Sie sind auf Seite 1von 1

VERTICAL TURBINE FIRE PUMP

TYPICAL DIESEL ENGINE DRIVEN INSTALLATION FOR SUMP APPLICATION

SILENCER

FLEX JOINT

DISCHARGE HEAD ASSEMBLY

0000
RPM

kPa
100 300 200

kPa
300 100 500 10 20 40 30

AIR RELEASE VALVE R.A.G.D. REDUCING FLANGE FLYWHEEL GUARD FLEX SHAFT W/GUARD

PSI
30 10 70 50

DIESEL ENGINE

CONTROLLER
PSI
C
60 0 40 60 140 220 180 60 80 100

100

TO RELIEF VALVE & WASTE CONE TO TEST LINE


RELIEF TEE

80 100 120140 60 40 20 0 200 180 160

INDICATING CONTROL VALVE

FUEL TANK ASSEMBLY

BRONZE CHECK VALVE W/ 3/32" ORIFICE IN CLAPPER

CHECK VALVE

COOLING LOOP ASSEMBLY


80 60 40
SUBODH BAADKAR

PRESSURE GAUGE & PETCOCK


100 120 140 160 180 0 200 20

PRESSURE SWITCH ENGINE BASE BATTERY, RACK & CABLES

1/2" GLOBE VALVE

DISCHARGE

1/4" PLUG
SUBODH BAADKAR

TEE

S.A. Armstrong Limited 2005


SERIAL SIZE RPM GPM TDH 90-0627 14 LKM-FP 1750 1000 240'
FRESNO, CALIFORNIA

1/2" GLOBE VALVE

TO SYSTEM

1/2" GLOBE VALVE BRONZE CHECK VALVE W/ 3/32" ORIFICE IN CLAPPER 1/4" PLUG 1/2" GLOBE VALVE

NOTE :

FILE NO: DATE: SUPERSEDES: DATE:

1. LINEAR MEASURED DISTANCE BETWEEN THE TWO CHECK VALVES CONTAINING 3/32" ORIFICE SHALL NOT BE LESS THEN 5'-0" PER NFPA-20.

F51.169 Aug. 15, 2005 New New

FP-IO-01

(REV.#3)

Das könnte Ihnen auch gefallen