PROJECT

DUNG QUAT REFINERY (DQR) PROJECT

QUALITY CONTROL FORM

QCF

118

CLIENT

VIETNAM OIL AND GAS CORPORATION (PETROVIETNAM) 8474L

PROJ. NO

: :

STEEL STRUCTURE ERECTION


ITEM NO. DRAWING NO. UNIT / AREA

DATE

REV.

STATUS SUMMARY OF ITR ACCEPTABLE NOT ACCEPTABLE

REMARKS

FOUNDATION ACCEPTANCE ALL STRUCTURAL MEMBERS CORRECTLY INSTALLED STRUCTURE IS PLUM IN ALL DIRECTIONS

ALL WASHERS CORRECTLY MOUNTED

LENGTH OF BOLTS CORRECT

ALL BOLTS IN AND CORRECTLY TIGHTENED

GROUNTING

FIRE PROOFING

GROUNDING (EARTHING LUGS INSTALLED)

FLOORING CORRECTLY INSTALLED

SLIDING CORRECTLY INSTALLED

ROOFING CORRECTLY INSTALLED

RAILS ON RUNWAY CORRECTLY INSTALLED

HANDRAILS CORRECTLY INSTALLED

SAFETY CHAINS CORRECTLY INSTALLED

SUBCONTRACTOR

CONTRACTOR

CLIENT

Name

Name

Name

Signature

Signature

Signature

Date

Date

Date