
31.00
2.26
0.50
95.99
47.25
2.67
4.46
1.42
0.62
3.11
1.63
1.08
31.00
2.26
0.50
848.03
472.50
26.70
44.60
14.15
6.24
107.64
31.08
16.35
10.75
113.02
22.60
5.00
870.63
472.50
26.70
44.60
14.15
6.24
107.64
31.08
16.35
10.75
113.02
22.60
5.00
870.63
472.50
26.70
44.60
14.15

R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R

6.24
107.64
31.08
16.35
10.75
113.02
22.60
5.00
870.63
472.50
26.70
44.60
14.15
6.24
107.64
31.08
16.35
10.75
113.02
22.60
5.00
870.63
472.50
26.70
44.60
14.15
6.24
107.64
31.08
16.35
10.75
113.02
22.60
5.00
93.73
47.25
2.67
4.46
1.42
0.62
3.11
1.63
1.08
31.00
2.26
0.50
95.99
47.25
2.67
4.46
1.42
0.62
3.11
1.63
1.08
31.00
2.26
0.50
95.99
47.25
2.67
4.46
1.42
0.62
3.11
1.63

R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R

1.08
31.00
2.26
0.50
95.99
47.25
2.67
4.46
1.42
0.62
3.11
1.63
1.08
31.00
2.26
0.50
95.99
47.25
2.67
4.46
1.42
0.62
3.11
1.63
1.08
31.00
2.26
0.50
713.13
315.00
26.70
44.60
14.15
6.24
107.64
31.08
16.35
10.75
113.02
22.60
5.00
713.13
315.00
26.70
44.60
14.15
6.24
107.64
31.08
16.35
10.75
113.02
22.60
5.00
713.13
315.00
26.70
44.60
14.15
6.24
107.64
31.08
16.35
10.75
113.02
22.60

R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R

5.00
713.13
315.00
26.70
44.60
14.15
6.24
107.64
31.08
16.35
10.75
113.02
22.60
5.00
80.24
31.50
2.67
4.46
1.42
0.62
3.11
1.63
1.08
31.00
2.26
0.50
80.24
31.50
2.67
4.46
1.42
0.62
3.11
1.63
1.08
31.00
2.26
0.50
80.24
31.50
2.67
4.46
1.42
0.62
3.11
1.63
1.08
31.00
0.50
2.26
80.24
31.50
2.67
4.46
1.42
0.62
3.11
1.63
1.08
31.00
2.26
0.50
1100
339.07
25.52
28.06

R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R

13.08
6.00
10.80
16.10
6.90
28.26
36.73
113.02
126.00
10.00
695.06
315.00
26.70
44.60
18.68
6.24
107.64
31.08
16.35
10.75
113.02
22.60
5.00
717.66
315.00
26.70
44.60
18.68
6.24
107.64
31.08
16.35
10.75
113.02
22.60
5.00
717.66
315.00
26.70
44.60
18.68
6.24
107.64
31.08
16.35
10.75
113.02
22.60
5.00
717.66
315.00
26.70
44.60
18.68
6.24
107.64
31.08
16.35
10.75
113.02
22.60
5.00
717.66
315.00
26.70
44.60

R
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R

18.68
6.24
107.64
31.08
16.35
10.75
113.02
22.60
5.00
80.70
31.50
2.67
4.46
1.87
0.62
3.11
1.63
1.08
31.00
2.26
0.50
80.70
31.50
2.67
4.46
1.87
0.62
3.11
1.63
1.08
31.00
2.26
0.50
80.70
31.50
2.67
4.46
1.87
0.62
3.11
1.63
1.08
31.00
2.26
0.50
80.70
31.50
2.67
4.46
1.87
0.62
3.11
1.63
1.08
31.00
2.26
0.50
339.07
18.56
30.69
13.08
4.50
8.10
12.08
36.73

R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R

180.02
126.00
10.00
628.98
322.50
18.69
34.69
14.15
6.24
31.08
16.35
10.75
180.02
21.53
5.00
628.98
322.50
18.69
34.69
14.15
6.24
31.08
16.35
10.75
180.02
21.53
5.00
628.98
322.50
18.69
34.69
14.15
6.24
31.08
16.35
10.75
180.02
21.53
5.00
628.98
322.50
18.69
34.69
14.15
6.24
31.08
16.35
10.75
180.02
21.53
5.00
628.98
322.50
18.69
34.69
14.15
6.24
31.08
16.35
10.75
180.02
21.53
5.00
628.98
322.50

