ITEM
I
DESCRIPCION
UND. CANTIDAD
VALOR
UNITARIO
1.0
3,063,078,222.00
PRELIMINARES
1.1
1.2
1.3
Campamentos
1.4
VALOR PARCIAL
104,438,800.00
UND.
1.0
1,650,428
1,650,428
ML
2,966.0
2,642
7,836,172
UND.
1.0
3,000,000
3,000,000
GL
1.0
250,200
250,200
1.5
ML
66.0
175,482
11,581,812
1.6
ML
718.0
1.7
24.0
1.8
48.0
1.9
180.0
94,666.0
67,500
67,970,188
12,150,000
2.0
EXCAVACIONES
683,869,588.00
2.1
10,564.0
26,726
282,333,464.00
2.2
7,145.0
27,014
193,015,030.00
2.3
301.0
34,000
10,234,000.00
2.4
2,024.0
46,828
94,779,872.00
2.5
4,186.0
24,727
103,507,222.00
3.0
3.1
RELLENOS
Relleno material seleccionado acorde con las
necesidades de la de la cimentacion de la tuberia, incluye
suministro y transporte
498,175,098.00
2,176.0
56,312
122,534,912.00
3.2
16,754.0
20,549
344,277,946.00
3.3
780.0
40,208
31,362,240.00
4.0
ENTIBADOS
4.1
5.0
5.1
5.2
5.3
5.4
5.5
DEMILICION DE PAVIMENTO
Corte de pavimento
Demolicion de pavimento
Conformacion compactacion de subrasante
Subase en material seleccionado y compactado al 95 %
del proctor modificado e= 0,20 m
Pavimento en concreto rigido de 3000 PSI
420,888,000.00
11,856.0
35,500
420,888,000.00
ML
M
M
485.0
384.0
4,360.0
14,708
36,812
2,800
100,489,972.00
7,133,380.00
14,135,808.00
12,208,000.00
482.0
59,416
28,638,512.00
384.0
99,933
38,374,272.00
6.0
99,733,722.00
6.1
6.2
6.3
UND
UND
2.0
20.0
1,699,737
2,121,247
3,399,474.00
42,424,940.00
6.4
UND
19.0
2,837,332
53,909,308.00
7.0
7.1
24,613,802.00
43.0
572,414
24,613,802.00
8.0
381,111,402.00
8.1
8.2
ML
2,486.0
124,047
308,380,842.00
8.3
ML
840.0
86,584
72,730,560.00
9.0
CONEXIONES DOMICILIARIAS
209,682,838.00
9.1
9.2
9.3
10.0
10.1
II
140.0
1,194,900
167,286,000.00
4.0
2,966.0
3,870,097
9,075
15,480,388.00
26,916,450.00
540,075,000.00
2,850.0
189,500
540,075,000.00
508,421,889.40
1.0
EXCAVACIONES
8,527,296.40
1.1
M3
47.8
26,726
1,277,503
1.2
M3
47.8
27,014
1,291,269
1.3
47.8
34,000
1,625,200
1.4
47.8
38,882
1,858,560
1.5
44.6
55,488
2,474,765
2.0
ENTIBADOS
2.1
3.0
3.1
4.0
CONCRETOS DE
INTEGRALMENTE
4.1
6.0
698,941
4,193,646.00
4.2
50.0
1,273,762
63,688,100.00
4.3
M
M
5.2
947,887
4,929,012.40
4.4
19.6
831,971
16,306,631.60
4.5
1.8
1,326,881
2,388,385.80
5.0
5.1
6.0
ACERO DE REFUERZO
Acero de Fy = 60 000 PSI cortado y figurado
RELLENOS COMPACTADOS
13,795,602
M2
35,870
13,795,602.00
626,926.00
M
3000
384.6
PSI
2.0
313,463
IMPERMEABILIZADO
626,926.00
91,505,775.80
KG
2,490.0
5,046
12,564,540.00
12,564,540.00
11,616,536.40
M
M
6.1
6.2
7.0
7.1
8.0
VARIOS
8.1
8.2
8.3
9.1
10.1
11.0
11.1
66.6
56,312
3,750,379.20
370.4
24,727
9,158,880.80
252.0
2.0
42,490
572,414
10,707,480.00
1,144,828.00
4.0
417,584
1,670,336.00
38,252,340.00
4.0
9,563,085
38,252,340.00
11,854,960.00
ML
80.0
148,187
11,854,960.00
115,101,972.00
ML
11.2
12.0
12.1
12.2
12.3
12.4
12.5
12.6
12.7
12.8
12.9
12.10
12.11
12.12
12.13
12.14
7,866,157.20
13,522,644.00
20,549
9,158,880.80
9.0
10.0
382.8
4.0
132,647
530,588.00
4.0
28,642,846
114,571,384.00
28,879,580.00
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
ML
UN
UN
2.0
2.0
2.0
4.0
4.0
4.0
2.0
2.0
4.0
4.0
2.0
6.0
6.0
2.0
148,586
10,287
38,355
8,171
1,282
1,300
7,938
9,530
1,018
1,008
21,945
9,486
4,830
127,836
297,172.00
20,574.00
76,710.00
32,684.00
5,128.00
5,200.00
15,876.00
19,060.00
4,072.00
4,032.00
43,890.00
56,916.00
28,980.00
255,672.00
ML
40.0
24,707
988,280.00
12.16
12.17
12.18
12.19
12.20
12.21
UN
UN
UN
UN
UN
UN
6.0
6.0
6.0
6.0
6.0
6.0
304,801
7,311
309,525
58,451
72,289
63,945
1,828,806.00
43,866.00
1,857,150.00
350,706.00
433,734.00
383,670.00
12.22
UN
2.0
9,901,253
19,802,506.00
2.0
1,162,448
2,324,896.00
de
10,562,750.00
1.0
10,562,750
10,562,750.00
1,504,360.00
1.0
1,504,360
1,504,360.00
7,457,140.00
20.0
171,512
3,430,240.00
30.0
134,230
4,026,900.00
11,254,914.00
16.1
17.0
17.1
1.0
7,200,000
7,200,000.00
17.2
1.0
2,821,364
2,821,364.00
18.0
18.1
18.2
18.3
18.4
18.5
18.6
UN
2.0
5,627,457
11,254,914.00
10,021,364.00
GLB
112,214,308.00
4.0
4.0
4.0
4.0
4.0
2.0
985,123
2,538,096
886,344
2,769,282
3,167,387
1,704,982
3,940,492.00
10,152,384.00
3,545,376.00
11,077,128.00
12,669,548.00
3,409,964.00
18.7
18.8
18.9
18.10
18.11
18.12
18.13
III
1.0
1.1
1.2
2.0
2.1
2.2
2.2.1
2.2.2
2.2.3
2.2.4
2.2.5
3.0
3.1
4.0
4.1
4.2
4.3
5.0
5.1
CONSTRUCCIN DE LA ESTACIN
BOMBEO SECTOR PLAYA BLANCA.
UND.
ML
UND.
UND.
UND.
UND.
UND.
2.0
92.0
4.0
4.0
2.0
8.0
2.0
673,300
196,469
800,489
1,138,678
14,491,091
1,192,288
860,257
DE
133,179,917.90
30,938,350.00
M
250
35,870
8,967,500.00
550
39,947
2.80
313,463
21,970,850.00
57,932,949.90
877,696.40
M
M
M
M
M
20.40
32.40
10.20
3.70
1.00
69,894
1,273,762
975,917
831,971
1,326,881
Kg
4,253.00
5,046
M
M
M
315.00
55.00
305.00
20,549
56,312
24,727
ML
135.00
42,490
B. CASETA DE BOMBEO
1.0
1.1
1.2
2.0
2.1
2.2
2.3
3.0
3.1
3.2
3.3
3.4
3.5
4.0
4.1
4.2
4.3
5.0
PRELIMINARES
Descapote
Localicacion y replanteo
CIMENTACION
Excavacion humeda en material comun
Sobrecimiento en bloque 0,15 m (1 hilada)
Viga de amarre en concreto rezorzado de 0.25 x 0,30 m
MAMPOSTERIA Y ESTRUCTURA
Levante en bloque e=0,15 m
Levante en bloque e=0,20 m
Paete en mortero para muro e=0,03m
Alfajia en concreto
Viga anillo en concreto de 0.15 x 0.20 m
PISOS Y ENCHAPES
Plantilla en concreto
Pisos en baldosa en granito
Enchape para muro de bao
CUBIERTA
1,346,600.00
18,075,148.00
3,201,956.00
4,554,712.00
28,982,182.00
9,538,304.00
1,720,514.00
1,425,837.60
41,269,888.80
9,954,353.40
3,078,292.70
1,326,881.00
21,460,638.00
21,460,638.00
17,111,830.00
6,472,935.00
3,097,160.00
7,541,735.00
5,736,150.00
5,736,150.00
46,451,091.65
M
M
10.00
78.00
26,804
2,642
M
ML
ML
56.30
54.30
4.10
39,947
18,205
62,482
M
M
M
ML
ML
46.60
69.00
231.00
7.40
1.70
38,425
59,100
17,625
31,166
57,493
M
M
M
62.40
32.00
8.70
43,082
51,191
44,369
474,116.00
268,040.00
206,076.00
3,493,723.80
2,249,016.10
988,531.50
256,176.20
10,268,246.50
1,790,605.00
4,077,900.00
4,071,375.00
230,628.40
97,738.10
4,712,439.10
2,688,316.80
1,638,112.00
386,010.30
12,850,207.00
5.1
6.0
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
7.0
7.1
8.0
8.1
IV
1.0
1.1
2.0
2.1
2.2
2.3
2.4
M
UND
UND
UND
UND
UND
M
M
M
M
M
Gl
231.00
9,288
2,145,528.00
2,642
M
M
M
M
3,848.0
3,078.0
710.0
5,484.0
26,726
30,155
56,312
20,549
324.0
24,727
8,011,548.00
4.1
1,926,125.00
4,440.0
4.0
6.2
1,926,125
ML
6.1
1.00
12,850,207.00
10,580,706.25
845,138.00
1,422,200.00
501,020.00
601,020.00
1,017,225.00
297,406.25
706,800.50
133,996.50
2,046,876.00
3,009,024.00
1,926,125.00
2,884,415,127.50
11,730,480.00
11,730,480.00
356,342,522.00
102,841,648.00
92,817,090.00
39,981,520.00
112,690,716.00
3.1
5.0
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
5.10
6.0
845,138
711,100
501,020
601,020
1,017,225
237,925
403,886
406,050
656,050
1,044,800
TUBERIA DE IMPULSION
3.0
4.2
1.00
2.00
1.00
1.00
1.00
1.25
1.75
0.33
3.12
2.88
86,243
2,145,528.00
PRELIMINARES
Localizacin y replanteo.
