0.113889 m3/sec
KW = Q x H
3.672 X n
Where,
Where,
Q = Flow in m3/hr
H = Head in MWC
n = %Efficiency
Q=
H=
n=
KW =
HP = W x Q x H
0.75 x n
273 m3/hr
88 MWC
70
93.46
112.152
W=
Q=
H=
n=
Q = 0.113889 m3/sec
H=
60 MWC
n=
70
HP =
130.16
Inch
Outside
Nomina Diameter
l Size
mm
1/8"
1/4"
3/8"
1/2"
3/4"
1"
1.1/4"
1.1/2"
2"
2.1/2"
3"
3.1/2"
4"
5"
6"
8"
10"
12"
14"
16"
18"
20"
22"
24"
26"
28"
30"
32"
34"
36"
38"
40"
42"
44"
46"
48"
52"
56"
60"
64"
68"
72"
76"
80"
10.3
13.7
17.1
21.3
26.7
33.4
42.2
48.3
60.3
73
88.9
101.6
114.3
141.3
168.3
219.1
273
323.8
355.6
406.4
457
508
559
610
660
711
762
813
864
914
965
1016
1067
1118
1168
1219
1321
1422
1524
1626
1727
1829
1930
2032
TABLE 2
DIMENSIONS AND WEIGHTS OF WELDED AND SEAMLESS WROUGHT STEEL PIPE
Wall Thickness mm
Schedule No.
Standard Extra-strong
Double Extra-strong
Schedule No.
Schedule No.
10
20
30
40
60
80
100
120
140
160
STD
XS
XXS
5S
10S
40S
80S
10
20
30
40
60
80
100
120
140
160
------------------6.35
6.35
6.35
6.35
6.35
6.35
7.92
7.92
7.92
7.92
7.92
7.92
---------------
---------------6.35
6.35
6.35
7.92
7.92
7.92
9.53
9.53
9.53
12.7
12.7
12.7
12.7
12.7
12.7
---------------
---------------7.04
7.8
8.38
9.53
9.53
11.13
12.7
12.7
14.27
-15.8
15.8
15.8
15.8
15.8
---------------
1.73
2.24
2.31
2.77
2.87
3.38
3.56
3.68
3.91
5.16
5.49
5.74
6.02
6.55
7.11
8.18
9.27
10.31
11.13
12.7
14.27
15.09
-17.48
---17.48
17.48
19.05
---------------
---------------10.31
12.7
14.27
15.09
16.66
19.05
20.62
22.23
24.61
---------------------
2.41
3.02
3.2
3.73
3.91
4.55
4.85
5.08
5.54
7.01
7.62
8.08
8.56
9.53
10.97
12.7
15.09
17.48
19.05
21.44
23.83
26.19
28.58
30.96
---------------------
---------------15.09
18.26
21.44
23.83
26.19
29.36
32.54
34.93
38.89
---------------------
------------11.13
12.7
14.27
18.26
21.44
25.4
27.79
30.96
34.93
38.1
41.28
46.02
---------------------
---------------20.62
25.4
28.58
31.75
36.53
39.67
44.45
47.63
52.37
---------------------
---4.78
5.56
6.35
6.35
7.14
8.74
9.53
11.13
-13.49
15.88
18.26
23.01
28.58
33.32
35.71
40.49
45.24
50.01
53.98
59.54
---------------------
1.73
2.24
2.31
2.77
2.87
3.38
3.56
3.68
3.91
5.16
5.49
5.74
6.02
6.55
7.11
8.18
9.27
9.53
9.53
9.53
9.53
9.53
9.53
9.53
9.53
9.53
9.53
9.53
9.53
9.53
9.53
9.53
9.53
9.53
9.53
9.53
---------
2.41
3.02
3.2
3.73
3.91
4.55
4.85
5.08
5.54
7.01
7.62
8.08
8.56
9.53
10.97
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
---------
---7.47
7.82
9.09
9.7
10.15
11.07
14.02
15.24
-17.12
19.05
21.95
22.23
25.4
25.4
---------------------------
---1.65
1.65
1.65
1.65
1.65
1.65
2.11
2.11
2.11
2.11
2.77
2.77
2.77
3.4
3.96
3.96
4.19
4.19
4.78
4.78
5.54
--6.35
------------------
1.24
1.65
1.65
