Sie sind auf Seite 1von 7

E-302B LEAKAGE RECTIFICATION

Activity
ID

Activity
Description

T&T

FAUJI FERTILIZER COMPANY LTD. MM

(REV5)
SUBT

SUB2

SECT

2
28
29
30
31
6 12 18 0 6 12 18 0 6 12 18 0 6 12 18 0

Plnd
Dur

Early
Start

Early
Finish

Total
Float

93

27MAR13 08:00

31MAR13 04:59

Subtotal

40

27MAR13 08:00

28MAR13 23:59

32

SD

32

Subtotal

40

27MAR13 08:00

28MAR13 23:59

32

SD

32

27
6 12 18 0

E-302B LEAKAGE RECTIFICATION


Total

PLANT SHUTDOWN
HANDOVER ACTIVITES

1000

FEED CUTOFF

27MAR13 08:00

SD

1010

HANDOVER OF E-302 B

12

27MAR13 08:00

27MAR13 19:59

SD

1015

HANDOVER FOR TIE-INS OF K-212

20

27MAR13 08:00

28MAR13 03:59

SD

1020

HANDOVER OF FURNACE

40

27MAR13 08:00

28MAR13 23:59

10

SD

1025

HANDOVER OF K-431

27MAR13 08:00

27MAR13 15:59

44

SD

1028

HANDOVER OF TK-431

18

27MAR13 08:00

28MAR13 01:59

54

SD

1030

HANDOVER OF TK/K-441

16

27MAR13 08:00

27MAR13 23:59

56

SD

1040

HANDOVER OF K-101

27MAR13 08:00

27MAR13 11:59

17

SD

17

1050

HANDOVER OF V-113

27MAR13 08:00

27MAR13 10:59

42

SD

42

1060

HANDOVER OF 06-TRC-1V/2V

18

27MAR13 08:00

28MAR13 01:59

SD

Subtotal

16

28MAR13 02:00

28MAR13 17:59

06TRC

EM

Subtotal

16

28MAR13 02:00

28MAR13 17:59

06TRC

EM

1
2
10
44
54
56

UTILITY PLANT
EQUIPMENT MAINTENANCE
REPLACEMENT OF 06-TRC-1V/2V BFW VALVES

2130

Cutting of old valves spool of 06-TRC-1V

28MAR13 02:00

28MAR13 03:59

06TRC

EM

2140

Cutting of old valves spool of 06-TRC-2V

28MAR13 04:00

28MAR13 05:59

06TRC

EM

2150

Reclaimation of fall facea for welding

28MAR13 06:00

28MAR13 09:59

06TRC

EM

2160

Welding of new valves spool of 06-TRC-1V

28MAR13 10:00

28MAR13 13:59

06TRC

EM

2170

Welding of new valves spool of 06-TRC-2V

28MAR13 14:00

28MAR13 17:59

06TRC

EM

2180

JOB COMPLETED (06-TRC-1V/V2)

28MAR13 17:59

06TRC

EM

0
0
0
0

AMMONIA PLANT
EQUIPMENT MAINTENANCE
E-302B TUBE LEAKAGE RECTIFICATION
Subtotal

24

27MAR13 20:00

28MAR13 19:59

57

E302B

EM

57

Subtotal

24

27MAR13 20:00

28MAR13 19:59

57

E302B

EM

57

E302B

EM

E302B

EM

2000

JOB START (E-302B))