EXCAVACION Y RELLENO
Excavacion comun en material arenoso
Excavacion comun en conglomerado
Relleno con material seleccionado
Relleno con material proveniente de la excavacion
Cargue, transporte y disposicion final del material
proveniente de la excavacion a cualquier distacias, incluye
permiso y dereho de botadero
ENTIVADOS
2.5
149.00
89,675,000.00
M
2,500.0
35,870
89,675,000.00
1,809,499,866.00
ML
4,434.0
405,682
1,798,793,988.00
ML
6.0
1,784,313
10,705,878.00
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
1.0
2.0
4.0
3.0
3.0
2.0
5.0
12.0
12.0
10.0
1,162,448
195,688
37,348
139,289
46,192
7,938
3,547
1,001
954
18,457
2,501,300.00
1,162,448.00
391,376.00
149,392.00
417,867.00
138,576.00
15,876.00
17,735.00
12,012.00
11,448.00
184,570.00
26,459,354.00
UND
1.0
23,456,951
23,456,951.00
UND
2.0
67,648
135,296.00
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
7.0
7.1
8.0
8.1
UND
UND
UND
ML
UND
UND
UND
UND
UND
1.0
1.0
1.0
20.0
2.0
2.0
2.0
1.0
1.0
27,846
462,846
92,074
8,460
364,824
21,760
364,824
198,461
413,864
27,846.00
462,846.00
92,074.00
169,200.00
729,648.00
43,520.00
729,648.00
198,461.00
413,864.00
4,475,780.00
ML
20.0
223,789
4,475,780.00
52,991,746.00
UND
1.0
4,446,284
4,446,284.00
UND
UND
UND
UND
UND
UND
UND
UND
UND
1.0
2.0
4.0
1.0
2.0
2.0
2.0
2.0
1.0
3,900,000
182,369
182,369
289,745
342,973
215,034
189,463
1,345,375
13,198,651
3,900,000.00
364,738.00
729,476.00
289,745.00
685,946.00
430,068.00
378,926.00
2,690,750.00
13,198,651.00
8.11
2.0
7,805,987
15,611,974.00
8.12
2.0
5,132,594
10,265,188.00
8.2
8.3
8.4
8.5
8.6
8.7
8.8
8.9
8.10
9.0
9.1
10.0
10.1
10.2
10.3
754,968.00
24.0
31,457
754,968.00
5.0
3.0
75,471
59,012
364,378,117.00
377,355.00
177,036.00
2.0
408,654
817,308.00
10.4
6.0
110,864
665,184.00
10.5
2.0
110,854,123
221,708,246.00
10.6
1.0
124,985,147
124,985,147.00
10.7
11.0
11.1
11.2
11.3
11.4
11.5
11.6
11.7
11.8
11.9
11.10
11.11
11.12
11.13
12.0
12.1
UND
1.0
15,647,841
15,647,841.00
109,499,880.00
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
1.0
1.0
1.0
1.0
2,620,340
1,304,376
12,845,715
2,145,861
6,240,864
8,468,754
4,278,451
2,157,364
6,347,515
3,124,861
1,845,176
1,764,521
9,946,842
5,240,680.00
2,608,752.00
25,691,430.00
4,291,722.00
12,481,728.00
16,937,508.00
8,556,902.00
4,314,728.00
12,695,030.00
3,124,861.00
1,845,176.00
1,764,521.00
9,946,842.00
56,106,115
GL
1.0
56,106,115
56,106,115.00
6,635,546,248
1,990,663,875
8,626,210,123
Repblica de Colombia
Departamento de crdoba
Municipio de San Antero Municipio de San Antero Municipio de San Antero Municipio
Secretara de Obras Pblicas Municipal
6,635,546,248.45
4,263,648.20
6,897,801.00
313,463.00
45,752,887.90
6,282,270.00
5,808,268.20
4,579,440.40
6,761,322.00
19,126,170.00
5,927,480.00
57,550,986.00
14,439,790.00
5,281,375.00
752,180.00
3,728,570.00
5,627,457.00
5,010,682.00
14,400,000.00
5,642,728.00
56,107,154.00
3,064,046,137.05
3,571,500,111.40
6,635,546,248.45
1990663875
8,626,210,122.99
35.52
41.40
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
MATERIALES(M)
UNIDAD
TRANSPORTE ( T )
VOL/PESO
UND: M
RENDIMIENTOPRECIO
111.00
80,000.00
VR. UNITARIO
720.72
198.90
SUBTOTAL
CANTIDAD
919.62
VR. UNITARIO
PRECIO
SUBTOTAL
0.00
DIST.(Km) M o TON/Km PRECIO VR. UNITARIO
SUBTOTAL
0.00
MANO DE OBRA(MO) JORNAL PRESTACION J. TOTAL RENDIM VR. UNITARIO
Topografo
60,000.00
50,000.00 110,000.00
100.00
1,100.00
1 ayudante
16,000.00
12,000.00 28,000.00
100.00
311.20
1 cadenero
16,000.00
12,000.00 28,000.00
100.00
311.20
0.00
0.00
SUBTOTAL
1,722.4
COSTO DIRECTO
2,642.0
AIU(30%)
PRECIO UNITARIO TOTAL
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
MATERIALES(M)
UND: GL
UNIDAD
dia
dia
UNIDAD
RENDIMIENTOPRECIO
SUBTOTAL
CANTIDAD
VR. UNITARIO
0.00
VR. UNITARIO
PRECIO
SUBTOTAL
TRANSPORTE ( T ) VOL/PESO DIST.(Km) M o TON/Km
SUBTOTAL
MANO DE OBRA(MO) JORNAL PRESTACION J. TOTAL
0.00
0.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
0.00
PRECIO VR. UNITARIO
0.00
RENDIM VR. UNITARIO
0.00
0.00
3,000,000.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
MATERIALES(M)
Cinta preventiva
UND: GL
UNIDAD
dia
dia
UNIDAD
rollo
RENDIMIENTO PRECIO
SUBTOTAL
CANTIDAD
15.00
SUBTOTAL
MANO DE OBRA(MO) JORNAL PRESTACION J. TOTAL
60,000.00
42,000.00
0.00
VR. UNITARIO
240,000.00
PRECIO
16,000.00
SUBTOTAL
TRANSPORTE ( T ) VOL/PESO DIST.(Km) M o TON/Km
cuadrilla
VR. UNITARIO
102,000.00
0.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
240,000.00
PRECIO VR. UNITARIO
0.00
RENDIM VR. UNITARIO
10.00
10.00
10,200.00
10,200.0
250,200.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
MATERIALES(M)
concreto 3000
UNIDAD
M3
TRANSPORTE ( T ) VOL/PESO
UND: GL
RENDIMIENTO PRECIO
SUBTOTAL
CANTIDAD
0.08
60,000.00
40,000.00
SUBTOTAL
DIST.(Km) M o TON/Km
42,000.00
28,000.00
100.00
VR. UNITARIO
31,200.00
PRECIO
390,000.00
SUBTOTAL
MANO DE OBRA(MO) JORNAL PRESTACION J. TOTAL
cuadrilla
cuadrilla
VR. UNITARIO
100.00
102,000.00
68,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
31,200.00
PRECIO VR. UNITARIO
0.00
RENDIM VR. UNITARIO
2.00
2.00
51,000.00
34,000.00
85,000.0
116,300.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
RENDIMIENTO
PRECIO
UNIDAD
UNIDAD
ML
Kg
SUBTOTAL
CANTIDAD
1.50
8.00
0.50
PRECIO
15,000.00
1,500.00
4,000.00
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
MANO DE OBRA(MO)
JORNAL
SUBTOTAL
PRESTACION
cuadrilla
cuadrilla
60,000.00
40,000.00
42,000.00
28,000.00
MATERIALES(M)
madrina
alambre dem puas
grapas
TRANSPORTE ( T )
UNIDAD
dia
dia
VR. UNITARIO
1,499.30
PRECIO
1,499.30
VR. UNITARIO
22,500.00
12,000.00
2,000.00
0.00
36,500.00
VR. UNITARIO
J. TOTAL
RENDIM
0.00
VR. UNITARIO
102,000.00
68,000.00
3.00
3.00
34,000.00
22,666.67
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
56,666.7
94,666.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
UND: UND
EQUIPOS(E)
herramuenta menor
VR. UNITARIO
1,500.00
UNIDAD
dia
dia
RENDIMIENTO
PRECIO
UNIDAD
UNIDAD
Ml
SUBTOTAL
CANTIDAD
1.00
6.00
PRECIO
25,000.00
4,000.00
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
MANO DE OBRA(MO)
JORNAL
SUBTOTAL
PRESTACION
cuadrilla
cuadrilla
60,000.00
40,000.00
42,000.00
28,000.00
MATERIALES(M)
coco
madera
TRANSPORTE ( T )
PRECIO
1,500.00
VR. UNITARIO
25,000.00
24,000.00
0.00
0.00
49,000.00
VR. UNITARIO
J. TOTAL
RENDIM
0.00
VR. UNITARIO
102,000.00
68,000.00
10.00
10.00
10,200.00
6,800.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
17,000.0
67,500.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
RENDIMIENTO
0.50
3.00
PRECIO
1,744.00
8,000.00
VR. UNITARIO
3,488.00
2,666.67
6,154.67
VR. UNITARIO
MATERIALES(M)
UNIDAD
SUBTOTAL
CANTIDAD
PRECIO
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
JORNAL
40,000.00
SUBTOTAL
PRESTACION
1.80
MANO DE OBRA(MO)
Cuadrilla
J. TOTAL
72,000.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
PRECIO
0.00
VR. UNITARIO
RENDIM
3.50
0.00
VR. UNITARIO
20,571.43
20,571.4
26,726.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
UNIDAD
RENDIMIENTO
1.00
1.00
14.00
SUBTOTAL
CANTIDAD
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
0.00
VR. UNITARIO
JORNAL
60,000.00
SUBTOTAL
PRESTACION
1.80
J. TOTAL
108,000.00
RENDIM
14.00
0.00
VR. UNITARIO
7,714.29
MANO DE OBRA(MO)
Cuadrilla
UNIDAD
dia
dia
da
PRECIO
1,299.70
8,000.00
140,000.00
VR. UNITARIO
1,299.70
8,000.00
10,000.00
19,299.70
VR. UNITARIO
PRECIO
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
7,714.3
27,014.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
UNIDAD
RENDIMIENTO
1.00
1.00
10.00
SUBTOTAL
CANTIDAD
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(Km)
JORNAL
60,000.00
SUBTOTAL
PRESTACION
1.80
MANO DE OBRA(MO)
Cuadrilla
UNIDAD
dia
dia
da
UNDAD:
PRECIO
1,200.00
8,000.00
140,000.00
VR. UNITARIO
1,200.00
8,000.00
14,000.00
23,200.00
VR. UNITARIO
PRECIO
M o TON/Km
J. TOTAL
108,000.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
PRECIO
0.00
VR. UNITARIO
RENDIM
10.00
0.00
VR. UNITARIO
10,800.00
10,800.0
34,000.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
UNDAD:
EQUIPOS(E)
UNIDAD
Herramienta menor
dia
Motobomba autocebante =3"
dia
Retroexcavadora Oruga 140 hp
da
MATERIALES(M)
UNIDAD
RENDIMIENTO
1.00
1.00
7.00
SUBTOTAL
CANTIDAD
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(Km)
JORNAL
60,000.00
SUBTOTAL
PRESTACION
1.80
MANO DE OBRA(MO)
Cuadrilla
PRECIO
2,999.40
8,000.00
140,000.00
VR. UNITARIO
2,999.40
8,000.00
20,000.00
30,999.40
VR. UNITARIO
PRECIO
M o TON/Km
J. TOTAL
108,000.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
PRECIO
0.00
VR. UNITARIO
RENDIM
7.00
0.00
VR. UNITARIO
15,428.57
15,428.6
46,428.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
MATERIALES(M)
Valla Informativa
segn
especificaciones
UNIDAD
UNIDAD
und
RENDIMIENTO
PRECIO
SUBTOTAL
CANTIDAD
1
VR. UNITARIO
0.00
0.00
VR. UNITARIO
1,650,428.00
PRECIO
1,650,428
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
1,650,428.00
VR. UNITARIO
MANO DE OBRA(MO)
1 oficial
2 ayudantes
JORNAL
28,000.00
32,000.00
SUBTOTAL
PRESTACION
21,000.00
24,000.00
J. TOTAL
49,000.00
56,000.00
RENDIM
1.00
1.00
0.00
VR. UNITARIO
49,000.00
56,000.00
SUBTOTAL
COSTO DIRECTO
105,000.0
1,755,428.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
MATERIALES(M)
Material seleccionado
TRANSPORTE ( T )
UNDAD:
UNIDAD
dia
RENDIMIENTO
10.00
PRECIO
65,000.00
VR. UNITARIO
6,500.00
Glb
1.00
1,499.50
1,499.50
UNIDAD
m
SUBTOTAL
CANTIDAD
1.10
PRECIO
30,000.00
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
7,999.50
VR. UNITARIO
33,000.00
0.00
0.00
0.00
33,000.00
VR. UNITARIO
SUBTOTAL
PRESTACION
52,500.00
J. TOTAL
122,500.00
RENDIM
8.00
0.00
VR. UNITARIO
15,312.50
MANO DE OBRA(MO)
JORNAL
Cuadrilla 1 ofic - 2 ayudantes 70,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
15,312.5
56,312.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM:Cargue, transporte y disposicion final del material proveniente de la excavacion a cualquier distacias,
incluye permiso y dereho de botadero, equipo herramienta y t mano de obras
UNIDAD: M
EQUIPOS(E)
Herramienta menor
MATERIALES(M)
UNIDAD
dia
UNIDAD
TRANSPORTE ( T )
Volqueta (retiro de sobrantes)
Cargue
VOL/PESO
1.25
0.50
MANO DE OBRA(MO)
2 ayudantes
JORNAL
40,000.00
RENDIMIENTO
1.00
PRECIO
1,499.70
VR. UNITARIO
1,499.70
SUBTOTAL
CANTIDAD
PRECIO
1,499.70
VR. UNITARIO
SUBTOTAL
DIST.(Km)
15.00
M o TON/Km
400.00
PRECIO
7,500.00
6,000.00
0.00
0.00
0.00
0.00
VR. UNITARIO
7,500.00
3,000.00
SUBTOTAL
PRESTACION
30,000.00
J. TOTAL
70,000.00
RENDIM
5.50
10,500.00
VR. UNITARIO
12,727.27
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
12,727.3
24,727.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
RENDIMIENTO
15.00
PRECIO
65,000.00
VR. UNITARIO
4,333.33
Glb
1.00
1,499.10
1,499.10
MATERIALES(M)
UNIDAD
Lt
SUBTOTAL
CANTIDAD
16.44
PRECIO
150.00
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
JORNAL
70,000.00
SUBTOTAL
PRESTACION
52,500.00
Agua
MANO DE OBRA(MO)
Cuadrilla 1 ofic - 2 ayudantes
UNIDAD
dia
UNIDAD:
J. TOTAL
122,500.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
PRECIO
5,832.43
VR. UNITARIO
2,466.61
0.00
0.00
0.00
2,466.61
VR. UNITARIO
RENDIM
10.00
0.00
VR. UNITARIO
12,250.00
12,250.0
20,549.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
MATERIALES(M)
Material arenoso de rio
TRANSPORTE ( T )
MANO DE OBRA(MO)
Cuadrilla 1 ofic - 2 ayudantes
UNIDAD
dia
Glb
UNDAD:
RENDIMIENTO
10.00
1.00
PRECIO
65,000.00
1,499.70
UNIDAD
m
SUBTOTAL
CANTIDAD
1.10
PRECIO
20,000.00
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
7,999.70
VR. UNITARIO
22,000.00
0.00
0.00
0.00
22,000.00
VR. UNITARIO
JORNAL
70,000.00
SUBTOTAL
PRESTACION
52,500.00
J. TOTAL
122,500.00
RENDIM
12.00
0.00
VR. UNITARIO
10,208.33
SUBTOTAL
COSTO DIRECTO
AIU(30%)
VR. UNITARIO
6,500.00
1,499.70
10,208.3
40,208.0
MATERIALES(M)
Sistema de modulos de entibados,
constituidos 2 cuerpos con tablones de
madera (e=1"), cada cuerpo tiene
medidas de 0.2x4.5 mts, sujetados con
puntales de madera
TRANSPORTE ( T )
MANO DE OBRA(MO)
4 ayudantes
UNIDAD
dia
RENDIMIENTO
1.00
PRECIO
1,500.00
VR. UNITARIO
1,500.00
PRECIO
5,000.00
1,500.00
VR. UNITARIO
20,000.00
UNIDAD
und
SUBTOTAL
CANTIDAD
4.00
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
20,000.00
VR. UNITARIO
JORNAL
64,000.00
SUBTOTAL
PRESTACION
48,000.00
J. TOTAL
112,000.00
RENDIM
8.00
0.00
VR. UNITARIO
14,000.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
14,000.0
35,500.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
UNDAD:
RENDIMIENTO
20.00
1.00
PRECIO
60,000.00
1,499.70
UNIDAD
SUBTOTAL
CANTIDAD
PRECIO
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
4,499.70
VR. UNITARIO
0.00
0.00
0.00
0.00
0.00
VR. UNITARIO
MANO DE OBRA(MO)
Cuadrilla 1 ofic - 2 ayudantes
JORNAL
70,000.00
SUBTOTAL
PRESTACION
52,500.00
J. TOTAL
122,500.00
RENDIM
12.00
0.00
VR. UNITARIO
10,208.33
MATERIALES(M)
UNIDAD
dia
Glb
ML
SUBTOTAL
COSTO DIRECTO
AIU(30%)
VR. UNITARIO
3,000.00
1,499.70
10,208.3
14,708.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
MATERIALES(M)
UNDAD:
UNIDAD
RENDIMIENTO
PRECIO
VR. UNITARIO
Glb
1.00
1,499.50
1,499.50
UNIDAD
SUBTOTAL
CANTIDAD
PRECIO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
20,000.00
1,499.50
VR. UNITARIO
0.00
0.00
0.00
0.00
0.00
VR. UNITARIO
20,000.00
SUBTOTAL
