STATUS - CONTROL ROOM OPERATOR CERTIFICATION - TRAINING PROGRAM - LAFARGE CIMENT HOGHIZ
Summary Induction 1 - Health & Safety - Environment 1- Cement manufacturing basics 2- LUCIE 3 - Introduction to plant Equipment 4- Laboratory functions & Quality 8.44 STATUS_CRO_TRAINING_PROGRAM_CRO_before_ final_ theoretical_test 9.72 8.64 9.62 8.98 8.42 Deadtime Barta Elena 100% Huntai Alexandrin Crutu Sofia a 100% 100% Ionescu Maria 100% Jondre Viorica 100% Grama
Lacramioara
100%
Foundations
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
93.1%
100.0%
97.5%
98.9%
99.4%
94.3%
2.0 SOPs review 3.0 Certification operator final report 4.0 Certification operator
CRO_Complete_path_training_programme21 09 06.xls
INDUCTION
TOTAL:
Environment LAFARGE and Plant environment policy and procedures Main environmental risks: Dust, gases, Noise, vibrations, Fuel caracteristic, ARM and ARF, soils and waters contamination local regulations compliance and plant commitments
CRO_Complete_path_training_programme21 09 06.xls
1 Programat de efectuat
Barta Elena
Efectuat instruire / data Inter Evaluare
Huntai Alexandrina
Crutu Sofia
Ionescu Maria
Inter Evaluare
Jondre Viorica
Efectuat instruire / data Inter Evaluare
FOUNDATIONS
Resp. instruire
Efectuat instruire / data Inter Evaluare Efectuat instruire / data Inter Evaluare Efectuat instruire / data
Class Training
OJT
25.5
8.44
25.5
9.72
25.5
8.64
25.5
9.62
25.5
8.98
25.5
8.42
26
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
100.0%
1 1 1 1 1 1 1 1 1 6.32 8.89 8.26 10.00 7.78
100.0%
1 1 1 1 1 1 1 1 1 9.47 10.00 10.00 10.00 10.00
100.0%
1 1 1 1 1 1 1 1 1 6.32 10.00 7.83 9.47 10.00
100.0%
1 1 1 1 1 1 1 1 1 9.47 10.00 10.00 10.00 10.00
100.0%
1 1 1 1 1 1 1 1 1 8.42 10.00 10.00 10.00 7.78
100.0%
1 1 1 1 1 1 1 1 1 8.42
Georgescu P.
1 1 1 1 1 1 1 1 1 1 1 1 9.41
1 1 1 1 1 1 1 1 1 1 1 1 8.82
1 1 1 1 1 1 1 1 1 1 1 1 8.24
1 1 1 1 1 1 1 1 1 1 1 1 8.24
1 1 1 1 1 1 1 1 1 1 1 1 7.65
1 1 1 1 1 1 1 1 1 1 1 1
CECIL lesson 33
1.14 Refractories
CECIL lesson 24: Refractories 2 - LUCIE Raw mill Solid fuel mill Cement mills Kilns 3 - Introduction to plant Equipment 2.1 Plant equipment Big Blasterer Rigole, transportoare cu banda, snec, transportoare cu racleti, Filtre cu saci Dozatoare cu banda, cantare, cantare cu rotor, debitmetre de Suflante, ventilatoare Elevatoare cu cupe Sistemul de distributie a aerului comprimat si compresoare 4 - Laboratory functions & Quality control 4.1 Introduction to Quality Develop Exploraid assignment for Quality Dpt. 4.2 Sampling Safety rules in the lab. 4.3 Laboratory functions Raw mix design concepts Quality Management Necesary analysis 4.4 Chemical Analysis Laboratory Equipment (Mills, Chemical analysis, X ray, Microscopy ) A, C, S, F, analysis, Free lime, Minor elements, volatiles 4.5 Physical tests Making test cubes compression - extension tests, 1, 2, 7, 28 days blaine, sieve, % passing, % retained Vicat
Demeter I.
1 1 1
0.25 0.25
Georgescu P.
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
Stefania M.
0.25 0.25 0.25 0.25 0.25 0.25 0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
CRO_Complete_path_training_programme21 09 06.xls
Responsible
Dead line
P. Georgescu
Apr-10
Cuptor
Pornire cuptor dupa o oprire de lunga durata; Operare cuptor in conditii stabile Rupere inel din cuptor; Procedura oprire cuptor scurta durata; Oprire incidentala alimentare faina; Oprire incidentala ID Fan; Oprire pfister faina Deblocare de ciclon Oprire incidentala suflanta aer axial arzator; Oprire incidentala suflanta pfister cocs si suflanta pfister pompa moler; Functionare cuptor cu Lucie
Responsabil
Termen
Status
100% 60% 85% 85% 85% 85% 85% 85% In lucru In lucru
Observatii
Cerut feedback Discutat cu operatorii Discutat cu operatorii Discutat cu operatorii Discutat cu operatorii Discutat cu operatorii Discutat cu operatorii Discutat cu operatorii
Responsabil
Termen
Status
0% 0% 0% 0% 0%
Observatii
Process parameter Kiln feed rate [t/h] NOx of kiln backend gas
Disturbance cause
Operator reactions
Notices