27MAR13 20:00

2010

OPENING OF HEAD FLANGES

27MAR13 20:00

28MAR13 00:59

1
1

1
6 12 18

E-302B LEAKAGE RECTIFICATION


Activity
ID

Activity
Description

Plnd
Dur

Early
Start

Early
Finish

Total
Float

T&T

FAUJI FERTILIZER COMPANY LTD. MM

(REV5)
SUBT

SUB2

SECT

2
27
28
29
30
31
6 12 18 0 6 12 18 0 6 12 18 0 6 12 18 0 6 12 18 0
1

2020

RIGGING OF HEAD FLANGES

28MAR13 01:00

28MAR13 01:59

E302B

EM

2030

INSTALLATION OF TEST RINGS

28MAR13 02:00

28MAR13 03:59

E302B

EM

2040

OPENING OF SHELL SIDE FLANGES

27MAR13 20:00

27MAR13 21:59

79

E302B

EM

2050

INSTALLATION OF BLINDS

27MAR13 20:00

27MAR13 23:59

77

E302B

EM

2060

INSTALLATION OF LEAK TEST ASSEMBLY

27MAR13 20:00

27MAR13 20:59

80

E302B

EM

2065

SOAP FILM TEST

28MAR13 04:00

28MAR13 06:59

E302B

EM

2070

BOROSCOPY OF LEAKING TUBE

28MAR13 07:00

28MAR13 08:59

E302B

EM

2080

WELDING /PLUGING OF LEAK TUBES & DPT (02 EA)

28MAR13 09:00

28MAR13 11:59

E302B

EM

2090

LEAK TEST

28MAR13 12:00

28MAR13 12:59

E302B

EM

2100

TEST RING REMOVAL

28MAR13 13:00

28MAR13 13:59

E302B

EM

2110

BOXUP

28MAR13 14:00

28MAR13 19:59

E302B

EM

2120

JOB COMPLETED (E-302B)

28MAR13 19:59

E302B

EM

EM

1
79
77
80
1
1

1
1

K-212 TIE IN OF NG LINE


Subtotal

20

28MAR13 04:00

28MAR13 23:59

53

K212

10

28MAR13 04:00

28MAR13 13:59

63

K212

TIEIN

EM

53

TIE - IN FOR INLET LINE


Subtotal

63

4500

JOB START(K-212)

28MAR13 04:00

K212

TIEIN

EM

4520

CUTTING OF EXISTING LINE &SHIFTING

28MAR13 04:00

28MAR13 05:59

63

K212

TIEIN

EM

63

4530

OPENING OF EXISTING OUTLET LINE FLANGE FROM V250

28MAR13 04:00

28MAR13 05:59

63

K212

TIEIN

EM

63

4540

INSTALLATION OF NEW FABRICATED SPOOL AT V-250

28MAR13 06:00

28MAR13 06:59

63

K212

TIEIN

EM

63

4550

BEVELLING OF DAI. 8'' PIPE

28MAR13 07:00

28MAR13 07:59

63

K212

TIEIN

EM

63

4560

TACKING OF NEW PIPE SPOOL WITH EXISTING LINE

28MAR13 08:00

28MAR13 08:59

63

K212

TIEIN

EM

63

4570

ROOT AND HOT PASS

28MAR13 09:00

28MAR13 10:59

63

K212

TIEIN

EM

63

4580

COOLING & DPT OF JOINT

28MAR13 11:00

28MAR13 11:59

63

K212

TIEIN

EM

63

4590

FILLING & CAPPING

28MAR13 12:00

28MAR13 13:59

63

K212

TIEIN

EM

20

28MAR13 04:00

28MAR13 23:59

K212

TIEINO

EM

63

TIE- IN FOR OUTLET LINE


Subtotal
4600

CUTTING OF EXISTING DIA 8'' LINE & SHIFTING

28MAR13 04:00

28MAR13 05:59

K212

TIEINO

EM

4610

BEVELLING OF DIA. 8'' LINE

28MAR13 06:00

28MAR13 07:59

K212

TIEINO

EM

4620

TACKING OF NEW SPOOL WITH EXISTING LINE

28MAR13 08:00

28MAR13 09:59

K212

TIEINO

EM

4630

ROOT & HOT PASS

28MAR13 10:00

28MAR13 13:59

K212

TIEINO

EM

4640

COOLING & DPT

28MAR13 14:00

28MAR13 15:59

K212

TIEINO

EM

4650

FILLING & CAPPING

28MAR13 16:00

28MAR13 21:59

K212

TIEINO

EM

4655

RT OF ANY JOINT

28MAR13 22:00

28MAR13 23:59

K212

TIEINO

EM

4660

JOB COMPLETED (K-212)

28MAR13 23:59

K212

TIEINO

EM

2
2
2
2
2
2
2
2
2

F-201 RADIANT CHMABER ROOF REPAIR


Subtotal

12

29MAR13 00:00

29MAR13 11:59

10

F201

EM

10

Subtotal

12

29MAR13 00:00

29MAR13 11:59

10

F201

EM

10

10

F201

EM

10

F201

EM

4670

JOB START (F-201)