R
R
R
I
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R
R
R
I
R

18.69
34.69
14.15
6.24
31.08
16.35
10.75
180.02
21.53
5.00
628.98
322.50
18.69
34.69
14.15
6.24
31.08
16.35
10.75
180.02
21.53
5.00
628.98
322.50
18.69
34.69
14.15
6.24
31.08
16.35
10.75
180.02
21.53
5.00
628.98
322.50
18.69
34.69
14.15
6.24
31.08
16.35
10.75
180.02
21.53
5.00
650.51
322.50
18.69
34.69
14.15
6.24
31.08
16.35
10.75
180.02
21.53
5.00
650.51
322.50
18.69
34.69
14.15
6.24
31.08
16.35

R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R

10.75
180.02
21.53
5.00
650.51
322.50
18.69
34.69
14.15
6.24
31.08
16.35
10.75
180.02
21.53
5.00
650.51
322.50
18.69
34.69
14.15
6.24
31.08
16.35
10.75
180.02
21.53
5.00
1340
322.50
25.52
52.62
13.08
3.00
5.40
8.05
6.90
28.26
36.73
213.13
126.00
10.00
2819.12
2100.00
26.70
44.60
18.68
6.24
107.64
31.08
16.35
10.75
452.09
5.00
363.70
210.00
2.67
4.46
1.87
0.62
3.11
1.63
1.08
137.76
0.50

R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R
R

3871.47
2100.00
26.70
44.60
18.68
6.24
107.64
31.08
16.35
10.75
565.11
611.65
327.67
37.67
5.00
3871.47
2100.00
26.70
44.60
18.68
6.24
107.64
31.08
16.35
10.75
565.11
611.65
327.67
37.67
5.00
3871.47
2100.00
26.70
44.60
18.68
6.24
107.64
31.08
16.35
10.75
565.11
611.65
327.67
37.67
5.00
398.14
210.00
2.67
4.46
1.87
0.62
3.11
1.63
1.08
172.20
0.50
3151.35
2100.00
26.70
43.30
18.68
6.24
413.28
31.08
16.35

I
I
R
R
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R

10.75
442.30
37.67
5.00
3151.35
2100.00
26.70
43.30
18.68
6.24
413.28
31.08
16.35
10.75
442.30
37.67
5.00
3151.35
2100.00
26.70
43.30
18.68
6.24
413.28
31.08
16.35
10.75
442.30
37.67
5.00
3151.35
2100.00
26.70
43.30
18.68
6.24
413.28
31.08
16.35
10.75
442.30
37.67
5.00
3550.72
2100.00
300.00
31.08
16.35
10.75
442.30
578.59
37.67
5.00

R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R

3550.72
2100.00
300.00
578.59
31.08
16.35
10.75
442.30
37.67
5.00
3550.72
2100.00
300.00

I
R
R
R
R
R
R
R
R
R
I
R
R

578.59
31.08
16.35
10.75
442.30
37.67
5.00
3550.72
2100.00
300.00
578.59
31.08
16.35
10.75
442.30
37.67
5.00
2852.01
2100.00
27.10
55.97
6.24
31.08
16.35
10.75
508.60
90.92
37.67
5.00
2889.68
2100.00
27.10
55.97
6.24
31.08
16.35
10.75
508.60
90.92
37.67
5.00
2889.68
2100.00
27.10
55.97
6.24
31.08
16.35
10.75
508.60
90.92
37.67
5.00
2889.68
2100.00
27.10
55.97
6.24
31.08
16.35
10.75
508.60
90.92
37.67
5.00
2889.68

R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I

2100.00
27.10
55.97
6.24
31.08
16.35
10.75
508.60
90.92
37.67
5.00
1210
641.19
22.38
50.00
2.50
2.00
36.00
453.00
2.81
1210
641.19
22.38
50.00
2.50
2.00
36.00
453.00
2.81
1210
641.19
22.38
50.00
2.50
2.00
453.00
36.00
2.81
1210
641.19
22.38
50.00
2.50
2.00
453.00
36.00
2.81
214
64.12
2.24
5.00
0.25
0.20
138.00
3.60
0.28
214
64.12
2.24
5.00
0.25
0.20
138.00
3.60
0.28

