NTPC LTD
Operation Services
Ref. No: NROS/UNCHAHAR/ORT-MINUTES/206 Sub: Minutes of 206th Meeting of UNCHAHAR Operation Review Team.
Enclosed please find herewith a copy of minutes of 206th ORT Meeting held at UNCHAHAR on 1 from 03:00 pm to 06:00 pm to review the performance of the station for the month of August'09 Next Meeting of ORT will be held tentatively on 10/10/2009 at 11:00 am. This is for your information and necessary action please.
DISTRIBUTION: Concerned Station: Through LAN Corporate centre / Regional HQ: Through NTPC Intranet/e mail Projects (Through intranet/e mail):
Head of station Singrauli / Korba / Ramagundam / Rihand / Vindhyachal / Dadri(Coal) / Dadri Talcher Thermal / Talcher Kaniha / Farakka / Kahalgaon/ Badarpur /Tanda / Simhadri / Anta/ Aur Jhanor Gandhar / Kayamkulam / Faridabad FORMAT NO: OS-Q-ISO-P-010/F1-R4
UTPP/NTPC)
rvices
Date:
8/11/2009
(ORT Co-ordinator)
GUIDELINES
CONTENTS
1.0 HIGHLIGHTS 1.1 RANKING OF STATIONS (PREVIOUS MONTH): 1.2 BEST ACHIEVED PARAMETERS 1.3 TRENDING OF BEST ACHIEVED PARAMETERS 2.1 VARIATION IN MOU TARGET WITH ACTION PLAN :
2.0 STATION PERFORMANCE 2.2 DETAILS OF PARAMETERS WITH RETRIEVAL PROGRAM 3.0 PERFORMANCE 3.1 OVERVIEW OF STATION PERFORMANCE (TREND)
3.1 OVERVIEW OF STATION PERFORMANCE DATA (MONTH WISE / CUMULATIVE): 3.2 UNIT WISE PERFORMANCE DATA (MONTH WISE / CUMULATIVE): 4.1 TRENDING OF DC GAP 4.2 ABT GAP ANALYSIS (FOR STATIONS UNDER ABT) 4.3 ACTION PLAN FOR ANY DEVIATION IN ABT GAP ANALYSIS: 4.4 DATA FOR TRENDING OF DC GAP 4.5 SCATTER DIAGRAM (AG/DC PLOT AGAINST FREQUENCY)-MONTH WISE 4.6 OPPORTUNITY MATRIX (FOR STATIONS UNDER ABT): 4.7 105% DC CAPABILITY 4.8 CONTRAINTS FOR ACHIEVING 105% DC AND ACTION PLAN 4.9 ABT COMPLIANCE (GENERAL): 4.10 No. of time blocks when the unit generated at 105% DC 5.1 TREND OF AVAILBILITY LOSS (STATION) FOR LAST 5 YEARS (%): 5.2 OVERVIEW OF AVAILBILITY LOSS BREAK UP(STATION)-UNIT WISE-FIN YEAR -CUMULATIVE (%): 5.3 OVERVIEW OF FORCED OUTAGE-% -UNIT WISE-FIN. YEAR- CUMULATIVE 5.4 SUMMARY OF AVAILBILITY LOSS BREAK UP(STATION)-MONTH WISE: 5.5 UNIT WISE AVAILBILITY LOSS BREAK UP: 5.6 DETAILS OF AVAILBILITY LOSS BREAK UP DUE TO EQUIPMENT(UNIT WISE & MONTH WISE): 6.1 TREND OF NUMER OF OUTAGES (STATION) FOR LAST 5 YEARS (No.): 6.2 ACTION PLAN TO ACHIEVE 'ZERO FORCED OUTAGE". 