29MAR13 00:00

4680

S/F INSTALLATION

29MAR13 00:00

29MAR13 05:59

10
10

1
6 12 18

E-302B LEAKAGE RECTIFICATION


Activity
ID

Activity
Description

Plnd
Dur

Early
Start

Early
Finish

Total
Float

T&T

FAUJI FERTILIZER COMPANY LTD. MM

(REV5)
SUBT

SUB2

SECT

4690

REPAIR OF ROOF

29MAR13 06:00

29MAR13 09:59

10

F201

EM

4700

S/F REMOVAL

29MAR13 10:00

29MAR13 11:59

10

F201

EM

4710

JOB COMPLETED(F-201)

29MAR13 11:59

10

F201

EM

2
28
29
30
31
6 12 18 0 6 12 18 0 6 12 18 0 6 12 18 0
10

27
6 12 18 0

10
10

MACHINERY MAINTENANCE
K-431 INSP OF XT-303 BEARING
Subtotal

17

27MAR13 16:00

28MAR13 08:59

68

K-431

MACH

68

Subtotal

17

27MAR13 16:00

28MAR13 08:59

68

K-431

MACH

68

2650

JOB START (K-431)

27MAR13 16:00

44

K-431

MACH

44

2660

COUPLING REMOVAL

27MAR13 16:00

27MAR13 17:59

68

K-431

MACH

68

2670

PROBE REMOVAL

27MAR13 18:00

27MAR13 18:59

68

K-431

MACH

68

2680

BEARING COVER REMOVAL

27MAR13 19:00

27MAR13 19:59

68

K-431

MACH

68

2690

THRUST BEARING INSPECTION

27MAR13 20:00

28MAR13 00:59

68

K-431

MACH

2700

ROTOR CENTERING/PROBE INSTALLATION

28MAR13 01:00

28MAR13 05:59

68

K-431

MACH

68

2710

BEARING COVER INSTALLATION

28MAR13 06:00

28MAR13 06:59

68

K-431

MACH

68

2720

COUPLING INSTALLATION

28MAR13 07:00

28MAR13 08:59

68

K-431

MACH

2730

XT-303 JOB COMPLETE

28MAR13 08:59

68

K-431

MACH

68

68
68

TK-431, INSPECTION OF XT-305 BEARING


Subtotal

31

28MAR13 02:00

29MAR13 08:59

44

TK-431

MACH

44

Subtotal

31

28MAR13 02:00

29MAR13 08:59

44

TK-431

MACH

44

2740

XT-305,JOB START

28MAR13 02:00

44

TK-431

MACH

44

2750

PROBE REMOVAL

28MAR13 02:00

28MAR13 02:59

44

TK-431

MACH

44

2760

COUPLING COVER REMOVAL

28MAR13 03:00

28MAR13 03:59

44

TK-431

MACH

44

2770

COUPLING REMOVAL & INSPECTION

28MAR13 04:00

28MAR13 05:59

44

TK-431

MACH

2780

BEARING COVER REMOVAL

28MAR13 06:00

28MAR13 07:59

44

TK-431

MACH

2790

THRUST BEARING REMOVAL & INSPECTION

28MAR13 08:00

28MAR13 11:59

44

TK-431

MACH

2800

REMOVAL OF OIL RETAINING RING

28MAR13 12:00

28MAR13 15:59

44

TK-431

MACH

2810

OIL RETAINING RING INSTALLATION

28MAR13 16:00

28MAR13 19:59

44

TK-431

MACH

2820

THRUST BEARING INSTALLATION & ROTOR CENTERING

28MAR13 20:00

29MAR13 01:59

44

TK-431

MACH

2830

BEARING COVER INSTALLATION

29MAR13 02:00

29MAR13 04:59

44

TK-431

MACH

2840

COUPLING INSTALLATION

29MAR13 05:00

29MAR13 06:59

44

TK-431

MACH

44

2850

COUPLING COVER INSTALLATION

29MAR13 07:00

29MAR13 07:59

44

TK-431

MACH

44

2860

PROBES INSTALLATION

29MAR13 08:00

29MAR13 08:59

44

TK-431

MACH

2870

JOB COMPLETED (K-431)