2.11
2.11
2.77
2.77
2.77
2.77
3.05
3.05
3.05
3.05
3.4
3.4
3.76
4.19
4.57
4.78
4.78
4.78
5.54
5.54
6.35
--7.92
------------------
1.73
2.24
2.31
2.77
2.87
3.38
3.56
3.68
3.91
5.16
5.49
5.74
6.02
6.55
7.11
8.18
9.27
9.53
---------------------------
2.41
3.02
3.2
3.73
3.91
4.55
4.85
5.08
5.54
7.01
7.62
8.08
8.56
9.53
10.97
12.7
12.7
12.7
---------------------------
------------------342.9
393.7
444.3
495.3
546.3
597.3
644.16
695.16
746.16
797.16
848.16
898.16
---------------
---------------206.4
260.3
311.1
339.76
390.56
441.16
488.14
539.94
590.94
634.6
685.6
736.6
787.6
838.6
888.6
---------------
---------------205.02
257.4
307.04
336.54
387.34
434.74
482.6
533.6
581.46
-679.24
730.24
781.24
832.24
882.24
---------------
6.84
9.22
12.48
15.76
20.96
26.64
35.08
40.94
52.48
62.68
77.92
90.12
102.26
128.2
154.08
202.74
254.46
303.18
333.34
381
428.46
477.82
-575.04
---778.04
829.04
875.9
---------------
---------------198.48
247.6
295.26
325.42
373.08
418.9
466.76
514.54
560.78
---------------------
5.48
7.66
10.7
13.84
18.88
24.3
32.5
38.14
49.22
58.98
73.66
85.44
97.18
122.24
146.36
193.7
242.82
288.84
317.5
363.52
409.34
455.62
501.84
548.08
---------------------
---------------188.92
236.48
280.92
307.94
354.02
398.28
442.92
489.14
532.22
---------------------
------------92.04
115.9
139.76
182.58
230.12
273
300.02
344.48
387.14
431.8
476.44
517.96
---------------------
---------------177.86
222.2
266.64
292.1
333.34
377.66
419.1
463.74
505.26
---------------------
---11.74
15.58
20.7
29.5
34.02
42.82
53.94
66.64
-87.32
109.54
131.78
173.08
215.84
257.16
284.18
325.42
366.52
407.98
451.04
490.92
---------------------
Standard
Schedule No.
Extra-strong
Double
STD
XSExtraXXS 5S 10S 40S 80S
---------------------
---------------
---------------
---------------------
---------------------
1 inch
1 Sq.m
1 lpm
1 lps
1 F
1 IGPM
1
2
3
4
5
6
7
1 USGPM =
8
1 psi
9
0.305
1
25.4
1
10.75
1
0.06
1
3.6
1
-17.22
1
0.273
1
0.227
1
0.07
1
UNIT
m
`
mm
Sq.ft
UNIT
3.279 ft
0.09 Sq.m
inch
m3/hr =
16.67 lpm
m3/hr =
0.278 lps
34 F
m3/hr =
3.663 IGPM
m3/hr =
4.405 USGPM
kg/cm2 =
14.22 psi
CATEGORY
I
II
III
IV
Storage area =
Note: If aisle width between storage racks is less than 2.5m or the maximum storage
area is more than 150m2, the applicable design density shall be loaded by 2.5 lpm/m2
12.5
plus
500 Sprinklers
1000 Sprinklers
1000 Sprinklers
DESIGN
DENSITY
LPM/M2 AMAO M2
12.50
260
15.00
260
17.50
300
22.50
300
12.5
---
---
2.5
2.5
s exceeding 3.7m but within 7.4m in width, one row of sprinklers shall
ed on each wall at the above spacing and if the length of the room
2m,the sprinkelrs in the opposite walls shall be staggered.