6.3 STATUS OF MATERIAL PROCUREMENT AS PER ACTION PLAN 6.4 DETAILS OF UNIT OUTAGES 6.5 EXCEPTIONS OF THE ACTION PLAN OF LAST FINANCIAL YEAR: 6.6 RESTORATION OF UNITS 6.7 START UP PARAMETERS 6.8 DETAILS OF MULTIPLE UNIT TRIPPING: 6.9 DETAILS OF MAJOR FAILURES: 6.10 FAILURE OF TRANSFORMERS: 7.1 TREND OF PARTIAL LOADING (%) FOR THE LAST 5 FIN. YEARS (STATION) 7.2 OVERVIEW OF PARTIAL LOADING--CUMULATIVE-CURRENT FIN. YEAR (%) 7.3 ACTION PLAN FOR REDUCING PARTIAL LOADING 7.4 SUMMARY OF PARTIAL LOADING (STATION) MONTHWISE,%: 7.5 SUMMARY OF EQUIPMENT PARTIAL LOADING UNITWISE-MONTHWISE (%)7.6 SUMMARY OF EXTERNAL PARTIAL LOADING UNITWISE-MONTHWISE (%)7.7 DETAILS OF PARTIAL LOADING DUE TO EQUIPMENT: 8.1 SPECIFIC OIL CONSUMPTION-UNIT-WISE-MONTH WISE (ml/Kwh): 8.2 MAJOR REASONS FOR OIL CONSUMPTION DURING THE MONTH: 8.3 AUXILIARY POWER CONSUMPTION-UNIT-WISE-MONTH WISE (%): 8.4 MAJOR CONTRIBUTORS FOR AUX. POWER CONSUMPTION: 8.5 STEPS TAKEN FOR ENERGY CONSERVATION: 8.6 STATUS OF ENERGY AUDIT 9.1 COAL RECEIPT / STOCK STATUS: 9.2 TREND OF GCV (KCAL/KG) 9.3 FUEL STOCK DETAILS 9.4 DM WATER CONSUMPTION / STOCK DETAILS 10.1 TREND OF BOILER TUBE LEAKAGE FOR THE LAST 5 FIN. YEARS 10.2 TUBE LEAKAGE WITHIN 3 MONTHS OF OVERHAUL-CURRENT FINANCIAL YEAR 10.3 OVERVIEW OF BOILER TUBE LEAKAGE-CUMULATIVE (CURRENT FY)-% 10.4 DETAILS OF BOILER TUBE LEAKAGES DURING THE FINANCIAL YEAR: 10.5 EXCEPTIONS OF THE ACTION PLAN OF LAST FINANCIAL YEAR: 10.6 DETAILS OF BOILER TUBE LEAKAGES-LOCATION WISE:
9.0 FUEL-WATER-
10.7 DETAILS OF BOILER TUBE LEAKAGES-CAUSE WISE: 10.8 METAL TEMPERATURE EXCURSION 10.9 ACTION PLAN FOR REDUCING METAL TEMP. EXCURSION: 10.10 AVERAGE MILL ROLL LIFE (In Hrs.) 11.1 TREND OF RATIO OF GROSS SALE OF ENERGY/FUEL COST 11.2 OVERVIEW OF EFFICIENCY GAP ANALYSIS -UNIT WISE 11.3 DETAILS OF TEST PARAMETERS : 11.4 EQUIPMENT TEST RESULTS 11.5 BOILER EFFICIENCY LOSS BASED ON TESTS (%) 11.6. TURBINE HEAT RATE DEVIATION BASED ON TEST -KCAL/KWH 11.7. UNIT HEAT RATE DEVIATIONS BASED ON TESTS (kcal/kWh): 11.8 HEAT RATE IMPROVEMENT ACTION PLAN & STATUS OF PROCUREMENT 11.9 HIGH ENERGY DRAIN VALVE PASSING 11.10. PRE & POST OVERHAUL PERFORMANCE 11.11 PG TEST STATUS 11.12 PG TEST STATUS FOR PENDING PACKAGES 12.1 SUMMARY OF ADVERSE PARAMETERS & ACTION PLAN 