29MAR13 08:59

44

TK-431

MACH

44
44
44
44
44
44
44

44
44

TK/K 441 COUPLING INSPECTION


Subtotal

21

28MAR13 02:00

28MAR13 22:59

54

K441

MACH

Subtotal

21

28MAR13 02:00

28MAR13 22:59

54

K441

MACH

28MAR13 02:00

54

K441

MACH

3000

JOB START (TK/K-441)

54

54
54

1
6 12 18

E-302B LEAKAGE RECTIFICATION

FAUJI FERTILIZER COMPANY LTD. MM

(REV5)

3005

REMOVAL OF VT-452 & VT-401

28MAR13 02:00

28MAR13 03:59

54

K441

MACH

2
28
29
30
31
6 12 18 0 6 12 18 0 6 12 18 0 6 12 18 0
54

3010

REMOVAL OF COUPLING COVER

28MAR13 04:00

28MAR13 04:59

54

K441

MACH

54

3020

REMOVAL OF BEARING COVER VT-452 & VT-401

28MAR13 05:00

28MAR13 06:59

54

K441

MACH

3030

CHECK COUPLING FLOAT

28MAR13 07:00

28MAR13 07:59

54

K441

MACH

3040

REMOVAL OF COUPLING SPACER

28MAR13 08:00

28MAR13 09:59

54

K441

MACH

3050

CLEANING & INSPECTION OF COUPLING

28MAR13 10:00

28MAR13 13:59

54

K441

MACH

3060

INSTALLATION OF COUPLING & CHECK COUPLING FLOAT

28MAR13 14:00

28MAR13 15:59

54

K441

MACH

3070

INSTALLATION OF BEARING COVER VT-452

28MAR13 16:00

28MAR13 17:59

54

K441

MACH

3080

INSTALLATION OF BEARING COVER VT-401

28MAR13 18:00

28MAR13 19:59

54

K441

MACH

3090

INSTALLATION OF COUPLING COVER

28MAR13 20:00

28MAR13 20:59

54

K441

MACH

3100

INSTALLATION OF VT-452 & VT-401

28MAR13 21:00

28MAR13 22:59

54

K441

MACH

3110

JOB COMPLETED (TK/K-441)

28MAR13 22:59

54

K441

MACH

EM

Activity
ID

Activity
Description

Plnd
Dur

Early
Start

Early
Finish

Total
Float

T&T

SUBT

SUB2

SECT

27
6 12 18 0

54
54
54
54
54
54
54
54
54
54

UREA PLANT
EQUIPMENT MAINTENANCE
V-113 REPLACEMENT
Subtotal

48

27MAR13 11:00

29MAR13 10:59

42

V113

11

27MAR13 11:00

27MAR13 21:59

79

V113

DIS

EM

42

V113

DIS

EM

42

42

DISMANTLING
Subtotal

79

1400

JOB START (V-113)