R
R
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R

214
64.12
2.24
5.00
0.25
0.20
138.00
3.60
0.28
214

397
192.36
6.71
15.00
0.75
0.60
169.80
0.00
10.80
0.84
397
192.36
6.71
15.00
0.75
0.60
169.80
0.00
10.80
0.84
397
192.36
6.71
15.00
0.75
0.60
169.80
0.00
10.80
0.84
2873
1392.67
48.60
108.60
5.43
4.34
1229.35
0.00
78.19
6.11
2873
1392.67
48.60
108.60
5.43
4.34
1229.35
0.00
78.19
6.11

278
134.65

I
R
R
R
R
R
R
R
R
I
I
I
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
I
I
R

4.70
10.50
0.53
0.42
118.86
7.56
0.59
278
134.65
4.70
10.50
0.53
0.42
118.86
7.56
0.59
278
134.65
4.70
10.50
0.53
0.42
118.86
7.56
0.59
1676
812.39
28.35
63.35
3.17
2.53
717.12
45.61
3.56
1676
812.39
28.35
63.35
3.17
2.53
717.12
45.61
3.56
884
541.53
22.38
50.00
2.50
2.00
227.00
36.00
2.81
884
541.53
22.38
50.00
2.50
2.00
227.00
36.00
2.81
884
541.53
22.38
50.00

R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R

2.50
2.00
227.00
36.00
2.81
884
541.53
22.38
50.00
2.50
2.00
227.00
36.00
2.81
884
541.53
22.38
50.00
2.50
2.00
227.00
36.00
2.81
884
541.53
22.38
50.00
2.50
2.00
227.00
36.00
2.81
916
541.53
22.38
50.00
2.50
2.00
49.94
249.00
36.00
2.81
916
541.53
22.38
50.00
2.50
2.00
49.94
249.00
36.00
2.81
916
541.53
22.38
50.00
2.50
2.00
49.94
249.00
36.00
2.81
916
541.53
22.38
50.00

R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R

2.50
2.00
49.94
249.00
36.00
2.81
916
541.53
22.38
50.00
2.50
2.00
49.94
249.00
36.00
2.81
916
541.53
22.38
50.00
2.50
2.00
49.94
249.00
36.00
2.81
1542.70
340
263.00

359.43
359.43
359.43
359.43
359.43
359.43
310.43
310.43
310.43
310.43
310.43
310.43
410.43
410.43
410.43
410.43
410.43
410.43
264.43
329.43
310.43
310.43
329.43
310.43
310.43
330.43
310.43
310.43
379.43
379.43

R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
I
R
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

339.43
303
186.00
60.00
1642.90
1603.00
1642.90
1603.00
1757.40
1717.50
1869
1869
1869
1869
1869
1869
4566
4566
4566
4566
4566
4566

5154
2,348.33
262.68
345.29
100.00
725.00
174.00
25.00
872
283.50
30.02
67.83
120.30
10.00
125.00
15.00
2.88
4139
297.60
29.83
59.01
120.30
10.00
125.00
7.50
2.88
2,533.65

3494
2362.50
122.60
155.00
49.94
790.00
105.00
14.06
3494
2362.50
122.60

I
I
R
R
I
I
R
I
R
I
R
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
I
I
R
R
R
R
R
R
R
I
R
R

155.00
49.94
790.00
105.00
14.06
3515
2362.50
122.60
155.00
49.94
790.00
105.00
14.06
3536
2362.50
122.60
155.00
49.94
790.00
105.00
14.06
3557
2362.50
122.60
155.00
49.94
790.00
105.00
14.06
3578
2362.50
122.60
155.00
49.94
790.00
105.00
14.06
757.47
483.89
29.26
33.96
8.73
16.35
13.09
167.21
5.00
778.47
483.89
29.26
33.96
8.73
16.35
13.09
167.21
5.00
799.47
483.89
29.26
33.96
8.73
16.35
13.09
167.21
5.00
820.47
483.89