ms exceeding 3.7m but within 7.4m in width, one row of sprinklers shall
d on each wall at the above spacing and the sprinklers in the opposite
be staggered.If the width exceeds 7.4m, it is necessary to sprinkler the
rtion by conventional sprinklers and the distance between the above
dewall sprinklers shall not be les than 3.7m
FLOW
STATIC
LOSS
C=100
TOTAL
LOSS
C=120
TOTAL
LOSS
900
800
700
650
600
550
500
450
400
350
300
250
200
150
100
80
65
50
40
32
25
P=
Q=
C=
D=
1
P=
Q=
C=
D=
1.83E-08
3.51E-08
7.46E-08
0.000000152
0.00000044
0.0000019
0.0000134
0.0000492
0.00011
0.000402
0.00132
0.00286
0.0118
AS PER TAC
HAZEN WILLIAMS FORMULA
REQD.PRESSURE
P=6.05 X Q1.85 X 103
AT REMOTE POINT
C1.85 X D4.87
Loss of pressure per unit length of pipe (mbar/m)
ADD.LOSSES
Flow rate of water through pipe length (lpm)
Constant for the type of pipe
MINIMUM AVAILABLE PRESSURE
Mean bore of pipe (mm)
AS PER NFPA15
AT PUMP SHALL BE
HAZEN WILLIAMS FORMULA
P=6.05 X Q1.85 X 105
C1.85 X D4.87
Loss of pressure per unit length of pipe (mbar/m)
Flow rate of water through pipe length (lpm)
Constant for the type of pipe
Actual internal diameter of pipe (mm)
2
2 P=V
200
M/SEC
BARS
C-100
C-120
MBAR
MBAR
MBAR
COMMONLY USED
PIPE
C
UNLINED CAST OR DUCTILE IRON
GALVANIZED STEEL PIPE
PLASTIC (LISTED) UNDERGROUND
CEMENT LINED CAST OR DUCTILE IRON
COPPER TUBE OR STAINLESS STEEL
100
120
130
140
150
PRESSURE
INPUTS FOR DESIGN
p = Design pressure in kgf / cm2
D1 = Inside diameter of the shell in mm
J = Weld ,joint efficiency factor
S = Allowable stress value in kgf / mm2
L = length of shell ( WL to WL )
VESSEL
150.00
600.00
1.00
20000.00
3600.00
CALCULATION
#REF!
volumetric calculations
Tank Volume
=
V
=
Vi
=
Length =
volumetric calculations
Tank Volume
0.360252
1) DESIGN PARAMETERS
: 10.0 m 3 ( minimum )
IS 2825
Design temperature
400C
Design pressure
10.0 kg/cm2
Corrosion allowance
2mm
Thinning Allowance
Joint efficiency
A)
0.5 mm
:
0.70
PR
SE - 0.6P
0.093465
t =
0.09
SAY t
2.37
Corrossion allowance
( mm )
3.00
5.37
Provided thickness
A)
( mm ) :
72.00
PD
2SE - 0.2P
2.555304
t =
2.56
SAY t
64.90
Corrossion allowance
( mm )
3.00
67.90
Provided thickness
B)
( mm ) :
72.00
Inside dia Di
Crown radius Ri
Design pressure
Allowable stress f
to be calculated
Ri + t
ro =
ri + t
Do =
Di + 2t
ho
2) hE =
Do2
4 Ro
3) hE =
Doro
2
ho is given by
ho =
Ro -
ho =
239.13063
1) hE = ho =
2) hE =
3) hE =
239.13063
Do2 / 4 Ro
=
311.27031
Do r o
2
158.38561
Minimum value of hE
from 1 , 2 and 3
above
Now hE / Do =
(Ro - Do/2) x ( Ro + D0 /2 -2 ro )
Also t / Do
0.020649
0.8125
pDoC / 200 fJ
0.001515 mm
Corrossion allowance
( mm )
1.50
thinning
( mm )
1.00
allowance
( mm ) :
2.50
8.00
EL
CALCULATION
e shell in mm
11.00
300.00
1.00
100.00
600.00
1.00
ue in kgf / mm 2
20000.00 20000.00
4480.00 3600.00
he shell in mm
ue in kgf / mm 2
650.00
355.20
60.00
11.00
20000.00
1.00
19182
14.00
369.20
74.00
678.00
Tanks Dia
Area
m
12
m2
113.1
1228
m3
Height Reqd.
m
1.59
Dead Storage
Height
m
1.5
Tank Height
m
10.34
Free Board
5% of Height
m
0.517
Total Tank
Height
m
10.857
Total Tank
Volume
m3
1227.9267
Diameter of sphere =
Area of sphere =
Design density =
Theoritical water reqd =
Sprayer
Disch.
angle
70
80
90
100
110
120
125
5
4
3
2
No. of
drops
Nos.