PRESTACION
52,500.00
J. TOTAL
122,500.00
RENDIM
8.00
20,000.00
VR. UNITARIO
15,312.50
TRANSPORTE ( T )
Volqueta
VOL/PESO
1.00
MANO DE OBRA(MO)
Cuadrilla 1 ofic - 2 ayudantes
JORNAL
70,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
15,312.5
36,812.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
TRANSPORTE ( T )
MANO DE OBRA(MO)
ayudante
UNDAD:
UNIDAD
UNIDAD
RENDIMIENTO
100.00
10.00
100.00
SUBTOTAL
CANTIDAD
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
JORNAL
20,000.00
SUBTOTAL
PRESTACION
15,000.00
J. TOTAL
35,000.00
RENDIM
100.00
Hora
Glb
Hora
PRECIO
120,000.00
1,500.00
110,000.00
PRECIO
SUBTOTAL
COSTO DIRECTO
AIU(30%)
VR. UNITARIO
1,200.00
150.00
1,100.00
2,450.00
VR. UNITARIO
0.00
0.00
0.00
0.00
0.00
VR. UNITARIO
0.00
0.00
VR. UNITARIO
350.00
350.0
2,800.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
MATERIALES(M)
Material seleccionado
TRANSPORTE ( T )
MANO DE OBRA(MO)
Cuadrilla 1 ofic - 2 ayudantes
UNIDAD
RENDIMIENTO
PRECIO
VR. UNITARIO
Glb
1.00
1,499.30
1,499.30
UNIDAD
m
SUBTOTAL
CANTIDAD
1.25
PRECIO
30,000.00
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
1,499.30
VR. UNITARIO
37,500.00
0.00
0.00
0.00
37,500.00
VR. UNITARIO
JORNAL
70,000.00
SUBTOTAL
PRESTACION
52,500.00
J. TOTAL
122,500.00
RENDIM
6.00
0.00
VR. UNITARIO
20,416.67
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
20,416.7
59,416.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
UNIDAD :
EQUIPOS(E)
Vibrador para Concreto
UNIDAD
und
Glb
RENDIM
1.00
PRECIO
8,000.00
VR. UNITARIO
8,000.00
0.00
3,499.10
UNIDAD
m
SUBTOTAL
CANTIDAD
0.20
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
3,481.97
73,121.37
VR. UNITARIO
MANO DE OBRA(MO)
JORNAL
30,000.00
40,000.00
SUBTOTAL
PRESTACION
22,500.00
30,000.00
J. TOTAL
52,500.00
70,000.00
RENDIM
8.00
8.00
0.00
VR. UNITARIO
6,562.50
8,750.00
MATERIALES(M)
Concreto
11,499.10
VR. UNITARIO
69,639.40
0.00
0.00
PRECIO
348,197.00
Desperdicio (5%)
1 Oficial
2 Ayudantes
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
15,312.5
99,933.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
MANO DE OBRA(MO)
1 Oficial
5 Ayudantes
UNIDAD
und
und
und
Glb
UND:m
RENDIMIENTO
1.00
5.00
2.50
PRECIO
15,000.00
6,500.00
1,000.00
1,499.50
UNIDAD
Kg
m
m
Lt
SUBTOTAL
CANTIDAD
350.00
0.56
0.85
180.00
PRECIO
550.00
45,000.00
50,000.00
150.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
JORNAL
30,000.00
100,000.00
SUBTOTAL
PRESTACION
22,500.00
75,000.00
J. TOTAL
52,500.00
175,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
PRECIO
VR. UNITARIO
15,000.00
1,300.00
400.00
1,499.50
18,199.50
VR. UNITARIO
192,500.00
25,200.00
42,500.00
27,000.00
14,360.00
301,560.00
VR. UNITARIO
RENDIM
8.00
8.00
0.00
VR. UNITARIO
6,562.50
21,875.00
28,437.5
348,197.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
RENDIMIENTO
0.10
0.10
4.00
MATERIALES(M)
Concreto de 3000 psi
Cinta pvc
Refuerzo
entibado
Formaleta
Desperdicio
UNIDAD
m3
ml
kg
gl
U
SUBTOTAL
CANTIDAD
1.65
1.50
36.00
1.00
1.00
TRANSPORTE ( T )
Transporte local
VOL/PESO
Vje
SUBTOTAL
Tarifa
60,000.00
JORNAL
45,000.00
60,000.00
120,000.00
SUBTOTAL
PRESTACION
33,750.00
45,000.00
90,000.00
MANO DE OBRA(MO)
Maestro
Oficial 2
Ayudante 6
PRECIO
1,200.00
1,800.00
50,000.00
VR. UNITARIO
12,000.00
18,000.00
12,500.00
PRECIO
348,197.00
48,000.00
5,200.00
150,000.00
50,000.00
1,033,725.05
Cantidad
2.00
J. TOTAL
78,750.00
105,000.00
210,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
UND: UND
PRECIO
RENDIM
0.70
0.70
0.70
42,500.00
VR. UNITARIO
574,525.05
72,000.00
187,200.00
150,000.00
50,000.00
31,011.75
1,064,736.80
VR. UNITARIO
30,000.00
30,000.00
VR. UNITARIO
112,500.00
150,000.00
300,000.00
562,500.0
1,699,737.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
UNIDAD
hora
hora
hora
RENDIMIENTO
0.16
0.14
4.00
MATERIALES(M)
Concreto de 3000 psi
entivados
Refuerzo
cinta pvc
Formaleta
Desperdicio
UNIDAD
m3
Gl
kg
ml
U
SUBTOTAL
CANTIDAD
2.07
1.00
38.00
1.50
1.25
TRANSPORTE ( T )
Transporte local
VOL/PESO
Vje
SUBTOTAL
Tarifa
60,001.20
Cantidad
1.60
PRECIO
JORNAL
45,000.00
60,000.00
120,000.00
SUBTOTAL
PRESTACION
33,750.00
45,000.00
90,000.00
J. TOTAL
78,750.00
105,000.00
210,000.00
RENDIM
0.50
0.50
0.50
MANO DE OBRA(MO)
Maestro
Oficial 2
Ayudante 6
PRECIO
1,200.00
1,800.00
50,000.00
VR. UNITARIO
7,500.00
13,235.29
12,500.00
PRECIO
348,197.00
150,000.00
5,200.00
48,000.00
50,000.00
1,202,867.79
SUBTOTAL
COSTO DIRECTO
UND: UND
33,235.29
VR. UNITARIO
720,767.79
150,000.00
197,600.00
72,000.00
62,500.00
60,143.39
1,263,011.18
VR. UNITARIO
37,500.75
37,500.75
VR. UNITARIO
157,500.00
210,000.00
420,000.00
787,500.0
2,121,247.00
AIU(30%)
PRECIO UNITARIO TOTAL
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
UNIDAD
hora
hora
RENDIMIENTO
0.07
0.06
MATERIALES(M)
Concreto de 3000 psi
Tapa y anillos
Refuerzo
Formaleta
Desperdicio
UNIDAD
m3
Gl
kg
U
SUBTOTAL
CANTIDAD
4.95
1.00
40.00
3.00
TRANSPORTE ( T )
Transporte local
VOL/PESO
Vje
SUBTOTAL
Tarifa
50,000.00
Cantidad
0.67
PRECIO
JORNAL
40,000.00
56,000.00
96,000.00
SUBTOTAL
PRESTACION
30,000.00
42,000.00
72,000.00
J. TOTAL
70,000.00
98,000.00
168,000.00
RENDIM
0.33
0.33
0.33
MANO DE OBRA(MO)
Maestro
Oficial 2
Ayudante 6
PRECIO
1,200.00
1,800.00
VR. UNITARIO
18,000.00
32,400.00
PRECIO
264,830.63
288,991.20
2,000.00
30,000.00
1,769,902.82
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
UND: UND
50,400.00
VR. UNITARIO
1,310,911.62
288,991.20
80,000.00
90,000.00
53,097.08
1,822,999.90
VR. UNITARIO
75,000.00
75,000.00
VR. UNITARIO
210,000.00
294,000.00
504,000.00
1,008,000.0
2,956,400.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
UNIDAD
hora
hora
hora
RENDIMIENTO
0.07
0.06
4.00
MATERIALES(M)
Concreto de 3000 psi
cinta pvc
Refuerzo
Formaleta
Desperdicio
UNIDAD
m3
ML
kg
U
SUBTOTAL
CANTIDAD
4.95
1.50
40.00
3.00
TRANSPORTE ( T )
Transporte local
VOL/PESO
Vje
SUBTOTAL
Tarifa
50,000.00
JORNAL
40,000.00
60,000.00
120,000.00
SUBTOTAL
PRESTACION
30,000.00
45,000.00
90,000.00
MANO DE OBRA(MO)
Maestro
Oficial 2
Ayudante 6
PRECIO
1,200.00
1,800.00
50,000.00
VR. UNITARIO
18,000.00
32,400.00
12,500.00
PRECIO
348,197.00
48,000.00
5,200.00
50,000.00
2,153,575.15
Cantidad
0.67
J. TOTAL
70,000.00
105,000.00
210,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
UND: UND
PRECIO
RENDIM
0.80
0.80
0.80
62,900.00
VR. UNITARIO
1,723,575.15
72,000.00
208,000.00
150,000.00
64,607.25
2,218,182.40
VR. UNITARIO
75,000.00
75,000.00
VR. UNITARIO
87,500.00
131,250.00
262,500.00
481,250.0
2,837,332.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
UNIDAD
hora
hora
hora
RENDIMIENTO
0.10
0.10
4.00
PRECIO
1,200.00
1,800.00
50,000.00
MATERIALES(M)
Concreto de 3000 psi
Tapa y anillo
Refuerzo
UNIDAD
m3
und
kg
SUBTOTAL
CANTIDAD
0.20
1.00
10.00
PRECIO
348,197.00
300,000.00
5,200.00
Desperdicio
MANO DE OBRA(MO)
Maestro
Oficial 2
Ayudante 6
VR. UNITARIO
12,000.00
18,000.00
12,500.00
421,639.40
TRANSPORTE ( T )
Transporte local
VOL/PESO
Vje
SUBTOTAL
Tarifa
60,000.00
Cantidad
2.00
PRECIO
JORNAL
45,000.00
60,000.00
120,000.00
SUBTOTAL
PRESTACION
33,750.00
45,000.00
90,000.00
J. TOTAL
78,750.00
105,000.00
210,000.00
RENDIM
6.00
6.00
6.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
UND: UND
42,500.00
VR. UNITARIO
69,639.40
300,000.00
52,000.00
0.00
0.00
12,649.18
434,288.58
VR. UNITARIO
30,000.00
30,000.00
VR. UNITARIO
13,125.00
17,500.00
35,000.00
65,625.0
572,414.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
EQUIPOS(E)
Bombas prueba
Bomba gasolina
Herramientas menores
Equipo de Topografa
UNIDAD
hr
hr
UNIDAD
da
MATERIALES(M)
Union nova fort
PVC Novafort 8"
Limpiador, lubricante, pegante
hidrosello
UNIDAD
U
m
U
U
TRANSPORTE ( T )
VOL/PESO
CANTIDAD
0.40
0.40
1.00
0.01
SUBTOTAL
CANTIDAD
0.17
1.00
20.00
6.00
SUBTOTAL
DIST.(Km)
VALOR UNITARIO
6,000.00
8,500.00
1,500.00
100,000.00
PRECIO
38,450.00
49,969.23
98,842.00
5,500.00
M o TON/Km
PRECIO
Transporte local
MANO DE OBRA(MO)
Oficial
2 Obreros
Topografo
1 ayudante
1 cadenero
ITEM
UND: ml
VR PARCIAL
2,400.00
3,400.00
1,500.00
650.00
7,950.00
VR. UNITARIO
6,536.50
49,969.23
4,942.10
916.67
62,364.50
VR. UNITARIO
200.90
JORNAL
45,000
60,000
80,000
25,000
30,000
SUBTOTAL
PRESTACION
31,500
42,000
50,000
18,750
22,500
SUBTOTAL
COSTO DIRECTO
J. TOTAL
76,500
102,000
130,000
43,750
52,500
RENDIM
12
12
200
200
200
200.90
VR. UNITARIO
6,375.00
8,500.00
650.00
249.95
293.70
16,068.7
86,584.0
EQUIPOS(E)
Bombas prueba
Bomba gasolina
Herramientas menores
Equipo de Topografa
UNIDAD
hr
hr
UNIDAD
da
MATERIALES(M)
Union novafot 10"
PVC Novafort 10"
Limpiador, lubricante, pegante
Hidro sello
UNIDAD
U
m
U
u
TRANSPORTE ( T )
VOL/PESO
CANTIDAD
0.40
0.40
1.00
0.01
SUBTOTAL
CANTIDAD
0.17
1.00
15.00
6.00
SUBTOTAL
DIST.(Km)
VALOR UNITARIO
6,000.00
8,500.00
1,499.10
100,000.00
PRECIO
98,456.00
72,000.00
98,842.00
9,500.00
M o TON/Km
PRECIO
VR PARCIAL
2,400.00
3,400.00
1,499.10
650.00
7,949.10
VR. UNITARIO
16,737.52
72,000.00
6,589.47
1,583.33
96,910.32
VR. UNITARIO
Transporte local
MANO DE OBRA(MO)
Oficial
2 Obreros
Topografo
1 ayudante
1 cadenero
200.20
SUBTOTAL
JORNAL
PRESTACION
45,000.00
31,500.00
60,000.00
42,000.00
60,000
50,000
30,000
22,500
30,000
22,500
SUBTOTAL
COSTO DIRECTO
J. TOTAL
76,500
102,000
110,000
52,500
52,500
200.20
RENDIM
VR. UNITARIO
10.00
7,650.00
10.00
10,200.00
200
550.00
200
293.70
200
293.70
18,987.4
124,047.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
UNIDAD
hora
hora
1
RENDIMIENTO
1.00
1.00
40.00
MATERIALES(M)
silla yee para tubera tipo Novafort
adhecibo novafort
tubera de 6" tipo Novafort
Lubricante novafort
Codo de 45
Hidrosello
acondicionador
Entibado
registro de concreto
Desperdicio
UNIDAD
und
und
ml
gm
UND
u
un
M
und
SUBTOTAL
CANTIDAD
1.00
0.50
6.00
0.20
1.00
1.00
65.00
8.00
1.00
VOL/PESO
Vje
SUBTOTAL
Tarifa
50,000.00
Cantidad
2.00
PRECIO
JORNAL
45,000.00
120,000.00
SUBTOTAL
PRESTACION
33,750.00
90,000.00
J. TOTAL
78,750.00
210,000.00
RENDIM
1.00
1.00
TRANSPORTE ( T )
Transporte local
MANO DE OBRA(MO)
Oficial 1
Ayudante 4
PRECIO
1,200.00
1,800.00
64,847.00
VR. UNITARIO
1,200.00
1,800.00
1,621.18
PRECIO
181,456.00
48,840.00
32,484.00
24,851.00
34,480.00
9,200.00
98,756.00
35,480.00
100,000.00
834,789.52
SUBTOTAL
COSTO DIRECTO
AIU(25%)
PRECIO UNITARIO TOTAL
UND: UND
4,621.18
VR. UNITARIO
181,456.00
24,420.00
194,904.00
4,970.20
34,480.00
9,200.00
1,519.32
283,840.00
100,000.00
41,739.48
876,529.00
VR. UNITARIO
25,000.00
25,000.00
VR. UNITARIO
78,750.00
210,000.00
288,750.0
1,194,900.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
UNIDAD
hora
hora
dia
RENDIMIENTO
0.07
0.06
8.00
PRECIO
1,200.00
1,800.00
145,000.00
UNIDAD
m3
SUBTOTAL
CANTIDAD
1.50
PRECIO
65,000.00
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
Tarifa
Cantidad
PRECIO
68,525.00
VR. UNITARIO
97,500.00
0.00
0.00
0.00
2,925.00
100,425.00
VR. UNITARIO
MANO DE OBRA(MO)
JORNAL
40,000.00
56,000.00
96,000.00
SUBTOTAL
PRESTACION
30,000.00
42,000.00
72,000.00
J. TOTAL
70,000.00
98,000.00
168,000.00
RENDIM
16.00
16.00
16.00
0.00
VR. UNITARIO
4,375.00
6,125.00
10,500.00
MATERIALES(M)
Roca
Desperdicio
Maestro
Oficial 2
Ayudante 6
UND: UND
VR. UNITARIO
18,000.00
32,400.00
18,125.00
97,500.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
21,000.0
189,950.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
MATERIALES(M)
TRANSPORTE ( T )
MANO DE OBRA(MO)
Cuadrilla
UNIDAD:
RENDIMIENTO
0.50
3.00
PRECIO
1,744.00
8,000.00
VR. UNITARIO
3,488.00
2,666.67
UNIDAD
SUBTOTAL
CANTIDAD
PRECIO
6,154.67
VR. UNITARIO
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
0.00
VR. UNITARIO
JORNAL
40,000.00
SUBTOTAL
PRESTACION
1.80
J. TOTAL
72,000.00
RENDIM
2.20
0.00
VR. UNITARIO
32,727.27
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
32,727.3
38,882.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
RENDIMIENTO
0.50
2.00
PRECIO
1,744.00
8,000.00
VR. UNITARIO
3,488.00
4,000.00
UNIDAD
SUBTOTAL
CANTIDAD
PRECIO
7,488.00
VR. UNITARIO
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
0.00
VR. UNITARIO
MANO DE OBRA(MO)
JORNAL
40,000.00
SUBTOTAL
PRESTACION
1.80
J. TOTAL
72,000.00
RENDIM
1.50
0.00
VR. UNITARIO
48,000.00
MATERIALES(M)
Cuadrilla
UNIDAD
dia
dia
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
48,000.0
55,488.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
MATERIALES(M)
Concreto de 3000 psi
accesorios para caida tuberia
UNIDAD
m3
Gl
UND: UND
RENDIMIENTO
0.05
0.05
PRECIO
1,200.00
1,800.00
VR. UNITARIO
24,000.00
36,000.00
SUBTOTAL
CANTIDAD
6.60
1.00
PRECIO
348,197.00
795,758.00
60,000.00
VR. UNITARIO
2,298,100.20
795,758.00
Desperdicio
3,093,858.20
TRANSPORTE ( T )
Transporte local
VOL/PESO
Vje
SUBTOTAL
Tarifa
50,000.00
Cantidad
0.20
PRECIO
MANO DE OBRA(MO)
Maestro
Oficial 2
Ayudante 6
JORNAL
50,000.00
90,000.00
180,000.00
SUBTOTAL
PRESTACION
37,500.00
67,500.00
135,000.00
J. TOTAL
87,500.00
157,500.00
315,000.00
RENDIM
1.50
1.50
1.50
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
92,905.75
3,186,763.95
VR. UNITARIO
250,000.00
250,000.00
VR. UNITARIO
58,333.33
105,000.00
210,000.00
373,333.3
3,870,097.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
MATERIALES(M)
TRANSPORTE ( T )
MANO DE OBRA(MO)
Cuadrilla
RENDIMIENTO
0.50
3.00
PRECIO
1,744.00
8,000.00
VR. UNITARIO
3,488.00
