Sie sind auf Seite 1von 2

312BE01

Power Required to Drive the Pulley: P= (Fp*v)/6120= Q + S=

175.29

kW

Fp = Effective Tension of Elevator Belt: Weight of carrying materials to be loaded at the maximum in buckets in the loading: Q= Resistance received by bucket at the boot pulley: S= Qt= Carrying Quantity: Boot Pulley Diameter: D= Belt Speed: v= Back Calculations: Power Required to Drive the Pulley: Carrying Quantity:

10395.3 kg

10000 kg (2*Qt*D)/v 395.35 kg 255 tons/hr 80 cm 103.2 meter/min

P= Qt=

(((6120)*(P)/v)-Q)*(v/(2*D))

kW tons/hr

Actual Values: Fresh Feed Bucket Elevator Load (kW)

103.2

Das könnte Ihnen auch gefallen