10
10
12
12
14
14
16
16
18
20
20
24
24
24
24
28
28
28
6.93
7.94
9
9.91
10.92
12
13
14
14.92
15.91
16.92
18
18.9
19.84
21
21.82
22.83
23.84
6.37
7.45
8.79
9.17
10.25
11.7
12.65
13.67
14.31
15.19
16.24
17.56
18.05
18.53
20.39
20.3
21.42
22.53
5.05
6.36
8.12
7.47
8.76
10.76
11.53
12.65
12.99
13.62
14.78
16.16
16.22
15.57
18.44
16.85
18.29
19.64
1.7
4.23
6.86
3.65
5.86
8.96
9.38
10.72
10.71
10.85
12.28
13.52
13
9.55
14.64
9.57
12.15
14.24
5.05
6.36
4.56
7.47
8.76
5.55
5
7.21
6.54
5.23
7.77
8.55
6.59
15.57
6.15
16.85
18.29
19.64
6.37
7.45
6.86
9.17
10.25
8.96
9.38
10.72
10.71
10.85
12.28
13.52
13
18.53
14.64
20.3
21.42
22.53
6.93
7.94
8.12
9.91
10.92
10.76
11.53
12.65
12.99
13.62
14.78
16.16
16.22
19.84
18.44
21.82
22.83
23.84
From e
Number
9
10
8.79
11.7
12.65
13.67
14.31
15.19
16.24
17.56
18.05
20.39
14.92
15.91
16.92
18.9
11
12
7 7
8 8
9 9
7 7
8 8
9 9
9 8
9 9
10 10
9 9
10 10
9 9
10 9
8 7
8 8
8 7
8 8
9 8
Equator
9
8
7
6
FOR ODD NO.OF BANDS
2
4
7
3
4
7
6
7
7
6
7
7
7
4
6
3
4
5
2
4
5
3
4
4
3
5
7
3
5
4
3
4
2
3
4
5
5 7 7
7 8 8
5 7 8
6 7 7
7 8 8
4 7 8
3 6 8
5 7 8
9 10 10
3 6 8
5 7 9
4 7 8
3 7 8
6 7 8
2 6 7
6 7 8
7 8 8
7 8 9
9
8
9
10
9
10
9
9
8
10
9
10
10
11
12
Density =
Sprayers Sprayers Sprayers
No. of
for legs flanges etc. prod. Pipes sprayers
Nos.
10
4
5
61
10
4
5
73
12
4
5
88
12
4
5
67
14
8
5
81
14
8
5
92
16
8
5
88
16
8
5
96
18
8
5
123
20
8
5
103
20
8
5
115
24
8
5
102
24
8
5
111
24
8
5
87
24
8
5
91
28
8
5
89
28
8
5
95
28
8
5
99
10.2
Water
reqd.
lpm
1728
2255
2850
3523
4264
5071
5958
6912
7933
9021
10188
11422
12723
14104
15540
17066
18648
20308
lpm/m2
Flow on
K-factor Act.flow on Total flow Add for prod.
Total flow
each noz. selected. each noz. on nozzles piping & losses
lpm
lpm
lpm
lpm
lpm
28.33
24
30.76
1876.58
187.66
2064.24
30.89
37
43.78
3195.87
319.59
3515.45
32.39
38
44.96
3956.67
395.67
4352.34
52.58
62
73.36
4915.08
491.51
5406.59
52.64
62
73.36
5942.11
594.21
6536.32
55.12
65
76.91
7075.63
707.56
7783.19
67.70
80
94.66
8329.84
832.98
9162.82
72.00
85
100.57
9655.04
965.50
10620.55
64.50
76
89.92
11060.70
1106.07
12166.77
87.58
104
123.05
12674.61
1267.46
13942.07
88.59
105
124.24
14287.33
1428.73
15716.07
111.98
132
156.18
15930.82
1593.08
17523.90
114.62
136
160.92
17861.83
1786.18
19648.01
162.11
192
227.18
19764.44
1976.44
21740.88
170.77
202
239.01
21749.88
2174.99
23924.86
191.75
227
268.59
23904.51
2390.45
26294.96
196.29
232
274.51
26078.08
2607.81
28685.89
205.13
243
287.52
28464.63
2846.46
31311.09
---------------------
---------
Petroleum Refineries
Petroleum Depots
LPG Bottling Plants
Port Oil Terminals
Small Bottling Plants
Safety Practices during Construction
Storage & Handling of LNG
424
lpm
Expansion ratio =
Hence, capacity of generator =
900
381.6
m3/min
No. of Generators =
Foam solution reqd. =
Foam concentrate reqd. =
Hence for 2.5min operation time foam conc. Reqd. =
Storage as per NFPA for 15 minutes =
17
7208
216.24
540.6
3243.6
lpm
lpm
Litres
Litres
Design Density =
10.2
Size of vessel :
Height =
3.6
Dia =
60
Shell Area = 678.58
Roof type = Conical
Roof area = Conical
Water reqd. = 6921.516
Spray
Angle
No.of
Rings
2
Length of
bay
3.6
Dia of
vessel
60
Area of
shell
678.58
lpm/m2
m
m
m2
lpm
No. of
nozzles
152
Flow
on
Water
each
reqd. nozzle
6921.52 45.536
KR
38
KA
65
150 - 1No.