2,666.67
UNIDAD
SUBTOTAL
CANTIDAD
PRECIO
6,154.67
VR. UNITARIO
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
0.00
VR. UNITARIO
JORNAL
40,000.00
SUBTOTAL
PRESTACION
1.80
J. TOTAL
72,000.00
RENDIM
3.50
0.00
VR. UNITARIO
20,571.43
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
20,571.4
26,726.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
UNIDAD
RENDIMIENTO
1.00
1.00
14.00
SUBTOTAL
CANTIDAD
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
0.00
VR. UNITARIO
JORNAL
60,000.00
SUBTOTAL
PRESTACION
1.80
J. TOTAL
108,000.00
RENDIM
14.00
0.00
VR. UNITARIO
7,714.29
MANO DE OBRA(MO)
Cuadrilla
UNIDAD
dia
dia
da
UNDAD: M
PRECIO
1,299.70
8,000.00
140,000.00
VR. UNITARIO
1,299.70
8,000.00
10,000.00
19,299.70
VR. UNITARIO
PRECIO
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
7,714.3
27,014.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
MANO DE OBRA(MO)
1 Oficial
5 Ayudantes
UND:m
UNIDAD
und
und
und
Glb
RENDIMIENTO
1.00
5.00
2.50
PRECIO
8,000.50
6,000.00
2,000.00
1,500.00
UNIDAD
Kg
m
m
Lt
SUBTOTAL
CANTIDAD
280.00
0.70
0.90
200.00
PRECIO
550.00
45,000.00
50,000.00
150.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
JORNAL
30,000.00
100,000.00
SUBTOTAL
PRESTACION
22,500.00
75,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
J. TOTAL
52,500.00
175,000.00
PRECIO
VR. UNITARIO
8,000.50
1,200.00
800.00
1,500.00
11,500.50
VR. UNITARIO
154,000.00
31,500.00
45,000.00
30,000.00
13,025.00
273,525.00
VR. UNITARIO
RENDIM
8.00
8.00
0.00
VR. UNITARIO
6,562.50
21,875.00
28,437.5
313,463.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
UNIDAD
und
und
Cuerpo
Glb
dia
UNIDAD
m
Kg
ML
UNIDAD:
RENDIMIENTO
1.20
1.00
0.04
PRECIO
10,000.00
15,000.80
2,000.00
4.00
SUBTOTAL
CANTIDAD
1.00
10.00
15.00
50,000.00
PRECIO
348,197.00
5,000.00
2,500.00
VR. UNITARIO
8,333.33
15,000.80
50,000.00
2,500.00
12,500.00
88,334.13
VR. UNITARIO
348,197.00
50,000.00
37,500.00
Desperdicio (5%)
TRANSPORTE ( T )
MANO DE OBRA(MO)
1 Oficial
10 Ayudantes
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
21,784.85
457,481.85
VR. UNITARIO
JORNAL
45,000.00
200,000.00
SUBTOTAL
PRESTACION
33,750.00
150,000.00
J. TOTAL
78,750.00
350,000.00
RENDIM
2.80
2.80
0.00
VR. UNITARIO
28,125.00
125,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
153,125.0
698,941.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
UNIDAD
und
m2
Cuerpo
Glb
dia
RENDIM
1.45
32.00
0.03
PRECIO
10,000.00
15,000.00
350.00
PRECIO
348,197.00
5,000.00
68,452.00
VR. UNITARIO
6,896.55
480,000.00
11,666.67
3,500.90
12,549.43
514,613.55
VR. UNITARIO
348,197.00
100,000.00
13,690.40
43,923.00
UNIDAD
m
Kg
Kg
3.50
SUBTOTAL
CANTIDAD
1.00
20.00
0.20
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
23,094.37
484,981.77
VR. UNITARIO
JORNAL
28,000.00
160,000.00
SUBTOTAL
PRESTACION
21,000.00
120,000.00
J. TOTAL
49,000.00
280,000.00
RENDIM
1.20
1.20
0.00
VR. UNITARIO
40,833.33
233,333.33
Desperdicio (5%)
TRANSPORTE ( T )
MANO DE OBRA(MO)
1 Oficial
10 Ayudantes
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
274,166.7
1,273,762.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
MANO DE OBRA(MO)
1 Oficial
10 Ayudantes
UNIDAD
und
m2
Cuerpo
Glb
dia
RENDIM
0.80
10.50
0.01
PRECIO
10,000.00
15,000.00
350.00
43,923.00
UNIDAD
m
Kg
ml
Kg
3.50
SUBTOTAL
CANTIDAD
1.00
20.00
2.20
0.30
PRECIO
348,197.00
5,000.00
8,784.60
68,452.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
VR. UNITARIO
12,500.00
157,500.00
35,000.00
3,500.90
12,549.43
221,050.33
VR. UNITARIO
348,197.00
100,000.00
19,326.12
20,535.60
24,402.94
512,461.66
VR. UNITARIO
JORNAL
45,000.00
200,000.00
SUBTOTAL
PRESTACION
33,750.00
150,000.00
J. TOTAL
78,750.00
350,000.00
RENDIM
2.00
2.00
0.00
VR. UNITARIO
39,375.00
175,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
214,375.0
947,887.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
MANO DE OBRA(MO)
1 Oficial
10 Ayudantes
RENDIM
0.80
25.00
0.003
PRECIO
10,000.00
10,000.00
350.00
43,923.00
UNIDAD
m
Kg
Kg
5.00
SUBTOTAL
CANTIDAD
1.00
20.00
0.12
PRECIO
348,197.00
500.00
5,124.35
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
JORNAL
28,000.00
160,000.00
SUBTOTAL
PRESTACION
21,000.00
120,000.00
J. TOTAL
49,000.00
280,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
PRECIO
VR. UNITARIO
12,500.00
250,000.00
140,000.00
3,500.00
8,784.60
414,784.60
VR. UNITARIO
348,197.00
10,000.00
614.92
17,940.60
376,752.52
VR. UNITARIO
RENDIM
1.85
1.85
0.00
VR. UNITARIO
26,486.49
151,351.35
177,837.8
969,375.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM:Concreto 210Kg/cm para tapas prefabricadas para cmara de llegada
EQUIPOS(E)
Vibrador para Concreto
Puntales y Cerchas
Reglas y herramienta menor
MATERIALES(M)
Concreto
Angulos 2"x2"x1/4"
Platinas de 2"x1/4"
Plastocrete
Antisol
Desperdicio (5%)
TRANSPORTE ( T )
MANO DE OBRA(MO)
1 Oficial
2 Ayudantes
1 Oficial soldador
UNIDAD
und
und
Glb
RENDIM
0.80
0.003
PRECIO
200.00
350.00
UNIDAD
m
ml
ml
Kg
Kg
SUBTOTAL
CANTIDAD
1.00
19.00
18.50
20.00
0.12
PRECIO
348,197.00
7,564.52
4,880.33
5,000.00
8,000.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
JORNAL
30,000.00
60,000.00
30,000.00
SUBTOTAL
PRESTACION
22,500.00
45,000.00
22,500.00
J. TOTAL
52,500.00
105,000.00
52,500.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
250.00
140,000.00
3,500.10
PRECIO
143,750.10
VR. UNITARIO
348,197.00
143,725.82
90,286.17
100,000.00
960.00
34,158.45
716,807.36
VR. UNITARIO
RENDIM
1.00
1.00
0.17
0.00
VR. UNITARIO
52,500.00
105,000.00
308,823.53
466,323.5
1,326,881.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
MATERIALES(M)
Acero 60 KSI
UNIDAD
dia
dia
Glb
UND: Kg
RENDIM
100.00
100.000
UNIDAD
Kg
SUBTOTAL
CANTIDAD
1.00
PRECIO
1,500.00
15,000.00
VR. UNITARIO
15.00
150.00
100.00
PRECIO
2,800.00
265.00
VR. UNITARIO
2,800.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
560.00
3,360.00
VR. UNITARIO
JORNAL
30,000.00
60,000.00
SUBTOTAL
PRESTACION
22,500.00
45,000.00
J. TOTAL
52,500.00
105,000.00
RENDIM
100.00
100.00
0.00
VR. UNITARIO
525.00
1,050.00
Desperdicio (20%)
TRANSPORTE ( T )
MANO DE OBRA(MO)
1 Oficial
2 Ayudantes
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
1,575.0
5,200.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
UNIDAD
RENDIMIENTO
PRECIO
MATERIALES(M)
UNIDAD
SUBTOTAL
CANTIDAD
ml
1.00
37,890.00
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
JORNAL
30,000.00
20,000.00
SUBTOTAL
PRESTACION
24,000.00
16,000.00
MANO DE OBRA(MO)
oficial
ayudante
PRECIO
J. TOTAL
54,000.00
36,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
1,000.00
1,000.00
VR. UNITARIO
PRECIO
37,890.00
0.00
0.00
0.00
37,890.00
VR. UNITARIO
RENDIM
25.00
25.00
0.00
VR. UNITARIO
2,160.00
1,440.00
3,600.0
42,490.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM:Concreto 210Kg/cm para tapas prefabricadas para cmara de llegada
EQUIPOS(E)
Vibrador para Concreto
Puntales y Cerchas
Reglas y herramienta menor
MATERIALES(M)
Concreto
Angulos 2"x2"x1/4"
Platinas de 2"x1/4"
Plastocrete
Antisol
Desperdicio (5%)
TRANSPORTE ( T )
MANO DE OBRA(MO)
1 Oficial
2 Ayudantes
1 Oficial soldador
UNIDAD
und
und
Glb
RENDIM
0.80
4.000
PRECIO
200.00
7,000.00
UNIDAD
m
ml
ml
Kg
Kg
SUBTOTAL
CANTIDAD
0.50
6.00
10.00
10.00
1.00
PRECIO
348,197.00
7,564.52
4,880.33
5,000.00
8,000.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
JORNAL
30,000.00
60,000.00
30,000.00
SUBTOTAL
PRESTACION
22,500.00
45,000.00
22,500.00
J. TOTAL
52,500.00
105,000.00
52,500.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
250.00
1,750.00
3,500.70
PRECIO
5,500.70
VR. UNITARIO
174,098.50
45,387.10
48,803.33
50,000.00
8,000.00
16,314.45
342,083.31
VR. UNITARIO
RENDIM
3.00
3.00
3.00
0.00
VR. UNITARIO
17,500.00
35,000.00
17,500.00
70,000.0
417,584.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM:Suministro de arrancador estrella - tringulo para motobombas trifsicas a 440 vol, bobinas a 220 vol,
para 45 amp, Cat AC 3, 60 Hz, incluye: dos contactoresw tripolares a 45 amp con dos contactos auxiliares
N/A y 2 N/C, un contactor tripolar 38 amp
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Triangulo para motobomba
Bobina a 220 vol
Cat AC 3 60 Hz
Contador tripolares de 45 Am
Contacto auxiliares
Contacto tripolar
Desperdicio (5%)
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
UNIDAD
Glb
UNIDAD: UND
RENDIM
1.00
PRECIO
3,500.00
VR. UNITARIO
3,500.60
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
SUBTOTAL
CANTIDAD
1.00
1.00
1.00
2.00
2.00
1.00
PRECIO
3,587,541.00
1,200,486.00
450,687.00
358,475.00
487,541.00
854,671.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
3,500.60
VR. UNITARIO
3,587,541.00
1,200,486.00
450,687.00
716,950.00
975,082.00
854,671.00
389,270.85
8,174,167.78
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
45,000.00
0.00
J. TOTAL
61,250.00
105,000.00
0.00
RENDIM
0.12
0.12
0.00
VR. UNITARIO
510,416.67
875,000.00
JORNAL
35,000.00
60,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
1,385,416.7
9,563,085.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM:Acometida en cable de cobre de fuerza 4 x No. 6 THHN tipo encauchetado ducto PVC tipo pesado 1 1/2"
UNIDAD: ML
EQUIPOS(E)
UNIDAD
RENDIM
PRECIO
VR. UNITARIO
Herramientas menores
Glb
3,500.80
UNIDAD
ML
ML
SUBTOTAL
CANTIDAD
2.00
1.00
PRECIO
55,000.00
8,500.00
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
3,500.80
VR. UNITARIO
110,000.00
8,500.00
0.00
0.00
0.00
0.00
5,925.00
123,904.93
VR. UNITARIO
MANO DE OBRA(MO)
JORNAL
35,000.00
60,000.00
SUBTOTAL
PRESTACION
26,250.00
45,000.00
0.00
J. TOTAL
61,250.00
105,000.00
0.00
RENDIM
8.00
8.00
0.00
VR. UNITARIO
7,656.25
13,125.00
MATERIALES(M)
Cable de cobre de fuerza No. 6Thhn
Ducto PVC
Desperdicio (5%)
Electricista
2 Ayudantes
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
20,781.3
148,187.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM:Sistema de flotadores de mercurio para operacin automtica y proteccin de los motores
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Flotador de mercurio
UNIDAD
Glb
RENDIM
UNIDAD: UND
PRECIO
VR. UNITARIO
3,500.40
UNIDAD
ML
SUBTOTAL
CANTIDAD
1.00
PRECIO
102,368.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
3,500.40
VR. UNITARIO
102,368.00
0.00
0.00
0.00
0.00
0.00
5,118.40
106,966.33
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
45,000.00
0.00
J. TOTAL
61,250.00
105,000.00
0.00
RENDIM
8.00
8.00
0.00
VR. UNITARIO
7,656.25
13,125.00
Desperdicio (5%)
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
JORNAL
35,000.00
60,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
20,781.3
131,248.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEMBomba sumergible para aguas residuales, inatascable para slidos de tamao mximo de 4", con
acople y desacople automtico, dispositivo de suspensin, cable guia y cadena, incluye codo de pie. HDT:
6,0 m, Q=16,0 y 2,0 HP de potencia
UNIDAD: UND
EQUIPOS(E)
UNIDAD
RENDIM
PRECIO
VR. UNITARIO
Herramientas menores
Glb
3,500.80
MATERIALES(M)
Electrobomba sumergible
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
26,894,571.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
JORNAL
35,000.00
60,000.00
SUBTOTAL
PRESTACION
26,250.00
45,000.00
0.00
J. TOTAL
61,250.00
105,000.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
3,500.80
VR. UNITARIO
26,894,571.00
0.00
0.00
0.00
0.00
0.00
PRECIO
26,894,050.93
VR. UNITARIO
RENDIM
0.09
0.09
0.00
VR. UNITARIO
680,555.56
1,166,666.67
1,847,222.2
28,744,774.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Crucetas de madera 2.4 mts inmunizada certificada
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
cruceta de madera
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
124,824.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
124,303.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
45,000.00
0.00
J. TOTAL
61,250.00
105,000.00
0.00
RENDIM
8.00
8.00
0.00
VR. UNITARIO
7,656.25
13,125.00
UNIDAD
Glb
JORNAL
35,000.00
60,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
3,500.80
3,500.80
VR. UNITARIO
124,824.00
0.00
0.00
0.00
0.00
0.00
20,781.3
148,586.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Silleta para cruceta de madera
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Silleta para cruceta
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
6,482.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
5,961.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
45,000.00
0.00
J. TOTAL
61,250.00
105,000.00
0.00
RENDIM
50.00
50.00
0.00
VR. UNITARIO
1,225.00
2,100.00
UNIDAD
Glb
JORNAL
35,000.00
60,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
1,000.10
1,000.10
VR. UNITARIO
6,482.00
0.00
0.00
0.00
0.00
0.00
3,325.0
10,287.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Diagonal en V de 11/2"x3/16"x1.5m
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Diagonal en V de 1 " x 3/16" x
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
26,000.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
25,479.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
45,000.00
0.00
J. TOTAL
61,250.00
105,000.00
0.00
RENDIM
14.00
14.00
0.00
VR. UNITARIO
4,375.00
7,500.00
UNIDAD
Glb
JORNAL
35,000.00
60,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