27MAR13 11:00

1401

01-LC-30 Tx & CONTROLLER INSTT. TUBING REMOVAL

27MAR13 11:00

27MAR13 11:59

87

V113

DIS

EM

87

27MAR13 12:00

27MAR13 12:59

87

V113

DIS

EM

87

27MAR13 13:00

27MAR13 13:59

87

V113

DIS

EM

87

27MAR13 12:59

88

V113

DIS

EM

88
42

1402
1403

01-LC-30 VALVE INSTREUMENT TUBING REMOVAL


REMOVAL OF HLA-29 & LLA-30

1405

OPENING OF INLET LINE FLANGE

27MAR13 11:00

1410

OPENING OF OUTLET LINE FLANGE

27MAR13 11:00

27MAR13 12:59

42

V113

DIS

EM

27MAR13 13:00

27MAR13 14:59

80

V113

DIS

EM

27MAR13 15:00

27MAR13 16:59

80

V113

DIS

EM

27MAR13 17:00

27MAR13 20:59

80

V113

DIS

EM

27MAR13 16:59

84

V113

DIS

EM

84

1420
1430
1432

REMOVAL OF GLG/TRANSMITTER
REMOVAL OF PSV LINE
PSV-34 MAINTENANCE / CALIBRATION

80
80
80

1450

REMOVAL OF DRAIN LINE /LC-30

27MAR13 15:00

1460

CUTTING OF 1/2'' KW LINE

27MAR13 15:00

27MAR13 16:59

84

V113

DIS

EM

84

27MAR13 13:00

27MAR13 16:59

42

V113

DIS

EM

42

27MAR13 17:00

27MAR13 19:59

42

V113

DIS

EM

27MAR13 20:00

27MAR13 21:59

42

V113

DIS

EM

42

27MAR13 17:00

27MAR13 20:59

80

V113

DIS

EM

80

12

27MAR13 22:00

28MAR13 09:59

42

V113

R&S

EM

1470
1475
1500
1505

OPENING OF HEAD FLANGE E-122 TO V-113


REMOVAL OF CABLE & CABLE TRAY
REMOVAL OF SCAFFOLDING
SHOP CALIBRATION OF LEVEL Tx & CONTROLLER

42

RIGGING & SHIFTING


Subtotal
1510

RIGGING TO GROUND

27MAR13 22:00

28MAR13 03:59

42

V113

R&S

EM

1520

RIGGING OF NEW VESSEL TO POSITION

28MAR13 04:00

28MAR13 09:59

42

V113

R&S

EM

28MAR13 10:00

28MAR13 15:59

42

V113

F&I

EM

42
42
42

FITTING & INSTALLATION


Subtotal
1530

ERRECTION OF SCAFFOLDING

28MAR13 10:00

28MAR13 11:59

42

V113

F&I

EM

1540

FITTING OF HEAD FLANGE E-122 TO V-113

28MAR13 12:00

28MAR13 13:59

42

V113

F&I

EM

42
42
42

1
6 12 18

E-302B LEAKAGE RECTIFICATION


Activity
ID

Activity
Description

FAUJI FERTILIZER COMPANY LTD. MM

(REV5)