Flow on
each
nozzle Total flow
76.91
11690.32
150 - 1No.
2.25
69.96
DESIGN OF HORIZONTAL
lpm/m2
m
m
m2
lpm
Flow
Flow
No.of
on
on
Water Spray
each
each Total
reqd. nozzles nozzle KR KA nozzle flow
10.2 713.6
12
59.466 50 50 59.16 710
Density
Area
Width
0.4
No.of No.of
Rows Feeds
Length
Sprayer
angle
Size of Vessel :
Design
10.2
Density =
Length = 8.43
Dia. = 2.25
Surface Area = 69.96
Water reqd. = 713.59
N OF HORIZONTAL TANKS
Density
Flow
Produ No.of
No.of
on
Cumm.
ct pipe Spray
Water projector
each Total Actual
length nozzles
reqd. Nozzles KA nozzle flow
flow
15
5
10.2 153
32 37.86
0
724.92
DV reqd. =
80 - 1No.
Total No. of spray nozzles reqd.=
#REF!
27 18
387.5
lpm/m2
m
m
m2
lpm
Water
No.of
Flow
Flow
reqd. for Reverse
on
on
roof
action
each
each
cooling Nozzles nozzle KR KA nozzle
3 1162.5
54
21.528 18 30 35.5
1917
Water
No.of
reqd. for normal
bottom
action
cooling Nozzles
6742.5
54
Flow
on
each
nozzle
124.86
Flow
on
Cumm.
each
Actual
flow
KR
KA nozzle
106 106 125.42 6773 8689.7
DV reqd. = 150 - 1No.
Total No. of spray nozzles reqd.= 108
Total flow
25
15.5
387.5
7905
Total flow
20.4
lpm/m2
Density
Area
Width
Length
lpm/m2
Length of bay =
Width of bay =
Area of bay =
No.of bays =
Total area =
Water reqd. =
15
5.5
82.5
8
660
1980
m
m
m2
10.2
lpm/m2
m2
lpm
Size of Tanker :
Length of Tanker = 8.43 m
Dia. of Tanker = 2.25 m
Surface Area = 559.71 m2
Approx. Surface area of tyres =
72.38
m2
1980
80
24.75
21 30
35.5
2840 2.25
8.43
560
10.2
5709
KA
Flow
on
each Total
nozzle flow
224 41 48.51
Area
of
tyres
10866 72.38
Density
660
Water
reqd.
No.of
Nozzles
Density
Density
lpm/m2
15
Area
Area m2
No.of
Flow
Flow
Reverse
on
on
action
each
each Total
Nozzles nozzle KR KA nozzle flow
Tanker
Length
Width m
Water
reqd.
lpm
Tanker
dia
No.of
Bays
Length m
10.2
Flow
No.of
on
Cumm.