1,000.10
1,000.10
VR. UNITARIO
26,000.00
0.00
0.00
0.00
0.00
0.00
11,875.0
38,355.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Perno de maquina 1/2*6
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Perno de Maquina
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
5,420.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
4,899.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
45,000.00
0.00
J. TOTAL
61,250.00
105,000.00
0.00
RENDIM
60.00
60.00
0.00
VR. UNITARIO
1,020.83
1,750.00
UNIDAD
Glb
JORNAL
35,000.00
60,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
500.20
500.20
VR. UNITARIO
5,420.00
0.00
0.00
0.00
0.00
0.00
2,770.8
8,171.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Arandela de presin de 1/2
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Arandela de presion de "
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
800.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
279.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
15,000.00
0.00
J. TOTAL
61,250.00
35,000.00
0.00
RENDIM
120.00
120.00
0.00
VR. UNITARIO
510.42
291.67
UNIDAD
Glb
JORNAL
35,000.00
20,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
200.00
200.00
VR. UNITARIO
800.00
0.00
0.00
0.00
0.00
0.00
802.1
1,282.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Arandela redonda de 1/2
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Arandela redonda de "
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
850.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
329.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
15,000.00
0.00
J. TOTAL
61,250.00
35,000.00
0.00
RENDIM
120.00
120.00
0.00
VR. UNITARIO
510.42
291.67
UNIDAD
Glb
JORNAL
35,000.00
20,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
168.00
168.00
VR. UNITARIO
850.00
0.00
0.00
0.00
0.00
0.00
802.1
1,300.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Perno de mquina 5/8"x8" con tuerca hexagonal
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Perno de Maquina 5/8" x 8"
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
5,451.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
4,930.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
15,000.00
0.00
J. TOTAL
61,250.00
35,000.00
0.00
RENDIM
40.00
40.00
0.00
VR. UNITARIO
1,531.25
875.00
UNIDAD
Glb
JORNAL
35,000.00
20,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
600.80
600.80
VR. UNITARIO
5,451.00
0.00
0.00
0.00
0.00
0.00
2,406.3
7,938.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Perno de mquina 5/8"x12" con tuerca hexagonal
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Perno de maquina de 5/8" x 12"
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
6,500.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
5,979.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
15,000.00
0.00
J. TOTAL
61,250.00
35,000.00
0.00
RENDIM
35.00
35.00
0.00
VR. UNITARIO
1,750.00
1,000.00
UNIDAD
Glb
JORNAL
35,000.00
20,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
800.10
800.10
VR. UNITARIO
6,500.00
0.00
0.00
0.00
0.00
0.00
2,750.0
9,530.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Arandela de presin de 5/8"
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Arande de presion de 5/8"
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
750.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
229.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
15,000.00
0.00
J. TOTAL
61,250.00
35,000.00
0.00
RENDIM
140.00
140.00
0.00
VR. UNITARIO
437.50
250.00
UNIDAD
Glb
JORNAL
35,000.00
20,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
100.60
100.60
VR. UNITARIO
750.00
0.00
0.00
0.00
0.00
0.00
687.5
1,018.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Arandela redonda de 5/8
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Arandela redonda de 5/8"
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
740.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
219.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
15,000.00
0.00
J. TOTAL
61,250.00
35,000.00
0.00
RENDIM
140.00
140.00
0.00
VR. UNITARIO
437.50
250.00
UNIDAD
Glb
JORNAL
35,000.00
20,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
100.60
100.60
VR. UNITARIO
740.00
0.00
0.00
0.00
0.00
0.00
687.5
1,008.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM:Tubo conduit galv. 1/2"x3mt
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Tubo conduit galv.1/2" x 3
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
15,248.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
14,727.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
15,000.00
0.00
J. TOTAL
61,250.00
35,000.00
0.00
RENDIM
15.00
15.00
0.00
VR. UNITARIO
4,083.33
2,333.33
UNIDAD
Glb
JORNAL
35,000.00
20,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
800.40
800.40
VR. UNITARIO
15,248.00
0.00
0.00
0.00
0.00
0.00
6,416.7
21,945.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM:Cinta de acero inoxidable de 3/8"
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Cinta de acero inoxidable de 3/8"
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
7,500.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
6,979.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
15,000.00
0.00
J. TOTAL
61,250.00
35,000.00
0.00
RENDIM
48.00
48.00
0.00
VR. UNITARIO
1,276.04
729.17
UNIDAD
Glb
JORNAL
35,000.00
20,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
500.90
500.90
VR. UNITARIO
7,500.00
0.00
0.00
0.00
0.00
0.00
2,005.2
9,486.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM:hebilla para cinta de acero inoxidable de 3/8"
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Hebilla para cinta
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
3,200.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
2,679.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
15,000.00
0.00
J. TOTAL
61,250.00
35,000.00
0.00
RENDIM
55.00
55.00
0.00
VR. UNITARIO
1,113.64
636.36
UNIDAD
Glb
JORNAL
35,000.00
20,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
400.10
400.10
VR. UNITARIO
3,200.00
0.00
0.00
0.00
0.00
0.00
1,750.0
4,830.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Varilla de tierra cobre de 2,4mx5/8" con conector
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Varilla a tierra
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
115,824.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
115,303.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
15,000.00
0.00
J. TOTAL
61,250.00
35,000.00
0.00
RENDIM
8.00
8.00
0.00
VR. UNITARIO
7,656.25
4,375.00
UNIDAD
Glb
JORNAL
35,000.00
20,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
500.80
500.80
VR. UNITARIO
115,824.00
0.00
0.00
0.00
0.00
0.00
12,031.3
127,836.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Cable de cobre desnudo No.2 AWG
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Cable cobre desnudo
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
14,802.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
14,281.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
15,000.00
0.00
J. TOTAL
61,250.00
35,000.00
0.00
RENDIM
10.00
10.00
0.00
VR. UNITARIO
6,125.00
3,500.00
UNIDAD
Glb
JORNAL
35,000.00
20,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
800.10
800.10
VR. UNITARIO
14,802.00
0.00
0.00
0.00
0.00
0.00
9,625.0
24,707.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Pararrayo tipo distribucin 12 KV
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Pararayo
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
280,458.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
279,937.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
15,000.00
0.00
J. TOTAL
61,250.00
35,000.00
0.00
RENDIM
4.00
4.00
0.00
VR. UNITARIO
15,312.50
8,750.00
UNIDAD
Glb
JORNAL
35,000.00
20,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
800.60
800.60
VR. UNITARIO
280,458.00
0.00
0.00
0.00
0.00
0.00
24,062.5
304,801.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Fusible tipo K-3A 13.8 Kv
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Fusible
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
4,600.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
4,079.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
15,000.00
0.00
J. TOTAL
61,250.00
35,000.00
0.00
RENDIM
34.00
34.00
0.00
VR. UNITARIO
1,801.47
1,029.41
UNIDAD
Glb
JORNAL
35,000.00
20,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
400.20
400.20
VR. UNITARIO
4,600.00
0.00
0.00
0.00
0.00
0.00
2,830.9
7,311.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Cortacircuito monopolar 15Kv 100 A
EQUIPOS(E)
Herramientas menores
UNIDAD
Glb
RENDIM
UNIDAD: UND
PRECIO
VR. UNITARIO
500.60
MATERIALES(M)
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
285,482.00
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
284,961.93
VR. UNITARIO
MANO DE OBRA(MO)
JORNAL
35,000.00
20,000.00
SUBTOTAL
PRESTACION
26,250.00
15,000.00
0.00
J. TOTAL
61,250.00
35,000.00
0.00
RENDIM
4.00
4.00
0.00
VR. UNITARIO
15,312.50
8,750.00
Cortacircuito
Electricista
2 Ayudantes
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
500.60
VR. UNITARIO
285,482.00
0.00
0.00
0.00
0.00
0.00
24,062.5
309,525.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Conector transversal
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Conector
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
48,846.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
48,325.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
15,000.00
0.00
J. TOTAL
61,250.00
35,000.00
0.00
RENDIM
10.00
10.00
0.00
VR. UNITARIO
6,125.00
3,500.00
UNIDAD
Glb
JORNAL
35,000.00
20,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
500.10
500.10
VR. UNITARIO
48,846.00
0.00
0.00
0.00
0.00
0.00
9,625.0
58,451.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Conectores Ampac
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Conectores
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
50,458.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
49,937.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
30,000.00
0.00
J. TOTAL
61,250.00
70,000.00
0.00
RENDIM
6.00
6.00
0.00
VR. UNITARIO
10,208.33
11,666.67
UNIDAD
Glb
JORNAL
35,000.00
40,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
500.10
500.10
VR. UNITARIO
50,458.00
0.00
0.00
0.00
0.00
0.00
21,875.0
72,313.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Estribos en cable de aluminio
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Varilla a tierra
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
48,246.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
47,725.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
15,000.00
0.00
J. TOTAL
61,250.00
35,000.00
0.00
RENDIM
4.00
4.00
0.00
VR. UNITARIO
15,312.50
8,750.00
UNIDAD
Glb
JORNAL
35,000.00
20,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
500.60
500.60
VR. UNITARIO
48,246.00
0.00
0.00
0.00
0.00
0.00
24,062.5
72,289.0
UND: ml
UNIDAD
dia
dia
und
RENDIMIENTO
200.00
1.00
1.00
MATERIALES(M)
TRANSPORTE ( T )
MANO DE OBRA(MO)
Cuadrilla 1ofic- 2 ayudantes
PRECIO
450,000.00
200.00
500.00
VR. UNITARIO
2,250.00
200.00
500.00
UNIDAD
SUBTOTAL
CANTIDAD
PRECIO
2,950.00
VR. UNITARIO
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
0.00
VR. UNITARIO
JORNAL
70,000.00
SUBTOTAL
PRESTACION
52,500.00
J. TOTAL
122,500.00
RENDIM
20.00
0.00
VR. UNITARIO
6,125.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
6,125.0
9,075.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Transformador Trifsico de 30 KVA relacin de transformacin 13.200/220-127 voltios conexin DY5
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
tranformador
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
8,648,648.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
8,648,127.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
15,000.00
0.00
J. TOTAL
61,250.00
35,000.00
0.00
RENDIM
0.08
0.08
0.00
VR. UNITARIO
765,625.00
437,500.00
UNIDAD
Glb
JORNAL
35,000.00
20,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
50,000.10
50,000.10
VR. UNITARIO
8,648,648.00
0.00
0.00
0.00
0.00
0.00
1,203,125.0
9,901,253.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Poste de concreto 12m 750 kg Homologado
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
poste de concreto
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
920,468.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
919,947.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
15,000.00
0.00
J. TOTAL
61,250.00
35,000.00
0.00
RENDIM
0.50
0.50
0.00
VR. UNITARIO
122,500.00
70,000.00
UNIDAD
Glb
JORNAL
35,000.00
20,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
50,000.10
50,000.10
VR. UNITARIO
920,468.00
0.00
0.00
0.00
0.00
0.00
192,500.0
1,162,448.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Un (1) Bloque de pruebas, Una (1) Caja para el medidor y el bloque de pruebas tipo interperie, Un (1)
Contador de energa 3x127/220V medida directa, Ductos galvanizados de 1" x 3mt, Accesorios para
conexin y cableado incluye: Coraza americana de 1", conectores para coraza americana, cable de control
etc.