Plnd
Dur

Early
Start

Early
Finish

Total
Float

T&T

SUBT

SUB2

SECT

1550

FITUP OF INLET NOZZLE

28MAR13 14:00

28MAR13 14:59

42

V113

F&I

EM

1560

FITUP OF OUTLET NOZZLE

28MAR13 14:00

28MAR13 15:59

42

V113

F&I

EM

19

28MAR13 16:00

29MAR13 10:59

42

V113

OD6

EM

27
6 12 18 0

2
28
29
30
31
6 12 18 0 6 12 18 0 6 12 18 0 6 12 18 0
42
42

OUTLINE DIA 6''(37A) PER JOINT


Subtotal

42

1570

MARKING & CUTTING OF DIA 6'' OUTLINE

28MAR13 16:00

28MAR13 18:59

42

V113

OD6

EM

1580

BEVELLING OF JOINT

28MAR13 19:00

28MAR13 21:59

42

V113

OD6

EM

1590

ALIGNMENT & TACKING

28MAR13 22:00

29MAR13 01:59

42

V113

OD6

EM

1600

ROOT & HOT PASS

29MAR13 02:00

29MAR13 03:59

42

V113

OD6

EM

42

1610

DPT

29MAR13 04:00

29MAR13 04:59

42

V113

OD6

EM

42

1620

FILLING & CAPPING

29MAR13 07:00

29MAR13 08:59

42

V113

OD6

EM

1630

RT OF JOINT

29MAR13 09:00

29MAR13 10:59

42

V113

OD6

EM

1640

MAKING & CUTTING OF DIA 3'' PSV-34 LINE

28MAR13 16:00

28MAR13 17:59

44

V113

OD6

EM

1650

BEVELLING OF JOINT

28MAR13 18:00

28MAR13 19:59

44

V113

OD6

EM

1660

ALIGNMENT & TACKING

28MAR13 20:00

28MAR13 22:59

44

V113

OD6

EM

1670

ROOT & HOT PASS

28MAR13 23:00

28MAR13 23:59

44

V113

OD6

EM

44

1680

DPT

29MAR13 00:00

29MAR13 00:59

44

V113

OD6

EM

44

1690

FILLING & CAPPING

29MAR13 01:00

29MAR13 02:59

44

V113

OD6

EM

1695

RT OF JOINT

29MAR13 03:00

29MAR13 04:59

44

V113

OD6

EM

1700

REPAIR. IF ANY

29MAR13 05:00

29MAR13 08:59

44

V113

OD6

EM

44

29MAR13 02:00

29MAR13 09:59

43

V113

INST

EM

43

42
42
42

42
42
44
44
44

44
44

INSTALLATION
Subtotal
1710

FITUP OF GLG /LEVEL TRANSMITTER

29MAR13 02:00

29MAR13 02:59

43

V113

INST

EM

1712

INSTALLATION OF CONTROLLER

29MAR13 03:00

29MAR13 04:59

46

V113

INST

EM

1714

INSTALLATION OF HLA-29 & LLA-30

29MAR13 05:00

29MAR13 06:59

46

V113

INST

EM

46

1716

CABLE TRAY LAYING & DRESSING

29MAR13 03:00

29MAR13 06:59

43

V113

INST

EM

43

1718

CONTROLLER & TX TUBING

29MAR13 07:00

29MAR13 09:59

43

V113

INST

EM

1719

VALVE TUBING

29MAR13 07:00

29MAR13 09:59

43

V113

INST

EM

1720

INSTALLATION OF DRAIN LINE/LC-30

29MAR13 03:00

29MAR13 03:59

49

V113

INST

EM

49

1730

INSTALLATION OF KW LINE

29MAR13 03:00

29MAR13 03:59

49

V113

INST

EM

49

1740

JOB COMPLETED (V-113)