12.2 DETAILS OF CRITICAL PARAMETERS : 12.3 COMBUSTION RELATED PARAMETERS: 12.3.1 UNBURNT CARBON 12.3.2 MILL FINENESS 12.3.3 OXYGEN 12.3.4 BOILER FLUE GAS PRESSURE DROP (Month) 12.4 SOOT BLOWERS AVAILABILITY/OPERATION DETAILS : 12.5 GENERATOR HYDROGEN COOLING SYSTEM: 12.6 GENERATOR STATOR WATER SYSTEM: 12.7 ASH WATER RATIO (SAMPLE TAKEN AT PIPE DISCHARGE) 13.1 DEVIATION IN WATER CYCLE CHEMISTRY 13.2 ACTION PLAN FOR ANY DEVIATION IN STEAM-WATER CYCLE CHEMISTRY: 13.3 MOT / FRF OIL ANALYSIS 13.4 ACTION PLAN FOR ANY ABNORMALITY IN THE MOT / FRF OIL ANALYSIS: 13.5 CPU AVAILABILITY 13.6 ACTION PLAN FOR ANY DEVIATION IN WTP/ DM PLANT: 13.7 SWAS (STEAM WATER ANALYSIS SYSTEM): 13.8 CBD OPENING HOURS 13.9 CHEMICAL CONSUMPTION 13.10 NO. OF REGENERATION 13.11 DEW POINT OF INSTRUMENT AIR 13.12 CIRCULATING WATER PARAMETERS 13.13 STATUS OF CW CLORINATION/PT CLORINATION PLANT 14.1.1 OPI-PART-A 14.1.2 OPI-PART-B 14.2.1 KEY SPARES & CONTRACTS REQUIRED FOR OH 14.2.2 KEY SPARES & CONTRACTS REQUIRED FOR OH 14.3 ORT SUMMARY SHEET 14.4 MONTHLY EXCEPTION REPORT 14.5 DEVIATION IN PLANNED OUTAGE SCHEDULE & DURATION DURING THE YEAR (ACTUAL VS PLANNED): 14.6 OERVIEW OF OVERHAULING QUALITY 14.7 PLANNED OUTAGES-QUALITY OF OVERHAULS 14.8 OVERHAULING COST : 14.9 MAJOR (CAPITAL) SPARES CONSUMED (Recently completed Overhauls):: 14.10 PLANNED MAINTENANCE ROLLING PLAN FOR 8 YEARS: 14.11 DETAILS OF SCOPE OF WORK FOR FORTHCOMING OVERHAULS: 14.12 RUNNING HOURS OF THE UNIT SINCE LAST OVERHAUL & SNCE INCEPTION 15.1 ANURAKSHNAN SYSTEM: 15.2 EQUIPMENTS NOT AVAILABLE FOR MORE THAN 15 DAYS: 15.3 EQUIPMENTS WHERE REPEATED FAILURES OCCURRED (CURRENT FY): 15.4 MAJOR EQUIPMENTS HAVING HIGH VIBRATIONS: 15.5 WOC QUANTITATIVE ANALYSIS: 15.6 STATUS OF MOU PARAMETERS 15.7 REPAIR & MAINTENANCE COST 15.8 FINANCIAL RATIOS (MOU) 16.1 SAFETY: MAJOR DEVIATIONS (FOR THE FIN. YEAR): 16.2 STATUS OF SAFETY AUDIT ACTION PLAN: 16.3 DETAILS OF FIRE PROTECTION SYSTEM: 16.4 OBSERVATIONS ON THE CHECKING / INSPECTION OF SAFETY SYSTEMS: 16.5 TESTING OF TOOLS & TACKLES (FINANCIAL YEAR): 16.6 MANDATORY LICENSES: 16.7 STRUCTURE CHECKING:
11. EFFICIENCY
13.0 CHEMISTRY
20.0 CHP
21.0 MGR
21.3 ACCIDENT DERAILMENTS: (ANY OCCURRENCE WHICH AFFECTS SAFETY OF MGR SYSTEM,DELAY TRAINS,BREACH OF SAFET
22 .0 O&M ISSUES