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Bloque
Caja para medidor
Contador de energia 3 x 127/220
Tubo Galvanizado de 1"
Conectores para coraza
cable control
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
UNIDAD
Glb
RENDIM
UNIDAD: UND
PRECIO
VR. UNITARIO
50,000.60
UNIDAD
unidad
UNIDAD
UNIDAD
ML
UNIDAD
Ml
SUBTOTAL
CANTIDAD
1.00
1.00
1.00
6.00
1,248,756.00
20.00
PRECIO
920,468.00
80,354.00
453,852.00
15,000.00
1.00
68,451.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
4,161,929.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
15,000.00
0.00
J. TOTAL
61,250.00
35,000.00
0.00
RENDIM
0.09
0.09
0.00
VR. UNITARIO
680,555.56
388,888.89
JORNAL
35,000.00
20,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
50,000.60
VR. UNITARIO
920,468.00
80,354.00
453,852.00
90,000.00
1,248,756.00
1,369,020.00
1,069,444.4
5,281,375.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Construida con varillas cooperweld de 5/8x2.4 metros y cable de cobre desnudo No. 2/0 conexin mediante
soldadura cadwell
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Varilla cooperwell
Cable desnudo
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
UNIDAD
Glb
RENDIM
UNIDAD: UND
PRECIO
VR. UNITARIO
45,000.10
UNIDAD
unidad
ML
SUBTOTAL
CANTIDAD
3.00
8.00
PRECIO
168,000.00
1,400.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
514,679.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
15,000.00
0.00
J. TOTAL
61,250.00
35,000.00
0.00
RENDIM
0.50
0.50
0.00
VR. UNITARIO
122,500.00
70,000.00
JORNAL
35,000.00
20,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
45,000.10
VR. UNITARIO
504,000.00
11,200.00
0.00
0.00
0.00
0.00
192,500.0
752,180.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM:Acometida en cable de cobre THHN 3xNo.4+2xNo.4 en ducto galv. pesado de 1 1/2" (incluye adaptador,
UNIDAD: ML
EQUIPOS(E)
UNIDAD
RENDIM
PRECIO
VR. UNITARIO
Herramientas menores
Glb
4,000.80
MATERIALES(M)
Cable THHN 3 x No. 4+2xNo.4
Tubo galvanizado
Adaptador
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
UNIDAD
ML
ML
SUBTOTAL
CANTIDAD
2.00
6.00
PRECIO
15,000.00
21,000.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
155,479.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
15,000.00
0.00
J. TOTAL
61,250.00
35,000.00
0.00
RENDIM
8.00
8.00
0.00
VR. UNITARIO
7,656.25
4,375.00
JORNAL
35,000.00
20,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
4,000.80
VR. UNITARIO
30,000.00
126,000.00
0.00
0.00
0.00
0.00
12,031.3
171,512.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Acometida subterrnea en cable de cobre THHN 3xNo.4+2xNo.4 ducto PVC de 1 1/2"
UNIDAD: ML
EQUIPOS(E)
UNIDAD
RENDIM
PRECIO
Herramientas menores
Glb
MATERIALES(M)
Cable THHN 3 x No. 4+2xNo.4
Tubo galvanizado
Adaptador
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
VR. UNITARIO
40,000.10
UNIDAD
unidad
ML
SUBTOTAL
CANTIDAD
2.00
1.00
PRECIO
15,000.00
21,000.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
50,479.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
30,000.00
0.00
J. TOTAL
61,250.00
70,000.00
0.00
RENDIM
3.00
3.00
0.00
VR. UNITARIO
20,416.67
23,333.33
JORNAL
35,000.00
40,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
40,000.10
VR. UNITARIO
30,000.00
21,000.00
0.00
0.00
0.00
0.00
43,750.0
134,230.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM:Gabinete metlico en lmina calibre No. 16 tipo interperie incluye: (1) Voltimetro, (2) amperimetros, (1)
barraje de cobre con tres fases, neutro y tierra, (1) breaker totalizador de 3x100Amp, (2) Arrancadores
directos para bombas de 7,5 kw (10HP), (1) monitor de voltaje (6) luces piloto. (1) banco de condensadores
con contactor, breaker y pulsador.
UNIDAD: ML
EQUIPOS(E)
UNIDAD
RENDIM
PRECIO
VR. UNITARIO
Herramientas menores
Glb
50,000.70
MATERIALES(M)
Gabinete
Voltimetro
Amperimetro
Barraje
Totalizador
Arancadores
Monitor de voltaje
Luces piloto
Banco de condensadorae
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
UNIDAD
unidad
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
UNIDAD
SUBTOTAL
CANTIDAD
1.00
1.00
2.00
1.00
1.00
2.00
1.00
6.00
1.00
PRECIO
850,461.00
354,285.00
125,897.00
95,789.00
452,698.00
658,974.00
452,341.00
45,897.00
68,945.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
4,119,122.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
30,000.00
0.00
J. TOTAL
61,250.00
70,000.00
0.00
RENDIM
0.09
0.09
0.00
VR. UNITARIO
680,555.56
777,777.78
JORNAL
35,000.00
40,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
50,000.70
VR. UNITARIO
850,461.00
354,285.00
251,794.00
95,789.00
452,698.00
1,317,948.00
452,341.00
275,382.00
68,945.00
1,458,333.3
5,627,457.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Pago elaboracin de planos, estudios y derechos de instalacion y costos de medidores con sus
accesorios
UNIDAD: GL
EQUIPOS(E)
UNIDAD
RENDIM
PRECIO
VR. UNITARIO
Herramientas menores
Glb
MATERIALES(M)
Pago de estudio
TRANSPORTE ( T )
MANO DE OBRA(MO)
UNIDAD
GL
SUBTOTAL
CANTIDAD
1.00
PRECIO
3,800,000.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
JORNAL
SUBTOTAL
PRESTACION
0.00
0.00
0.00
J. TOTAL
0.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
0.00
VR. UNITARIO
3,800,000.00
0.00
0.00
0.00
0.00
0.00
PRECIO
3,800,000.00
VR. UNITARIO
RENDIM
3.00
3.00
0.00
VR. UNITARIO
0.00
0.00
0.0
3,800,000.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Pago de Inspectoria para la certificacin del RETIE
EQUIPOS(E)
Herramientas menores
UNIDAD
Glb
RENDIM
UNIDAD: ML
PRECIO
VR. UNITARIO
UNIDAD
Gl
SUBTOTAL
CANTIDAD
1.00
PRECIO
1,850,000.00
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
1,850,000.00
VR. UNITARIO
MANO DE OBRA(MO)
JORNAL
SUBTOTAL
PRESTACION
0.00
0.00
0.00
J. TOTAL
0.00
0.00
0.00
RENDIM
3.00
3.00
0.00
VR. UNITARIO
0.00
0.00
MATERIALES(M)
Pago certificacion
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
0.00
VR. UNITARIO
1,850,000.00
0.00
0.00
0.00
0.00
0.00
0.0
1,850,000.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Ampliacin concntrica de HF 4" x 8" brida x brida
EQUIPOS(E)
Herramientas menores
UNIDAD
Glb
RENDIM
UNIDAD: ML
PRECIO
VR. UNITARIO
MATERIALES(M)
Anpliacion concentrica HF 4 a 8"
UNIDAD
Gl
SUBTOTAL
CANTIDAD
1.00
PRECIO
925,648.00
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
925,648.00
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
30,000.00
0.00
J. TOTAL
61,250.00
70,000.00
0.00
RENDIM
2.00
2.00
0.00
VR. UNITARIO
30,625.00
35,000.00
MANO DE OBRA(MO)
Plomero
Ayudante
JORNAL
35,000.00
40,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
0.00
VR. UNITARIO
925,648.00
0.00
0.00
0.00
0.00
0.00
65,625.0
991,273.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Niple de HF 4" L=3 000 m brida x brida
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Niple HF
TRANSPORTE ( T )
MANO DE OBRA(MO)
Plomero
2 ayudante
UNIDAD
Glb
RENDIM
UNIDAD: ML
PRECIO
VR. UNITARIO
50,000.00
UNIDAD
Gl
SUBTOTAL
CANTIDAD
1.00
PRECIO
2,356,846.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
2,356,846.00
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
30,000.00
0.00
J. TOTAL
61,250.00
70,000.00
0.00
RENDIM
1.00
1.00
0.00
VR. UNITARIO
61,250.00
70,000.00
JORNAL
35,000.00
40,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
50,000.00
VR. UNITARIO
2,356,846.00
0.00
0.00
0.00
0.00
0.00
131,250.0
2,538,096.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Codo HF radio corto 4" brida x brida
EQUIPOS(E)
Herramientas menores
UNIDAD
Glb
RENDIM
UNIDAD: UND
PRECIO
VR. UNITARIO
50,000.00
MATERIALES(M)
UNIDAD
UNIDAD
SUBTOTAL
CANTIDAD
1.00
PRECIO
742,584.00
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
742,584.00
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
30,000.00
0.00
J. TOTAL
61,250.00
70,000.00
0.00
RENDIM
1.40
1.40
0.00
VR. UNITARIO
43,750.00
50,000.00
Codo Hf
MANO DE OBRA(MO)
Plomero
2 ayudante
JORNAL
35,000.00
40,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
50,000.00
VR. UNITARIO
742,584.00
0.00
0.00
0.00
0.00
0.00
93,750.0
886,334.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Vlvula de compuerta HF 4" brida x brida
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Valvula HF
TRANSPORTE ( T )
MANO DE OBRA(MO)
Plomero
2 ayudante
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
UNIDAD
SUBTOTAL
CANTIDAD
1.00
PRECIO
2,456,782.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
2,456,782.00
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
30,000.00
0.00
J. TOTAL
61,250.00
70,000.00
0.00
RENDIM
0.50
0.50
0.00
VR. UNITARIO
122,500.00
140,000.00
UNIDAD
Glb
JORNAL
35,000.00
40,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
50,000.00
50,000.00
VR. UNITARIO
2,456,782.00
0.00
0.00
0.00
0.00
0.00
262,500.0
2,769,282.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Vlvula de retencin HF 4" brida x brida
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Vlvula de retencin HF 4"
TRANSPORTE ( T )
MANO DE OBRA(MO)
Plomero
2 ayudante
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
UNIDAD
SUBTOTAL
CANTIDAD
1.00
PRECIO
2,986,137.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
2,986,137.00
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
30,000.00
0.00
J. TOTAL
61,250.00
70,000.00
0.00
RENDIM
1.00
1.00
0.00
VR. UNITARIO
61,250.00
70,000.00
UNIDAD
Glb
JORNAL
35,000.00
40,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
50,000.00
50,000.00
VR. UNITARIO
2,986,137.00
0.00
0.00
0.00
0.00
0.00
131,250.0
3,167,387.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Niple pasamuro HF 4" L=1240 mm brida por brida
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Niple HF
TRANSPORTE ( T )
MANO DE OBRA(MO)
Plomero
2 ayudante
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
Gl
SUBTOTAL
CANTIDAD
1.00
PRECIO
1,589,357.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
1,589,357.00
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
30,000.00
0.00
J. TOTAL
61,250.00
70,000.00
0.00
RENDIM
2.00
2.00
0.00
VR. UNITARIO
30,625.00
35,000.00
UNIDAD
Glb
JORNAL
35,000.00
40,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
50,000.00
50,000.00
VR. UNITARIO
1,589,357.00
0.00
0.00
0.00
0.00
0.00
65,625.0
1,704,982.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Niple HF 4" L=200 mm brida x extremo liso
EQUIPOS(E)
Herramientas menores
UNIDAD
Glb
RENDIM
UNIDAD: UND
PRECIO
VR. UNITARIO
5,000.50
MATERIALES(M)
UNIDAD
Gl
SUBTOTAL
CANTIDAD
1.00
PRECIO
635,487.00
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
635,487.00
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
30,000.00
0.00
J. TOTAL
61,250.00
70,000.00
0.00
RENDIM
4.00
4.00
0.00
VR. UNITARIO
15,312.50
17,500.00
Niple HF
MANO DE OBRA(MO)
Plomero
2 ayudante
JORNAL
35,000.00
40,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
5,000.50
VR. UNITARIO
635,487.00
0.00
0.00
0.00
0.00
0.00
32,812.5
673,300.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Linea de impulsin estacin N 3 en PVC 8" RDE 41
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Tubo presion
TRANSPORTE ( T )
MANO DE OBRA(MO)
Plomero
2 ayudante
UNIDAD
Glb
RENDIM
UNIDAD: ML
PRECIO
VR. UNITARIO
5,000.50
UNIDAD
ML
SUBTOTAL
CANTIDAD
1.00
PRECIO
158,654.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
158,654.00
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
30,000.00
0.00
J. TOTAL
61,250.00
70,000.00
0.00
RENDIM
4.00
4.00
0.00
VR. UNITARIO
15,312.50
17,500.00
JORNAL
35,000.00
40,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
5,000.50
VR. UNITARIO
158,654.00
0.00
0.00
0.00
0.00
0.00
32,812.5
196,467.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM:Codo radio largo PVC 8" 45