R
R
R
R
R
I
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R

29.26
33.96
8.73
16.35
13.09
167.21
5.00
841.47
483.89
29.26
33.96
8.73
16.35
13.09
167.21
5.00
862.47
483.89
29.26
33.96
8.73
16.35
13.09
167.21
5.00
469
236.25
13.61
25.75
33.60
49.94
147.00
14.06
609.23
305.61
16.24
29.15
8.73
37.08
16.35
13.09
140.96
5.00
630.23
305.61
16.24
29.15
8.73
37.08
16.35
13.09
140.96
5.00
651.23
305.61
16.24
29.15
8.73
37.08
16.35
13.09
140.96
5.00
672.23
305.61
16.24

R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R

29.15
8.73
37.08
16.35
13.09
140.96
5.00
693.23
305.61
16.24
29.15
8.73
37.08
16.35
13.09
140.96
5.00
714.23
305.61
16.24
29.15
8.73
37.08
16.35
13.09
140.96
5.00

354
214.94
1.40
20.04
116.00
1.43
370
214.94
1.40
20.04
116.00
1.43
386
214.94
1.40
20.04
116.00
1.43
402
214.94
1.40
20.04
116.00
1.43
2633
1601.90
10.47
149.38
861.00
10.69
5278
3203.81
20.93
298.76
1733.00
21.38

R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
I
I
R
R
R
R
R
I
R
R
R
R
R
I
R
R
R
R
R
I
R
R
R
R
R
I
I
R
R
R
R
R
I
R
R
R
R
R
I

170
3.93
0.93
116.00

679
550.00
802
650.00
925
750.00

680
550.00
799
650.00
1101
900.00
1122
900.00
3075
2,500.00
71
56.70
91
94.50
91
94.50
91
94.50
91
94.50
91
94.50
146
94.50
146
94.50
146
94.50
146
94.50
146
94.50
146
94.50
136
110.25
128
110.25
128
110.25
128
110.25
128
110.25
128
110.25
128

I
I
R
R
R
I
I
I
R
I
R
I
R
I
I
I
R
I
R
I
R
I
R
I
I
R
I
I
R
I
I
R
I
R
I
R
I
R
I
R
I
I
R
I
R
I
R
I
R
I
R
I
R
I
R
I
I
R
I
R
I
R
I
R
I
R
I

110.25

113.40
113.40
113.40
113.40
113.40
113.40
115.50
115.50
115.50
115.50
115.50
115.50
393.75
136.50

583
401.14
72.00
587
350.93
125.00
450
15000
349
216.31
79.00
76
16.21
12.59
30.38
7.09
9.45
0.08
10453
10102.71
350.00

3576
667.45
419.54
810.00
118.57
107.00
236.42
315.00
28.12
2702
667.45
419.54
810.00
118.57
107.00
236.42
315.00
28.12
2702
667.45
419.54
810.00
118.57
107.00

R
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
R
R
I
R
R
I
I
I
R
R
I
R
R
R
R
R
R
I
R
R
I
I
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R

236.42
315.00
28.12
2752.542
609.72
280.33
500.59
764.10
472.50
75.30
50.00
4364.803
978.93
500.59
1,748.94
225.00
192.00
472.50
75.30
50.00
3000.000
762.80
419.54
1012.50
118.57
107.00
236.42
315.00
28.12
360
13.13
32.62
35.00
29.00
125.00
26.00
10.00
10.00
220
16.78
30.64
29.00
15.00
49.94
116.00
2.81
220
16.78
30.64
29.00
15.00
49.94
116.00
2.81
229
16.78
30.64
29.00
15.00
49.94
116.00
9.00
2.81
238
16.78

R
R
R
I
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R

30.64
49.94
116.00
29.00
15.00
2.81
9.00
247
16.78
30.64
49.94
116.00
29.00
15.00
2.81
9.00
256
16.78
30.64
49.94
116.00
29.00
15.00
2.81
9.00
255.35
17.35
35.56
131.25
5.00
36.75
16.35
13.09
264.85
17.35
35.56
131.25
5.00
36.75
16.35
13.09
274.35
17.35
35.56
131.25
5.00
36.75
16.35
13.09
283.85
17.35
35.56
131.25
5.00
36.75
16.35
13.09
293.35
17.35
35.56
131.25
5.00
36.75
16.35
13.09
302.85

