DATA
Span Lx = 3600 mm,
Den.of concrete=
24 N/m
Thk. Of Slab= 250 mm
Depth,d = 197.5 mm
LOADING
Finishes=
Live load=
10
20
Fcu
Fy
Cover
Dia. bar
=
=
=
=
25
460
40
25
N/m
N/m
mm
mm^2
kN/m
kN/m
DEAD LOAD
SLAB
FINISHING ETC.
Gk =
DEAD LOAD FACTOR
IMPOSED LOAD FACTOR
F =
Rev.
Job Title:-
of
MOMENT(kNm)
SHEAR(kN)
M
K
la
z
As req.
No.of bar req.
Diameter Bar
No. of bar prov.
As prov.
Spacing bar
Steel ratio p %
Vc
V/bd
Shear Check
M/bd^2
fs tension
Mod.factor (tension)
L/d allowble
L/d actual
Deflection
Spacing bar
LIVE LOAD
6
10
kN/m
kN/m
20
kN/m
16
kN/m Qk=
20
kN/m
1.4
1.6
195.84
kN
Middle of
end span
& fist inter.
support
60.63
117.50
60.63
0.06
0.93
182.75
829
1.69
20
7
2199
125
0.88
0.72
0.59
O.K
1.55
108.38
1.80
46.84
18.23
Def.O.K
T20@125c/c
Middle of
int. span
& Inter. support
Simply
supported
44.42
97.92
44.42
0.05
0.95
186.94
594
1.21
20
7
2199
125
0.88
0.72
0.50
O.K
1.14
77.62
2.00
52.00
18.23
Def.O.K
T20@125c/c
88.13
97.92
88.13
0.09
0.89
175.14
1257
2.56
12
10
1131
200
0.45
0.58
0.50
O.K
2.26
319.63
0.97
19.30
18.23
Def.O.K
T12@200c/c