22.2 CRITICAL ISSUES (OTHER THAN O&M ISSUES) 22.3 ISSUES TO BE TAKEN UP WITH CORPORATE CENTRE DEPARTMENTS 23.1 IDENTIFICATION OF R&M NEEDS:
A. EQUIPMENTS WHICH ARE CONSTRAINTS IN ACHIEVING THE TARGETED PERFORMANCE PARAMETERS B. EQUIPMENTS / SYSTEMS WHOSE PERFORMANCE IS BECOMING A CONSTRAINT IN MEETING STATUTORY / C. WEAK AREAS / SYSTEMS WHICH ARE LIKELY TO CAUSE PROBLEM BASED ON OPERATORS GUT FEELINGS: D. ITEMS / SYSTEMS WHICH ARE OBSOLETE / NEARING OBSOLESCENCE: 23.2 STATUS OF R&M WORKS OF STATION 23.3 DEPARTMENT WISE REPAIR & MAINTENANCE EXPENDITURE AND PROJECTED EXPENDITURE 24.1 TQM STATUS 24.2 INVENTORY STATUS 24 .3 SOFTWARE 24.4 NEW POINTS DISCUSSED DURING ORT MEETING 24.5 ANY ABNORMAL INCIDENT DURING THE MONTH 24.6 FEEDBACK TO SITE 25.1 START UP PARAMETERS 25.2 SHUT DOWN PARAMETERS
QUENCY)-MONTH WISE
ST 5 YEARS (%): ATION)-UNIT WISE-FIN YEAR -CUMULATIVE (%): IN. YEAR- CUMULATIVE ATION)-MONTH WISE:
ST 5 FIN. YEARS UL-CURRENT FINANCIAL YEAR ATIVE (CURRENT FY)-% THE FINANCIAL YEAR:
ATUS OF PROCUREMENT
ly completed Overhauls)::
ON OF SAFETY SYSTEMS:
KNOWLEDGE TEAM
BATTERY SYSTEM:
WHICH AFFECTS SAFETY OF MGR SYSTEM,DELAY TRAINS,BREACH OF SAFETY RULES OR LOSS TO NTPC IS ACCIDENT
NTRE DEPARTMENTS
EVING THE TARGETED PERFORMANCE PARAMETERS IS BECOMING A CONSTRAINT IN MEETING STATUTORY / CAUSE PROBLEM BASED ON OPERATORS GUT FEELINGS: NG OBSOLESCENCE:
Name / Shri
Y.V. Rao Vipan Kumar Amit Mukherjee Ram Kuber S.K. Srivastava A.K. Shrivastava D. Paul R.K. saxena K. Das RB Pandey T Ravindran GC Aggarwal Prasanna Kumar A.K. Sharma M.Z.A. Siddhiqui S.K. Chaturvedi B.S. Rao P. Srivastava Manish Aggarwal R.S. Juneja V.K. Karan P.M. Tripathi S. M. Chaubey N.K. Singh Mustak Ali Vikram Paul Nathi Ram S. Chakraborty
Designation
GM (U) AGM (O&M) AGM (Opn) AGM (Maint.) AGM (FM) DGM (Chem) DGM (EEMG) DGM (MTP) DGM (CHP) DGM (F&A) DGM (TMD) DGM (MTP) DGM (BMD) DGM (EMD) DGM (EMD) DGM (TS) DGM (Opn.) DGM (AMG) DGM (C&I) Sr. Supdt. (EEMG) Sr. Supdt. (MTP) Sr. Supdt. (AMG) Sr. Supdt. (AUC) Supdt. (EEMG) Dy.Supdt. ( EEMG) Finance Officer Engr. (EEMG) Engr. (EEMG)
B. REGIONAL HQ
S.No. 1 2 3 Name Sushil Sriwastava Pyush Kumar L.M. Shah Designation DGM (NR-OS) DGM (NR-OS) Sr. Engineer (NR-OS)
C. CORPORATE CENTRE
S.No. 1 Name Md. Riyaz Ahmad Designation DGM (OS-CC)