R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
I

17.35
35.56
131.25
5.00
36.75
16.35
13.09
377
12.20
40.70
140.00
14.00
29.00
35.00
10.00
10.00
203
16.78
25.20
2.91
49.94
116.00
14.40
15.00
2.81
267.83
23.09
28.57
2.83
16.35
130.20
17.22
28.26
13.09
5.00
277.33
23.09
28.57
2.83
130.20
17.22
28.26
16.35
13.09
5.00
286.83
23.09
28.57
2.83
130.20
17.22
28.26
16.35
13.09
5.00
296.33
23.09
28.57
2.83
130.20
17.22
28.26
16.35
13.09
5.00
305.83

R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I

23.09
28.57
2.83
130.20
17.22
28.26
16.35
13.09
5.00
315.33
23.09
28.57
2.83
130.20
17.22
28.26
16.35
13.09
5.00
417
20.64
40.38
0.80
140.00
14.00
29.00
10.00
10.00
219
16.78
25.20
2.91
49.94
132.00
14.40
15.00
2.81
332.95
28.97
2.86
44.60
18.01
147.00
11.60
17.22
28.26
16.35
13.09
5.00
342.45
28.97
2.86
44.60
18.01
147.00
11.60
17.22
28.26
16.35
13.09
5.00
351.95
28.97
2.86
44.60
18.01

R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R

147.00
11.60
17.22
28.26
16.35
13.09
5.00
361.45
28.97
2.86
44.60
18.01
147.00
11.60
17.22
28.26
16.35
13.09
5.00
370.95
28.97
2.86
44.60
18.01
147.00
11.60
17.22
28.26
16.35
13.09
5.00
380.45
28.97
2.86
44.60
18.01
147.00
11.60
17.22
28.26
16.35
13.09
5.00
268.53
20.02
35.56
2.83
130.20
17.22
28.26
16.35
13.09
5.00
278.03
20.02
35.56
2.83
130.20
17.22
28.26
16.35
13.09
5.00
287.53
20.02
35.56

R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R

2.83
130.20
17.22
28.26
16.35
13.09
5.00
297.03
20.02
35.56
2.83
130.20
17.22
28.26
16.35
13.09
5.00
306.53
20.02
35.56
2.83
130.20
17.22
28.26
16.35
13.09
5.00
294.31
19.09
19.53
2.83
130.20
17.22
28.26
16.35
13.09
5.00
328
44.75
87.34
6.99
49.94
132.00
29.00
15.00
2.81
337
44.75
87.34
6.99
49.94
132.00
29.00
15.00
9.00
2.81
346
44.75
87.34
6.99
49.94
132.00
29.00
15.00
2.81
9.00

R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R

355
44.75
87.34
6.99
49.94
132.00
29.00
15.00
2.81
9.00
364
44.75
87.34
6.99
49.94
132.00
29.00
15.00
9.00
2.81
767
16.78
30.64
49.94
116.00
29.00
15.00
8.91
2.81
776
16.78
30.64
72.66
49.94
116.00
29.00
15.00
9.00
2.81
785
16.78
30.64
72.66
49.94
116.00
9.00
29.00
15.00
2.81
794
16.78
30.64
72.66
49.94
116.00
9.00
29.00
15.00
2.81
803
16.78
30.64
72.66
49.94
116.00
29.00

I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R

15.00
9.00
2.81
192
9.21
4.82
24.43
110.00
10.00
170
2.55
1.51
125.00

1112
664.02
62.50
23.31
362.00
1112
664.02
62.50
23.31
362.00
1112
664.02
62.50
23.31
362.00
1237
853.94
15.00
5.59
362.00
1252
853.94
15.00
5.59
362.00
362.00
1267
853.94
15.00
5.59
362.00
362.00
362.00
1282
853.94
15.00
5.59
362.00
362.00
1297
853.94
15.00
5.59
362.00
362.00

