TIME SCHEDULE EARTH WORK RAW WATER BASIN

CODE DESCRIPTION
SITE PREPARATION WORKS Sub Bill No 1 - Mobilization & Demobilization Mobilization Demobilization RAW WATER BASIN Sub Bill No 2 - Earth Work Earth W orks Site grading & Clearing Excavation top soil; 300mm depth with transported to stockpile radius 0.5 to 1.0 km Excavation top soil; 300mm depth with transported to stockpile radius 1.0 to 1.5 km Excavation unused material transported to spoilbank area B,C radius 0.5 to 1.0 km Excavation unused material transported to spoilbank area D radius 1.0 to 1.5 km Excavation unused material transported to spoilbank area A,E radius 1.5 to 2.0 km

UNIT 1 2 3 4 5 6

WEEK 7 8 9 10 11

1.00 1.00

ls ls

a b c d e f

532,440.00 159,732.00 159,732.00 82,920.00 193,080.00 256,440.00

m2 m3 m3 m3 m3 m3