Doc. Ref. No.

: DWA_C&S_AA_002 RECORD SHEET FOR INSPECTION AND APPROVAL (AFTER CONCRETING)

Project Title:

Proj. Ref. No.:

Location:

Structural Element/s:

Details of Additional Steel Provided if any: [Other than specified in Drg.] POST CONCRETING

Pour Start Date & Time: Concreting End Date & Time: No. of Cubes Taken: Average Slump:

Method of Pouring & Vibration Stability of Formwork after Pour Line, Level & finishing

Acceptable Acceptable Acceptable

To Improve To Improve To Improve

Arrangement for Curing / Ponding Others [Specify]

Acceptable Acceptable Acceptable

To Improve To Improve To Improve

Sch. date for formwork removal with supports Sch. date for form work removal entirely Line, Level & finishing of Concrete surface DESHUTTER Removal of Battens, Maskin tape etc. Action Required:Dry finish Wet finish Grouting Epoxy Treatment Remarks:
Acceptable Acceptable To Rectify To Rectify

Actual Date of Removal Actual Date of Removal


Accepta ble Acceptable To Rectify To Rectify

Rectifications done as specified:

Task End Date:

Inspection Decision Name Signature

Approved / Disapproved