Sie sind auf Seite 1von 1

RAWMILL AREA SHUTDOWN WORKS LIST(AUG-2013)

Sl. No Description Day Day Day Day Day Day Day Day Day Day 1 2 3 4 5 6 7 8 9 10

1 Rawmill-1 girth gear, pinions cleaning & inspection(guards cleaning),both pinions &girth gear clearances checking 2 Rawmill-2 girth gear, pinions cleaning & inspection(guards cleaning),both pinions &girth gear clearances checking 3 RABH fan impeller inspection,Coupling greasing 4 RA fan bearings inspection & greasing, impeller & damper inspection 5 Dust Silo Bucket elevator chain ,buckets, sprockets inspection 6 Dust Silo Bucket Elevator head sprocket bearings inspection & greasing 7 Dust silo Bucket Elevator gearbox I/P shaft oilseal replacement work 8 Enmass conveyor-1,2,3&7 all bearings inspection and greasing 9 Enmass conveyor-1,2,3,&7 all glands replacing work 10 RABH all modules inspection doors packings replacement work 11 RABH all modules inspection, all poppet dampers inspection 12 RABH inlet duct transition area strengthening flats full welding work 13 RABH supporting structure channel box bottom side weldings cracks to be repaired 14 Bridge Reclaimer scraper chain inspection,chain guide and buckets inspection 15 Bridge Reclaimer Scraper conveyor bearings inspection & greasing 16 Bridge Reclaimer harrow face raking wheels bearings inspection & greasing 17 Bridge Reclaimer all structural weldings inspection & bolts tightness checking 18 RM-1 O-sepa O/L transition piece inside castable work PROUCTION DEPT.

Das könnte Ihnen auch gefallen