6262
1,059.58
422.16
2,067.20

R
R
R
I
R
R
R
R
R
I
R
R
R
I
I
I
R
R
R
R
I
R
R
R
R
I
R
R
R
R
I
I
R
R
R
R
I
R
R
R
R
R
I
R
R
R
R
R
R
I
R
R
R
R
R
I
R
R
R
R
R
I
I
I
R
R
R

447.50
196.90
75.00
25.00
500.00
25.00
9979
1,059.58
422.16
2,067.20
2,500.00
75.00
25.00
500.00
1,100.00
25.00
9595
1,059.58
422.16
2,067.20
2,187.50
700.00
75.00
25.00
962.50
25.00
10625
1,059.58
422.16
2,067.20
2,450.00
700.00
260.00
25.00
75.00
100.00
1,078.00
100.00
25.00
13200
1,059.58
422.16
2,067.20
2,450.00
700.00
260.00
25.00
75.00
100.00
1,078.00
100.00
25.00
12335
1,059.58
422.16
2,067.20
3,250.00
700.00
260.00
25.00
75.00
100.00
1,430.00
100.00
25.00
931
80.06

R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R

31.90
155.04
250.00
64.61
19.50
1.88
5.63
10.00
110.00
7.50
1.88
9558
1,059.58
422.16
2,067.20
1,687.50
700.00
260.00
75.00
25.00
100.00
742.50
100.00
25.00
401
54.03
41.95
162.00
4.53
136.00
2.81
157
12.16
9.44
36.45
3.62
10.64
0.63
157
12.16
9.44
36.45
3.62
10.64
0.63
3897
484.52
198.12
456.83
1600.00
262.50
236.42
473.00
157.50
28.12
6106
484.52
198.12
456.83
1600.00
1777.50
236.42
578.00
746.55
28.12

R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
I
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R

6433
484.52
198.12
456.83
1600.00
1944.00
236.42
578.00
907.20
28.12
6433
484.52
198.12
456.83
1600.00
1944.00
236.42
578.00
907.20
28.12
6433
484.52
198.12
456.83
1600.00
1944.00
236.42
578.00
907.20
28.12
4056
2038.40
90.75
115.84
639.29
161.47
121.00
578.00
369.60
28.12
7342
484.52
198.12
456.83
1600.00
2500.00
236.42
99.89
578.00
1160.00
28.12
7610
484.52
198.12
456.83
1600.00
2500.00
236.42
99.89
578.00
158.00
1160.00
110.00
28.12
7878
484.52

I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R

198.12
456.83
1600.00
2500.00
236.42
99.89
578.00
158.00
1160.00
110.00
28.12
8146
484.52
198.12
456.83
1600.00
2500.00
236.42
99.89
578.00
158.00
1160.00
110.00
28.12
8414
484.52
198.12
456.83
1600.00
2500.00
236.42
99.89
578.00
158.00
1160.00
110.00
28.12
9226
484.52
198.12
456.83
1600.00
3850.00
236.42
99.89
578.00
1694.00
28.12
9538
484.52
198.12
456.83
1600.00
3850.00
236.42
99.89
578.00
158.00
1694.00
154.00
28.12
9850
484.52
198.12
456.83
1600.00

R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R

3850.00
236.42
99.89
578.00
158.00
1694.00
154.00
28.12
10162
484.52
198.12
456.83
1600.00
3850.00
236.42
99.89
578.00
1694.00
158.00
154.00
28.12
10474
484.52
198.12
456.83
1600.00
3850.00
236.42
99.89
578.00
158.00
1694.00
154.00
28.12
617
29.07
11.89
27.41
96.00
275.00
14.19
5.99
34.68
121.00
1.69
637
29.07
11.89
27.41
96.00
275.00
14.19
5.99
34.68
9.48
121.00
11.00
1.69
658
29.07
11.89
27.41
96.00
275.00
14.19
5.99

R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R

34.68
121.00
9.48
11.00
1.69
678
29.07
11.89
27.41
96.00
275.00
14.19
5.99
34.68
9.48
121.00
11.00
1.69
580
24.23
9.91
22.84
80.00
275.00
11.82
4.99
28.90
121.00
1.41
599
24.23
9.91
22.84
80.00
275.00
11.82
4.99
28.90
121.00
7.90
11.00
1.41
618
24.23
9.91
22.84
80.00
275.00
11.82
4.99
28.90
121.00
7.90
11.00
1.41
637
24.23
9.91
22.84
80.00
275.00
11.82
4.99
28.90
121.00
7.90