Water projector
each Total Actual
reqd. Nozzles KA nozzle flow
flow
738.3
64
32 37.86
2423
16129
45
3.5
BAR
84.19
LPM
IFIC PRESSURE
NOZZLE ANGLE =
HENCE =
DIST. FROM SURFACE 'A' =
HENCE HORIZONTALL
DISTANCE COVERED BY
NOZZLE '2B' =
SPRAY COVERAGE
120
1.047198
60
0.65
1.047198
2.25
B
A
TAN = B/A
B = TAN * A
Horizontal dist. Covered by nozzle I =
Radius of tank R =
d=
Central Angle in radians =
Curved length covered by nozzle S =
2.25
4
3.84
0.57
2.28
DOC NO:
REV:
DATE:
Type of
Fittings
Fittings eqlt
(m)
26.40
7E ,1BV, 1AV
34.52
PRESSURE AVAILABLE AT
BASEMENT -2
BASEMENT -1
G .FLOOR
1st FLOOR
2nd FLOOR
3rd FLOOR
4th FLOOR
5th FLOOR
6th FLOOR
7th FLOOR
section
Nozzle
flow(lpm)
Pipe flow
(lpm)
1000.00
1000.00
1000.00
1000.00
1000.00
1000.00
1000.00
1000.00
1000.00
1000.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
150.00
10.00
37.00
42.55
48.15
52.10
56.20
60.25
64.30
68.35
72.40
4E,1 T,1 BV
11E,1 T,1 BV
11 E,1 T,1 BV
11 E,1 T,1 BV
11 E,1 T,1 BV
11 E,1 T,1 BV
11 E,1 T,1 BV
11 E,1 T,1 BV
11 E,1 T,1 BV
11 E,1 T,1 BV
26.99
47.99
47.99
47.99
47.99
47.99
47.99
47.99
47.99
47.99
1000.00
1000.00
1000.00
80.00
100.00
150.00
12.20
18.00
26.27
0.00
1Red.
1Red.+2 T
0.00
6.10
25.83
1000.00
1000.00
1000.00
80.00
100.00
150.00
6.10
12.20
7.77
1Red.+1 T
1Red.
1Red.+2 T+1E
9.50
6.10
28.83
1000.00
1000.00
1000.00
80.00
100.00
150.00
11.30
19.20
3.00
I E,
1Red.
2T
3.00
6.10
17.22
FOURTH FLOOR
DESIGN POINT A
A-B
B-C
C-D
1000.00
DESIGN POINT E
E-F
F-G
G-D
1000.00
DESIGN POINT H
H-I
I-J
J-D
1000.00
PROJECT
CIENT
OWNER'S CONSULTANT
PACKAGE
CONTRACTOR
CONTRACT NO
DATE
MD/BC/SIL/I/PS
10/2/2003
60.47
79.07
7.72
28.57
32.86
37.18
40.23
43.40
46.52
49.65
52.78
55.90
20.84
37.06
37.06
37.06
37.06
37.06
37.06
37.06
37.06
37.06
201.18
100.13
20.28
0.00
33.93
19.94
100.59
67.86
6.00
186.34
106.80
2.32
Elev. Loss
(mb)
Velocity
(m/sec)
8800.00
8660.45
1.70
8481.89
8084.83
7525.54
6961.22
6563.17
6150.00
5741.87
5333.75
4925.62
4517.49
0.94
0.94
0.94
0.94
0.94
0.94
0.94
0.94
0.94
0.94
0.00
0.00
0.00
1500.00
1701.18
1835.23
1875.46
3.32
2.12
0.94
156.66
33.93
22.26
0.00
0.00
0.00
1500.00
1757.24
1859.04
1887.30
3.32
2.12
0.94
49.47
33.93
13.30
0.00
0.00
0.00
1500.00
1735.81
1876.54
1892.15
3.32
2.12
0.94
150.00
510.00
1065.00
1625.00
2020.00
2430.00
2835.00
3240.00
3645.00
4050.00
178.56
575.63
1134.91
1699.24
2097.29
2510.45
2918.58
3326.71
3734.83
4142.96
28.56
65.63
69.91
74.24
77.29
80.45
83.58
86.71
89.83
92.96
DT.09/01/2002
:
:
AMITABH GODE
CALCULATION FOR ORIFICE PLATES
g=9.81 m/sec2
Sr. No.of
Reference Nodes Pressure Pressure Differential Pipe
No. Hydrants From
To
Available Required Pressure
Size
P1
P2
P1-P2
m
m
m
m
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
5
1
2
4
4
2
4
2
2
3
1
1
3
3
1
1
39
COMPANY
DESIGNER
CLIENT
PROJECT
203
201
205
206
208
214
213
213
212
212
217
218
211
210
216
209
204
205
206
207
206
215
214
215
210
217
218
219
203
211
208
210
77.97
78.16
77.69
77.31
77.29
77.18
77.1
77.07
76.82
76.23
75.87
76.15
77.47
76.99
77.22
77.08
70
70
70
70
70
70
70
70
70
70
70
70
70
70
70
70
7.97
8.16
7.69
7.31
7.29
7.18
7.1
7.07
6.82
6.23
5.87
6.15
7.47
6.99
7.22
7.08
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
Pipe
Area
Flow Remark
m2
Q
m3/sec
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
m2
0.0004
0.0004
0.0004
0.0004
0.0004
0.0004
0.0004
0.0004
0.0004
0.0004
0.0004
0.0004
0.0004
0.0004
0.0004
0.0004
:
:
:
:
Orifice
area
0.0027
0.0026
0.0027
0.0028
0.0028
0.0028
0.0028
0.0028
0.0029
0.0030
0.0031
0.0030
0.0028
0.0028
0.0028
0.0028
DT.09/01/2002
JOB NO.
