Weekly Plan from 16th Sept to 22nd Sept for SMJ I Pit
1 PC for
SL4-SL1LL
Seam
Thickness Tonnage
Name
SL1LL
SL1
SL2
SL3
SL4
SL5
SM1
4.89
2.69
1.87
2.64
1.03
1.95
2.91
Total
1 PC for
SM1 and SL5
4839
4252
2542
4317
1417
2574
1590
21531
Weekly Plan Calculation from 16th Sept'13 to 22nd Sept'13 for SMJ I
Pit
PC1250-02
TOTAL
Total shift
13
13
13
13
13
13
Work hour/shift
9.0
9.0
9.0
9.0
9.0
9.0
EX Pdty (bcm/hr)
550
550
550
550
550
550
59,538
59,538
59,538
59,538
59,538
2.8
2.8
2.8
3.0
3.0
2.9
HD 465
28
HD Pdty (bcm/hr)
86
86
86
80
80
84
49,880
49,880
59,856
55,680
55,680
270,976
49,880
49,880
59,530
55,680
55,680
270,650
Prod (bcm)
Distance (km)
Prod (bcm)
297,688
Target
20819
21,531
1656
Striping Ratio
12.57
Weekly Plan from 16th Sept to 22nd Sept for SMJ II Pit
EX-700
For SR2
PC1250-01
For SR4
th
nd
Sept'13 for
PC1250-01
EC700-01
Total shift
13
13
13
Work hour/shift
9.0
9.0
9.0
EX Pdty (bcm/hr)
550
500
526
59,538
54,125
2.4
2.4
2.4
HD 465
10
HD Pdty (bcm/hr)
90
90
90
52,200
52,200
104,400
52,200
52,200
104,400
Prod (bcm)
Distance (km)
Prod (bcm)
TOTAL
113,663
Target
OB (MBCM) Limited by No of fleets (2 Fleets)
Total Coal (Ton) per week
Striping Ratio
7,969
13.10