R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R

11.00
1.41
656
24.23
9.91
22.84
80.00
275.00
11.82
4.99
28.90
121.00
7.90
11.00
1.41
617
29.07
11.89
27.41
96.00
275.00
14.19
5.99
34.68
121.00
1.69
637
29.07
11.89
27.41
96.00
275.00
14.19
5.99
34.68
121.00
9.48
11.00
1.69
658
29.07
11.89
27.41
96.00
275.00
14.19
5.99
34.68
121.00
9.48
11.00
1.69
678
29.07
11.89
27.41
96.00
275.00
14.19
5.99
34.68
121.00
9.48
11.00
1.69
678

R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
R
I

29.07
11.89
27.41
96.00
275.00
14.19
5.99
34.68
121.00
9.48
11.00
1.69
8564
1059.58
422.16
2790.72
1250.00
700.00
25.00
75.00
550.00
10.00
10265
1059.58
422.16
2790.72
700.00
25.00
75.00
100.00
2000.00
880.00
25.00

10978
4,242.00
2,600.00
25.00
100.00
100.00
190.00
1,248.00
25.00
9009
4,242.00
1,687.50
25.00
100.00
100.00
190.00
810.00
25.00
14130
4,242.00
4,400.00
25.00
100.00
100.00
190.00
2,200.00
25.00
11058
4,242.00
2,860.00
25.00
100.00

R
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
I
I
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R

100.00
190.00
1,430.00
25.00

9585
4284.80
3300.00
236.42
99.89
184.00
1452.00
28.12
9717
4284.80
3300.00
236.42
99.89
184.00
1452.00
132.00
28.12
9849
4284.80
3300.00
236.42
99.89
184.00
1452.00
28.12
132.00
9981
4284.80
3300.00
236.42
99.89
184.00
1452.00
28.12
132.00
10113
4284.80
3300.00
236.42
99.89
184.00
1452.00
28.12
132.00
7119
4284.80
1666.67
121.00
28.12
184.00
806.67
28.12
7193
4284.80
1666.67
121.00
28.12
184.00
806.67
28.12

R
R
R
R
I
I
I
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R

73.33
7266
4284.80
1666.67
121.00
28.12
184.00
806.67
28.12
73.33
7339
4284.80
1666.67
121.00
28.12
184.00
806.67
28.12
73.33
7413
4284.80
1666.67
121.00
28.12
184.00
806.67
28.12
73.33
7119
4284.80
1666.67
121.00
28.12
184.00
806.67
28.12
7193
4284.80
1666.67
121.00
28.12
184.00
806.67
28.12
73.33
7266
4284.80
1666.67
121.00
28.12
184.00
806.67
28.12
73.33
7339
4284.80
1666.67
121.00
28.12
184.00
806.67
28.12
73.33
7119
4284.80

R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
I
R

1666.67
121.00
28.12
184.00
806.67
28.12
7193
4284.80
1666.67
121.00
28.12
184.00
806.67
73.33
28.12
7266
4284.80
1666.67
121.00
28.12
184.00
806.67
73.33
28.12
7339
4284.80
1666.67
121.00
28.12
184.00
806.67
73.33
28.12
7413
4284.80
1666.67
121.00
28.12
184.00
806.67
73.33
28.12

5371.77
4646.00
378.00
26.78
163.46
107.54
50.00
5371.77
4646.00
378.00
26.78
163.46
107.54
50.00
5371.77
4646.00
378.00
26.78
163.46
107.54
50.00
5371.77
4646.00

R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
I
I
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
R

378.00
26.78
163.46
107.54
50.00
5371.77
4646.00
378.00
26.78
163.46
107.54
50.00
5371.77
4646.00
378.00
26.78
163.46
107.54
50.00
5193.27
4646.00
199.50
26.78
163.46
107.54
50.00
5193.27
4646.00
199.50
26.78
163.46
107.54
50.00
5193.27
4646.00
199.50
26.78
163.46
107.54
50.00
5193.27
4646.00
199.50
26.78
163.46
107.54
50.00
5193.27
4646.00
199.50
26.78
163.46
107.54
50.00
5193.27
4646.00
199.50
26.78
163.46
107.54
50.00
5193.27
4646.00
199.50
26.78