:
008/2001-02/WR
C=0.65
SYSTEM
:
CALCULATION FOR ORIFICE PLATES REQUIRED FOR SPRAY SYSTEM
g=9.81 m/sec2
Sr. No.of
Reference Nodes Pressure Pressure Differential Pipe Pipe Flow Remark
No. Tappings From
To
Available Required Pressure
Size Area
P1
P2
P1-P2
Q
m
m
m
m
m2 m3/sec
Orifice
area
m2
1
2
3
4
2
2
216
206
208
216
207
206
77.22
77.31
77.29
36.2
36.2
36.2
41.02
41.11
41.09
0.2
0.2
0.2
0.0044
0.0044
0.0044
216
216
77.22
73.46
3.76
0.2
0.013
5
6
7
8
1
1
1
3
217
218
219
212
217
218
219
210
75.82
75.92
76.39
76.82
37.42
37.42
37.42
37.42
38.4
38.5
38.97
39.4
0.2
0.2
0.2
0.2
0.031
0.031
0.031
0.031
0.066
0.066
0.066
0.066
0.00436
0.00436
0.00436
0.00436
0.004
0.004
0.004
0.004
9
10
11
1
1
1
217
218
219
217
218
219
75.82
75.92
76.39
71.68
71.68
71.68
4.14
4.24
4.71
0.1
0.1
0.1
0.008 0.014
0.008 0.014
0.008 0.014
0.0002
0.0002
0.0002
0.0026
0.0026
0.0024
12
13
2
2
214
214
215
215
77.18
77.18
70.15
72.33
7.03
4.85
0.0054
0.0036
14
15
1
1
27
209
210
77.08
209
210
77.08
NOS.OF ORIFICE PLATES
27.43
26.3
49.65
50.78
0.0057
0.0029
DT.09/01/2002
Orifice
Dia
"d"
m
0.0586
0.0575
0.0586
0.0597
0.0597
0.0597
0.0597
0.0597
0.0608
0.0618
0.0628
0.0618
0.0597
0.0597
0.0597
0.0597
0.6
0.6
4
5
6
7
0.36
0.36
16
25
36
49
DT.09/01/2002
Orifice REMARK
Dia
"d"
m
FOR MVWSS
0.0748 WEST OF HSD
0.0748 NORTH OF HSD
0.0748 SOUTH OF HSD
FOR FOAM
0.1287 WEST OF HSD
FOR MVWSS
0.0714 SOUTH OF MS
0.0714 SOUTH OF MS
0.0714 SOUTH OF MS
0.0714 NORTH OF MS
FOR FOAM
0.0575 SOUTH OF MS
0.0575 SOUTH OF MS
0.0553 SOUTH OF MS
FOR FOAM
0.0829 EAST OF SKO
0.0677 EAST OF SKO
FOR MVWSS
0.0852 WEST OF TLF
0.0608 WEST OF TLF
636
636
MM
MTRS Elbow Tee
FOAM MAKER OF 636 LPM CAP.HAVING
MIN PRESSURE AT REMOTE FOA
636
100
101
80
14.4
1
11
STATIC LOSS THRU. 14.4M HT.