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Codo radio largo PVC
TRANSPORTE ( T )
MANO DE OBRA(MO)
Plomero
2 ayudante
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
UNIDAD
SUBTOTAL
CANTIDAD
1.00
PRECIO
684,864.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
684,864.00
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
30,000.00
0.00
J. TOTAL
61,250.00
70,000.00
0.00
RENDIM
2.00
2.00
0.00
VR. UNITARIO
30,625.00
35,000.00
UNIDAD
Glb
JORNAL
35,000.00
40,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
50,000.00
50,000.00
VR. UNITARIO
684,864.00
0.00
0.00
0.00
0.00
0.00
65,625.0
800,489.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Niple en AC 8" BxEL L=0.5
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Tubo presion
TRANSPORTE ( T )
MANO DE OBRA(MO)
Plomero
2 ayudante
UNIDAD
Glb
RENDIM
UNIDAD: ML
PRECIO
VR. UNITARIO
5,000.50
UNIDAD
ML
SUBTOTAL
CANTIDAD
1.00
PRECIO
1,100,865.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
1,100,865.00
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
30,000.00
0.00
J. TOTAL
61,250.00
70,000.00
0.00
RENDIM
4.00
4.00
0.00
VR. UNITARIO
15,312.50
17,500.00
JORNAL
35,000.00
40,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
5,000.50
VR. UNITARIO
1,100,865.00
0.00
0.00
0.00
0.00
0.00
32,812.5
1,138,678.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Niple en AC 8" BxB L=15
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Tubo presion
TRANSPORTE ( T )
MANO DE OBRA(MO)
Plomero
2 ayudante
UNIDAD
Glb
RENDIM
UNIDAD: ML
PRECIO
VR. UNITARIO
5,000.00
UNIDAD
ML
SUBTOTAL
CANTIDAD
1.00
PRECIO
14,354,841.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
14,354,841.00
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
30,000.00
0.00
J. TOTAL
61,250.00
70,000.00
0.00
RENDIM
1.00
1.00
0.00
VR. UNITARIO
61,250.00
70,000.00
JORNAL
35,000.00
40,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
5,000.00
VR. UNITARIO
14,354,841.00
0.00
0.00
0.00
0.00
0.00
131,250.0
14,491,091.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Codo en AC 8" BxB x45
EQUIPOS(E)
Herramientas menores
UNIDAD
Glb
RENDIM
UNIDAD: UND
PRECIO
VR. UNITARIO
5,000.50
MATERIALES(M)
UNIDAD
UNIDAD
SUBTOTAL
CANTIDAD
1.00
PRECIO
1,154,875.00
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
1,154,875.00
VR. UNITARIO
MANO DE OBRA(MO)
JORNAL
35,000.00
40,000.00
SUBTOTAL
PRESTACION
26,250.00
30,000.00
0.00
J. TOTAL
61,250.00
70,000.00
0.00
RENDIM
4.00
4.00
0.00
VR. UNITARIO
15,312.50
17,500.00
Codo AC
Plomero
2 ayudante
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
5,000.50
VR. UNITARIO
1,154,875.00
0.00
0.00
0.00
0.00
0.00
32,812.5
1,192,688.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Tee en AC 8"x8" BxB
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
TEE AC
TRANSPORTE ( T )
MANO DE OBRA(MO)
Plomero
2 ayudante
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
ML
SUBTOTAL
CANTIDAD
1.00
PRECIO
789,632.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
789,632.00
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
30,000.00
0.00
J. TOTAL
61,250.00
70,000.00
0.00
RENDIM
2.00
2.00
0.00
VR. UNITARIO
30,625.00
35,000.00
UNIDAD
Glb
JORNAL
35,000.00
40,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
5,000.00
5,000.00
VR. UNITARIO
789,632.00
0.00
0.00
0.00
0.00
0.00
65,625.0
860,257.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
MATERIALES(M)
TRANSPORTE ( T )
MANO DE OBRA(MO)
Cuadrilla
RENDIMIENTO
0.30
1.50
PRECIO
1,744.00
8,000.00
VR. UNITARIO
5,813.33
5,333.33
UNIDAD
SUBTOTAL
CANTIDAD
PRECIO
11,146.67
VR. UNITARIO
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
0.00
VR. UNITARIO
JORNAL
40,000.00
SUBTOTAL
PRESTACION
1.80
J. TOTAL
72,000.00
RENDIM
2.50
0.00
VR. UNITARIO
28,800.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
28,800.0
39,947.0
MATERIALES(M)
Bloque 0.15
Mortero de pega 1:4
Mortero de pega 1:4 (relleno)
TRANSPORTE ( T )
MANO DE OBRA(MO)
1 oficial
1 ayudante
UNIDAD
Glb
UND: ml
RENDIMIENTO
PRECIO
1,000.00
VR. UNITARIO
1,000.00
UNIDAD
und
m
m
SUBTOTAL
CANTIDAD
3.00
0.005
0.006
PRECIO
1,500.00
280,000.00
280,000.00
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
1,000.00
VR. UNITARIO
4,500.00
1,400.00
1,680.00
0.00
7,580.00
VR. UNITARIO
JORNAL
28,000.00
16,000.00
SUBTOTAL
PRESTACION
21,000.00
12,000.00
J. TOTAL
49,000.00
28,000.00
RENDIM
8.00
8.00
0.00
VR. UNITARIO
6,125.00
3,500.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
9,625.0
18,205.0
MATERIALES(M)
Concreto 210 Kg/cm
Varillas 1/2"
Acero 3/8"
Puntillas
TRANSPORTE ( T )
MANO DE OBRA(MO)
1 oficial
4 ayudante
UNIDAD
Glb
m
UND: ml
RENDIMIENTO
2.00
PRECIO
500.00
8,500.00
VR. UNITARIO
500.50
4,250.00
VOL/PESO
SUBTOTAL
CANTIDAD
0.08
4
1.8
0.10
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
4,750.50
VR. UNITARIO
27,159.37
20,168.00
9,075.60
200.00
56,602.97
VR. UNITARIO
JORNAL
35,000.00
80,000.00
SUBTOTAL
PRESTACION
26,250.00
60,000.00
J. TOTAL
61,250.00
140,000.00
RENDIM
18.00
18.00
0.00
VR. UNITARIO
3,402.78
7,777.78
UNIDAD
m
Kg
Kg
Lb
PRECIO
348,197.00
5,042.0
5,042.0
2,000.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
11,180.6
72,534.0
MATERIALES(M)
Bloque 0.15
Mortero de pega 1:4
TRANSPORTE ( T )
MANO DE OBRA(MO)
1 oficial
1 ayudante
UND: m
UNIDAD
Glb
RENDIMIENTO
PRECIO
1,000.00
VR. UNITARIO
1,000.00
PRECIO
1,600.00
280,000.00
1,000.00
VR. UNITARIO
20,800.00
7,000.00
UNIDAD
und
m
SUBTOTAL
CANTIDAD
13.00
0.025
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
0.00
27,800.00
VR. UNITARIO
JORNAL
28,000.00
16,000.00
SUBTOTAL
PRESTACION
21,000.00
12,000.00
J. TOTAL
49,000.00
28,000.00
RENDIM
8.00
8.00
0.00
VR. UNITARIO
6,125.00
3,500.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
9,625.0
38,425.0
MATERIALES(M)
Bloque 0.20
Mortero de pega 1:4
Mortero de pega 1:4(relleno)
TRANSPORTE ( T )
MANO DE OBRA(MO)
1 oficial
1 ayudante
UNIDAD
Glb
UND: m
RENDIMIENTO
PRECIO
1,000.00
VR. UNITARIO
1,000.00
UNIDAD
und
m
m
SUBTOTAL
CANTIDAD
13.00
0.030
0.025
PRECIO
2,100.00
280,000.00
280,000.00
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
1,000.00
VR. UNITARIO
27,300.00
8,400.00
7,000.00
0.00
42,700.00
VR. UNITARIO
JORNAL
28,000.00
16,000.00
SUBTOTAL
PRESTACION
21,000.00
12,000.00
J. TOTAL
49,000.00
28,000.00
RENDIM
5.00
5.00
0.00
VR. UNITARIO
9,800.00
5,600.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
15,400.0
59,100.0
MATERIALES(M)
Mortero 1:4
TRANSPORTE ( T )
MANO DE OBRA(MO)
1 oficial
1 ayudante
UNIDAD
Glb
RENDIMIENTO
PRECIO
1,000.00
VR. UNITARIO
1,000.00
1,000.00
VR. UNITARIO
7,000.00
UNIDAD
m
SUBTOTAL
CANTIDAD
0.025
PRECIO
280,000.00
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
7,000.00
VR. UNITARIO
JORNAL
35,000.00
20,000.00
SUBTOTAL
PRESTACION
26,250.00
15,000.00
J. TOTAL
61,250.00
35,000.00
RENDIM
10.00
10.00
0.00
VR. UNITARIO
6,125.00
3,500.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
9,625.0
17,625.0
MATERIALES(M)
Concreto 210 Kg/cm
Varillas 1/4"
Puntillas
TRANSPORTE ( T )
MANO DE OBRA(MO)
1 oficial
4 ayudante
UNIDAD
Glb
m
RENDIMIENTO
2.00
PRECIO
1,000.10
12,444.85
VR. UNITARIO
1,000.10
6,222.43
UNIDAD
m
Kg
Lb
SUBTOTAL
CANTIDAD
0.017
1.00
0.20
PRECIO
348,197.00
5,046.0
2,000.00
7,222.53
VR. UNITARIO
5,919.35
5,046.00
400.00
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
11,365.35
VR. UNITARIO
JORNAL
35,000.00
80,000.00
SUBTOTAL
PRESTACION
26,250.00
60,000.00
J. TOTAL
61,250.00
140,000.00
RENDIM
16.00
16.00
0.00
VR. UNITARIO
3,828.13
8,750.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
12,578.1
31,166.0
MATERIALES(M)
Concreto 210 Kg/cm
Varillas 1/2"
Acero 3/8"
Puntillas
TRANSPORTE ( T )
MANO DE OBRA(MO)
1 oficial
4 ayudante
UNIDAD
Glb
m
UND: ml
RENDIMIENTO
2.00
PRECIO
1,000.400
14,000.00
VR. UNITARIO
1,000.40
7,000.00
VOL/PESO
SUBTOTAL
CANTIDAD
0.03
2.00
3.00
0.20
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
8,000.40
VR. UNITARIO
10,445.91
10,092.00
15,138.00
400.00
36,075.91
VR. UNITARIO
JORNAL
35,000.00
80,000.00
SUBTOTAL
PRESTACION
26,250.00
60,000.00
J. TOTAL
61,250.00
140,000.00
RENDIM
15.00
15.00
0.00
VR. UNITARIO
4,083.33
9,333.33
UNIDAD
m
Kg
Kg
Lb
PRECIO
348,197.00
5,046.0
5,046.0
2,000.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
13,416.7
57,493.0
UND: m
UNIDAD
Glb
PRECIO
1,000.90
VR. UNITARIO
1,000.90
PRECIO
348,197.00
5,046.0
1,000.90
VR. UNITARIO
24,373.79
7,316.70
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
31,690.49
VR. UNITARIO
JORNAL
35,000.00
60,000.00
SUBTOTAL
PRESTACION
26,250.00
45,000.00
J. TOTAL
61,250.00
105,000.00
RENDIM
16.00
16.00
0.00
VR. UNITARIO
3,828.13
6,562.50
MATERIALES(M)
UNIDAD
Concreto 210 Kg/cm
m
Varillas 1/4" (reparticin cada 0.5m) Kg
TRANSPORTE ( T )
MANO DE OBRA(MO)
1 oficial
2 ayudantes
RENDIMIENTO
SUBTOTAL
CANTIDAD
0.07
1.45
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
10,390.6
43,082.0
UND: m
UNIDAD
Glb
RENDIMIENTO
PRECIO
1,000.40
VR. UNITARIO
1,000.40
PRECIO
28,000.00
280,000.0
3,500.0
1,000.40
VR. UNITARIO
30,800.00
5,600.00
700.00
UNIDAD
m
m
Kg
SUBTOTAL
CANTIDAD
1.10
0.02
0.20
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
37,100.00
VR. UNITARIO
MANO DE OBRA(MO)
JORNAL
35,000.00
60,000.00
SUBTOTAL
PRESTACION
26,250.00
45,000.00
J. TOTAL
61,250.00
105,000.00
RENDIM
12.70
12.70
0.00
VR. UNITARIO
4,822.83
8,267.72
MATERIALES(M)
Baldosa de granito
Mortero 1:4
Cemento blanco (incluye oxido zinc)
1 oficial
2 ayudantes
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
13,090.6
51,191.0
UNIDAD
Glb
RENDIMIENTO
PRECIO
1,000.80
VR. UNITARIO
1,000.80
PRECIO
25,000.00
510.0
1,800.0
1,000.80
VR. UNITARIO
27,500.00
1,275.00
360.00
UNIDAD
m
Kg
Kg
SUBTOTAL
CANTIDAD
1.10
2.50
0.20
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
29,135.00
VR. UNITARIO
MANO DE OBRA(MO)
JORNAL
35,000.00
60,000.00
SUBTOTAL
PRESTACION
26,250.00
45,000.00
J. TOTAL
61,250.00
105,000.00
RENDIM
12.00
12.00
0.00
VR. UNITARIO
5,104.17
8,750.00
MATERIALES(M)
Enchape 0.2x0.2
Cemento gris
Cemento blanco (incluye oxido zinc)
1 oficial
2 ayudantes
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
13,854.2
43,990.0
MATERIALES(M)
Lmina Termoacstica
Tornillo autoperforante
Igas gris (5 Kg)
TRANSPORTE ( T )
MANO DE OBRA(MO)
1 oficial
2 ayudantes
UNIDAD
Glb
RENDIMIENTO
PRECIO
2,000.70
VR. UNITARIO
2,000.70
PRECIO
120,000.00
8,000.0
5,218.1
2,000.70
VR. UNITARIO
60,000.00
2,000.00
1,461.05
UNIDAD
und
und
Kg
SUBTOTAL
CANTIDAD
0.50
0.25
0.28
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
63,461.05
VR. UNITARIO
JORNAL
35,000.00
60,000.00
SUBTOTAL
PRESTACION
26,250.00
45,000.00
J. TOTAL
61,250.00
105,000.00
RENDIM
8.00
8.00
0.00
VR. UNITARIO
7,656.25
13,125.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
20,781.3
86,243.0
UNIDAD
Glb
UNIDAD:
RENDIMIENTO
UND
PRECIO
5,000.50
VR. UNITARIO
5,000.50
UNIDAD
und
SUBTOTAL
CANTIDAD
1
PRECIO
700,000.0
5,000.50
VR. UNITARIO
700,000.00
m
und
0.04
12.00
280,000.0
4,000.0
11,200.00
48,000.00
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
759,200.00
VR. UNITARIO
MANO DE OBRA(MO)
JORNAL
35,000.00
2,000.00
SUBTOTAL
PRESTACION
26,250.00
1,500.00
J. TOTAL
61,250.00
3,500.00
RENDIM
0.80
0.80
0.00
VR. UNITARIO
76,562.50
4,375.00
MATERIALES(M)
Puerta venta PV-1 (1.4 x 2.05)
aluminio/vidrio(cerradura y bisagra)
Mortero de pega 1:4
Chazos y tornillos
1 oficial
1 ayudantes
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
80,937.5
845,138.0
UNIDAD
Glb
RENDIMIENTO
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
CANTIDAD
1
0.04
6.00
1.00
SUBTOTAL
DIST.(Km)
MANO DE OBRA(MO)
JORNAL
35,000.00
20,000.00
SUBTOTAL
PRESTACION
26,250.00
15,000.00
MATERIALES(M)
Puerta (0.90 x 2.2) madera
Mortero de pega 1:4
Chazos y tornillos