R
R
R
R
R
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
I
R
R
R

163.46
107.54
50.00
5193.27
4646.00
199.50
26.78
163.46
107.54
50.00
5193.27
4646.00
199.50
26.78
163.46
107.54
50.00
5193.27
4646.00
199.50
26.78
163.46
107.54
50.00
5193.27
4646.00
199.50
26.78
163.46
107.54
50.00
5193.27
4646.00
199.50
26.78
163.46
107.54
50.00
5193.27
4646.00
199.50
26.78
163.46
107.54
50.00
5371.77
4646.00
378.00
26.78
163.46
107.54
50.00
5193.27
4646.00
199.50
26.78
163.46
107.54
50.00
5371.77
4646.00
199.50
26.78
163.46
107.54
50.00

R
R
R
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
I
R
R
R
R
R
R
I
R
R
R
R
R
R

5193.27
4646.00
199.50
26.78
163.46
107.54
50.00
5193.27
4646.00
199.50
26.78
163.46
107.54
50.00
5371.77
4646.00
199.50
26.78
163.46
107.54
50.00
5193.27
4646.00
199.50
26.78
163.46
107.54
50.00
4845.50
4646.00
199.50
26.78
163.46
107.54
50.00
5024.00
4646.00
199.50
26.78
163.46
107.54
50.00
5024.00
4646.00
199.50
26.78
163.46
107.54
50.00
5193.27
4646.00
199.50
26.78
163.46
107.54
50.00

77593
61,954.50
614.30
179.25
250.00
5,500.00
300.00
50.00

I
R
R
R
R
R
R
I
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
I
I
R
R
R
R
R
R
R

52954.25
47,277.00
680.00
175.00
250.00
4,515.00
105.00
163.46
107.54
50
63,157.50
615.30
5,500.00
250.00
150.00
250.00
50
0.00
0.00
0.00
250.00
150.00
250.00
51
0.00
0.00
0.00
250.00
150.00
250.00
777.00
51
0.00
0.00
0.00
250.00
150.00
250.00
1,554.00
51
0.00
0.00
0.00
250.00
150.00
250.00
2,331.00
52
0.00
0.00
0.00
250.00
150.00
250.00
3,108.00
710
425,500.00
60,610.00
21,645.00
640
490.00
98374
64,478.00
12,000.00

I
R
R
R
R
R
R
R
R
I
I
R
R
R
R
R
R
I
R
R
R
R
R
R
I
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
I
I
R
R
R
I
R
I
I
R
R

7,500.00
130000
130000
130000
130000
130000
130000
1455.54
1059.58
282.56
899
700.00
909
72.04
126.00
8.00
3.50
301.62
58.08
0.11
12.50
22.38
42.00
2.81
909
72.04
126.00
8.00
3.50
301.62
58.08
0.11
12.50
22.38
42.00
2.81
700.00
285.00
535.00

285.00

350.00
350.00
200.00
3500.00

18933.56
6096.10
252.88
5359.18
3704.40
163.46
107.54
900.00
150.00

R
I
I
I
I
I
I
I
I
R
R
I
I
R
I
I
R
R
R
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
R
R
R
R
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
R
R
R
R
R
R
R
R
I

11930.92
4623.52
252.88
3436.62
396.90
163.46
107.54
900.00
150.00
10062.07
4435.55
252.88
2305.74
396.90
163.46
107.54
900.00
33045

520
237.00
222.31
520
237.00
222.31
520
237.00
222.31
520
237.00
222.31
520
237.00
222.31
520
237.00
222.31
520
237.00
222.31
520
237.00
222.31
520
237.00
222.31
520
237.00
222.31

I
R
R
R
R
R
R
R
R
I
R
R
R
R
R
R
R
I
I
I
I
I
R
R
I
R
R
I
R
R
I
R
R
I
R
R
I
I
R
R
I
R
R
I
R
R
I
R
R
I
R
R

Das könnte Ihnen auch gefallen