29MAR13 09:59

43

V113

INST

EM

43
46

43
43

43

MACHINERY MAINTENANCE
K-101, 2BCL 306A BALANCE DRUM SEAL REPLACEMENT
Subtotal

60

27MAR13 12:00

29MAR13 23:59

29

K101

MACH

29

Subtotal

60

27MAR13 12:00

29MAR13 23:59

29

K101

MACH

29

1100

INSERT BLIND & REMOVE AUXILIARY PIPING

27MAR13 12:00

27MAR13 13:59

17

K101

MACH

17

1130

REMOVE COUPLING & BEARING COVERS

27MAR13 12:00

27MAR13 13:59

17

K101

MACH

17

1140

REMOVE XTs & VTs

27MAR13 14:00

27MAR13 15:59

17

K101

MACH

1150

CHECK ROTOR FLOAT & REMOVE BEARINGS

27MAR13 16:00

27MAR13 17:59

17

K101

MACH

1160

REMOVE THRUST COLLAR

27MAR13 18:00

27MAR13 18:59

17

K101

MACH

1170

REMOVE HEAD FLANGE

27MAR13 19:00

27MAR13 20:59

17

K101

MACH

17
17
17
17

1
6 12 18

E-302B LEAKAGE RECTIFICATION


Activity
ID

Activity
Description

Plnd
Dur

Early
Start

Early
Finish

Total
Float

T&T

FAUJI FERTILIZER COMPANY LTD. MM

(REV5)
SUBT

SUB2

SECT

2
27
28
29
30
31
6 12 18 0 6 12 18 0 6 12 18 0 6 12 18 0 6 12 18 0
17

1180

REMOVE BUNDLE

27MAR13 21:00

27MAR13 23:59

17

K101

MACH

1181

DISMANTLING OF BARREL

28MAR13 00:00

28MAR13 00:59

17

K101

MACH

1182

CLEARANCE CHECK WITH OLD ROTOR

28MAR13 01:00

28MAR13 01:59

17

K101

MACH

17

1183

INSTALLATION OF NEW ROTOR

28MAR13 02:00

28MAR13 02:59

17

K101

MACH

17

1184

MEASUREMENT OF SEAL CLEARANCE

28MAR13 03:00

28MAR13 04:59

17

K101

MACH

17

1185

MACHINING OF SEALS AS PER REQUIREMENT

28MAR13 05:00

28MAR13 05:59

17

K101

MACH

17

1186

INSTALLATION OF ROTOR

28MAR13 06:00

28MAR13 06:59

17

K101

MACH

17

1187

MEASUREMENT OF CLEARANCE

28MAR13 07:00

28MAR13 09:59

17

K101

MACH

1188

BARREL BOX-UP

28MAR13 10:00

28MAR13 11:59

17

K101

MACH

1190

REPLACEMENT OF SEALS

28MAR13 12:00

28MAR13 14:59

17

K101

MACH

17

1200

INSTALL FLAT RING ON THE BUNDLE

28MAR13 12:00

28MAR13 13:59

63

K101

MACH

63

1230

INSERT BUNDLE

28MAR13 15:00

28MAR13 17:59

17

K101

MACH

1240

FIT HEAD FLANGE

28MAR13 18:00

28MAR13 20:59

17

K101

MACH

1270

INSTALL JOURNAL BEARINGS

28MAR13 21:00

28MAR13 22:59

17

K101

MACH

1275

CHECK ROTOR FLOAT

28MAR13 23:00

28MAR13 23:59

17

K101

MACH

1290

INSTALL THRUST COLLAR & BEARING

29MAR13 00:00

29MAR13 02:59

17

K101

MACH

1300

INSTALL XTs & VTs

29MAR13 03:00

29MAR13 04:59

17

K101

MACH

1310

FIT COUPLING

29MAR13 05:00

29MAR13 08:59

17

K101

MACH

1315

FIT BEARING COVERS

29MAR13 09:00

29MAR13 10:59

17

K101

MACH

1320

BOX-UP AUXILIARY PIPING

29MAR13 11:00

29MAR13 12:59

17

K101

MACH

1325

ALIGNMENT

11

29MAR13 13:00

29MAR13 23:59

17

K101

MACH

1330

JOB COMPLETED (K-101)

29MAR13 23:59

17

K101

MACH

17

17
17

17
17
17
17
17
17
17
17
17
17
17

STARTUP ACTIVITIES
STARUP OF UTILITIES PLANT
Subtotal

10

28MAR13 18:00

29MAR13 03:59

STUTY

ST

Subtotal

10

28MAR13 18:00

29MAR13 03:59

STUTY

ST

28MAR13 19:59

STUTY

ST

1515

BFW STATRUP

28MAR13 18:00

1525

STARUP OF B-602

28MAR13 20:00

29MAR13 03:59

STUTY

ST

Subtotal

53

28MAR13 20:00

31MAR13 00:59

STAMM

ST

Subtotal

53

28MAR13 20:00

31MAR13 00:59

STAMM

ST

0
0

STARTUP AMMONIA

3500

BLOWING

20

29MAR13 00:00

29MAR13 19:59

STAMM

ST

3503

F-201 STARTUP

18

29MAR13 20:00

30MAR13 13:59

STAMM

ST

3505

BENFIELD SOLUTION FEEDING/PRESS/CIRCULATION

28MAR13 20:00

29MAR13 02:59

STAMM

ST

3510

PASSIVATION

36

29MAR13 04:00

30MAR13 15:59

STAMM

ST

3520

VENT SHIFTING

30MAR13 16:00

30MAR13 16:59

STAMM

ST

3525

CO2 PRODUCTION

30MAR13 16:59

STAMM

ST

3528

BACKEND STARTUP

31MAR13 00:59

STAMM

ST

30MAR13 17:00

2
2
1

0
4

1
6 12 18

E-302B LEAKAGE RECTIFICATION


Activity
ID
3530

Activity
Description
AMMONIA PRODUCTION

Plnd
Dur

Early
Start

FAUJI FERTILIZER COMPANY LTD. MM

(REV5)

Early
Finish

Total
Float

T&T

SUBT

SUB2

SECT

31MAR13 00:59

STAMM

ST

27
6 12 18 0

2
28
29
30
31
6 12 18 0 6 12 18 0 6 12 18 0 6 12 18 0
4

STARTUP OF UREA PLANT


Subtotal

12

30MAR13 17:00

31MAR13 04:59

STUREA

ST

Subtotal

12

30MAR13 17:00

31MAR13 04:59

STUREA

ST

1440

COMPRESSOR STARTUP

30MAR13 17:00

30MAR13 20:59

STUREA

ST

1480

AMMONIATION

30MAR13 21:00

31MAR13 00:59

STUREA

ST

1490

FEED AND PRILLING

31MAR13 01:00

31MAR13 04:59

STUREA

ST

1495

UREA PRODUCTION

31MAR13 04:59

STUREA

ST

0
0
0
0

1
6 12 18