Cerradura y Bisagras
1 oficial
1 ayudantes
UNIDAD
und
m
und
und
PRECIO
5,000.00
VR. UNITARIO
5,000.00
M o TON/Km
PRECIO
5,000.00
VR. UNITARIO
450,000.00
11,200.00
2,400.00
50,000.00
513,600.00
VR. UNITARIO
J. TOTAL
61,250.00
35,000.00
RENDIM
0.50
0.50
0.00
VR. UNITARIO
122,500.00
70,000.00
PRECIO
450,000.0
280,000.0
400.0
50,000.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
192,500.0
711,100.0
UNIDAD
Glb
RENDIMIENTO
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
CANTIDAD
1
0.04
6.00
1.00
SUBTOTAL
DIST.(Km)
MANO DE OBRA(MO)
JORNAL
35,000.00
20,000.00
SUBTOTAL
PRESTACION
26,250.00
15,000.00
MATERIALES(M)
Puerta (0.75 x 2.2) madera
Mortero de pega 1:4
Chazos y tornillos
Cerradura y Bisagras
1 oficial
1 ayudantes
UNIDAD
und
m
und
und
PRECIO
5,000.00
VR. UNITARIO
5,000.00
M o TON/Km
PRECIO
5,000.00
VR. UNITARIO
250,000.00
1,120.00
2,400.00
50,000.00
303,520.00
VR. UNITARIO
J. TOTAL
61,250.00
35,000.00
RENDIM
0.50
0.50
0.00
VR. UNITARIO
122,500.00
70,000.00
PRECIO
250,000.0
28,000.0
400.0
50,000.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
192,500.0
501,020.0
UNIDAD
Glb
RENDIMIENTO
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
CANTIDAD
1
0.04
6.00
1.00
SUBTOTAL
DIST.(Km)
MANO DE OBRA(MO)
JORNAL
35,000.00
20,000.00
SUBTOTAL
PRESTACION
26,250.00
15,000.00
MATERIALES(M)
Puerta (1.10 x 2.2) madera
Mortero de pega 1:4
Chazos y tornillos
Cerradura y Bisagras
1 oficial
1 ayudantes
UNIDAD
und
m
und
und
PRECIO
5,000.00
VR. UNITARIO
5,000.00
M o TON/Km
PRECIO
5,000.00
VR. UNITARIO
350,000.00
1,120.00
2,400.00
50,000.00
403,520.00
VR. UNITARIO
J. TOTAL
61,250.00
35,000.00
RENDIM
0.50
0.50
0.00
VR. UNITARIO
122,500.00
70,000.00
PRECIO
350,000.0
28,000.0
400.0
50,000.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
192,500.0
601,020.0
MATERIALES(M)
Puerta corrediza metlica
(2.15 x 2.05)
Mortero de pega 1:4
Chazos y tornillos
TRANSPORTE ( T )
MANO DE OBRA(MO)
1 oficial
1 ayudantes
UNIDAD
Glb
RENDIMIENTO
PRECIO
5,000.00
VR. UNITARIO
5,000.00
UNIDAD
und
SUBTOTAL
CANTIDAD
1
PRECIO
750,000.0
5,000.00
VR. UNITARIO
750,000.00
m
und
0.06
12.00
280,000.0
400.0
16,800.00
4,800.00
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
771,600.00
VR. UNITARIO
JORNAL
35,000.00
20,000.00
SUBTOTAL
PRESTACION
26,250.00
15,000.00
J. TOTAL
61,250.00
35,000.00
RENDIM
0.40
0.40
0.00
VR. UNITARIO
153,125.00
87,500.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
240,625.0
1,017,225.0
MATERIALES(M)
Ventana V-2 (0.50 x 1.25)
aluminio/vidrio
Chazos y tornillos
TRANSPORTE ( T )
MANO DE OBRA(MO)
1 oficial
1 ayudante
UNIDAD
Glb
RENDIMIENTO
PRECIO
5,000.00
VR. UNITARIO
5,000.00
UNIDAD
und
SUBTOTAL
CANTIDAD
1
PRECIO
180,000.0
5,000.00
VR. UNITARIO
180,000.00
und
12.00
400.0
4,800.00
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
184,800.00
VR. UNITARIO
JORNAL
35,000.00
20,000.00
SUBTOTAL
PRESTACION
26,250.00
15,000.00
J. TOTAL
61,250.00
35,000.00
RENDIM
2.00
2.00
0.00
VR. UNITARIO
30,625.00
17,500.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
48,125.0
237,925.0
MATERIALES(M)
Ventana V-2 (1.40 x 1.25)
aluminio/vidrio
Chazos y tornillos
TRANSPORTE ( T )
MANO DE OBRA(MO)
1 oficial
1 ayudante
UNIDAD
Glb
RENDIMIENTO
PRECIO
5,000.60
VR. UNITARIO
5,000.60
UNIDAD
m
SUBTOTAL
CANTIDAD
1
PRECIO
300,000.0
5,000.60
VR. UNITARIO
300,000.00
und
12.00
219.6
2,635.38
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
302,635.38
VR. UNITARIO
JORNAL
35,000.00
20,000.00
SUBTOTAL
PRESTACION
26,250.00
15,000.00
J. TOTAL
61,250.00
35,000.00
RENDIM
1.00
1.00
0.00
VR. UNITARIO
61,250.00
35,000.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
96,250.0
403,886.0
MATERIALES(M)
Ventana V-4 (1.10 x 1.25)
aluminio/vidrio
Chazos y tornillos
TRANSPORTE ( T )
MANO DE OBRA(MO)
1 oficial
1 ayudante
UNIDAD
Glb
RENDIMIENTO
PRECIO
5,000.00
VR. UNITARIO
5,000.00
UNIDAD
m
SUBTOTAL
CANTIDAD
1
PRECIO
300,000.0
5,000.00
VR. UNITARIO
300,000.00
und
12.00
400.0
4,800.00
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
304,800.00
VR. UNITARIO
JORNAL
35,000.00
20,000.00
SUBTOTAL
PRESTACION
26,250.00
15,000.00
J. TOTAL
61,250.00
35,000.00
RENDIM
1.00
1.00
0.00
VR. UNITARIO
61,250.00
35,000.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
96,250.0
406,050.0
MATERIALES(M)
Ventana V-5 (2.50 x 1.25)
aluminio/vidrio
Chazos y tornillos
TRANSPORTE ( T )
MANO DE OBRA(MO)
1 oficial
1 ayudante
UNIDAD
Glb
RENDIMIENTO
PRECIO
5,000.00
VR. UNITARIO
5,000.00
UNIDAD
m
SUBTOTAL
CANTIDAD
1
PRECIO
550,000.0
5,000.00
VR. UNITARIO
550,000.00
und
12.00
400.0
4,800.00
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
554,800.00
VR. UNITARIO
JORNAL
35,000.00
20,000.00
SUBTOTAL
PRESTACION
26,250.00
15,000.00
J. TOTAL
61,250.00
35,000.00
RENDIM
1.00
1.00
0.00
VR. UNITARIO
61,250.00
35,000.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
96,250.0
656,050.0
MATERIALES(M)
Reja R-2 (2.40 x 1.20)
aluminio/vidrio
Chazos y tornillos
TRANSPORTE ( T )
MANO DE OBRA(MO)
1 oficial
1 ayudante
UNIDAD
Glb
RENDIMIENTO
PRECIO
5,000.00
VR. UNITARIO
5,000.00
UNIDAD
m
SUBTOTAL
CANTIDAD
1
PRECIO
964,854.0
5,000.00
VR. UNITARIO
964,854.00
und
12.00
400.0
4,800.00
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
969,654.00
VR. UNITARIO
JORNAL
35,000.00
16,000.00
SUBTOTAL
PRESTACION
26,250.00
12,000.00
J. TOTAL
61,250.00
28,000.00
RENDIM
1.00
1.00
0.00
VR. UNITARIO
61,250.00
28,000.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
89,250.0
1,063,904.0
UNIDAD
Glb
RENDIMIENTO
PRECIO
10,000.00
VR. UNITARIO
10,000.00
MATERIALES(M)
Instalacin sanitaria incluye puntos
hidraulicos 1/2", puntos sanitarios,
suministro de aparatos sanitarios
UNIDAD
SUBTOTAL
CANTIDAD
PRECIO
10,000.00
VR. UNITARIO
und
1.00
1,500,500.00
1,500,500.00
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
JORNAL
35,000.00
60,000.00
SUBTOTAL
PRESTACION
26,250.00
45,000.00
MANO DE OBRA(MO)
1 oficial
2 ayudante
J. TOTAL
61,250.00
105,000.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
PRECIO
1,500,500.00
VR. UNITARIO
RENDIM
0.40
0.40
0.00
VR. UNITARIO
153,125.00
262,500.00
415,625.0
1,926,125.0
MATERIALES(M)
Vinilo Tipo Coraza PINTUCO
Base 1100
TRANSPORTE ( T )
MANO DE OBRA(MO)
2 ayudantes
Pintor
UNIDAD
Glb
dia
PRECIO
500.50
20,000.00
VR. UNITARIO
500.50
200.00
UNIDAD
gal
gal
SUBTOTAL
CANTIDAD
0.08
0.04
PRECIO
65,000.00
30,000.0
700.50
VR. UNITARIO
5,200.00
1,200.00
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
JORNAL
40,000.00
35,000.00
RENDIMIENTO
100.000
SUBTOTAL
PRESTACION
J. TOTAL
30,000.00
70,000.00
26,250.00
61,250.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
PRECIO
6,400.00
VR. UNITARIO
RENDIM
60.00
60.00
0.00
VR. UNITARIO
1,166.67
1,020.83
2,187.5
9,288.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
MATERIALES(M)
TRANSPORTE ( T )
MANO DE OBRA(MO)
Cuadrilla
UNIDAD
dia
dia
UNIDAD:
RENDIMIENTO
0.50
3.00
PRECIO
1,744.00
8,000.00
VR. UNITARIO
3,488.00
2,666.67
UNIDAD
SUBTOTAL
CANTIDAD
PRECIO
6,154.67
VR. UNITARIO
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
PRECIO
0.00
VR. UNITARIO
JORNAL
40,000.00
SUBTOTAL
PRESTACION
1.80
J. TOTAL
72,000.00
RENDIM
3.00
0.00
VR. UNITARIO
24,000.00
0.00
0.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
24,000.0
30,155.0
MATERIALES(M)
Tuberia PVC = 12" RDE 21, incluye
sellos de caucho, codos,
Lubricante
union
TRANSPORTE ( T )
Transporte interno
MANO DE OBRA(MO)
1 oficial
4 ayudantes
UNIDAD:
ML
PRECIO
1,000.60
VR. UNITARIO
1,000.60
UNIDAD
SUBTOTAL
CANTIDAD
PRECIO
1,000.60
VR. UNITARIO
ml
und
und
1.00
0.01
0.17
268,451.00
79,000.00
650,481.00
268,451.00
877.78
110,581.77
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
JORNAL
35,000.00
80,000.00
SUBTOTAL
PRESTACION
26,250.00
60,000.00
UNIDAD
und
RENDIMIENTO
J. TOTAL
61,250.00
140,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
PRECIO
8,000.00
379,910.55
VR. UNITARIO
8,000.00
RENDIM
12.00
12.00
8,000.00
VR. UNITARIO
5,104.17
11,666.67
16,770.8
405,682.0
EQUIPOS(E)
Bombas prueba
Bomba gasolina
Herramientas menores
Equipo de Topografa
MATERIALES(M)
Tubera A al C de 12" para cruce de puentes
Codo A al C de 90 x 12", B x EL para PVC
Codo A al C de 90 x 12", Extremos bridados
Niple A al C de 12", L= 0.5 m.
TRANSPORTE ( T )
UNIDAD
hr
hr
UNIDAD
da
UNIDAD
CANTIDAD
0.40
0.40
1.00
0.01
SUBTOTAL
CANTIDAD
VALOR UNITARIO
6,500.00
15,000.00
50,000.00
80,000.00
PRECIO
m
un
un
un
1.00
0.35
0.35
0.35
870,458.0
701,584.00
754,845.00
785,469.00
VOL/PESO
SUBTOTAL
DIST.(Km)
M o TON/Km
Oficial
2 Obreros
Topografo
1 ayudante
1 cadenero
VR PARCIAL
2,600.00
6,000.00
50,000.00
520.00
59,120.00
VR. UNITARIO
870,458.0
245,554.40
264,195.75
274,914.15
PRECIO
Transporte local
MANO DE OBRA(MO)
UND: ml
1,655,122.3
VR. UNITARIO
5,000.00
JORNAL
35,000
40,000
60,000
20,000
25,000
SUBTOTAL
PRESTACION
24,500
28,000
50,000
15,000
18,750
SUBTOTAL
COSTO DIRECTO
J. TOTAL
59,500
68,000
110,000
35,000
43,750
RENDIM
2
2
150
150
150
5,000.00
VR. UNITARIO
29,750.00
34,000.00
733.33
264.53
322.87
65,070.7
1,784,313.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Cruceta metalica 2 m x 6,3 x 6,3 x0,5 cm
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
cruceta de metalica
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
158,458.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
157,937.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
45,000.00
0.00
J. TOTAL
61,250.00
105,000.00
0.00
RENDIM
5.00
5.00
0.00
VR. UNITARIO
12,250.00
21,000.00
UNIDAD
Glb
JORNAL
35,000.00
60,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
4,500.10
4,500.10
VR. UNITARIO
158,458.00
0.00
0.00
0.00
0.00
0.00
33,250.0
195,688.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Diagonal recta para cruceta metalica de 0,6m
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
Diagonal para cruceta
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
25,784.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
25,263.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
45,000.00
0.00
J. TOTAL
61,250.00
105,000.00
0.00
RENDIM
15.00
15.00
0.00
VR. UNITARIO
4,083.33
7,000.00
UNIDAD
Glb
JORNAL
35,000.00
60,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
PRECIO UNITARIO TOTAL
VR. UNITARIO
1,000.70
1,000.70
VR. UNITARIO
25,784.00
0.00
0.00
0.00
0.00
0.00
11,083.3
37,348.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Aislador tipo, pin 23 KV Clase 56-1
EQUIPOS(E)
Herramientas menores
UNIDAD
Glb
RENDIM
UNIDAD: UND
PRECIO
VR. UNITARIO
1,000.10
MATERIALES(M)
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
125,684.00
TRANSPORTE ( T )
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
125,163.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
45,000.00
0.00
J. TOTAL
61,250.00
105,000.00
0.00
RENDIM
10.00
15.00
0.00
VR. UNITARIO
6,125.00
7,000.00
Aislador
MANO DE OBRA(MO)
Electricista
2 Ayudantes
JORNAL
35,000.00
60,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
1,000.10
VR. UNITARIO
125,684.00
0.00
0.00
0.00
0.00
0.00
13,125.0
139,289.0
DEPARTAMENTO DE CORDOBA
MUNICIPIO DE SAN ANTERO
PROPONENTE:
FECHA:
ITEM: Espigo para cruceta metalica de 23KV 36000 PSI
EQUIPOS(E)
Herramientas menores
MATERIALES(M)
espigo para cruceta
TRANSPORTE ( T )
MANO DE OBRA(MO)
Electricista
2 Ayudantes
RENDIM
UNIDAD: UND
PRECIO
UNIDAD
unidad
SUBTOTAL
CANTIDAD
1.00
PRECIO
32,587.00
VOL/PESO
SUBTOTAL
DIST.(km)
m o ton/km
PRECIO
32,066.93
VR. UNITARIO
SUBTOTAL
PRESTACION
26,250.00
45,000.00
0.00
J. TOTAL
61,250.00
105,000.00
0.00
RENDIM
10.00
15.00
0.00
VR. UNITARIO
6,125.00
7,000.00
UNIDAD
Glb
JORNAL
35,000.00
60,000.00
SUBTOTAL
COSTO DIRECTO
AIU(30%)
VR. UNITARIO
1,000.10
1,000.10
VR. UNITARIO
32,587.00
0.00
0.00
0.00
0.00
0.00
13,125.0
46,192.0