636
101
102
80
30
1
11
1272
102
103
150
80
33
1272
LOSSES THROUGH VENTURY ( INLINE INDUCTOR)
1272 LOSSES THROUGH GATE VALVE 150 DIA.
TOTAL FLOW REQD. AT TAPPING POINT NEAR HYDRANT MAINS FOR TANK NO. T-01-02 A / B
HARACTERISTICS
DT. 12/10/01
250 250
1.52E-07
200 200
4.4E-07
150 150
0.0000019
100 100
0.0000134
80 80
0.0000492
65 65
0.00011
50 50
0.000402
40 40
0.00132
32 32
0.00286
25 25
0.0118
MTRS
Mbars
RESSURE AT REMOTE FOAM MAKER
25.4
7.557
HT.
41
7.557
113
NE INDUCTOR)
4
O. T-01-02 A / B
1.052
Mbars
191.95
1440.00
309.84
118.88
2168.85
1.052
4.208
1272
LPM @ BARS
MINIMUM
PRESSURE
REQD.
Mbars
3000.00
3191.95
4631.95
4941.78
4941.78
5060.66
5060.66
7229.52
7233.72
7233.72
29
327.43
6470
6469.7
129
130
250
63.6
66.6
2743
1.7 700.0
Mbars PRESSURE
813.6
2742.65
2742.65
CLIENT:
PROJECT: FIRE PROTECTION SYSTEM FOR
ORDER NO :
DATE :
CASE I
1
2
3
4
CASE II
5
6
7
8
SKO
0
0
0
0
DYKE 2 - FOR TANK NOS. 5,6,7 & 8 NO FIRE WATER SPRAY SYSTEM IS ENVISAGED
ADD FOAM QTY FOR TANK ON FIRE
TOTAL WATER DEMAND
FR
MS
A
28 15
1320
3
3960
237.6
0
3
0
0
0
3
0
0
FOAM DAM WIDTH CONSIDERED 800 MM
5
5
5
5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4
4
2
2
0.00
0.00
0
0
0
68
12
816
0
0
792
0
0
48
0
0
0.00
0.00
0.00
4
4
4
CASE III
9
10
11
CR
0
0.00
0.00
CASE V
CASE IV
DYKE 3 - TANK NOS. 9,10 & 11 FALL WITHIN R+30 FROM TANK ON FIRE HENCE TOTAL WATER DEMAND FOR THREE TANKS
ADD FOAM QTY FOR TANK ON FIRE
TOTAL WATER DEMAND
FOR TLF SHED THE TOTAL WATER REQUIRED FOR ONE BAY @ 600LPM ( 36 M3/HR)
TOTAL FLOW FOR 10 BAYS
ADD HOSE STREAM @ 288 M3/HR
TOTAL FLOW FOR TLF SHED INCLUDING HOSE STREAM
9
FR
MS
A
28 15
1320
3
3960
237.6
0
0
68
12
816
10
0
3
0
0
0
0
0
11
0
3
0
0
0
0
0
CONSIDERING SINKING OF 1 NO FLOATING ROOF TANK WITH FOAM DISCHARGE DENSITY OF 8.1LPM ON LIQUID SURFACE AREA
11 -A
FR
MS
A
28 15
1320
3
3960
238
615
8.1
4985
360
288
648
792
0
0
48
0
0
4836
290
DYKE 3 - TANK NOS. 9,10 & 11 FALL WITHIN R+30 FROM TANK ON FIRE HENCE TOTAL WATER DEMAND FOR THREE TANKS
NOTES :
ADD FOAM QTY FOR TANK ON FIRE WITTH SINKING CONDITION CONSIDERING 8.1 LPM FOAM SOLUTION ON LIQUID SUFACE AREA.
TOTAL WATER DEMAND
CR - CONE ROOF TANK
FR - FLOATING ROOF TANK
MAX . WIDTH OF FOAM DAM CONSIDERED - 800mm
0.00
0.00
0.00
4
4
4
4
0.00
290
290
COMPANY
DESIGNER
CLIENT
PROJECT
JOB NO.
SYSTEM
NOZZLE
NO.
34
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
TOTAL FLOW
226
227
200
1
RING
AT
2222
2315
78
15
6
3.184
19.104
2245 M bars PRESSURE
2244.54
2244.54
93
238.17
2483
1140.00
3623