We intend to keep the existing market intact and infilling activities into different pockets of the market.

Also providing additional activities on the upper floor which will act as a catalyst. Demolishing the existing market and reconstructing would affect the peoples life

Location- Gaddi Godam, Nagpur Total Site Area= 5688.5sq m Maximum Floor Area Ratio:1.25 Maximum permissible height:7.5 m Set backs (existing): front- 2.5m, side-1.0m

GROUND FLOOR
PRIMARY ACTIVITIES
SECONDARY ACTIVITIES

MAIN MARKET

MORNING MARKET

WEEKLY MARKET

PARKING

FOOD STALLS

SELLING

LOADING UNLOADING

FRUITS

CLOTHES

HOME DCOR

FOOTWEAR

ART & CRAFT ARTICLES

EARTHENWARE

FIRST FLOOR

PRIMARY ACTIVITIES

SECONDARY ACTIVITIES

YOGA CENTER

EDUCATIONAL PROGRAM

NURSERY

NIGHT SCHOOL

COURSES ON HOUSE KEEPING,

GROUND FLOOR
SPACES
EXISTING SHOPS AND GODOWNS WEEKLY MARKET WASHROOMS PARKING (MOTORCYCLES) (BICYCLES) TOTAL AREA

AREAS (SQ.M.)
2580 5 2.5 1.44 0.84

NOS.

TOTAL AREA
2580

10-15 4 50 50

40-60 20 72 42 2774

FIRST FLOOR SPACES


MULTI PURPOSE CLASS ROOMS TEACHERS ROOM

AREA (SQ. M.)


100 4

NOS.
2 3

TOTAL AREA
200 12

LOBBY
NURSERY (BUILT UP) (OPEN) WASHROOMS TOTAL AREA

8
8 40-50 2.5

1
1 1 4

8
8 50 10 288

OTHER AREAS
SPACES
STAIRCASE LIFT CIRCULATION SPACE TOTAL AREA

AREA (SQ.M)
21 3 150

NOS.
2 1

TOTAL AREA (SQ.M)


42 3 150 195

classroom

teacher's room
existing shops nursery washroom lobby weekly market parking staircase lifts

3% 2% 1% classroom

19%

teacher's room staircase

7% 4%

64%

nursery
washroom lobby lift

existing shops and godowns washrooms staircase lift

EXISTING MARKET

PROPOSED MARKET

Existing first floor godown area

Location of dustbins Slaughter House

Ground floor area


Space for Weekly market Location of control assembly unit entrance

Proposed First Floor area At daytime

entrance

entrance

ALLOCATION OF SPACES

Space for Food stalls

Proposed First Floor Volume entrance

At night time

ALLOCATION OF SPACES

DAILY SCHEDULE (GROUND FLOOR):

DAILY SCHEDULE (FIRST FLOOR):

Yearly Scheduling:

Parking: Staircase: 1 per 50 occupants (1.5 m width) Sanitation W.C.- for females:1/25 persons - for males:1/15 persons Washbasins- 1/25 persons Cleaning area- 1 on each floor Provision for drinking water- 1/100 persons on each floor

Renewal of existing sources of water supply i.e. the tap and the handpump. Provision of water coolers, one on each floor. Water supply to washrooms will be provided accordingly.

SOURCES OF ELECTRICITY
Electricity will be supplied to all shops through feeder pillar provided at the place of existing electric pole. All the electric lines will be underground.

Provision of one common dustbin for every 4-5 temporary shops of weekly market. 1 dustbin each at four corners.

DRAINAGE AND SANITATION


Underground drainage along both sides of pathway. Pathway sloping towards the drainage on both sides.